﻿ES0" 
Fiscal Year 2000
(I October 19 - 30 eptmbr200 
Part 2 of 2 
* @6* e~g I * *6*II 
I, i~i~;~ I~(B 
0 ~ Sl 

TABLE OF CONTENTS 
Chapter 
Northwestern Division 
Omaha, NE, District 
Kansas City, MO, District 
Portland, OR, District 
Seattle, WA, District 
Walla Walla, WA, District 
Pacific Ocean Division 
Honolulu, HI, District 
Alaska District 
South Pacific Division 
Los Angeles, CA, District 
San Francisco, CA, District 
Sacramento, CA, District ... 
California Debris Commission 
Albuquerque, NM, District ... 
Southwestern Division 
Little Rock, AR, District 
Tulsa, OK, District 
Fort Worth, TX, District 
Galveston, TX, District 
M ississippi River Com m ission ............................................ 
Engineer Research and Development Center .................................. 
W ater Resources Support Center ............................. .......... 
Permanent International Association 
of Navigation Congresses ....... .............................. 
International Boundary Water Boards .................. ................... 
Investigation of Projects Under Federal Power Act ........................ 
Regulatory, Sunken Vessel Removal and 
National Emergency Preparedness ................ ......... ..... .. 
Natural Disaster Preparedness, Response and 
Recovery Activities .............. ...... ... 
26-1 
27-1 
28-1 
29-1 
30-1 
31-1 
32-1 
33-1 
34-1 
35-1 
35-1-A 
36-1 
37-1 
38-1 
39-1 
40-1 
41-1 
42-1 
43-1 
44-1 
45-1 
46-1 
47-1 
48-1 
.. . . . . . . . . . . . . . . . . . . . . . . . . . . . 
. . . . . . . . . . . . . . I 
. . . . . . . . . . . . 
. . . . . . . . . . .. . . . . . . . . . 
~ 
~ ~rr 
+

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Chapter 
Appendices 
Flood Control Reservoirs Operable ..................................... .. A-I 
Flood Control Reservoirs Constructed or Contributed to by Corps 
of Engineers but Operated by Others ........................... ........... A-26 
Flood Control Projects Under Construction .................................. B-1 
Beach Erosion Control Projects Under Construction ...................... ... B-16 
Environmental Restoration Projects Under Construction ................... ..... B-19 
Navigation Locks and DamsOperable ...................................... C-1 
Navigation Project Under Construction ..................................... D-l 
Multiple-Purpose Projects Including Power Operable .......................... E-1 
Multiple-Purpose Projects Including Power Under Construction .................. F-1 
Flood Damages Suffered and Prevented ..................................... G-1 
Index I-1 
ii
OMAHA, NE, DISTRICT* 
This district comprises portions of Montana, Wyoming, North Dakota, South Dakota, Minnesota, Colorado, 
Nebraska, Iowa, and Missouri, all embraced in the drainage basin of the Missouri River along the mainstem and 
tributaries to Rulo, NE. 
IMPROVEMENTS 
Navigation 
1. Missouri River, Sioux City, IA 
to Rulo, NE 
2 Navigation Work Under Special 
Authorization 
Page 
26-3 
26-3 
Flood Control 
3 Aberdeen and Vicinity, SD 
4 Bear Creek Lake, CO 
5. Big Sioux River & Skunk Creek, 
Sioux Falls, SD 
6. Bowman-Haley Lake, ND 
7. Buford Trenton Irrigation District, ND 
8. Chatfield Lake, CO 
9. Cherry Creek Lake, CO 
10. Fall River Basin, SD 
11. Logan Creek, Pender, NE 
12. Milk River, Malta, MT 
13. Missouri National Recreational 
River, NE and SD 
14. Missouri River, Kenslers Bend, 
NE to Sioux City, IA 
15. Nishnabotna River, Hamburg, IA 
16. Papillion Creek and Tributaries 
Lakes, NE 
17. Pebble Creek, Scribner, NE 
18. Perry Creek, IA 
19. Pick-Sloan Missouri River Basin 
Program (Omaha District) 
20. Pipestem Lake, ND 
21 Salt Creek & Tributaries, NE 
22. South Platte River Basin, CO 
23. Thurman to Hamburg, IA 
24. Van Bibber Creek, CO 
25. Wood River, Grand Island, NE 
26. Inspection of Completed Flood 
Control Works 
27. Scheduling Flood Control 
Reservoir Operations 
28. Flood Control Activities Under 
Special Authorization 
26-3 
26-4 
26-4 
26-4 
26-4 
26-5 
26-5 
26-5 
26-6 
26-6 
26-6 
26-7 
26-7 
26-7 
26-7 
26-8 
26-8 
26-8 
26-9 
26-9 
26-9 
26-9 
26-9 
26-10 
26-10 
26-10 
Environmental 
29. Boyer Chute, NE 
30. California Bend, NE 
31. Cheyenne River Sioux Tribe 
32. Hidden Lake/Great Marsh, NE 
33. Lower Decatur, NE 
34. Missouri River Fish & Wildlife 
Mitigation, IA, NE, KS, & ND 
35. Nathan's Lake 
36 Wehrspann Lake Aquatic 
Multiple Purpose Projects 
Including Power 
37. Big Bend Dam-Lake Sharpe, 
Missouri River Basin, SD 
38 Fort Peck Lake, MT 
39. Fort Randall Dam-Lake Francis 
Case, Missouri River Basin, SD 
40. Garrision Dam Major Rehabilitation, 
Lake Sakakawea, ND 
41. Garrison Dam-Lake Sakakawea, 
Missouri River Basin, ND 
42. Gavins Point Dam-Lewis and 
Clark Lake, Missouri River 
Basin, NE and SD 
43. Oahe Dam-Lake Oahe, Missouri 
River Basin, SD and ND 
44. Missouri River Between Ft. Peck 
Dam, MT and Gavins Point Dam, 
SD & NE 
45. Pierre, SD 
Miscellaneous 
46. Missouri River Master Water 
Control Manual Review and 
Update 
26-1 
Page 
26-1 1 
26-11 
26-12 
26-12 
26-12 
26-13 
26-13 
26-13 
26-14 
26-14 
26-15 
26-15 
26-15 
26-16 
26-16 
26-16 
26-17 
26-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Miscellaneous (continued) Page 
47. National Emergency Preparedness 
(NEPP) 26-18 
48. Flood Control and Coastal 
Emergency (FC&CE) 26-18 
49. General Regulatory Functions 26-18 
50. General Investigations 
(See Table 26-K) 26-18 
Tables 
26-A Cost and Financial Statement 26-19 
26-B Authorizing Legislation 26-26 
26-C Other Authorized Navigation 
Projects 26-32 
26-D Not Applicable 
26-E Other Authorized Flood Control 
Projects 26-33 
26-F Other Multiple Purpose Projects 
Including Power 26-35 
26-G Deauthorized Projects 26-36 
26-H Missouri River Levee System 
Sioux City, IA to Rulo, NE 26-38 
26-I Pick-Sloan Missouri River Basin 
Program 26-39 
26-J Missouri River Levee System, 
Sioux City, IA to Rulo, NE 26-40 
26-K Active General Investigations 26-44 
26-L Flood Control Activities 
Under Special Authorization 26-46 
26-M Environmental 26-47 
26-2

OMAHA, NE, DISTRICT 
Navigation 
1. MISSOURI RIVER, SIOUX CITY, IA 
TO MOUTH (SIOUX CITY, IA 
TO RULO, NE) 
Location. Channel of the Missouri River extending 
from Sioux City, IA to Rulo, NE. 
Previous Projects. For details see page 1893, Annual 
Report for 1915, and page 1175, Annual Report for 1938. 
Existing Project. A navigation channel of 9-foot 
depth and width not less than 300 feet, obtained by revetment 
of banks, rock dikes to contract and stabilize waterway, 
cutoffs to eliminate long bends. closing minor channels, 
and removal of snags and dredging as required. 
Construction was initiated on this section of the project 
(Sioux City to Rulo) in FY 1928, the bank stabilization 
work was completed in April 1979, and the navigation 
feature was completed in September 1980. A reliable channel 
suitable for navigation is available through this section. 
Controlling depth at ordinary stages of the river is 9 feet, 
with additional depths available during high stages. 
Commercial navigation was inaugurated on this section in 
May 1939, and common carrier transportation service was 
inaugurated in October 1946. Seven riverside recreation 
sites are complete and in operation. (See Table 26-A for 
total cost of construction.) 
Local Cooperation. Requirements are described in 
full on page 26-2 of FY 1988 Annual Report. 
Terminal Facilities. Terminal facilities for loading 
and unloading grain, liquids and dry bulk products are 
maintained by private interests at various locations on this 
section of the river. A complete list of terminal facilities is 
included in the Missouri River navigation maps and can be 
obtained from the Omaha District for a small fee. 
Operations During FY. District personnel accomplished 
channel reconnaissance, surveys and mapping, 
engineering and design, surveys and layouts of construction, 
and supervision and administration. Local interests operate 
and maintain the recreation sites. Government Hired Labor 
Forces completed maintenance, which consisted of placing 
stone on damaged structures and placing structure markers 
to aid navigation. 
2. NAVIGATION WORK UNDER SPECIAL 
AUTHORIZATION 
Small Navigation Projects Not Specifically Authorized 
by Congress (Sec. 107 of the River and Harbor 
Act of 1960, as amended, Public Law 645, 86th Congress). 
No work during the period. 
Flood Control 
3. ABERDEEN, SD 
Location. This project is in the Moccasin Creek 
subbasin in the city of Aberdeen, Brown County, South 
Dakota. Aberdeen is located in the James River Valley in 
the northeast quarter of South Dakota. 
Existing Project. The selected alternative is a 100- 
year event levee 2.9 miles long on the northeast side of 
Aberdeen that will prevent 49 percent of the average annual 
flood damages to structures and contents in that area. The 
proposed levee will essentially block existing drainage to 
Moccasin Creek, and a combination of culverts with gates 
and detention ponds were incorporated into the design to 
mitigate this interior drainage problem. A two-foot road 
raise at Fairgrounds Road is also included. 
Local Cooperation. Section 205, Flood Control Act 
of 1948, as amended applies. The city of Aberdeen and 
Brown County is paying the local share of the project. 
Operations During FY. Preparation of the plans and 
specifications were completed for Phase II construction. 
The Phase I construction contract to construct a 1.4 mile 
long earth fill levee on the northeast side of Aberdeen was 
completed this FY with final inspection on November 11, 
1999. Advertisement and award of Phase II will occur once 
necessary Real Estate interests have been obtained. 
4. BEAR CREEK LAKE, CO 
Location. The dam site is on Bear Creek in Jefferson 
County, CO, about 8 miles above the confluence of Bear 
Creek with the South Platte River at Denver. 
26-3 
~_ __ __~_

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Existing Project. Earthfill dam 180 feet high, with a 
crest length of about 5,300 feet; and a supplementary 
earthfill dike with a height of 65 feet and a crest length of 
2,100 feet, to the south of the main dam, and an 
uncontrolled earth and rock-cut emergency spillway. The 
lake provides storage capacity of 28,831 acre-feet for flood 
control and 1,979 acre-feet for sediment and recreation. 
Construction of the project was initiated in October 1973 
and was completed in September 1982, exclusive of 
recreation facilities. (See Table 26-A for total cost of 
construction.) 
Local Cooperation. Requirements are described in 
full on page 21-3 of FY 1981 Annual Report. 
Operations During FY. Maintenance: Continued 
routine operation and maintenance activities. 
5. BIG SIOUX RIVER AND SKUNK CREEK, 
SIOUX FALLS, SOUTH DAKOTA 
Location. Sioux Falls is located on a large bend of the 
Big Sioux River and at the confluence with Skunk Creek 
in the south half of Minnehaha County in southeastern 
South Dakota. 
Existing Project. The project builds upon an existing 
project. It consists of raising an existing levee from the 
diversion dam to the upstream tie-off, raising the 
diversion channel levee, modifying the chute and stilling 
basin, raising the diversion dam, raising the levees on 
Skunk Creek, raising big Sioux levees downstream of 
Skunk Creek, and providing for bnridge improvements. 
Local Cooperation. This project is authorized under 
Section 101 of the Water Resources Development Act of 
1996. The Project Cooperation Agreement (PCA) with 
the city of Sioux Falls to sponsor the Big Sioux River 
project was executed on 14 August 2000. The current 
non-Federal cost estimate is $10, 150,000. The current 
Federal cost estimate is $30,450,000, for a total project 
cost of $40,600,000. 
Operations During FY. Planning, engineering and 
design was completed this FY and construction phase 
activities initiated. The solicitation for bid on Phase IA for 
the first portion of the modifications to the existing 
reinforced concrete chute and stilling basin structures and 
associated sub-drain system was issued on 8 September 
2000 for award in October of 2000. 
6. BOWMAN-HALEY LAKE, ND 
Location. The dam site is on North Fork of Grand 
River in southwestern North Dakota, about 6 miles above 
Haley, ND. 
Existing Project. An earth-fill dam 79 feet high, with 
a crest length of 5,730 feet, and a reservoir with a flood 
storage capacity of about 72,700 acre-feet, plus 19,780 
acre-feet for sediment storage, fish and wildlife 
conservation, recreation, and future water supply for 
communities of Bowman, Reeder, Scranton, and Gascoyne, 
ND. Construction was initiated in July 1964, and the 
project was completed in 1970. (See Table 26-A for total 
cost of construction.) 
Local Cooperation. Requirements are described in 
full on page 26-2 of FY 1988 Annual Report. 
Operations During FY. Maintenance: Continued 
routine operation and maintenance activities. 
7. BUFORD TRENTON IRRIGATION 
DISTRICT, ND (LAND ACQUISITION) 
Location. The Buford Trenton Irrigation District 
(BTID) is located in the flood plain along the left (north) 
bank of the Missouri River near its confluence with the 
Yellowstone River, in Williams County near Williston, ND. 
Existing Project. The project consists of the 
acquisition of permanent flowage and saturation easements 
within and surrounding the BTID for land that has been 
affected by rising ground water and the risk of surface 
flooding. There are approximately 70 affected landowners 
and 90 tracts. Approximately 10,000 acres are irrigable 
and 1,750 non-irrigable. Acquisition of easements and 
relocation assistance under P. L. 91-646 began in FY 1998. 
Estimated project cost is $40,129,000. 
Location Cooperation. The project is authorized 
under Section 336(a) of the Water Resources Development 
Act of 1996, P. L. 104-303. Local cooperation is not 
applicable. 
Operations During FY. This FY, fifteen easements 
were purchased totaling $5,505,000 with associated costs. 
26-4

OMAHA, NE, DISTRICT 
Appraisal of existing tracts will continue into FY 2001 
along with the purchase of additional easements. 
8. CHATFIELD LAKE, CO 
Location. A dam site on the South Platte River, just 
below the mouth of Plum Creek, about eight miles upstream 
from Denver, CO. 
Existing Project. Consists of rolled earth-fill dam 
with a maximum height of 148 feet and a crest length of 
12,500 feet; a reservoir with flood control capacity of 
204,737 acre-feet and sediment capacity of 26,692 acrefeet, 
which will be used for recreation; and an enlarged 
channel from the dam downstream to Denver to 
accommodate reservoir flood releases. 
The Corps participated with local interests in acquisition of 
lands and development of recreation facilities immediately 
downstream of the Chatfield Dam in lieu of a portion of the 
channel improvement. Construction of the project was 
initiated in August 1967 and was physically completed in 
1992. (See Table 26-A for total cost of construction.) 
Local Cooperation. Requirements are described in 
full on page 26-3 of FY 1993 Annual Report. 
Operations During FY. Maintenance: Continued 
routine operation and maintenance activities. 
9. CHERRY CREEK LAKE, CO 
Location. A dam site on Cherry Creek in Arapahoe 
County, CO, approximately 6 miles southeast of Denver, 
CO, just outside of city limits. Cherry Creek joins South 
Platte River within city limits of Denver, 
Existing Project. A rolled earth-fill dam with 
maximum height of 141 feet above streambed and a crest 
length of 14,300 feet. Project includes a reinforced concrete 
outlet works and an uncontrolled side channel spillway 
canal discharging into adjacent Toll Gate Creek. Cherry 
Creek project provides reservoir storage capacity of 93,920 
acre-feet below spillway canal invert and, in addition, a 
surcharge storage of 134,470 acre-feet. Plan of operation 
in ultimate development for multiple-purpose uses includes 
13,960 acre-feet for sediment storage and 79,960 acre-feet 
for conservation purposes. Construction began in FY 1946 
and was completed in June 1961, exclusive of recreation 
facilities. (See Table 26-A for total cost of construction.) 
Local Cooperation. None required except for 
recreation cost sharing. 
Operations During FY. Maintenance: Continued 
routine operation and maintenance activities. 
10. FALL RIVER BASIN, SD 
Location. In Custer and Fall River Counties, in and 
near the town of Hot Springs, SD. Hot Springs unit is in the 
town of Hot Springs, immediately south of the junction of 
Cold Brook and Hot Brook which combine to form the Fall 
River. Cold Brook Lake unit is approximately 1.25 miles 
north of the town of Hot Springs on Cold Brook, and 
Cottonwood Springs Lake unit is approximately 4.5 miles 
west of the town of Hot Springs on Cottonwood Springs 
Creek, one-half mile upstream from its confluence with Hot 
Brook. 
Existing Project. The general plan of improvement 
provides flood protection for Hot Springs, SD. The Hot 
Springs channel improvement unit consisted of widening, 
deepening and straightening 6,000 feet of channel of Fall 
River. The Cold Brook Lake unit, an earth-fill dam with 
appurtenant structures, controls an area of 70.5 square 
miles. The Cottonwood Springs Lake unit consists of an 
earth-fill dam with appurtenant structures and controls an 
area of 26 square miles. Construction of Hot Springs unit 
was completed during FY 1951. Construction of Cold 
Brook unit dam and appurtenances was completed in FY 
1953 with the exception of a road and parking area, which 
were completed in FY 1955. Construction of the 
Cottonwood Springs Dam was completed in FY 1970, with 
the exception of the recreation facilities, which were 
completed in FY 1972. (See Table 26-A for total cost of 
construction.) 
Local Cooperation. Local cooperation requirements 
have been fully complied with. 
Operations During FY. Maintenance: Routine 
operation and maintenance activities were continued on the 
Cottonwood Springs and Cold Brook Dams and structures. 
11. LOGAN CREEK, PENDER, NE 
Location. This project is located in northeastern NE, 
approximately 75 miles north-northwest of Omaha, NE. 
Pender is located along the right bank of Logan Creek, 
about midpoint in the Logan Creek basin. 
26-5 
_

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Existing Project. The selected plan is a combination 
levee and floodwall with a detention storage feature. It 
provides flood protection from Logan Creek as well as 
incidental benefit from Stage Creek flooding to the 
Village's residential and industrial area as well as its central 
business district. The levee extends approximately 15,000 
feet in length along the north, east, and south edge of the 
community, averaging 10 feet in height. 
Local Cooperation. Section 205, Flood Control Act 
of 1948, as amended; Flood Damage Reduction applies. 
The Village of Pender is paying the local share of the 
project. 
Operations During FY. Construction was complete 
in September 2000 with final inspection on July 12, 1999. 
O&M Manuals, Real Estate Certification and project 
closeout are projected for completion in 2001. 
12. MILK RIVER, MALTA, MT 
Location. This project is located in Phillips County in 
North Central MT. The city of Malta is located approximately 
170 miles northeast of Great Falls, MT. 
Existing Project. The selected plan is a levee/floodwall 
constructed along the right bank of the Milk River to 
provide protection for the area immediately upstream from 
the Burlington Northern Santa Fe Railroad (BNSF) bridge. 
The project consists of an earthen levee that is 1,800 ft in 
length, combined with a floodwall that extends 1,040 ft. 
The height of the levee ranges from 4 to 10 ft above natural 
ground along its entire length. The levee/tloodwall requires 
a tie-off with the existing BNSF grade on the downstream 
end. 
Local Cooperation. Section 205 of the Flood Control 
Act of 1948, as amended; Flood Damage Reduction applies. 
The city of Malta participated in the project's costsharing 
requirements utilizing a $176,500 grant from the State of 
MT combined with real estate interests of approximately 
$282,000. 
Operations During FY. Construction phase is 
essentially complete with remaining requirements directed 
toward project management, coordination with local 
sponsors and project closeout. 
13. MISSOURI NATIONAL RECREATIONAL 
RIVER, NE AND SD 
Location. On the Missouri River between Gavins 
Point Dam and Ponca State Park, NE. This includes Cedar 
and Dixon Counties in Nebraska, and Yankton, Clay, and 
Union Counties in South Dakota. 
Existing Project. The designation as a National 
Recreational River will preserve outstanding and important 
scenic values and will provide additional opportunities for 
river access and recreation use. The project provides 
erosion control, consisting of bank stabilization and river 
management techniques designed to preserve the existing 
environment, and at the same time preserves high bank 
flood plain lands. Estimated total cost of construction is 
$21,640,000 (1996) of which $21,000,000 is the Federal 
cost of construction and $640,000 is the non-Federal 
contributed funds. 
Local Cooperation. All recreational construction on 
this project will be done in accordance with the cost-sharing 
and financing concepts reflected in the Water Resources 
Development Act of 1986. A cost-sharing contract with the 
state of South Dakota for the Myron Grove access site was 
signed on June 24, 1986; and the Yankton-Riverside Park 
Section 215 Agreement was signed on April 24, 1989. 
Construction was completed in June 1987 and June 1991, 
respectively. 
Operations During FY. Construction for bank 
stabilization at Ponca State Park was completed with final 
inspection on March 17, 2000. Coordination and 
preparation of a Preliminary Restoration Plan for the Ponca 
Aquatic Habitat Restoration was completed. Evaluation 
and alternatives were provided for seven potential areas for 
streambank protection. A design agreement dated March 1, 
2000 was entered into with the Nebraska Game and Parks 
Commission for the construction of the Ponca Resource and 
Education Center for 50/50 costshared recreational 
development. 
14. MISSOURI RIVER, KENSLERS BEND, NE, 
TO SIOUX CITY, IA 
Location. Project is along Missouri River between 
Ponca Bend, NE, and combination bridge at Sioux City, IA. 
Existing Project. Construction of dikes, revetments 
26-6

OMAHA, NE, DISTRICT 
and channel improvement along Missouri River from 
Miners Bend and vicinity, SD and NE, to Sioux City, IA. 
Project was started in June 1946 and completed in June 
1961. (See Table 26-A for total costs.) 
Operations During FY. Routine operation and 
maintenance activities continued. 
15. NISHNABOTNA RIVER, HAMBURG, IA 
Location. This project, the Nishnabotna River and 
Main Ditch 6 at Hamburg, IA is located in Fremont County, 
40 miles south-southeast of Omaha, NE. 
Existing Project. The selected plan determined in the 
feasibility investigations is the construction of a levee 
approximately 8,300 ft in length along the left bank of Main 
Ditch No. 6. A range of economically feasible plans were 
identified from which the city of Hamburg selected and is 
supported by the Corps. A levee will be constructed along 
Main Ditch 6 with a levee top, referenced as the 911.0 
m.s.l. plan having an accedence equivalent to a 300-year 
event and a 46 percent reliability passing 500-year event. 
Selection of a levee height was constrained by the elevation 
of the Burlington Northern Santa Fe (BNSF) Railroad 
mainline tracks. The BNSF has raised its mainline track 
approximately 1.5 ft to accommodate the new levee. 
Local Cooperation. Section 205 of the Flood Control 
Act of 1948, as amended; Flood Damage Reduction applies. 
The city of Hamburg is participating in the project's costsharing 
requirements utilizing a Community Development 
Block Grant to help fund real estate interests of 
approximately $130,500 and cash contributions of 
$226,800. 
Operations During FY. Completion of construction 
contract occurred with final inspection in September 1999. 
Remaining requirements are directed toward project 
management coordination with local sponsors and project 
closeout. 
16. PAPILLION CREEK AND TRIBUTARIES 
LAKES, NE 
Location. The Papillion Creek basin is located in 
Washington, Douglas, and Sarpy Counties, NE. Big 
Papillion Creek rises west of Blair and flows south-easterly 
through metropolitan Omaha. It is joined by the Little 
Papillion Creek just above Offutt AFB, forming Papillion 
Creek. The combined creeks flow along the side of Offutt 
AFB to its confluence with the Missouri River. 
Existing Project. The project consists of a series of 
four dams and reservoirs, channel improvements, an 
effluent storage facility, and a flood warning system on 
tributaries of Papillion Creek. Construction was initiated in 
FY 1972. Completed projects include Standing Bear Lake, 
Glenn Cunningham Lake, and Wehrspann Lake. Estimated 
total costs for the project is $68,659,000 consisting of 
$64,334,000 in Federal funds ($1,367,000 to be reimbursed 
by the non-Federal sponsor) and $2,958,000 non-Federal 
other costs and cash contributions. 
Local Cooperation. Requirements are described in 
full on page 21-6 of FY 1981 Annual Report. 
Operations During FY. Construction was completed 
on recreation facilities at Ed Zorinsky Lake, and on the Big 
Papillion Creek Channel flood control project. The recreational 
facilities at Zorinsky Lake have been transferred to 
the City of Omaha for operations and maintenance. The Big 
Papillion Creek channel flood control project has been 
transferred to the Papio Natural Resource District for 
operation and maintenance. O&M manuals are being 
prepared. 
17. PEBBLE CREEK, SCRIBNER, NE 
Location. Scribner, NE, is located in Dodge County 
about 47 miles northwest of Omaha. Pebble Creek is a 
right-bank tributary to the Elkhorn River. 
Existing Project. The project includes a 3.6 mile-long 
levee along the Elkhorn River with a maximum height of 5 
ft(a modification to the original Pebble Creek project), one 
closure structure at U.S. HWY 275 at the northern edge of 
Scribner, and several ramps over the two levees. An 
automated flood warning system was installed that will 
allow adequate time to operate the closure structure. Both 
levees are completed which essentially is one ring levee that 
provides protection for the entire city of Scribner. 
Local Cooperation. The city of Scribner strongly 
supported the entire Pebble Creek levee project, including 
the Elkhorn River levee and its modification. The City 
obtained cost-sharing assistance from the Nebraska Natural 
Resources Commission and the Lower Elkhorn Natural 
Resources District. 
26-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Operations During FY. Construction of the Elkhorn 
River levee was initiated in March 1994 with the original 
contract being completed in December 1995. A modification 
to the Elkhom River levee was completed in July 1996. 
The total cost of the project was $3,232,000. The non- 
Federal portion of this totaled was $807,000 which includes 
$363,000 for lands, easements, and rights-of-way. Final 
audit and project closeout will occur in FY 2001. 
18. PERRY CREEK, IA 
Location. The Perry Creek basin is located in 
Woodbury and Plymouth Counties in northwestern Iowa. 
The downstream five miles of the basin lie within the 
corporate limits of Sioux City, IA, and drain the central 
portion of the city. 
Existing Project. The project consists of 14,800 
linear feet of grass and rock lined channel, 1,500 linear feet 
of new conduit, modification of 7 10 linear feet of existing 
conduit, and a concrete stilling basin, to provide capacity for 
the 100-year event. Also included are 4.25 miles of 
hiking/biking trail and a basin-wide flood warning system. 
Estimated project cost is $70,000,000, of which 
$45,400,000 is Federal cost and $24,600,000 is non- 
Federal cost. 
Local Cooperation. The project is authorized under 
the 1986 Water Resources Development Act. The city of 
Sioux City, IA, is the local sponsor. 
Operations During FY Relocation of the State of 
South Dakota's railroad bridge by the Burlington Northern 
and Santa Fe Railroad was completed in FY 00. 
Construction for Phases II and III remained ongoing. 
Design efforts for Phase IV award, scheduled for FY 01, 
were initiated. 
19. PICK-SLOAN MISSOURI BASIN PROGRAM 
(OMAHA DISTRICT) 
Location. Flood control improvements in this project 
are along the Missouri River and several of its pnncipal 
tributaries and in states comprising the Missouri River 
Basin. 
Existing Project. A general comprehensive plan for 
flood control and other purposes in the Missouri River 
Basin provides for levees along Missouri River between 
Sioux City, IA, and mouth and reservoirs on the Missouri 
River main stem and tributaries. See individual reports and 
Table 26-I for projects in the Omaha District included in the 
program. 
20. PIPESTEM LAKE, ND 
Location. On Pipestem Creek in Stutsman County, 
ND, three miles upstream from where Pipestem Creek joins 
the James River at Jamestown, ND. 
Existing Project. The project consists of a rolled 
earthfill dam approximately 108 feet high with a crest 
length of 4,000 feet and outlet works of a gated reinforced 
concrete conduit. The reservoir provides 146,880 acre-feet 
of storage. The multipurpose pool provides space for silt 
storage and 885 acres of water surface for fish, wildlife and 
recreation needs. Construction of the project was initiated 
in FY 1970 and completed in FY 1977. (See Table 26-A 
for total construction costs.) 
Local Cooperation. Requirements are described in 
full on page 26-6 of FY 1988 Annual Report. 
Operations During FY. Routine operation and 
maintenance activities continued. 
21. SALT CREEK AND TRIBUTARIES, NE 
Location. Salt Creek Basin comprises an area of about 
1,627 square miles in and around Lincoln in southeastern 
Nebraska. 
Existing Project. The authorized project consists of 
a system of 10 dams and reservoirs, channel clearing, 
enlarging and realignment, levees and necessary bridge 
alternations. Pursuant to Senate Resolution adopted August 
7, 1964, which authorized a review of the Salt Creek survey 
report, additional units were placed in "inactive" classification. 
Construction of the project began in the spring of 
1962. All work under the active portion of the project, 
consisting of the 10 dams and reservoirs and the channel 
improvements and levees through Lincoln, was completed 
in 1969. Funds were transferred to the project in FY 1980 
with concurrence of Congressional Committees. These 
funds were used to determine an effective method of 
correction for the dispersive clay problem in the completed 
26-8

OMAHA, NE, DISTRICT 
downstream levees through Lincoln. (See Table 26-A for 
total construction costs.) 
Local Cooperation. Requirements are descrinbed min 
full on page 26-6 of FY 1988 Annual Report. 
Operations During FY. Maintenance: Routine 
operation and maintenance activities continued. 
22. SOUTH PLATTE RIVER BASIN, CO 
Location. Flood control improvements in this project 
are along the South Platte River and its tributaries in 
Colorado. 
Existing Project. General plan for flood control and 
other purposes to provide for construction of Chatfield Lake 
on the South Platte River, Bear Creek Lake on Bear Creek, 
and levee and channel improvements on the South Platte 
River. (See individual reports and Table 26-B for authorizing 
legislation). 
23. THURMAN TO HAMBURG, IA 
Location. The project area is approximately I10 
square miles. It extends from Thurman, IA, on the north to 
the mouth of the Nishnabotna River on the south and from 
the Missouri River on the west to the bluffs on the east. 
Existing Project. The flood problem was caused by 
floodwaters backing up behind the existing levees when 
drainage structures are closed during high flows on these 
rivers. Two pump stations have been built to alleviate this 
flooding in the southern half of the study area. The cost 
through construction was $1,040,760 Federal and $346,921 
non-Federal. 
Local Cooperation. Fremont County, IA and five 
drainage districts were the cost-sharing sponsors. 
Operations During FY. The project was completed 
in April 1997. Final audit and project closeout are 
complete. 
24. VAN BIBBER CREEK, CO 
Location. Van Bibber Creek is a right bank tributary 
of Ralston Creek with the confluence in Arvada, CO. The 
potential project area includes approximately one mile of 
the downstream portion of the creek located partially in 
Arvada and partially in Jefferson County. 
Existing Project. The propoed project would include 
channel improvements including an underground conduit to 
convey Van Bibber Creek flood waters to Ralston Creek. 
Local Cooperation. Section 205, Flood Control Act 
of 1948, as amended, applies. 
Operations During FY. Plans and specifications 
activity for the FY consisted of sponsor acquisition of 
LERRD's and Project Cooperation Agreement review. 
Project coordination of remaining work is ongoing. 
25. WOOD RIVER, GRAND ISLAND, NE 
Location. This project is located in Hall County 
Nebraska, approximately midway between the city of 
Grand Island and Interstate 80. 
Existing Project. This project consists of a five-mile 
long diversion channel with levees on both sides. The 
channel will divert Wood River flood flows to the Platte 
River. The diversion structure will be located 
downstream from the Highway 281 bridge that crosses 
the Wood River. The diversion channel will begin at that 
point and run eastward to the Platte River. The current 
county and city bridges that cross the channels will be 
designed and constructed by the sponsor. One bridge for 
the Union Pacific Railroad will be constructed. In 
addition, a two-mile long tie-off levee and small diversion 
channel will be built west of highway 281 to prevent 
Wood River flood flows from spilling into the Warm 
slough basin nearby and outflanking the diversion 
channel. 
Local Cooperation. This project is authorized under the 
Water Resources Development Act (WRDA) of 1996, 
Section 101K modified by WRDA of 1999, Section 335. 
The Project Cooperation Agreement (PCA with the 
Central Platte Natural Resources District was executed on 
2 May 2000. The current non-Federal cost estimate is 
$4,134,000. The current Federal cost estimate is 
$10,698,000, for a total project cost of $14,832,000. 
Operations During FY. Developed Federal Emergency 
Management Agency (FEMA) flood plain 
mapping for the west end of the project and coordinated 
with the sponsor on real estate acquisition. The Railroad 
26-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Relocation Contract with the Union Pacific Railroad was 
executed on 1 1 February 2000 with railroad bridge 
design completed during the FY. 
26. INSPECTION OF COMPLETED FLOOD 
CONTROL WORKS 
Flood Control Act of June 22, 1936, and subsequent 
acts require local interests to furnish assurances that they 
will maintain and operate certain local protection projects 
after completion, in accordance with regulations prescribed 
by Secretary of the Army. District Engineers are responsible 
for administration of these regulations within the boundaries 
of their respective districts. 
Inspections of completed local protection projects 
which have been turned over to local interests for 
maintenance and operation during the FY are set forth in 
Table 26-J, Inspections of Completed Local Protection 
Projects. FY 2000 costs were $160,371. 
27. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
Under Sections 7 and 9, Flood Control Act of 
December 22, 1944, the Corps of Engineers is responsible 
for detailed scheduling of operations involving storage 
capacity reserved for or assigned to flood control in 
reservoirs constructed by the Bureau of Reclamation as well 
as those constructed by the Corps of Engineers. Costs for 
FY 2000 were $348,525; and total through September 30, 
2000 were $9,762,415. 
28. FLOOD CONTROL ACTIVITIES UNDER 
SPECIAL AUTHORIZATION 
Emergency Response Activities - Repair, Flood 
Fighting and Rescue Work (Public Law 99, 84th Cong., 
and antecedent legislation.) 
On July 26, 1999 the Omaha District responded to the 
Governor of South Dakota's requests for assistance 
regarding a dangerous long term flooding situation for the 
community of Waubay, SD. Waubay is located in a 
closed basin region and rising lake levels were 
threatening the city's sanitary lift station #7. The district 
worked closely with State and Federal agencies to look at 
programs to protect the lift station. The Corp's Advance 
Measures program was the answer to the impending 
danger. The Advance Measures project consisted of 
constructing a concrete box structure around the lift 
station and a earthen berm to protect the lift station from 
rising lake levels and future ice related damages. Cost for 
the project was $32,485. Construction was completed on 
November 23, 1999. 
Two Federally constructed projects damaged by August 
1999 Flood Event have been repaired. The Federal 
projects were the Missouri River Levee Unit L-611-614 
tieback levee near Council Bluffs, IA, and the Little 
Papillion Creek channel project in Omaha, NE. Repair 
cost were $72,636 and $482,210 respectively. Repairs to 
Missouri River Levee Unit L-611-614 was completed 
December 20, 1999 and Little Papillion Creek August 
15, 2000. 
Operational Program Areas. FY costs as follows: 
Preparedness: 
All Hazards Planning Activities.............. $ 
All Hazards Training & Exercise.............. 
Facilities .............. . ............ .. ..... 
National Centers of Expertise .................... 
Emergency Operations: 
Response Operations .................... ..... 
After Action Report ............................. 
Post Flood Response ................... 
Acquisition of Supplies & Equipment........ 
Support From Others ................................... 
Rehabilitation of Flood Control Works: 
Rehab. Federal Flood Control Works.......... 
Rehab. Non-Federal Flood Control Works.. 
Shore Protection ....... ........ ..................... 
Field Investigations ..... .. .. ............. 
Inspections .................... ....... ................ 
Interagency Levee Activities..................... 
Advance Measures: 
Advance Measure Assistance .................... 
Field Investigations.......................... 
Hazard Mitigation (By State): 
Hazard Mitigation Team Activities............. 
424,441 
39,930 
27,845 
0 
223 
0
0 
0 
179,357 
621,216 
259 
0 
51,080 
40,563 
0 
542,756 
10,698 
O 
Small Flood Control Projects Not Specifically 
Authorized by Congress (Sec. 205,1948 Flood Control 
Act as amended, Public Law 858, 80th Cong., June 30, 
1948 as amended.) 
26-10

OMAHA, NE, DISTRICT 
Federal costs for FY 1999 were $203,454 for 
feasibility studies, $2,070,147 for plans and specifications 
and construction measures. See Table 26-L for detailed 
breakdown by project. 
Emergency Bank Protection (Sec. 14, 1946 Flood 
Control Act, Public Law 526,79th Cong., July 24, 1946 
as amended.) 
Operations under this heading were as follows: Federal 
costs for FY 1999 were O$fo r projects in the Planning and 
Design Analysis Phase and $262,613 for projects in the 
construction phase. See Table 26-L for detailed breakdown 
by project. 
Environmental 
29. BOYER CHUTE, NE 
Location. The side channel connecting river mile 
633.5 to 637.7 on the Missouri River in Washington 
County, NE, about 7 miles north of Omaha, NE. 
Existing Project. The project was constructed from 
October 1992 to April 1993. Its purpose is to restore flows 
from the Missouri River into an old river channel, Boyer 
Chute. This has restored fish breeding, brood rearing, 
resting and feeding habitat, and will benefit the riverine 
ecosystem as a whole. The part of the old channel that was 
previously filled with sediment and grown up in young trees 
was cleared of vegetation, and a pilot channel for new 
inflows was excavated through it. Soil excavated from the 
pilot channel was placed along the channel to be washed 
away by restored chute flows over time. A 180-foot wide 
notch in the upstream riverbank was constructed for new 
inflows, and the chute's old outlet at the downstream end 
was widened. The culvert crossing of a road across the 
chute was replaced by a bridge, which passes adequate 
flows to prevent backwater effects and sedimentation. The 
total cost of about $4,019,000 was 25 percent costshared by 
a non-Federal sponsor. 
Local Cooperation. Section 1135 of 1986 WRDA 
applies. The Papio-Missouri River Natural Resources 
District provided all needed cost-sharing, including real 
estate interests valued at approximately $1,033,000 and 
cash of about $82,000. 
Operations During FY. A final project inspection 
was performed on May 3, 1995; and the project was tumed 
over to the local sponsor. Interim financial closeout during 
final year of monitoring occurred during FY 2000. 
30. CALIFORNIA BEND, NE 
Location. The remnant river channel and floodplain 
land along river miles 648.5 - 650.0 along the Missouri 
River, in Washington County, about one mile east of Blair, 
NE. 
Existing Project. The project to be modified is the 
Missouri River Navigation and Bank Stabilization Project. 
The California Bend modification will restore river flows 
through the historic river channel adjacent to the navigation 
channel, to restore fish breeding, brood rearing, resting and 
feeding habitat, and to benefit the riverine ecosystem as a 
whole. The downstream end of a 1.5-mile long backwater 
will be enlarged to provide a permanent connection to the 
navigation channel, and about I mile of excavation will 
connect its upstream end to the river. This will create 
permanent flows through about 2.5 miles of channels. 
Some of the surrounding farmland will be restored to 
floodplain forest. Also several of the spur dikes along the 
navigation channel will be lowered to enable navigation 
flows to create shallow margins along the river. 
Local Cooperation. Section 1135 of 1986 WRDA 
applies. The Papio-Missouri River Natural Resources 
District is providing all needed cost-sharing, including real 
estate interests valued at approximately $367,000, and cash 
of about $699,000. 
Operations During FY. Plans and specifications and 
Sponsor acquisition of real estate interests were ongoing in 
FY 2000. 
31. CHEYENNE RIVER SIOUX TRIBE, LOWER 
BRULE SIOUX TRIBE, AND STATE OF SOUTH 
DAKOTA TERRESTRIAL WILDLIFE HABITAT 
RESTORATION 
Location. Generally lands located in the state of South 
Dakota and acquired by the Secretary of the Army for the 
implementation of the Pick-Sloan Missouri River Basin 
program. Lands to be transferred to the State are Corps 
land located above the top of the exclusive flood pool of 
the Oahe, Big Bend, Fort Randall and Gavins Point 
projects and located outside of the external boundaries of 
a reservation of an Indian Tribe. Lands to be transferred 
26-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
to the Secretary of the Interior are lands located above the 
top of the flood pool of the Big Bend and Oahe projects 
and located within the external boundaries of the 
reservation of the Cheyenne River Sioux Tribe and the 
Lower Brule Sioux Tribe. 
Existing Project. Review and submittal to congress of 
wildlife habitat restoration plans developed by the State 
and Indian Tribes. Accomplish the transfer of Corps of 
Engineers land to the State of South Dakota and the 
Department of Interior for the two Indian Tribes. 
Estimated total cost of the project is $108,000,000. 
Local Cooperation. This project has no cost-sharing 
sponsor. The entire project is being borne by the Federal 
government with no cost to either local or tribal 
governments or the affected state. Therefore, no Project 
Cooperation Agreements are required. Restoration of 
terrestrial wildlife habitat loss programs are being 
accomplished by the transferees through the use of grant 
instruments until ten years from date of enactment under 
which the trust funds established under project 
authorization are fully capitalized. 
Operations During FY. Coordination efforts with state 
and tribal entities were initiated to establish roles and 
responsibilities and to draft and implement grant 
agreements. Cultural resource preservation, cultural site 
protection and scoping of environmental impact statement 
efforts were performed. 
32. HIDDEN LAKE/GREAT MARSH, NE 
Location. A historic backwater adjacent to Missouri 
River miles 602.5-603.5, and a nearby marsh, in Sarpy 
County, about I mile south of Omaha and adjacent to 
Bellevue, NE. 
Existing Project The project being modified is the 
Missouri River Navigation and Bank Stabilization Project. 
The Hidden Lake modification is restoring a historic 
backwater of the river to restore fish breeding, brood 
rearing, resting and feeding habitat, and to benefit the 
riverine ecosystem as a whole. A one mile long backwater 
lake which was filled with sediment in a rare flood event has 
been excavated and reconnected at its downstream end to 
the river. The Great marsh modification has removed 
sediment and encroaching plants to deepen and expand a 
marshy wetland, extending its life and benefiting the aquatic 
community. About 40 acres of wetland were excavated at 
an average of two feet deeper, increasing the marsh also in 
size. Total project costs are $3,020,000, with a Federal 
share of $2,266,000. 
Local Cooperation. Section 1135 of 1986 WRDA 
applies. Papio-Missouri River Natural Resources District 
provided all needed cost sharing including real estate 
interests. 
Operations During FY. Construction was essentially 
complete and post-construction monitoring continued. 
33. LOWER DECATUR, NE 
Location. The Missouri River's right (west) overbank 
including side channels, from river mile 684.5 to 689 on the 
Missouri River in Burt County, NE, about 2 miles southeast 
of Decatur, NE. 
Existing Project. Modification of the Missouri River 
Bank Stabilization and Navigation Project (MRBSN) 
constructed from 1935 to 1982. Lower Decatur Bend is one 
of many bend cutoffs (straightenings) created by the Corps 
during channelization of the Missouri River for navigation 
and bank stabilization. The proposed project modification 
includes 3 main off-stream aquatic components: sidechannel 
restoration, lowering of the riverward extent of 
closure spur dikes, and revetment lowering over an 
extended length to allow river flows to erode the river bank 
behind the revetment, thereby increasing the top width of 
the channel over an extended area. An opportunity exists at 
Lower Decatur Bend to restore the physical habitat to 
configurations more similar to those that existed prior to the 
channelization of this reach of the river. Total Project costs 
are estimated at $6,018,000, with a Federal share of 
$4,513,000. 
Local Cooperation. Section 1135 of 1986 WRDA 
applies. The Papio-Missouri River Natural Resources 
District is providing all needed costsharing, including real 
estate interests valued at approximately $574,000 and cash 
of about $1,076,000. 
Operation During FY. Feasibility studies were 
completed. 
34. MISSOURI RIVER FISH & WILDLIFE 
MITIGATION, IA, NE, KS, & MO 
26-12

OMAHA, NE, DISTRICT 
Location. The project extends along the Missouri 
River from Sioux City, IA, to the mouth near St. Louis, Mo. 
Existing Project. To mitigate a portion of the fish and 
wildlife habitat losses resulting from the construction and 
operation of the Missouri River Bank Stabilization and 
Navigation project. Estimated total cost of the project is 
$84,500,000 federal funds. 
Local Cooperation. This project has no cost-sharing 
sponsor. The entire project is being borne by the Federal 
government with no cost to either local governments or the 
affected states. Therefore, no Project Cooperation Agreement 
is required. Although the four affected states are not 
participating financially in the project, the states are very 
actively involved in the planning and design of the project. 
The states also are participatming in the project by fimrnishing 
perpetual easements for construction and operation on 
existing state-owned lands. The states of Missouri and Iowa 
are the primary donors of such easements. 
Operations During FY. Efforts continued on acquiring 
land rights on 29,900 acres of land and agreements with 
the states for development on 18,200 acres of state-owned 
land, 16,900 of which is terrestrial habitat. Design work 
continued on the Blackbird-Tieville Bend and Kansas Bend. 
Two construction contracts were awarded to create wildlife 
habitat. 
35. NATHAN'S LAKE/DEER CREEK AQUATIC 
HABITAT IMPROVEMENT, NE 
Location: The project is located in the Missouri River 
floodplain, several remnant wetland basins and a ditched 
creek channel, from river mile 632.8 to 633.5 on the 
Missouri River in Washington County, Nebraska, about 3 
miles north of Omaha and 4 miles southeast of Ft. 
Calhoun, Nebraska. 
Existing Project. Construction of Nathan's Lake and 
Mud Lake islands and shallow fingers, expansion of 
wetland areas, construction of a diversion sediment basin 
and the west ditch and west berm. Additional work will 
include emphasis on palustrine emergent wetland benefits 
as well as stream riparian restoration related to those 
wetlands and the river. This is the first Section 206 
project authorized for study nationwide and the work will 
be a component of the sponsor's Missouri River Corridor 
Plan. 
Local Cooperation. Section 206 of the Water Resources 
Development Act of 1996 (P.L. 104-303), as amended 
applies. The Papio-Missouri River Natural Resources 
District is the local sponsor and providing all necessary 
cost shanng including real estate interests. 
Operations During FY. Plans and specifications were 
completed and construction initiated. 
36. WEHRSPANN LAKE AQUATIC 
Location. The existing Papio Dam #20 and its 
Wehrspann Lake are located on a tributary to the South 
Branch Papillion Creek, West Branch Papillion Creek 
Basin, Sarpy County, NE, about 4 miles southwest of 
Omaha. The subimpoundment is located in the headwaters 
of Wehrspann Lake, within the lake's flood control pool, and 
within the existing project's boundaries. 
Existing Project. Wehrspann Lake Aquatic 
Improvement Project - Modification of Wehrspann Lake, 
completed in 1984 as Papio Dam #20 for flood control and 
recreation; Congressional District: NE-2. Wehrspann Lake 
site is located within Omaha, NE metropolitan area, and as 
such it is highly visible, heavily utilized and important 
ecological, recreational, and educational resource. The 
modification, a subimpoundment in the lake's flood control 
pool, will play an essential role in maintaining water quality 
and fish habitat within Wehrspann Lake by decreasing the 
amounts of influent nutrients and especially sediment. Total 
project costs are currently estimated at $2,660,000 with a 
Federal share of $ 1,995,000. 
Local Cooperation. Section 1135 of 1986 WRDA 
applies. Papio-Missouri River Natural Resources District 
is providing all needed cost sharing including real estate 
interests. 
Operations During FY. Project construction was 
initiated. 
Multiple Purpose Projects Including 
Power 
37. BIG BEND DAM-LAKE SHARPE, 
MISSOURI RIVER BASIN, SD 
Location. On the Missouri River, 987.4 miles above 
26-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
the mouth, near Fort Thompson, SD, and approximately 20 
miles upstream from Chamberlain, SD. Dam is located in 
the upstream reach of Fort Randall reservoir (Lake Francis 
Case). Big Bend reservoir (Lake Sharpe) extends upstream 
to Pierre, SD. 
Existing Project. A rolled earth-fill dam 95 feet high, 
with a crest length of 10,570 feet, a hydroelectric generating 
plant consisting of five 58,500 kilowatt units, three 67,276 
kilowatt units, and a chute-type gated spillway. Reservoir 
provides gross storage of 1,859,000 acre-feet. Federal cost 
of the project was $107,498,000. Construction began in 
September 1959 and was completed in September 1977, 
except for Code 710 recreation facilities. 
Local Cooperation. None required except for 
recreation cost-sharing. 
Operation During FY. Maintenance: Project was 
operated in conjunction with other Missouri River 
reservoirs for flood control, power production and other 
multiple purpose uses. Normal operation and maintenance 
procedures were accomplished during the FY. During the 
period, 1,157,122,000 net kilowatt-hours of electricity were 
produced. 
38. FORT PECK DAM AND LAKE, MT 
Location. The reservoir is in the Missounri River 
Valley in McCone, Valley, Garfield, Phillips, Petroleum, 
and Fergus Counties, MT. Dam is approximately 1,771.6 
miles above the mouth of the Missouri River. Nearest 
towns are Glasgow, 17 miles northwest; and Nashua, nine 
miles north. 
Existing Project. A hydraulic earthfill dam with a 
maximum height of 251 feet, with a crest length of 21,026 
feet, and a reservoir for flood control, irrigation, navigation, 
hydroelectric power, and other purposes, with a gross 
storage capacity of 18,688,000 acre-feet at maximum 
operating pool. Work started on the original project in 
October 1933 and on the second power plant in August 
1956. The project was completed in 1965. The power 
installations at the project were uprated in FY 1979. The 
five generators have a total output of 185,250 KW: two 
generators at 40,000 KW each, two generators at 43,500 
KW each and one generator at 18,250 KW. See page 818 
of 1965 Annual Report and page 905 of 1958 Annual 
Report for project details. Federal cost of the project was 
$158,428,000, 
Local Cooperation. None required except for 
recreation cost-sharing. 
Operations During FY. Maintenance: Project was 
operated in conjunction with the other Missouri River 
reservoirs for flood control, navigation, power production, 
and other multiple purpose uses. Normal operation and 
maintenance procedures were accomplished during the FY. 
Generating facilities produced 912,980,000 net kilowatt 
hours of electricity. 
39. FORT RANDALL DAM-LAKE FRANCIS 
CASE, MISSOURI RIVER BASIN, SD 
Location. Located on the Missouri River in Charles 
Mix and Gregory Counties, SD, about 82 miles above 
Yankton, SD. Site is 880 miles above the mouth of the 
Missouri River and 148 miles above Sioux City, IA. 
Existing Project. A rolled earth-fill dam with a 
maximum height of 165 feet; a crest length of 10,700 feet; 
and a reservoir for flood control, irrigation, navigation, 
hydroelectric power, and other purposes, with a gross 
storage capacity of 5,494,000 acre-feet at maximum 
operating pool. The power installation consists of eight 
units rated at 40,000 kilowatts each. Construction began in 
May 1946 and was completed in 1969, except for Code 7 10 
recreation facilities. Federal cost of the project was 
$199,066,000. Non-Federal contribution for constructing 
approaches to the Platte-Winner Bridge was $720,000. 
Local Cooperation. None required except for 
recreation cost-sharing and bridge approaches. 
Operations During FY. Maintenance: Project was 
operated in conjunction with other Missouri River 
reservoirs for flood control, navigation, power production, 
and other multiple purpose uses. Normal operation and 
maintenance procedures were accomplished during the FY. 
Generating facilities produced 2,062,867,000 net kilowatt 
hours of electricity. 
40. GARRISON DAM MAJOR 
REHABILITATION, 
LAKE SAKAKAWEA, ND 
Location. Located on the Missouri River in McLean 
and Mercer Counties, ND, about 11 miles south of 
26-14

OMAHA, NE, DISTRICT 
Garrison, ND, and 9 miles west of Coleharbor, ND, 1,389.9 
miles about the mouth and 75 miles above Bismarck. 
Existing Project. Garrison Dam is a multi-purpose 
project consisting of a rolled earth-filled dam with a sheet 
pile cutoff, a hydroelectric power plant, and a reservoir with 
storage capacity of 23,821,000 acre feet for flood control, 
navigation, power, recreation, irrigation, and municipal 
water supply. This major rehabilitation project will replace 
the turbine runners on all five existing units with new 
runners designed to improve reliability and maximize 
efficiency over a broad range of operating conditions for a 
total project cost of $37,122,000. 
Local Cooperation. None required. 
Operations During FY. Completed construction for 
two governor reconditioning contracts, bulkhead 
replacements and crane reconditioning. Construction for 
turbine runner replacement (with options exercised to 
rewind two generators) is in the fabrication stage for four of 
the turbines and efficiency testing for the first turbine to be 
brought on line. Engineering and design during 
construction for stress analysis, stud bolt testing and related 
efforts remains ongoing. 
41. GARRISON DAM-LAKE SAKAKAWEA, 
MISSOURI RIVER BASIN, ND 
Location. Located on the Missouri River in McLean 
and Mercer Counties, ND, about 11 miles south of 
Garrison, ND, and 9 miles west of Coleharbor, ND. 1,389.9 
miles above the mouth and 75 miles above Bismarck, ND. 
Existing Project. A rolled earth-fill dam 11,300 feet 
long with a maximum height of 210 feet, and a reservoir for 
flood control, irrigation, navigation, hydroelectric power, 
and other purposes, with a gross storage capacity of 
23,821,000 acre-feet. It provides five power units (three 
units rated at 109,250 kilowatts each and two units rated at 
95,000 kilowatts each), three flood control tunnels, and a 
gated spillway. Federal cost of the prqject was 
$299,938,000, including $4,208,000 for major 
rehabilitation. Non-Federal contribution in connection with 
widening Snake Creek Embankment was $687,000. 
Construction of the project was initiated in April 1946 and 
completed in 1966, except for recreational development 
using Code 710 funds. 
Local Cooperation. None required except costsharing 
with the state of North Dakota for widening the 
Snake Creek Embankment and recreation cost-sharing. 
Operations During FY. Maintenance: Project was 
operated in conjunction with other Missouri River 
reservoirs for flood control, navigation, power 
production, and other multiple purpose uses. Normal 
operation and maintenance procedures were 
accomplished during the FY. Generating facilities 
produced 2,176,37 3,000 net kilowatt hours of electricity. 
42. GAVINS POINT DAM-LEWIS AND CLARK 
LAKE, MISSOURI RIVER BASIN, NE AND 
SD 
Location. On the Missouri River in Yankton County, 
SD, and Knox County, NE, about four miles upstream from 
Yankton, SD, and 811.1 miles above the mouth. 
Existing Project. A concrete and rolled earth-fill dam 
with a maximum height of 74 feet, and a reservoir for flood 
control, irrigation, navigation, hydroelectric power, and 
other purposes, with a gross storage capacity of 492,000 
acre-feet at maximum operating pool. The power 
installation consists of three units rated at 44,099 kilowatts 
each. Federal cost of the project was 
$49,617,000.Construction of the original project was 
initiated in March 1952 and completed in 1964. 
Local Cooperation. None required except for 
recreation cost-sharing. 
Operations During FY. Maintenance: Project was 
operated in conjunction with other Missouri River 
reservoirs for flood control, navigation, power production, 
and other multiple purpose uses. Normal operation and 
maintenance procedures were accomplished during the FY. 
Generating facilities produced 852,374,000 net kilowatt 
hours of electricity during FY. 
43. OAHE DAM-LAKE OAHE, MISSOURI 
RIVER BASIN, SD AND ND 
Location. Dam is on the Missouri River in Hughes 
and Stanley Counties, SD, about six miles northwest of 
Pierre, SD, and 1,072.3 miles above the mouth. 
Existing Project. A rolled earth-fill dam with 
maximum height of 245 feet; a crest length of 9,300 feet; 
and a reservoir for flood control, irrigation, navigation, 
hydroelectric power, and other purposes, with a gross 
26-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
storage capacity of 23,137,000 acre-feet at maximum 
operating pool. It contains seven power units rated at 
112,290 kilowatts each. Federal cost of the project was 
$346,521,000. Construction was initiated in August 1948 
and the project was placed in operation in June 1963. 
Local Cooperation. None required except for 
recreation cost-sharing. 
Operations During FY. Maintenance: Project was 
operated in conjunction with other Missouri River 
reservoirs for flood control, navigation, power production, 
and other multiple purpose uses. Normal operation and 
maintenance procedures were accomplished during the FY. 
Generating facilities produced 3,148,230,000 net kilowatt 
hours of electricity. 
44. MISSOURI RIVER, BETWEEN FT. PECK 
DAM, MT AND GAVINS POINT DAM, SD, 
NE 
Location. The project is located along the Missouri 
River between Fort Peck Dam, MT, and a point 59 miles 
downstream of Gavins Point Dam, SD and NE. 
Existing Project. Consists of undertaking measures, 
including maintenance and rehabilitation of existing 
structures, to alleviate bank erosion and related problems 
associated with releases from the six Missouri River main 
stem dams that the Secretary determines will be needed. In 
lieu of structural measures, lands may be acquired in 
affected areas from willing sellers. The costs of the 
measures shall be apportioned among project purposes as 
a joint-use operation and maintenance expense. Estimated 
Federal cost of the project is between $140 million for 
construction or $14 million for the land requisition 
alternative. Cost is limited to no more than $3 million per 
FY. 
Local Cooperation. Non-federal funds are not 
required for this project. One reach, the Missouri National 
Recreational River downstream from Gavins Point Dam, 
requires, under its separate authorization, that the 
landowners make available appropriate land interests to 
maintain the recreational and scenic qualities of the river 
and adjacent lands. In the other river reaches, lands can be 
acquired on a willing-seller basis if land acquisition is the 
recommended measure for erosion control at a given river 
site. 
Operations During FY. Continued coordination for 
sloughing easements in pursuit of real estate acquisitions in 
response to requests from landowners. Monitored 
previously constructed Section 33 projects. Continued 
cumulative impacts study to determine effects of bank 
erosion. 
45. PIERRE, SD 
Location. The project area consists of the Missouri 
River just downstream of Oahe Dam near Pierre and Fort 
Pierre, South Dakota. 
Existing Project. The legislation authorizes that the 
Secretary may acquire from willing sellers such land and 
property in the vicinity of Pierre, South Dakota or flood 
proof or relocate such property within the project area, as 
the Secretary determines is adversely affected by the full 
wintertime Oahe Powerplant releases. Total cost of this 
project is held at $35,000,000 by authorizing legislation. 
Local Cooperation. This project has no cost-sharing 
sponsor. The entire project is completely federally 
financed as the mitigation is for a problem caused by the 
Oahe Dam project. By funding the project 100 percent 
Federal, the costs are allocated to the Oahe Project with 
45.83 percent of the costs considered as joint costs to 
allocate for repayment by the Western Area Power 
Administration (WAPA). When WAPA invokes the suballocation 
of 15.8 percent of power costs to future 
irrigation, the 45.83 percent joint use costs will actually 
result in a final cost share of 38.6 percent to be repaid by 
non-Federal interests. 
Operations During FY. Throughout the year, 
coordination with affected property owners to prioritize 
and finalize buyback or flood proofing remedies for each 
tract affected occurred. Ongoing appraisal activities, title 
evidence, and acquisition of forty-eight tracts with 
multiple owners resulted in relocation actions under the 
authority of PL 91-646. Twelve tracts and their affected 
owners received reimbursement under this authority. 
Owner's policies, warranty deeds and closing actions 
were also completed. Coordination and development of 
infrastructure agreements for the cities of Pierre and Fort 
Pierre were also drafted. 
26-16

OMAHA, NE, DISTRICT 
Miscellaneous 
46. MISSOURI RIVER MASTER WATER 
CONTROL MANUAL REVIEW AND 
UPDATE 
Location. The area being studied is the Missouri 
River basin, to include the Missouri River main stem 
system States included in the study area include Nebraska, 
Montana, North Dakota, South Dakota, lowa, Kansas, and 
Missouri. 
Existing Project. During 1987 through 1992, the 
Missouri River basin experienced a moderate to severe 
drought, impacting upon the Missouri River main stem 
projects for the first time since filled in 1967. The drought 
has had severe impacts on people and industries that use the 
Missouri River and the main stem reservoirs for navigation, 
hydropower, water supply, and recreation. Some of the 
people impacted by the drought have stated that the current 
Master Water Control Manual for the Missouri River main 
stem system of reservoirs does not adequately take into 
consideration the contemporary needs of the basin. The 
purpose of the Missouri River Master Water Control 
Manual Review and Update study is to determine the water 
control plan that best meets the needs of the Missouri River 
basin. 
Local Cooperation. None required. 
Operations/Activities During FY. Since 1998, 
NWD has been working intensely with all Basin entities 
involved in development of consensus flow management 
plans and continuing our government-to-government 
consultation with the 28 Basin Tribes. In January 2000, a 
NWD Preferred Alternative (PA) was announced. In 
March 2000, the USFWS indicated that the NWD PA 
would not preclude jeopardy of listed Missouri River 
species. The Corps requested the USFWS to move to 
formal consultation so that it could find out, in detail, what 
components need to be added to the current water control 
plan to preclude jeopardy. On 1 April 2000, formal 
consultation on the current operation of the Missouri River 
Mainstem Reservoirs, Bank Stabilization and Navigation 
Project, and Kansas River Operations was initiated. A Final 
Biological Opinion (BO), received on 30 November 2000, 
concluded that current operations jeopardize the continued 
existence of the piping plover, interior least tern and pallid 
sturgeon. As a component of the Reasonable and Prudent 
Alternative (RPA), the USFWS indicated in their Final BO 
that higher spring releases and lower summer releases from 
Gavins Point Dam are necessary to preclude jeopardy. 
NWD released a Draft Implementation Plan (IP), which 
presents (conceptually) how NWD intends to implement the 
RPA's, Reasonable and Prudent Measures (RPM's), and 
measures to minimize take, that were included in the Final 
BO. The comment period for the Draft IP closed on 14 
December 2000. A non-jeopardy alternative for the 
Missouri River Master Manual (MRMM) will be detailed 
in a Revised Draft EIS (RDEIS), which will be the subject 
of full public review and comment as required by the 
National Environmental Policy Act. The RDEIS is 
currently scheduled for publication in summer 2001. 
Implementation of a new water control plan is scheduled for 
March of 2003. No substantial change in the operation of 
the mainstem reservoir system will be implemented until the 
ROD is signed and the Master Manual is revised. 
47. NATIONAL EMERGENCY PREPARENESS 
PROGRAM (NEPP) AND SUPPORT FOR 
FEMA 
P. L. 93-288 (and Antecedent Legislation) 
Continuity of Operations (510) 
National Preparedness 
Planning (520) 
Emergency Operations 
Center Support (530) 
Catastrophic Disaster 
Training and Exercise (560) 
Total Catastrophic Disaster 
Preparedness Program 
$ 22,020 
72,907 
3,013 
9,897 
$ 107,837 
48. FLOOD CONTROL AND COASTAL 
EMERGENCIES (FC&CE) 
Flood control work under Authorization Emergency Flood 
Control Activities, Flood Fighting. P. L. 84-99. 
Disaster Preparedness (100) 
Emergency Operations (200) 
Rehabilitation and Inspection 
Program (300) 
Advance Measures (400) 
Hazard Mitigation (600) 
Reimbursable Activities (900) 
Total FC&CE 
$ 483,216 
223 
713,118 
553,454
0 
179,357 
$1,929,368 
49. GENERAL REGULATORY FUNCTIONS 
26-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Permit Evaluation 
Enforcement 
Studies 
Environmental Impact Statement 
Administrative Appeals 
Reimbursable Activities 
Total Regulatory 
$ 4,060,154 
241,774 
173,728 
58,955 
11,432 
86.971 
$4,633,014 
50. GENERAL INVESTIGATIONS 
FY 2000 non-reimbursable costs totaled $2,142,522 for all 
General Investigation activities. See Table 26-K which 
covers Surveys, Collection and Study of Basic Data, 
Research and Development, Preconstruction Engineering 
and Design (projects not fully authorized), Planning and 
Engineering under Proposed Program Legislation, and 
Preconstruction Engineering and Design (fully authorized 
projects). 
26-18

OMAHA, NE DISTRICT 
TABLE 26-A COST AND FINANCIAL STATEMENT 
See Total Cost to 
Section September 30, 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 2000 
1. Missouri River, 
Sioux City, IA 
to Mouth (Sioux 
City, IA to Rulo 
NE) 
3. Aberdeen & 
Vicinity, SD 
Required 
Contributed 
Funds 
Consolidated 
Summary 
4. Bear Creek Lake, 
CO 
5. Big Sioux River 
and Skunk Creek 
Sioux Falls, SD 
6. Bowman-Haley 
Lake, ND 
7. Buford Trenton 
Irrigation District, ND 
(Land Acquisition) 
8. Chatfield Lake, 
CO 
Required 
Contributed 
Funds 
Consolidated 
Summary 
New Work: 
Approp. 
Cost. 
Maint:
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
Maint: 
Approp. 
Cost. 
New Work 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
Maint: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
Maint: 
Approp. 
Cost. 
1,802,000 2,143,000 2,034,000 
1,803,264 2.114,434 2.081,757 
187,000 54,000 
128,231 101,637 
187,000 
128,231 
345,700 
352,123 
164,000 
161,906 
352,802 
327226 
30,084 
4,539 
54,000 382,886 
101,637 331,765 
360,000 416,000 
364,699 417,667 
155,000 130,000 
159,626 131,588 
2,300,000 2.327,000 
2,071,907 2,421,119 
773,000 955,000 
791,429 954,737 
783,000 
794,914 
2,001,438 
1,986,394 
5,000 
44,760 
250,000 
20,744 
255,000 
65,504 
540,276 
534,838 
525,000 
297,450 
186,830 
186,978 
5,760,000 
5,852,428 
831,042 
826,005 
1/ Includes $18,325,581 National Industrial Recovery Act funds, $8,625,718 Emergency Relief Funds, and 51,181,125 for previous project. 
26-19 
189,225,991 1/ 
189,225,991 11/ 
129,583,888 
129,568,328 
839,759 
835,799 
280,084 
25,283 
1,119,843 
863,082 
62,018,608 
62,018,608 
6,254,585 
6,248,451 
525,000 
297,450 
4,372,174 
4,372,174 
4,201.100 
4,200,731 
10,387,000 
10,345,454 
95,444,010 
95,444,010 
1,315,328 
1,315,328 
96,759,338 
96,759,338 
14,811,272 
14,805,971

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 26-A (continued) COST AND FINANCIAL STATEMENT 
See Total Cost to 
Section September 30, 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 2000 
9. Cherry Creek 
Lake, CO 
10. Fall River 
Basin, SD 
(Cottonwood & 
Coldbrook) 
11. Logan Creek 
Pender, NE 
Required 
Contributed 
Funds 
Consolidated 
Summary 
12. Milk River, 
Malta, MT 
Required 
Contributed 
Funds 
Consolidated 
Summary 
13. Missouri National 
Recreational River 
NE& SD 
Required 
Contributed 
Funds 
Consolidated 
Summary 
New Work: 
Approp. 
Cost. 
Maint. 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
Maint. 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work:, 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
Maint.
Approp. 
Cost. 
771,000 1,237,000 
781,224 1,212239 
324,000 
344,833 
229200 
222,084 
1,326,000 
1,358,725 
490,000 337,000 
474,854 350,767 
2,422,000 1,083,100 
2,392,477 1,038,621 
264,790 
63,895 
229,200 
222,084 
604,268 
555,205 
61,700 
76,486 
665,965 
631,691 
105,000 
110,890 
105,000 
110,890 
196,000 
174,245 
131,543 
2,686,790 1,083,100 
2,456.372 1,170,164 
(39,200) 
17,495 
938 
(39,200) 
18,433 
150,000 
117,322 
6,816 
6,816 
416,000 
235,697 
150,000 416,000 
117,322 235,697 
196,000 
229,911 
65,000 
167,384 
26-20 
396,322 
398,121 
690,966 
694,703 
14,000 
48,037 
32,388 
14,000 
80,425 
1,678 
1,678 
900,000 
777,252 
12,774 
7,500 
912,774 
784,752 
241,879 
246,985 
15,220,364 
15,220,364 
15,313,796 
15,310,186 
5,538,432 
5,538,432 
8,661,167 
8,659,305 
4,162,113 
4,101,606 
394,090 
357,124 
4,556,203 
4,458,730 
1,483,618 
1,472,185 
222,720 
205,937 
1,706,338 
1,678,122 
3,565,259 
3,221,137 
652,774 
647,500 
4,218,033 
3,868,637 
2,935,879 
2,935,135

OMAHA, NE DISTRICT 
TABLE 26-A (continued) COST AND FINANCIAL STATEMENT 
See Total Cost to 
Section September 30, 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 2000 
14. Missouri River New Work: 
Kenslers Bend, 
NE, to Sioux 
City, IA 
15. Nishnabotna 
River, Hamburg, 
IA 
Required 
Contributed 
Funds 
Consolidated 
Summary 
16. Papillion Creek 
and Tributaries 
Lakes, NE 
Required 
Contributed 
Funds 
Consolidated 
Summary 
17. Pebble Creek 
Scribner, NE 
Required 
Contributed 
Funds 
Consolidated 
Summary 
18. Perry Creek, IA 
Required 
Contributed 
Funds 
Consolidated 
Summary 
Approp. 
Cost. 
Maint.
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
Maint:
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
2/ Does not include $1,854,338 cost of inactive sites. 
88,000 
88,349 
151,900 
188,774 
4,600 
17,413 
156,500 
206,187 
18.070 
5,857 
23,927 
615,000 
605,775 
59,000 
57,132 
587,500 
281,129 
55,890 
11,733 
643,390 
292,862 
1,091 
1,091 
593.000 
581,127 
3,221 
38,000 145,555 
41,152 145,685 
266,500 
606,611 
170,947 
183,621 
437,447 
790,232 
6,453 
6,453 
50,000 
49,949 
10,490 
50,000 
51,439 
11,294,414 
1 1294,414 
5,166,974 
5,166,974 
1,368,600 
1,353,371 
359,887 
336,736 
1,728,487 
1,690,107 
- 66,612,215 2i 
2,040 66,605,606 21 
- 955,000 
- 884,680 
- 67,567,215 
2,040 67,490,286 
532,000 598,822 
552,855 599,595 
547 
444 
3,665 547 
4,650,000 3,424,000 
4,850,900 2,516,925 
400,000 
86,625 
4,650,000 3,824,000 
4,850,900 2,603,550 
258 
258 
10,265,266 
10264,015 
2,725,728 
2,716,954 
435,656 
419,880 
3,161,384 
3,136,834 
6,235,237 13,900,000 35,431,485 
6,799,322 13212,961 34,312,672 
850,000 642,718 
1,023,819 608,778 
7,085237 14,542,718 
7,823,141 13,821,739 
1,892,718 
1,719,222 
37,324,203 
36,031,894 
26-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 26-A (continued) COST AND FINANCIAL STATEMENT 
See Total Cost to 
Section September 30, 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 2000 
20. Pipestem Lake, New Work: 
21. Salt Creek and 
Tributaries, NE 
23. Thurman to 
Hamburg, IA 
Required 
Contributed 
Funds 
Consolidated 
Summary 
24. Van Bibber 
Creek, CO 
Required 
Contributed 
Funds 
Consolidated 
Summary 
25. Wood River, 
Grand Island, NE 
Required 
Contributed 
Funds 
Consolidated 
Summary 
26. Inspections of 
Completed Local 
Protection Projects 
ND 
619,000 
617,114 
Approp. 
Cost. 
Maint: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
Maint. 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp 
Cost. 
New Work: 
Approp. 
Cost. 
Funding 
New Work. 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
Maint.
Approp. 
Cost. 
561,000 580,000 
539,598 608,744 
757,000 728,000 
750,354 741,767 
(30237) 
6,000 (26,281) 
598,307 
597,556 
725,646 
725,776 
26,028 26 81 
26,028 (30237) 
6,000 - 
216,000 
252,741 
1,030 
355,000 216,000 
261,285 252,741 
1,000,000 
309,037 
100.000 
309,037 
253,000 
251,864 
50,200 
77,715 
50200 
77,515 
246,744 112,226 
246,744 112,226 
238,000 224,000 
231,759 232,590 
(7,200) 
10,401 
(7,200) 
10,401 
386,000 
409,029 
386,000 
409,029 
160,269 
160,371 
9,277,545 
9,277,545 
8,837,711 
8,836,641 
12,197,621 31/ 
12,197,621 1/ 
16,664,922 
16,663,883 
1,040,763 
1,040,763 
397,587 
397,587 
1,438,350 
1,438,350 
1,066,589 
1,047,916 
125,200 
125,200 
1,191,789 
1,173,116 
1,386,000 
1,077,036 
1,386,000 
1,077,036 
5,617,745 
5,617,203 
3/ Includes $123,000 of government cost applicable to that portion of the project which is currently being carried in a deferred status 
26-22 
778,000 
772,287 
360,000 
399,998 
157,000 
294,218 
517,000 
694,216 
355,000 
261,285

OMAHA, NE DISTRICT 
TABLE 26-A (continued) COST AND FINANCIAL STATEMENT 
See Total Cost to 
Section September 30, 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 2000 
27. Scheduling Flood 
Control Reservoir 
Operations 
29. Boyer Chute, NE 
(Mo Riv Bank.. 
Stab/Nay) 
Required 
Contributed 
Funds 
Consolidated 
Summary 
30. California 
Bend, NE 
Required 
Contributed 
Funds 
Consolidated 
Summary 
31. Cheyenne River Sioux Tribe, 
Lower Brule Sioux Tribe, 
and State of SD 
Terrestrial Wildlife 
Habitat Restoration, SD 
32. Hidden Lake/ 
Great Marsh. 
NE 
Required 
Contributed 
Consolidated 
Summary 
33. Lower 
Decatur, NE 
Required 
Contributed 
Funds 
Consolidated 
Summary 
Funds 
Maint.
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
470,000 334,000 372,000 
473,101 374,993 374,993 
2,898
6 
2,904 
16,000 
24,499 
16,000 
24,499 
359,000 
377295 
102,000 
137,075 
461.000 
514,370 
20,000 
9,806 
20,000 
9,806 
137,000 
136,570 
137,000 
136,570 
200 
61,843 
62,043 
263,000 307,000 
166,005 351,728 
268.000 307,000 
166,005 351,728 
20,000 
12,663 
20,000 
12,663 
35,000 
30,543 
35,000 
30,543 
15,0oo 
8,126 
15,794 
15,000 
23,920 
100,000 
135,983 
100,000 
135,983 
26-23 
345,996 
348,525 
398,901 
402,611 
9,762,680 
9,762,415 
2,178,401 
2,163,127 
82,000 
81,993 
398,901 
402,611 
200,495 
192,614 
200,495 
192,614 
2,500,000 
893,862 
15,000 
12,600 
(1,358) 
15,000 
11,242 
205.000 
178,845 
205.000 
178,845 
2,260,401 
2,245,120 
645,995 
631,831 
645,995 
631,831 
2,500,000 
893,862 
2,236,000 
2225,865 
650,000 
641,191 
2,886,000 
2,867,056 
880,000 
836,334 
880,000 
836,334

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 26-A (continued) COST AND FINANCIAL STATEMENT 
See Total Cost to 
Section September 30, 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 2000 
34. Missouri River 
Fish & Wildlife 
Mitigation, IA, 
NE, KS, MO 
35. Nathan's Lake/ 
Deer Creck 
Aquatic Habitat 
Improvement, NE 
Required 
Contributed 
Funds 
Consolidated 
Summary 
Funds 
36. Wehrspann Lake 
Aquatic 
Required 
Contributed 
Funds 
37. 
Consolidated 
Summary 
Funds 
Big Bend Dam- 
Lake Sharpe, 
Missouri River 
Basin, SD 
38. Fort Peck Lake, 
MT 
39. Fort Randall 
Dam-Lake Francis 
Case, Missouri 
River Basin, SD 
New Work: 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
Maint.
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
Maint.
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
Maint.
Approp. 
Cost. 
1,584,000 1,374,000 4,070,000 
1,208,461 1,603,873 3,374,515 
95,000 
71,192 
95,000 
71,192 
30,000 
52,102 
50,000 
30,196 
80,000 
83,018 
110,000 171,000 1328,000 
123 269 158,912 1,270323 
506,000 
303,376 
110,000 171,000 1,834,000 
123,269 158,912 1,573,699 
5,692300 7,121,300 6,035,000 
5,595,713 6,623,326 6,667,015 
3,459,000 4,141,000 4,391,000 
3,469,804 4,891,338 4,505,403 
8,943,500 9,118,000 7,844,000 
9,149,872 8,887,964 8,147,631 
4,700,000 
4,258,705 
135.000 
19,178 
18,241 
135.000 
37,419 
273,000 
349,497 
94,000 
223,616 
367,000 
573,113 
6,515,756 
6,479,037 
4,031,141 
4,078,081 
26,963,000 
25,592,241 
260,000 
142,472 
50,000 
49,157 
310,000 
191,629 
1,947,000 
1,946,785 
600,000 
526,992 
2,547,000 
2,473,777 
107,497,597 
107,497,597 
122,151,329 A 
122,103,592 A 
158,428,080 
158,428,080 
104,700,975 A/ 
104,692,597 4/ 
199,065,883 
199,065,883 
7,968,478 187,039,612 4/ 
7,963,253 187,023,837 4 
4/ Includes Special Recreation Use Fees. 
26-24

OMAHA, NE DISTRICT 
TABLE 26-A (continued) COST AND FINANCIAL STATEMENT 
See Total Cost to 
Section September 30, 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 2000 
40 & 41. Garrison Dam 
Lake Sakakawea, 
Missouri River 
Basin, ND 
Federal Funds Maint
Approp. 
Cost. 
8,491,000 7,540,000 9,050,000 
8,113,054 7,942,739 9,165,548 
8,063,896 201,393,569 41 
8,060,510 201,386,251 _/ 
1,035,000 4,500,000 
555,288 4,424,506 
42. Gavins Point 
Dam-Lewis & 
Clark Lake, 
Missouri River 
Basin, 
NE and SD 
43. Oahe Dam-Lake 
Oahe, Missouri 
River Basin, 
SD & ND 
44. Missouri River 
Between Ft. Peck 
Dam MT & Gavins 
Point Dam, SD and NE 
45. Pierre, SD 
46. Missouri River 
Master Water 
Control Manual 
Review and Update 
New Work: 
Approp. 
Cost. 
Maint:
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
Maint:
Approp. 
Cost. 
Maint. 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
Maint: 
Approp. 
Cost. 
49,617,239 
49,617,239 
5,933,500 6227,000 6.984,000 
5,931,717 5,965,884 7,336,181 
5,889,002 137,764,414 4 
5,908,727 137,748,753 41 
346,520,603 
346,520,603 
9,148,000 11,669,200 10,685,000 
9246,349 10,292,662 12,081,727 
735,000 
242223 
737,000 2,183,000 
1,528,412 2,385,152 
-- 340,000 
- -- 339,82 
2,549,000 1,800,000 1,863,000 
2,566,603 1,810,941 1,814,557 
12.236271 210,871,97141 
12,253,913 210,846,74741 
227,000 
285,554 
7,500,000 
6,009,111 
669,109 
662,650 
6,882,000 
6,881,668 
7,840,000 
6,348,393 
23,979,109 S 
23,924,207 5 
4/ Includes Special Recreation Use Fees. 
5/ Included in the Mscellaneous Section of the Text. 
26-25 
New Work: 
Approp. 
Cost. 
295,729,613 
295,729,613 
Major Rehab: 
Approp. 
Cost. 
Required 
Contributed 
Funds 
374,000 
356,271 
Approp. 
Cost. 
8,500,000 
5,558,299 
18,617310 
15,102,674 
686,961 
686,961

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 26-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing Project and Work 
in Text Act Authorized Documents 
MISSOURI RIVER, SIOUX CITY, IA TO MOUTH 
(SIOUX CITY, IA TO RULO, NE) 
Jan 12, 1927 Appropriation of $12 million authorized for 
securing a 6 foot depth from Quindaro Bend 
(Kansas City, MO to Sioux City, IA). 
July 3, 1930 Appropriation of $ 15 million additional allotments 
totaling $29,153,108 made by Public Works 
Administration under provisions of National 
Industrial Recovery Act of 1933, and 59,669,791 
allotted under provisions of Emergency Relief 
Appropriations Act of 1935. 
Aug 30, 1935 For completion of project from mouth to Sioux City, IA. 
Mar 2, 1945 For a channel of 9-foot depth and 300-foot width. 
H. Doc. 1120, 60th Cong. 
PL 71-520 
PL 73-67 
H. Doc 238, 73rd Cong. 
PL 74-409 
H. Doc. 214, 76th Cong. 
PL 79-14 
Flood Control 
Act of 1948 
Aug 13, 1968 
Water Resources 
Development Act 
Of 1996 
5. 
ABERDEEN & VICINITY, SD 
Section 205 of the Flood Control Act of 1948 as 
amended; flood damage reduction 
BEAR CREEK LAKE, CO 
A flood control reservoir for protection of 
metropolitan Denver, CO. 
BIG SIOUX RIVER AND SKUNK CREEK, SIOUX FALLS, SD 
A flood control project for raising levees and diversion 
dams, modification of chute and stilling basin, and 
providing bridge improvements. 
S. Doc. 87, 90th Cong. 
PL 90-483 
Section 101 
P.L. 104-303 
Flood Control 
Act of 1962 
Section 336(a) 
Water Resources 
Development Act 
of 1996 
Flood control 
Act of 1950 
Water Resources 
Development Act 
of 1986 
BOWMAN-HALEY LAKE, ND 
Flood Control reservoir and water supply. H. Doc. 574, 87th Cong. 
PL 87-874 
BUFORD TRENTON IRRIGATION DISTRICT, ND 
(LAND ACQUISTION) 
CHATFIELD LAKE, CO 
Flood control reservoir and channel improvements 
to provide downstream protection for Denver, CO. 
Modified 1950 Flood Control Act to operate dam 
and other Federal improvements to achieve 
authorized level of protection, beginning at dam 
and ending 82 miles downstream. Reassigns a 
portion of the storage space in the lake project to 
joint flood control-conservation purposes. Modified 
1974 WRDA to exempt prohibition of encroachment 
for Mineral Ave/ Ken Caryl Rd. ext & 
transmission line. 
P.L. 104-303 
H. Doc. 669, 80th Cong. 
PL 81-516 
H. Doc. 1013, 99th Cong. 
PL 99-662 
26-26 
6. 
8.

OMAHA, NE DISTRICT 
TABLE 26-B (Continued) AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing Project and Work 
in Text Act Authorized Documents 
Aug 18, 1941 
Dec 22, 1944 
Dec 22, 1944 
10. 
11. 
12. 
13. 
CHERRY CREEK LAKE, CO 
Initiation and partial accomplishment of project. 
Completion of plan approved in Act of Aug 18, 1941. 
General comprehensive plan. Missouri River Basin. 
FALL RIVER BASIN, SD 
Provide flood control to the town of Hot Springs. SD. 
LOGAN CREEK, PENDER NE 
Section 205 of the Flood Control Act of 1948 as 
amended; flood damage reduction 
MILK RIVER, MALTA, MT 
Section 205 of the Flood Control Act of 1948 as 
amended, flood damage reduction 
MISSOURI NATIONAL RECREATIONAL RIVER, NE AND SD 
Preservation and enhancement of the Missouri 
River between the reaches from Gavins Point 
Dam. NE & SD to Ponca State Park, NE. 
MISSOURI RIVER, KENSLERS BEND, NE, TO SIOUX CITY, IA 
Construction of dike. revetments. 
H. Doe. 426, 76th Cong. 
PL 77-228 
H. Doc. 426, 76th Cong. 
PL 78-534 
H. Doc. 475, and S. Does. 
191 and 247, 78th Cong. 
PL 78-534 
H. Doc. 655, 76th Cong. 
PL 77-228 
PL 95-625 
H. Doe. 821,76th Cong. 
PL 77-228 
PL 80-858 
Aug 18, 1941 
Flood Control 
Act of 1948 
Flood Control 
Act of 1948 
National Parks 
and Recreation 
Act of 1978 
Aug 18, 1941 
June 30, 1948 
Flood Control 
Act of 1948 
Flood Control 
Act of 1968 
Water Resources 
Development Act 
of 1986 
June 30, 1948 
Water Resources 
Development Act 
of 1986 
PAPILLION CREEK AND TRIBUTARIES LAKES, NE 
Series of flood control reservoirs, providing protection 
for the metropolitan areas of Omaha, NE. 
Authorized additional S4.8 million for channel 
improvement on Big Papillon Creek, and to 
Union Pacific RR bridge, rec trail and flood 
warning system. 
PEBBLE CREEK, SCRIBNER, NE 
Levee and channel improvement for local 
protection - Section 205. 
PERRY CREEK, IA 
Provide flood protection for Perry Creek, Iowa. 
H. Doe. 349, 90th Cong. 
PL 90-485 
H. Doec. 1013, 99th Cong. 
PL 99-662 
858, 80th Cong. 
Section 401 a, 
PL 99-662 
26-27 
NISHNABOTNA RIVER, HAMBURG, IA 
Section 205 of the Flood Control Act of 1948 as 
amended; flood damage reduction 
14. 
15. 
16. 
17. 
18.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 26-B (Continued) AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing Project and Work 
in Text Act Authorized Documents 
June 28, 1938 
Aug 18, 1941 
Dec 22, 1944 
July 24, 1946 
May 17, 1950 
Sep 3, 1954 
Sep 3, 1954 
May 2, 1956 
July 3, 1958 
July 14, 1960 
Dec 30, 1963 
June 18. 1965 
Aug 13, 1968 
June 19, 1970 
Dec 24, 1970 
Dec 31, 1970 
Dec 23, 1971 
Mar 7, 1974 
July 8, 1976 
Nov 16, 1977 
Flood Control Act 
of 27 Oct 1965 
19. 
PIPESTEM LAKE, ND 
Provide flood control for Jamestown. ND and 
downstream areas. 
PICK-SLOAN MISSOURI BASIN PROGRAM (OMAHA DIST.) 
Adopted general comprehensive plan for Missouri 
River basin and authonzed $9 million for 
initiation and partial accomplishment. 
Modified general comprehensive plan to include 
Harlan County Dam and Reservoir on Republican 
River, NE and authorized additional $7 million. 
Expanded general comprehensive plan for Missouri River 
Basin and authorized additional S200 million. 
Authorized additional $150 million for prosecution 
of general comprehensive plan for Missouri River Basin. 
Authorized additional $250 million for prosecution 
of general comprehensive plan for Missouri River Basin. 
Expanded general comprehensive plan for Missouri 
River Basin and authorized additional $217,710,000. 
Authorized $5.384.014 to compensate Sioux Indians for 
reservation lands required for Oahe, South Dakota project. 
Modified general comprehensive plan for Missouri 
River Basin by deletion of construction of Red 
Willow Dam and Reservoir, NE, and addition of 
construction of Wilson Dam and Reservoir. KS. 
Expanded general comprehensive plan for Missouri 
River Basin and authorized additional $200 million. 
Authorized additional $207 million for prosecution 
of general comprehensive plan for Missouri River Basin. 
Authorized additional $80 million for prosecution 
of general comprehensive plan for Missouri River Basin 
and modified the plan to include work protection 
and rectification works below Garrison Dam. 
Authorized additional S116 million for prosecution 
of general comprehensive plan for Missouri River Basin. 
Authorized additional $38 million for prosecution 
of general comprehensive plan for Missouri River Basin. 
Authorized additional $109 million for prosecution 
of general comprehensive plan for Missouri River Basin. 
Changed comprehensive plan name to Pick-Sloan 
Missouri Basin Program. 
Oahe Darn and Reservoir. ND. 
Authorized additional S101 million for prosecution 
of Pick-Sloan Missouri Basin Program. 
Authorized additional $72 million for prosecution 
of Pick-Sloan Missouri Basin Program. 
Authorized additional $85 million for prosecution 
of Pick-Sloan Missouri Basin Program. 
Authorized additional $59 million for prosecution 
of Pick-Sloan Missouri Basin Program. 
26-28 
Flood Control Committee 
Doc. 1, 75th Cong. 
PL 75-761 
H. Doc. 842, 76th Cong. 
PL 77-228 
H. Doc. 475, and S. Does. 191 
and 247, 78th Cong. 
PL 78-534 
PL 79-526 
PL 81-516 
H. Does. 549 and 642, 81st 
Cong. 
PL 83-780 
PL 83-776 
PL 84-505 
H. Doc. 409, 84th Cong. 
P. L. 85-500 
P.L 86-645 
P. L. 88-253 
P. L. 89-042 
P. L. 90-483 
H. Doe. 91-748 and 
S. Doc. 91-895 
P. L. 91-282 
S. Doe. 91-1100, 91st Cong. 
P. L. 91-576 
H. Doe. 91-23 and 
P. L. 91-611 
P. L. 92-222 
P. L. 93-251 
P.L. 94-347 
P.L. 95-189 
H. Doc. 266, 89th Cong. 
P.L. 89-298 
20.

OMAHA, NE DISTRICT 
TABLE 26-B (Continued) AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing Project and Work 
in Text Act Authorized Documents 
July 3,. 1958 
May 17, 1950 
May 12, 1967 
Aug 13, 1968 
Jun 19, 1970 
Dec 23, 1971 
Mar 7, 1974 
Jul 8, 1976 
Nov 16, 1977 
Water Resources 
Development Act 
of 1986 
SALT CREEK AND TRIBUTARIES, NE 
Series of dams and channel improvements for flood 
control around Lincoln, NE. 
SOUTH PLATTE RIVER BASIN, CO 
Adopted plan of improvement for South Platte 
River Basin and authorized S26.3 million for 
initiation and partial accomplishment. 
Authorized additional $2 million for prosecution of plan. 
Authorized additional S 12 million for prosecution of plan. 
Authorized additional 521 million for prosecution of plan. 
Authorized additional S37 million for prosecution of plan. 
Authorized additional $15 million for prosecution of plan. 
Authorized additional S22 million for prosecution of plan. 
Authonzed additional S3 million for prosecution of plan. 
THURMAN TO HAMBURG, IA 
Install pumping facilities to prevent flooding in the Thurman 
to Hamburg area of the Missouri River in western Fremont 
County, IA. 
H. Doc. 396, 84th Cong. 
P.L. 85-500 
H Doc. 669, 80th Cong. 
P.L. 81-516 
P.L. 90-17 
P.L. 90-843 
P.L. 91-282 
P.L. 92-222 
P.L. 93-251 
P.L. 94-347 
P.L. 95-189 
Section 1152 
P. L. 99-662 
Flood Control 
Act of 1948 
Water Resources 
Development Act 
of 1996 and 1999 
Nov 17, 1986 
Nov 17, 1986 
Water Resources 
Development Act 
of 1999 
Nov 17, 1986 
Nov 17, 1986 
VAN BIBBER CREEK, CO 
Section 205 of the Flood Control Act of 1948 as 
amended; flood damage reduction 
WOOD RIVER,GRAND ISLAND, NE 
Five-mile long diversion channel with levees. 
Section 101k 
P.L. 104-303 and 
and Section 335 
P.L. 106-53 
BOYER CHUTE, NE 
Section 1135 (b) of the Water Resource Development Act of 
1986, as amended; environmental improvement 
CALIFORNIA BEND, NE 
Section 1135 (b) of the Water Resource Development Act of 
1986, as amended; environmental improvement 
P. L. 99-662 
P. L. 99-662 
HIDDEN LAKE/GREAT MARSH 
Section 1135 (b) of the Water Resource Development Act of 
1986. as amended: environmental improvement 
LOWER DECATUR, NE 
Section 1135(b) of the Water Resource Development Act 
of 1986 as amended; environmental improvement 
P. L. 99-662 
P. L. 99-662 
26-29 
21. 
22. 
23. 
24. 
25. 
29. 
30. 
31. 
32. 
33. 
CHEYENNE RIVER SIOUX TRIBE, LOWER BRULE 
SIOUX TRIBE AND STATE OF SOUTH DAKOTA AND 
TERRESTRIAL WILDLFE HABITAT RESTORATION P.L. 106-53 
Land transfer, mitigation and cultural work within the State of South Dakota

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 26-B (Continued) AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing Project and Work 
in Text Act Authonzed Documents 
Water Resources 
Development Act 
of 1986 and 
1999 
Water Resources 
Development Act 
Of 1986 
Nov 17, 1986 
Dec. 22, 1944 
June 16, 1933 
Aug 30, 1935 
May 18, 1938 
Dec 22, 1944 
Dec. 22, 1944 
PWA 1968 
Dec. 22, 1944 
MISSOURI RIVER FISH & WILDLIFE MITIGATION, IA, NE, KS, MO 
Mitigate fish and wildlife losses resulting from the con- Section 601(a), 
struction and operation of the Missouri River Bank PL 99-662 and 
Stabilization and Navigation project. Section 334, P.L. 106-53 
35. 
Section 601(a), 
PL 99-662 and 
Section 334, P.L. 106-53 
P. L. 99-662 
NATHAN'S LAKE, NE 
Mitigate fish and wildlife losses resulting from the construction 
and operation of the Missouri River Bank 
Stabilization and Navigation project. 
WEHRSPANN LAKE AQUATIC, NE 
Section 1 135(b) of the Water Resource Development Act 
of 1986 as amended; environmental improvement 
BIG BEND DAM - LAKE SHARPE, SD 
Expanded general comprehensive plan for flood control 
and other purposes in the Missouri River Basin. 
FORT PECK LAKE, MT 
Construction of earth dam. as recommended by Chief of 
Engineers Sep 30. 1933, was approved by Executive Order 
by the President and included in Public Works Administration 
program. Oct 14, 1933 as authorized by the National Industrial 
Recovery Act of 1933 and adopted by the River and Harbor 
Act of 1935 (PL 74-409). 
Completion, maintenance. and operation of a hydroelectric 
power plant. subject to certain provisions in act respecting 
transmission and sale of electric energy. Also authorizes 
installation of additional power-generating facilities by 
Secretary of War when deemed necessary in judgment of 
Bureau of Reclamation. 
FORT RANDALL DAM - LAKE FRANCIS CASE, SD 
Expanded general comprehensive plan for flood control 
and other purposes in the Missouri River Basin. 
GARRISON DAM - LAKE SAKAKAWEA, 
MISSOURI RIVER BASIN, ND 
Expanded general comprehensive plan for flood control 
and other purposes in the Missouri River Basin. 
GAVINS POINT DAM - LEWIS AND CLARK LAKE, 
MISSOURI RIVER BASIN, NE AND SD 
Expanded general comprehensive plan for flood control 
and other purposes in the Missouri River Basin. 
OAHE DAM - LAKE OAHE, 
MISSOURI RIVER BASIN, SD & ND 
Expanded general comprehensive plan for flood control 
and other purposes in the Missouri River Basin. 
26-30 
34. 
H. Doe. 475 and S. Doe. 247, 
78th Cong. PL 78-534 
H. Doe. 238, 73rd Cong. 
P .L. 74-409 
P. L. 75-529 
H. Doe. 475 and S. Does. 191 
and 247, 78th Cong. 
P.L. 78-534 
H. Doe. 475 and S. Doc. 247, 
78th Cong. PL 78-534 
H. Doc. 475 and S. Doc. 247, 
78th Cong. P. L. 78-534 
H. Doe. 475 and S. Does. 191 
and 247, 78th Cong. 
36. 
37. 
38. 
39. 
40- 41. 
42. 
43. 
Dec. 22, 1944

OMAHA, NE DISTRICT 
TABLE 26-B (Continued) AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing Project and Work 
in Text Act Authorized Documents 
Water Resources 
Development Act 
of 1988 
Water Resources 
Development Act 
of 1999 
MISSOURI RIVER BETWEEN FT. PECK DAM ,MT & 
GAVINS POINT DAM, SD & NE 
Undertake measures to alleviate bank erosion and related 
problems associated with releases along the Missouri 
River from the six main stem dams. 
PIERRE, SD 
Mitigation for flooding caused by the Oahe Dam Project 
to the cities of Pierre and Ft. Pierre, SD. 
MISSOURI RIVER MASTER WATER CONTROL 
MANUAL REVIEW AND UPDATE 
Expanded general comprehensive plan for flood control 
and other purposes in the Missouri River Basin. 
Section 33, 
PL 100-676 
P.L. 106-53 
H. Doc. 475 and S. Does. 191 
and 247, 78th Cong. 
P. L. 78-534 
26-31 
44. 
45. 
46. 
Dec 22, 1944

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 26-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost Cost to September 30, 2000 
Full Report 
See Annual Operation and 
Projec Status Report For Construction Maintenance 
Missoun River, Sioux City, IA to 
Fort Benton, MT Complete 1948 3,123,141 644,863 
Small Navigation Project at 
Sioux City, IA Complete 1970 43,582 88,716 
26-32

OMAHA, NE DISTRICT 
TABLE 26-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost Cost to September 30, 2000 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Belle Fourche, Cheyenne River, SD 11 Complete 1940 37,410 
Big Sioux River at Sioux City, IA 3/ Complete 1982 7,479,899 
Blackbird Creek Near Macy, NE I/ Complete 1970 262,479 
Buffalo Creek, Meadow Grove, NE 2/ Complete 1974 293,016 
Buffalo Creek, Scranton, ND -1 Complete 1960 102.980 
Cedar Canyon Dam, Rapid City, SD Complete 1960 120,482 
City of Aurora, 
Westerly Creek, CO Complete 1955 150,000 
Clarkson, NE, Maple Creek Complete 1967 191,282 
Council Bluffs, IA (Act of 1936) Complete 1939 - 
Council Bluffs, IA (Act of 1944) Complete 1954 2,557,680 
Deadman's Gulch, Sturgis, SD z Complete 1981 3.000,000 
Dry Creek, Hawarden, IA Complete 1964 400,000 
East Nishnabotna River 
at Red Oak, IA 2/ Complete 1986 2,154,016 
Floyd River, Sioux City, IA Complete 1970 11,556,667 
Forsyth, MT Complete 1950 255,177 
Frazer-Wolf Point, MT Complete 1982 435.000 
Genng Valley, NE Complete 1971 5,989,663 
Glasgow. MT Complete 1939 16.832 
Great Falls, MT Complete 1991 11.905.000 
Greybull, WY Complete 1960 248,507 
Havre, MT Complete 1958 1,825,881 
Herreid, Spring Creek, SD Complete 1954 50.216 
Hooper. NE 2/ Complete 1968 326,667 
Ida Grove, IA 2/ Complete 1972 522.344 
Indian Creek at Emerson, IA 2/ Complete 1986 333,000 
Jamestown Reservoir, ND Complete 1950 
Linton, ND 2/ Inactive 1973 
Little Papillion Creek, NE Complete 1976 3,643,111 
Little Sioux River, IA Complete 1992 20,630,000 
Loup River, Columbus, NE 2 Complete 1973 1,000,000 
Lower Heart River, ND Complete 1964 1,961,173 
Lower Heart River, Mandan, ND 1 Complete 1991 1,153,430 
Madison, NE, Union and 
Taylor Creeks 21 Complete 1967 234,839 
Mandan, Heart River, ND Complete 1960 676,916 
Marmarth. ND Complete 1960 169,498 
McCook Lake, SD Complete 1958 147,627 
Miles City, MT Inactive 1956 
Missouri River, Aten, NE Complete 1951 578,791 
1/ Completed as a Public Works Administration project. 
2/ Authorized by Chief of Engineers. 
3/ Design Deficiency Correction initiated in FY00. 
26-33

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 26-E (Continued) OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to September 30, 2000 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Missoun River Levee System, 
IA, NE, KS and MO Complete 1993 37,964,177 
Missouri River, Niobrara, NE Complete 1945 99,370 
Mott, ND Defrred - - 
Mud Creek, Broken Bow, NE 21 Complete 1976 1,000,000 
Nishnabotna River at 
Hamburg, IA Complete 1948 236.000 
Norfolk, NE Complete 1971 3,400,504 
Omaha, NE Complete 1954 5,903,640 
Pierce, NE Complete 1967 296,597 
Platte River Near Schuyler, NE I/ Complete 1948 74,940 
Platte River and Lost Creek, 
Schuyler, NE Complete 1971 257398 
Platte River and Tributaries, NE Inactive - 1,538,69 
Rapid Creek, Rapid City, SD Complete 1980 1,004,000 
Saco, MT Complete 1958 67,793 
Sacred Heart Hospital, 
Yankton, SD Complete 1978 184380 
Sheridan, WY 3/ Complete 1976 2,618,809 
Shields River, 
Near Clyde Park, MT I1 Complete 1951 25,747 
Sioux Falls, SD Complete 1966 5,288,707 
Vaughn, MT, Sun River 2 Complete 1971 457,582 
Waterloo, NE Complete 1970 237,883 
West Point, NE Complete 1966 149,596 
Yellowstone River, 
W. Glendive, MT Complete 1960 230294 
2/ Authorized by Chief of Engineers. 
3/ Includes inactive segment 
26-34

OMAHA, NE DISTRICT 
TABLE 26-F OTHER MULTIPLE PURPOSE PROJECTS INCLUDING POWER 
For Last Cost to September 30, 2000 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Gavins Point Dam -Lewis and Clark Lake, 
Relocation of Niobrara, NE Complete 1980 13,516,459 
Williston, ND Water Intake Complete 1981 988,583 
26-35

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 26-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Deauthorization Funds Funds 
Project Report For Document Expended Expended 
Billings, MT (Western Unit) 
Boulder, CO 
Buffalo, Johnson County 
Diversion Channel, WY 
Castlewood Lake, 
Douglas County, CO 
Davids Creek Lake, IA 
Dayton, WY 
Giles Creek, Elkhom, NE 
Indian Creek Lake, IA 
Lake Herman 
(Dredging), SD 
Little Nemaha River, 
Nemaha County, NE 
Milk River, 
Havre, MT 
Miles City, MT 
Morrison, Bear Creek, CO 
Oahe Dam -Lake Oahe 
(Wildlife Restoration), 
ND 
Redwater River and 
Hay Creek, Bell Fourche, SD 
1976 
1976 
1961 
1943 
1972 
1956 
1952 
1969 
N/A 
1973 
N/A 
1982 
1950 
N/A 
1966 
Sec. 201. FC Act 1950 
23 Mar 81 
FC Act 1950 
WRDA of 1986 
17 Oct 86 
FC Act 1950 
WRDA of 1986 
17 Oct 86 
PL 77-228 
WRDA of 1986 
17 Oct 86 
Sec. 203, PL 90483 
WRDA of 1986 
17 Oct 86 
Sec. 12, PL 93-251 
WRDA of 1974 
5 Aug 77 
Sec. 12, PL 93-251 
WRDA of 1974 
6 Nov 77 
See. 12. PL 93-251 
WRDA of 1974 
4 Jan 74 
Sec. 1001(a), PL 89-298 
WRDA of 1986 
17 Oct 86 
Sec. 204, PL 89-298 
WRDA of 1986 
17 Oct 86 
Sec. 1001(a), PL 89-298 
WRDA of 1986 
17 Oct 86 
FC Act of 1950 
Section 1001(b) 
WRDA 1986 
Sec. 12. PL 93-251 
WRDA of 1974 
5 Aug 77 
FC Act of 1970 
Section 1001(b) 
WRDA 1986 
Sec. 12, PL 93-251 
WRDA of 1974 
4 Jan 74 
26-36 
75,000 
142,666 
135,000 
282200 
30,000
0 
1,000 
The following investigations for flood control called for by Flood Control Acts and committee resolutions were deauthorized by WRDA of 1986, 17 Oct 86; Aowa & South Creek, NE; Bow Creek, 
NE; Cannonball River, ND: James River, ND & SD;.Judith River Basin, MT; Niobrara River Basin. NE, SD & WY; Omaha Creek, NE; South Dakota Lakes, SD. Weeping Water Creek, NE; 
Windpower at Ft. Peck Lake, MT; Yellowstone River below Billings, MT. South Platte River, Denver-Ft. Lupton-Ft. Morgan, CO; Lower Big Sioux River IA & SD; Eagle Bay Highway Bridge, 
Missouri River Basin. ND; Shendan. WY (Stage III); Missoun River Levee System Units: R53 ,1 R540, R553. R555, R577, R589, R603, R610, R623, R644. R645, R652, R661, R669, R676, R682, 
R686, R703. R717, R719, R725, R728, R742, R750

OMAHA, NE DISTRICT 
TABLE 26-G (continued) DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Deauthorization Funds Funds 
Project Report For Document Expended Expended 
Shell Creek, NE 1962 Sec. 12. PL 93-251 71,000 
WRDA of 1974 
3 Oct 78 
Upper Missouri River, SD N/A Sec. 1001(a), PL 89-298 
Streambank Erosion Control Project WRDA of 1986 
17 Oct 86 
Vermillion River and Tribs, SD 1968 Sec. 12 PL 93-251 208,000 
WRDA of 1974 
4 Jan 74 
The folowtng investiptions for flood control called for by Flood Control Acts and commrnrntteere solutions were deauthonzed by WRDA of 1986, 17 Oct 86; Aows & South Creek, NE; Bow Creek, 
NE; Cannonball River ND; James River, ND A SD.,Judith River Basin, MT. Niobrara River Basin, NE, SD & WY; Omaha Creek, NE, South Dakota Lakm, SD; Weeping Water Creek. NE; 
Windpower at Ft. Peck Lake, MT; Yellowstone River below Billings, MT; South Platte River, Denver-Ft. Lupton-Ft. Morgan, CO; Lower Big Sioux River IA & SD, Eagle Bay Highway Bridge, 
Misouri River Basin, ND; Shenrdan WY (Stage III); Miuoun River Levee System Units- R531, R540, R553, R555 R5577, R589, R603, R610. R623, R644. R645, R652, R661, R669, R676, R682, 
R686, R703, R717, R719, R725, R728, R742, R750 
26-37

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
MISSOURI RIVER LEVEE SYSTEM, SIOUX CITY, IA TO RULO, NE 
TABLE 26-H 
Miles of 
Unit Levee Status 
L627-624 
L601 
L594 
R580 
L575 
R573 
R562 
L561-550 
R548 
L536 
R520 
R613 
R616 
L611-614 
L627, L624, 
L561-550 
Comprehensive 
Mosquito Creek Levee 
Watkins-Waubonsie Ditch Levees 
Pleasant Valley Levee 
Nebraska City Levee 
Thurman-Hamburg Levee 
Otto County Drainage District No. 2 
Peru Dike 
Atchison County Levee District No. I 
Brownville-Nemaha Levee 
Mill Creek Levee 
Richardson County Drainage District No. 8 
Papillion Creeck-Platte River Levee 
Bellevue-Papillion Creek Levees 
Mosquito-Keg Creek Levees 
Remedial Studies on Completed Units 
Restudy of Levee System 
14.2 
15.0 
11.4 
0.2 
45.8 
5.9 
7.6 
41.3 
19.5 
13.6 
6.3 
14.0 
4.5 
22.0 
Complete 1950 
Complete 1966 
Complete 1964 
Complete 1950 
Complete 1950 
Complete 1950 
Complete 1950 
Complete 1952 
Complete 1952 
Complete 1952 
Complete 1960 
Complete 1971 
Complete 1987 
Complete 1988 
Studies Complete 
Studies Complete 
26-38

OMAHA, NE DISTRICT 
PICK-SLOAN MISSOURI RIVER BASIN PROGRAM 
TABLE 26-I (See Section 19 of Text) 
Estimated Estimated 
Project Federal Cost Non-Federal Cost 
Fort Peck Lake, MT /, 1/ 158,428,000 1,103,000 
Garrison Dam, Lake Sakakawea, ND /, 3/&/ 310,832,264 1,516,000 
Missouri River Levee System, IA, NE, KS and MO 
(Sioux City, IA to Rulo, NE) 11 37,931,000 4,618,000 
Oahe Dam-Lake Oahe, SD and ND /., T 346,521,000 2,320,000 
Big Bend Dam-Lake Sharpe, SD , 2/ 107,498,000 302,000 
Fort Randall Dam, Lake Francis Case, SD 1/, 199,066,000 1,609,000 
Gavins Point Dam, Lewis & Clark Lake, SD & NE 1/, 2 49,617,000 137,000 
Gavins Point Dam, Lewis & Clark Lake, SD 
& NE-Relocation of Niobrara, NE 2/ 13,516,000 
Omaha, NE 2/ 5,904,000 362,000 
Council Bluffs, IA L/ 2,558,000 146,000 
Missouri River, Garrison Dam to Lake Oahe, ND 2/ 9,413,000 270,000 
Cherry Creek Lake, CO 1/, / 15,220,000 285,000 
11 Details presented on individual report. 2/ Completed. 3/ Active portion of project. 
26-39

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
INSPECTION OF COMPLETED LOCAL PROTECTION PROJECTS 
TABLE 26-J (See Section 26 of Text) 
Location Month Inspected 
Montana 
Beaver Creek, Saco Sep 99 
* Clyde Park, Shields River Sep 99 
Glasgow, Milk River Nov 99 
Havre, Milk River Oct 99 
Havre, Scott Coulee-Bull Hook Dam Oct 99 
Three Forks, Lower Madison River Oct 99 
Forsythe, Yellowstone River Aug 00 
West Glendive, Yellowstone River Aug 00 
Sun River,Vaughn Oct 99 
* Yellowstone River, Water Plant, Livingston Sep 99 
Sun River, Great Falls Oct 99 
* Milk River, Malta (Sewer Line) Oct 99 
* Yellowstone River, Livingston (N.E. Livingston Bridge) Sep 99 
* Milk River, Chinook (Finley Bridge) Oct 99 
* Battle Creek, Chinook (Uhruh Bridge) May 99 
* East Gallatin, Near Bozeman (Intst Bridge) Sep 99 
* Yellowstone River, Near Livingston (Hwy 89 - 7 Miles East of Livingston) Sep 99 
* Shields River, Near Livingston (Hwy 89) Sep 99 
* Teton River, Near Choteau (Hwy 89) Oct 99 
* Madison River, Quake Lake Sep 99 
* Milk River, Malta Oct 99 
Missouri River, Bank Stabilization Project. Frazer Sep 94 
* Dearborn River - Hwy 287, Wolf Creek Oct 99 
* Muddy Creek - Int Hwy 15 - Frontage Road, Vaughn Oct 99 
* Badger Creek -Hwy 89, Browning Sep 99 
Wyoming 
* Baldwin Creek. Lander (Sewage Lagoons) Sep 99 
Greybull, Big Horn River Aug 00 
Sheridan, Big and Little Goose Creeks Aug 00 
* Shoshone River, Bank Protection, Lovell Aug 92 
* Shoshone River, Byron Oct 98 
* Powder River, Arvada Oct 98 
* Medicine Bow River, Elk Mountain Jan 97 
North Dakota 
Mandan, Lower Heart River Oct 99 
Marmarth, Little Missouri River May 99 
Scranton, Buffalo May 99 
* Cannonball River Oct 97 
* Denotes Section 14 Projects 
** Denotes PL-84-99 Projects 
26-40

OMAHA, NE DISTRICT 
INSPECTION OF COMPLETED LOCAL PROTECTION PROJECTS 
TABLE 26-J (Continued) (See Section 26 of Text) 
Location Month Inspected 
South Dakota 
Big Sioux River, Union County Jun 00 
Big Sioux River. North Sioux City Jun 00 
Sioux Falls, Big Sioux River Jul 00 
Belle Fourche, Belle Fourche River Aug 99 
Rapid City, Cedar Canyon Dam Sep 99 
Hot Springs, Fall River Channel Sep 99 
Herreid, Spring Creek Aug 00 
* Missouri River, Bank Protection, Greenwood Aug 00 
* Bad River, Bank Protection, Fort Pierre 
* Big Sioux River, Schofield Bridge, Near Flandreau Jun 00 
* Rapid Creek, Rapid City Sep 99 
* Missouri River. Sacred Heart Hospital, Yankton Aug 97 
* Vermillion River, Vermillion May 00 
* Big Sioux River, Harrisburgh Jun 00 
* Big Sioux River, Jefferson Jun 00 
Deadman Gulch. Sturgis Aug 00 
* MarneCreek, Yankton May 00 
* White River, Winner Oct 96 
* James River, Yankton Jun 00 
* Missouri River, White Swan & Sunshine Bottoms Aug 98 
* Big Sioux River. Plymouth County Jun 99 
Colorado 
Aurora. Westerly Creek-Kelley Road Dam Sep 00 
* South Platte River, Kersey Aug 99 
* South Platte River. Merino Sep 99 
* South Platte River. Iliff Sep 99 
* South Platte River. Platteville Sep 99 
* Big Thompson River, Johnstown Aug 99 
* Cache La Poudre River, Ft. Collins (Water Treatment Plant) Sep 96 
* South Platte River. Fort Lupton Hwy 85 Aug 99 
* South Platte River. Logan County (Bridges 175A & 173) Sep 99 
* Downstream Chatfield. Denver Jun 99 
Nebraska 
* Blackbird Creek. Burt County May 97 
Omaha, Missouri River Oct 99 
Waterloo, Elkhom River May 00 
West Point, Elkhorn River May 99 
Pierce. Elkhorn River May 00 
Clarkson, Middle Fork, Maple Creek Aug 00 
Hooper, Elkhorn River Jul 99 
Norfolk, North Fork. Elkhom River May 00 
Madison, Union & Taylor Creeks May 00 
Schuyler, Lost Creek & Platte River Sep 99 
Little Papillion, Little Papillion Creek Oct 97 
* Denotes Section 14 Projects 
** Denotes PL-84-99 Projects 
26-41

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
INSPECTION OF COMPLETED LOCAL PROTECTION PROJECTS 
TABLE 26-J (Continued) (See Section 26 of Text) 
Location Month Inspected 
Nebraska (continued) 
Macy, Blackbird Creek May 99 
Lincoln, Salt Creek & Tributaries Mar 99 
Meadow Grove, Buffalo Creek May 00 
Columbus, Loup River Aug 99 
Broken Bow, Mud Creek Aug 00 
* Platte River, Brady Feb 95 
* Elm Creek, Decatur Nov 98 
* Nebraska City South Table Creek Jul 99 
* Wigle Creek, Homer Dec 98 
* South Elkhorn River, near Ewing, NE May 99 
* Elk Creek, Jackson Dec 98 
* Elk Creek, Willis Dec 98 
Flood Control Project, Lost Creek, Columbus Aug 99 
* Middle Pebble Creek. Snyder Nov 98 
* Elm Creek, Burt County Apr 98 
* Platte River, Camp Ashland Nov 98 
* West Branch Papillion Creek. Omaha. NE Oct 99 
* Logan Creek. Near Bancroft Dec 98 
* Platte River, Near North Bend Aug 98 
* Elkhom River, Near Beemer Nov 98 
* East Bow Creek, Wynot Jun 99 
* Cedar River, Spalding Aug 97 
** Ames Diking District near Ames Aug 98 
* North Bend Diking District Aug 98 
** Cottrelle Diking District Jul 99 
** Fremont County Bd of Sup Winslow Levee Jul 99 
** Fremont County Bd of Sup Bowman, Zach, Roth Jul 99 
** Fremont County Bd of Sup Peterson Jul 99 
** Clear Creek Diking District Jul 99 
** SID #1 Lake Waconda Jul 99 
** SID #97 Hawaiian Village Jun 00 
** SID #101 Hansen Lake Jun 00 
** PMRNRD Western Feb 98 
** PMRNRD Cape-L Str Oct 99 
** LPSNRD Omaha Fish Mar 00 
** PMRNRD Union Dike Sep 99 
** PMRNRD No Name Jul 99 
** Coming Levee Dist #2 Mill Creek D.D. May 00 
** Fremont Co. Bd. of Sup. Whitehead Levee Jul 99 
* Lodgepole Creek, Sydney Sep 99 
Gering Drain. Gering Sep 99 
* Denotes Section 14 Projects 
* * Denotes PL-84-99 Projects 
26-42

OMAHA, NE DISTRICT 
INSPECTION OF COMPLETED LOCAL PROTECTION PROJECTS 
TABLE 26J (Continued) (See Section 26 of Text) 
Location Month Inspected 
Iowa
Council Bluffs, Missouri River Jul 00 
Ida Grove, Maple River-Odebolt Creek Aug 00 
Sioux City, Floyd River Sep 00 
Hawarden, Dry Creek Aug 99 
Hamburg L575, Nishnabotna River Dec 99 
Intercounty D.D., Little Sioux River Sep 00 
Nagel D.D., Little Sioux River Sep 00 
Bennett-McDonald-Smithland D.D., Little Sioux River Sep 99 
* West Nishnabotna River, Mills County Bridge, Near Malvern Jul 99 
* East Nisbnabotna River, Page County Bridge, Near Essex Jul 99 
East Nishnabotna River, Red Oak Jul 00 
* Mucky Creek, Mapleton, IA Dec 98 
Emerson, Indian Creek, Mills County Oct 99 
Monona-Harrison Ditch Control, Monona County Sep 99 
* Little Sioux River, Anthon Dec 98 
* Keg Creek. Minden Jul 99 
* Soldier River, Near Ute Sep 98 
Missouri River Levees 
L624 & L627, Mosquito Creek & Sieck Levees Oct 99 
L60 1, Watkins Levee District Aug 00 
L601, Miller-Sturgeon Levee District Aug 00 
L601, Missouri River Levee District # 1 Aug 00 
L594, Waubansie Drainage District Apr 99 
L594, Pleasant Valley Levee District Apr 99 
L575, Benton-Washington Levee District Mar 99 
L575, Northwest Atchison Levee District Dec 99 
L575. McKissock Island Levee District Dec 99 
L575, Bucbannan Levee District Dec 99 
L56 1, L550, L536, Atchison County Levee District Aug 00 
L611-614. M & P Missouri River Levee District Jul 00 
R613, Papio Natural Resources District Oct 99 
R548, Little Nemaha Levee District Aug 00 
R520, Richardson Co. Levee Dist. #8 Sep 99 
R573, Otoe County Drainage Dist. #2 Sep 00 
R616, Sarpy County Papio Natural Resources District Oct 99 
R562, Peru Levee District Sep 99 
R548, Brownville-Nemaha Levee District Aug 00 
* Denotes Section 14 Projects 
** Denotes PL-84-99 Projects 
26-43

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
ACTIVE GENERAL INVESTIGATIONS 
TABLE 26-K (See Section 50 of Text) 
Federal Cost Totals By 
Item Fiscal Year 00 Subtotal and Category 
SURVEYS (Category 100) 
Flood Damage Prevention Studies (120) 
Reconnaissance Study (121) 
Indian Creek, Council Bluffs. IA 39,798 
Feasibility Study (121) 
Chatfield, Cherry Creek & Bear Creek, CO 422 
Antelope Creek, Lincoln, NE 151,601 
Lower Platte River and Tribs., NE 518,305 
Subtotal 710,126 
Special Studies (140) 
None in FY 00 
Review of Authorized Projects (160) 
Review of Completed Projects: Recon. Study (163) 
Chatfield, Cherry Creek & Bear Creek, CO 638 
Oahe Lake Sharpe, SD 24 
Review of Completed Project: Feasibility Study (164) 
Chatfield, Cherry Creek & Bear Creek 428,544 
Subtotal 429,206 
Miscellaneous Activities (170) 
Special Investigations (17 1) 165,453 
FERC Licensing Activities (172) 2,335 
Interagency Water Resources Development(173) 25,650 
North American Waterfowl Management Plan(176) 4,735 
Subtotal 198,173 
Coordination Studies with Other Agencies (180) 
Cooperation With Other Water Resources Agencies (181) 22,790 
Cooperation with States (186) 247.196 
Subtotal 269,986 
TOTAL (Category 100) 1,607,491 
COLLECTION AND STUDY OF BASIC DATA (Category 200) 
Flood Plain Management Services (250) <90> 
Flood Plain Management, Omaha. NE 54.664 
National Flood Proofing Cmet (NFPC) 5.161 
Quick Responses (250) 6,008 
SS -May Creek, Bismarck. ND 0 
SS -Big Sioux River, Esteline. SD 2,980 
SS - N. Fork, Elkhom River. CO 6,999 
SS - Montgomery County, IA 6,016 
SS -Polk, NE 3,914 
SS - Heart River, Morton County. ND 0 
SS - Winslow, NE, Nonstructural F.H. 16,721 
SS - Glendive, MT 1224 
SS - Parkston, SD 5,036 
SS -Roundup, MT 4,896 
Technical Services, General (250) 70,002 
Hydrologic Studies (260) 
General Hydrologic Studies (262) 40,643 
TOTAL (Category 200) 224,174 
26-44

OMAHA, NE DISTRICT 
ACTIVE GENERAL INVESTIGATIONS 
TABLE 26-K (Continued) (See Section 50 of Text) 
Federal Cost Totals By 
Item Fiscal Year 00 Subtotal and Categories 
PRECONSTRUCTION ENGINEERING AND DESIGN - 
PROJECTS NOT FULLY AUTHORIZED (Category 400) 
Wood River, Grand Island, NE (451) 
Big Sioux River, Sioux Falls, SD (451) 
Watertown and Vicinity, SD (451) 
Sand Croek Watershed, Wahoo, NE (451 ) 
Gregory County Hydroelectric Pumping Storage. SD (460) 
TOTAL (Category 400) 
GRAND TOTAL GENERAL INVESTIGATIONS 
120 
189.598 
70,736 
5,403 
45,000 
310,857 
2,142,522 
26-45

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
FLOOD CONTROL ACTIVITIES UNDER SPECIAL AUTHORIZATION 
TABLE 26-L (See Section 28 of Text) 
Fiscal Year 00 
Project Name Stage Cost 
Flood Control and Coastal Emergencies 
Disaster Preparedness (100) 483,217 
Emergency Operations (200) 223 
Rehabilitation & Inspection Program (300) 713,117 
Emergency Water Supplies & Drought Assistance (400) 0 
Advance Measures (500) 553,454 
Hazard Mitigation (600) 0- 
Support for Others 179,357 
Total (FCCE) 1,929,368 
Section 205: 
Logan Creek, Pender, NE C 48,037 
Aberdeen & Vicinity, SD C 44,760 
Maple Creek East Fork, Howells. NE C 482 
Milk River, Malta, MT C 1,678 
Nishnabotna River, Hamburg, IA C 40,949 
Pebble Creek. Scribner, NE C 258 
Van Bibber Creek, Arvada, CO P 10,401 
Iowa & South Creeks, Ponca, NE F 660 
Denison, IA F 99,574 
Verdigre, NE F 43,952 
Burt & Washington Counties, NE F 41,546 
Livingston, MT F 30,229 
Cold Brook Creek, Hot Springs, SD F 41,666 
Sidney, NE C 10,512 
Ponca Creek, Lynch, NE F 41,317 
Heart River, Mandan, ND F 11,552 
Mosquito Creek, Council Bluffs, IA F 6,295 
Knife River, Beulah. ND F 12,306 
Yellowstone River, Glendive, MT F 65,510 
Crow Creek, Cheynne, WY F 5,508 
Total (Section 205's) 557,192 
Section 14: 
Little Missouri River, E. River Rd., Medora, ND C 3,120 
James River Rd. (CR 213), SD C 16,333 
Cache La Poudre. CO C 169,157 
Coulson Park Landfill. Billings. MT C 353,044 
Elk Creek, Lancaster County, NE PDA 27,841 
Total (Section 14's) 569,495 
Total Flood Control Activities S 3,056,055 
L = Litigation R = Recon 
P = Plans & Specs C = Construction 
F = Feasibility - - Does Not Apply 
PDA = Planning & Design Analysis (Section 14 only) 
26-46

OMAHA, NE DISTRICT 
TABLE 26-M ENVIRONMENTAL 
Modification of projects for the purpose of improving 
the quality of the environment in the public interest. 
(Includes Section 1135, Public Law 99-662, as amended and Section 206, Public Law 104-303, as amended.) 
Fiscal Year 00 Fiscal Year 00 
Study/Project and Location Federal Funds Expended Contributed Funds Expended 
Boyer Chute, NE 402,611 
California Bend, NE 192,614 3,985 
Cheyenne River Sioux Tribe, Lower Brule 
Sioux Tribe and State of South Dakota 
Terrestrial Wildlife Habitat Restoration 893,862 
Coordination Account Funds 34,844 
Glenn Cunningham Lake, NE 56,581 
Hidden Lake Restoration, NE 12.600 (1,358) 
Initial Appraisals, General, NE 20,305 
Lower Decatur Bend, NE 178,845 
Missouri River Fish & Wildlife Mitigation, 
IA, NE, KS & ND 4,250,687 
Missouri River Levee Unit L536 2,800 
Nathan's Lake, NE 19,178 18,241 
Plattesmouth Bend Chute, NE& 2,226 
Upper Central Platte Valley (Colfax Reach), CO 524,733 
Wehrspann, Lake Aquatic, NE 349,497 223,616 
26-47
KANSAS CITY, MO, DISTRICT* 
The district comprises a portion of southwestern Iowa; northwestern, central and western Missouri; northern Kansas; southern 
Nebraska; and a portion of northeastern Colorado embraced in drainage basin of the Missouri River and tributaries from Rulo, 
Nebraska, to the mouth. Report on navigation project for section of Missouri River from Sioux City, Iowa, to Rulo, Nebraska, 
is in report of Omaha District. 
IMPROVEMENTS 
Navigation 
1. Missouri River, Sioux City, IA to 
Mouth (Rulo, NE, to Mouth) 
2. Missouri River Fish and Wildlife 
Mitigation,IA,NE,KS, and MO 
Flood Control 
3. Blue River Basin, Kansas City,MO 
4. Blue River Channel, Kansas City,MO 
5. Brush Creek, Kansas City, MO 
6. Clinton Lake, Wakarusa River, KS 
7. Harlan County Lake, Republican 
River, NE 
8. Hillsdale Lake, Big Bull CreekKS 
9. Kanopolis Lake, Smoky Hill River,KS 
10. Little Blue River Lakes, MO 
11. Long Branch Lake, Little Chariton 
River, MO 
12. Melvern Lake, Marais des Cygnes 
(Osage) River, KS 
13. Milford Lake, Republican River, KS 
14. Missouri River Levee System, IA, NE, 
KS, and MO (Rulo, NE, to Mouth) 
15. Perry Lake, Delaware River, KS 
16. Pick-Sloan Missouri Basin Program 
(Kansas City Dist.) 
17. Pomme de Terre Lake, Pomme de Terre 
River, MO 
18. Pomona Lake, One Hundred Ten Mile 
Creek, KS 
19. Rathbun Lake, Chariton River, IA 
20. Smithville lake, Little Platte 
River,MO 
21. Turkey Creek Basin, KS & MO 
22. Tuttle Creek Lake,Big Blue River,KS 
23. Wilson Lake, Saline River,KS 
24. Scheduling of Flood Control 
Reservoir Operations 
25. Inspection of Completed Flood 
Control Projects 
Multiple Purpose Projects Including Power 
26. Harry S. Truman Dam and Reservoir, 
Osage River, MO 
27. Stockton Lake, Sac River, MO 
Page 
27-2 
27-2 
Work Under Special Authorities 
28. Continuing Authorities Program 
29. Emergency Response Activities 
General Investigations 
30. General Investigations 
27-2 
27-3 
27-3 
27-3 
27-3 
27-4 
27-4 
27-4 
27-5 
27-5 
27-5 
27-6 
27-6 
27-6 
27-6 
27-7 
27-7 
27-7 
27-7 
27-7 
27-8 
27-8 
27-8 
Other Activities 
31. Mississippi River Main Stem 
Model Development 
32. Catastrophic Disaster Preparedness 
Program 
33. Missouri River Basin Collaborative 
Water Resources, Planning/Partnering 
Process 
34. Regulatory Program 
Tables 
Table 27-A Cost & Financial Statement 
Table 27-B Authorizing Legislation 
Table 27-C Other Authorized Navigation 
Projects 
Table 27-D Not Applicable 
Table 27-E Other Authorized Flood Control 
Projects 
Table 27-F Not Applicable 
Table 27-G Deauthorized Projects 
Table 27-H Missouri River Levee System 
Table 27-I Kansas City District Projects 
Included in Pick-Sloan 
Missouri Basin Program 
Table 27-J Inspection of Completed Flood 
Control Projects 
Table 27-K Work Under Special Authorities 
Continuing Authorities Program 
Aquatic Ecosystem Restoration 
Project Modifications for 
Improvement of Environment 
Emergency Response Activities 
Table 27-L Active General Investigations 
Table 27-M Regulatory Program 
27-8 
27-8 
27- 1 
27-9 
27-10 
27-10 
27-10 
27-10 
27-10 
27-11 
27-12 
27-16 
27-22 
27-23 
27-25 
27-29 
27-30 
27-31 
27-33 
27-34 
27-34 
27-34 
27-36 
27-38

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Navigation 
1. MISSOURI RIVER,SIOUX CITY, 
IA,TO MOUTH (RULO,NE,TO 
MOUTH) 
Location. Jefferson, Madison, and Gallatin Rivers conjoin 
at Three Forks, Montana, to form the Missouri River, which 
flows southeasterly 2,315 miles (1960 mileage) across or 
along seven states to the Mississippi River, 17 miles above 
St. Louis. For description see page 1149, Annual Report for 
1932. The river is commercially navigable from Sioux City, 
Iowa, to the mouth, a distance of 732 miles. The portion of 
project in Kansas City District extends from Rulo, Nebraska, 
to the mouth, a distance of 498 miles. 
Previous Projects. For details see page 1891 of Annual 
Report for 1915, and pages 1153 and 1175 of Annual Report 
for 1938. 
Existing Project. A channel of 9-foot depth and width not 
less than 300 feet, obtained by revetment of banks, 
construction of permeable dikes to contract and stabilize the 
waterways, cutoffs to eliminate long bends, closing minor 
channels, removal of snags, and dredging as required. The 
improved reach within the Kansas City District extends from 
the mouth to Rulo, Nebraska, a distance of 498.4 miles. The 
Bank Stabilization and Navigation features of the project 
were completed in September 1980. For the reach from 
Rulo, Nebraska, to the mouth, the total construction cost was 
$237,942,190 including $8,665,594 for previous project. 
River access sites have been completed at 11 locations. 
Ordinary and extreme stage fluctuations are 16 and 38 feet, 
respectively. 
Local cooperation. Cooperation from benefited localities 
may be required where any improvement may confer special 
benefit. The receipt of contributions from private parties are 
to be expended along with Government funds upon 
authorized work where such work would be in the interest of 
navigation, as authorized by 1915 Rivers and Harbors Act. 
Secretary of the Army approved general principle of 
cooperative construction on Missouri River below Kansas 
City on basis that 25 percent of cost of any special 
installation shall be paid by the United States and 75 percent 
by local interests. Total contributed by local interests in 
cooperation with the United States from 1918 to June 30, 
1964, was $675,663, of which $8,647 was returned to 
contributors. Local interests must share in cost of recreation 
facilities in accordance with provisions of the Federal Water 
Project Recreation Act of 1965. Local interests have 
contributed $171,816 for cost sharing on construction of 
recreation in addition to constructing portions of the facility. 
Terminal facilities. A listing of terminal facilities are 
included in Missouri River Navigation Charts and can be 
obtained from Kansas City District Engineer for a small fee. 
Operations during fiscal year. Routine maintenance of 
dikes and revetments along the lower river was 
accomplished by contract. Field hired labor accomplished 
emergency construction of a flow control structure at the 
entrance of a newly formed chute. District personnel also 
27- 
accomplished other work items: Channel reconnaissance, 
stream gauging condition studies, surveys and mapping, 
engineering and design, surveys and layouts of construction, 
and supervision and administration. Project tonnage on the 
river for CY 2000 is estimated at 8.0 million tons, excluding 
waterway improvement materials. District estimates the 
recreation use on the Missouri River (NWK) at 1.2 million 
recreation days annually. 
2. MISSOURI RIVER FISH AND 
WILDLIFE MITIGATION, IA, NE, KS, 
and MO 
Location. This project extends along the Missouri River 
from Sioux City, Iowa, to the Mouth near St. Louis, a river 
distance of 732 miles. This location is coincident with the 
Bank Stabilization and Navigation Project on the river. 
Existing project. The project is to mitigate losses of fish 
and wildlife habitat resulting from construction and 
operation of the Missouri River Bank Stabilization and 
Navigation Project. The four major components of the plan 
are restoration of aquatic habitat on public and non-public 
lands (2,500 acres), preservation of aquatic habitat on public 
and non-public lands subject to the effects of riverbed 
degradation (700 acres), acquisition and development of 
existing undeveloped habitat on private lands (28,000 acres), 
and development of terrestrial wildlife habitat on existing 
undeveloped public lands (16,900 acres). Estimated fully 
funded cost of the project (2000) is $85,400,000, all Federal. 
Both the Kansas City and Omaha Districts are involved in 
the implementation of the project, with Kansas City District 
involvement directed mainly to sites in Kansas and Missouri. 
Local cooperation. There is no non-Federal sponsor for the 
project. The U.S. Fish & Wildlife Service and the states of 
Iowa, Nebraska, Kansas, and Missouri are voluntarily 
serving on a coordinating team, which is actively involved in 
ongoing project activities. 
Operations during fiscal year. Funding was continued for 
land acquisition and construction of mitigation features. 
Land was purchased at Nishnabotna, Overton Bottoms, and 
Thurnau, Missouri. Design activities were carried out at the 
following: Louisville Bend, Iowa; Kansas Bend , Nebraska; 
Blackbird-Tieville-Decatur, Iowa and Nebraska; Overton 
Bottoms, Lower Hamburg, Eagles Bluff, Columbia Bottoms, 
and Worthwine Island, Missouri. Construction activities 
occurred at Tobacco Island and Langdon Bend, Nebraska; 
Derion Bend and Overton Bottoms, Missouri; and California 
Bend, Iowa. 
Flood Control 
3. BLUE RIVER BASIN, KANSAS CITY, 
MO 
Location. Along the left bank of the Blue River from U.S. 
Highway 71 upstream for a distance of about 1-1/4 miles in 
Jackson County, Missouri, to the Bannister Federal Complex 
levee. 
2

KANSAS CITY, MO, DISTRICT 
Existing project. The recommended project includes 
construction of approximately 1-1/4 miles in Jackson 
County, Missouri, to the Bannister Federal Complex levee. 
Existing project. The recommended project includes 
construction of approximately 1-1/4 miles of levee to 
provide flood protection to 280 acres in the Dodson 
Industrial Area and surrounding area in Kansas City. 
Estimated Federal cost through construction of the project 
(2004) is $13,500,000, and estimated non-Federal cost of 
lands damages and relocations is $6,500,000. Funds were 
provided in FY 2001 for a new construction start. 
Local Cooperation. The city of Kansas City provided a 
letter of assurance, dated November 17, 1995, officially 
stating its intent to cost share the project. 
Operations during fiscal year. Preconstruction 
engineering and design continued with preparation of the 
design memorandum and plans and specifications. 
4. BLUE RIVER CHANNEL, KANSAS 
CITY, MO 
Location. Along the Blue River and tributaries in Jackson 
County, Missouri. 
Existing Project. Preliminary plans consist of 12.5 miles of 
improved channel along the Blue River within Kansas City, 
Missouri. Estimated Federal cost through construction of 
the project (2000) is $220,000,000, and estimated non- 
Federal cost of lands, damages and relocations is 
$32,500,000. 
Local Cooperation. Section 2, Flood Control Act of June 
22, 1936 applies. The City of Kansas City, Missouri, passed 
a resolution of intent on December 9, 1975 to provide the 
required assurances of local cooperation when requested. 
The Kansas City District Engineer signed the Section 221 
agreement on September 8, 1983. 
Operations during fiscal year. All work on stages I and 2 
has been completed. The Stage 3 reach of the project 
consists of four construction contracts. The 12-19* Street 
contract is complete. The 19h to Stadium Drive construction 
contract is nearing completion. The Plans and Specifications 
for the remaining two contracts have been initiated. 
Railroad alteration contracts in the Stage 3 reach with the 
Kansas City Southern and Burlington Northern Santa Fe 
Railroad Companies have been completed. One Union 
Pacific Railroad bridge has been completed and the design 
of the remaining three bridges is underway. 
5. BRUSH CREEK, KANSAS CITY, MO 
Location. A major tributary of the Blue River in Kansas 
City, Missouri, and Johnson County, Kansas, draining a 
highly urbanized 29-square-mile area in the two states. 
Existing project. The authorized project consists of 
improving about 7,500 feet of the channel from near 
Roanoke Parkway downstream to near Troost Avenue in 
Kansas City. At the request of the sponsor, Kansas City, 
Missouri, a modified project was built which provides 
identical flood protection, but which also accommodates 
park and recreation development in the authorized reach. 
Estimated fully funded Federal cost of the modified project 
(1996) is $14,464,000; and estimated non-Federal cost of 
lands, damages, and cash is $19,526,000. 
Local cooperation. The City of Kansas City and the Corps 
of Engineers entered into a Local Cooperation Agreement 
(LCA) on the project in March 1991. 
Operations during fiscal year. The dedication of the 
project was in June 1995. The project was turned over to the 
local sponsor in January 1997. 
6. CLINTON LAKE, WAKARUSA 
RIVER, KS 
Location. Damsite is on Wakarusa River about 4 miles 
southwest of Lawrence, in Douglas County, Kansas. The 
lake extends into Shawnee and Osage Counties, Kansas. 
Existing project. An earthfill dam about 9,250 feet long 
constructed to a height of about 114 feet with an 
uncontrolled spillway in left abutment. Total reservoir 
storage capacity 397,200 acre-feet (258,300 for flood 
control, 28,500 for sediment reserve, and 110,400 of 
multipurpose storage for municipal and industrial waste 
supply and recreation). Cost of constructing the completed 
project was $57,415,433. Construction was initiated in 
January 1972, and the project was placed in operation in 
November 1977. 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938 applies. Reimbursement in the estimated amount 
of $6,768,000 is required for water supply storage in 
accordance with the Water Supply Act of 1958. A contract 
was signed by the State on September 6, 1978 and was 
approved by the Secretary of the Army on October 30, 1978. 
Utilization of storage was initiated in December 1979. 
Repayment also began at that time. 
Operations during fiscal year. Visitation for FY 2000 was 
7,103,248 visitor hours. Maintenance: Activities consisted 
of ordinary operation and maintenance. 
7. HARLAN COUNTY LAKE, 
REPUBLICAN RIVER, NE 
Location. Dam is on main stem of Republican River about 
235 miles above confluence of stream with Smoky Hill 
River. Site is in Harlan County, 1-1/2 miles south of 
Republican City and 13 miles west of Franklin, Nebraska. 
Existing project. An earthfill dam about 107 feet above 
streambed with a total length of 11,827 feet, including a 
gate-controlled, concrete, gravity-type spillway section near 
the center of dam. Reservoir provides storage capacity of 
850,000 acre-feet (500,000 for flood control and 350,000 for 
irrigation and sedimentation allowance). Initial cost of 
constructing the project was $45,279,532. Total Federal cost 
27- 3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
of project, including $1,017,623 for major rehabilitation 
work and $1,832,394 supplemental recreation development 
(Code 710), is $48,129,549. Construction of the project was 
initiated in August 1946. The project was placed in 
operation in December 1952. Major rehabilitation work was 
completed in FY 1968. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. 
Operations during fiscal year. Visitation for FY 2000 was 
7,006,522 visitor hours. Maintenance: Activities consisted 
of ordinary operation and maintenance. 
Study of future operation. We continued coordination 
efforts with the Bureau of Reclamation and continued as a 
cooperating agency and providing input to BOR's 
Republican River Basin Environmental Impact Statement 
(EIS). A team comprised of District and BOR 
representatives developed a Consensus Operation Plan 
(Plan) for use of the sediment storage at Harlan County Lake 
for incorporation in the Republican River EIS. The Plan 
resolved a decades-old issue between the two agencies and 
the district and completed the Technical Report addressing 
the impacts of the Plan that was incorporated into the EIS. 
The Division Engineer signed a Record of Decision on July 
25, 2000 adopting the Republican River EIS for Harlan 
County Lake. We continue to maintain our coordination 
with BOR. We also continue to respond to requests from the 
Department of Justice (DOJ) on the Kansas and Nebraska 
lawsuit on the Republican River Compact. 
8. HILLSDALE LAKE, BIG BULL 
CREEK, KS 
Location. The project is located approximately 12 miles 
above the mouth of Big Bull Creek, a tributary of the Marais 
des Cygnes River and about 2'/2 miles west of Hillsdale, in 
Miami County, Kansas. 
Existing project. An earthfill embankment about 11,600 
feet long (including approximately 3,300 feet of dike 
section) about 75 feet above rising valley flood plain. The 
spillway is gravity type uncontrolled and the outlet works 
are controlled. The total reservoir storage capacity is 
160,000 acre-feet (81,000 for flood control, 11,000 for 
sediment reserve, and 68,000 for multipurpose storage for 
water supply, water quality control, and recreation). 
Construction was initiated in December 1974, and the 
project was placed in operation in October 1981. Federal 
cost of construction was $64,161,400. 
Local cooperation. Section 2, Flood Control Act 1938, 
applies. Local interests must make reimbursement of 
$21,145,338 for water supply storage in accordance with 
Water Supply Act of 1958. The Kansas Water Resources 
Board signed a contract in January 1974, approved by the 
Secretary of the Army in April 1974, for the entire 53,000 
acre-feet of water supply storage. The Kansas Department 
of Wildlife and Parks has s 50-year lease on 12,880 acres for 
management of land and water areas for public park, 
recreational, and fish and wildlife purposes. 
Operations during fiscal year. Visitation for FY 2000 was 
1,931,380 visitor hours. Maintenance: Activities consisted 
of ordinary operation and maintenance. 
9. KANOPOLIS LAKE, SMOKY 
HILL RIVER, KS 
Location. The dam is on the Smoky Hill River about 184 
river miles above the mouth of the stream, and about 11 
miles northwest of Marquette, Kansas. 
Existing project. An earthfill dam about 131 feet above 
streambed, having a total length of 15,360 feet, including 
4,070 feet of dike section on the left abutment and 2,550 feet 
of dike section on right abutment. The reservoir provides 
storage capacity of 450,000 acre-feet, (400,000 for flood 
control and 50,000 for recreation and streamflow 
regulation). Outlet works and spillway are in right 
abutment. Initial cost of constructing the project was 
$12,327,735. Total Federal cost of project, including 
$249,492, supplemental recreational development (Code 
710), was $12,577,227. Construction was initiated in June 
1940, and project was placed in operation in May 1948. 
Local Cooperation. Section 2, Flood Control Act of 1938, 
applies. 
Operations during fiscal year. Visitation for FY 2000 was 
1,768,704 visitor hours. Maintenance: Activities consisted 
of ordinary operation and maintenance. 
10. LITTLE BLUE RIVER LAKESMO 
Location. This project consists of two lakes in Jackson 
County, Missouri, located in Kansas City, Missouri, and 
suburban communities. The Blue Springs Lake site is on the 
East Fork of the Little Blue River about 2 mile south of U,S. 
Highway 40, and the Longview Lake site is on the main 
stem at approximately 109"' Street. 
Existing Project. The Blue Springs dam is an earthfill 
embankment about 2,500 feet long and rising about 78 feet 
above the streambed, with an uncontrolled service spillway 
and uncontrolled outlet conduit. The total reservoir storage 
capacity is 26,600 acre-feet (15,700 for flood control, 10,600 
for multipurpose storage for water quality and recreation, 
and 300 for sedimentation). 
The Longview dam is an earthfill embankment about 1,900 
feet long and rising about 120 feet above the streambed, with 
an uncontrolled service spillway and an uncontrolled outlet 
conduit. The total reservoir storage capacity is 46,900 acrefeet 
(24,300 for flood control and 20,600 for multipurpose 
storage for water quality and recreation, and 2,000 for 
sedimentation). Federal cost (1992) for both lakes through 
construction of the project was $140,809,200. Construction 
was initiated in September 1977, and the project became 
operational in September 1988 
Local cooperation. Section 2 of the Flood Control Act of 
June 28,1938 applies. Local interest must share in separable 
costs allocated to recreation in accordance with Federal 
Water Project Recreation Act of 1965. The Jackson County 
27- 4

Legislature approved a recreation cost-sharing contract on 
July 5, 1974, which was approved by the Secretary of the 
Army on June 24, 1976. A supplemental agreement, signed 
by Jackson County officials on June 5, 1978, and approved 
by the Secretary of the Army January 10, 1979, revised the 
existing contract to include additional costs involved in 
raising the multipurpose pool elevation at the Blue Springs 
Lake. Reimbursement for recreation was $15,047,000 of 
which $450,000 was accomplished during construction by 
local interests. 
Operations during fiscal year. Project is complete. Land 
acquisition is complete. Visitation for FY 2000 was 
3,203,673 visitor hours. Maintenance: Activities consisted 
of ordinary operation and maintenance. 
11. LONG BRANCH LAKE, LITTLE 
CHARITON RIVER, MO 
Location. The Damsite is on the East Fork Little Chariton 
River in north central Missouri about 2 miles west of Macon 
in Macon County. 
Existing project. An earthfill dam about 3,800 feet long 
and about 71 feet high with an uncontrolled outlet conduit 
and an uncontrolled service spillway in the right abutment. 
Total reservoir storage capacity is 65,000 acre-feet (29,000 
for flood control, 4,000 for sediment reserve, and 32,000 of 
multipurpose storage for water supply, water quality control, 
fish and wildlife, and recreation). Estimated Federal cost 
(1997) is $20,288,000, and estimated non-Federal cost is 
$3,605,000. Construction was initiated in March 1973. The 
project was placed in useful operation for flood control on 
September 1, 1980. 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938 applies. Local interests must make reimbursement 
of $5,567,000 for water supply storage in accordance with 
Water Supply Act of 1958 and share in separable cost of 
$3,589,000 allocated to recreation in accordance with 
Federal Water Project Recreation Act of 1965. On 
September 15, 1972 the Secretary of the Army approved a 
contract signed by the City of Macon, Missouri, for water 
supply and recreation development. Missouri State agencies 
indicated their intent to sponsor future water supply and 
signed a contract on June 17, 1977 to sponsor recreational 
development in lieu of the City of Macon. After review by 
the Office of the Secretary of the Army, the state signed the 
contract in December 1979, and it was approved by the 
Secretary of the Army on April 18, 1980. Supplemental 
Agreement No. 1 to this contract was approved December 
28, 1993 to provide for additional recreational facilities. 
Additional facilities have been designed 
Operations during fiscal year. Visitation for FY 2000 was 
1,492,716 visitor hours. Project is 100 percent complete on 
scheduled work. The remaining unscheduled work is 
construction of recreation facilities. Maintenance: 
Activities consisted of ordinary operation and maintenance. 
12. MELVERN LAKE, MARAIS DES 
CYGNES (OSAGE) RIVER, KS 
Location. Damsite is on Marais des Cygnes (Osage) River 
in Osage County, Kansas, about 4 miles west of Melvern, 
Kansas. 
Existing project. An earthfill dam about 9,700 feet long 
and about 98 feet high with an uncontrolled chute-type 
spillway in the left abutment. Total reservoir storage 
capacity is 363,000 acre-feet (200,000 for flood control, 
26,000 for sediment reserve, and 137,000 for multipurpose 
storage for water supply, water quality control, and 
recreation). Cost of constructing the completed project was 
$37,436,530. Construction was initiated in July 1967, and 
the project was placed in operation in August 1972. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. Project storage was reallocated in 1989 to include 
municipal and industrial water supply in accordance with 
provisions of the Water Supply Act of 1958. In accordance 
with the provisions of the Memorandum of Understanding 
between the State of Kansas and the Department of the 
Army dated 1985, payment in full of $7,131,834 for 50,000 
acre-feet of water supply storage was made in March 1995. 
Utilization of storage for water supply was initiated in 
September 1993 under an interim contract and continues 
under the current contract signed in January 1995. 
Operations during fiscal year. Visitation for FY 2000 was 
6,594,953 visitor hours. Maintenance: Activities consisted 
of ordinary operation and maintenance and resurfacing outlet 
road. 
13. MILFORD LAKE, REPUBLICAN 
RIVER, KS 
Location. The Damsite is on the Republican River near the 
village of Alida about 10 miles above confluence of 
Republican and Smoky Hill Rivers which form Kansas 
River; and about 4 miles northwest of Junction City, Kansas. 
Existing project. An earthfill dam about 6,300 feet long 
and 126 feet high with an uncontrolled service-chute 
spillway in a saddle on right abutment. Total reservoir 
storage capacity is 1,160,000 acre-feet (700,000 for flood 
control, 160,000 for sediment reserve and 300,000 of 
multipurpose storage for water supply, water quality control, 
and recreation). Water supply storage is included in the 
project at the request of the Governor of Kansas under 
provisions of the Federal Water Supply Act of 1958. Initial 
cost of constructing the completed project was $48,268,843. 
Total Federal cost of project, including $1,297,649 
supplemental recreational development (Code 710), was 
$49,566,492. Construction was initiated in July 1961. The 
project was placed in operation in June 1965. 
27- 5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. Local interests must make reimbursement of 
$12,162,134 for water supply storage in accordance with 
Water Supply Act of 1958. Utilization of storage for water 
supply was initiated in October 1984. Reimbursement was 
initiated, at the option of the State, in September 1976. 
Operations during fiscal year. Visitation for FY 2000 was 
5,646,084 visitor hours. Maintenance: Activities included 
ordinary operation and maintenance. 
14. MISSOURI RIVER LEVEE SYSTEM 
IA, NE, KS AND MO 
(RULO, NE, TO MOUTH) 
Location. On both banks of the Missouri River from Sioux 
City, Iowa, about 760 miles to the mouth near St. Louis, 
Missouri. The portion of the project in Kansas City District 
extends from Rulo, Nebraska, 498 miles to mouth. 
Existing project. A series of levee units and appurtenant 
works along both sides of Missouri River from Sioux City, 
Iowa, to the mouth, for protection of agricultural lands and 
small communities against floods. Estimated fully funded 
(2000) for the active portion of the project from Rulo, 
Nebraska, to mouth is $148,496,000, including 
$107,174,000 Federal and $20,135,000 non-Federal 
contributions, and costs of $21,187,000 for lands and 
damages are to be borne by local interests. Remaining 
portion of project consists of units on which planning and 
construction are being delayed pending restudy to assure that 
additional levee construction is economically justified. 
Current cost estimate for deferred, inactive, and 
deauthorized portion of project Rulo, Nebraska, to mouth is 
$168,865,000 (1964, 1986, and 1987 price levels), of which 
$153,233,000 is Federal cost for construction and 
$15,632,000 for lands and damages to be borne by local 
interests. Construction of the project was initiated in June 
1948. 
Local cooperation. Section 3, Flood Control Act of 1936 
applies. Fully complied with for all completed units and 
units under construction. Local sponsors provide all 
operation and maintenance. 
Operations during fiscal year. Status of individual units of 
active portion at end of fiscal year is shown in Table 27-H 
on Missouri River Levee System. Unit L385 was approved 
for construction in FY 1994. Planning on Unit L142 
continued. The Project Cooperation Agreement on Unit 
L385 was executed September 23,1997. 
15. PERRY LAKE, DELAWARE RIVER 
Location. The Damsite is on the Delaware River about 5 
miles above the mouth in Jefferson County, and about 3 
miles northwest of Perry, Kansas. 
Existing project. An earthfill dam about 7,750 feet long 
constructed to an elevation about 95 feet above valley floor 
with gated-outlet works and an uncontrolled spillway in left 
abutment. Total reservoir storage capacity is 770,000 acrefeet 
(480,000 for flood control, including 140,000 for 
sediment reserve and 150,000 of multipurpose storage for 
water supply, water quality control, and recreation). Water 
supply storage is included in the project plan at the request 
of the State of Kansas under provisions of the Federal Water 
Supply Act of 1958. Initial cost of constructing the 
completed project was $48,371,706. Total Federal cost of 
project, including $724,212 supplemental recreational 
development (Code 710), is $49,095,918. Construction was 
initiated in March 1964, and the project was placed in 
operation in January 1969. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. Local interests must make reimbursement of 
$8,551,805 for water supply storage in accordance with 
Water Supply Act of 1958. Utilization of storage for water 
supply was initiated in October 1991. Reimbursement was 
initiated at the option of the State in September 1978. 
Operations during fiscal year. Visitation for FY 2000 was 
6,018,153 visitor hours. Maintenance: Activities included 
ordinary operation and maintenance. 
16. PICK-SLOAN MISSOURI BASIN 
PROGRAM (KANSAS CITY DIST.) 
Location. Flood control improvements included in this 
project are on and along the Missouri River and several of its 
principle tributaries, in states comprising the Missouri River 
Basin. 
Existing project. The Pick-Sloan Missouri Basin program 
for flood control and other purposes in Missouri River Basin 
provides for levees along Missouri River between Sioux 
City, Iowa, and the mouth, flood-protection works at certain 
municipalities, and reservoirs on main stem of Missouri 
River and on tributaries for control of flooding. (See Table 
27-B for authorizing legislation and Table 27-I on Kansas 
City District projects included in Pick-Sloan Missouri Basin 
program.) See individual project reports. 
17. POMME DE TERRE LAKE 
POMME DE TERRE RIVER, MO 
Location. The dam is on the main stem Pomme de Terre 
River, about 44 miles above the mouth in Hickory County, 
Missouri. The lake extends upstream into Polk County, 
Missouri. The site is about 4 miles south of Hermitage, 
Missouri, and 20 miles north of Bolivar, Missouri. 
Existing project An earth and rockfill dam about 4,630 
feet long constructed to about 155 feet above riverbed and a 
dike section on left abutment about 2,790 feet long, 
providing storage capacity of 650,000 acre-feet (407,000 for 
flood control and 243,000 for sedimentation and multipurpose). 
Initial cost of constructing the complete project 
was $14,946,784. Total Federal cost of project, including 
$329,140 area redevelopment and $2,089,529 supplemental 
recreational development (Code 710), is $17,365,453. 
Construction was initiated in January 1957, and the project 
was placed in useful operation in October 1961. 
27- 6

KANSAS CITY, MO, DISTRICT 
Operations during fiscal year. Visitation for FY 2000 was 
16,967,502 visitor hours. Maintenance: Activities consisted 
of ordinary operation and maintenance. 
18. POMONA LAKE, ONE HUNDRED 
TEN MILE CREEK, KS 
Location. The dam is on One Hundred Ten Mile Creek, a 
tributary of Marais des Cygnes (Osage) River, 7 miles above 
mouth of stream in Osage County, Kansas, about 8 miles 
northwest of Pomona, Kansas, and 34 miles upstream from 
Ottawa, Kansas. 
Existing project An earthfill dam 7,750 feet long 
constructed to an average height of about 85 feet above 
streambed, with gated-outlet works and an ungated chutetype 
spillway near left abutment. Total reservoir storage 
capacity is 230,000 acre-feet (160,000 for flood control, 
14,000 for sediment reserve, and 56,000 of multipurpose 
storage for water quality control, and recreation). Initial cost 
of constructing the completed project was $13,272,108. 
Total Federal cost of project, including $731,130 
supplemental recreational development (Code 710), was 
$14,003,238. Construction began in July 1959, and the 
project was placed in operation in October 1963. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. Pomona has water supply reimbursement under 
Water Supply Act of 1958 totaling $862,923. 
Operations during fiscal year. Visitation for FY 2000 was 
3,035,557visitor hours. Maintenance: Activities consisted 
of ordinary operation and maintenance. 
19. RATHBUN LAKE, CHARITON 
RIVER, IA 
Location. The Damsite is on the Chariton River about 7 
miles north of Centerville and I mile north of Rathbun, 
Appanoose County, Iowa. 
Existing project An earthfill dam 10,600 feet long 
constructed to an elevation about 86 feet above valley floor, 
with gated-outlet works and an uncontrolled service chute 
with paved sill spillway about a mile upstream from left 
abutment. Total reservoir storage capacity is 552,000 acrefeet 
(339,000 for flood control, 24,000 for sediment reserve 
and 189,000 of multipurpose storage for navigation, water 
quality control, and recreation). Initial cost of constructing 
the project was $27,033,210. Total Federal cost of project, 
including $588,948 supplemental recreation development 
(Code 710), was $27,622,158. Construction of the project 
was initiated in September 1964 and completed in 
November 1969. The operating plan for this project was 
revised to reduce flood control releases during critical times 
of the year to allow local farmers better access during 
planting and harvesting and to facilitate field drainage and 
drying out. The revised plan has resulted in more frequent 
high pool elevations than anticipated, which has inundated 
roads and recreation facilities. A shoreline erosion study 
was accomplished; and a supplement to the master plan was 
approved, which resulted in relocation of recreation facilities 
and bank stabilization work to compensate for the higher 
lake levels. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations during fiscal year. Visitation for FY 2000 was 
5,383,605 visitor hours. Maintenance: Activities included 
ordinary operation and maintenance. 
20. SMITHVILLE LAKE, LITTLE 
PLATTE RIVER, MO 
Location. The Damsite is on the Little Platte River about I 
mile northeast of Smithville and about 5 miles north of 
Kansas City, in Clay and Clinton Counties, Missouri. 
Existing project. Earthfill dam about 4,200 feet long and 
95 feet high with an uncontrolled service spillway. A dike 
about 2,400 feet long crosses a saddle in the left abutment. 
Total reservoir storage capacity is 246,500 acre-feet (92,000 
for flood control, 52,300 for sediment reserve, and 102,200 
of multipurpose storage for water supply, water quality 
control, and recreation). Cost of constructing the project 
was $87,685,314. Construction was initiated in November 
1973, and the project was placed in operation in March 
1982. 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938 applies. Reimbursement of $24,000,000 will be 
required for water supply storage in accordance with Water 
Supply Act of 1958, and reimbursement of $7,500,000 will 
be required for recreation development in accordance with 
Federal Water Recreation Act of 1965. Additional non- 
Federal contribution for recreation amounts to $737,000. 
All contracts for local cooperation were approved by the 
Secretary of the Army on November 27, 1972. 
Operations during fiscal year. Visitation for FY 2000 was 
6,835,372 visitor hours. Maintenance: Activities consisted 
of ordinary operation and maintenance. 
21. TURKEY CREEK BASIN, KS & MO 
Location: The Turkey Creek Basin is a 23-square mile area 
within Kansas City, KS and suburbs in Johnson and 
Wyandotte Counties in Kansas. 
Existing Project. The recommended project is estimated to 
cost $42,875,000, with an estimated Federal cost of 
$25,596,000 and an estimated non-Federal cost of 
$17,279,000, including construction of channel modification 
and tributary flood water diversion. 
Local Cooperation. Latest evidence of sponsor support for 
design and construction was execution of the 
Preconstruction Engineering and Design (PED) agreement 
on 29 March 1999. 
Operations during fiscal year. Work continued on 
Preconstruction Engineering and Design. 
27- 7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
22. TUTTLE CREEK LAKE, 
BIG BLUE RIVER, KS 
Location. The dam is on the main stem of the Big Blue 
River, about 12 miles above the stream mouth in Riley and 
Pottawatomie Counties, Kansas. Site is about 5 miles north 
of Manhattan, Kansas. 
Existing project. An earth and rock dam 7,500 feet long 
and 157 feet high. Total reservoir storage capacity is 
2,346,000 acre-feet (1,933,000 for flood control, 228,000 for 
sediment reserve and 185,000 for multipurpose storage, for 
low-flow regulation, navigation, and recreation). Initial cost 
of constructing the completed project was $80,051,031. 
Total Federal cost of project, including $533,048 
supplemental recreational development (ode 710), was 
$80,584,079. Construction began in October 1952. Project 
was placed in Operation in July 1962. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations during fiscal year. Visitation for FY 2000 was 
2,654,356 visitor hours. Maintenance: Activities included 
ordinary operation and maintenance. 
23. WILSON LAKE,SALINE RIVER,KS 
Location. The dam is on the Saline River about 130 miles 
above its mouth, near the eastern edge of Russell County, 
Kansas, about 50 miles west of Salina, 10 miles north of 
Wilson, and 20 miles east of Russell, Kansas. 
Existing project. An earthfill dam about 5,600 feet long 
and 160 feet high with a gated-outlet works, chute spillway, 
storage capacity is 776,000 acre-feet (511,000 for flood 
control, 40,000 for sediment reserve and 225,000 
multipurpose storage for irrigation, navigation, and low-flow 
regulation). Initial cost of constructing the project was 
$20,015,023. Total Federal cost of project, including 
$448,344 supplemental recreational development (Code 
710), was $20,463,367. Construction began in April 1961, 
and the project was placed in operation in December 1964. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. 
Operations during fiscal year. Visitation for FY 2000 was 
2,165,029 visitor hours. Maintenance: Activity included 
ordinary operation and maintenance. 
24. SCHEDULING OF FLOOD CONTROL 
RESERVOIR OPERATIONS 
Under sections 7 and 9, 1944 Flood Control Act, the Corps 
is responsible for detailed scheduling of operations 
concerning storage capacity reserved for or assigned to flood 
control in reservoirs constructed by Bureau of Reclamation 
as well as those constructed by the Corps. Fiscal Year costs 
were $293,000. 
25. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Flood Control Act of June 22, 1936, P.L. 738, and 
subsequent acts require local interests to furnish assurances 
that they will maintain and operate certain local protection 
projects after completion in accordance with regulations 
prescribed by the Secretary of the Army. District Engineers 
are responsible for administration of these regulations within 
boundaries of their respective district. (See Table 27-J on 
inspection of completed flood control projects.) 
Multiple Purpose Projects 
Including Power 
26. HARRY S. TRUMAN DAM AND 
RESERVOIR, Osage River, MO 
Location. The Damsite is on the main stem of the Osage 
River about 1.5 miles northwest of Warsaw, Benton County, 
Missouri. Reservoir extends into Bates, Henry, Hickory, St. 
Clair, and Vernon Counties, Missouri. 
Existing project. An earthfill dam about 5,000 feet long 
constructed to an average height of about 96 feet above 
streambed, including a gate-controlled overfall spillway and 
a power installation consisting of six inclined pumpgenerating 
units with a combined generating capability of 
160,000 kilowatts. Total reservoir storage capacity is 
5,202,000 acre-feet (3,918,000 for flood control, 244,000 for 
sediment reserve, and 1,040,000 multipurpose storage for 
power, low-flow regulation, and recreation). The operating 
purposes of the project are flood control, hydroelectric 
power, water supply, recreation, and fish and wildlife. 
Public Law 91-267, approved May 26, 1970, authorized a 
change in project name from Kaysinger Bluff Dam and 
Reservoir, Osage River Basin, Missouri, to the Harry S. 
Truman Dam and Reservoir. Initial cost of constructing the 
completed project was $550,909,000. Construction of 
relocated Missouri Highway M-13 was initiated September 
1964 and completed May 1966. Construction of the dam 
and reservoir was initiated in October 1964. The project was 
operational for flood control in October 1979, and 
multipurpose pool was reached in November 1979. The first 
power unit was placed on line on December 22, 1979. 
Subsequent problems with the turbine bearings required 
remedial repair that was completed in FY 1999. Through 
September 2000, power generation totaled 5,446,223,000- 
kilowatt hours. Of the gross income from the sale of power 
by Southwestern Power Administration, $124,661,472 was 
allocated to the Corps of Engineers for project power 
operating costs, interest, and investment recovery. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operation during fiscal year. Visitation for FY 2000 was 
10,531,867 visitor hours. Project is complete. During FY 
2000, 86,141,000 kilowatt-hours of electrical power were 
generated. Maintenance activities consisted of ordinary 
operation and maintenance and completion of turbine repair. 
77- R

KANSAS CITY, MO, DISTRICT 
27. STOCKTON LAKE, SAC RIVER, MO 
Location. The Damsite is on the Sac River about 49.5 miles 
above its confluence with the Osage River, and about 1 mile 
east of Stockton, Cedar County, Missouri. The lake extends 
into Dade and Polk Counties. 
Existing project. A rock-shell dam with impervious core 
about 5,100 feet long constructed to an average height of 
about 128 feet, ---- with a gated overfall spillway and a 
45,200-kilowatt power installation. Total reservoir storage 
capacity is 1,674,000 acre-feet (774,000 for flood control, 
25,000 for sediment reserve and 875,000 multipurpose 
storage for power and recreation). The authorized project 
purposes are flood control, hydroelectric power, water 
quality, water supply, recreation, and fish and wildlife. 
Initial cost of constructing the completed project was 
$75,715,300. Cost of the project, including $3,758,000 for 
downstream channel work and $502,057 for supplemental 
recreational development (Code 710), was $79,975,357. 
Construction was initiated in October 1963, and the project 
was placed in operation in December 1969. Power operation 
problems were encountered with the initial operation in 
March 1973 because the downstream channel did not have 
the capacity which earlier observations and computations 
indicated. As a result, it has been necessary to restrict the 
power operation to about the 30,000-kilowatt level. Rightof-
way for construction of a channel cutoff and bridge at 
Horseshoe Bend were acquired, and construction completed. 
Sloughing easements downstream to Caplinger Mills were 
acquired. Completion assured downstream channel capacity 
to Caplinger Mills of 8,000 c.f.s. for powerplant operation. 
Discharge in this range will accommodate power operations 
at a 39,500-kilowatt level. Through September 2000 power 
generation totaled 1,679,260,000 kilowatt-hours. Of the 
gross income from the sale of power by Southwestern Power 
Administration, $34,672,925 was allocated to the Corps of 
Engineers for project operating costs, interest, and 
investment recovery. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. 
Operations during fiscal year. Visitation for FY 2000 was 
7,516,896 visitor hours. The project is complete and in 
operational status. During FY 2000, 23,141,000 kilowatthours 
of electrical power were generated. Maintenance: 
Activities consisted of ordinary operation and maintenance. 
Work Under Special Authorities 
28. CONTINUING AUTHORITIES 
Small Flood Control Projects Not Specifically 
Authorized by Congress (Sec. 205, 1948 Flood Control 
Act, Public Law 858, 80" Cong., June 30, 1948, as 
amended). 
Each project selected must be complete in itself, 
economically and environmentally justified, and limited to a 
Federal cost of not more than $7 million. The local 
sponsoring agency must agree to provide without cost to the 
Department of the Army, all lands, easements, and rights-ofway, 
including highway bridge, and utility relocations and 
alterations; hold and save the Department of the Army free 
from damages; maintain and operate the project after 
completion; assume all project costs in excess of the Federal 
cost limit; and prevent future encroachments on improved 
channels. 
The non-Federal sponsors of Section 205 projects are 
required to pay 50 percent of all feasibility study costs over 
$100,000. For structural flood control projects, the sponsor 
must pay in cash during the construction at least 
5 percent of the construction cost. The sponsor's cash and 
other contributions must equal 35 percent of the total 
construction cost, but will not be required to exceed 50 
percent. 
There were no Section 205 projects under construction in 
Fiscal Year 2000. 
See Table K for expenditures under Section 205 during 
2000. 
Emergency Streambank Protection (Section 14, 
1946 Flood Control Act, Public Law 526, 79' 
Cong., July 24, 1946) as amended. 
Each project selected must be complete in itself, engineering 
feasible, economically justifiable environmentally 
acceptable, and limited to a Federal statutory cost of not 
more than $1,000,000. The local sponsoring entity must 
agree to provide without cost to the Department of the 
Army, all lands, easements, and rights-of-way, including 
highway, highway bridge, and utility relocations and 
alterations required for project construction; provide over the 
period of construction, an amount equal to not less than 35 
percent or more than 50 percent of total project cost, at least 
5 percent of which will be cash; operate, maintain, repair, 
replace, and rehabilitate the project upon completion; hold 
and save the Department of the Army free from damages 
arising from the construction, operation, and maintenance of 
the completed project; and assume all project costs in excess 
of the Federal statutory cost limit. 
Construction was completed on three projects in FY 2000 as 
follows: 
West Creek, Topeka, KS, Hinkson Creek, Columbia 
Sewer Main, MO, and West Fork Grand River, Route 
W, Roadway. MO. Projects were completed and turned 
over to the sponsors. 
See Table 27-K for Emergency Streambank Protection 
expenditures during FY 2000. 
Project Modifications for Improvement of 
Environment (Section 1135, Water Resources 
Development Act of 1986, Public Law 662, 99 th 
Cong., November 17, 1986). 
27-

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Section 1135 authorizes review of the operation of 
completed water resources projects to determine need for 
modifications for the purpose of improving environmental 
quality. 
No projects were completed in FY 2000. 
See Table 27-K for Section 1135 studies status and 
expenditures for FY 2000. 
Aquatic Ecosystem Restoration (Section 206, 
Water Resources Development Act of 1996, 
Public Law 303, 104t" Cong., October 12, 1996). 
Section 206 authorizes small aquatic ecosystem restoration 
projects to improve the quality of the environment if in the 
public interest and cost effective. 
No projects were completed in FY 2000. 
See Table 27-K for Section 206 Studies status and 
expenditures for FY 2000. 
29. EMERGENCY RESPONSE 
ACTIVITIES 
A. Disaster Preparedness Program. The Disaster 
Preparedness Program (DPP) involves planning, training, 
inspection, supplies and equipment, and personnel. Planning 
activities involve development of District response and 
recovery plans in support of natural disasters. Current plans 
include the Flood Fight Plan, Emergency Operations Center, 
Plan, Emergency Alerts and Dismissal Plan, Emergency 
Operations and Disaster Assistance - Deployment Plan.. 
Training activities to support disaster preparedness this year 
included flood fight training, refresher and alternate team 
member of the District's Emergency Water Planning and 
Response Team. The District identified and trained two 
members of the NWD Logistics Emergency Response Team 
(LERT) during the third quarter of FY 00. 
Disaster preparedness includes maintaining the necessary 
supplies and equipment to support disaster response. To 
support flood-fighting efforts , an inventory is maintained of 
over 1.4 million sandbags 40 pumps and sandbag filling 
machines. During this FY funding was received to maintain, 
repair and upgrade all flood fighting equipment. 
Response operations included deploying personnel to SPD, 
Albuquerque District to support the Los Alamos Wildfire 
recovery missions received from FEMA and the Department 
of Energy. 
Continued prolonged drought conditions over the Midwest 
resulted in request from the Kickapoo Nation in Horton, 
Kansas for technical assistance in supplying water for the 
reservation. A site investigation was performed, a project 
information report with recommended assistance alternative 
identified and forwarded to higher headquarters and the 
Assistant Secretary of the Army for Civil Works. The 
District has received approval to provide assistance with a 
pumping operation to insure adequate water supply to the 
Kickapoo's for an additional year. 
B. Public Law 84-99. Rehabilitation of Flood Control 
Works. Work continued on several federal levees damaged 
from 1999 events.. 
C. Catastrophic Disaster Response Planning. New 
Madrid/Cascadia. 
(1) NWK participated in a New Madrid Earthquake exercise 
held at Fort Riley, Kansas. The New Madrid OPLAN was 
up-dated to incorporate the initiatives of Readiness 2000. 
The OPLAN will be published in the near future. 
(2) NWK completed Volume 1, Part 9 of the Cascadia 
OPLAN. NWK received a New Mission Statement from 
NWD. NWK was tasked to develop Volume H, Part 9 of the 
Cascadia OPLAN. This OPLAN outlines duties and 
responsibilities of NWK in the event that NWS becomes a 
"VICTIM Command" and is declared non-mission capable. 
The OPLAN is in draft form and is essentially ready for 
review by the district staff. 
(3) NWK will participate in an internal and external NWD 
tabletop exercise this calendar year. 
30. GENERAL INVESTIGATIONS 
Fiscal year 2000 costs totaled $1,756,642 for all General 
Investigations activities. See Table 27-L, which covers 
Surveys, Collection and Study of Basic Data and 
Preconstruction Engineering and Design expenditures in FY 
2000. 
Other Activities 
31. MISSISSIPPI RIVER MAIN STEM 
No activity within this appropriation this fiscal year. 
32. CATASTROPHIC DISASTER 
PREPAREDNESS PROGRAM 
FY 2000 expenditures of $97,600 provided for activities 
required for local and national preparedness. 
33. MISSOURI RIVER BASIN 
COLLABORATIVE WATER 
RESOURCES, PLANNING/ 
PARTNERING PROCESS 
Missouri River Basin Association and the Corps will 
manage and facilitate the process of collaboration for some 
limited studies. The collaborative effort allows input from 
the states, tribes, and Federal agencies economic and 
environmental interest groups and the general public on both 
the operation issues, i.e. Master Manual, and nonoperational 
issues. In addition, the collaborative process 
could address recreation industry development, ecosystem 
27 - 10

KANSAS CITY, MO, DISTRICT 
management, streambank erosion, project mitigation, 
structural changes for endangered species, environmental 
monitoring tribal water rights, and support to navigation and 
agriculture. Fiscal Year costs were $13,500. 
34. REGULATORY PROGRAM 
Statutes. The Corps of Engineers is charged with 
protecting the public interest in all waters of the United 
States, including wetlands. This is accomplished through a 
Department of the Army permit program pursuant to Section 
10 of the Rivers and Harbors Act of 1899 and Section 404 of 
the Clean Water Act. 
Operations during Fiscal Year 2000. Kansas City District 
completed 2,733 permit actions during the year. Of the 114 
violations reported and evaluated this year, 111 were 
resolved by permits, voluntary restoration, administrative 
action or other means. Special projects or emphases during 
the year included continued review of dredging data for all 
commercial dredgers on the Kansas River (18 sites); 
completed development of a wetland mitigation bank in 
Johnson County, Kansas; entered into two merged 
NEPA/Section 404 applications for Federal Highway 
Administration/Kansas Department of Transportation 
projects; completed two merged NEPA/Section 404 
applications for Federal Highway Administration/Missouri 
Department of Transportation projects; completed and 
issued a general permit for activities at the Lake of the 
Ozarks; completed agency coordination and issued regional 
conditions in Kansas and Missouri for the Nationwide 
Permit Program; established State Regulatory Offices in 
Jefferson City, Missouri and El Dorado, Kansas; continued 
the transition of moving the workload from the District 
office to the field offices under the "Full Service Field 
Office: concept; implemented a new Appeals Program in 
regulatory which resulted in two cases being appealed to the 
Division Engineer; provided a Regulatory IV wetland 
delineation training class for regional federal and state 
agencies. Fiscal Year costs totaled $2,500,896.84 for all 
regulatory activities. See Table M that shows expenditures 
for Permit Evaluation, Enforcement, and Administrative 
Appeals. 
27- 11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 27-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 Sep 30, 2000 
1. Missouri River, New Work: 
Sioux City, IA Approp. 
to Mouth (Rulo, Cost 
NE, to Mouth) Maint. 
(Federal Funds) Approp. 
Cost 
Contributed Fundt New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Consolidated New Work: 
Summary Approp. 
Cost 
Maint. 
Approp. 
Cost 
2. Missouri River Fis New Work: 
& Wildlife Mitigatk Approp. 
IA, NE,KS & MO Cost 
3. Blue River Basin New Work: 
Kansas City, MO Approp. 
Cost 
4. Blue River Chann, New Work: 
Kansas City, MO Approp. 
(Federal Funds) Cost 
Contributed Fund. New Work: 
Approp. 
Cost 
Consolidated New Work: 
Summary Approp. 
Cost 
5. Brush Creek, New Work: 
Kansas City, MO Approp- 
(Federal Funds) Cost 
Expanded Project New Work: 
Approp. 
Cost 
Consolidated New Work: 
Summary Approp. 
Cost 
6. Clinton Lake, 
Wakarusa 
River, KS 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
237,942,190 1/ 
237,942,190 1/ 
4,370,000 5,394,000 1/ 
5,006,345 5,499,400 
4,919,000 
5,385,141 
5,460,000 342,839,774 21 
5,460,505 342,839,774 2/ 
816,190 
816,190 
22,642 
22,642 
238,758,380 1/ 
238,758,380 1/ 
4,370,000 5,394,000 4,919,000 5,460,000 342,862,416 2/ 
5,006,345 5,499,400 5,385,141 5,460,505 342,662,416 3/ 
1,734,000 2,950,000 2,494,000 5,462,000 26,592,000 
1,860,790 2,917,728 2,426,721 5,509,102 26,492,179 
312,000 
309,974 
558,000 
537,624 
323,000 
340,417 
7,623,000 23,224,000 38,357,000 
7,598,503 23,229,700 38,339,550 
- -1,000,000 
1,597,981 1,909,237 523,944 
294,000 1,494,000 
298,719 1,493,648 
10,002,000 163,345,171 
8,705,818 162,009,485 
- 6,738,041 
155,295 6,100,189 ~I 
7,623,000 22,224,000 38,357,000 10,002,000 170,083,212 
9,196,484 25,138,937 38,863,494 8,861,113 168,109,674 51 
176,000 
196,529 
-25,027 
176,000 
171,502 
15,880 
-819,998 
117,582 
-819,998 
133,462 
3,684 
765,000 
333,510 
765,000 
337,194 
- 14,390,000 
39 14,373,158 
- 7,776,002 
438,384 8,121,423 
- 22,166,002 
438,423 22,494,581 _1 
57,415,433 
57,415,433 I 
1,374,000 1,498,000 2,464,000 1,517,000 28,152,000 
1,391,356 1,493,154 2,469,000 1,517,000 28,152,000 
27 - 12

KANSAS CITY, MO, DISTRICT 
TABLE 27-A DI18 COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 Sep 30, 2000 
7. Harlan County New Work: 
Lake, Republican Approp. 
River, NE 
8. Hillsdale Lake, 
Big Bull 
Creek, KS 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
47,111,926 
47,111,926 
1,477,000 1,502,000 1,860,000 2,309,000 38,253,984 
1,449,128 1,528,992 1,867,001 2,309,000 38,253,984 
- - - 1,017,623 
- - - 1,017,623 
- - - 64,161,400 
- - - 64,161,400 
774,000 
978,231 
773,000 
773,114 
887,000 
887,000 
905,000 14,158,870 
905,000 14,158,870 
9. Kanopolis Lake, 
Smoky Hill 
River, KS 
10. Little Blue River 
Lakes, Little Blue 
River, MO 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
11. Long Branch Lake New Work: 
Little Chariton Approp. 
River, MO Cost 
Maint. 
Approp. 
Cost 
Contributed New Work: 
Funds Approp. 
Cost 
Consolidated New Work: 
Summary Approp. 
Cost 
12. Melvem Lake New Work: 
Osage (Marais de Approp. 
Cygnes) River, K% Cost 
Maint. 
Approp. 
Cost 
13. Milford Lake, New Work: 
Republican River, Approp. 
KS Cost 
Maint. 
Approp. 
Cost 
- - - 12,577,227 
- -- - 12,577,227 91 
1,524,000 1,266,000 1,280,000 1,255,000 35,653,312 
1,644,406 1,292,359 1,282,500 1,255,000 35,653,312 
S-- -- 140,809,200 
- - -- 140,809,200 S 
715,000 
741,235 
787,000 771,000 
789,435 771,000 
936,000 10,697,784 
936,000 10,697,784 
18,216,177 
18,216,177 
736,000 
697,100 
f-- 
1,348 
1,348 
834,000 835,000 
877,245 835,000 
814,000 12,798,112 
814,000 12,798,112 
1,139,455 
1,139,332 11 
19,355,509 
19,355,509 
- - - 37,436,530 
- - - 37,436,530 
1,623,000 1,611,000 1,846,000 1,957,000 33,423,154 
1,606,853 1,631,492 1,846,000 1,957,000 33,423,154 
49,566,492 
49,566,492 
4,594,000 1,622,000 2/ 1,818,000 
4,413,833 1,812,038 4/ 1,818,000 
1,896,000 43,815,940 
1,896,000 43,815,940 
27- 13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY: 
TABLE 27-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 97 FY 98 FY99 FY00 Sep 30, 2000 
14. Missouri River New Work: 
Levee System 
IA, NE, KS 
and MO 
Approp. 
Cost 
298,000 
249,182 
907,000 1,375,000 2,926,000 70,586,851 
859,101 1,451,985 2,900,539 70,525,374 
15. Perry Lake, New Work: 
Delaware River, K Approp. 
Cost 
Maint. 
Approp. 
Cost 
17. Pomme de Terre New Work: 
Lake, Pomme de Approp. 
Terre River, MO Cost 
Maint. 
Approp. 
Cost 
18. Pomona Lake, Or New Work: 
Hundred Ten Mile Approp. 
Creek, KS Cost 
Maint. 
Approp. 
Cost 
19. Rathbun Lake, New Work: 
Chariton River, Approp. 
IA Cost 
Maint. 
Approp. 
Cost 
20. Smithville Lake, New Work: 
Little Platte Approp. 
River, MO Cost 
Maint. 
Approp. 
Cost 
21. Tuttle Creek Lake New Work: 
Big Blue Approp. 
River, KS Cost 
Maint. 
Approp. 
Cost 
- - - 49,095,918 
- - - 49,095,918 
1,757,000 1,768,000 1,902,000 1,984,000 41,703,343 
1,758,054 1,771,291 1,902,000 1,984,000 41,703,343 
17,365,452 
17,365,452 
1,849,000 1,721,000 1,824,000 1,948,282 39,754,743 
1,850,621 1,736,822 1,824,000 1,948,282 39,754,743 
-- - 14,003,238 
14,003,238 
1,704,000 1,564,000 1,786,000 1,667,064 35,739,134 
1,698,224 1,572,043 1,786,000 1,667,064 35,739,134 
27,622,159 
27,622,159 
1,928,000 1,928,000 2,162,000 2,045,000 45,919,211 
1,948,639 1,918,090 2,179,433 2,045,000 45,919,211 
87,685,314 
87,685,314 
969,000 
1,051,859 
1,012,000 1,071,000 
989,947 1,102,637 
944,000 19,115,848 
944,000 19,115,848 
80,584,079 
80,584,079 
3,306,000 1,956,000 1,938,000 
3,448,551 2,094,153 4/ 1,938,000 
2,283,000 45,797,232 
2,282,000 45,796,232 
22. Wilson Lake, 
Saline River, 
KS 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
23. Scheduling Flood Maint. 
Control Reservoir Approp. 
Operations Cost 
20,463,367 
20,463,367 
1,382,000 1,301,000 1,698,000 1,551,000 32,663,604 
1,341,516 1,346,829 1,698,000 1,551,000 32,663,604 
308,000 
308,000 
323,000 
323,000 
27- 14 
301,000 
301,000 
293,000 57,521,452 
293,000 57,521,452

NSAS CITY, MO, DISTRICT 
TABLE 27-A 
See 
Section 
in Text Project Funding 
24. Inspection of Maint. 
Completed Flood Approp. 
Control Projects Cost 
25. Harry S. Truman New Work: 
Dam & Reservoir Approp. 
Osage River, MO Cost 
Maint. 
Approp. 
Cost 
26. Stockton Lake, 
Sac River, MO 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
COST AND FINANCIAL STATEMENT 
Total Cost to 
FY 97 FY 98 FY 99 FY 00 Sep 30, 2000 
521,000 
517,635 
-935 
583,000 
586,365 
426,000 
426,000 
401,500 10,002,931 
401,500 10,002,931 
550,909,000 
550,908,965 
7,833,000 8,954,000 6,948,000 7,063,583 131,361,745 
7,650,016 9,162,409 6,991,712 7,063,583 131,361,745 
- - - 79,975,357 
- - - 79,975,357 
3,467,000 3,042,000 4,096,000 3,200,810 65,867,969 
3,096,906 3,516,862 4,144,023 3,200,810 65,867,969 
30. Mississippi River Maint. 
Main Stem Model Approp. 
Development Cost 
31. National Emergen Maint. 
Preparedness Approp. 
Program Cost 
32. Missouri River Ba. New Work: 
Collaborative Approp. 
Effort Cost 
50,000 
49,659 
174,500 
174,065 
229,000 
228,717 
90,000 
341 90,000 
104,000 
104,435 
100,000 
99,602 
1. Includes $8,665,595 cost of new work for previous project. 
2. Includes $738,109 for maintenance of previous project. 
3. Includes funds appropriated under FY 1993 Emergency Flood 
Supplemental Appropriation, 96 3/7 3123: Missouri River, Rulo 
NE to Mouth, $40,000; and Milford Lake, KS, $40,000 
4. Includes funds expended under FY 1993 Emergency Flood 
Supplemental Appropriation, 96 3/7 3123: Missouri River, Rulo 
NE to Mouth, $1,119,854; Milford Lake, KS, $45.526; and 
Tuttle Creek Lake, KS, $53,087. 
5. Excludes $35,296 non-Federal contribution not required for 
90,000 
85,000 
75,000 
75,681 
92,600 3,920,950 
97,600 3,920,950 
13,500 
13,500 
417,500 
417,500 
7. Excludes $118,805 non-Federal contribution not 
authorized Clinton Lake project (1973-1979). 
8. Excludes cost of materials furnished Harlan Cou 
project without charge in the amount of $24,198 
9. Excludes cost of materials furnished Kanopolis t 
without charge in the amount of $7,885. 
10. Excludes $2,732,554 thru FY 1990 non-Federe 
not required for authorized Little Blue Lakes prn 
11. Corrected total. Excludes $42,149 interest du 
at Long Branch Lake project, and $500,000 wi 
authorized Blue River Channel project (Blue River Channel Mobay 
Chemical 1984-1987). 
6. Corps is building Brush Creek Expanded Project requested by 
sponsor, City of Kansas City, MO, with all costs of betterments and 
enhancements not required by authorized project funded by sponsor. 
Excludes sponsor's contributions of $2,548,121 for I 
PED (FWKCM) 1987 through 1997; 1 Park Features 
Design; $1,071,274 for Water Pollution Control di 
27 - 15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS AC ES FOR FY 2000 
TABLE 27-B 
See Section Date of 
AUTHORIZING LEGISLATION 
in Text Act Project and Work Authorized Documents 
MISSOURI RIVER, SIOUX CITY, IA, TO 
MOUTH (RULO, NE, TO MOUTH) 
1. Jul 25, 1912 Project adopted for securing a permanent navigable H. Doc. 1287, 61st Cong., 
channel of 6-foot depth from Kansas City, MO to (contains latest published 
mouth. map). P.L. 241-62 
Aug 8, 1917 Fixed upstream limit of improvement at upper end of H. Doc. 463, 64th Cong., 
Quindaro Bend (274.8 miles from mouth) and provic (contains latest published 
for dredging. map). 
Mar 3, 1925 For a minimum width of 200 feet and depth of 6 feet, P.L. 585-68 
with a reasonable additional width around bends, 
mouth to upper end of Quindaro Bend, Kansas City, MO. 
Jan 12,1927 Appropriation of $12 million authorized for securing a H. Doc. 1120, 60th Cong., 
6-foot channel depth between Kansas City, MO, P.L. 560-70 
Quindaro Bend, and Sioux City, IA. 
Jul 3, 1930 Appropriation of $15 million additional authorized; P.L. 67-73 
additional allotments totaling $29,153,108 were made 
by Public Works Administration under provisions of H.R. 11781 
National Industrial Recovery Act of 1933, and P.L. 520-71 
$9,669,791 allotted under provisions of Emergency 
Relief Appropriation Act of 1935. 
Aug 30, 1935 Completion of improvement from mouth to Sioux City, H. Doc. 238, 73d Cong., 
(contains latest published 
map). P.L. 409-73 
Mar 2, 1945 Securing a navigable channel of 9-foot depth and a H. Doc. 214, 76th Cong., 
minimum width of 300 feet. (contains latest published 
map). P.L. 14-79 
2. Nov 17, 1986 
3. Oct 12,1996 
MISSOURI RIVER FISH AND WILDLIFE MITIGATION, 
MO, KS, IA & NE 
Project for mitigation of fish and wildlife losses Title VI, Section 601(a), 
Missouri River Bank Stabalization and Navigation Water Resources Develop- 
Project, MO, KS, IA & finE: April 24, 1984, Report a ment Act of 1986, P.L. 
Chief of Engineers, authorized at estimated cost of 99-662. 
$51,900,000. 
BLUE RIVER BASIN, KANSAS CITY, MO 
Project for flood control along the left bank of the Blue Title I, Section 101(a), Water 
River from U.S. Highway 71 upstream for a distance Resources Development 
of about 1 1/4 miles in Jackson County, MO, to the Act of 1996, P.L. 104-303 
Bannister Federal Complex levee: Report of the Chief 
of Engineers, dated Sep 5, 1996, at a total cost of 
$17,082,000, with an estimated Federal cost of 
$12,043,000 and an estimated non-Federal cost of 
$5,039,000. 
27-16

KANSAS CITY, MO, DISTRICT 
TABLE 27-B AUTHORIZING LEGISLATION 
See Section Date of 
in Text Act Project and Work Authorized Documents 
BLUE RIVER CHANNEL, KANSAS CITY, MO 
4. Dec 31, 1970 Adopted plan for Blue River Basin and authorized H. Doc. 91-332, 91st Cong. 
$40,000,000 for initiation and partial accomplishment. 
BRUSH CREEK, KANSAS CITY, MO 
5. Nov 17, 1986 Project for flood control on Brush Creek, a tributary of Sec. 401(a), Water Resources 
the Blue River, Kansas City, MO, authorized at estin Development Act of 1986, 
total cost of $16,100,000. P.L. 99-662 
Nov 28, 1990 Modified to authorize the Secretary of the Army to Water Resources Development 
construct the project substantially in accordance witl Act of 1990, P.L. 101-640. 
the Post Authorization Change Report, dated April 1989 
(revised January 1990), at a total cost of $26,200,000. 
CLINTON LAKE, WAKARUSA RIVER, KS 
6. Oct 23, 1962 The project for the Kansas River, KS,NE and CO is 1962 Flood Control Act, H. Doc 
authorized at an estimated cost of $88,070,000. 578, 87th Cong. P.L. 87-874. 
HARLAN COUNTY LAKE, REPUBLICAN, NE 
7. Jun 28, 1938 Adopted general comprehensive plan for Missouri Riv Flood Control Committee Doc. 1, 
Basin and authorized $9 million for initiation and par 75th Cong., P.L. 761. 
accomplishment. 
Aug 18, 1941 Modified general comprehensive plan to include Harla H. Doc. 842, 76th Cong.; 
County Dam and Reservoir on Republican River, NE P.L. 77-228 
other supplemental flood control works on upper 
Republican River, and authorized $7 million additional 
expenditure. 
Dec 22, 1944 Expanded general comprehensive plan for Missouri R H. Doc. 475 and S. Docs. 191 
Basin and authorized $200 million additional expenc and 247, 78th Cong., P.L. 534. 
HILLSDALE LAKE, BIG BULL CREEK, KS 
8. Sep 3, 1954 The comprehensive plan for the Missouri River Basin, P.L. 780, 83rd Cong., H. Doc. 
approved by the Act of June 28, 1938, and as amen 549, 81st Cong. 
and supplemented is further modified to include the 
project for flood protection on the Kansas River and 
tributaries. It is further modified to include the project for 
flood protection on the Osage River and tributaries. 
KANOPOLIS LAKE, SMOKY HILL RIVER, KS 
9. June 28, 1938 Adopted general comprehensive plan for Missouri Riv Flood Control Committee Doc. 1, 
Basin and authorized $9 million for initiation and par 7th Cong., P.L. 761. 
accomplishment. 
Aug 18, 1941 Modified general comprehensive plan to include Harla H. Doc. 842, 76th Cong.; 
County Dam and Reservoir on Republican River, NE P.L. 77-228 
other supplemental flood control works on upper 
Republican River, and authorized $7 million additional 
expenditure. 
27 - 17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS A Y 2000 
TABLE 27-B AUTHORIZING LEGISLATION 
See Section Date of 
in Text Act Project and Work Authorized Documents 
Dec 22, 1944 Expanded general comprehensive plan for Missouri R H. Doc. 475 and S. Docs. 191 
Basin and authorized $200 million additional expenc and 247, 78th Cong., P.L. 534. 
LITTLE BLUE RIVER LAKES, MO 
10. Aug 13, 1968 Additional $38 million for prosecution of general comp P.L. 90-483, H. Doc. 169, 
hensive plan for Missouri River Basin 90th Cong. 
LONG BRANCH LAKE, LITTLE CHARITON RIVER, MO 
11. Oct 27, 1965 The project for flood protection on the Chariton and Li 1965 Flood Control Act 
Chariton Rivers and tributaries, IA and MO, is autho P.L. 89-298, H. Doc. 238, 
at an estimated cost of $9,167,000. 89th Cong 
MELVERN LAKE, MARAIS DES CYGNES (OSAGE) 
RIVER, KS 
12. Sep 3, 1954 Expanded general comprehensive plan for Missouri R H. Docs. 642, 549 1/ 
Basin and authorized $217,710,000 for additional and 561, 81st Cong.; 
expenditure. 83rd Cong., P.L. 780 
MILFORD LAKE, REPUBLICAN RIVER, KS 
13. Sep 3, 1954 Expanded general comprehensive plan for Missouri R H. Doc. 549 11, 81st Cong.; 
Basin and authorized $217,710,000 for additional P.L. 780 
expenditure. 
MISSOURI RIVER LEVEE SYSTEM, IA, NE, KS AND MO 
14. Aug 18,1941 Levees along both sides of river from Sioux City to H. Doc 821, 76th Cong. 
Kansas City. P.L. 77-228 
Dec 22, 1944 Extended project from Kansas City to the mouth and H. Doc 475 and S. Docs. 
provided for increased protection. 191 and 247, 78th Cong. 
PERRY LAKE, DELAWARE RIVER, KS 
15. Sep 3, 1954 Expanded general comprehensive plan for Missouri R H. Docs. 642, 549 1/, and 561, 
Basin and authorized $217,710,000 additional expei 81st Cong.; 83rd Cong., 
P.L. 780 
16. Jun 28, 1938 
Aug 18, 1941 
Dec 22,1944 
Jul 24, 1946 
May 17, 1950 
PICK-SLOAN MISSOURI BASIN PROGRAM 
(KANSAS CITY DISTRICT) 
Adopted general comprehensive plan for Missouri Riv Flood Control Committee Doc. 1, 
Basin and authorized $9 million for initiation and par 75th Cong. 
accomplishment. 
Modified general comprehensive plan to include Harla H. Doc. 842, 76th Cong.; 
County Dam and Reservoir on Republican River, NE P.L. 77-228 
other supplemental flood control works on upper 
Republican River, and authorized $7 million additional 
expenditure. 
Expanded general comprehensive plan for Missouri R H. Doc. 475 and S. Docs. 191 
and authorized $200 million additional expenditure. and 247, 78th Cong. 
Additional expenditure of $150 million for prosecution of 
general comprehensive plan for Missouri River Basin. 
Additional expenditure of $250 million for prosecution of 
general comprehensive plan for Missouri River Basin. 
27- 18

KANSAS CITY, MO, DISTRICT 
TABLE 27-B AUTHORIZING LEGISLATION 
See Section Date of 
in Text Act Project and Work Authorized Documents 
Sep 3, 1954 Expanded general comprehensive plan for Missouri R H. Docs. 642 and 549 1/ 
Basin and authorized $217,710,000 for additional 81st Cong.; 83rd Cong., 
expenditure. P.L. 780 
May 2, 1956 Modified general comprehensive plan for Missouri River 
River Basin by deletion of construction of Red Willow 
Dam and Reservoir, NE, and addition of construction of 
Wilson Dam and Reservoir, KS. 
Jul 3, 1958 Expanded general comprehensive plan for Missouri R H. Doc. 409, 84th Cong. 
Basin and authorized $200 million additional expenditure. 
Jul 14, 1960 Additional expenditure of $207 million for prosecution of 
general comprehensive plan for Missouri River Basin. 
Dec 30, 1963 Additional expenditure of $80 million for prosecution of 
general comprehensive plan for Missouri River Basin 
and modified plan to include bank protection or rectification 
works below Garrison Dam. 
Jun 18, 1965 Additional $116 million for prosecution of general comprehensive 
plan for Missouri River Basin. 
May 12, 1967 Additional $20 million for prosecution of general comprehensive 
plan for Missouri River Basin. 
Aug 13, 1968 Additional $38 million for prosecution of general comprehensive 
plan for Missouri River Basin. 
Dec 24, 1970 Change comprehensive plan name to Pick-Sloan S. Doc. 91-1100, 91st Cong. 
Missouri River Basin Program. 
Dec 23, 1971 Additional $101,000,000 for prosecution of general S. Doc. 92-222, 92nd Cong. 
comprehensive plan for Pick-Sloan Missouri River Basin 
Program. 
Mar 7, 1974 Additional $72,000,000 for prosecution of general 
comprehensive plan for Pick-Sloan Missouri River Basin 
Program. 
POMME DE TERRE LAKE, POMME DE TERRE RIVER, MO 
17. Jun 28, 1938 Adopted general comprehensive plan for Missouri Riv Flood Control Committee Doc. 1, 
Basin and authorized $9 million for initiation and par 75th Cong., P.L. 761. 
accomplishment. 
Dec 22, 1944 Expanded general comprehensive plan for Missouri R H. Doc. 475 and S. Docs. 191 
Basin and authorized $200 million additional expenc and 247, 78th Cong., P.L. 534. 
Sep 3, 1954 Expanded general comprehensive plan for Missouri R H. Doc. 642, 549 1/, and 561, 
Basin and authorized $217,710,000 additional expei 81st Cong.; 83rd Cong., 
P.L. 780. 
POMONA LAKE, ONE HUNDRED TEN MILE CREEK, KS 
18. Sep 3, 1954 Expanded general comprehensive plan for Missouri R H. Doc. 549 1/, 561, 81st Cong.; 
Basin and authorized $217,710,000 additional expei 83rd Cong., P.L. 780 
27- 19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS At 2000 
TABLE 27-B 
See Section Date of 
AUTHORIZING LEGISLATION 
in Text Act Project and Work Authorized Documents 
RATHBUN LAKE, CHARITON RIVER, IA 
19. Sep 3, 1954 Expanded general comprehensive plan for Missouri R H. Doc. 561, 81st Cong., 
Basin and authorized $217,710,000 additional expel 83rd Cong., P.L. 780 
SMITHVILLE LAKE, LITTLE PLATTE RIVER, MO 
20. Oct 27, 1965 The project for flood protection on the Platte River an( 1965 Flood Control Act, 
tributaries, MO and IA, is authorized at an estimate' P.L. 89-298 (H. Doc. 262, 
of $26,889,000. 89th Cong.) 
21. Aug 17, 1999 TURKEY CREEK BASIN, KS & MO 
Project for flood control at the lower reaches of Turke) Title I Section 101(a) Water 
Basin in Kansas City, KS and Kansas City, MO. RE Resources Development Act 
the Chief of Engineers dated April 21, 1999, at a tot of 1999, P.L. 106-53 
of $42,875,000, with an estimated Federal cost of 
$25,596,000 and an estimated non-Federal cost of 
$17,279,000. 
TUTTLE CREEK LAKE, BIG BLUE RIVER, KS 
22. Jun 28, 1938 Adopted general comprehensive plan for Missouri Riv Flood Control Committee Doc. 1, 
Basin and authorized $9 million for initiation and par 75th Cong., P.L. 761. 
accomplishment. 
Aug 18, 1941 Modified general comprehensive plan to include Harla H. Doc. 842, 76th Cong.; 
County Dam and Reservoir on Republican River, NE P.L. 77-228 
Dec 22, 1944 
23 Dec 22, 1944 
Jul 14, 1960 2/ 
26. Sep 3, 1954 
Oct 23, 1962 
other supplemental flood control works on upper 
Republican River, and authorized $7 million additional 
expenditure. 
Expanded general comprehensive plan for Missouri R H. Doc. 475 and S. Docs. 191 
Basin and authorized $200 million additional expenc & 247, 78th Cong., P.L. 645 
WILSON LAKE, SALINE RIVER, KS 
Expanded general comprehensive plan for Missouri R H. Doc. 475 and S. Docs. 191 
Basin and authorized $200 million additional expenc & 247, 78th Cong., P.L. 534 
Additional expenditure of $207 million for prosecution S. Doc. 96, 86th Cong., P.L. 645 
general comprehensive plan for Missouri River Basin 
HARRY S. TRUMAN DAM AND RESERVOIR, OSAGE 
RIVER, MO 
Expanded general comprehensive plan for Missouri R H. Doc. 549 11, 81st Cong.; 
Basin and authorized $217,710,000 additional expel 83rd Cong., P.L. 780 
The Kaysinger Bluff Reservoir is hereby mosified in 1962 Flood Control Act, 
accordance with recommendations of the Chief of H. Doc. 578, 87th Cong., 
Engineers in H. Doc. 578, 87th Cong., at an estimat P.L. 87-874 
additional cost of $43,245,000; provided, that nothing in 
this Act shall be construed as authorizing the acquisition 
of additional lands for the establishment of a national 
wildlife refuge at the reservoir.
27 - 20

KANSAS CITY, MO, DISTRICT 
TABLE 27-B AUTHORIZING LEGISLATION 
See Section Date of 
in Text Act Project and Work Authorized Documents 
STOCKTON LAKE, SAC RIVER, MO 
27. Sep 3, 1954 Expanded general comprehensive plan for Missouri R H. Doc. 549 1/, 81st Cong.; 
Basin and authorized $217,710,000 additional expei 83rd Cong., P.L. 780 
1/ Contains latest published mr 
of Missouri River 
2/ Report ot Chief of Engineers on justification of Wilson 
Dam and Reservoir, submitted in compliance with 
Public Law 505, 84th Congress, published as Senate 
Document 96, 86th Congress, was approved July 14, 
1960 (Public Law 645). 
27 - 21 
,.,,.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WO OR FY 2000 
TABLE 27-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to SeDtember 2000 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Fort Leavenworth Bridge removal Complete 1965 270,393 - 
Gasconade River, MO 1/2/ Complete 1931 139,003 85,077 
1/ Improvement, adequate for existing needs. Project 
for maintenance only. Curtailment of project in H. Doc. 
467, 69th Cong. 
2/ Inactive portion of project deauthorized Jan 1, 1990 
in accordance with Section 1001(b)(1) of Water 
Resources Development Act (WRDA) of 1986 
(P.L. 99-662). 
27 - 22

KANSAS CITY, MO, DISTRICT 
TABLE 27-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
Project 
Abilene, KS 
Atchison, KS 
Bamard, KS 1/ 
Bartley, NE 
Bedford, East Fork, 102 River, IA 1/ 
Big Blue River, Seward, NE 1/ 
Big Stranger Creek, KS 1/ 
Blue River Basin, Overland Park, KS 
Indian Creek Channel Modification 11 
Braymer Lake, Shoal Creek, MO a/ 
Brookfield Lake, Yellow Creek, MO }1 
Chariton-Little Chariton Basin, MO (1965 Act) 41 
Chariton River, MO (1944 Act) 
East Muddy Creek, MO I/ 
Elk Creek, Clyde, KS 1/ 
Fairbury, Little Blue River, NE 
Frankfort, Black Vermillion River, KS 
Gypsum, Gypsum Creek, KS 11 
Harry S. Truman Dam and Reservoir, MO 
(Downstream Fish and Wildlife Mitigation) 
Indianola, NE 
Kansas City, Kansas River, KS (62 Mod) 
Kansas Citys on MO and KS Rivers, 
MO and KS 
Lawrence, Kansas River, KS 
Little Blue River Channel Improvement, 
Little Blue River, MO 
Lower Grand River, MO 3/ 
Manhattan, Kansas River, KS 
Mercer Lake, Weldon River, MO 2/ 
Missouri River at New Haven, MO 
(Sec 212, 1950 Act) 
Osawatomie, Pottawatomie Creek, KS 
Ottawa, Osage, (Marais des Cygnes) River, KS 
Pattonsburg Lake, Grand River, MO 12/9 
Perry Lake Area (Road Improvements), KS 
Platte River, MO, Channel Improvement 
Rathbun Lake Fish Hatchery 
Salina, Smoky Hill River, KS 
Seward, NE 1/ 
Smithville Channel, Little Platte River, MO 
Stonehouse Creek, Jefferson Co., KS 1/ 
Status 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Inactive 
Inactive 
Completed 
Completed 
Inactive 
Completed 
Completed 
Completed 
Completed 
Inactive 
Completed 
Completed 
For Last 
Full Report 
See Annual 
Report For 
1961 
1973 
1953 
1974
- 
1994 
1966 
1976 
1977 
1973 
1966 
1984 
1973 
1966 
1984 
1950 
1984 
Completed 1980 
Completed 1985 
Completed 
inactive 
Completed 
Inactive 
Completed 
Completed 
Completed 
Inactive 
Completed 
Deferred 
Completed 
Completed 
Completed 
Deferred 
Completed 
1989 
1966 
1967 
1976 
1973 
1966 
1976 
1982 
1973 
1975 
1967 
1973 
1972 
Constructior 
1,099,350 
4,099,590 
127,860 
118,269 
652,414 
126,887 
337,131 
Operation and 
Maintenance 
.-. , 
-., 
269,288 2/ 
451,400 
692,706 41 
8,052,990 
989,015 
726,966 
1,271,025 
2,782,793 51 
67,275 
25,010,500 6/ 
42,434,197 7/ 
8,773,488 A/ 
25,530,083 
2,488,585 
432,245 
139,883 
2,036,624 
4,462,661 
5,315,168 
222,193 
700,000 
3,878,668 
126,887 
6,896 
246,995 
27 -23

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORK: FY 2000 
TABLE 27-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last 
Full Report 
See Annual Operation and 
Project Status Report For Constructior Maintenance 
Topeka, Kansas River, KS Completed 1974 21,174,593 - 
Trenton Lake, Thompson River, MO / Inactive 1966 
Trimble Wildlife Area, Smithville Lake, MO Completed 1990 1,570,000 - 
Upper Grand River, MO 2/ Inactive 1966 - - 
1I Authorized by the Chief of Engineers under 
Section 205, Public Law 858, 80th Congress, as 
amended. 
21 Required non-Federal contributions $129,680. 
a1 Grand River Basin reconnaissance study 
(authorized by resolution of the Committee on 
Public Works and Transportation, U.S. House of 
Representatives on July 3, 1987) reviewed and 
updated costs for these projects authorized in 
the Flood Control Act of 1965, and found no 
economically feasible plan. 
4/ Inactive units Little Chariton River (East and Middle 
Fork) and Mussell Fork were deauthorized Jan 1,1990 
by Section 1001(b)(1) of the Water Resources 
Development Act of 1986, P.L. 99-662. Construction 
cost includes $481,106 cost of completed Shoal Creek 
Unit and $211,600 cost of deauthorized Little Chariton 
River and Mussell Fork units. 
5/ Includes $130,841 non-Federal contributions. 
6I Inactive units Kansas Avenue Bridge and Approach, 
and Lower Argentine Units were deauthorized Jult 9, 1995 in 
accordance with Section 1001(b)(2) of WRDA of 1986, P.L. 99- 
662. Construction cost above includes $67,500 for deauthorized 
Bridge and Approach Unit; does not include $1,181,000 non- 
Federal Contributions. 
7/ Includes $619,787 non-Federal contributions for work 
desired by local interests, but not required under the project. 
The project as a whole is complete except for Turkey Creek 
facilities in Central Industrial District Unit. 
9/ Includes $153,377 non-Federal contributions. 
91 Patonsburg Lake Highway Relocation and town relocation 
portions of the project were deauthorized Jan 1,1990 in 
accordance with Section 1001 (b)(1) of the Water Resources 
Development Act of 1986, P.L. 99-662. 
27 - 24

KANSAS CITY, MO, DISTRICT 
TABLE 27-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Funds Funds Date 
Project Report Fc Date and Authority Expended Expended Deauthorized 
Arlington Lake, MO 1948 
Beatrice, Big Blue River, NE 1965 
Chariton-Little Chariton 
Basin, MO (1965 Act)-- 1977 
Inactive Units Little 
Chariton River (East and 
Middle Fork) and Mussell 
Fork Units only 11 
Dry Fork and East Fork 1974 
Lakes, Fishing River, MO 
Fort Scott Lake 1976 
Gamett Lake, Pottawatomie 1973 
Creek, KS 
Gasconade River Navigation, 1931 
MO 
Grove Lake, Soldier Creek, K 1977 
Hackleman Corners Lake, -- 
Cedar Creek, MO 
Hays, Big Creek, KS 3/ 1974 
Indian Lake, Blue River, KS 1976 
Kansas City, Kansas River, 1984 
KS (62) Mod)-Inactive Units 
Kansas Avenue Bridge 
Approach, and Lower 
Argentine Units Only 
Kansas River Navigation 1980 
Flood Control Act approved June 28, 
1938, as modified by Flood Control 
Act approved August 18, 1941, and 
expanded by Flood Control Act 
approved December 22, 1944 
Flood Control Act appr 
September 3, 1954 
1965 Flood Control Act P.L. 89-298 
(H. Doc. 238, 89th Cong., 1st sess.) 
1965 Flood Control Act P.L. 89-298 
(H. Doc. 281, 89th Cong., 1st sess.) 
1954 Flood Control Act (H. Doc. 549, 
81st Cong. 2nd Sess) 
Flood Control Act approved 
September 3, 1954 
Curtailment of project in H. Doc. 467, 
69th Cong. 1928 
1962 Flood Control Act (S. Doc. 122, 
87th Cong. 2d sess.) 
Authorized by Flood Control Act 
approved September 3, 1954 
Flood Control Act of 1965 approved 
October 27, 1965 
1970 Flood Control Act (H. Doc. 332 
91st Cong., 2d sess.) 
1962 Flood Control Act, S. Doc. 122, 
87th Cong., P.L. 87-874 
$8,651 
16,317 
211,600 
51,989 
757,500 
71,466 
2/ 
1,754,019 
499,200 
127,297 
67,500 4/ 
1965 Flood Control Act, P.L. 89-298, 259,900 
Sec. 201 
-- Aug 5, 1977 
- May 6, 1981 
-- Jan 1, 1990 
-- Jan 1, 1990 
-- Apr 5, 1999 
Nov 17, 1986 
-- Jan 1, 1990 
Nov 17, 1986 
Aug 5, 1977 
-- Jan 18, 1978 
-- Nov 17, 1986 
-- Jul 9, 1995 
-- Nov 17, 1986 
27 - 25

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 27-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Funds Funds Date 
Project Report Fc Date and Authority Expended Expended Deauthorized 
Marysville, KS 
Melvem Lake and Pomona - 
Lake (Road Improvements) 
KS (1974 Act) 
Merriam, Turkey Creek, KS 1970 
Mill Lake, Blue River, MO 1971 
Missouri River Levee System, 
IA, KS, MO, and NE 
Deauthorized by Sec. 1002 
Water Resources Development 
Act of 1968, P.L. 99-662, 
Section 1002: Units R402; - 
R393-395; and R414 
Deauthorized in accordance - 
with WRDA Section 1001(b)(1): 
Units L36; R42; L51; R55-59-61; 
L68-92; R70; L78; R87;L94; 
L99; L103; R104; R107; R112; 
L117; L121; L124; L129; L134; 
L137-139; L145; R150; L154; 
L157; R161; L164; R169; L175; 
R179-184; L191-196; L205; 
L217; R226; R240; R251; L256; 
R259; L263-270 I; R272; 
R284; R302; R336; L353; L357; 
R361; L362; L392; L419-426; 
L435; R512-513, Section III 
Flood Control Act of September 3, 
1954 
Water Resources Development Act 
of 1974, Section 17 
Flood Control Act approved September 
3, 1954 
KANSAS CITY, MO, DISTRICT 
133,682 
39,708 
1970 Flood Control Act (H. Doc. 332, 
91st Cong., 2d sess.) 
Flood Control Act of August 18, 
1941, P.L. 228, 77th Cong. 
Flood Control Act of August 18, 
1941, P.L. 228, 77th Cong. 
57,500 
1,631,700 
Jan 1967 
Jan 1, 1990 
- Nov 27, 1973 
Nov 17, 1986 
-- Nov 17, 1986 
- Jan 1, 1990 
27-26

KANSAS CITY, MO, DISTRICT 
TABLE 27-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Funds Funds Date 
Project Report Fc Date and Authority Expended Expended Deauthorized 
Onaga Lake, Vermillion Creek, 
KS 
Osage River Navigation, MO, 1952 
lock and dam 
Pattonsburg Lake, Grand 
River, MO 7/ 
1-35 Highway Relocation 
Town Relocation 
Pioneer Lake, KS 
Pomme de Terre Lake 
(Power Addition), MO 
Richland Lake, MO 
1976 
1976 
1952 
1954 
1974 
1948 
Flood Control Act of 1962, Octo- 2,178,261 
ber 23, 1962 (P.L. 87-874) 
Original lock and dam authorized 658,076 6/ 
Mar 3, 1899; improvement authorized 
in 1928; placed in standby 
status Jul 1952 and operation & 
maintenance discontinued. 
1965 Flood Control Act, P.L. 89-298 393,623 
(H. Doc. 241, 89th Cong., 1st sess) 91,929 
Flood Control Act approved June 28, 95,692 
1938, as modified by Flood Control 
Act of August 18, 1941, and 
expanded by Flood Control Act 
approved December 22, 1944 
Flood Control Act of 1954 
(H. Doc. 549, 81st Cong., 2d sess.) 
Flood Control Act approved June 28, 8,548 
1938, as modified by Flood Control 
Act approved August 18, 1941, and 
expanded by Flood Control Act 
approved December 2, 1944 
-- Nov 17, 1986 
-- Jan 1, 1990 
-- Jan 1, 1990 
-- Jan 1, 1990 
-- Aug 5, 1977 
Nov 17, 1986 
-- Aug 5, 1977 
27 - 27

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 27-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Funds Funds Date 
Project Report Fc Date and Authority Expended Expended Deauthorized 
Tomahawk Lake, 1976 1970 Flood Control Act (H. Doc. 332, 77,189 -- Nov 17, 1986 
Blue River, KS 91st Cong., 2d sess.) 
Tuttle Creek Lake, KS (Road 1977 Sec. 18 of Water Resources 3,000 Nov 17, 1986 
Improvement-1974 Mod.) Development Act of 1974 
Tuttle Creek Lake, KS -- Water Resources Development Act o - - Jan 1, 1990 
Road and Bridge (1976 1976, Section 189, P.L. 94-587 
Act) 
Wolf-Coffee Lake, Blue River 1976 1970 Flood Control Act (H. Doc. 332, 1,095,020 Nov 17, 1986 
KS 91st Cong., 2d sess.) 
1/ For completed Shoal Creek unit of Chariton-Little 
Chariton Basin, MO, see Table 27-E. 
a/ For completed project see Table 27-C. Deauthorized 
under Sec. 1001(b)(1) WRDA of 1986, P.L. 99-662. 
3/ Hays, Lincoln Draw, KS, Section 205 feasibility study 
terminated in March 1991 due to lack of identifiable 
project that would meet dam safety concerns. 
4/ For completed Argentine, Amourdale, and Central 
Industrial Units of project, see Table 27-E. 
/ Incorrectly shown as R263-270 in the deauthorization 
act. 
6/ Operation and maintenance costs $850,495. 
Deauthorized under Sec. 1001 (b)(1) of WRDA, P.L. 99-662. 
7 Pattonsburg Lake portion of project is inactive. See 
Table 27-E. 
27 -28

KANSAS CITY , MO, DISTRICT 
TABLE 27-H MISSOURI RIVER LEVEE SYSTEM 
(See Section 14 of Text) 
Miles of 
Unit Levee Status 
R512-513 Richardson Co. D.D. No. 7 
R500 Iowa Point D. D. No. 4 
Kimsey Holly Creek 
L497 Forest City L. D. 
L488 Holt Co. D. D. No. 7 
R482 Burr Oak D. D. No. 3 
L476 Amazonia L. D. 
R460-471 Elwood-Gladden L. D. 
L455 S. St. Joseph L. D. 
L443-448 Halls L. D. 
R440 Atchison & Doniphan Co. D. D. 
L408 Farley-Beverly D. D. 
L400 Waldron L. D. 
L385 Riverside-Quindaro D. D. 
R351 Atherton L. D. 
L330-345 Orrick L. D. 
L319-325 Henrietta-Crooked River D. D. 
L246 Brunswick-Dalton D. D. 
L142 
L15 North County L. D. 
Remaining units 
19.1 
4.1 
4.4 
16.0 
11.5 
8.2 
10.8 
13.8 
15.6 
17.3 
10.7 
12.2 
7.6 
6.5 
15.9 
43.4 
35.0 
20.0 
6.0 
40.0 
Complete--1958 
Complete--1954 
Complete--1970 
Complete--1962 
Complete--1955 
Complete--1954 
Complete--l 956 
Complete--1968 
Complete--1967 
Complete--1957 
Complete--1959 
Complete (Levee raise modification)-1972 
Complete-1 957 
Planning underway 
Complete--1966 
Inactive 
Inactive 
Complete--1983 
Planning underway 
Planning underway 
Detailed planning not initiated 
27- 29

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 27-I KANSAS CITY DISTRICT PROJECTS INCLUDED IN 
PICK-SLOAN MISSOURI BASIN PROGRAM 
(See Section 16 of Text) 
Federal Non-Federal Non-Federal 
Project Status Cost Cost Reimbursable 
Abilene, Smoky Hill River, KS C $1,099,350 $287,000 
Bartley, Republican River, NE C 118,269 9,500 
Fort Scott Lake, Marmaton River, KS D 71,186,000 19,314,000 $44,800,000 5. 
Garnett Lake, Pottawatomie Creek, KS D 71,466 - 
Harlan County Lake, Republican River, NE C 48,129,549 -- 
Harry S. Truman Dam and Reservoir, Osage River, MO C 550,908,965 -- 138,385,000 6/ 
Hillsdale Lake, Big Bull Creek, KS C 64,161,400 - 21,145,338 5/ 
Indianola, Republican River, NE C 67,275 7,592 
Kanopolis Lake, Smoky Hill River, KS C 12,577,227 -- 
Lawrence, Kansas River, KS C 8,620,111 2,130,000 
Manhattan, Kansas River, KS C 2,488,585 265,000 
Melvem Lake, Osage (Marais des Cygnes) River, KS C 37,436,530 -- 7,131,834 7/ 
Melvem Lake and Pomona Lake (Road improvement), 
KS (1974 Authorization) D -- 
Milford Lake, Republican River, KS C 49,566,492 -- 12,162,134 51 
Missouri River Levee System, Rulo to the Mouth 8/ A 93,553,000 35,265,000 
Osawatomie, Osage (Marais des Cygnes) River, KS C 2,036,624 348,300 
Ottawa, Osage (Marais des Cygnes) River, KS C 4,462,661 876,000 
Perry Lake, Delaware River, KS C 49,095,918 -- 8,551,805 5/ 
Pomme de Terre Lake, Pomme de Terre River, MO C 17,365,453 - 
Pomona Lake, Osage River Basin, KS C 14,003,238 -- 862,923 5/ 
Salina, Smoky Hill River, KS C 3,878,668 1,960,000 
Stockton Lake, Sac River, MO C 79,975,357 - 24,206,593 2/ 
Topeka, Kansas River, KS C 21,174,593 10,383,492 
Tuttle Creek Lake, Big Blue River, KS C 80,584,079 - 2,333,916 51 
Tuttle Creek Lake, KS--Road and Bridge (1976 Act) D - 
Tuttle Creek Lake (Road Improvement), KS 
(1974 Modification) D 3,000 
Wilson Lake, Saline River, KS C 20,463,367 
1/ Status: A = Active; C = Completed; D = Deauthoriz 7/ In accordance with the Memorandum of Understanding 
I = Inactive. between the State of Kansas and the Dept. of the Army 
2/ Actual appropriations for completed and deauthoriz dated 1985, payment in full of $7,131,834 for 50,000 acreprojects; 
estimated appropriation requirements for active feet of water supply was made in March 1995. 
and inactive projects. 8/ Active portion of project. Currently estimated cost 
3/ Estimated cost during construction. (1997): Deferred portion of project--$46,753,000 Federal 
4/ Future reimbursement of initial Federal cost. and $4,336,000 non-Federal; Inactive portion of project-- 
5/ Estimated reimbursement costs allocated to water $104,791,000 Federal and $11,296,000 non-Federal. Actual 
supply. cost of deauthorized units (1990) is $1,689,200 Federal. 
6/ Estimated reimbursement costs allocated to power 2 Includes $22,116,864 estimated reimbursement costs 
allocated to power, and $2,089,729 estimated reimbursement 
costs allocated to water supply. 
27 - 30

TABLE 27-J 
KANSAS CITY, MO, DISTRICT 
INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
(See Section 25 of Text) 
ffimmmw
Project Month Inspecte 
Missouri River Main Stem 
R482, R500, R440 and Atchison, KS 
L497, L488, L476 
Kimsey Holley Creek, MO 
Birmingham, MO 
Fairfax Jersey Creek (KCK) 
North Kansas City, MO (Lower Section 
L408, L400, R471-460 and R351-1 
KCMO Units - CID (MO), East Bottoms, NKC Airport 
L448-443, L455 
L246, Lower Chariton, MO and New Haven, MO 
R512-513 
Kansas River 
North Topeka, Soldier Creek 
South Topeka Units-Oakland, South Topeka, Aubumdalr and 
Waterworks Unit 
Manhattan, KS 
Ft Riley, KS 
Lawrence, KS 
Kaw Valley-Argentine, Armourdale, Lower Fairfax, CID (KS) 
Lower Fairfax (all KCK) 
Osae River (MO) Marais des Cvanes (KS) 
Ottawa, KS 
Osawatomie, KS 
Smokey Hill, Saline. Solomon Rivers & Tributaries (KS) 
Abilene, KS 
Saline, KS & Barnard, KS 
Gypsum, KS 
Republican River 
Clyde, KS 
Indianola, NE 
Big and Little Blue Rivers (KS & NE) 
Frankfort, KS 
Fairbury, NE, Seward, NE 
Blue River (MO) 
GSA Complex (KCMO) 
Blue River Channel & Brush Creek (KCMO) 
27- 31 
Little Blue River Channel, Jackson County. MO 
R351-11 
Little Blue River Channel, Jackson, MO 
Lake City AAP, MO 
1 I I 
Apr-2000 
Apr-2000 
Apr-2000 
May-2000 
May-2000 
May-2000 
May-2000 
Jun-2000 
Jun-2000 
Jun-2000 
Oct-2000 
Apr-2000 
Apr-2000 
May-2000 
Jun-2000 
Sep-2000 
Oct-2000 
Jun-2000 
Jun-2000 
Jun-2000 
Sep- 2000 
Oct-2000 
Apr-2000 
Oct-2000 
Apr-2000 
Sep-2000 
May-2000 
Jun-2000 
May-2000 
Jul-2000 
Jul-2000

KANSAS CITY, MO, DISTRICT 
Miscellaneous 
Bedford, IA Apr-2000 
Shoal Creek, MO Aug-2000 
Macon-Adair Project, Kirksville, MO Aug-2000 
Stonehouse Creek, KS Sep-2000 
27- 32

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 27-K WORK UNDER SPECIAL AUTHORITIES 
(See Section 28 of Test) 
Fiscal Year 
Study Status 11 Cost 
Flood Control Activities Pursuant to Section 205, 1948 Flood Control Act, 
Public Law 858, 80th Congress, June 30, 1948, as Amended 
Section 205 Coordination Account $20,660 
St Joseph, MO F 59,661 
Excelsior Springs, MO F 2,493 
Brunswick, MO F 20,412 
Wears Creek, MO F 19,972 
TOTAL ALL SECTION 205 ACTIVITIES $123,198 
Emergency Streambank Protection--Sec. 14, 1946 Flood Control Act 
Public Law 526, 79th Congress, July 24, 1946, as Amended 
Section 14 Coordination Account -- $17,441 
Chariton River, MO D 17,518 
Delaware River Water Intake, Kickapoo Reservation, KS C 64,458 
Flat Creek, MO D 48,649 
Grand River, Route A Bridge, MO D 8,875 
Grand River, Chariton County, MO, Salt Creek Bridge C 4,398 
Hinkson Creek, Columbia Sewermain, MO C 93,742 
Kansas River, Eudora Bend Bridge, KS D 59,566 
Little Blue River Barnes Road D 2,782 
Muddy Creek, Grundy County, MO C -1,872 
Platte River Bridge, Conception, MO D 16,416 
West Creek, Topeka, KS C 83,763 
West Fork, Grand River, Route H Bridge, Gentry 
County, MO C -6,757 
West Fork, Grand River, Route W Roadway C 2,250 
TOTAL ALL SECTION 14 ACTIVITIES $411,229 
27- 33

KANSAS CITY, MO, DISTRICT 
Project Modifications for Improvement of Environment 
Section 1135, Water Resources Development Act of 1986, 
Public Law 662, 99th Congress, November 17, 1986 
Coordination Account Funds $13,525 
Initial Appraisals, General I 12,818 
Blue Springs Lake Habitat, MO D 2,986 
Milford Lake Habitat Restoration, KS F 57,461 
Rathbun Lake Habitat Restoration, IA P 23,772 
TOTAL ALL SECTION 1135 ACTIVITIES $110,562 
Aquatic Ecosystem Restoration 
Section 206, Water Resources Development Act of 1996 
Public Law 303, 104th Congress, October 12, 1996 
Coordination Account Funds $15,659 
Preliminary Restoration Funds I 22,836 
Lake Nemaha Wetlands, KS F 42,237 
Straightwater Marsh, Wetland Habitat F 17,278 
TOTAL SECTION 206 ACTIVITIES $98,010 
11 Status: I = Initial; D = Planning and Design Analysis; F = Feasibility; P = P&S; C = Construction; 
O =Operational 
Emergency Response Activities 
(See Section 28 of Text) 
Emergency Flood Control Activities-Repair, 
Flood Fighting, and Rescue Work- 
Public Law 99, 84th Congress 
and Antecedent Legislation 
Activit Approp 96X3125 
FY 00 Exoendtures 
FLOOD CONTROL AND COASTAL EMERGENCIES 
Disaster Prepardness Program-100 
Planning Activities $421,695 
Training and Exercise 10,215 
Facilities -15,272 
National Centers for Expertise 0 
Total Disaster Preparedness Program $416t638 
27- 34

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Emergency Operations-200 
Response Operations-210 
Acquisition of Supplies & Equipment 
Operational Deployment 
Total Emergency Operations 
Rehabilitation-300 
Federal Flood Control Works 
Non-Federal Flood Control Works 
Field Investigation 
Inspections 
Interagency Levee Activities 
Total Rehabilitation 
$0 
99,778 
12,064 
$111,842 
$1,679,302 
48,018 
46,475
0 
131,788 
$1,905,583 
Emergency Water Supplies and Draught Assistance-400 
Field Investigations $5,757 
Total $5,757 
Hazard Mitigation-600 
Hazard Mitigation Team Activities 0 
FLOOD CONTROL AND COASTAL EMERGENCIES 
TOTAL FEDERAL NON-REIMBURSEABLE ACTIVITIES $2,439,820 
Rivers and Harbors 
Contributed Funds 
Approp 96X8862 
Expenditures 
SPONSOR'S CONTRIBUTED FUNDS 
Maintenance-300 
Non-Federal Flood Control Works-320 $3,611 
TOTAL ALL EMERGENCY RESPONSE ACTIVITIES EXPENDITURES 
27- 35 
$2,443,431

KANSAS CITY, MO, DISTRICT 
TABLE 27-L ACTIVE GENERAL INVESTIGATIONS 
(See Section 30 of Text) 
Federal Cost Total By 
Item and PWI Number FY 00 Category 
SURVEYS (Category 100) 
Flood Damage Prevention Studies (120) 
Swope Park Industrial Area, Kansas City, MO--012821 
Kansas City, MO & KS-13268 
Subtotal 
Review of Authorized Projects (160) 
Kansas City, MO & KS--013268 
MRLS, Units L455 and R460-471 (013267) 
Topeka, KS--013200 
Subtotal 
Miscellaneous Activities (170) 
Special Investigations--017250 
Interagency Water Resources Development-014713 
North American Waterfowl Mgmt-053904 
Subtotal 
Coordination with Other Agencies and Non-Federal 
Interests (180) 
Coop with Other Water Resources Agencies (181)--053907 
Planning Assistance to States (186) 
Subtotal 
$55,027 
99,887 
$154,914 
$100,301 
117,051 
111,000 
$328,352 
$145,547 
10,181 
3,500 
$160,724 
$16,050 
307,764 
$323,814 
TOTAL SURVEYS (Category 100) $966,308 
COLLECTION AND STUDY OF BASIC DATA 
(Category 200) 
Flood Plain Management Services (250) 
Flood Plain Management Service Unit--082030 
Technical Services-082040 
Quick Responses--082045 
Flood Plains Management Study--082500 
Special Studies 
Liberty, MO--083070 
Missouri SEM MRCS-083614 
Bluefield, VA--083650 
Subtotal 
$35,152 
44,877 
6,000 
-961 
747 
364 
38,784 
$124,963 
27 - 36

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITY FOR FY 2000 
Hydrologic Studies (260) 
General Hydrology Studies-053820 $26,204 
TOTAL COLLECTION AND STUDY OF BASIC DATA 
(Category 200) 
PRECONSTRUCTION ENGINEERING AND DESIGN 
Flood Control Projects (Project Not Fully Authorized) 
(Category 450) 
Turkey Creek Basin, KS & MO-012381 $71,053 
Flood Control Projects (Fully Authorized Project) (Category 600) 
Turkey Creek KS & MO Cost Sharing $269,394 
Blue River Basin, Kansas City, MO--012563 298,719 
TOTAL PRECONSTRUCTION ENGINEERING AND DESIGN 
GRAND TOTAL GENERAL INVESTIGATIONS 
27- 37 
$151,167 
$639,167 
$1,756,642

KANSAS CITY, MO, DISTRICT 
TABLE 27-M REGULATORY PROGRAM 
(See Section 34 of Text) 
Federal cost 
Item and PWI Number FY 00 
PERMIT EVALUATION (100) 
REG-Permit Evaluation--008204 
ENFORCEMENT (200) 
REG-Enforcement--008205 
ADMINISTRATIVE APPEALS (600) 
-013579 
GRAND TOTAL REGULATORY PROGRAM 
27 - 38 
$2,157,527 
325,586 
17,784 
$2,500,897 
__
PORTLAND, OR DISTRICT* 
REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
PORTLAND, OR DISTRICT 
The territorial limits of the Portland District include the Pacific coastal drainage area of the State of 
Oregon, the portions of the States of Oregon and Washington which lie within the Columbia River 
watershed downstream of the Umatilla Bridge below McNary Dam, and south central Oregon west of the 
Malheur River and the Steens Mountains, but not including that part which drains into the Klamath Lake 
and River. 
Improvements 
Navigation Page 
1. Bonneville Navigation Lock, Bonneville 28-2 
Dam, OR and WA 
2. Chetco River, OR 28-2 
3. Columbia and Lower Willamette Rivers 
below Vancouver, WA and Portland, OR 28-3 
4. Columbia River at Baker Bay, WA 28-4 
5. Columbia River between Chinook, WA 
and Head of Sand Island 28-4 
6. Columbia River at the Mouth, OR and WA 28-5 
7. Columbia River between Vancouver, 
WA and The Dalles, OR. 28-5 
8. Columbia River, Seafarers Memorial 
Hammond, OR 28-6 
9. Coos Bay, OR 28-6 
10. Coquille River, OR 28-7 
11. Depoe Bay, OR 28-7 
12. Port Orford, OR 28-8 
13. Rogue River Harbor at Gold Beach, OR 28-8 
14. Siuslaw River, OR 28-8 
15. Skipanon Channel, OR 28-9 
16. Tillamook Bay and Bar, OR 28-9 
17. Umpqua River, OR 28-10 
18. Willamette River at Willamette Falls, OR 28-10 
19. Yaquina Bay and Harbor, OR 28-11 
20. Yaquina River, OR 28-12 
21. Project Condition Surveys 28-12 
22. Navigation Activities Under Special 
Authorization 28-12 
Shore Protection 
23. Shore Protection Activities Under Special 
Authorization 28-12 
Flood Control 
24. Applegate Lake, Rogue River Basin, OR 28-12 
25. Blue River Lake, OR 28-13 
26. Cottage Grove Lake, OR 28-13 
27. Dorena Lake, OR 28-13 
28. Elk Creek Lake, Rogue River Basin, OR 28-14 
29. Fall Creek Lake, OR 28-15 
30. Fern Ridge Lake, OR 28-15 
31. Lower Columbia River Basin Bank 
Protection, OR and WA. 28-1 
Flood Control (Cont'd) Page 
32. Mt. St. Helens Sediment Control, WA 28-16 
33. Scappoose Drainage District, OR 28-17 
34. Willamette River Basin Bank 28-17 
Protection, OR 
35. Willow Creek Lake, Heppner, OR 28-17 
36. Inspection of Completed Flood Control 
Projects 28-18 
37. Scheduling Flood Control Reservoir 
Operations 28-18 
38. Flood Control Activities Under 
Special Authorization 28-18 
Multiple-Purpose Projects, Including Power 
39.Bonneville Lock and Dam - 
Lake Bonneville, OR and WA 28-19 
40. Columbia River Treaty Fishing Sites, 
OR and WA 28-20 
41. Cougar Lake, OR 28-20 
42. Detroit Lake - Big Cliff, OR 28-21 
43. Green Peter - Foster Lakes, OR 28-21 
44. Hills Creek Lake, OR 28-22 
45. John Day Lock and Dam - 
Lake Umatilla, OR and WA 28-22 
46. Lookout Point - Dexter Lakes, OR 28-23 
47. Lost Creek Lake, Rogue River Basin, OR 28-24 
48. The Dalles Lock and Dam - 
Lake Celilo, WA and OR 28-24 
Environmental 
49. Columbia River Fish Mitigation, 
OR and WA 28-25 
50. Willamette River Temperature 
Control, OR 28-26 
51. Environmental Activities Under Special 
Authorization 28-26 
General Investigations 
52. Surveys 28-27 
53. Collection and Study of Basic Data 28-28 
54. Preconstruction Engineering and Design 28-28 
Other 
55. Flood Control and Coastal Emergencies 28-28 
Tables 
5 Table 28-A Cost & Financial Statement 28-30 
Table 28-B Authorizing Legislation 28-37 
28-1

PORTLAND DISTRICT 
Tables (Cont'd) Page 
Table 28-C Other Authorized Navigation 
Projects 28-38 
Table 28-D Not Applicable 
Table 28-E Other Authorized Flood Control 
Projects 28-39 
Table 28-F Other Authorized Multiple Purpose 
Projects, Including Power 28-41 
Table 28-G Deauthorized Projects 28-41 
Table 28-H Columbia and Lower Willamette 
River bellow Vancouver, WA and 
Portland, OR 28-42 
Table 28-1 Project Condition Surveys 28-42 
Table 28-J Willamette River at Willamette Falls, 
OR, Principal Features of Existing 
Canal and Locks 28-42 
Table 28-K Flood Control Reservoir 
Operations 28-43 
Navigation 
1. BONNEVILLE NAVIGATION LOCK, 
BONNEVILLE DAM, OR AND WA 
Location. On Columbia River 40 miles east of 
Portland, OR about 146 miles above mouth of river. 
Existing project. The existing lock chamber is 76 
feet wide and 500 feet long with 24.2 feet depth of 
water over the sill. Construction of a new navigation 
lock just south of the existing lock was authorized in 
the FY 1985 Supplemental Appropriations Act, 
Public Law 99-88, August 15, 1985. Inland Waterways 
Trust Fund will fund 50 percent of the project 
cost in accordance with the Water Resources 
Development Act of 1986, Public Law 99-662, 
November 17, 1986. The new lock chamber is 86 
feet wide and 675 feet long with 19 feet depth of 
water over the sill. Estimated cost for construction of 
the new navigation lock is $348,100,000. Construction 
of the lock is completed. The lock opened to 
shipping on March 26, 1993. Restoration of the 
grounds and historic buildings is complete. 
Local cooperation. None required. 
Operations during fiscal year. New work: Continued 
real estate activities to obtain title to project 
lands. 
2. CHETCO RIVER, OR 
Location. Rises in Siskiyou Mountains of Coast 
Range at an elevation of 4,000 feet, flows for about 
51 miles in a circuitous route, and empties into 
Pacific Ocean at Brookings, OR, 300 miles south of 
entrance to Columbia River and 345 miles north of 
San Francisco Bay. (See National Oceanic and 
Atmospheric Administration Charts 18600 and 
18203). 
Tables (Cont'd) Page 
Existing project. Provides for two jetties at the 
mouth of the river. Modification of 1965 authorized 
an entrance channel 120 feet wide by 14 feet deep; a 
barge turning basin about 250 feet wide, 650 feet 
long, and 14 feet deep; and a small boat access 
channel 100 feet wide by 12 feet deep. Also authorized 
was a 450-foot extension of north jetty with an 
increase in elevation of existing portion and a 
protective dike about 1,800 feet long with a top 
elevation of 18 feet. Mean lower low water is plane 
of reference. Tidal range between mean lower low 
water and mean higher high water is 6.9 feet and 
extreme is about 12 feet. 
Construction of jetties was completed December 
1957. Removal of rock pinnacles and an abandoned 
bridge structure was accomplished in June 1959. 
Under authorized modification of October 1965, two 
contracts were completed. Construction of entrance 
channel and extension of north jetty was completed 
in July 1969. Construction of a protective dike, 
turning basin and small boat access channel was 
completed in March 1970. The authorization was 
modified by WRDA 92 to "direct the Secretary of the 
Army to assume maintenance of the approximately 
200-foot long access channel to the south commercial 
boat basin consistent with authorized project depths". 
This channel will be maintained in lieu of the small 
boat access channel. 
Local cooperation. Fully complied with. 
Terminal facilities. The Port of Brookings has 
developed two large boat basins, one for commercial 
fishing boats and the other for sport boats, and a 
public boat launching ramp. There are four fish 
28-2
Table 28-L Work Under Special 
Authorities, Projects Not 
Specifically Authorized 28-44 
Table 28-M Work Under Special 
Authorities, Emergency 
Response Activities 28-45 
Table 28-N Principal Data Concerning 
Columbia River Navigation 
Lock, Spillway Dam, and 
Powerplant 28-46 
Table 28-0 Bonneville Power Admin 
Cost and Financial Statement 28-48 
Table 28-P Power Revenue and Power 
Generation 28-50 
Table 28-Q Inspection of Completed 
Local Protection Projects 28-50

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
receiving docks and a sea-going barge dock for 
lumber loading and storage. There is also a privately 
owned marina and a Coast Guard Station. 
Operations during fiscal year. Maintenance: A 
total of 36,094 cubic yards of material was removed 
by the U.S. hopper dredge Yaquina. The sand 
bypasser Sandwick worked six days. 
3. COLUMBIA AND LOWER WILLAMETTE 
RIVERS BELOW VANCOUVER, WA, AND 
PORTLAND, OR 
Location. The Columbia River rises in British 
Columbia, through which it flows for 425 miles. It 
enters the United States in northeastern Washington, 
and empties into the Pacific Ocean 645 miles north of 
San Francisco Bay and 160 miles south of Strait of 
Juan DeFuca. Total length of river is 1,210 miles. 
(See NOAA Charts 18520, 18521, 18522, 18523, 
18524, 18526, and 18531; also Geological Survey 
Map of Washington.) Willamette River rises in 
Cascade Range in western Oregon, flows northerly, 
and empties into Columbia River about 100 miles 
from the sea. Its length from source of Middle Fork is 
about 294 miles. Project embraces 103.5 miles of 
Columbia River below Vancouver, WA, and 14.6 
miles of Willamette River below Portland, OR. (See 
NOAA Chart 18526 and Geological Survey Map, 
State of Oregon.) 
Existing project. Provides for a channel 35 feet 
deep and 500 feet wide from River Mile 106.5 to 
105.5, the distance between existing highway and 
railroad bridges; a channel 40 feet deep and 600 feet 
wide from Vancouver, WA, River Mile 105.5 to 
mouth of Columbia River, River Mile 3; a turning 
basin at Vancouver, WA, 40 feet deep, 800 feet wide, 
and about 5,000 feet long; a turning basin at 
Longview, WA, 40 feet deep, average width of 1,200 
feet, and about 6,000 feet long; and a channel 40 feet 
deep in the Willamette River with varying widths of 
600 to 1,900 feet from the mouth (River Mile 0) to 
Broadway Bridge (River Mile 11.6) which encompasses 
Portland Harbor area, subject to provisions 
that channel from mouth of Willamette River to 
turning basin at Vancouver, WA, be limited to 500 
feet in width until need for additional width is 
demonstrated by developed traffic. Existing project 
also provides for auxiliary channels 10 feet deep and 
300 feet wide near Cathlamet, WA; 30 feet deep and 
300 feet wide in St. Helens, (Oregon); and 30 feet 
deep and 500 feet wide connecting upper end of St. 
Helens Channel with main ship channel of Columbia; 
24 feet deep and 200 feet wide along frontage of 
town of Rainier, OR, extended to its upper and lower 
ends to deep water in Columbia River, 8 feet deep 
and 150 feet wide from this depth in Columbia River 
through old mouth of Cowlitz River to a point about 
3,000 feet upstream from present terminus of harbor 
line; a channel from Longview Port dock downstream 
along pierhead line and past Weyerhaeuser 
Timber Co. plant at Longview to a connection with 
main ship channel below Mount Coffin, the downstream 
2,400 feet of this channel to be 30 feet deep 
and 300 feet wide and remainder to be 28 feet deep 
and 250 feet wide; construction of a small boat 
mooring basin at Astoria, OR, to include a sheet pile, 
sand-filled breakwater about 2,400 feet long with a 
30-foot roadway along its full length, and steel pile 
shore wings totaling about 1,460 feet long and for 
stone-and-pile dikes and revetments. Plane of 
reference in estuary from mouth of Harrington Point 
is mean lower low water; thence to Portland and 
Vancouver, adopted low water. Tidal range between 
mean lower low water and mean higher high water at 
mouth of Columbia is about 8 feet, and at Portland 
and Vancouver, about 3 feet at low stage of rivers. 
Extreme tidal ranges are about 13 and 3 feet, 
respectively. Annual freshets have little effect on 
stage of tide at mouth of Columbia; at Portland and 
Vancouver, they average about 12 feet, while highest 
know reached a stage of 33 feet above water at 
Portland. 
Work on the 40-foot channel in Columbia River 
from Portland, OR, and Vancouver, WA, to the sea 
was completed in 1976. Auxiliary channel in vicinity 
of Longview was completed in 1949, and improvement 
of mouth of Cowlitz River and small boat 
mooring basin at Astoria were completed in 1950. 
Project depths are maintained all year except for the 
period immediately following the annual freshet in 
May-June when shoaling occurs at several locations. 
Timing of vessel movement with tidal fluctuations 
permits maximum draft conditions. In Columbia and 
Willamette Rivers between mouth and Broadway 
Bridge at Portland a depth of 40 feet at low tide and 
42 feet at high tide is practicable all year. In Columbia 
River between mouth of Willamette River and 
Vancouver, WA, depths of 40 and 42 feet at low and 
high tide, respectively, are practicable all year. (For 
details relating to previous project, see pages 1995 
and 1998 of Annual Report for 1915 and page 1746 
of Annual Report for 1938.) 
A feasibility study for deepening the Columbia 
and Lower Willamette navigation channel is being 
conducted in cooperation with the Association of 
Lower Columbia River Ports. 
Local cooperation. Fully complied with. Requirements 
are described in full on page 37-3 of FY 
1981 Annual Report. 
Terminal facilities. At Portland, OR, there are six 
Port of Portland terminals consisting of 43 berths 
equipped to handle general cargo, bulk cargo, 
lumber, automobiles, lift-on-lift-off and roll-on-rolloff 
containers, and breakbulk vessels. The Port of 
Portland owns and operates a major ship repair yard, 
which includes the west coast's largest, and the 
28-3

PORTLAND DISTRICT 
world's third largest, floating dry dock. Also 
available in the harbor area are privately operated 
facilities for receiving, storing and outloading 
petroleum, wood chips, grain, logs, sand and gravel, 
cement, and steel products. 
At Astoria, OR, there is a terminal with facilities 
for receiving and handling all types of general cargo. 
At Vancouver, WA, there are municipal facilities 
capable of berthing five ships simultaneously. Each 
berth is completely outfitted with mechanical and lift 
facilities for receiving and handling all types of 
cargo. The port has a low dock to handle roll-on-rolloff 
and side-port discharging vessels. The grain 
terminal has a storage capacity of 4,500,000 bushels. 
Port of Longview has a public terminal on Columbia 
River and a privately owned grain elevator 
with a capacity of 6,900,000 bushels. This port also 
has a heavy lift facility, with a capacity of 600 tons. 
Port of Kalama has two berthing areas, one port 
owned and one private. 
At other locations on Columbia River between 
Portland and Columbia River entrance there are 
sufficient private facilities to accommodate river 
vessels and fishing craft. These facilities, with 
planned extensions, are considered adequate for 
existing commerce. (For details, see Port Series Nos. 
33 and 34, Corps of Engineers, published in 1974 
and 1975 respectively.) 
Operations during fiscal year. Maintenance: A 
total of 7.4 million cubic yards of material was 
removed. The U.S. hopper dredge Essayons removed 
3.8 million cubic yards, the U.S. hopper dredge 
Yaquina removed 362,640 cubic yards, the pipeline 
dredge Oregon removed about 3 million cubic yards, 
and the contract hopper dredge Dodge Island 
removed 202,450 cubic yards. The sand bypasser 
Sandwick worked five days in the Cowlitz Old 
Mouth Channel. An additional 600 feet west of the 
easternmost 400 feet of the East Astoria Boat Basin 
North Breakwater was repaired with new sheetpile. 
4. COLUMBIA RIVER AT BAKER BAY, WA 
Location. Baker Bay is a shallow body of water 
about 15 square miles in extent on the north side of 
Columbia River near its mouth. The bay is separated 
from the river by Sand Island, a low-lying sand bar 
only a few feet above high tide level. (See NOAA 
Chart 18521.) 
Existing project. A mooring basin 10 and 12 feet 
deep, about 20 acres in extent with protecting 
breakwaters; and a west channel 16 feet deep and 200 
feet wide for the first 2,000 feet, then 16 feet deep 
and 150 feet wide to the boat basin; a channel east of 
Sand Island to Port of Ilwaco, a distance of about 4 
miles. Mean lower low water is plane of reference. 
Tidal range between mean lower low water and mean 
higher high water is about 8 feet, and extreme about 
13 feet. 
Channel extending through easterly passage of 
Sand Island was completed in 1934. This portion of 
authorized project is not passable and is not maintained 
at the present time. Dredging west channel to 8 
feet was accomplished September 1948. Deepening 
west channel to 10 feet, and boat basin and breakwater 
construction at llwaco, WA, was finished 
December 1957, and again, deepening of the west 
channel to 16 feet completed in August 1985 under 
Section 107, finished the project. 
Local cooperation. Fully complied with. 
Terminal facilities. Wharves, floats, ramps, and 
berths, for fishing craft, barges and tow-boats. Smallboat 
basin and protecting breakwater provides 
moorings for numerous fishing and recreational craft 
all year. Facilities are considered adequate for 
existing commerce. 
Operations during fiscal year. Maintenance: 
Contract clamshell dredge Sea Vulture removed 
186,300 cubic yards of material. 
5. COLUMBIA RIVER BETWEEN CHINOOK, 
WA, AND HEAD OF SAND ISLAND 
Location. At easterly end of Baker Bay, lying on 
north side of Columbia River near mouth. (See Coast 
and Geodetic Survey Chart 6151.) 
Existing Project. Channel 10 feet deep and 150 
feet wide, extending from head of Sand Island to 
Chinook; a turning and mooring basin at upper end 
of channel, 10 feet deep, 660 feet long, and ranging 
from 275 to 500 feet wide; reconstruction of easterly 
393 feet of existing breakwater; and extension of 
existing breakwater easterly and thence northerly to 
connect with shore in vicinity of Portland Street, 
Chinook, WA. Tidal range between mean lower low 
water and mean higher high water is about 8 feet and 
extreme about 13 feet. 
Project as originally authorized was completed in 
1940. The 10-foot channel depth modification was 
accomplished September 1958. Rehabilitation of 
existing breakwater was completed September 1962. 
Local cooperation. Fully complied with. 
Terminal facilities. Chinook Packing Company 
owns a wharf for receiving fresh fish, and one 
additional fish buying company is located at 
Chinook. A portion of wharf is also used as a public 
landing. At upper end of channel there is a turning 
and mooring basin with facilities for mooring 350 
fishing and recreational craft. Adequate terminal and 
mooring facilities include a public launching ramp, 
hoist with 10-ton capacity and suitable supply 
facilities. 
28-4

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Operations during fiscal year. Maintenance: 
Contract clamshell dredge Seattle removed 297,700 
cubic yards of material. 
6. COLUMBIA RIVER AT THE MOUTH, 
OR AND WA 
Location. The Columbia River entrance is 645 
miles north of San Francisco Bay. Project is about 
120 miles downstream of Portland, OR and Vancouver, 
WA. For description of Columbia River see 
Section 3. 
Existing project. Provides for a one-half-milewide 
channel across a bar 55 feet deep (mean lower 
low water) for the northernmost 2,000 feet, and 48 
feet deep (mean lower low water) along the southern 
640 feet, to be secured by two rubblemound jetties, 
spur jetty "A" on the north shore and by dredging. 
The north jetty is about 2.5 miles long and the south 
jetty about 6.6 miles long, spur jetty "A" is about 0.3 
miles long. Tidal range on bar between mean lower 
low water and mean higher high water is about 8 feet, 
and extreme about 13 feet. 
The originally authorized project depth of 40 feet 
was completed in 1918, south jetty completed in 
1914 and north jetty in 1917. A spur jetty (jetty "A") 
was completed in 1939 (repaired in 1961) for the 
purpose of channel stabilization. Spur jetty "B" 
currently is classified "inactive." Dredging of the 48- 
foot bar channel started April 1956 was completed in 
September 1957. South jetty rehabilitation started 
June 1962 was completed September 1964. North 
jetty rehabilitation started January 1965 was completed 
April 1965. Additional rehabilitation of the 
south jetty was initiated in May 1982 and completed 
in September 1982. Deepening bar channel to 55 feet 
completed September 1984. In FY 95 a 500-foot 
section of the south jetty was removed to allow 
unimpeded access by fisheries resources to 603 acres 
of intertidal habitat under Section 1135 authority. 
Project dimensions were available at end of fiscal 
year. (For details relating to previous projects, see 
page 1999, Annual Report for 1915 and page 1740 of 
Annual Report for 1938.) 
Local cooperation. Fully complied with. Local 
interests contributed $500,000 toward construction of 
the north jetty, which was completed in 1917. 
Operations during fiscal year. Maintenance: A 
total of 4.8 million cubic yards of material was 
removed. The U.S. hopper dredge Essayons removed 
2.9 million cubic yards, and the contract hopper 
dredge Dodge Island removed 1.9 million cubic 
yards. 
7. COLUMBIA RIVER BETWEEN 
VANCOUVER, WA, AND THE DALLES, OR 
Location. On Columbia River, between Interstate 
Bridge at Vancouver, WA, 106.5 miles above mouth 
and The Dalles, OR, mile 191, a distance of 84.5 
miles. For description of Columbia River, See 
Section 3, "Columbia and Lower Willamette Rivers 
Below Vancouver, WA, and Portland, OR." 
Existing project. Channel 27 feet deep at low 
water and 300 feet wide between Vancouver, WA, 
and The Dalles, OR, 84.5 miles; a channel 10 feet 
deep at low water and 200 feet wide at upstream 
entrance to Oregon Slough, OR; a suitable turning 
basin adjacent to site of port development in vicinity 
of Camas and Washougal, WA; a boat basin at Hood 
River, OR, 500 by 1,300 feet and 10 feet deep at 
normal Bonneville pool level, with a connecting 
channel of same depth to deepwater, and a protecting 
breakwater on easterly side; a barge channel to 
waterfront at Bingen, WA, 10 feet deep at normal 
Bonneville pool level, 200 feet wide and about I mile 
long, and an access channel 7 feet deep at normal 
Bonneville pool level, 100 feet wide and about 1,000 
feet long, to a natural mooring basin for small boats 
near east end of channel; and construction of The 
Dalles small boat basin, to provide a breakwater and 
shear boom protected basin about 400 by 800 feet in 
size with depth of 8 feet below a pool elevation of 
72.5 feet at mean sea level. Tidal range between 
mean lower low water and mean higher high water at 
Vancouver is about 3 feet and at Bonneville about 
0.2 foot at low stages of the river. Extreme tidal 
ranges are about 4 feet and 0.4 foot, respectively. 
Existing project is complete. Construction of The 
Dalles small boat basin, was completed in 1949. 
Channel dredging at upper end of Oregon Slough 
was accomplished in 1957. Project depth of 27 feet 
between Bonneville and The Dalles, OR, was 
achieved April 1959. The 27-foot channel depth 
between Vancouver, WA, and Bonneville, OR, was 
completed May 1938. Improvement of lower 
entrance of Bonneville Dam lock was completed in 
May 1961. At the present time, the channel is 
maintained to a depth of 17 feet, which is adequate 
for user traffic. Construction of a boat basin at Hood 
River, OR, and of Camas-Washougal, WA, turning 
basin was accomplished February 1962. Construction 
of a barge channel in Columbia River near Bingen, 
WA, was completed September 1963. Small boat 
recreation channel 100 feet wide 6 feet deep at South 
Channel Government Island completed 1985 under 
section 107. 
Local cooperation. Fully complied with. 
Terminal facilities. At Vancouver, WA, upstream 
of Interstate Highway bridge at River Mile 108.1 on 
site of former shipyard are numerous ship-building 
facilities equipped with railway and river moorage 
facilities. Also in this area are a paper-storage 
warehouse with barge slip, two boat-building 
businesses, and a storage dock with gantry crane. 
Sites are available for development to suit lessee. 
28-5

PORTLAND DISTRICT 
At Camas, WA, about 13.5 miles upstream from 
Vancouver, there is a private wharf used for transfer 
of paper-mill supplies and paper to and from barges, 
and facilities for discharging bulk oils from barges. 
At Port of The Dalles (mile 44 above Bonneville) 
there is a municipal wharf 125 by 1,100 feet for use 
by tugs and barges. There is a one-story timber and 
corrugated iron warehouse, 94 by 461 feet, on this 
wharf. A private elevator with a capacity of 40,000 
bushels and a public elevator of 1,113,800-bushel 
capacity for handling bulk grain to barges are also at 
The Dalles. Public elevator has rail, truck, and water 
connections. There is a port owned rail connection 
about three-fourths mile below municipal wharf 
where certain types of cargo may be handled between 
railroad cars and barges. 
At numerous locations along the entire waterway 
there are facilities for transfer of logs to water from 
trucks and public and private boat basins. Facilities 
are considered adequate for present commerce. 
Operations during fiscal year. Maintenance: 
Condition surveys were performed. U.S. hopper 
dredge Yaquina removed 115,700 cubic yards of 
material. A total of 10 king piles were constructed at 
the ends of existing timber pile dikes. 
8. COLUMBIA RIVER, SEAFARERS 
MEMORIAL, HAMMOND, OR 
Location. The memorial will be located at Point 
Adams, in the City of Warrenton, OR, at River Mile 
8.5 on the Columbia River approximately 50 yards 
off shore and adjacent to an existing Corps of 
Engineers pile dike. 
Existing project. None. 
Local cooperation. A Local Cooperation 
Agreement (LCA) with the local sponsor, City of 
Warrenton, OR, is being developed. This LCA will 
require the sponsor to pay for all costs above the 
authorized $150,000 for engineering, design, 
acquisition and construction of a support structure to 
serve as the foundation for the Seafarers Memorial. 
In addition, the sponsor is providing the statue for 
which the foundation structure is being built. 
Operations during fiscal year. All work has 
been suspended and Federal funds were rescinded. 
The local sponsor was unable to raise sufficient funds 
for purchase of the statue or for costs above the 
$150,000 limit for the support structure. 
9. COOS BAY, OR 
Location. On Oregon coast 200 miles south of 
mouth of Columbia River and 445 miles north of San 
Francisco Bay. It is about 13 miles long and I mile 
wide, with an area at high tide of about 15 square 
miles. (See NOAA Charts 18580 and 18587.) 
Existing project. Two rubblemound, high-tide 
jetties at entrance; a channel across the outer bar 45 
feet deep and 700 feet wide, reducing gradually to 35 
feet deep and 300 feet wide near River Mile 1 and 
continuing to about mile 9; thence a channel 35 feet 
deep and generally 400 feet wide to mile 15; an 
anchorage area 35 feet deep, 800 feet wide, and 
1,000 feet long at Empire (River Mile 5.5); turning 
basins at North Bend (River Mile 12.5) and Coalbank 
(River Mile 14.7) 35 feet deep, 650 feet wide and 
1,000 feet long; a channel 22 feet deep and 150 feet 
wide from Smith's Mill (River Mile 15) to Millington 
(River Mile 17); a small boat basin, about 500 by 900 
feet at Charleston, with a connecting channel, 16 feet 
deep, 150 feet wide and 6,200 feet long, to deep 
water in Coos Bay, and construction of a protecting 
breakwater and bulkhead. Plane of reference is mean 
lower low water. Tidal range between mean lower 
low water and mean higher high water is 7 feet and 
extreme is about 11 feet at both the entrance and at 
Coos Bay. 
South jetty was completed in 1928, north jetty in 
1929, and 24-foot channel in 1937. The south jetty 
was restored in 1941 and 1942 by construction of a 
concrete cap for full length of the jetty. Excavation of 
channel to 30 feet deep and generally 300 feet wide 
from entrance of Isthmus Slough was completed in 
1951. Dredging outer bar channel to a depth of 40 
feet, decreasing to 30 feet at Guano Rock was 
completed in 1952. Construction of the Charleston 
Channel and small-boat basin was completed in 
September 1956. Rehabilitation of south jetty was 
started in June 1962 and completed December 1963. 
Repair of north jetty was completed in August 1989. 
Construction of the deeper and wider channel to mile 
15 was completed in 1979. Deepening of Charleston 
channel and turning basin completed in 1985 under 
Section 107. (For details relating to previous projects, 
see page 1987 to Annual Report for 1915 and page 
1728 of Annual Report for 1938.) 
A modification to the existing project was 
authorized in the FY 1996 Energy and Water 
Development Appropriations Act, Public Law 104- 
46, November 13, 1995. This authorization provided 
for deepening the channel by 2 feet to 47 feet below 
mean lower low water (MLLW) from the entrance to 
Guano Rock (river mile 1) and to 37 feet below 
MLLW from river mile I to 15. Public Law 104-46 
also provided for deepening by two feet and expanding 
the turning basin at river mile 12 by 100 feet 
from 800 by 1000 feet to 900 by 1000 feet. The 
excavation material for the channel deepening was 
transported to the ocean for disposal. The cost for 
preparation of the plans and specifications and the 
construction of the project was $11,616,000, of 
which $8,116,000 was federal and $3,500,000 was 
non-federal. In addition, the sponsor paid 100 
28-6

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
percent of the estimated cost for dredging the berth 
areas. 
Local cooperation. Fully complied with. Requirements 
are described in full on page 37-5 of FY 
1981 Annual Report. 
The sponsor, International Port of Coos Bay, 
signed a Project Cooperation Agreement on May 8, 
1996 for the project modification to deepen the 
channel as authorized in Public Law 104-46. In 
accordance with cost sharing requirements of the 
Water Resources Development Act of 1986, the 
Federal Government provided 75 percent of the costs 
associated with the general navigation features of the 
project. The non-federal sponsor was required to 
provide 25 percent of the total construction cost of 
the general navigation features up front. The sponsor 
was also required to provide an additional 10 percent 
of the cost of the general navigation features of the 
project in cash over a period not to exceed 30 years. 
Terminal facilities. At North Bend there is a 
municipal dock 649 feet long fronting on channel, 
about 2,380 feet of privately owned mill docks, and 
three oil receiving terminals in vicinity. 
At Coos Bay there is a privately owned dock with 
a frontage of 1,345 feet, open to the public on equal 
terms; several small landings for fishing and harbor 
craft; and three lumber docks with 1,300-foot, 576- 
foot and 500-foot frontages, respectively. 
In the North Spit industrial area, there is one 
woodchip loading facility having a frontage of 1200 
feet and a smaller T-dock operated by the Port of 
Coos Bay. 
At Eastside, on Isthmus Slough, there is a 200- 
foot dock. 
At Empire there is a privately owned lumber dock 
with frontage of 510 feet, and an oil terminal, owned 
by Port of Coos Bay, for receipt of petroleum 
products by barge. A barge slip also owned by the 
Port was completed in 1986. 
At Charleston there are wharves, for receipt of 
fresh fish and shellfish and a large seafood receiving 
and processing plant. There are also two municipally 
owned small-boat basins, open to all on equal terms, 
capable of mooring 250 fishing and recreation craft. 
Servicing facilities for small craft are available at all 
facilities, and public launching ramps have been 
constructed in Charleston area by private interests. A 
privately owned floating moorage on Joe Ney Slough 
has facilities for mooring about 50 fishing vessels. 
At Jordan Cove area there is a dock, 248 feet long, 
for wood chip ships. 
Operations during fiscal year. New work: 
Project construction was completed in FY98, except 
for post construction monitoring which was completed 
in FY00. 
Maintenance: A total of 945,100 cubic yards of 
material was removed. The US hopper dredge 
Yaquina removed 195,900 cubic yards, and the 
contract hopper dredge Dodge Island removed 
749,200 cubic yards. The sand-bypasser Sandwick 
worked 20 days in Charleston entrance channel. 
10. COQUILLE RIVER, OR 
Location. Rises in Coast Range, flows generally 
westerly for about 100 miles, and empties into 
Pacific Ocean at Bandon, OR, 225 miles south of 
mouth of Columbia River and 420 miles north of San 
Francisco Bay. (See NOAA Charts 18580 and 
18186.) 
Existing project. Two rubblemound high-tide 
jetties at river mouth, south jetty 2,700 feet long and 
the north, 3,450 feet long; and a channel 13 feet deep 
at mean lower low water and of suitable width from 
the sea to a point 1 mile above old Coquille River 
Lighthouse, and snagging to State highway bridge at 
city of Coquille. Mean lower low water is plane of 
reference. Tidal range between mean lower low water 
and mean higher high water at mouth is 7 feet and 
extreme about 10 feet. 
Jetties were completed in 1908 and entrance 
channel in 1933. North jetty was reconstructed in 
1942 and a 750-foot extension to easterly end was 
constructed in 1951. South jetty was repaired in 1954 
and north jetty in 1956. Coquille Lighthouse 
rehabilitation was completed June 21, 1976. Port of 
Bandon constructed boat basin facility in conjunction 
with protective breakwater and entrance channel 
construction in 1985, under Section 107. (For details 
relating to previous projects, see page 1986 of 
Annual Report for 1915 and page 1727 of Annual 
Report for 1938.) 
A plan to deepen the entrance channel of the 
Coquille River from 13 feet to 18 feet was approved 
in May 1988. The economics were reevaluated in 
FY1993 and the project was not economically 
feasible at that time. 
Local cooperation. Restoration of lighthouse 
using Code 710, Recreation Facilities at Completed 
Projects funding, required 50 percent cost sharing 
with non-Federal sponsor (Oregon State Parks). 
Terminal facilities. At Bandon: A publicly 
owned wharf, and a small-boat basin open to all on 
equal terms. 
Operations during fiscal year. Maintenance: 
U.S. hopper dredge Yaquina removed 14,359 cubic 
yards of material from the entrance channel. 
11. DEPOE BAY, OR 
Location. Harbor on Oregon coast 100 miles 
south of mouth of Columbia River. (See Coast and 
Geodetic Survey Chart 5902.) 
28-7

PORTLAND DISTRICT 
Existing project. Two breakwaters north of 
entrance; an entrance channel 8 feet deep and 50 feet 
wide; an inner basin 750 feet long, 390 feet wide and 
8 feet deep with retaining wall along easterly side; 
and a stone spending beach. Mean lower low water 
is plane of reference. Tidal range between mean 
lower low water and mean higher high water is 8 feet 
and extreme is about 12 feet. Project as originally 
authorized was completed in 1939 and project 
modifications, enlarging the basin and deepening to 8 
feet, were accomplished in June 1952 and August 
1966. 
Local cooperation. Fully complied with. 
Terminal facilities. Facilities, in inner basin, 
consist of landings and floats to accommodate 
operators of excursion and commercial fishing boats. 
Facilities considered adequate for existing commerce. 
Operations during fiscal year. Maintenance: 
Contract pipeline and clamshell dredges removed 
19,845 cubic yards of material. A project condition 
survey and miscellaneous inspections were performed. 
12. PORT ORFORD, OR 
Location. On Oregon coast 250 miles south of 
Columbia River entrance and 390 miles north of San 
Francisco Bay. (NOAA Chart 18203 and Geological 
Survey Quadrangle, Port Orford, OR) 
Existing project. Improvement of harbor by 55- 
foot extension of existing locally constructed 
breakwater and dredging of a turning basin, 340 feet 
long, 100 feet wide and 16 feet deep. Breakwater was 
completed October 1968. Turning basin was 
completed September 1971. The authorization was 
modified by WRDA 92 to allow the Corps to 
maintain the authorized navigation channel within 50 
feet of the port facility. 
Local cooperation. Fully complied with. 
Terminal facilities. In FY 2000 local interests 
replaced the aging wooden pile dock with a sheet pile 
bulkhead and backfill dock. This dock provides 
almost 3 acres of dock area and two large-capacity 
cranes. 
Operations during fiscal year. Maintenance: 
During the summer months the sand-bypasser 
Sandwick worked 40 days. 
13. ROGUE RIVER HARBOR AT GOLD 
BEACH, OR 
Location. Rises in Cascade Range in southwestern 
Oregon; flows westerly through Coast Range, and 
empties into Pacific Ocean 264 miles south of mouth 
of Columbia River and 381 miles north of San 
Francisco Bay. (See NOAA Chart 18202.) 
Existing project. Two jetties at etrance, and a 
channel 13 feet deep and 300 feet wide from ocean to 
a point immediately below State highway bridge, 
about I mile, including widening channel at a point 
about 0.25 mile below bridge to form a turning basin 
13 feet deep, 500 feet wide, and 650 feet long. At 
request of local interests, turning basin was located in 
south portion of estuary downstream from a point 
0.25 mile below bridge. This change was effected to 
permit adequate terminal facilities to be constructed 
adjacent to turning basin. Mean lower low water is 
plane of reference. Range of tide between mean 
lower low water and mean higher high water is 7 
feet, and extreme about 14 feet. 
Project as authorized has been completed. Construction 
of two jetties at entrance was completed 
September 1960. Dredging river channel by contract 
and entrance bar by government plant was completed 
October 1961. North jetty rehabilitation along 
channel side was completed October 1966. Breakwater 
construction and dredging, under contract 
awarded in September 1964, was 17 percent accomplished 
when flood of December 1964 destroyed all 
completed works. Contract was terminated as further 
construction at that location was considered unfeasible. 
Bank protection work at Wedderburn location 
was completed in October 1972. A breakwater, 
constructed by Port of Gold Beach, was completed 
during 1973. In 1985, three pile dikes, located on the 
south side of channel oceanward of the boat basin 
entrance, were completed. In 1997, at the direction of 
Congress, the boat basin entrance channel was 
relocated approximately 1,000 feet upstream to a new 
opening in the breakwater provided by the Port of 
Gold Beach. 
Local cooperation. Fully complied with. 
Terminal facilities. There are various landings 
for fishing and recreational craft. At Wedderburn, 
across river from Gold Beach, is a facility to 
accommodate excursion passengers and small freight 
items destined for various private landings between 
Wedderburn and Agness, OR. Facilities considered 
adequate for existing commerce. 
Operations during fiscal year. Maintenance: 
U.S. hopper dredge Yaquina removed 44,845 cubic 
yards of material from the entrance channel. Sandbypasser 
Sandwick worked 10 days. 
14. SIUSLAW RIVER, OR 
Location. Rises in coast range, flows about 110 
miles westerly and empties into Pacific Ocean about 
160 miles south of entrance of Columbia River and 
485 miles north of San Francisco Bay, CA. (See 
NOAA Charts 19583 and 18580.) 
Existing project. Provides for 2 high-tide, rubblemound 
jetties 750 feet apart at the outer end, the 
north jetty 8,390 feet long (600 feet unconstructed) 
and the south jetty 4,200 feet long; an entrance 
channel 18 feet deep and 300 feet wide from deep 
28-8

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
water in ocean to a point 1,500 feet inside the outer 
end of existing north jetty; thence a channel 16 feet 
deep, 200 feet wide with additional widening at 
bends, and about 5 miles long, to a turning basin, 16 
feet deep, 400 feet wide, and 600 feet long, opposite 
Siuslaw dock at Florence; a channel 12 feet deep, 
150 feet wide from Florence to mile 16.5; and at 
River Mile 15.5 a turning basin 12 feet deep, 300 feet 
wide, and 500 feet long. Mean lower low water is 
plane of reference. Tidal range between mean lower 
low water and mean higher high water at mouth of 
river is 7 feet and extreme about 1 1 feet. During low 
stages of river, tidal effect extends to Mapleton, 20.5 
miles above mouth. (For details relating to previous 
project, see page 1988 of Annual Report for 1915.) 
A modification to the existing project was 
authorized by Public Law 96-367, October 1, 1980. 
North and south jetty modifications were completed 
in FY 86. Modifications provide for extending the 
north and south jetties by 1,900 and 2,300 feet 
respectively. The jetty extensions terminate at 
approximately the minus 25-foot contour. Spur jetties 
were constructed on each jetty extension to reduce 
longshore currents from transporting material around 
the heads of the jetties. Each spur jetty is 400 feet 
long and originates approximately 900 feet shoreward 
of the jetty head. The north jetty spur is 
oriented 45 degrees to the north of the existing jetty 
alignment and the south jetty spur 45 degrees to the 
south of the jetty alignment. 
In cooperation with local interests and the U.S. 
Coast Guard, the entrance channel was realigned in 
FY00. This has resulted in a safer entrance and 
reduced dredging. 
Local cooperation. Fully complied with. 
Terminal facilities. Port dock at Florence, 150 
feet wide and 350 feet long, is about 5.3 miles above 
river entrance and accommodates a fish-receiving 
station at east end of wharf which maintains a 2-ton 
capacity winch and supplies gasoline, oil and ice to 
fishermen. Other facilities at Florence consist of 
various floatways which provide docking facilities 
for fishing vessels and other small craft and a floating 
dock with accommodations for 75 commercial 
fishing vessels. Adjacent to commercial basin is 
mooring basin with accommodations for 200 sport 
boats of all sizes. 
Modern docks for loading ocean-going barges 
with packaged lumber is maintained at Mapleton and 
owned by the Davison Lumber Company. 
There are also a number of private landings and 
log booms between Cushman and Mapleton to 
accommodate river traffic. These facilities are 
considered adequate for existing traffic. 
Operations during fiscal year. Maintenance: 
U.S. hopper dredge Yaquina removed 55,050 cubic 
yards of material. 
15. SKIPANON CHANNEL, OR 
Location. In tidal waterway extending south 2.7 
miles from deep water in Columbia River. Channel 
enters Columbia about 10 miles above mouth and 4 
miles below Astoria, OR. (See NOAA Chart 18523.) 
Existing project. Channel 30 feet deep and generally 
200 feet wide extending from deep water in 
Columbia River to railroad bridge at Warrenton, OR, 
distance of 1.8 miles, turning basin of same depth, 
mooring basin 12 feet deep at mean lower low water 
at Warrenton, OR, and channel 7 feet deep, generally 
40 feet wide, with increased widths at log dumps and 
terminals, for 4,500 feet via cutoff channel above 
railroad bridge. Channel is maintained to 16 feet, 
which is adequate for user traffic. Mean lower low 
water is plane of reference. Tidal range between 
mean lower low water and mean higher high water is 
about 8 feet; extreme is about 13 feet. 
Project as authorized is complete. Dredging river 
channel and turning basin was completed in 1939. 
Construction of small-boat mooring basin at Warrenton, 
OR, was completed October 1957, and fill 
stabilization work was accomplished in August 1958. 
Local cooperation. None required. 
Terminal facilities. City of Warrenton owns 
wharf with a 300-foot frontage open to pubic on 
equal terms. One privately owned cannery wharf 
with a 300-foot frontage is used for unloading fish 
and handling fish nets. One privately owned boatyard 
has floats and moorage facilities for use by a 
maximum of 80 small boats. Small-boat basin has 
facilities for numerous fishing and recreation craft, 
and a privately owned lumber mill has a barge 
loading facility for chips and lumber. Facilities are 
considered adequate for existing commerce. 
Operations during fiscal year. Maintenance: A 
total of 266,800 cubic yards of material was removed 
by contract dredges Sea Vulture and Crystal Gayle. 
16. TILLAMOOK BAY AND BAR, OR 
Location. Bay is on Oregon coast about 50 miles 
south of mouth of Columbia River. (See NOAA 
Charts 18520 and 18558.) 
Existing project. Provides for a jetty about 5,700 
feet long on north side of entrance and a jetty 8,000 
feet long on south side; a channel through bar 18 feet 
deep and of such width as can be practically and 
economically obtained; for a channel 200 feet wide 
and 18 feet deep from deep water in bay to Miami 
Cove; and for initial dredging to 12 feet deep of a 
small-boat basin and approach thereto at Garibaldi, 
OR. Project also provides for improvement of 
28-9

PORTLAND DISTRICT 
Bayocean Peninsula, OR, by construction of sand and 
rockfill dike 1.4 miles long, on alignment extending 
between Pitcher Point and town of Bayocean. Mean 
lower low water is plane of reference. Tidal range 
between mean lower low water and mean higher high 
water is 8 feet; extreme is about 14 feet. Hobsonville 
Channel portion of project is inactive. 
Except for construction of Hobsonville Channel 
portion, classified inactive, channels were completed 
in 1927, north jetty in 1933, improvement of 
Bayocean Peninsula in 1956 and small-boat basin in 
1958. The north jetty was rehabilitated in 1965 and 
again in 1991. South jetty construction was initiated 
in 1969, extended in 1974, and completed to the 
authorized 8,000 feet in 1978. 18-foot channel to 
Miami Cove is inactive due to mill closure. (For 
details relating to previous projects, see page 1989 of 
Annual Report for 1915 and page 1474 of Annual 
Report for 1936.) 
Local cooperation. Fully complied with. Requirements 
are described in full on page 37-9 of FY 
1981 Annual Report. 
Terminal facilities. At Garibaldi: A facility 
owned by the Port of Bay City, for shipping lumber 
and receiving logs, a public landing suitable for 
mooring fishing vessels, towboats, and other craft. 
Small-boat basin has adequate facilities for mooring 
fishing and recreational craft. A privately owned boat 
ramp and moorage is available for recreational craft. 
At Bay City: A privately owned wharf used exclusively 
for receipt of fresh fish and shellfish. 
Facilities considered adequate for existing commerce. 
Operations during fiscal year. Maintenance: 
Contract pipeline dredge removed 32,825 cubic yards 
of material near Garibaldi. 
17. UMPQUA RIVER, OR 
Location. Rises in Cascade Range, flows westerly 
about 120 miles, and empties into Pacific Ocean 180 
miles south of Columbia River and 465 miles north 
of San Francisco Bay. (See NOAA Charts 18580 and 
18584.) 
Existing project. A jetty on north side of entrance 
about 8,000 feet long, a south jetty 4,200 feet long 
extending to a point 1,800 feet south of outer end of 
north jetty; dredging to provide a usable entrance 
channel 26 feet deep, and a river channel 22 feet 
deep and 200 feet wide, from mouth to Reedsport, a 
distance of about 12 miles with a turning basin at 
Reedsport 1,000 feet long, 600 feet wide, and 22 feet 
deep; deepening of channel at Winchester Bay to 16 
feet deep by 100 feet wide for 3,100 feet, then adding 
16 feet deep by 100 feet wide for 500 feet, and 12 
feet deep by 75 feet wide for 950 feet beyond boat 
basin making up the East Boat Channel. A new West 
Boat Channel was added 16 feet deep by 100 feet 
wide for 4,300 feet and completed in 1984. Project 
was modified in 1951 to provide a channel in 
Scholfield River, but this portion of the project is 
currently inactive. Mean lower low water is plane of 
reference. Tidal range between mean lower low water 
and mean higher high water at river mouth is 7 feet, 
and extreme range is about 11 feet. 
North jetty was completed in 1930. Extension to 
original south jetty was completed in 1938. Dredging 
a 22-foot channel from mouth of river to Reedsport 
was completed in 1941. Gardiner Channel and 
turning basin was completed in 1949 and Winchester 
Bay Channel and mooring basin in 1956. Rehabilitation 
of south jetty was completed August 1963. 
Extension of training jetty was completed October 9, 
1980. Deepening Winchester Bay East Channel and 
new West Channel completed 1984 under Section 
107. (For details relating to previous projects, see 
page 2967 of Annual Report for 1898 and page 1732 
of Annual Report for 1938.) 
Local cooperation. None required. 
Terminal facilities. At Gardiner there is about 
650 feet of wharf frontage. Also there is an oil 
unloading facility owned by International Paper Co. 
for exclusive use of tanker barges. Port of Umpqua 
owns one wharf with 456 feet of water frontage, of 
which 228 feet is usable for vessels and another with 
about 75 feet of water frontage which has not been 
used generally for commercial shipping. 
On Bolon Island across the river from Reedsport a 
wharf was constructed which has about 5 acres of 
open storage for lumber and available to all on equal 
terms. 
At Winchester Bay, 2 miles from river entrance 
there is a major sports and commercial fishing 
harbor. Facilities are considered adequate for existing 
commerce. 
Operations during fiscal year. Maintenance: 
U.S. hopper dredge Yaquina removed 125,747 cubic 
yards of material, and the sand-bypasser Sandwick 
worked 16 days at Winchester Bay. 
18. WILLAMETTE RIVER AT WILLAMETTE 
FALLS, OR 
Location. Locks and dam covered by this project 
are at Willamette Falls, a rocky reef in Willamette 
River at Oregon City, OR, about 26 miles above 
mouth of river. 
Existing project. Canal and locks were originally 
constructed by private interest in 1873 and were 
purchased by the United States in April 1915 for 
$375,000. Final report on purchase and rehabilitation 
of canal and locks is in the Annual Report for 1923, 
when project was reported 98 percent complete. The 
project includes four locks a canal basin and an extra 
guard lock used to prevent flooding when river levels 
28-10

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
are high. The system acts as a fluid staircase between 
the upper and lower reaches of the Willamette River. 
Total length of existing canals and locks is about 
3,500 feet. Principal features of existing canal and 
locks at Willamette Falls are set forth in Table 28-J. 
Ordinary fluctuation of stage of water above locks is 
12 feet and extreme, due to flood conditions, 20 feet. 
Below locks, ordinary fluctuation is 15 feet and 
extreme 50 feet. 
Until the 1940's, the gates were opened manually. 
Now, the gates are operated by hydraulic pumps 
controlled by switches in two control stations with 
the aid of closed-circuit television and radio communication. 
All the gates have been replaced under 
minor rehabilitation funds. Existing locks and 
grounds are in good condition and in continuous 
operation. New service building was completed in 
1988 costing $523,000. The project was placed on 
the National Register of Historic Places in 1974, and 
was established as an Oregon Civil Engineering 
Landmark in 1991. 
As a result of the mill closure in 1996, one of two 
shifts was eliminated and hours of operation reduced. 
Local cooperation. Fully complied with. 
Terminal facilities. Simpson Paper closed the 
mill in 1996 after over 100 years of operations. The 
mill was sold to West Linn Paper. West Linn Paper 
has a timber wharf about 850 feet long, extending to 
and supported by a concrete division wall built in 
lock canal by the United States. The use of the wharf 
for operations purposes by the mill may be changed 
due to shipping changes by the new owner. 
Operations during fiscal year. Maintenance: 
Routine operation and maintenance continued. 
19. YAQUINA BAY AND HARBOR, OR 
Location. Yaquina Bay is on Oregon coast, 113 
miles south of mouth of Columbia River. (See 
NOAA Charts 18580 and 18581.) 
Existing project. Two high tide rubblemound 
jetties at entrance, north jetty 7,000 feet, and south 
jetty 8,600 feet long; a spur jetty on channel side of 
south jetty 4,700 feet from its sea end, 800 feet long; 
five groins channelward from south jetty; channel 40 
feet deep for a general width of 400 feet across bar 
and at outer end of entrance channel; a channel 30 
feet deep and 300 feet wide to a turning basin of 
same depth, 900 to 1,200 feet wide and 1,400 feet 
long, and a channel 18 feet deep and 200 feet wide 
from 30-foot channel at about mile 2.4, thence 
upstream to abandoned railroad terminus at Yaquina, 
a distance of about 4.5 miles. Project also provides 
for two small boat mooring basins at Newport, OR. 
Mean lower low water is plane of reference. Tidal 
range between mean lower low water and mean 
higher high water is 8 feet and extreme is about 12 
feet. At mile 1.2 a 1,300 foot long breakwater 
protecting the Port of Newport South Beach Marina 
together with an entrance channel 8 feet long by 100 
feet wide for a distance of 2,035 feet. 
Project as originally authorized was completed in 
May 1952. Restoration of jetties was completed in 
1934 and extension of north jetty 1,000 feet seaward 
was completed in 1940. Construction of mooring 
basin at Newport and dredging of channel and 
turning basin to project dimensions, were completed 
during fiscal year 1949. Restoration of north jetty 
was again accomplished in 1956. Under modification 
of July 3, 1958, extension of north jetty was completed 
in September 1966, dredging of 40-foot bar 
channel and 30-foot river channel was completed in 
October 1968, and extension of south jetty was 
completed in June 1972. The north jetty was 
rehabilitated in 1978 and again in 1988. (For details 
relating to previous projects see Annual Report for 
1893, part 4, page 3314, and Annual Report for 1938, 
page 1736.) 
Local cooperation. None required. 
Terminal facilities. At McLean Point, on north 
side of bay, about 2 miles from entrance, Port of 
Newport has two berths capable of serving oceangoing 
vessels, one 435 feet long, the second 520 feet 
long. At the time the second berth was dredged, a 
retaining wall and fill of 6 acres were constructed 
adjacent to deep water. There now is 40 acres of 
filled land adjacent to deep water, and of this total 7 
acres were constructed in 1956-57. This facility has 
necessary carriers and lift trucks for handling lumber 
cargoes, warehouse for covered cargo storage, and is 
open to all on equal terms. 
Port of Newport also has a public wharf with 300 
feet of frontage for servicing fishing boats. In 
addition, Port of Newport maintains 510 berths for 
mooring commercial and sport fishing vessels. There 
are several seafood companies on the bay which have 
their own facilities for handling fresh fish and crab. 
Supplies and petroleum products are readily available 
for small vessels. On south side of bay about 1.2 
miles above entrance, Port of Newport has constructed 
South Beach Marina which can handle 
approximately 600 pleasure craft and shallow draft 
fishing boats. Public facilities include public 
automobile and boat trailer parking, boat launching 
ramp, fuel dock, fishing pier, and picnic area. A dry 
boat moorage of 120 boats is complete. A swing 
hoist with 3-ton capacity is currently available and 
one with 60-ton capacity is planned. 
About 2.0 miles above entrance, Oregon State 
University, in conjunction with the Marine Science 
Center on 52 acres, maintains a 220-foot pier for 
docking large and small research vessels and a 100- 
foot float for docking small boats. Docking facilities 
28-11

PORTLAND DISTRICT 
are restricted to research vessels and State of Oregon 
small boats. 
Operations during fiscal year. Maintenance: 
Displaced jetty stone was removed from the entrance 
channel to alleviate dangerous navigation conditions. 
Evaluation of ocean dredged material disposal sites 
continued. Maintenance dredging was not required. 
20. YAQUINA RIVER, OR 
Location. Rises in Coast Range, flows about 50 
miles in a westerly direction, and empties into 
Yaquina Bay, on Oregon coast. (See US Coast and 
Geodetic Survey Charts Nos. 5802 and 6058.) 
Existing project. Provides for two controlling 
half-tide dikes of piling, brush, and stone, each about 
1,100 feet long (constructed by local interests), and 
for a channel 10 feet deep and generally 150 feet 
wide on Yaquina River and 200 feet wide in Depot 
Slough, extending from town of Yaquina near RM 
4.0 to Toledo at RM 14.4. 
Mean lower low water is plane of reference. Tidal 
range between lower low water and mean higher high 
water is 8 feet and extreme about 12 feet. Freshet 
heights are about 12 feet at mouth of Depot Slough. 
Channel work authorized March 1913 was completed 
in 1914. Additional work authorized in 1960 was 
completed in 1969. 
Local cooperation. Fully complied with. 
Terminal facilities. Near town of Yaquina at 
river mouth, which is also head of Yaquina Bay, 
there is a moorage for small vessels and a small-craft 
shipyard. The Port of Toledo has public-terminal 
facilities for accommodation of local craft. There are 
also privately owned facilities for loading lumber 
barges, receipt of bunker fuel, and log rollways for 
receipt of logs. These facilities are considered 
adequate for existing commerce. 
Operations during fiscal year. Maintenance: 
None required. 
21. PROJECT CONDITION SURVEYS 
Hydrographic surveys are conducted to determine 
navigation conditions at boat basins, small navigation 
projects, and channels not funded on a project basis 
for the current fiscal year. Soundings in subject areas 
are conducted in order to evaluate shoaling conditions. 
Hydrographic charts are prepared and 
distributed. Fiscal year costs were $83,448. See 
Table 28-1 for surveys conducted during the FY. 
22. NAVIGATION ACTIVITIES UNDER 
SPECIAL AUTHORIZATION 
Navigation Activities Pursuant to Section 107 
of the 1960 Rivers and Harbors Act, Public Law 
645, 86th Congress, as Amended. In addition to 
general requirements, each project is limited to a 
federal statutory cost of not more than $4,000,000. 
The local sponsor must agree to provide an amount, 
in cash, not less than 10 percent or more than 50 
percent of total project cost for navigation depending 
upon the planned depth of channel or basin; pay an 
additional 10 percent of the construction costs in cash 
over a period not to exceed 30 years after project 
completion. The non-federal sponsor must also agree 
to provide, maintain, and operate an adequate public 
parking, landing or wharf, service facilities, berthing 
areas, floats, pier, slips and similar marina and 
mooring facilities. The remaining portion of the 
project, such as the access channel or breakwater 
structure, is maintained by the Corps of Engineers at 
Federal expense within a limited amount. Federal 
expenditures for operation and maintenance under 
the Section 107 authority are administratively limited 
to the greater of $4,500,000, or 2.25 times the 
Federal costs of the project including costs for the 
feasibility through the construction phases. 
No projects were under construction during the 
fiscal year. 
Shore Protection 
23. SHORE PROTECTION ACTIVITIES 
UNDER SPECIAL AUTHORIZATION 
Protection of the shores of publicly owned 
property from hurricane and storm damage 
pursuant to Section 103 of the River and Harbor 
Act of 1962, Public Law 874, 87t' Congress, as 
Amended. In addition to general requirements, each 
project is limited to a Federal statutory expenditure of 
not more than $3,000,000 per year. Costs for 
protection of Federally owned property are 100 
percent Federal. Costs assigned to areas meeting 
public use criteria are 35 percent non-Federal. Costs 
assigned to protection of privately owned undeveloped 
lands and shores that are not open to the public 
are 100 percent non-Federal. 
See Table 28-L for expenditures under Section 
103 during the fiscal year. 
No projects were under construction during the 
FY. 
Flood Control 
24. APPLEGATE LAKE, ROGUE RIVER 
BASIN, OR 
Location. In Jackson County, OR, on Upper 
Applegate River, a tributary of Rogue River, at River 
Mile 46, about 23 airline miles southwest of 
Medford, OR. 
Existing project. A gravel-fill embankment dam, 
242 feet high from streambed to crest with an overall 
length of 1,300 feet. A gate-controlled concrete 
chute-type spillway on the left abutment, and a 
regulating outlet conduit, and intake tower with 
28-12

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
multilevel intakes on the left side of valley floor. 
Lake, 5 miles long, provides 75,000 acre-feet of 
usable storage for flood control and water conservation 
utilization. Project controls runoff from a 
drainage area of 223 square miles. In addition to 
flood control, reservoir is operated to provide 
irrigation, fish and wildlife enhancement, water 
quality control, and recreation benefits. Recreation 
facilities were provided by the Corps of Engineers, 
with operation and maintenance by the USFS under a 
memorandum of agreement. Project is complete and 
operating. 
Freshets regulated by Applegate Lake on Applegate 
River and Rogue River are shown in Table 28- 
K. 
Local cooperation. Authorizing act requires that 
State of Oregon insure maintenance of stream flow 
released for fishery. In addition, costs allocated to 
irrigation would have to be repaid in a manner and to 
an extent consistent with reclamation laws and 
policies. Oregon Department of Fish and Wildlife 
made filing May 31, 1962 with State Engineer for 
water rights for use of stored water and natural flows 
for fish habitat improvement in amounts and at times 
specified in project authorization. The U.S. Bureau of 
Reclamation has made a feasibility study of Applegate 
Irrigation Division. The results of the study 
indicate that at present there does not appear to be a 
feasible Federal irrigation project for the Applegate 
River valley. Local interests have furnished all local 
cooperation specified by the 1970 Flood Control Act. 
The assurances were approved by the Secretary of 
the Army on May 8, 1975. 
Operations during fiscal year. Maintenance: 
Routine operation and maintenance was performed. 
25. BLUE RIVER LAKE, OR 
Location. On Blue River, a major tributary of 
McKenzie River, 1.8 miles above confluence of the 
two streams at the confluence of Quartz Creek and 
Blue River and about 42 miles easterly of Eugene, 
OR.
Existing project. A gravel-fill embankment dam 
1,329 feet long at crest including spillway and 319 
feet above the lowest point of the general foundation. 
A concrete gravity chute-type spillway with two 
gates is located on left abutment. Outlet works are in 
left abutment. On left shore of reservoir an earth-andgravel 
fill embankment, about 1,535 feet long and 70 
feet high, closes a low saddle between Blue River 
and McKenzie River. Project controls runoff from 
drainage area of 88 square miles. Reservoir provides 
85,000 acre-feet of usable flood control storage and 
is operated as a unit of coordinated reservoir system 
to protect Willamette River Valley and increase low 
water flows for navigation and other purposes. 
Recreation facilities are provided by the U.S. Forest 
Service under a Memorandum of Agreement. Project 
is complete. Construction of dam and appurtenant 
works was initiated in May 1963 and operation for 
flood control was effective in October 1968. 
Settlement of claims was completed in May 1974. 
Eugene Water and Electric Board (EWEB) was 
granted a FERC license in November 1989 to install 
two small hydropower units at Blue River Lake 
project. EWEB has delayed their plans for hydropower 
units pending the conclusion of a Corps 
proposal to add water temperature control to the 
regulating outlet tower. Refer to the Willamette 
River Temperature Control project write-up for 
additional information. 
Freshets regulated by Blue River Lake project on 
Blue River, a major tributary of McKenzie River, are 
shown in Table 28-K. 
Local cooperation. None required. 
Operations during fiscal year. Maintenance: 
Routine operation and maintenance work performed. 
26. COTTAGE GROVE LAKE, OR 
Location. On Coast Fork of Willamette River, 29 
miles from mouth. Coast Fork rises in Douglas 
County, OR, on western slope of Cascade Range and 
northern slope of Calapooia Range, flows north for 
49 miles, and unites with Middle Fork to form main 
Willamette River. 
Existing project. An earthfill dam, 1,750 feet 
long at crest, 114 feet high from lowest point of the 
general foundation, a concrete gravity free overflow 
spillway 264 feet long near the right abutment, and a 
concrete gravity non-overflow section 96 feet long 
forming the right abutment. Total length of dam is 
2,110 feet. Outlet works, consisting of three gatecontrolled 
conduits, pass through spillway section. 
Reservoir provides 30,060 acre-feet of usable flood 
control storage and controls runoff of drainage area 
of 104 square miles. Project is operated as a unit of 
coordinated reservoir system to protect Willamette 
River Valley and increase low waterflow for 
navigation and for other purposes. Recreational 
development consists of day use and overnight 
facilities at five sites operated by the Corps of 
Engineers. Construction of project initiated August 
1940 was completed April 1952. Dam and reservoir 
have been in continuous operation since September 
1942. 
Freshets regulated by Cottage Grove Lake on 
Coast Fork Willamette River are shown in Table 28- 
K. 
Local cooperation. Development of additional 
recreation facilities will require a local sponsor 
willing to cost share and assume all operation and 
maintenance of park facilities. 
28-13

PORTLAND DISTRICT 
Operations during fiscal year. Maintenance: 
Routine operation and maintenance work continued. 
27. DORENA LAKE, OR 
Location. On Row River, OR, 7 miles from 
mouth. Row River rises in Lane County on western 
slope of Cascade Range, flows northwest for 19 
miles, and enters Coast Fork of Willamette River 
19.5 miles above mouth. 
Existing project. An earthfill embankment dam, 
3,352 feet long at crest and 145 feet high from lowest 
point of the general foundation. Concrete gravity 
free-overflow spillway, 200 feet long, forms right 
abutment. Outlet works on five slide-gate-controlled 
conduits pass through spillway section. Reservoir 
provides 70,500 acre-feet of usable flood control 
storage and controls runoff of 265 square miles. The 
Project is operated as a unit of coordinated reservoir 
system to protect Willamette River Valley and 
increase low water flows for navigational and other 
purposes. Construction of project initiated June 1941 
was completed October 1952 except for construction 
of additional recreation facilities that were funded 
under the Code 710 program. Future recreation 
facility construction will be accomplished in 
accordance with the cost-sharing contract with Lane 
County, OR. Dam and reservoir have been in 
continuous operation since November 1949. 
Freshets regulated by Dorena Lake project on 
Row and Coast Fork Willamette Rivers are shown in 
Table 28-K. 
Local cooperation. A multiple project cost sharing 
agreement has been in force with Lane County 
since Sept. 1976. It includes 4 projects and 14 parks. 
At Dorena Lake, 6 parks included in the agreement 
are managed by Lane County under a lease agreement. 
Future recreation development will require cost 
sharing. 
Operations during fiscal year. Maintenance: 
Routine operation and maintenance continued. 
28. ELK CREEK LAKE, ROGUE RIVER 
BASIN, OR 
Location. In Jackson County, OR at River Mile 
1.7 on Elk Creek, a tributary of Rogue River, about 
26.5 miles northerly from Medford, OR. 
Existing project. Construction work for the 249- 
foot high roller compacted concrete gravity dam, 
2,600 feet long at the crest, with a gate controlled 
concrete chute spillway, regulating outlet conduits, 
power penstock and multiple use intake tower 
attached to the upstream face of the dam has been 
stopped due to a court injunction. The project would 
control runoff from a drainage area of 135 square 
miles, and provide fUture municipal and industrial 
water supply, irrigation, fish and wildlife enhancement, 
water quality control, and recreation benefits. 
Funds to initiate preconstruction planning were 
appropriated in FY65, and for construction in FY71. 
Construction was deferred in FY77 due to a lack of 
state support. Following significant review, evaluation, 
and a public hearing, the Water Policy Review 
Board reversed its position and in April 1981 voted 
to support Elk Creek. Funds were appropriated in 
FY82 and FY83 to update and continue project 
design, plans, and specifications. Funds were 
appropriated in FY85 to resume construction. After 
initiation of construction, an injunction was placed 
against completion of the project and additional 
analysis under National Environmental Policy Act 
(NEPA) was required in order to remove the 
injunction. Construction of the project was terminated 
with the project at 83 feet, one-third its design 
height. 
After completion of the final Environmental Impact 
Statement Supplemental #2, the Department of 
Justice filed a motion with the Court to remove the 
injunction. The Ninth Circuit Court of Appeals 
issued a ruling on April 21, 1995. In a 2-1 decision, 
the Court also reversed the District Court decision 
that EISS #2 met the requirements of the earlier 
Ninth Circuit opinion and awarded attorneys fees to 
the plaintiffs. The case was remanded with instructions 
to prepare a third supplement adequately 
addressing all issues raised under the NEPA process. 
Due to the Ninth Circuit Court of Appeals decision 
and the current Federal budgetary climate, the 
Corps does not plan to perform the environmental 
studies under NEPA necessary to remove the Federal 
court injunction against completion of the project. 
Therefore, an evaluation of the requirements for long 
term of the project in its uncompleted state will be 
required. 
Although the Corps has no plans to perform the 
NEPA studies required to remove the injunction at 
this time, removal of a section of the spillway and 
left abutment will not prevent future completion of 
the project. Removing a section of the dam will 
provide passive fish passage in accordance with the 
language in the FY97 Energy and Water Development 
Appropriations Act. In addition, it is the most 
cost effective method to provide fish passage over 
the long term with the project in an uncompleted 
state. Until construction of the fish passage modification 
is complete, fish passage around the project 
will continue to be provided by the Department of 
Fish and Wildlife using Corps' funds. 
Funds were not available to construct the fish 
passage corridor in FY00, so consultations began 
with the National Marine Fisheries Service (NMFS) 
concerning alternatives for long-term fish passage at 
Elk Creek under the Endangered Species Act. Four 
28-14

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
potential upstream fish passage alternatives were 
evaluated in the Corps' biological assessment. Based 
on this analysis, it was determined that passage 
through the existing diversion tunnel and continued 
operation of the existing trap and haul facility would 
result in jeopardy to the continued existence of coho 
salmon in Elk Creek over a ten to fifty year period. 
The assessment found that construction of a new trap 
and haul facility, designed to function effectively 
with the uncompleted project or removal of a section 
of the dam to provide a fish passage corridor, would 
not impact the continued existence of the species. 
Local cooperation. Authorizing act requires that 
State of Oregon take action prior to construction to 
insure maintenance in stream of flow to be released 
for fishery. In addition, costs allocated to irrigation 
would have to be repaid in a manner and to an extent 
consistent with the U.S. Bureau of Reclamation laws 
and policies. On February 24, 1966, State of Oregon 
Water Resources Board filed for withdrawal rights of 
25 cubic feet per second to maintain a minimum flow 
for fish. Development of recreation facilities requires 
a local sponsor willing to cost share in recreation 
development and assume operations and maintenance 
of park facilities. 
Operations during fiscal year. New Work: 
Operation during construction continued. 
29. FALL CREEK LAKE, OR 
Location. On Fall Creek, a tributary of Middle 
Fork Willamette River, about 7 miles above confluence 
of the streams and about 19 miles southeasterly 
of Eugene, OR. 
Existing project. An earth-and-gravel fill embankment 
about 5,100 feet long at crest and 193 feet 
high from lowest point of the general foundation. A 
gated concrete gravity spillway is in left abutment. 
Outlet is in right abutment. Reservoir provides 
115,000 acre-feet of usable flood control storage and 
is operated as a unit of coordinated reservoir system 
to protect Willamette River Valley and increase low 
waterflows for navigation and other purposes. 
Construction of project began May 1962 and was 
essentially complete November 1965. Reservoir 
storage for flood control was effective October 1965. 
Sky Camp Lodge was completed October 1978. 
Future recreation facilities will be provided in 
accordance with the cost-sharing contract with Bethel 
School District. Bethel School District has a subagreement 
with the Springfield Kiwanis Club for 
management of this facility. The Corps manages one 
park at the project. 
Freshets regulated by Fall Creek Lake project on 
Fall Creek, a tributary of the Middle Fork, Willamette 
River are shown in Table 28-K. 
Local cooperation. Fall Creek Lake is included in 
the Lane County multiple project cost sharing 
agreement. Two parks are managed by Lane County 
under lease agreement. Future development will 
require a supplement to the cost sharing agreement. 
Operations during fiscal year. Maintenance: 
Routine operation and maintenance continued. 
30. FERN RIDGE LAKE, OR 
Location. On Long Tom River, 23.6 miles from 
the mouth. Long Tom River rises in Lane county, 
OR, on eastern slope of Coast Range, flows north for 
50 miles, and enters Willamette River 147 miles 
above its mouth. 
Existing project. A main dam 6,624 feet long at 
crest and 49 feet high from lowest point of the 
general foundation and two auxiliary dikes, 915 and 
3,929 feet long, along northeasterly boundary of lake. 
Main dam consists of an earthfill embankment dam 
6,330 feet long, a concrete gravity spillway near left 
abutment with a non-overflow structure 46 feet long, 
containing outlet works, and an overflow structure, 
248 feet long, controlled by six automatic gates. 
Project includes rectification of channel of Long Tom 
River downstream of dam. Reservoir provides 
110,000 acre-feet of usable flood control storage and 
controls runoff of tributary drainage area of 275 
square miles. Reservoir protects Long Tom River 
Valley and is operated as a unit of coordinated 
reservoir system to protect Willamette River Valley 
generally and to increase low water-flows for 
navigation and other purposes. Dam was originally 
constructed in 1941 to height of 47 feet. Provision of 
additional storage for flood control was obtained in 
1965 by raising embankments 2 feet to 49 feet above 
lowest point of the general foundation. 
Construction of project initiated April 1940 was 
completed August 1951, except for provision of 
additional storage for flood control authorized in 
1962 and completed April 1965, and construction of 
additional recreation facilities funded through the 
Code 710 program. Construction of three waterfowl 
impoundments was completed in 1994 under Section 
1135 authority. Dam and reservoir have been in 
continuous operation since December 1941. Development 
of future recreation facilities will be in 
accordance with the cost-sharing contract with Lane 
County, and requires a 50 percent contribution by the 
county. Development is subject to availability of 
funds by the Government and the county. 
Freshets regulated by Fern Ridge Lake project on 
Long Tom River are shown in Table 28-K. 
Local cooperation. Fern Ridge Lake is included 
in the Lane County multiple project cost sharing 
agreement. Three parks are managed by Lane County 
under lease agreements. Future development will 
require cost sharing. The Oregon Department of Fish 
28-15

PORTLAND DISTRICT 
and Wildlife manages 5,000 acres of land and water 
for migratory waterfowl under a lease agreement. 
Operations during fiscal year. Maintenance: 
Routine operation and maintenance continued. 
31. LOWER COLUMBIA RIVER BASIN BANK 
PROTECTION, OR AND WA 
Location. On the Columbia River and tributaries 
between Sandy River, OR, and mouth of Columbia 
River. 
Existing project. Provides for construction of 
224,000 linear feet of bank protection works at 96 
locations along Lower Columbia River below River 
Mile 125 and along principal tributaries in this reach, 
to protect existing improvements such as levees and 
developed industrial lands from further erosion. 
Existing project is a unit of general comprehensive 
plan for flood control, navigation, and other purposes 
in Columbia River Basin. Construction of project 
began in July 1961 and is 88 percent complete. A 
total of 191,000 linear feet of bank protection work at 
84 locations has been completed. Estimated Federal 
cost is $28,000,000. 
Local cooperation. Flood Control Act of 1950 
provides local interests furnish lands and rights-ofway; 
make necessary highway, highway bridge, and 
utility alterations; hold the United States free from 
damages; and maintain and operate completed works. 
Under Section 103 of the Water Resources Development 
Act of 1986, Local Interests will also be 
required to make a cash contribution for construction 
of each site. Estimated costs for all requirements of 
local cooperation are $2,000,000. 
Operations during fiscal year. New Work: Coordination 
with sponsors and evaluation of local 
erosion problems continued. One bank protection 
project was under construction as follows: 
Barlow Point, WA 
Location: Consolidated Diking Improvement 
District No. 1 (CCDID#1) is located on the north 
bank of the Columbia River in Cowlitz County, 
Washington. The district is approximately 38 miles 
downstream from Portland, Oregon. Barlow Point is 
point of land that protrudes into the Columbia River 
on the Washington shore at Columbia RM 61.8. The 
area of CCDID#1 is nearly 10,000 acres, of which 
2,722 acres are in the cities of Longview and West 
Kelso. Longview alone has protected land and 
improvements exceeding $3 billion in value. Erosion 
of Barlow Point had been progressing at an average 
rate of about five feet per year for the last several 
years and threatened to encroach into the toe of the 
levee. 
Project Description: Construction consisted of 
placement of rock-filled erosion protection mattresses 
over compacted fill covering an area of 
approximately 1220 feet long by 24 feet wide from 
an existing downstream beach access area to the 
existing riprap at the upstream end, with plantings 2 
foot on center of willows and dogwoods. 
Local cooperation: The Consolidated Diking 
Improvement District No. I signed a Project 
Cooperation Agreement on August 21, 2000. 
32. MOUNT ST. HELENS SEDIMENT 
CONTROL, WA 
Location. On the North Fork Toutle River, 2 
miles upstream from its confluence with the Green 
River, in Cowlitz County, southwest Washington. 
The river systems impacted by the project include 
Toutle, Cowlitz and Columbia Rivers. Most of the 
population affected by the problems reside in the 
communities of Longview, Kelso, Lexington, and 
Castle Rock, Washington. 
Existing project. The project was authorized by 
the Supplement Appropriations Act, 1985 (Public 
Law 88, 99th Congress, August 15, 1985). The Act 
includes authorization "... to construct, operate and 
maintain a sediment retention structure near the 
confluence of the Toutle and Green River, Washington, 
with such design features and associated 
downstream actions as are necessary, in accordance 
with the Feasibility Report of the Chief of Engineers 
dated December 1984." The project will provide a 
permanent solution to potential flooding on the 
Cowlitz River from sedimentation problems created 
by the eruption of Mt. St. Helens. The Decision 
document recommended construction of a single 
sediment retention structure (SRS) with a 125-foot 
high spillway at the Green River site on the North 
Fork Toutle River, improvements to the levee system 
at Kelso, Washington, and dredging downstream 
from the SRS. 
Local cooperation. Local interests were responsible 
for provision of all lands, easements, and rightsof-
way for the sediment retention structure, dredging 
disposal areas, and levee improvements. Local 
interests were also responsible for all alterations and 
relocations of buildings, roads, bridges and other 
structures or utilities made necessary by implementation 
of the project. In addition, operation and 
maintenance of fish facilities, the levee system at 
Kelso and dredged material disposal sites are the 
responsibility of local interests. Cowlitz County 
offers visitor services in their viewpoint area. Nonfederal 
cash contribution is $3,600,000 and the 
estimated non-federal land, easements, right-of-ways, 
and relocations costs are $21,000,000. 
Operations during fiscal year. New work: Coordination 
with Federal and local agencies continued. 
Continued an engineering reanalysis of anticipated 
erosion and deposition of the debris avalanche. 
28-16

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Maintenance: Routine operation and maintenance 
performed. 
33. SCAPPOOSE DRAINAGE DISTRICT, OR 
Location. Scappoose Drainage District is located 
in Columbia County, Oregon, along the left bank of 
Multnomah Channel opposite Columbia River Miles 
90.3 to 97.0. 
Project Description. The project, as originally 
authorized by the Flood Control Act of June 22, 
1936, provided for reconstruction of the existing 
levee system. Additional improvements, as provided 
for in the Flood Control Act of May 17, 1950, 
consisted of raising and strengthening 52,000 feet of 
levee, construction of toe drains, and additional 
pumping capacity. The project as originally authorized 
was completed in 1941. The additional 
improvements were completed in September 1980. 
The main pumping plant was constructed by the 
Corps of Engineers as part of a comprehensive plan 
for upgrading the flood protection works to provide 
protection against the Standard Project Flood of 
850,000 cubic feet per second as measured at The 
Dalles, Oregon. This equates to a flood level of 27.8 
feet and 26.2 at the upstream and downstream ends, 
respectively, of the drainage district. 
The four pumps at the main pumping plant did not 
operate properly during the February 1996 flood. 
The problem began when the Columbia River 
exceeded the ordinary high water level of 14 feet. At 
that point, the pumps started to overheat and shut 
down. When the river stage reaches approximately 
22.5 feet, the motor overload protection trips out. 
Emergency measures were taken by rotating the 
operation of the pumps. All pump motors overheated 
and only one pump at a time in rotation could be 
operated. The reduced pumping capability induced 
interior flooding that caused extensive damage to a 
large plant nursery, flooded residential properties, 
and cut off access to interior drainage channel pump 
stations. The pumps were designed to operate with 
river stages from +1.0 to 26.6 feet. The river crested 
at 26.6 feet during the flood. During the February 
1996 flood the pumps were tested under major 
flooding conditions for the first time. Corrective 
action was to replace the existing pump impellers 
having a 17 degree pitch with impellers having 14.5 
degree pitch. The cost for this corrective action was 
$119,000, which was 100% Federal. 
Local Cooperation. Fully complied with. 
Operations during fiscal year. New work: 
Project closeout. 
34. WILLAMETTE RIVER BASIN BANK 
PROTECTION, OR 
Location. On Willamette River and tributaries, 
between Cascade Range and Coast Range, from a 
point south of Eugene to Portland, OR. 
Existing project. Provides for clearing, sloping, 
and reveting riverbanks; construction of pile and 
timber bulkheads and drift barriers; minor channel 
improvements; and maintenance of existing works 
for control of floods and prevention of erosion at 
various locations along Willamette River and its 
tributaries. The current scope of the project is a total 
of 510,000 linear feet of bank protection at 236 
locations. Estimated Federal cost is $30,700,000. 
Construction of project began in 1938 and is 96 
percent complete. A total of 489,795 linear feet of 
bank protection work at 230 locations consisting of 
revetment of riverbanks, pile and timber bulkheads, 
drift barriers, and channel improvements, have been 
completed on Willamette River and tributaries. 
Local cooperation. Section 3, Flood Control Act 
of 1936 and Section 103, Water Resources Development 
Act of 1986 applies. Estimated costs for all 
requirements of local cooperation under terms of 
project authorization were $2,300,000. 
Operations during fiscal year. Maintenance: 
Continued coordination and evaluation of local 
erosion problems. 
35. WILLOW CREEK LAKE, HEPPNER, OR 
Location. On Willow Creek immediately upstream 
from Heppner and just downstream from 
junction of Balm Fork and Willow Creek in Section 
35, Township 2 South, Range 26 East, Willamette 
Meridian. 
Existing project. Project provides flood protection 
to the city of Heppner and downstream area by 
controlling runoff from a drainage area of 96 square 
miles. The dam is a roller compacted concrete 
structure 160 feet high at crest elevation 2,130. 
Ancillary features include a center uncontrolled 
spillway with a maximum flood capacity of 93,300 
cfs (cubic feet per second), an outlet works with a 
capacity of 500 cfs, a minor flow works and diversion 
works. Gross storage capacity of the project is 
13,250 acre-feet, consisting of 7,750 acre-feet for 
exclusive flood control, 1,750 acre-feet for joint 
flood control and irrigation, 1,750 acre-feet exclusive 
irrigation, and 2,000 acre-feet dead storage for fish, 
wildlife, recreation, sediment accumulation, and 
aesthetics. Limited recreation facilities are being 
provided. 
Willow Creek Parks and Recreation District has 
leased recreation facilities at Willow Creek Lake. A 
courtesy handling dock was constructed by the 
Recreation District utilizing Oregon State Marine 
Board funds. A playfield area below the dam has 
been leased to the City of Heppner. 
28-17

PORTLAND DISTRICT 
The final Environmental Impact Statement was 
filed with the Environmental Protection Agency on 
December 20, 1979. The provisions of the Clear 
Water Act were met by a Section 404(b)(1) Evaluation 
and a public notice issued January 12, 1980, and 
a section 401 certification from the State of Oregon 
on February 15, 1980. Land acquisition is about 99 
percent complete. 
Local cooperation. Development of additional 
recreation facilities will require a local sponsor 
willing to cost share and assume all operation and 
maintenance of facilities. 
Operations during fiscal year. Maintenance: 
Routine operation and maintenance performed. 
36. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Funds appropriated for inspection of completed 
local flood protection works are used to determine 
maintenance condition of completed works, and to 
ascertain whether those works are properly maintained 
by local interests. Numerous leveed areas and 
bank protection works were inspected at various 
locations along both banks of Lower Columbia River 
below Bonneville Dam, along Oregon Coast, in 
eastern Oregon, in southern Oregon and in Willamette 
River Basin. A representative of sponsoring 
districts accompanied the Portland District representatives 
performing the levee inspections. Deficiencies 
in maintenance and need for repairs were discussed 
with sponsoring districts' representatives and a report 
was made to each sponsor with recommendations for 
improving maintenance. The program to improve 
maintenance of completed Federal projects initiated 
by House Appropriations Committee on Civil 
Functions was continued. 
Did not perform aerial inspection of 186 revetments 
in the Willamette River Basin due to non- 
Department of Defense (DOD) certification for 
helicopter companies in Oregon. DOD certification 
has now been obtained, and inspection of these 
revetments will be completed in FY01. 
Refer to Table 28-Q for information relating to 
completed works. Fiscal year costs were $113,058. 
37. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
Corps of Engineers monitored flood control operations 
at four Bureau of Reclamation projects 
(Prineville, Ochoco, Emigrant, and Scoggins), one 
local project operated by Douglas County (Galesville), 
and one municipal power project operated by 
Tacoma City Light (Mossyrock). The projects were 
partially constructed with flood control funds, 
thereby subjecting project operation to monitoring by 
the Corps of Engineers under Section 7, Flood 
Control Act of 1944. 
The four Bureau of Reclamation projects, Douglas 
County project and Mossyrock project were operated 
during the fiscal year within the flood control 
regulations specified for each project. Total cost of 
monitoring and flood control direction of the six 
projects during the fiscal year was $59,422. 
38. FLOOD CONTROL ACTIVITIES UNDER 
SPECIAL AUTHORIZATION 
Flood Control Activities Pursuant to Section 
205 of the 1948 Flood Control Act, Public Law 
858, 80th Congress, as Amended: In addition to 
general requirements, each project selected is limited 
to a federal statutory cost of not more than 
$7,000,000. The local sponsor must agree to provide 
an amount not less than 35 percent or more than 50 
percent of total project cost, at least 5 percent of 
which will be cash; and operate, maintain, repair, 
replace, and rehabilitate the project upon completion. 
Two projects were under construction as follows: 
Keizer, OR 
Location: The city of Keizer is located 40 miles 
south of Portland, Oregon and immediately north of 
Salem, Oregon, on the right bank of the Willamette 
River. 
Project description: The city of Keizer constructed 
the Keizer Dike after the 1965 flood to 
protect the population from flooding of the Willamette 
River. The population has steadily grown to 
31,000 in 2000. In 1995 the Federal Emergency 
Management Agency revised its flood insurance rate 
map of Keizer to include a large area of the city 
within the one-percent (100-year) floodplain. The 
reason for the revision was due to the low crest 
elevation of the dike and backwater from the 
Willamette River through a low swale. The close 
proximity of residential structures to the dike 
complicated solutions that would increase the level of 
protection. The authorized project included three 
components: 1) a concrete wall constructed inside the 
dike, which is called the riverwall, 2) an earthen 
embankment across the low swale and 3) four valves 
stormdrain pipes. The riverwall is 12 inches thick, 
2,600 feet long and extends up to 18 inches above the 
existing dike crest. The downstream cross-dike is 
220 feet long, 28 feet wide and two feet high. The 
right-of-way involved 26 property owners. The 
authorized project was based on an average annual 
cost of $47,400 and average annual benefits of 
$217,800 resulting in a 4.6 benefit-cost ratio. The 
project was constructed during the summer and fall 
2000. The construction cost, including real estate, 
was $700,000. 
Local cooperation: The city of Keizer is the nonfederal 
sponsor. They are responsible for providing 
lands, easements, rights-of-way, relocations and 
dredged disposal sites for the project. They are also 
28-18

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
responsible for operation and maintenance of the 
project. Due to the nature of the project, the annual 
operation and maintenance cost is anticipated to be 
minimal. 
Operations during fiscal year: A construction 
contract was awarded on August 2, 2000 and will be 
completed early in FY01. 
Peninsula Drainage District No. I, OR: 
Location. Peninsula Drainage District is located 
in Portland, Oregon along the Columbia River near 
river mile 106. 
Project Description. The Peninsula Drainage 
District is surrounded by 6.8 miles of levees, flood 
walls, and railroad and highway embankments. The 
weak links in the flood protect works are the railroad 
embankment and the outlet pipe of the pumping plant 
located on the Columbia Slough levee. The project 
consists of reinforcing the flood protective system in 
order to protect against the 100-year reoccurrence 
frequency flood event. This will be accomplished by 
reinforcing 2,000 linear feet of the landward side of 
the railroad embankment at the southwest corner of 
the drainage district and raising the outlet pipes of the 
pumping station to above-design flood level of 28.7 
feet Portland Datum. The railroad embankment will 
be reinforced by constructing a sand embankment 
structure against the landward slope of the railroad 
embankment having a 12-foot wide crown and I 
vertical to 5 horizontal side slopes. The catch point 
along a portion of this fill is in a golf course water 
hazard and the embankment will cover existing golf 
course tees. As a consequence, a 200 linear foot 
gabion retaining wall will confine the fill and allow 
construction of a flat bench so the tees can be reestablished. 
The height of the retaining wall will 
vary from 2 to 9 feet. The estimated cost for 
preparation of plans and specifications and construction 
of the project is $1,484,000, of which 
$1,113,000 is federal and $371,000 is non-federal. 
Local cooperation. The Peninsula Drainage 
District Number 1, Oregon, the non-federal sponsor, 
signed a Project Cooperation Agreement on July 3, 
1997. 
Operations during fiscal year. The project was 
modified to address safety issues. A boat barrier was 
added to preclude access to the outlet. The contract 
for this task was awarded on Sept 1, 1999 and was 
physically complete Nov 10, 1999. 
Emergency Streambank Protection Activities 
Pursuant to Section 14 of the 1946 Flood Control 
Act, Public Law 526, 79th Congress, as Amended: 
In addition to general requirements, each project is 
limited to a federal statutory expenditure of not more 
than $1,000,000 in any one year. The local sponsor 
must agree to provide an amount not less than 35 
percent or more than 50 percent of total project cost, 
at least 5 percent of which will be cash; and operate, 
maintain, repair, replace, and rehabilitate the project 
upon completion. No projects were under construction 
during the fiscal year. 
Multiple-Purpose Projects, 
Including Power 
39. BONNEVILLE LOCK AND DAM - LAKE 
BONNEVILLE, OR AND WA 
Location. Project is on Columbia River, 40 miles 
east of Portland, OR, about 146 miles above mouth 
of river. For description of Columbia River, see 
Section 3. 
Existing project. A dam, powerplant, and lock 
for power and navigation. Spillway dam extends 
across main channel from Cascade island shore to 
Bradford Island. Overflow crest at 24 feet above 
mean sea level is surmounted by 18 vertical-lift steel 
gates, 10 with remote control hoists placed between 
piers which extend to elevation 99 feet where a 
service roadway provides access, and two 350-ton 
gantry cranes for regulating gates. Powerhouse No. I 
extending across Bradford Slough to the Oregon 
shore has an installation of 10 units, consisting of one 
unit of 48,000 kilowatts, one unit of 59,500 kilowatts, 
and eight units of 60,000 kilowatts each, 
totaling 587,500 kilowatts. Ordinary and extreme 
fluctuations of river at lower lock gate are about 21 
and 47 feet respectively. Project includes fish ladders 
to serve both main channel, Bradford Slough 
Channel, and Powerhouse II channel. Navigation 
lock and powerhouses are founded on andesite, and 
main dam rests on solidified sedimentary rock of 
volcanic origin. The pool created by dam provides a 
navigable channel 27 feet deep between Bonneville 
and The Dalles Dams, a distance of 47 river miles. 
Principal data concerning navigation lock, spillway 
dam, and powerplant are set forth in Table 28-N. 
Dam, navigation lock, 10-unit power generating 
installation, fishways, and attendant buildings and 
grounds cost $83,239,395, of which $6,072,480 is for 
navigation facilities, $39,350,824 for power facilities 
and $37,816,091 for joint facilities, consisting of 
dam, fishways, buildings and grounds, and headwall 
section of power units 0 to 6, cost of which 
$2,106,000 is allocated to dam and lake facilities. 
In response to flow regulations and peakings from 
upstream plants operating under conditions of 
Canadian storage and Pacific Northwest-Southwest 
Intertie, two modifications were undertaken at the 
Bonneville project. The modification for peaking 
project was undertaken to minimize adverse environmental 
effects under rapidly changing flow 
conditions from upstream dams. The project was 
completed in 1978 at a cost of $27,195,000. The 
second modification provided for increased power 
28-19

PORTLAND DISTRICT 
installation by building a second powerhouse located 
on the Washington shore adjacent to the end of the 
existing spillway. The new powerhouse contains 
eight units of 66,500 kilowatts each and two fish 
attraction turbine generator units of 13,100 kilowatts 
each for a combined capacity of 558,200 kilowatts, 
bringing the entire Bonneville capacity to 1,145.7 
megawatts. Additional fish facilities consist of the 
powerhouse collection system, second fish ladder on 
the Washington shore, transportation channel 
connecting the Cascade Island fish ladder with new 
exit control section, and fingerling bypass facilities 
which include fish screens in both the powerhouses. 
To provide for the anticipated increased visitor use, 
onsite visitor facilities are included. Under authority 
of the Bonneville Project Act (August 20, 1937), a 
letter from Bonneville Power Administration to 
North Pacific Division dated January 21, 1965, 
requested construction of a second powerhouse. 
Construction of project started October 1933, was 
completed February 1943. Modification of powerhouse 
control equipment started March 1957, was 
completed September 1958. First two power units 
were placed in operation during fiscal year 1938. 
Powerhouse with complete installation of 10 units, 
was in operation December 1943. 
Construction of modification for peaking work 
commenced in September 1970 and was completed 
in September 1978. 
Construction of second powerhouse is complete. 
Final environmental impact statement was filed with 
Council on Environmental Quality in April 1972. In 
response to increasing visitation which now exceeds 
800,000 a year at the dam site itself and 2,700,000 
project wide, a visitor center with windows into the 
fish ladders, a 60-seat theatre, exhibits and displays 
was completed in 1975. Units 11 through 18 were 
on-line by October, 1982. The visitor facility for the 
new powerhouse (which does not require costsharing) 
is an integral part of that structure. The total 
cost for construction of the second powerhouse was 
$678,945,000. 
In June 1993 work began on the rehabilitation of 
the First Powerhouse. In the first phase the existing 
circuit breakers and ten transformers were replaced 
and the switchyard was rehabilitated. Circuit breaker 
work was completed in 1995. The remaining work 
was completed in 1997. Phase I cost was 
$24,120,000. The second phase consists of replacing 
the windings of six generators and replacing ten 
turbines. Second phase work was contracted in 1994 
and is scheduled to complete in 2009. Phase 11 will 
cost an estimated $110,800,000. 
The first powerhouse, spillway, navigation lock 
and associated facilities have been designated as a 
National Historic District. 
Development of recreation facilities at Home 
Valley was completed in FY 1989. 
Electrical power generation and associated revenue 
from sale of power by Bonneville Power 
Administration, the marketing agency, are shown on 
Table 28-P. 
Local cooperation. None required, except for 
non-federal cost-sharing for development of recreational 
facilities. 
Operations during fiscal year. New work: Real 
estate actions to provide access to Crates Point for 
State of Washington received State of Washington, 
Dept. of Ecology, concurrence that site monitoring 
for contamination is no longer necessary. 
Maintenance: Increased activities to protect and 
enhance the anadromous fisheries in the Northwest 
were performed. Repair of units 12 and 18 stator 
winding and rewedge repairs were completed. 
Completed navigation lock gate retensioning. 
Routine operation and maintenance was performed 
with enhanced maintenance on the turbines. 
Major Rehabilitation: A contract to rehabilitate 
the generators and turbines in the first powerhouse is 
in progress. Two units have been rehabilitated to 
date. Completed bridge crane repair. 
40. COLUMBIA RIVER TREATY FISHING 
ACCESS SITES, OR & WA 
Location. This project provides for construction 
of 31 sites along the Columbia River on Bonneville 
pool, John Day pool, and The Dalles pool. 
Existing project. Congress has provided authority 
through public law to implement a wide range of 
land management, transfer, acquisition and development 
actions to provide fishing access for Indian 
tribes who exercise treaty fishing rights on the 
Columbia River. The law designates certain federal 
sites on Bonneville, John Day, and The Dalles pools 
for fishing access. The improvements required at the 
access sites are specified in the authorizing legislation. 
They include all weather access roads, camping 
facilities, boat ramps, docks, sanitation, and fish 
cleaning facilities. Construction of these facilities 
will greatly improve access by the four tribes, which 
have fishing rights along this reach of the Columbia 
River. 
Local cooperation. None required. 
Operations during fiscal year. New work: 
Work on plans and specifications for Phase II sites 
continued. Construction of the second phase sites 
continued. A total of 17 sites have been completed. 
41. COUGAR LAKE, OR 
Location. At mile 4.4 on South Fork McKenzie 
River which joins McKenzie River about 56.5 miles 
28-20

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
above its confluence with Willamette River. Project 
is about 42 miles east of Eugene, OR. 
Existing project. A rockfill dam with an impervious 
earth core, about 1,738 feet long at crest and 445 
feet high above the streambed. Reservoir is 6 miles 
long with storage capacity at full pool of 219,000 
acre-feet and controls runoff of tributary drainage 
area of 210 square miles. Spillway is on right 
abutment and outlet and power tunnels in left 
abutment. Outlet tunnel is provided with a chute and 
stilling basin. Powerplant consists of two 12,500 
kilowatt units with minimum provisions for installing 
a third unit of 35,000 kilowatts for future peaking 
capacity. Improvement functions as a unit in 
coordinated system of reservoirs for multiple-purpose 
development of water resources in Willamette River 
Basin. Recreation facilities are provided by the U.S. 
Forest Service. Also authorized (but unconstructed) 
is a reregulating dam, Strube Lake, below Cougar 
Lake, which would permit Cougar to operate as a 
peaking powerplant. The Strube dam would contain 
two units totalling 4,600 kilowatts. Estimated Federal 
cost of Strube Lake and Cougar Additional Units is 
$114,000,000. 
Construction of project initiated June 1956 is 
complete, excluding Strube Lake and Cougar 
Additional Unit for which planning is essentially 
complete. Also, plans and specifications for the first 
construction contract (relocations) have been 
completed. Generating units I and 2 were placed in 
commercial operation March 23 and February 4, 
1964, respectively. Physical in-service date for flood 
control was November 29, 1963. 
Freshets regulated by Cougar Lake on South Fork 
McKenzie River are shown on Table 28-K. 
Electrical power generation and associated revenue 
from sale of power by Bonneville Power 
Administration, the marketing agency, are shown on 
Table 28-P. 
The addition of water temperature control to the 
intake tower is authorized. Water temperature control 
will enhance fish passage and incubation in the 
McKenzie River. Refer to the Willamette River 
Temperature Control project write-up for additional 
information. 
Local cooperation. None required. 
Operations during fiscal year. Maintenance: 
Routine operation and maintenance continued. 
42. DETROIT LAKE - BIG CLIFF, OR 
Location. On North Santiam River with dam 50 
miles from mouth 40 miles southeast of Salem, OR. 
North Santiam River flows north and west for 85 
miles, and unites with South Santiam River to form 
Santiam River, which 10 miles downstream enters 
Willamette River 108 miles above its mouth. 
Existing project. Main dam and a reregulating 
dam, both with power-generating facilities. Detroit 
Dam is a concrete gravity structure about 1,522 feet 
long and 454 feet high from lowest point of the 
general foundation to roadway deck. Spillway is a 
gate-controlled overflow section, and outlet works 
are gate-controlled conduits through dam. Powerhouse 
with two units having a capacity of 50,000 
kilowatts each is in right abutment immediately 
below dam. Reservoir has a storage capacity at full 
pool of 454,900 acre-feet and controls runoff of 
tributary drainage area of 438 square miles. It is 
being operated as a unit in coordinated reservoir 
system to protect Willamette Valley from floods, to 
increase low water flows in interest of navigation and 
irrigation, to generate power, and for other purposes. 
Reregulating dam 3 miles downstream at Big Cliff 
site is concrete gravity type, about 191 feet high from 
lowest point of the general foundation to roadway 
deck. Power installation consists of one unit with a 
capacity of 18,000 kilowatts. Reservoir has a storage 
capacity of 5,930 acre-feet at full pool. Project is a 
unit of comprehensive plan for flood control and 
other purposes in Willamette Basin. Recreation 
facilities are provided by the U.S. Forest Service, 
Oregon State Park System and the town of Detroit. 
Construction of project begun in May 1947 was 
completed December 1960. The two powerhouse 
generating units were placed in commercial operation 
June and October 1953. At Big Cliff powerhouse, 
single generating unit was placed on-line June 1954. 
Use of Big Cliff Dam for reregulating fluctuating 
flow from Detroit units was effected October 1953. 
Electrical power generation and associated revenue 
from sale of power by Bonneville Power 
Administration, the marketing agency, are shown on 
Table 28-P. 
Freshets regulated by the Detroit Lake project on 
North Santiam River are shown in Table 28-K. 
Local cooperation. None required. 
Operations during fiscal year. Maintenance: 
Routine operation and maintenance continued. 
Refurbished Big Cliff gantry crane. 
43. GREEN PETER-FOSTER LAKES, OR 
Location. At approximate mile 5.5 on Middle 
Santiam River which joins South Santiam River 
about 56.8 miles above its confluence with Willamette 
River. Dam is about 30 miles southeast of 
Albany in Linn County, OR. 
Existing project. Main dam and a reregulating 
dam, both with power-generating facilities. Green 
Peter Dam is a concrete gravity structure, 1,400 feet 
long and 385 feet high above the lowest point of the 
general foundation with a gate-controlled spillway. 
Outlet works consist of two conduits through 
28-21

PORTLAND DISTRICT 
spillway, discharging into a stilling basin. Powerplant, 
on right bank adjacent to spillway stilling 
basin, consists of two units with an installed capacity 
of 80,000 kilowatts. Reservoir provides storage 
capacity at full pool of 430,000 acre-feet, extending 
6.5 miles up Quartzville Creek and some 7.5 miles up 
Middle Santiam River above creek junction, forming 
a Y-shaped pool. Reservoir controls runoff of 
tributary drainage area of 277 square miles. 
Foster Dam, 7 miles downstream from Green 
Peter Dam is located on South Santiam River about 
38 miles above its confluence with Santiam River 
and 1.5 miles below its confluence with Middle 
Santiam River. Foster Dam consists of an earth, 
gravel, and rock-filled embankment, 146 feet high 
from lowest point of the general foundation and a 
concrete gravity gate controlled spillway and stilling 
basin for a total length of 4,800 feet. Power installation 
consists of two units with capacity of 20,000 
kilowatts. Foster Lake has a storage capacity, at full 
pool, of 61,000 acre-feet. Project functions as a unit 
in coordinated system of reservoirs for multiplepurpose 
development of water resources in Willamette 
River Basin. 
All construction on Green Peter-Foster Lakes 
project initiated June 1961 is completed. Green Peter 
Lake was placed in operation for useful flood control 
June 1967 as a unit of coordinated reservoir system 
for protection of the Willamette River Basin. First 
power-generation unit was placed on the line June 9, 
1967 and second, June 28, 1967. Use of Foster Lake 
for reregulating fluctuating flows from Green Peter 
units was effective December 1967. First power 
generation unit was placed on-line August 22, 1968 
and second, September 6, 1968. 
Electrical power generation and associated revenue 
from sale of power by Bonneville Power 
Administration, the marketing agency, are shown on 
Table 28-P. 
Freshets regulated by Green Peter Lake project on 
Middle Santiam River are shown in Table 28-K. 
Local cooperation. Future recreation development 
at Foster or Green Peter will require cost 
sharing. Recreation facilities at Foster Lake includes 
4 parks and 2 parks at Green Peter Lake. Five of 
these parks were developed by the Corps and are 
operated by Linn county under lease agreement. One 
park is operated by the Corps. 
Operations during fiscal year. Maintenance: 
Routine operation and maintenance continued. 
Rewind Green Peter Unit I and Unit 2 completed. 
44. HILLS CREEK LAKE, OR 
Location. On the Middle Fork, Willamette River, 
47.8 miles from mouth and 26.5 miles upstream from 
Lookout Point Dam. Middle Fork, Willamette River 
rises on west slope of Cascade Range and flows 
northwesterly to its junction with Coast Fork, 
Willamette River. Dam is about 45 miles southeast 
from Eugene, OR. 
Existing project. An earth-and-gravel-fill dam 
about 2,150 feet long at the crest and 338 feet above 
lowest point of the general foundation. A gatecontrolled 
concrete gravity chute-type spillway is in 
right abutment. Diversion tunnel, outlet tunnel and 
power tunnel are in same abutment. Powerhouse with 
two 15,000 kilowatt units is located next to spillway. 
Hills Creek Lake is about 8.5 miles long and provides 
storage capacity at full pool of 356,000 acre-feet. 
Project controls runoff of drainage area of 389 square 
miles and is an integral unit of comprehensive plan 
for development of water resources of Willamette 
River Basin. Hills Creek Lake and Lookout Point 
Lake are operated as a unit for control of floods and 
generation of power on Middle Fork Willamette 
River. These projects, in conjunction with Dexter 
reregulating dam and Fall Creek Lake flood control 
system, will effectively control floods on Middle 
Fork and provide maximum efficient generation of 
hydroelectric power. Recreation facilities are 
provided by the U.S. Forest Service. Hills Creek 
power units are remote controlled from Lookout 
Point. 
Construction of project, initiated May 1956, was 
completed June 1963. The project was placed in 
service for useful flood control in November 1961. 
On May 2, 1962, the two power units were placed 
on-line. 
Electrical power generation and associated revenue 
from sale of power by Bonneville Power 
Administration, the marketing agency, are shown on 
Table 28-P. 
Freshets regulated by Hills Creek Lake on Middle 
Fork Willamette River are shown in Table 28-K. 
Local cooperation. None required. 
Operations during fiscal year. Maintenance: 
Routine operation and maintenance continued. 
45. JOHN DAY LOCK AND DAM - 
LAKE UMATILLA, OR AND WA 
Location. On Columbia River about 3 miles 
downstream from mouth of John Day River and 
about 215 miles above mouth of Columbia River. 
Existing project. A dam, powerplant, navigation 
lock, fish ladders, and appurtenant facilities with a 
slack-water lake about 75 miles long extending to 
McNary Lock and Dam. Included is relocation of 
railroads, highways, utilities, and communities 
affected by the impoundment. The project as 
originally authorized would have provided 2,000,000 
acre-feet of flood control storage. As modified, the 
project provides 500,000 acre-feet of flood control 
28-22

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
storage between elevations 257 and 268. The 
structure is 5,900 feet in length and stands about 161 
feet above streambed. Powerhouse has space for 20 
generating units of 135,000 kilowatts each; 16 units 
have been installed for a present capacity of 
2,160,000 kilowatts. Principal project data are set 
forth in Table 28-N. 
A detailed description of project as authorized and 
modified is on pages 1992 and 1993 of Annual 
Report for 1962 under the Walla Walla District. 
Construction began July 1958 and the project was 
opened to navigation April 1968. The main dam 
contract is complete. Lock rehabilitation work begun 
in FY 1980 was completed in FY 1986. 
Electrical power generation and associated revenue 
from sale of power by Bonneville Power 
Administration, the marketing agency, are shown on 
Table 28-P. 
Local cooperation. Recreation facilities at 5 parks 
are operated and maintained by local agencies under 
lease agreement with the Corps. Six developed 
recreation areas are operated and maintained by the 
Corps of Engineers. Any future recreation development 
will require cost sharing. 
Operations during fiscal year. Maintenance: 
Increased activities to protect and enhance the 
anadromous fisheries in the Northwest were performed. 
Construction and implementation of the data 
acquisition control system continued. Rewind of unit 
4 completed. Initiated replacement of main unit 
breakers. Started installation of new exciters. 
Routine operation and maintenance continued. 
46. LOOKOUT POINT - DEXTER LAKES, OR 
Location. On Middle Fork, Willamette River at 
Meridian site, 21.3 miles from mouth. Middle Fork, 
Willamette River, rises in Lane County on western 
slope of Cascade Range and flows northwesterly to 
its junction with Coast Fork, which is head of 
mainstem Willamette River. Dam is about 22 miles 
southeast from Eugene, OR. 
Existing project. A main dam at Meridian site 
and a reregulating dam 3 miles downstream at Dexter 
site. Both dams are earth-and-gravel-fills with 
concrete spillways and have power generating 
facilities. Main dam is 258 feet high from lowest 
point of the general foundation to deck and is 3,381 
feet long at crest forming a reservoir 14.2 miles long 
providing storage of 456,000 acre-feet at full-pool 
level. Reservoir controls runoff of tributary drainage 
area of 991 square miles. Spillway, 274 feet long, is a 
gate-controlled overflow type, forming right 
abutment. Outlet works consisting of slide-gatecontrolled 
conduits pass through spillway section. 
Powerhouse has three main generating units with a 
capacity of 120,000 kilowatts. Dexter reregulating 
dam has a maximum height of 107 feet above lowest 
point of the general foundation and is 2,765 feet long 
at crest, forming a full pool of 27,500 acre-feet 
extending upstream to main dam and providing 
pondage to regulate Lookout Point powerhouse water 
releases to a uniform discharge. Spillway consists of 
a gate-controlled overflow section 509 feet long 
forming right abutment. 
Flow regulation is accomplished by use of spillway 
gates and releases through powerhouse, which 
contains one 15,000-kilowatt unit. Lookout Point and 
Dexter Lakes are operated as a single unit of a 
coordinated system of reservoirs to protect Willamette 
River Valley against floods, to provide 
needed hydroelectric power, and to increase low 
water flows for navigation, irrigation, and other 
purposes. Existing project authorized as a unit of 
comprehensive plan for flood control and other 
purposes in Willamette River Basin. 
Construction of project initiated May 1947 was 
completed June 1961, except for construction of 
additional recreation facilities funded through the 
Code 710 program. Future recreation facilities will be 
provided in accordance with the cost-sharing contract 
with Lane County and will require a 50 percent 
contribution by Lane County and is subject to 
funding availability by the Government and the 
County. At Lookout Point powerhouse, generating 
units 1,2, and 3 were placed in commercial operation 
December 1954, February 1955, and April 1955, 
respectively. At Dexter powerhouse the single unit 
was placed on-line May 1955. Dexter was placed in 
operation for reregulation in December 1954. 
Electrical power generation and associated revenue 
from sale of power by Bonneville Power 
Administration, the marketing agency, are shown on 
Table 28-P. 
Freshets regulated by Lookout Point Lake project 
on Middle Fork Willamette River are shown in Table 
28-K. 
Local cooperation. A multiple project cost sharing 
agreement has been in force with Lane County 
since September 1976. It includes 4 projects and 13 
parks. All these parks are managed by Lane County 
under lease agreement. Recreation opportunities are 
provided at 2 parks on Dexter Lake which are 
operated by Lane County via the multi-project costsharing 
agreement and lease instruments. The north 
shore of Lookout Point Lake is also leased to Lane 
County for recreation purposes; there is essentially 
no development. Future development will require a 
supplement to the cost sharing agreement. 
Operations during fiscal year. Maintenance: 
Completed installation of new exciters at Lookout 
Point and Dexter. Routine operation and maintenance 
continued. 
28-23

PORTLAND DISTRICT 
47. LOST CREEK LAKE, ROGUE RIVER 
BASIN, OR 
Location. On Upper Rogue River at mile 153.6 
about 30 miles northeasterly from Medford, OR. 
Existing project. A rock and gravel-fill embankment 
dam about 327 feet high from streambed to 
crest, with an overall length of 3,750 feet with an 
impervious earth core and a gate-controlled concrete 
spillway. Powerhouse is on right abutment and 
houses two Francis-type turbines with installed 
capacity of 24,500 kilowatts each. Regulating outlet 
facility was provisions for temperature regulation for 
releases in interest of fishery enhancement is also on 
right bank. Reservoir 10 miles long provides 315,000 
acre-feet of usable storage. Project provides control 
of runoff of drainage area of 674 square miles. In 
addition to hydroelectric power generation, project 
provides flood control, irrigation, future municipal 
and industrial (M&I) water supply, fish and wildlife 
enhancement, water quality control and recreation 
benefits. 
Construction of project initiated July 1967 is 
complete. Generating units I and 2 were placed in 
commercial operation July 6 and July 13, 1977, 
respectively. Physical in-service date for flood 
control was February 18, 1977. Final environmental 
statement was filed with Council on Environmental 
Quality in June 1972. Recreation opportunities are 
provided by 4 parks at the project. The State of 
Oregon operates 2 parks, including a 200-unit 
campground, part of Stewart State Park. 
Electrical power generation and associated revenue 
from sale of power by Bonneville Power 
Administration, the marketing agency, are shown on 
Table 28-P. 
Freshets regulated by Lost Creek Lake on Rogue 
River are shown in Table 28-K. 
Local cooperation. Authorizing act required that 
local agencies furnish assurances prior to construction 
that demands will be made for future use of 
water supply storage within a period that will permit 
repayment of costs, including interest, allocated to 
water supply within life of the project; that State of 
Oregon take action, prior to construction to insure 
maintenance in stream of flows to be released for 
fishery; in addition, costs allocated to irrigation 
would have to be repaid in manner and to an extent 
consistent with reclamation laws and policies; and 
costs allocated to power will be repaid on a system 
basis by revenue from sales of power in Pacific 
Northwest Federal system by Bonneville Power 
Administration. A survey in September, 1980 of 
M&I water supply needs showed nine communities 
with water supply needs. A contract for M&I supply 
has been completed with one of the communities. 
Assurances for municipal and industrial water supply 
were obtained from six communities in Rogue River 
Valley. 
On February 26, 1966 Oregon State Department 
of Fish and Wildlife agreed to operate Cole M. 
Rivers Fish Hatchery for mitigation and enhancement 
of fish. The Corps provides full funding for the 
operation and maintenance of the hatchery. The 
hatchery became operational in 1972. 
Operations during fiscal year. Maintenance: 
Routine operation and maintenance continued. 
48. THE DALLES LOCK AND DAM - 
LAKE CELILO, WA AND OR 
Location. On Columbia River at head of pool 
behind Bonneville Dam, about 192 miles above 
mouth of river and 88 miles east of Portland, OR. 
Existing project. A dam, powerplant, navigation 
lock, and appurtenant facilities. Improvement 
provides for navigation and hydroelectric power 
generation. Dam is designed for a normal pool at 
elevation 160 feet at mean sea level. Normal pool 
forms a reservoir extending upstream about 23 miles 
providing slackwater to John Day Dam site. The 
Dalles Dam is 8,700 feet long and consists of a rock, 
gravel, and sand river closure section from Oregon 
shore connecting to a nonoverflow section which in 
turn joins powerhouse, then concrete nonoverflow 
sections connecting spillway with powerhouse and 
spillway with navigation lock at right abutment on 
Washington shore. Fish-passing facilities including 
two ladders and a fish lock are provided. Powerhouse 
was constructed for 14 units initially with substructure 
for eight additional units, an ultimate total of 22 
units. Initial installation, excluding two 13,500 
kilowatt fish-water units, is 1,092,000 kilowatts. 
With eight units installed for a capacity of 687,800 
kilowatts. The total generating capacity is 1,806,800 
kilowatts. Structures are founded on Columbia River 
basalt. 
Principal data concerning lock, spillway, and 
powerhouse are set forth in Table 28-N. 
Major construction of project initiated February 
1952, was completed October 1960 when unit No. 14 
was placed in commercial operation. Initial contract 
for additional units 15-22 was awarded in September 
1967. Additional 8-unit phase was completed when 
unit 22 was placed in commercial operation in 
November 1973. 
Basic recreation facilities were developed with 
construction funds at 4 parks on Lake Celilo. These 
parks were further expanded with code 710 funds in 
the late 60's and early 70's. Two parks are operated 
by Washington State Park Commission under a lease 
agreement. 
Studies for adding power generation facilities to 
the North Shore Fish Ladder Auxiliary Water supply 
28-24

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
System were initiated in October 1979 and completed 
in December 1980. These facilities would provide 
baseload generation (3.5 megawatts) and would not 
impact the present operation of the North Fish 
Ladder. However, it was determined that it was not 
within the Chief of Engineer's authority to add these 
power facilities. A local interest, North Wasco 
County Public Utility District pursued the construction 
of these power facilities through the FERC 
license processes and awarded a construction contract 
in September 1989. 
Seufert Visitor Center was completed in September 
1980. 
In October 1996 work began on major rehabilitation 
of powerhouse units 1-14. Work includes 
rewind of nine generators, replacement of blades on 
twelve turbine units, refurbishment of blades on two 
turbine units, and refurbishment of two bridge cranes. 
The total cost for major rehabilitation is estimated at 
$101,000,000 with completion in September 2010. 
Electrical power generation and associated revenue 
from sale of power by Bonneville Power 
Administration, the marketing agency, are shown on 
Table 28-P. 
Local cooperation. Further recreation development 
will require cost sharing and assumption of 
operation and maintenance by local, non-federal 
sponsor. 
Operations during fiscal year. Maintenance: 
Continued work on the data acquisition control 
system and installation of fish unit exciters. Completed 
Line Drop Compensation, replacement of 
4160 station service breakers, and installation of 
exciters for units 15-22. Increased activities to 
protect and enhance the anadromous fisheries in the 
Northwest were performed. Routine operation and 
maintenance continued. 
Major Rehabilitation: Continued generator rewind 
and exciter installation, initiated turbine efficiency 
testing, awarded roller gate contract, and procured an 
additional stator core. 
Environmental 
49. COLUMBIA RIVER FISH MITIGATION, 
OR AND WA 
Location. At Bonneville, The Dalles, and John 
Day Dams on the Columbia River in the states of 
Oregon and Washington. This project encompasses 
work at five other locations within Walla Walla 
District. 
Existing project. The eight Corps hydroelectric 
projects on the lower Columbia and Snake Rivers 
have been identified as a major contributing factor in 
causing mortality to migrating salmon and steelhead. 
Without adequate bypass facilities to guide juvenile 
fish away from the power turbines at the dams, 
mortalities incurred through project passage severely 
impact the commercial, recreational, and Indian 
fisheries. The Corps has recognized the need to 
reduce juvenile mortality and has undertaken bypass 
measures that include mechanized fish bypass 
systems with barge and truck transportation. Spill as 
an additional bypass route over the spillways has 
been used to divert fish from entering turbine units, 
but it is a significant adverse economic factor due to 
lost power revenues. Congress passed and the 
President signed the FY 1989 Energy and Water 
Development Appropriations Act (PL 100-371) 
which mandated the expenditure of funds for the 
design, testing, and construction of new or improved 
fish bypass facilities for the Columbia River Juvenile 
Fish Mitigation projects. Completion of the bypass 
and transportation facilities will significantly increase 
the survival of migrating downstream juvenile fish. 
The mitigation study will determine the overall scope 
of the juvenile and adult fish bypass facilities for 
these Columbia and Snake River dams. 
The plan of improvement within Portland District 
includes the following: (a) Bonneville - new juvenile 
fish monitoring facilities, and outfall relocation; (b) 
The Dalles - submerged extended fish screens and 
bypass system, new gantry crane and maintenance 
facility; (c) John Day - new juvenile fish monitoring 
facility, and planning and design for potential 
drawdown of the reservoir to minimum operating 
pool; (d) a mitigation study that analyzes long-term 
alternatives including impacts of federal Columbia 
River system and other activities on estuary habitat, 
surface bypass technology, gas abatement and 
improved turbine passage to improve fish passage 
and survival through Corps dams on the Columbia 
and Snake Rivers. 
The current fully funded total estimated Federal 
project cost is $1,386,000,000 which includes 
$778,400,000 for improvements in Walla Walla 
District, $597,817,000 in Portland District and 
$9,783,000 provided by the Bonneville Power 
Administration for design of the Bonneville juvenile 
fish monitoring facility. For information on the 
planned improvements in the upper Columbia and 
Snake Rivers, see Walla Walla District's Annual 
Report. 
Local cooperation. None required. 
Operations during fiscal year. New work: 
General: Continued to collect biological and 
hydraulic data at all projects, and develop alternatives 
to improve existing anadromous fish bypass methodology 
and systems, to reduce excess dissolved gas 
entrainment associated with use of the spillways and 
to improve turbine passage survival. 
Bonneville Dam: Completed construction of the 
juvenile fish bypass maintenance facility at the 
second powerhouse. Completed bio evaluation of the 
28-25

PORTLAND DISTRICT 
surface collection facility and extended length screen 
prototype at the first powerhouse. Initiated design 
for the juvenile fish bypass improvements at the first 
powerhouse. 
The Dalles Dam: Continued sluiceway and spillway 
juvenile survival studies in conjunction with 
development of future bypass system alternatives. 
Continued design for relocating sluiceway outfall and 
for provision of emergency auxiliary water for adult 
fishways. Initiated design of the adult south fish 
ladder channel dewatering facility. 
John Day Dam: Continued testing of extended 
length (40 ft.) bypass screens for potential replacement 
of existing 20 ft. screens associated with the 
existing juvenile bypass system. Completed Phase I 
of the John Day drawdown study. 
50. WILLAMETTE RIVER TEMPERATURE 
CONTROL, OR 
Location. At the Blue River and Cougar Lake 
projects in the McKenzie River sub-basin of the 
Willamette River basin in western Oregon. 
Project Description. Work consists of retrofitting 
the intake tower structures with movable weir intakes 
to allow modification of water temperatures downstream 
from the Blue River and Cougar projects. 
Water temperatures are currently cooler in the 
spring/summer and warmer in the fall/winter than 
pre-project conditions. This has impacted the fish 
resources in the McKenzie sub-basin, especially 
Willamette spring Chinook salmon and bull trout, 
both species of national and regional significance. 
The total project is estimated to cost $72,000,000. 
Local cooperation. None required. 
Operations during fiscal year. New work: 
Began work on diversion tunnel and gate. The first 
contract was awarded in August 2000 for the 
procurement of the gate structure and the opening of 
the diversion tunnel. 
51. ENVIRONMENTAL ACTIVITIES UNDER 
SPECIAL AUTHORIZATION 
Modifications to Structures and Operations of 
Constructed Corps Projects to Improve the 
Quality of the Environment, Pursuant to Section 
1135 of the 1986 Water Resources Development 
Act, Public Law 662, 99th Congress, as Amended. 
This program provides the authority to modify 
existing civil works projects to restore the environment. 
A non-federal entity is required to sponsor the 
project. The project must accomplish restoration by 
modifying a Corps project or operation of a Corps 
project, or be located on Corps project lands. The 
project must be feasible and consistent with the 
authorized purpose. The non-federal sponsor 
generally must assume responsibility of the operation 
and maintenance associated with the project. 
Planning studies, detailed design, and construction 
costs are shared by the Corps 75 percent and nonfederal 
sponsor 25 percent. Total project costs 
cannot exceed $6.7 million with the federal share 
limited to $5,000,000 without specific congressional 
authorization. 
See Table 28-L for expenditures under Section 
1135 during the fiscal year. 
Three projects were under construction as follows: 
Clatskanie River, OR 
Location: Near the mouth of Beaver Slough, at 
the head of Westport Slough, a side channel of the 
lower Columbia River. The site is two miles west of 
the town of Clatskanie, and about 70 road miles 
northwest of Portland, Oregon. 
Project description: The project entails reconnecting 
Westport Slough to Beaver Slough by 
placing a large 8-ft x 12-ft corrugated steel culvert 
through the levee plug. The interchange of water, 
increased flows, and increased circulation will 
improve fish habitat and water quality in Westport 
Slough and reestablish a crucial link for fish migration 
to spawning and rearing areas. Reestablishing 
the connection between the Westport Slough and 
Beaver Slough will also allow recreational boating 
access for canoes and kayaks. The are will also be 
planted with native vegetation 
Local cooperation: Columbia Soil and Water 
Conservation District, in cooperation with the Lower 
Columbia Watershed Council, signed a project 
cooperation agreement on July 25, 2000. The project 
was funded by a combination of sources including 
the Oregon Watershed Enhancement Board, the 
Washington Department of Ecology Coastal Protection 
Fund and the Lower Columbia River Estuary 
Program. 
Operations during fiscal year: Construction was 
completed on the culvert in September 2000. The 
project area will be planted with native vegetation in 
FY01. 
Fern Ridge Marsh, OR 
Location: This project modification is located at 
the Fern Ridge Lake project on the Long Tom River, 
a Tributary of the Willamette River approximately 6 
miles west of Eugene, Oregon. 
Project description: The Fern Ridge Marsh 
Restoration Project entails marsh restoration and 
management actions on 347 acres in the western 
portion of the Fisher Butte Management Unit (West 
Fisher Butte sub-unit) at Fern Ridge Lake Project. 
The restoration will restore and provide for management 
of 347 acres of marsh habitat via construction 
of 7 water control structures, 15,900 lineal feet of 
28-26

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
dikes and rock dikes (carp excluders) within the 
drawdown zone of Fern Ridge Lake Project. The 
general intent of the proposed action is the restoration 
of a more diverse and productive marsh plant 
and wildlife community in areas currently dominated 
by reed canarygrass. This species is an exotic plant 
found in extensive stands in shallow water areas 
around the reservoir perimeter. The total project 
cost, including lands, is estimated at approximately 
$540,000. 
Local cooperation: The Oregon Department of 
Fish and Wildlife signed a local cooperation agreement 
for the project on July 19, 1999. 
Operations during fiscal year: Construction 
continued from FY99. The project is substantially 
complete. However, given the short construction 
window, several small actions will continue into 
FY01. 
Lower Amazon Creek Wetlands Restoration, OR 
Location: This project modification is located 
along Amazon Creek at the western edge of the city 
of Eugene, Oregon. Amazon Creek is a major 
drainage channel for Eugene, conveying flows into 
the Long Tom River, a tributary of the Willamette 
River. 
Project description: Prior to settlement in the 
1850's, seasonal wet prairie habitat dominated the 
landscape of the lower Amazon Creek basin and 
much of the Willamette Valley. Since then, nearly 
all of this wetland type has been lost to agriculture 
and urban uses. The Amazon Creek Flood control 
Project built by the Corps in the 1950's further 
degraded the wetland hydrology when the creek and 
connecting drainages were channelized and lined 
with levees. It is estimated that less than one percent 
of the Willamette Valley's historic wet prairies 
remains today. The lower Amazon Creek Wetlands 
Project will restore the historic hydrology and 
vegetation community to almost 400 acres of wet 
prairie. All of the land within the project area is 
owned by the City of Eugene and BLM, having been 
acquired for wetland protection and restoration 
purposes. The total project cost, including lands and 
recreation facilities, is estimated at approximately 
$6.2 million. 
Phase I involves removing existing levees along 
Amazon Creek and associated drainages and 
restoring the channels more natural meandering 
stream configurations. New levees will be set back 
around the margin of the wetland restoration area to 
maintain the flood control function of the project. 
Interior wetland areas will now be subject to the high 
frequency flooding that occurred prior the flood 
control project. The new levees will be seeded with a 
combination of native upland grass species. A 
slotted weir will be constructed to maintain the 
complex flow relationship between the connected 
channels. Culverts, some gated, will also be installed 
to maintain drainage and to allow manipulation of 
surface hydrology for wetland management purposes. 
Disturbed areas along the stream channels and the old 
levee footprints will be seeded and planted with 
native wet prairie, emergent marsh and vernal pool 
species. The total cost for this phase is approximately 
$2.0 million. 
Phase II involves removal of non-native plant 
materials throughout the entire project area and 
replacement with native wet prairie plants. A major 
portion of this effort is propagation of native plants 
and seeds. Phase 11 will also include modification of 
surface hydrology through filling and restoration of 
old agricultural drainage channels draining into 
Amazon Creek. 
Phase III construction of recreation facilities will 
occur in Summer 2001. Facilities will include access 
points, viewing structures, interpretive displays and 
trails. 
Local cooperation: The City of Eugene signed a 
Project Cooperation Agreement (PCA) for the project 
on October 26, 1998. The project is also supported 
by the Bureau of Land Management under its West 
Eugene Wetlands Project. In 1999 the City of 
Eugene requested that the agreement be modified to 
include the addition of recreation facilities in 
accordance with recent Corps guidance. The 
modified PCA is scheduled to be signed in Spring 
2001. 
Operations during fiscal year: Phase I was 
completed in November 1999. Initiated construction 
of Phase 11. 
Restoration and Protection of Aquatic Ecosystems 
to Improve the Quality of the Environment, 
Pursuant to Section 206 of the Water Resources 
Development Act of 1996, Public Law 303, 104'" 
Congress, as Amended. In addition to general 
requirements, each project is limited to a Federal 
statutory expenditure of not more than $5,000,000 
per year. The non-Federal share of the costs shall be 
35 percent, however, the entire non-Federal share of 
the total project cost may be credited work-in-kind. 
See Table 28-L for expenditures under Section 
206 during the fiscal year. 
No projects were under construction during the 
FY. 
General Investigations 
52. SURVEYS 
Fiscal year costs were $1,161,676 of which - 
$1,163 was for navigation studies, $553,500 for 
Special Studies, $9,162 for comprehensive studies, 
$383,506 for miscellaneous activities, and $216,671 
for coordination with other agencies. Contributed 
28-27

PORTLAND DISTRICT 
funds in the amount of $625,761 were expended, of 
which $79,548 was contributed by the Association of 
Lower Columbia River Ports for the Columbia River 
Channel Deepening Study, $67,748 was contributed 
by the State of Oregon for the Willamette River 
Basin Review study, $100,608 was contributed by 
the City of Portland Bureau of Environmental 
Services for the Columbia Slough Ecosystem 
Restoration Study, $220,517 was contributed by 
Tillamook County for the Tillamook Ecosystem 
Restoration Study, and $157,340 was contributed for 
the Planning Assistance to States Program. 
53. COLLECTION AND STUDY OF BASIC 
DATA 
Flood Plain Management Services. Flood Plain 
Management Services Program comes under Section 
206 of the 1960 Flood Control Act, PL 86-645, as 
amended. Through technical services and planning 
guidance, the program encourages comprehensive 
flood plain management planning at all levels to 
reduce the potential for losses to life and property 
from floods. Federal and non-Federal agencies and 
the private sector are assisted with planning and 
development information for flood hazard areas. This 
assistance is in the form of local flood plain regulations, 
Federal Insurance Program requirements, and 
Executive Order 11988 guidelines. Such assistance 
may include factual flood information (available or 
determined) and interpretation on flood frequencies, 
extent of flooding, flood-water velocity, duration of 
flooding and floodway limits. 
Fiscal year costs totaling $258,420 were associated 
with the following tasks under the Flood Plain 
Management Services Program: FPMS Unit $52,317; 
Technical Services $55,188; Quick Responses 
$7,943; National Flood Proof Committee $5,252; and 
special studies $137,720. 
Hydrologic Studies. Crest stage gages were 
constructed and installed on streams in an ongoing 
program to record data from flood events. Fiscal 
year costs were $7,376 to build 80 gages. 
54. PRECONSTRUCTION ENGINEERING 
AND DESIGN 
Willamette River Temperature Control, OR 
The project plan consists of improving downstream 
water temperatures by modifying the existing 
intake towers at Cougar and Blue River projects. 
Restoring pre-project temperatures will improve 
survival rates and increase populations of three 
important native fish species: the wild stock of 
Willamette spring chinook salmon, the bull trout, and 
the rainbow trout. These fisheries once provided 
important recreational and commercial benefits to the 
region. Preconstruction engineering and design is 
estimated to cost $4,596,000 and be completed by 
March 2000. The construction phase is estimated to 
cost approximately $70.6 million. 
Continued design and geotechnical explorations 
work in support of the intake tower modifications. 
Fiscal year expenditures were $276,158. 
Columbia River Channel Improvements Study, 
OR & WA 
The project plan consists of deepening a segment 
of the Columbia and Willamette Rivers by 3 feet to 
43 feet. The project area begins at the mouth of the 
Columbia River and extends upstream to the vicinity 
of the Port of Vancouver, Washington (approximately 
river mile 105), and also includes the Lower 
Willamette River from its confluence with the 
Columbia River (river mile 101.5) upstream to the 
vicinity of downtown Portland (approximately river 
mile 11). Project cost sharing will include requirements 
for non-Federal interests to pay 25 percent of 
the project cost during construction, and an additional 
10 percent to be repaid over a period not 
exceeding 30 years. Cost of construction is estimated 
at $188,319,000. 
Fiscal year expenditures were $1,243,245 Federal 
funds and $131,481 contributed funds. 
Other 
55. FLOOD CONTROL AND COASTAL 
EMERGENCIES 
Disaster Preparedness Program. This program 
encompasses all the activities associated with 
preparing for, responding to and recovery from 
natural disasters. It includes publication of plans and 
policy documents, training, exercises, coordination 
with outside agencies and governments, maintaining 
response supplies and equipment, and the like. 
Significant activities included flood and earthquake 
response tabletop exercises for senior level leadership, 
communication exercise with hand held VHF 
radios, setting up communication equipment at 
emergency assembly sites and operation of HF SSB 
radios. Flood Fight Design workshops were 
conducted with state and local governments, with 
results presented to Association of Oregon Counties 
and professional associations. 
Public law 84-99. La Nina Climatological Event 
forecasted an unusually intense flood season with 
early arrival expected in October 1999. As a result, 
Tillamook County requested Advance Measures 
assistance to reduce damages caused during 1996 and 
1997. A project was constructed which included 12 
six-foot diameter tide gates in the Tillamook Bay 
levees, development of a log jam in the head water of 
Dougherty Slough and clearing two channels in the 
mouth of the Wilson River. The project was 
completed November 24, 1999 and the first event 
started that evening. Another flood event December 
28-28

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
16, 1999 was also reduced significantly by the 
project. The project saved an estimated $10,000,000 
in damages to the town of Tillamook and Tillamook 
County. 
Continuing Eligibility Inspections. The district 
completed all scheduled annual inspections of flood 
control works. As part of these inspections, sector 
engineers discussed and gave advice to local 
sponsors regarding their local flood plans and 
application of Public Law 84-99 as it pertains to 
them. 
Catastrophic Disaster Response Planning. This 
initiative was begun in FY98. It requires that a 
comprehensive set of Operations Plans be developed 
to cope with a subduction earthquake off the 
Oregon/Washington coast in the Richter range of 8 to 
8.5. Plans were approved by HQUSACE with 
modifications. 
See Table 28-M for expenditures during the fiscal 
year. 
28-29

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 28-A COST AND FINANCIAL STATEMENT 
See Total Cost 
Section Project Funding FY97 FY98 FY99 FY00 to 
In Text Sep.30, 2000 
1. Bonneville Navigation 
Lock, Bonneville Dam, 
OR and WA 
(Federal Funds) 
(Inland Waterway 
Trust Fund) 
2. Chetco River, OR 
3. Columbia and Lower 
Willamette Rivers 
Below Vancouver, 
WA and Portland, OR 
(Federal Funds) 
(Contributed Funds) 
4. Columbia River at 
Baker Bay, WA 
5. Columbia River 
Between Chinook, 
WA, and Head of 
Sand Island 
6. Columbia River at 
The Mouth, OR and WA 
7. Columbia River 
Between Vancouver,WA 
and The Dalles, OR 
8. Columbia River, 
Seafarers Memorial, 
Hammond, OR 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major Rehab. 
Approp 
Cost 
New Work 
Approp. 
Cost 
Maint 
Approp. 
Cost 
New Work 
Approp. 
Cost 
250,000 17,500 
459,423 34,063 
250,000 
353,704 
3,000 
7,985 
17,500 4,693,885 
30,558 4,700,058 
926 
4,186 
400,000 426,000 443,000 424,000 
393,612 432,929 443,781 423,401 
175,449,807 " 
175,439,296 ' 
180,140,385 
180,130,818 
2,043,713 ' 
2,043,713' 
10,664,673 
10,663,538 
28,349,304 2 
28,349,304 2 
22,278,000 14,280,550 16,136,000 18,265,000 424,803,846 
20,387,161 14,105,152 18.209,097 18,228,597 424,743,539 1 
665,954 
665,954 
14,000 
17,973 
13,000 
12,526 
4,000 
4,646 
14,000 1,071,000 
13,784 1,070,716 
4,000 286,000 741,000 
7,733 285,994 741,561 
2,880,000 6,325,000 6,361,500 7,133,000 
3,006,465 6,307,009 6,381,320 7,113,210 
636,000 657,000 290,000 578,000 
635,048 657,103 290,041 570,010 
941,252 
941,252 
5,745,087 
5,744,457 
220,283 
220,283 
8,651,877 
8,651,687 
24,913,661 6 
24,913,661 6 
173,335,353 ' 
173,315,169 ' 
7,322,878 
7,322,878 
5,989,509 
5,989,509" 
15,773,359' 
15,763,446 
150,000 
52,024 
28-30

PORTLAND, OREGON DISTRICT 
TABLE 28-A (Cont'd) COST AND FINANCIAL STATEMENT 
See Total Cost 
Section Project Funding FY97 FY98 FY99 FY00 to 
In Text Sep.30, 2000 
9. Coos Bay, OR 
(Federal Funds) 
Contributed Funds) 
10. Coquille River, OR 
11. Depoe Bay, OR 
12. Port Orford, OR 
13. Rogue River Harbor 
At Gold Beach, OR 
14. Siuslaw River, OR 
(Federal Funds) 
(Contributed Funds) 
15. Skipanon Channel, OR 
New Work 
Approp. 
Cost 
Maint 
Approp. 
Cost 
Major Rehab 
Approp. 
Cost 
New Work 
Contrib 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major Rehab 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major Rehab 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
4,407,000 
4,413,093 
3,006,000 
3,018,236 
1,730,000 
1,724,174 
849,000 
24,288 
3,181,000 
3,182,478 
637,000 
47,439 
868,554 
5,678,200 
5,666,808 
471,853 
4,647,( 
4,649,( 
49, 
329,000 127,000 224,000 133,000 
325,948 130,912 224,184 130,982 
3,000 32,000 
10,925 30,512 
10,000 233,000 
12,741 231,484 
411,000 509,000 767,000 446,000 
439,767 511,626 768,999 430,018 
898,000 1,072,000 87,000 557,000 
909,712 993,486 165,547 563,828 
198,000 283,000 262,000 297,000 
230,940 279,350 267,734 291,933 
132,000 189,000 159,000 1,273,000 
158,565 189,237 159,623 1,272,419 
37,866,092 " 
37,866,092 '" 
000 119,235,918 " 
648 119,222,553 " 
2,335,966 
2,335,966 
--- 3,986,680 
739 3,911,796 
693,366 ' 
693,366 12 
9,087,987 " 
9,085,857 " 
367,364 
367,364 
1,990,717 
1,988,725 
758,692 '" 
758,692 1 
7,627,217 
7,608,733 
4,156,252 " 
4,156,252 '" 
19,843,394 '6 
19,842,082 16 
635,783 
635,783 
29,502,212 17 
29,502,212 ,7 
17,559,384 '" 
17,554,272 Im 
879,285 
879,285 
493,611 
493,611 
280,854 
280,854 
5,416,064 
5,415,264 
28-31

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 28-A (Cont'd) COST AND FINANCIAL STATEMENT 
See Total Cost 
Section Project Funding FY97 FY98 FY99 FY00 to 
In Text Sep.30, 2000 
16. Tillamook Bay and 
Bar, OR 
17. Umpqua River, OR 
18. Willamette River at 
Willamette Falls, OR 
19. Yaquina Bay and 
Harbor, OR 
20. Yaquina River, OR 
24. Applegate Lake, 
Rogue River Basin 
OR 
25. Blue River Lake, OR 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major Rehab. 
Approp 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Minor Rehab 
Approp 
Cost 
New Work 
Approp. 
Cost 
Maint 
Approp. 
Costl 
Major Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
3,000 
4,981 
5,000 21,000 297,000 
8,807 21,804 292,250 
436,000 1,392,000 977,000 716,000 
443,911 1,393,683 976,853 707,546 
786,000 690,000 487,200 552,000 
696,184 865,491 498,267 553,632 
2,487,000 2,268,000 6,410,000 644,650 
2,499,188 2,259,405 6,420,500 639,447 
-278,000 -67,000 
-118,579 -65,116 913 
837,000 769,000 807,000 837,800 
835,902 755,008 818,099 825,496 
230,000 251,000 215,000 192,000 
250,095 246,491 220,207 201,315 
28-32 
22,434,827 19 
22,434,827 '" 
7,103,082 20 
7,097,712 21 
2,839,799 
2,839,799 
17,718,877 2) 
17,718,877 2 
35,321,093 
35,357,088 
2,500,677 
2,500,677 
520,005 22 
520,005 11 
24,892,018 2" 
24,888,894 23 
234,794 
234,794 
19,242,046 24 
19,242,046 24 
51,226,408 2 
51,220,118 2 
12,005 
12,005 
28,800 
28,800 
1,463,694 " 
1,463,694 5 
91,642,489 
91,642,489 
11,168,915 a 
11,147,026 
32,038,225 2, 
32,038,225 26 
4,870,299 
4,869,227 53

PORTLAND, OREGON DISTRICT 
TABLE 28-A (Cont'd) COST AND FINANCIAL STATEMENT 
See Total Cost 
Section Project Funding FY97 FY98 FY99 FY00 to 
In Text Sep.30, 2000 
26. Cottage Grove Lake, OR 
27. Dorena Lake, OR 
28. Elk Creek Lake, 
Rogue River Basin, OR 
29. Fall Creek Lake, OR 
30. Fern Ridge Lake, OR 
(Federal Funds) 
(Contributed Funds) 
31. Lower Columbia River Basin 
Bank Protection, OR & WA 
(Federal Funds) 
(Contributed Funds) 
32. Mt. St. Helens 
Sediment Control, WA 
(Federal Funds) 
(Contributed Funds) 
33. Scappoose Drainage 
District, OR 
34. Willamette River 
Basin Bank Protection, OR 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint 
Approp 
Cost 
931,000 696,000 819,000 941,000 
954,616 680,606 828,078 959, 180 
458,000 935,000 653,000 562,200 
482,749 893,215 700,441 570,537 
473,000 
1,203,214 
74,000 302,000 454,000 
887,209 495,882 413,224 
583,000 1,175,000 432,000 583,200 
601,053 1,131,573 467,066 595,746 
1,324,000 1,210,000 807,700 1,054,000 
1,343,905 1,165,721 856,142 1,060,382 
130,000 -10,000 
111,318 28,260 
10,200
0 
25,000 
10,160 
3,650
00 
322,000 
9,624 
104,250 
6,635 
34,000 300,000 840,000 
57,549 243,182 707,866 
1,364,000 308,000 281,100 227,000 
1,390,176 311,026 304,912 224,989 
161,000 
2,517 
30,000 
18,600 
805,000 
881,075 
0 
116,030 
-10,000 
7,227 
181,000 
198,469 
-29,000 
11,382 
2,790 
355,000 
351,834 
-2,071 
4,013,123 27 
4,013,123 " 
18,020,288 2, 
18,017,053 2, 
14,568,262 29 
14,568,262 29 
12,021,660 
12,018,199 
109,853,579 
109,682,990 
22,118,264 ' 
22,118,264 '" 
11,556,871 
11,555,857 
8,685,635 " 
8,685,635 * 
24,545,898 12 
24,542,204 12 
52,666 
52,666 
21,524,745 
21,201,868 
114,450 
6,635 
112,868,000 
112,677,907 
3,703,112 
3,703,112 
4,500,100 
4,497,561 
4,121,487 
4,121,487 
--- 24,971,816 "' 
24,971,325 33 
209,000 5,907,709 
120,425 5,815,802 
28-33

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 28-A (Cont'd) COST AND FINANCIAL STATEMENT 
See Total Cost 
Section Project Funding FY97 FY98 FY99 FY00 to 
In Text Sep.30, 2000 
35. Willow Creek Lake, OR 
39. Bonneville Lock and 
Dam - Lake Bonneville 
OR and WA 
40. Columbia River Treaty 
Fishing Access Sites, 
OR & WA 
41. Cougar Lake, OR 
42. Detroit Lake - 
Big Cliff, OR 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Minor Rehab 
Approp 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major Rehab. 
Approp. 
Cost 
43. Green Peter-Foster 
Lakes, OR 
44. Hills Creek Lake, OR 
45. John Day Lock and 
Dam - Lake Umatilla, 
OR and WA 
528,000 530,000 555,000 608,000 
536,019 512,150 581,009 607,151 
718,000 
676,103 
15,894,000 
15,966,594 
7,140,000 
6,944,705 
70,000 
96,720 
16,114,000 
15,637,786 
10,960,000 
11,092,955 
32,396 
50,475 
16,604,100 
17,009,763 
13,238,604 
12,870,401 
-659 
8,972 
17,814,100 
17,744,149 
16,864,731 
15,281,432 
2,729,000 7,460,079 7,774,442 6,717,000 
2,538,734 6,520,182 8,797,936 6,466,146 
1,443,000 1,272,000 1,366,200 1,027,400 
1,456,129 1,217,890 1,416,843 1,055,993 
2,107,000 2,537,000 2,538,200 2,600,000 
2,410,295 2,406,655 2,660,104 2,637,380 
2,828,000 2,683,000 2,929,600 3,154,800 
2,823,012 2,643,533 2,953,897 3,170,392 
668,000 743,000 901,900 808,100 
672,351 728,183 914,229 811,394 
11,850,000 
12,122,437 
1,591,000 
720,230 
12,427,000 13,386,500 15,485,1 
12,196,731 13,530,020 14,710,d 
889,761 4,463 
37,260,114 
37,260,114 
8,017,051 
8,009,597 
789,836,341 14 
789,836,341 3' 
333,769,863 " 
333,366,445 3 
77,154,335 
75,034,616 
30,417,521 
29,695,173 
58,636,393 16 
58,636,393 ' 
24,800,796 ' 
24,798,276 
62,729,698 
62,729,698 
50,948,807 41 
50,941,684 4' 
363,086 
363,086 
84,005,788 7 
84,005,788 31 
52,918,103 1 
52,884,540 * 
45,700,619 
45,700,619 
16,556,375 " 
16,553,560 " 
512,400,246 
512,400,246 
150 248,769,377 
742 247,820,831 
--- 44,005,128" 
--- 44,005,128 
28-34

PORTLAND, OREGON DISTRICT 
TABLE 28-A (Cont'd) COST AND FINANCIAL STATEMENT 
See Total Cost 
Section Project Funding FY97 FY98 FY99 FY00 to 
In Text Sep.30, 2000 
46. Lookout Point - Dexter New Work 
Lakes, OR Approp. 88,238,395 2 
Cost 88,238,395 * 
Maint. 
Approp. 6,109,000 4,663,000 4,402,500 4,245,000 91,557,032 " 
Cost 5,593,477 5,257,357 4,747,792 4,276,796 91,522,955 * 
47. Lost Creek Lake, New Work 
Rogue River Approp. 136,408,150 
Basin, OR Cost 136,408,150 
Maint 
Approp. 3,831,000 3,988,000 3,910,300 4,254,100 64,480,018 4 
Cost 3,864,327 3,820,931 4,050,722 4,228,512 64,404,668 4" 
48. The Dalles Lock and New Work 
Dam - Lake Celilo, Approp. 303,260,288 " 
WA and OR Cost 303,260,288 " 
Maint. 
Approp. 11,820,000 11,728,000 12,323,000 12,538,500 226,190,170 U 
Cost 12,609,899 11,614,994 12,508,235 12,313,384 225,880,563 w, 
Major Rehab. 
Approp. 1,893,000 4,637,000 5,560,000 4,272,000 16,362,000 
Cost 1,741,337 4,297,713 5,741,481 4,171,644 15,952,175 
49. Columbia River New Work 
Fish Mitigation, Approp. 47,391,000 57,719,000 58,749,000 31,625,000 256,070,000 52 
OR and WA Cost 44,279,324 58,545,415 49,673,014 39,759,406 252,438,002 52 
50. Willamette River New Work 
Temperature Control, OR Approp. 3, 181,000 3,181,000 
Cost 2,227,934 2,227,934 
Footnotes: 
I. Excludes $17,742 contributed funds for new work. 
2. Includes $1,529,413 for previous project. 
3. Includes $150,955 allotted from deferred maintenance funds, Code 700, $62,296 for public works accelerated program repair, and $1,214,865 for previous 
project.Excludes $24,320 expended from contributed funds prior to 1964. 
4. Excludes $31,636 contributed by city of Astoria and Bumble Bee Sea Foods, Astoria, OR (not part of regular project). Includes $223,026 expended from 
contributed funds prior to 1964 and $428,136 contributed by Port of Portland and $14,792 by Port of Vancouver. 
5. Includes $84,930 rehabilitation funds. 
6. Includes $1,986,253 for previous project and $608,111 allotted and expended under Code 710, recreation facilities at completed project. Excludes 
$500,000 contributed funds. 
7. Includes $2,186,000 for previous project and $1,188,625 under deferred maintenance, Code 700. 
8. Includes funds under Code 721 (small authorized projects) $30,393. Entrance to Oregon slough; $161,897, Camas-Washougal Turning Basin; $227,908, 
Hood River Small Boat Basin; $157,470, Bingen, WA, Barge Channel; and $140,619, The Dalles Small Boat Basin. 
9. Includes $2,033,408 under code 700 (Deferred Maintenance). 
10. Includes $802,096 for previous project. Excludes contributed funds. 
11. Includes $178,801 for previous project and $1,444,640 under Code 700, Deferred Maintenance. Excludes $8,387 contributed funds. 
12. Includes $340,726 for previous project. Excludes $72,891 contributed funds. Includes $36,000 under Code 71 1. 
13. Includes $41,467 for previous project and $78,500 under Code 700, Deferred Maintenance. 
14. Excludes $9,900 contributed funds 
15. Excludes $13,779 (other funds) contributed for additional landfill and extension of drainage lines. 
16. Includes $21,000, Wedderbumrn Study Funds. 
17. Includes $1,159,357 for previous project. 
18. Includes $10,611 for previous project and $188,000 under code 700, Deferred Maintenance. 
19. Includes $77,209 for previous project and $57,767 under Code 720 (Small Authorized Projects) Garibaldi Boat Basin. Excludes $592,622 contributed 
funds and $300,000 channel dredging by local interest. 
20. Includes $71,498 for previous project. Excludes $6,450 expended from contributed funds. 
28-35

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 28-A (Cont'd) COST AND FINANCIAL STATEMENT 
See Total Cost 
Section Project Funding FY97 FY98 FY99 FY00 to 
In Text Sep.30, 2000 
Footnotes (Cont'd) 
21. Includes $39,242 for previous project. Excludes $6,450 expended from contributed funds. 
22. Excludes $300,000 contributed funds. 
23. Includes $452,110 on operation and care from permanent indefinite appropriation and $150,000 under maintenance and operation of dams and other 
improvements of navigable waters. 
24. Includes $707,313 for previous project and $170,000 appropriated from public works acceleration program for north jetty rehabilitation. 
25. Includes $6,026 for previous project. 
26. Includes $96,000 pro rata share of site selection costs in lieu of Quartz Creek Lake. 
27. Includes $1,639,828 allotted and expended under Code 710, recreation facilities at completed project. 
28. Includes $167,878 special recreation use fees. Includes $101,262 under maintenance and operation of dams and other improvements to navigable waters. 
29. Includes $1,038,790 allotted and expended under Code 710, recreation facilities at completed project. 
30. Includes $1,026,264 allotted and expended under Code 710, recreation facilities at completed project. 
31. Includes $3,894,673 allotted and expended under Code 710, recreation facilities at completed project and $136,482 allotted under 721 (small authorized 
project) reservoir modification. Excludes $2,100 (other funds contributed). 
32. Includes $9,750 allotted under Code 700, deferred maintenance. Includes $66,678 under maintenance and operation of dams and other improvements to 
navigable waters. 
33. Excludes $93,733 contributed funds. 
34. Includes $12,200,000 Public Works Administration funds, $20,240,700 National Recover Act Funds, $27,195,400 modification for peaking funds, 
$136,457 Code 710, recreation facilities at completed project funds and $6,000 power units funds. 
35. Includes $540,000 deferred maintenance funds, Code 700 and $1,692,148 maintenance and operation of dams and other improvements of navigable 
waters. Excludes 96-89X4045 funds. 
36. Includes $96,000 pro rata share of site selection costs in lieu of Quartz Creek Lake. Includes $1,789,988 allotted and $1,789,954 expended for Strube Lake 
and Cougar Additional Unit. 
37. Includes $113,000 pro rata share of site selection costs in lieu of Quartz Creek Lake. 
38. Includes $983,934 under maintenance and operation of dams and other improvements of navigable waters. Excludes 96-89X4045 funds 
39. Includes $82,408 under maintenance and operation of dams and other improvements of navigable waters. Excludes 96-89X4045 funds. 
40. Includes $25,984 allotted and expended under 710, recreation facilities at completed projects. 
41. Includes $1,361,900 for O&M and fish evaluation of Spring Creek Hatchery (funds revoked and paid to USFWS at OCE level, but a cost to project); 
includes $423,800 special recreation use fees. Includes $933,438 under maintenance and operation of dams and other improvements of navigable waters. 
Excludes 96-89X4045 funds. 
42. Includes $457,611 allotted and expended under 710, recreation facilities at completed projects. 
43. Includes $991,562 under maintenance and operation of dams and other improvements of navigable waters. Excludes 96-89X4045 funds. 
44. Includes $978,478 under maintenance and operation of dams and other improvements of navigable waters. Excludes 96-89X4045 funds. 
45. Includes $1,140,747 allotted and expended under 710, recreation facilities at completed projects, and $52,997,220 allotted and expended additional units 
15 -22 funds. 
46. Includes $721,490 under maintenance and operation of dams and other improvements of navigable waters. Excludes 96-89X4045 funds. 
47. Includes $936,376 under maintenance and operation of dams and other improvements of navigable waters. Excludes 96-89X4045 funds. 
48. Includes $66,678 under maintenance and operation of dams and other improvements of navigable waters. 
49. Includes $861,852 under maintenance and operation of dams and other improvements of navigable waters. Excludes 96-89X4045 funds. 
50. Includes $24,307 under code 422 General Investigation. 
51. Excludes $3,000 contributed funds. 
52. Excludes 96-89X4045 funds. 
53. Includes $15,694 under maintenance and operation of dams and other improvements of navigable waters. 
54. Excludes 96-89X4045 funds. 
28-36

PORTLAND, OREGON DISTRICT 
TABLE 28-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
BONNEVILLE NAVIGATION LOCK, 
BONNEVILLE DAM, OR AND WA 
Aug 15, 1985 Construction of a new navigation lock just south 
of existing lock. 
Nov 17, 1986 Construction to be funded 50% from fuel taxes paid 
into Inland Waterways Trust Fund. 
CHETCO RIVER, OR 
Mar 02, 1945 To provide for the stabilization of the channel, by 
constructing jetties and dredging. 
Oct 27, 1965 Modification of channel entrance and channel 
improvements. 
Dec 04, 1981 Deepen channel 2 feet to 16 feet, extend the 
existing jetty S. system 750 feet for the North, and 
1,250 feet for the South jetty. 
Oct 31, 1992 Assume responsibility for O&M of the approximately 
200-foot-long access channel to the south commercial 
boat basin consistent with authorized project depths. 
COLUMBIA AND LOWER WILLAMETTE RIVERS 
BELOW VANCOUVER, WA AND PORTLAND, OR 
Feb 27, 1911 2 pipeline dredges and accessories. 
Jul 25, 1912 Increasing main channel to 30 feet. 
Jul 27, 1916 Consolidating improvement below Portland, OR and 
between Vancouver, WA and mouth of Willamette. 
Aug 08, 1917 For the Cathlamet channel. 
Sep 22, 1922 Construct an additional dredge 
(dredge was not built) and accessories for better 
maintenance, and construct 
contraction works. 
Mar 04, 19232 Channel from deep water in Willamette Slough to deep 
water in Columbia River. 
Mar 03, 1925 Depth of 25 feet.and width of 300 feet from mouth of 
Willamette River to Vancouver, WA. 
Mar 03, 1927 Closing east channel at Swan Island in Willamette River 
on condition that main channel to be opened to project 
dimensions on west side of island by Port of Portland. 
Jul 03, 1930 For a 35-foot channel 500 feet wide from Portland to 
the sea. 
Sep 06, 1933 , A channel 28 feet deep and 300 feet wide 
from mouth of Willamette River to Vancouver, 
with 2 turning basins, each generally 28 feet deep by 
800 feet wide by 2,000 feet long. 
Aug 30, 1935 A channel in Columbia River from mouth of Willamette 
to interstate highway bridge at Vancouver, WA, 
30 feet deep and 300 feet wide, with 2 turning 
basins at Vancouver. 
Aug 30, 1935 Maintenance of not to exceed 35 foot depth at low water 
in Portland Harbor and Willamette River between its 
mouth and Broadway Bridge at Portland. 
P.L. 99-88 
P.L. 99-662 
H. Doc. 817 ,77th 
Cong., 2d Sess 
S. Doc. 21, 89' 
Cong., Ist Sess. 
Doc. 10, 96th Cong., Ist Sess. 
P.L. 102-580, 102nd Cong. 
H. Doc. 1278, 61 st Cong., 3d 
Sess.' 
H. Doc. 1278, 61st Cong., 3d 
Sess.' 
No Prior Report 
H. Doc. 120, 63d Cong., Ist Sess.' 
H. Doc. 1009, 66th Cong., 3d 
Sess. 
H. Doc. 156, 67th Cong., 2d Sess. 
H. Doc 126, 68th Cong., Ist Sess. 
Rivers and Harbors 
Committee Doc. 10 
69th Cong., 2d Sess. 
H. Doc. 195, 70th Cong., 
I st Sess. and Rivers and Harbors 
Committee Doc. 8, 71st Cong., 
Ist Sess.' 
H. Doc. 249, 72d Cong., 
2d Sess.' 
Rivers and Harbors 
Committee Doc. 1, 
74th Cong., Ist Sess. 
Rivers and Harbors 
Committee Doc. 6, 
73d Cong., Ist Sess. l 
28-37 
2.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 28-B (Cont'd) AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Aug 30, 1935 Auxiliary channels, 30 feet deep, 300 feet and 500 
feet at St. Helens. 
Aug 26, 1937 Extension of lower turning basin at Vancouver, WA, 
1,000 feet downstream. 
4. 
Dec 11, 1933 
Aug 30, 1935 
Mar 02, 1945 
May 17, 1950 
COLUMBIA RIVER AT BAKER BAY, WA 
East Channel 
Main channel 
West channel 8 feet deep. 
West channel 10 feet deep and mooring basin with 
protecting breakwaters. 
COLUMBIA RIVER BETWEEN CHINOOK, WA 
AND HEAD OF SAND ISLAND 
Jun 20, 1938 Channel 8 feet deep. 
Doc. 50,75th Cong., 2d Sess. 
Sep 03, 1954 Channel 10 feet deep and mooring basin. 
COLUMBIA RIVER AT THE MOUTH, OR AND WA 
Mar 03, 1905 Extend South Jetty and construct North Jetty and dredging. 
Dec 22, 1944 Construction, operation, and maintenance of recreation 
facilities. 
Sep 03, 1954 Bar channel of 48-foot depth and spur jetty on 
north shore. 9 
Jul 30, 1983 Deepening the northernmost 2,000 feet of the channel 
cross section to 55 feet. 
May 24, 1995 Lower a 500' section of south jetty at river mile 7. 
H. Doc. 235, 72d Cong., Ist Sess.' 
Rivers and Harbors 
Committee Doc. 81, 
74th Cog, 2d Sess 
Public Works Administration 
H. Doc. 44, 73d Cong., Ist Sess. 
H. Doc. 443, 76th Cong., Ist Sess. 
S. Doc. 95, 81st Cong., Ist Sess. 
Rivers and Harbors Committee 
S. Doc. 8, 83d Cong.,lst Sess. 
H. Doc. 94, 56th Cong., Ist Sess. 
Sec. 4, Flood Control 
Act of 1944 as amended 
H. Doc. 249, 83d Cong., 2d Sess. 
P.L. 98-63 
Sec. 1135, P.L. 99-662, 
as amended 
COLUMBIA RIVER BETWEEN VANCOUVER, WA, 
AND THE DALLES, OR 
Aug 26, 1937 Construct a channel 27 feet deep by 300 feet from H. Committee Doc. 94, 
Vancouver, WA, to Bonneville, OR. 74th Cong., 2d Sess.l 
Mar 02, 1945 Construct Camas-Washougal turning basin. H. Doc. 218, 76th Cong., Ist Sess. 
Jul 24, 1946 Construct a channel 27 feet deep by 300 feet wide H. Doc. 704, 79th Cong., 2d Sess, 
from Bonneville, OR, to The Dalles, OR. 
Jul 24, 1946 Construct a boat basin at Hood River, OR, 10 feet deep, H. Doc. 704, 79th Cong., 2d Sess. 
500 feet wide, by 1,300 feet long. 
Jul 24, 1946 Construct a barge channel at Bingen, WA, 10 feet deep, H. Doc. 704, 79th Cong., 2d Sess. 
200 feet wide, by 1 mile long, and an access channel 
7 feet deep, 100 feet wide, by 1,000 feet long to natural 
mooring basin. 
Jul 24, 1946 Construct The Dalles Harbor 8 feet deep, 400 feet wide S. Doc. 89, 79th Cong., I st Sess. 1 
by 800 feet long. 
28-38 
5. 
6. 
7.

PORTLAND, OREGON DISTRICT 
TABLE 28-B (Cont'd) AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Proiect and Work Authorized Documents 
COLUMBIA RIVER, SEAFARERS MEMORIAL, 
HAMMOND, OR 
Nov 5, 1990 Engineering, design, acquisition and construction of a 
support structure to serve as the foundation for the 
Seafarer's Memorial in the Columbia River, in 
cooperation with the City of Hammond, Oregon. 
Jun 25, 1910 
Mar 02, 1919 
Sep 22, 1922 
COOS BAY, OR 
Dredging the Ocean Bar Channel. 
A channel 22 feet deep to Smith's Mill. 
Restore North Jetty 9,600 feet long, construct a South 
Jetty about 3,900 feet long, extend 22-foot bay channel 
from Smith's Mill to Millington. 
Jan 21, 1927 Extend jetties to such lengths as may be practicable 
within estimate of total cost of jetties, $3,250,000 given 
in H. Doc. 150, 67th Cong. 
Jul 03, 1930 A channel 24 feet deep and 300 feet wide, through 
Pigeon Point Reef, following a location along westerly 
side of bay. 
Aug 30, 1935 For 24-foot channel from Pigeon Point Reef to 
Smith's Mill and a turning basin above Marshfield. 
Jul 24, 1946 Increased dimensions of channel across bar and to 
Isthmus Slough and turning basin opposite Coalbank 
Slough and at city of North Bend; anchorage basins at 
mile 3.5 and near mile 7. 
Jun 30, 1948 A mooring basin and connecting channel at Charleston. 
Dec 31, 1970 Increase dimensions to provide for bar channel 45 feet 
deep, inner channel 35 feet deep to mile 15, and 
deepening and widening existing turning basins and 
anchorage area. 
Nov 13, 1995 Deepening the authorized channel by 2 feet and 
expanding one turningbasin. The entrance would 
be 47 feet deep to River Mile (RM) 1 and the 
inner channel 37 feet between RM 1 and 15. 
Aug 26, 1937 An auxiliary channel 24 feet deep 
and 200 feet wide along waterfront at Rainier, OR. 
Mar 02, 1945 Improvement of old mouth of Cowlitz River. 
Mar 02, 1945 
Jul 24, 1946 
Oct 23, 1962 
An auxiliary channel in vicinity of Longview, WA. 
A small-boat mooring basin at Astoria, OR. 
A channel 35 feet deep and 500 feet wide from 
mouth of Willamette River to interstate highway 
bridge at Vancouver, WA, with 2turning basins of 
same depth. 
Oct 23, 1962 A channel 40 feet deep and 600 feet wide from at 
Vancouver, WA, to mouth of Columbia River; 
a turning basinVancouver, WA, a turning basin at 
Longview, WA, and a channel 40 feet deep in 
Willamette River from mouth to Broadway Bridge 
which encompasses Portland Harbor area. 
Aug 17, 1999 Deepen the existing navigation channel by three feet. 
P. L. 101-514; H. R. 101-889, 
101st Cong, 2d Sess. 
H. Doc. 958, 60th Cong., I st Sess. 
H. Doc. 325, 65th Cong., Ist Sess. 
H. Doc. 150, 67th Cong., 2d Sess. 
H. Doc. 320, 69th Cong., Ist Sess. 
H. Doc. 110, 70th Cong., 
Ist Sess.' 
S. Committee Print, 
73d Cong., 2d Sess. I 
S. Doc. 253, 79th Cong., 2d Sess. 
H. Doc 646, 80th Cong.,2nd Sess. 
H. Doc. 151, 91st Cong., 2d Sess. 
P.L. 104-46 
H. Doc. 203, 75th Cong., 
1st Sess.I 
H. Doc. 341, 77th Cong., 
I st. Sess.' 
H. Doc. 630. 77th Cong., 2d Sess.' 
H. Doc. 692, 79th Cong.,2d Sess.' 
H. Doc. 203, 87th Cong., Ist Sess. 
H. Doc. 452, 87th Cong., 2d Sess.' 
P.L. 106-53 
28-39 
9.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 28-B (Cont'd) AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
COQUILE RIVER, OR 
Jun 25, 1910 Dredging shoals between mouth and Riverton, and 
removing obstruction between mouth of North Fork 
and Bandon. 
Mar 02, 1919 For a 13-foot channel from ocean to Bandon. 
Jul 03, 1930 Deepen channel to 16 feet between sea and eastern end 
of North Jetty. 
Aug 30, 1935 Present project depth between sea and eastern end of 
North Jetty. 
Dec 22, 1944 Construction, operation, and maintenance of 
recreation facilities. 
Mar 02, 1945 For 13-foot depth from sea to a point I mile above 
Coquille River Lighthouse and snagging to 
State Highway Bridge. 
H. Doc. 673, 61st Cong., 2d Sess. 
H. Doc. 207, 65th Cong.,lst Sess.' 
H. Doc. 186, 70th Cong., Ist Sess. 
S. Committee Print, 
74th Cong., Ist Sess. 
Sec. 4, Food Control 
Act of 1944 as amended 
H. Doc. 672, 76th Cong., 2d Sess.' 
DEPOE BAY, OR 
Aug 26, 1937 Construction of an inner basin 375 feet long, 125 feet wide H. Doc. 202, 75th Cong. 
and 5 feet deep, with an entrance channel of same depth I st Sess. 
and 30 feet wide. 
Mar 2, 1945 Construction of an inner basin 750 feet long, 390 feet wide H. Doc. 350, 77th Cong. 
and 8 feet deep, with entrance channel at same depth and Ist Sess. 
30 feet wide. 
July 14, 1960 Construction of entrance channel 8 feet deep and Sec. 107 of R&H Act 1960, 
approved 50 feet wide, concrete breakwater and. Feb. 1965. 
stone spending beach 
PORT ORFORD, OR 
Oct 27, 1965 Extension of existing breakwater by 550 feet. 
Dec 31, 1970 Dredging of turning basin 340 feet long, 100 feet wide, 
16 feet deep. 
Oct 3 1, 1992 Maintain the authorized navigation channel including 
those portions of the channel within 50 feet of the 
port facility. 
ROGUE RIVER HARBOR AT GOLD BEACH, OR 
Sep 03, 1954 Two jetties at entrance and improvement of channel. 
SIUSLAW RIVER, OR 
Sep 19, 1890 Build two high-tide stone jetties. 
Jun 25, 1910 Extends North Jetty 3,700 feet from old work constructed 
under previous project and provides for 4,200 foot 
south jetty. 
Mar 03, 1925 12-foot deep channel. 
Jul 03, 1958 18-foot bar channel and 16-foot river channel and 
a 600-foot extension of north Jetty. 
(600-foot extension classified deferred.) 
Oct 22, 1976 Phase I advance engineering and design for north 
and south jetty extensions. 
Oct 01, 1980 Extending north and south jetties about 2,000 and 
2,500 feet, respectively. 
S. Doc. 62, 88th Cong.,2d Sess 
H. Doc 151, 91st Cong.,2d Sess. 
P.L. 102-580, 102nd Cong. 
S. Doc. 83, 83d Cong. 2d Sess. 
H. Doc. 71, 51st Cong., Ist Sess. 
H. Doc. 648, 61st Cong., 2d Sess. 
S. Committee Print, 
Serial, 68th Cong., Ist Sess. 
H. Doc. 204, 85th Cong.,lst Sess.' 
Final Report of Chief 
of Engineers 
P.L. 96-367 
28-40 
II. 
12. 
13. 
14. 
10

PORTLAND, OREGON DISTRICT 
TABLE 28-B (Cont'd) AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
SKIPANON CHANNEL, OR 
Jul 03, 1930 Channel from deep water in Columbia River to railroad 
bridge, 30 feet deep. 
Aug 26, 1937 Channel extending upstream from railroad bridge a 
distance of 4,500 feet. 
Jun 30, 1948 Mooring basin 12 feet deep at Warrenton. 
TILLAMOOK BAY AND BAR, OR 
Jul 26, 1912 Construct North Jetty 5,700 feet long and dredging 
Mar 04, 1913 channel 16 feet deep, 200 feet wide, to Bay City. 
Mar 02, 1919 Abandon that portion of project above Bay City. 
Mar 03, 1925 Abandon Bay City Channel and present project x 
(600-foot extension classified of channels and turning 
basins with regulating works as needed. 
Mar 02, 1945 Repair damage and check erosion on Bayocean 
Peninsula caused by storm Jan. 1939. 
Jun 30, 1948 Dredging small-boat basin and approach at 
Garibaldi, OR, to depth of 12 feet. 
Sep 03, 1954 Closure of breach in Bayocean Peninsula. 
Oct 27, 1965 Construct South Jetty, 8,000 feet long. 
17. UMPQUA RIVER, OR 
Sep 22, 1922 North Jetty, 7,500 feet long 
Jan 21, 1927 Present project dimensions of North Jetty and dredging 
ocean bar. 
Jul 03, 1930 A short south jetty 
Aug 30, 1935 A full length south jetty and maintenance dredging 
to a 26-foot depth. 
Jun 20, 1938 Channel 22 feet deep and 200 feet wide from mouth 
to Reedsport. 
Mar 02, 1945 Channel 22 feet deep and 200 feet wide from river 
channel to Gardiner, and turning basin 22 feet deep, 
500 feet wide and 800 feet long. 
Mar 02, 1945 Channel 10 feet deep and 100 feet wide from river 
channel to dock in Winchester Bay with mooring and 
turning basin 10 feet deep, 175 feet wide , and 300 feet 
long at inner end. 
Jun 30, 1948 Channel 12 feet deep and 100 feet wide from river 
channel to dock in Winchester Bay with mooring and 
turning basin 12 feet deep, 175 feet wide, and 300 feet 
long at inner end. 
Sep 03, 1954 Channel 12 feet deep, Scholfield River. 5 
H. Doc. 278, 70th Cong., Ist Sess.' 
H. Doc. 201, 75th Cong., Ist Sess. 
S. Doc. 93, 80th Cong., Ist Sess.' 
H. Doc. 349, 62d Cong., 2d Sess. 
H. Doc. 760, 65th Cong., 2d Sess 
H. Doc. 562, 68th Cong., 2d Sess. 
S. Doc. 35, 79th Cong., 1st Sess.) 
H. Doc. 650, 80th Cong., Ist Sess. 
S. Doc. 128, 83d Cong., 2d Sess.1 
S. Doc. 43, 89th Cong., 1st Sess.' 
H. Doc. 913, 65th Cong., 2d Sess. 
H. Doc. 320, 69th Cong., Ist Sess. 
H. Doc. 317, 70th Cong., Ist Sess' 
Rivers and Harbors Committee 
Doc. 9,72d Cong., Ist Sess. 
S. Doc. 158, 75th Cong.,3d Sess.' 
S. Doc. 86,76th Cong., Ist Sess.' 
S. Doc. 191, 77th Cong., 2d Sess.' 
S. Doc. 154, 80th Cong., 2d Sess.' 
S. Doc. 133, 81st Cong., 2d Sess.' 
WILLAMETTE RIVER AT WILLAMETTE FALLS, OR 
Jun 25, 1910 For purchase and rehabilitation of system and H. Doc. 202, 56th Cong., Ist Sess. 
construction of concrete division wall. and Annual Report, 1900, P. 4374 
Aug 08, 1917 Deepening of locks. H. Doc. 1060, 62d Cong., 3d Sess.' 
Jun 26, 19346 Operation and care of canal and locks provided for with 
funds from War Department appropriations for Rivers 
and Harbors. 
Mar 02, 1945" Construction of New Willamette Falls Locks. H. Doc. 544, 75th Cong.,3d Sess. 
28-41 
15. 
16. 
18.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 28-B (Cont'd) AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
YAQUINA BAY AND HARBOR, OR 
Mar 02, 1919 Restoration and extension of jetties constructed under H. Doc. 109, 65th Cong., 
previous projects, rock removal at entrance, and Ist Sess. 
dredging in bay up to railroad terminus at Yaquina. 
Aug 26, 1937 Extension of north jetty seaward 1,000 feet. S. Committee Print, 75th Cong., 
Ist Sess. 
Mar 02, 1945 26-foot channel of suitable width across entrance bar, S. Doc. 119, 77th Cong., Ist Sess.' 
as far as rock bottom will allow, a 20-foot channel 
300 feet wide along south side of bay to and including 
a turning basin 22 feet deep, 1,000 feet wide and 
1,200 feet long. 
Jul 24, 1946 Construct a small-boat mooring basin at Newport, OR. S. Doc. 246, 79th Cong., 2d Sess. 
Jul 03, 1958 40-foot bar channel and 30-foot river channel S. Doc. 8, 85th Cong., Ist Sess.' 
extension of jetties at entrance. 
Jul 14, 1960 A small boat basin, south shore. Section 107, P.L. 86-645 
Authorized by Chief of Engineers, 
Mar. 4, 1977 
YAQUINA RIVER, OR 
Mar 4, 1913 Construction of channel 10 feet deep and generally Doc. 579, 62d Cong., 2d Sess. 
150 feet wide on Yaquina River and 200 feet wide in 
Depot Creek. 
APPLEGATE LAKE, ROGUE RIVER BASIN, OR 
Oct 23, 1962 Authorizes a rockfill embankment dam. H. Doc. 566, 87th Cong., 2d Sess. 
Mar 07, 1974 Authorizes construction of project but no operation for P.L. 93-251 
irrigation until local interests agree to repay cost allocated. 
20. 
24. 
25. 
May 17, 1950 
Nov 17, 1986 
BLUE RIVER LAKE, OR 
Authorizes gravel-filled embankment dam. 
Authorizes Construction of hydroelectric power facilities 
COTTAGE GROVE LAKE, OR 
Jun 28, 1938 Earthfill dam. 
Dec 22, 1944 Construction, operation, and maintenance of recreation 
facilities. 
DORENA LAKE, OR 
Jun 28, 1938 Earthfill dam. 
Dec 22, 1944 Construction, operation, and maintenance of recreation 
facilities. 
ELK CREEK LAKE, ROGUE RIVER BASIN, OR 
Oct 23, 1962 Roller compacted concrete dam. 
Oct 07, 1970 Authorized construction but not operation for irrigation 
until local interests agree to repay cost allocated. 
H. Doc. 531, 81st Cong., 2d Sess. 
P.L. 99-662 
H. Doc. 544, 75th Cong., 3d Sess. 
Sec 4, Flood Control Act of 1944, 
as amended 25. 
H. Doc. 544, 75th Cong., 3d Sess. 
Sec 4, Flood Control Act of 1944, 
as amended 
H. Doc. 566, 87th Cong.,2d Sess. 
P.L. 91-439 
28-42 
26. 
27. 
28. 
19.

PORTLAND, OREGON DISTRICT 
TABLE 28-B (Cont'd) AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
29. 
May 17, 1950 
Dec 22, 1944 
FALL CREEK LAKE, OR 
Earth and gravel fill embankment dam. 
Construction, operation, and maintenance of recreation 
facilities. 
FERN RIDGE LAKE, OR 
Jun 28, 1938 Earthfill embankment dam 
Dec 22, 1944 Construction, operation, and maintenance of recreation 
facilities. 
Oct 23, 1962 Raise height of dam to obtain additional storage. 
Jun 4, 1993 Construction of waterfowl impoundments. 
H. Doc. 531, 81st Cong., 2d Sess. 
Sec 4, Flood Control Act of 1944, 
as amended 
H. Doc. 544, 75th Cong. 3d Sess. 
Sec 4, Flood Control Act of 1944, 
as amended 
H. Doc 403, 87th Cong. 2d Sess. 
Sec 1135, P.L.99-662 as amended 
LOWER COLUMBIA RIVER BASIN BANK 
PROTECTION, OR AND WA 
Provides bank protection on Columbia River below 
river mile 125 and along principal tributaries. 
MT. ST. HELENS SEDIMENT CONTROL, WA 
Authorized construction of sediment and retention 
structures. 
SCAPPOOSE DRAINAGE DISTRICT, OR 
Construction of levee system. 
Raising and strengthening levee. 
WILLAMETTE RIVER BASIN BANK 
PROTECTION, OR 
Bank protection works, with channel clearing. 
Provide additional protection against flooding. 
Addition of 77 locations to scope of projects. 
WILLOW CREEK LAKE, HEPPNER, OR 
Oct 27, 1965 Storage project for flood control, recreation, and fish 
and wildlife. 
HI. Doc. 531, 81st Cong., 2d Sess. 
P.L. 99-88 
F.C. Act 1936 
H. Doc. 531, 81st Cong.,2d Sess. 
F.C. Act 1936 
H. Doc. 544, 75th Cong., 3d Sess. 
H. Doc. 531, 81st Cong.,2d Sess. 
H. Doc. 233, 89th Cong., Ist Sess. 
BONNEVILLE LOCK AND DAM -- LAKE 
BONNEVILLE, OR AND WA 
Existing project was originally authorized Sep. 30, 1933, by 
Federal Emergengy Administration of Public Works. 
Existing project authorized by Congress. S. Committee Print, 73d Cong., 
2d Sess., (Report of Chief of Engineers 
dated Aug 21, 1933) 
28-43 
30. 
31. 
May 17, 1950 
32. 
Aug 15, 1985 
33. 
Jun 22, 1936 
May 17, 1950 
34. 
Jun 22, 1936 
Jun 28, 1938 
May 17, 1950 
35. 
39. 
Aug 30, 1935

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 28-B (Cont'd) AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Aug 20, 1937 Completion, maintenance, and operation of Bonneville 
project under direction of Secretary of War and 
supervision of Chief of Engineers, subject to certain 
provisions herein relating to powers and duties of 
Bonneville Power Administrator. 
Dec 22, 1944 Construction, operation, and maintenance of recreation 
facilities. 
Mar 07, 1974 Authorizes relocation of town of North Bonneville 
to new town site. 
Aug 22, 1984 Acquisition of Steigerwald Lake wetland area. 
Oct 1992 Authorizes transfer of lands to town of North Bonneville. 
1992 Authorizes direct funding from Secretary of Interior 
to operate and maintain power facilities in the Pacific 
Northwest and improvements and replacements to the 
power generation facilities. 
40. 
Nov 1, 1988 
Oct 12, 1996 
41. 
May 17, 1950 
Sep 03, 1954 
Oct 23, 1962 
1992 
42. 
June 28, 1938 
Jun 30, 1948 
1992 
COLUMBIA RIVER TREATY FISHING ACCESS 
SITES, OR & WA 
Authorizes project for mitigation of lost treaty fishing 
access resulting from construction of Bonneville Dam. 
Boundary adjustments. 
COUGAR LAKE, OR 
Rockfill dam. 
Addition of power 
Strube Lake reregulating dam. 
Authorizes direct funding from Secretary of Interior 
to operate and maintain power facilities in the Pacific 
Northwest and improvements and replacements to the 
power generation facilities. 
DETROIT LAKE - BIG CLIFF, OR 
Authorizes concrete gravity structure. 
Addition of power and regulating Big Cliff Dam. 
with power 
Authorizes direct funding from Secretary of Interior 
to operate and maintain power facilities in the Pacific 
Northwest and improvements and replacements to the 
power generation facilities. 
GREEN PETER-FOSTER LAKES, OR 
May 17, 1950 Authorized Green Peter Dam in lieu of originally 
authorized Sweet Home Lake (1938). 
Sep 03, 1954 Addition of power at Green Peter and White Bridge 
Reregulating Dam. 
Jul 14, 1960 Changes location of reregulating dam from White 
Bridge location to Foster. 
Sec 4, Flood Control Act of 1944, 
as amended 
P.L. 93-251 
P.L. 98-396 
P.L. 102-396, Sec. 9147 
P.L. 102-486 
Title IV of P.L. 100-581 
P.L. 104-303, Sec. 512 39. 
H. Doc. 531, 81st Cong., 2d Sess. 
P.L. 83-780. 
P.L. 87-874 
P.L. 102-486 
H. Doc. 544, 75th Cong.,3d Sess. 
P.L. 858, 80th Cong.2d Sess. 
P.L. 102-486 
H. Doc. 531, 81st Cong., 2d Sess. 
P.L. 83-780, F. C. Act 1954 
S. Doc. 104, 86th Cong., 2d Sess. 
28-44 
43.

PORTLAND, OREGON DISTRICT 
TABLE 28-B (Cont'd) AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Authorizes direct funding from Secretary of Interior 
to operate and maintain power facilities in the Pacific 
Northwest and improvements and replacements to the 
power generation facilities. 
HILLS CREEK LAKE, OR 
Earth and gravel fill dam. 
Authorizes direct funding from Secretary of Interior 
to operate and maintain power facilities in the Pacific 
Northwest and improvements and replacements to the 
power generation facilities. 
JOHN DAY LOCK AND DAM - LAKE 
UMATILLA, OR AND WA 
May 17, 1950 Multiple-purpose dam, flood control, navigation. 
and power 
Dec 22, 1944 Construction, operation, and maintenance of recreation 
facilities. 
John Day waterfowl management area. 
Authorizes direct funding from Secretary of Interior 
to operate and maintain power facilities in the Pacific 
Northwest and improvements and replacements to the 
power generation facilities. 
LOOKOUT POINT - DEXTER LAKES, OR 
Earth-and-gravel filled dam. 
Construction, operation, and maintenance of recreation 
facilities. 
Addition of power and authorization of Dexter Lake 
as reregulating dam. 
Authorizes direct funding from Secretary of Interior 
to operate and maintain power facilities in the Pacific 
Northwest and improvements and replacements to the 
power generation facilities. 
LOST CREEK LAKE, ROGUE RIVER BASIN, OR 
Rock and gravel fill embankment dam, including power. 
Authorizes construction of project but not operation for 
irrigation until local interests agree to repay cost allocated. 
Authorizes direct funding from Secretary of Interior 
to operate and maintain power facilities in the Pacific 
Northwest and improvements and replacements to the 
power generation facilities. 
P.L. 102-486 
H. Doc. 531, 81st Cong., 2d Sess. 
P.L. 102-486 
H. Doc. 531, 81st Cong., 2d Sess. 
Sec 4, Flood Control Act of 1944, 
as amended 
S. Doc. 28, 89th Cong., Ist Sess. 
P.L. 102-486 
H. Doc. 544, 75th Cong., 3d Sess. 
Sec 4, Flood Control Act of 1944, 
as amended 
H. Doc. 531, 81st Cong., 2d Sess. 
P.L. 102-486 
H. Doc. 566, 87th Cong., 2d Sess. 
P.L. 89-689, Public Works 
Approp. Act, 1967 
P.L. 102-486 
28-45 
1992 
44. 
May 17, 1950 
1992 
45. 
Mar 24, 1965 
1992 
46. 
Jun 28, 1938 
Dec 22, 1944 
May 17, 1950 
1992 
47. 
Sep 21, 1962 
Oct 15, 1966 
1992

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 28-B (Cont'd) AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
THE DALLES LOCK AND DAM - LAKE 
CELILO, WA AND OR 
May 17, 1950 Multiple-purpose dam, flood control, navigation. 
and power 
Dec 22, 1944 Construction, operation, and maintenance of recreation 
facilities. 
1992 Authorizes direct funding from Secretary of Interior 
to operate and maintain power facilities in the Pacific 
Northwest and improvements and replacements to the 
power generation facilities. 
H. Doc. 531, 81st Cong., 2d Sess. 
Sec 4, Flood Control Act of 1944, 
as amended 
P.L. 102-486 
COLUMBIA RIVER FISH MITIGATION, OR and WA 
Jul 19, 1988 Design, test, and construct fish bypass facilities. P. L. 100-371 
WILLAMETE RIVER TEMPERATURE CONTROL, OR 
Oct 12, 1996 Authorized modifications to intake towers to benefit P.L. 104-303 
fish habitat. 
Aug 17, 1999 Increased authorized cost. P.L. 106 
Footnotes: 
1. Contains latest published maps. 
2. Public Resolution 105, 67th Cong. 
3. Public Works Administration. 
4. Includes following work, classified inactive. A channel to 
Hobsonville 200 feet wide and 16 feet deep, with a turning 
basin 500 feet wide at Hobsonville, and regulating works as needed. 
5. Inactive. 
6. Permanent appropriations Repeal Act. 
7. Flood Control Act 
8. Classified Deferred. 
9. Spur Jetty "B" classified inactive 
28-46 
49. 
50. 
48.

PORTLAND, OREGON DISTRICT 
TABLE 28-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to Sep. 30, 2000 
Full Report Operation 
See Annual and 
Project Status Report for Construction Maintenance 
Alsea River, OR Completed 2,000 26,237 
AstoriaTurning Basin, OR' Completed 1977 870,139 
Bandon Small Boat Basin, Coquille, OR' Completed 1985 1,173,524 
Bridges, Columbia River, Cascade Locks Completed 1944 1,081,806 16,648 
and Hood River, OR (Alteration) 
Cathlamet, WA' Completed 1971 171,467 
Charleston Channel, Coos Bay, OR' Completed 1985 1,197,300 
Clatskanie River, OR 2 Completed 1969 19,2400 194,8961 
Columbia River, Illwaco, WA' 1986 1,589,231 
Coos & Millicoma Rivers, OR Completed 1991 350,23811 2,152,914 
Cowlitz River, WA Completed 1985 277,436" 1,474,036 
Cushman-Mapleton Channels Completed 1975 329,423 
(Siuslaw River), OR' 
Deep River, WA Completed 1963 15,384 32,768 
Depoe Bay, OR' Completed 1971 145,588' 
Elochoman Slough, WA2 Completed 1990 18,641 7 196,864 
Grays River, WA2 Completed 1941 2,500 35,670 
Hammond Small Boat Basin, OR' Completed 1977 519,0907 
Interstate Bridge, Columbia River, Completed 1961 1,154,162" 
Portland, OR to Vancouver WA (Alteration) 
Interstate Highway Bridge 
(Barge Channel), OR' Completed 1963 15,281 
Kalama Turning Basin, Kalama, WA' Completed 1986 302,000 
Lake River, WA Completed 1983 2,700 58,127 
Lewis River, WA Completed 1985 58, 132 685,677 
Long Tom River, OR Completed 4,000 
Mooring for Battleship Oregon, OR Completed 25,000 
Multnomah Channel, OR2 Completed 1982 437,669" 
Nehalem Bay, OR Completed 1987 302,006 t "' 55,195 
Nestucca River, OR Completed 6,000 
Oregon Slough, (North Portland Harbor), OR Completed 1963 16,881 90,514 
Salmon River, OR2 Completed 1949 2,145 
Smith River, OR2 Completed 1974 143,120 205,130 
Skamokawa Creek, WA Completed 1991 2,400 436, 185 
South Channel, Government Island, OR' Completed 1985 119,800" 
South Slough (Charleston), OR' Completed 1970 26,821 
The Cascades Canal, Columbia River, OR'2 Abandoned 1939 3,903,780 559,858 
The Dalles-Celilo Canal, OR and WA"' Abandoned 1957 4,716,205 2,833,888 
Tongue Point, OR' Completed 1992 2,807,87619 
Umatilla Harbor, OR14 Abandoned 1952 
Westport Slough, OR 2 Completed 1966 16,276 171,909 
Willamette River above Portland and Completed 1985 862,918 17,900,293 
Yamhill River, OR 
Winchester Bay, Umpqua River, OR Completed 1985 1,616,369 
Yaquina Bay and Harbor Small 
Boat Basin, OR' Completed 1979 891,695" 
Yaquina River, OR I Completed 1971 195,31316 
Youngs and Claskanie River, OR Completed 2,000 
Youngs Bay and Youngs River, OR2 Completed 1979 9,348 34,449 
7.5 MCY Standby Time Completed 1996 4,314,000 
28-47

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 28-C (Cont'd) OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to Sep. 30, 2000 
Full Report Operation 
See Annual and 
Project Status Report for Construction Maintenance 
Footnotes: 
1. Authorized by Chief of Engineers (sec. 107). 11. Excludes $102,000 contributed funds. 
2. Channel adequate for present commerce. 12. Project abondoned due to flooding by Bonneville Dam pool. 
3. Includes $15,537 for previous project 13. Project abandoned due to flooding by The Dalles Dam pool. 
4.In cludes $23,489 for previous project. 14. Project transferred to Portland District from Walla Walla District 
5. Excludes $42,000 contributed funds. FY 1974 and abandoned due to flooding by the John Day Dam pool. 
6. Includes $239,529 for Sec. 107 project. 15. Excludes $969,342 contributed funds. 
7. Excludes $75,000 contributed funds. 16. Excludes $50,565 contributed funds 
8. Non-Federal funds, $1,204,100. 17. Excludes $86,586 contributed funds. 
9. Includes $419,557 for Sec. 107 project. 18. Excludes $80,000 contributed funds; includes $8,000 for previous project. 
10. Excludes $304,826 contributed funds. 19. Excludes $1,776,008 contributed funds. 
TABLE 28-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to Sep. 30, 2000 
Full Report Operation 
See Annual and 
Project Status Report for Construction Maintenance 
COLUMBIA RIVER BASIN 
Blind Slough Diking District, Clatsop 
County, OR 
Consolidated Diking and Improvement 
District 1,Cowlitz County, WA 
Deep River Area, Wahkiakum County, WA 
Deer Island Area, Columbia County, OR 
Diking District 2, Clatsop County, OR 
Diking District 5, Clatsop County, OR 
Diking and Improvement District 5, 
Cowlitz County, WA 
Diking District I and 3 (Puget Island) and 
Little Island, Wahkiakum County, WA 
Diking Improvement District 1, 
Pacific County WA 
Diking and Improvement District 4, 
Wahkiakum County, OR 
Drainage District 1, Clatsop County, OR 
John Day River Area, Clatsop County, OR 
Karlson Island, Clatsop County, OR 
Knappa Area, Clatsop County, OR 
Lewis and Clark River Area, 
Clatsop County, OR 
Lower Cowlitz River Area, 
Clatsop County, OR 
Magruder Drainage District, 
Columbia County, OR 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
1939 
1941 
1942 
1943 
1940 
1940 
1940 
1941 
1941 
1951 
1939 
1942 
1941 
1942 
1942 
1961 
1940 
163,397 
163,291 
69,724 
574,123 
25,609 
25,609 
161,381 
258,795 
26,810 
169,542 
240,939 
33,080 
25,773 
18,789 
158,419 
91,652 
61,186 
28-48

PORTLAND, OREGON DISTRICT 
TABLE 28-E (Cont'd) OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to Sep. 30, 2000 
Full Report Operation 
See Annual and 
Project Status Report for Construction Maintenance 
COLUMBIA RIVER BASIN (Cont'd) 
Marshland Drainage District, 
Columbia County, OR Completed 1940 39,475 
Midland Drainage District, 
Columbia County, OR Completed 1939 77,774 
Multnomah Drainage District 1, OR Completed 1951 593,0341 
Peninsula Drainage District 1, 
Multnomah County, OR Completed 1942 241,148 
Port of Kalama, WA I Completed 99,844 
Rainier Drainage District, 
Columbia County, OR Completed 1942 47,662 
Sauvie Island Areas A and B, 
Multnomah County, OR Completed 1951 1,623,505 
Skamokawa Creek Area, 
Wahkiakum County, WA Completed 1946 178,885 
Wahkiakum County Consolidated 
Diking District No. 1, WA Completed 1985 5,289,833 
Tenasillahe Island, Clatsop County, OR Completed 1939 133,778 
Upper Grays River Area, WA Completed 1947 61,263 
State Hwy 101 & 401, 
Columbia River, WA I Completed 1985 504,642" 
Walluski River, Clatsop County, OR Completed 1942 66,932 
Warrenton Diking District, 1, 
Clatsop County, OR Completed 1940 69,503 
Warrenton Diking District 2, 
Clatsop County, OR Completed 1940 74,596 
Webb District Improvement Co., 
Columbia County, OR Completed 1940 84,592 
Westland District Improvement Co., 
Columbia County, OR Completed 1940 205,531 
Westport District Columbia and 
Clatsop Counties, OR Completed 1943 40,658 
Woodson Drainage District, 
Columbia County, OR Completed 1940 22,797 
Youngs River Dikes, Clatsop County, OR Completed 1942 248,802 
LEWIS RIVER BASIN 
Diking and Improvement District 11, 
Cowlitz County, WA Completed 1943 172,521 
COWLITZ RIVER BASIN 
Cowlitz County Drainage Improvement 
District I, WA Completed 1939 42,978 
Diking Improvement District 13, 
Cowlitz County, WA Completed 1939 28,592 
Huntington Avenue, Castle Rock, WA l Completed 1985 250,000 
Mt. St. Helens and Vicinity, WA Completed 1995 42,036,000 
28-49

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 28-E (Cont'd) OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to Sep. 30, 2000 
Full Report Operation 
See Annual and 
Project Status Report for Construction Maintenance 
LOWER COLUMBIA RIVER BASIN 
Beaver Drainage District, OR Completed 1984 3, 131,944 
Cowlitz County Consolidated 
Diking Improvement District No. 2, WA Completed 1977 1,661,367 
Cowlitz County Diking Improvement 
District 2, WA Completed 1967 363,000 
Cowlitz County Diking Improvement 
District 13, WA Completed 1967 65,345 
Cowlitz County Diking Improvement 
District 15, WA Completed 1967 304,794 
Cowlitz River, Hopkins Creek, WA' Completed 236,860 
Hayden Island, OR Inactive 
Midland Drainage District, OR Completed 1971 304,511 
Multnomah County Drainage District 1, OR Completed 1964 1,499, 186 
Peninsula Drainage District 2, OR Active 1961 35,265 
Rainier Drainage District, OR Completed 1967 593,945 
Sandy Drainage District, OR Completed 1954 154,012 5 
Sauvie Island Drainage District, OR Completed 1966 674,137 
Vancouver Lake Area, WA Deferred 1981 889,391 
Wahkiakum Co. Diking District 4, WA Inactive 1971 48,619 
Washougal Area Levees, Clark County, OR Completed 1973 1,803,488 
Woodson Drainage District, OR Completed 1964 162,500 
WILLAMETTE RIVER BASIN 
Amazon Creek, OR Completed 1960 1,214,300 6 
Mill Creek, Salem, OR Completed 1993 175,8001' 
Sandy River and Sleepy Hollow, OR' Completed 276,700 
Whelton Ditch, OR Inactive 1967 39,624 
ALL OTHER FLOOD CONTROL 
Arlington, Alkali Canyon, OR7 Abandoned 1950 23,439 
Bear Creek, Medford, OR' Completed 23,050 
Beaver Creek Near Tillamook, OR2 Completed 1967 106,198 
Castle Rock, Cowlitz River, WA Completed 1957 104,921 
Catching Inlet Drainage District 
Coos River, OR2 Completed 1959 182,655 
Chewaucan River, Paisley, OR' Completed 42,761 
Clackamas River at 
Dixon Farm Location, OR Completed 1952 70,845 * 
Days Creek Lake, OR (Phase 1) Deferred 1982 1,307,216 
Depoe Bay, Lincoln County, OR' Completed 22,963 
Deschutes River, Bend, OR2 Completed 1988 106,2501 
John Day River (West), OR' Completed 1986 127,800 
Johnson Creek, OR Active 1981 170,245 
McDonald Dike Road, 
Nehalem River, OR' Completed 1985 29,500 
28-50

PORTLAND, OREGON DISTRICT 
TABLE 28-E (Cont'd) OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to Sep. 30, 2000 
Full Report Operation 
See Annual and 
Project Status Report for Construction Maintenance 
ALL OTHER FLOOD CONTROL (Cont'd) 
McKenzie River Near Walterville, OR2 Completed 
Miami River, OR' Completed 
Yaquina River, OR Completed 
Molalla River at Milk Creek Location, OR2 Completed 
Molalla River at Ressel Location, OR2 Completed 
Nestucca River, Condor Road, OR' Completed 
Nestucca River, Vicinity Pacific City, OR' Completed 
Pendleton Levees, Umatilla River, OR9 
(a) Riverside Area Units Deferred 
(b) State Hospital and City Areas (Zone 1) Completed 
(c) State Hospital and City Areas (Zone 2)2 Completed 
Pendleton, Umatilla River, OR9 Completed 
Reedsport Levees, Umpqua River, OR 2 Completed 
Rogue River, OR' Completed 
Salmon Creek at Oakridge, OR2 Completed 
Salmon Creek Near Vancouver, WA' Completed 
Sandy River, City of Troutdale, OR' Completed 
Siuslaw River, Lane County, OR' Completed 
Stillwell Drainage District, 
Tillamook Bay, OR 2 Completed 
Sumner Parker Airport, OR' Completed 
Trask River, Tillamook County, OR' Completed 
Tualatin, OR Completed 
Umatilla River, Stanfield, OR' Completed 
Umatilla River, Thorn Hollow, OR' Completed 
Umpqua River and Tributaries, OR Completed 
Vicinity of Nehalem, Nehalem River, OR Completed 
West Makinster Rd., Wilson River, OR' Completed 
Wilson River, Vicinity Highway 101, OR' Completed 
1966 
1948 
1955 
1952 
1960 
1959 
1960 
1939 
1971 
1960 
1985 
1994 
1961 
1984 
1985 
1985 
1952 
1952 
1986 
148,358 
15,321 
118,433 
55,007 
55,189 
11,690 
16,000 
9,100 
267,748 
161,540 
143,263 
968,716"' 
86,230 
288.447 
435,00012 
365,000' 
215,939 
176,351 
92,500 
121,273 
1,803,094 
33,835 
154,600 
428,881 
45,677 
176,000 
30,000 
Footnotes: 
1. Authorized by Chief of Engineers (Sec. 14). 
2. Authorized by Chief of Engineers (Sec. 205). 
3. Includes $26,241, Emergency Relief Act Funds. 
4. Excludes $25,000 contributed funds. 
5. Previous completed project, $138,956; $15,056 engineering costs 
project constructed by local interests. 
6. Excludes $154,751 contributed funds. 
7. Project transferred from Walla Walla District FY 1974 and abandoned due to 
flooding by the John Day Dam pool. Includes $3,328 FY 1960 preauthorization 
costs, Sec. 205, P.L. 80-85. See FY 1960 Annual Report, page 1887. 
8. Excludes $2,520 contributed funds. 
9. Reported by Walla Walla District prior to 1974. 
10. Excludes $230,070 contributed funds for new work 
and $31,284 Government furnished sheet steel pile. 
11. Includes $254,642 contributed funds. 
12. Includes $185,000 contributed funds. 
13. Excludes $5,822 contributed funds. 
14. Excludes $31,031 contributed funds. 
15. Excludes $98,313 contributed funds. 
28-51

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 28-F OTHER AUTHORIZED MULTIPLE PURPOSE 
PROJECTS, INCLUDING POWER 
For Last Cost to Sep. 30, 2000 
Full Report Operation 
See Annual and 
Project Status Report for Construction Maintenance 
Restoration of Indian Fishing Grounds Completed 1969 185,000 
Bonneville, OR 
Columbia and Snake Rivers Ports Inactive 1994 5,799,926 
Dredging, OR & WA 
TABLE 28-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Date Funds Funds 
Project Report for Deauthorized Expended Expended 
Area East of Albany, OR 1977 
Bachelor Island, WA 1977 
Bear Creek, Long Tom River, OR 1966 1971 4,559 
Calapooya River, OR 1959 1965 11,595 
Cascadia Lake, OR 1987 954, 114 
Chetco River, OR 1997 235,353 
Clatskanie River Area, Columbia County, OR 1960 1965 268 
Clatskanie Drainage Dist. 1, OR 1964 1978 18,543 
Clatsop County Drainage District i, OR 1960 1974 4,472 
Clatsop County Diking District 3, OR 1938 1961 258 
Clatsop County Diking District 4, OR 1978 
Clatsop County Diking District 6, OR 1961 1978 8,824 
Columbia Drainage District No. 1, OR 1987 
Columbia Slough, OR 1953 1978 21,352 
Coquille River, OR 1948 1953 908 
Cowlitz County Consolidate Diking 
Improvement District 1, OR 1977 
Cowlitz River at Randle, WA 1962 1977 11,095 
Coyote and Spencer Creek, 
Long Tom River, OR 1960 1970 6,819 
Deer Island Drainage District, OR 1987 
East Muddy and Lake Creek, OR 1959 1970 6,465 
Ferguson Creek Long Tom River, Or 1978 
Flat Creek, Long Tom River, OR 1977 
Floodwall and Levees at Portland, OR 1977 
Gate Creek Lake, OR 1987 745,001 2 
Holley Lake, OR 1963 1987 241,9923 
28-52

PORTLAND, OREGON DISTRICT 
TABLE 28-G (Cont'd) DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Date Funds Funds 
Project Report for Deauthorized Expended Expended 
John Drainage District, OR 1961 1979 23,754 
John Day River, OR 1974 1974 210,220 
Kalama River (South Area) Levee, 
Cowlitz County, WA 1969 1978 55,594 
Lake River Delta Area, WA 1977 
Lewis River Area, WA 1978 
Magruder Drainage District, OR 1940 1974 774 
Mud and Basket Slough 
Rickreall Creek, OR 1977 
Pendleton Levees, Riverside Area, OR 1987 9,000 
Peninsula Drainage District 1, OR 1942 1977 43,292 
Pilot Rock, Birch Creek, OR 1963 1968 4,558 
Prescott Area, Columbia County, OR 1941 1978 125 
Prineville Area, Crooked River and 
Ochoco Creek, OR 1962 1977 11,318 
Pudding River, OR 1950 1979 5,000 
Shelton Ditch, Marion County, OR 1967 1987 39,624 
Skamokawa (Steamboat Slough), WA 1939 1979 
Soap Creek, WA 1977 
Turner Prairie, Mill Creek, OR 1978 
Umatilla River (Echo), OR 1960 1964 24, 145 
Umpqua River-Scholfield River, OR 1987 4,000 
Waldo Lake Tunnel, OR 1958 
West Muddy Creek and Mary's River, OR 1962 1970 4,056 
Westport Slough, OR (Modification for 
32-foot channel) 1966 1977 
Wiley Creek Lake, OR 1960 112,000 
Willamette River above Portland and Yamhill 
River, OR (uncompleted portions) 1987 
Willamette Falls Fishladder, OR 1961 
Willamette River at Willamette Falls, OR 1948 1987 142,883 
Footnotes: 
I. Excludes Pro-rata share of $112,000 for Sweet Home Reservoir. 
2. Excludes Pro-rata share of $95,000 for Quartz Creek Reservoir. 
3. Excludes $100,000 preauthorization study costs. 
28-53

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 28-H COLUMBIA AND LOWER WILLAMETTE RIVER 
BELOW VANCOUVER, WA, AND PORTLAND, OR 
TOTAL COST OF EXISTING PROJECT TO SEP. 30, 2000 
(SEE SECTION 3 OF TEXT) 
Funds New Work Maintenance Total 
Regular 28,349,304 424,743,539 453,092,843 
Public Works 446,296 14,414 460,710 
Emergency Relief Administration 138,449 98,668 237,117 
Total U.S. 28,934,049 424,856,621 453,790,670 
Contributed Prior to 1964 223,026 24,320 247,346 
Contributed (1975) 35 to 40-foot Channel 442,928 442,928 
Total Contributed 665,954 24,320 690,274 
Total All Funds 29,600,003 424,880,941 454,480,944 
TABLE 28-I PROJECT CONDITION SURVEYS 
(SEE SECTION 21 OF TEXT) 
Project Date Survey Conducted 
Baker Bay, WA Oct 2000 
Tillamook, OR Aug 2000 
Hood River Boat Basin, OR Feb 2000 
Chinook, WA Oct 2000 
Siuslaw River - Florence to Mapleton, OR Sep 2000 
Hammond Boat Basin, OR Apr 2000 
Cathlamette Bay, OR Mar 2000 
Elochoman Slough, WA Dec 2000 
TABLE 28-J WILLAMETTE RIVER AT WILLAMETTE FALLS, OR 
PRINCIPAL FEATURES OF EXISTING CANAL AND LOCKS 
(SEE SECTION 18 OF TEXT) 
Usable Lock Dimensions ..................... ..................... Series of 4 locks, each 175 feet by 37 feet 1 
Lift of each lock ...................... ...... ........ . Lock I (Lower), 22,5 feet; Lock 2, 8.7 feet; Lock 3, 10.9 feet and 
Lock 4 (Upper), 8.1 feet 
Depth of Miter Sills at Lower Water ................................ Lower Lock, 8.4 feet; Upper Lock, 6 feet 
Character of foundation ..................... .................... Rock 
Kind of Dam ................... .................... Fixed3 
Type of Construction ................... ..................... Concrete 
Year of Completion ................... .................... 1873; Purchased by United States Apr. 26, 1915 
Cost ...................... ...................... Unknown; purchase price $375,000 
Footnotes: 
1. A guard lock 210 by 40 feet, which is used only at higher states of water, is at upper end of canal basin. 
2. A concrete division wall, 1,227 feet long, extending from Lock 4 to Guard Lock, separates upper basin of canal from head race, which formerly 
led directly from basin and supplied water for powerplants operated by Crown Zellerbach Corp., and Portland Ry., Light & Power Co., which is 
now being operated by Portland General Electric Co. 
3. The dam is owned by private parties. 
28-54

PORTLAND, OREGON DISTRICT 
TABLE 28-K FLOOD CONTROL RESERVOIR OPERATIONS 
See Section Date of Peak Inflow Storage Used 
in Text Project Peak Inflow Cu. Ft./Sec. Acre/feet 
24. Applegate Lake, OR January 14, 2000 4,780 8,649 
25. Blue River Lake, OR November 25, 1999 13,200 32,355 
26. Cottage Grove Lake, OR January 11, 2000 5,620 18,100 
41. Cougar Lake, OR November 26, 1999 12,200 30,330 
42. Detroit Lake, OR November 26, 1999 38,700 107,380 
27. Dorena Lake, OR January 10, 2000 17,300 40,950 
29. Fall Creek Lake, OR January 10, 2000 13,800 35,950 
30. Fern Ridge Lake, OR January 14, 2000 9,210 48,400 
43. Foster Lake, OR November 26, 1999 27,900 26,140 
43. Green Peter Lake, OR November 26, 1999 45,600 112,580 
44. Hills Creek Lake, OR January 10, 2000 11,200 45,320 
46. Lookout Point Lake, OR January 10, 2000 20,600 75, 120 
47. Lost Creek Lake, OR January 11, 2000 6,110 19,409 
TABLE 28-L WORK UNDER SPECIAL AUTHORITIES 
PROJECTS NOT SPECIFICALLY AUTHORIZED 
Fiscal Year Costs 
Project Status Federal Non-Federal Total 
Beach Erosion Control Projects Pursuant to Section 103 of the 1962 Rivers and Harbors Act, 
Public Law 874, 87th Congress, As Amended 
(See Section 23 of text) 
Lincoln City Highway 101, OR 
Rock Creek, Highway 101, OR 
US 101, Beverly Beach, OR 
Coordination 
21,265 
80,810 
1,332 
4,988 
Total Section 103 108,395 
21,265 
80,810 
1,332 
4,988 
108,395 
Navigation Activities Pursuant to Section 107 of the 1960 Rivers and Harbors Act, 
Public Law 645, 86th Congress, as Amended 
(See Section 22 of text) 
Port of Brookings (Chetco), OR 
Port of Morrow, OR 
Coordination 
X 
79,549 
2,042 
9,902 
Total Section 107 91,493 
96,801 
- 1,189 
95,612 
176,350 
853 
9,902 
187,105 
Flood Control Activities Pursuant to Section 205 of the Flood Control Act of 1948, 
Public Law 858, 80th Congress, as Amended 
(See Section 38 of text) 
Dougherty Slough, Jefferson, OR 
Keizer, OR 
Klickitat, WA 
Lewis County, WA 
Lewis River, Woodland, WA 
Little Pudding River, Marion County, OR 
36,604 
325,505 
6,919 
420 
5,148 
15,424 
1188,,112255 
36,604 
343,630 
6,919 
420 
5,148 
15,424 
28-55

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 28-L (Cont'd) WORK UNDER SPECIAL AUTHORITIES 
PROJECTS NOT SPECIFICALLY AUTHORIZED 
Fiscal Year Costs 
Project Status' Federal Non-Federal Total 
Flood Control Activities Pursuant to Section 205 (Cont'd) 
Malhuer Basin, Harney County, OR F 9,820 --- 9,820 
Mill Creek, The Dalles, OR X 4,544 --- 4,544 
Peninsula Drainage District # 1, OR X 26,185 16,618 42,803 
Salem, OR F 109,670 89,285 198,955 
Scio, OR X 32,072 --- 32,072 
Siuslaw River, Mapleton, OR X 29 --- 29 
Coordination 7,947 --- 7,947 
Total Section 205 580,287 124,028 704,315 
Emergency Streambank Protection Activities Pursuant to Section 14 of the 1946 Flood Control Act, 
Public Law 526, 79th Congress as amended 
(See Section 38 of text) 
Coordination 10,252 --- 10,252 
Total Section 14 10,252 --- 10,252 
Project Modifications for Improvement of the Environment Pursuant to Section 1135 of the 1986 Water 
Resources Development Act, Public Law 662, 99th Congress, as Amended 
(See Section 51 of text) 
Amazon Creek Wetlands, OR C 1,044,208 74,469 1,118,677 
Clatskanie River, OR C 104,605 18,518 123,123 
Fern Ridge Lake Marsh Restoration, OR C 131,797 24,467 156,264 
Fox Creek, OR D 338 --- 338 
Richardson Park, OR D 2.314 --- 2,314 
Trestle Bay, OR X -1,000 --- -1,000 
Willamette Mission State Park, OR F 102,435 --- 102,435 
Initial Appraisals 7,317 --- 7,317 
Coordination 10,155 --- 10,155 
Total Section 1135 1,402,169 117,454 1,519,623 
Aquatic Ecosystem Restoration Pursuant to Section 206 of the 1996 Water Resources Development Act, 
Public Law 303, 104th Congress, as Amended 
(See Section 51 of text) 
Bowers Rock State Park, OR X 4,604 --- 4,604 
Clatskanie River, OR D 34,941 34,941 
East Birch Creek Restoration, OR F 115,252 --- 115,252 
Eugene Delta Ponds, OR F 164,677 --- 164,677 
Gross Creek, Bandon, OR F 33,549 -- 33,549 
Springfield Millrace, OR F 164,851 --- 164,851 
Trout Creek, OR D 6,497 --- 6,497 
Upper Rogue Habitat Protection & Restoration, OR F 114,803 --- 114,803 
Preliminary Restoration Plans 39,075 --- 39,075 
Coordination 17,972 --- 17,972 
Total Section 206 696,221 --- 696,221 
1/ Status: C= Construction; D = Planning and Design Analysis; F = Feasibility; P= Plans and Specifications; X=Fiscal Close Out 
28-56

PORTLAND, OREGON DISTRICT 
TABLE 28-M FLOOD CONTROL ACIITIIES 
WORK UNDER SPECIAL AUTHORITIES 
EMERGENCY RESPONSE ACTIVITIES 
(SEE SECTION 55 OF TEXT) 
Appropriation Contributed 
96X3125 Funds 
Disaster Preparedness Program (Category 100) 
Planning 366,367 0 
Training and Exercise 23,146 0 
Facilities -132 0 
National Center for Expertise 0 0 
Total Disaster Preparedness Program 389,381 0 
Emergency Operations (Category 200) 
Response Operations 9,965 0 
Post Flood Response 0 0 
Acquisition of Supplies/Equip 0 0 
Operational Deployment -250 0 
Total Emergency Operations 9,715 0 
Rehabilitation (Category 300) 
Federal Flood Control Works 0 0 
Non-Federal Flood Control Works 0 0 
Field Investigations 0 0 
Initial Eligibility Inspections 42 0 
Continuing Eligibility Inspections 12,099 0 
Total Rehabilitation 12,141 0 
Advance Measures 
Advance Measure Assistance 449,740 0 
Field Investigations 2,711 0 
Total Advance Measures 452,451 0 
Reimbursement Activity 
Other Agencies 0 0 
Other Corps Offices 96,904 0 
Total Reimbursement Activity 96,904 0 
28-57

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 28-N PRINCIPAL DATA CONCERNING COLUMBIA RIVER 
NAVIGATION LOCK, SPILLWAY DAM, AND POWERPLANT 
Promject 
Bonneville Lock and Dam 
OR and WA - 
Lake Bonneville 
(See Section 39 of Text) 
John Day Lock and Dam, 
OR and WA - 
Lake Umatilla 
(See Section 45 of Text) 
NAVIGATION LOCK(NEW) 
Dimensions: 
Clear Width of Chamber 
Greatest Length Available for Full Width 
Lift (Vertical): 
At Extreme Low Water and Normal Pool Level 
At Normal River Stage 
At Extreme High Water 
Depth Over Miter Sills at Adopted Low Water 
Character of Foundation 
Open to Navigation 
SPILLWAY DAM 
Type of Construction 
Completed 
Capacity 
Elevation of Gate Sills on Crest of Spillway 
Height above Lowest Foundation 
Length of Dam Proper 
Length of Dam Overall 
Width at Base 
Gate Openings 
Crest Overflow (Above Mean Sea Level) 
Elevation(Normal)(Above Mean Sea Level) 
POWERPLANT 
Length (First Powerhouse) 
Length (Second Powerhouse) 
Width (First Powerhouse) 
Width (Second Powerhouse) 
Height (Roof to Bedrock) (First Powerhouse) 
Height (Roof to Bedrock)(Second Powerhouse) 
Generator (Station Unit) 
Generators (First Powerhouse) 
Generators (Second Powerhouse) 
Fishwater Supply Units (Second Powerhouse) 
Total Rated Capacity 
Speed 
NAVIGATION LOCK 
Clear Width 
Clear Length 
Lift: 
Minimum 
Average 
Maximum 
Minimum Water Depth Over Sills 
Opened to Navigation 
SPILLWAY DAM 
Type of Construction 
Completed 
Maximum Capacity 
Crest Elevation 
Control Gates: 
Type 
Size, Width by Height 
Number 
86 Feet 
675 Feet 
66 Feet 
59 Feet 
About 30 Feet 
19 Feet 
Andesite 
March 1993 
Concrete Gravity 
1938 
1,600,000 CFS 
23.3 Feet 
About 170 Feet 
1,090 Feet 
1,230 Feet 
200 Feet 
18 
24 Feet Pool 
72 Feet 
1,027 Feet 
953 Feet 
190 Feet 
235 Feet 
190 Feet 
200 Feet 
I @ 5,000 kw 
I 48,000 kw 
1 59,500 kw 
8 60,000 kw each 
8 @ 66,500 kw each 
2 @ 13,100 kw each 
1,145,700 kw 
75 Revolutions per Minute 
86 Feet 
669 feet 
97 Feet 
105 Feet 
113 Feet 
15 Feet 
April 1968 
Concrete Gravity 
March 1968 
2,250,000 cfs 
210 Feet 
Tainter 
50 ft. by 58.5 Ft. 
20 
28-58

PORTLAND, OREGON DISTRICT 
TABLE 28-N PRINCIPAL DATA CONCERNING COLUMBIA RIVER 
(Cont'd) NAVIGATION LOCK, SPILLWAY DAM, AND POWERPLANT 
Project 
POWERPLANT 
Length 
Width 
Generating Units: 
Number Installed 
Space for Additional 
Rating, Each 
Total Installed Capacity 
Total Potential Capacity 
Maximum Structural Height 
First Power-On-Line 
IMPOUNDMENT 
Elevations: Normal Operating Range 
Maximum 
Flood Control Storage 
Lake Length 
Lake Water Surface Area At Elevation 268 
Navigation Channel, Depth by Width 
Length of Shoreline 
1,975 Feet 
243 Feet 
16 
4
135,000 kw 
2,160,000 kw 
2,700,000 kw 
235 Feet 
July 1968 
268-257 Feet 
276 Feet 
500,000 Ac.-ft. 
76.4 Miles 
55,000 Acres 
15 Ft. by 250 Ft. 
200 miles 
The Dalles Lock and 
Dam, OR and WA - 
Lake Celilo 
(See Section 48 of Text) 
NAVIGATION LOCK 
Type 
Lift Normal 
Net Clear Length 
Net clear Width 
Normal Depth Over Upper Sill 
Minimum Depth Over Lower Sill 
Opened To Navigation 
SPILLWAY DAM 
Type 
Elevation of Crest 
Top of Crest Gates 
Number of Gates 
Size of Gates 
Height (Foundation to Crest) 
Design Flood 
POWERPLANT 
Powerhouse Dimensions 
Generators Main Units 
Fishwater Supply Units 
Total Rated Capacity 
Station Service Units 
Single Lift 
87.5 Feet 
675 Feet 
86 Feet 
20 Feet 
15 Feet 
March 17, 1957 
Controlled 
121 Ft. msl 
162 Ft. msl 
23 
50 by 43 Feet 
120 Feet 
2,290,000 cfs 
240 by 2,150 feet 
14 @ 78,000 kw each 
8 @ 86,000 kw each 
2 @ 13,500 kw each 
1,807,000 kw 
2 @ 3,000 kw each 
28-59

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 28-0 96-89X4045 APPROPRIATION 
BONNEVILLE POWER ADMINISTRATION 
Expenditures Total Cost 
To 
Project FY96 FY97 FY98 FY99 FY00 Sep 30, 2000 
Bonneville 88,179 197,994 416,161 1,668,674 3,082,172 5,453,180 
Columbia River Fish Mitigation 6,000,000 0 0 0 0 6,000,000 
Cougar 0 6,558 9,955 3,992 2,287 22,792 
Detroit 0 13,116 143,205 254,025 336,523 746,869 
Green Peter 0 12,124 85,027 835,485 1,558,120 2,490,756 
Hills Creek 0 7,544 7,463 1,976 28,381 45,364 
John Day 8,277 130,229 612,077 1,813,742 1,523,451 4,107,499 
John Day Rehab 0 0 157,294 811,937 2,202,667 3,171,898 
Lookout 0 15,694 95,001 162,810 598,874 872,379 
Lost Creek 0 702 1,621 0 0 2.323 
The Dalles 2 226 139 1,882,171 2 646,696 2,229,793 2,033790 11,018,589 
Total 8,322,595 2,266,132 4,174,500 7,782,434 11,366,265 33,931,649 
TABLE 28-P REPORT ON POWER REVENUE AND POWER GENERATION 
Revenue from Sale of 
Electricity by Generation of Electricity 
Project Bonneville Power Admin in Megawatt-Hours (MWH) 
Total Total 
FY00 Since Power FY00 Since Power FY00 MWH 
Revenues Plant Began MWH Plant Began To BPA 
Bonneville 
The Dalles 
John Day 
Cougar 
Detroit/Big Cliff 
Green Peter/Foster 
Hills Creek 
Lookout Point/Dexter 
Lost Creek 
Total 
12,315,790 
10,136,083 
11,530,392 
432,156 
1,851,544 
1,956,179 
432,516 
2,284,312 
1,330,006 
42,268,988 
683,264,945 
437,525,665 
477,334,428 
27,258,969 
82,674,399 
70,055,387 
25,209,590 
92,815,215 
37,653,4 59 
1,933,792,057 
5,354,060 
7,596,036 
10,078,924 
179,392 
524,442 
340,681 
169,218 
422,082 
317,601 
24,982,436 
261,754,060 
307,196,036 
336,578,924 
4,979,392 
23,124,442 
11,34340,681 
6,069,218 
18,322,082 
6,717,601 
976,082,436 
5,323,861 
7,578,939 
10,058,876 
178,59 
521,666 
338,202 
168,675 
419,894 
313,084 
24,901,776 
28-60

PORTLAND, OREGON DISTRICT 
TABLE 28-Q INSPECTION OF COMPLETED FLOOD CONTROL PROJECTS 
(SEE SECTION 36 OF TEXT) 
Date of 
Last Rating 
State/County/Location Sponsor River Inspection (1) 
State of Oregon 
Clackamas County 
Dixon Farm 
Sleepy Hollow Location 
Clatsop County 
Clatsop #15 Dr. Improv. Co. 
Clatsop Co. Dr. Imp. Co. # 1 
Clatsop Co. Dk. Dist. #5 
Clatsop Co. Dk. Dist. #7 
Youngs River 
Tucker/Battle Creek 
Grant 
Tansy Point Location 
Warrenton Dr. Dist. #1 
Warrenton Dr. Dist. #2 
Warrenton Dr. Dist. #3 
Svenson Is Dist. Imprv. Co 
John Day River Road Location 
Tansy R.R. Location 
Columbia/Multnomah County 
Sauvie Island 
Columbia County 
Scappoose Dr. Imp. Company 
Deer Island D. I. Company 
Rainier Water Imp District 
Beaver Drainage Improv. Co. 
Magruder Dr. Improv. Co. 
Midland Dr. Improv. Co. 
Marshland Dr. Improv. Co. 
Webb District Improv. Co. 
Woodson Drainage District 
Westland Dist. Improv. Co. 
Coos County 
Catching Inlet Dr Dist 
Deschutes County 
Bend Ice Boom 
Douglas County 
Reedsport Levee 
Jackson County 
Bear Creek 
Lower Clackamas Water Control District 
Clackamas County 
Clatsop No. 15, Drainage Improvement Co. 
Clatsop Co Drainage, Improvement Co No. 1 
Clatsop County Diking 
Clatsop County Diking, District No. 7 
Clatsop Co Diking, Improvement Co No. 9 
Clatsop Co Diking Improvement Co No. 9 
Clatsop Co Diking Improvement Co No. 9 
Port of Astoria 
City of Warrenton 
City of Warrenton 
City of Warrenton 
Svenson Island District Improvement Company 
Clatsop County 
City of Warrenton 
Island Drainage Improvement Company 
Scappoose Drainage Improvement Company 
Deer Island Drainage District 
Rainier Water Improvement District 
Beaver Drainage Improvement Co., Inc. 
Magruder Drainage Improvement Co., Inc. 
Midland Drainage Improvement Co., Inc 
Marshland Drainage Improvement Co., Inc 
Webb District Improvement Company 
Woodson Drainage District 
Westland District Improvement Company 
Catching Inlet Drainage District 
City of Bend 
City of Reedsport 
City of Medford 
Clackamas 
Sandy 
Columbia 
Columbia 
Columbia 
Blind Slough 
Youngs 
Youngs 
Youngs 
Columbia 
Columbia 
Skipanon 
Columbia 
Columbia 
John Day 
Columbia 
Columbia 
Columbia 
Columbia 
Columbia 
Columbia 
Columbia 
Columbia 
Columbia 
Columbia 
Columbia 
Columbia 
Catching Slough 
Deschutes 
Umpqua 
Bear Cr 
28-61 
E
F 
3/17/00 
4/4/00 
9/11/00 
4/27/00 
7/25/00 
4/28/00 
9/12/00 
9/12/00 
9/13/00 
8/30/00 
8/30/00 
8/30/00 
8/30/00 
8/29/00 
7/27/00 
8/30/00 
5/4/00 
3/30/00 
9/14/00 
6/1/00 
9/11/00 
9/11/00 
6/29/00 
9/11/00 
9/11/00 
9/11/00 
9/11/00 
8/9/00 
4/12/00 
8/9/00 
8/14/00 
VG 
VG 
E 
VG 
F
G 
VG 
E
E
E
E 
VG 
E
E
E
E 
VG 
E 
VG 
G
E 
VG 
G 
VG 
G 
VG 
E
E
E

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 28-Q INSPECTION OF COMPLETED FLOOD CONTROL PROJECTS 
(Cont'd) (SEE SECTION 36 OF TEXT) 
Date of 
Last Rating 
State/County/Location Sponsor River Inspection (1) 
Josephine County 
Pierce Riffle 
Pierce Riffle U/S Ext. 
Rogue River at Grants Pass 
Lake County 
Paisley Revetment 
Lane County 
Rhododendron Drive 
Amazon Creek 
Lincoln County 
Depoe Bay 
Mill Four 
Depoe Creek 
Linn County 
Landfill Location 
Marion County 
Mill Creek (Salem) 
Multnomah County 
Sandy Dr. Improvement Co 
Multnomah Co. Dr. Dist. #1 
Peninsula Dr. Dist. No. 2 
Peninsula Dr. Dist. No. I 
Sandy River at Troutdale 
Tillamook County 
Sunset Drainage District 
McDonald Road Location 
Wilson River (Hwy 101) 
West Makinster Road Location 
Stillwell Drainage District 
Tone Road 
Beaver Creek 
Pacific City 
Miami River 
Umatilla County 
Pendleton Zone 2 Levees 
Pendleton Levee Zone I 
Simon Springs 
Rattlesnake 
Grants Pass Irrigation District 
Grants Pass Irrigation District 
City of Grants Pass 
City of Paisley 
Lane County Public Works 
City of Eugene Public Works Department 
City of Depoe Bay 
Mill Four Drainage District 
Lincoln County Drainage District No. I 
City of Albany 
City of Salem Public Works Department 
Sandy Drainage Improvement Company 
Multnomah County Drainage District No. 1 
Peninsula Drainage District No.2 
Peninsula Drainage District No. I 
City of Troutdale 
Sunset Drainage District 
Tillamook County Department of Emergency 
Services 
Tillamook County Department of Emergency 
Services 
Tillamook County Department of Emergency 
Services 
Stillwell Drainage District 
Tillamook County Department of Emergency 
Services 
Tillamook County Department of Emergency 
Services 
State of Oregon Aeronautics Division 
Tillamook County 
Umatilla River Water Control District No 
City of Pendleton 
City of Pendleton 
City of Pendleton 
Rogue 
Rogue 
Rogue 
Chewaucan 
Siuslaw 
Amazon 
S. Depoe Bay Cr 
Yaquina 
Depoe Cr 
Calapooia 
Mill Creek 
Columbia 
Columbia 
Columbia 
Columbia 
Sandy 
Nehalem 
Nehalem 
Wilson 
Wilson 
Tillamook/Trask 
Trask 
Beaver Cr 
Nestucca 
Miami R 
Umatilla 
Umatilla 
Umatilla 
Umatilla 
28-62 
E
E
E 
8/14/00 
8/14/00 
8/14/00 
6/7/99 
8/9/00 
8/10/00 
8/8/00 
8/8/00 
8/8/00 
6/20/00 
6/20/00 
4/5/00 
4/5/00 
4/5/00 
3/10/00 
3/9/00 
8/15/00 
8/18/00 
8/18/00 
8/16/00 
8/15/00 
8/16/00 
8/16/00 
8/16/00 
7/27/00 
6/13/00 
6/14/00 
6/13/00 
6/13/00 
VG 
E
E
E 
VG 
E
E
G
G
E
E
E
E

PORTLAND, OREGON DISTRICT 
TABLE 28-Q INSPECTION OF COMPLETED FLOOD CONTROL PROJECTS 
(Cont'd) (SEE SECTION 36 OF TEXT) 
Date of 
Last Rating 
State/County/Location Sponsor River Inspection (1) 
State of Washington 
Clark County 
Salmon Creek Location 
Washougal Area Levees 
Cowlitz County 
Port of Kalama 
Cowlitz Co Cons Dk Imp 
Cowlitz Co Dr Imp 
Cowlitz Co Cons Dk Imp 
Cowlitz Co Cons Dk Imp 
Cowlitz Co Dk Impt 
Castle Rock 
Huntington Avenue Location 
Lewis County 
Fulton Location 
Holder Location 
Kirkendoll Location 
Hopkins Creek Location 
Pacific County 
Megler Location 
Wahkiakum County 
Wahkiakum Co Cons Dk 
Clark County Salmon Cr 
Port of Camas/Washougal Columbia 
Port of Kalama Columbia 
Cowlitz County Consolidated Diking Improv Cowlitz 
District No. 1 
Cowlitz County Drainage Improvement Columbia 
District No. I 
Cowlitz County Consolidated Diking Improv Lewis 
District No. 2 
Cowlitz County Consolidated Diking Improv Cowlitz 
District No. 3 
Diking Improvement District No. 15 of Columbia 
Cowlitz County 
City of Castle Rock Cowlitz 
City of Castle Rock Cowlitz 
Lewis County Public Works Department Cowlitz 
Lewis County Public Works Department Cowlitz 
Lewis County Public Works Department Cowlitz 
Lewis County Public Works Department Cowlitz 
Washington State Department of Transportation Columbia 
Consolidated Diking District No. I of 
Wahkiakum County 
Columbia 
(1) E= Excellent VG = Very Good G - Good F = Fair P = Poor 
28-63 
6/18/00 
8/30/00 
9/19/00 
3/16/00 
7/6/00 
6/6/00 
7/6/00 
6/6/00 
4/20/00 
4/20/00 
4/6/00 
4/6/00 
4/6/00 
4/6/00 
8/31/00 
3/14/00 
E
E
E
E
E 
VG 
E
E
E
E
E
E
E
E
E
E
SEATTLE, WASHINGTON DISTRICT* 
This District comprises Washington State except southern 
and southeastern portions, northern Idaho, and northwestern 
Montana, embraced in drainage basins tributary to 
Pacific Ocean south of international boundary to Cape 
Disappointment, and to the Columbia River above Yakima 
River, inclusively. 
IMPROVEMENTS 
Navigation Environmental 
Bellingham Harbor, WA 
Blair Waterway, Tacoma, WA 
Everett Harbor and Snohomish River, WA 
Friday Harbor, WA 
Grays Harbor and Chehalis River, WA 
Lake Washington Ship Canal, WA 
Olympia Harbor, WA 
Project Condition Surveys 
Puget Sound and its Tributary Waters, WA 
Quillayute River, WA 
Seattle Harbor, WA 
Swinomish Channel, WA 
Willapa River and Harbor and Naselle 
River, WA 
Other Navigation Activities 
29-2 
29-2 
29-2 
29-3 
29-3 
29-4 
29-5 
29-5 
29-5 
29-5 
29-6 
29-6 
29-7 
29-7 
26. 
27. 
28. 
29. 
30. 
31. 
32. 
33. 
Deepwater Slough, WA 
Goldsborough Creek, WA 
Lake Washington Ship Canal, WA 
Porter Levee, WA 
Puget Creek, WA 
Sammamish River Weir Restoration, WA 
Thorton Creek, WA 
Turning Basin #3, Seattle, WA 
General Investigations 
34. Surveys 
35. Collection and Study of Basic Data 
36. Preconstruction Engineering and Design 
Other Activities 
Shore Protection 
Shore Protection Activities 
Flood Control 
Cedar River, Renton, WA 
Howard A. Hanson Dam 
Inspection of Completed Flood Control 
Projects 
Long Road, Chehalis River, WA 
Mud Mountain Dam, WA 
Scheduling Flood Control Reservoir 
Operations 
Stillaguamish, River, WA 
Tacoma, Puyallup River, WA 
Willapa River, Raymond, WA 
Other Flood Control Activities 
Multiple-Purpose Power 
23. Albeni Falls Dam, ID 
24. Chief Joseph Dam - Rufus Woods Lake, WA 
25. Libby Dam - Lake Koocanusa, MT 
29-8 
29-8 
29-8 
29-8 
29-9 
29-9 
29-9 
29-10 
29-10 
29-10 
29-10 
29-11 
29-11 
29-7 
37. National Emergency Preparedness Program 
(NEPP) 
38. General Regulatory Functions Program 
29-15 
29-15 
29-16 
Tables 
Table 29-A Cost & Financial Statement 
Table 29-B Authorizing Legislation 29-23 
Table 29-C Other Authorized Navigation 
Projects 29-28 
Table 29-D Other Authorized Shore Protection Projects 29-29 
Table 29-E Other Authorized Flood Control 
Projects 29-30 
Table 29-F Other Authorized Multiple-Purpose 
Power Projects 29-33 
Table 29-G Other Authorized Environmental 
Projects 29-33 
Table 29-H Other Preconstruction Engineering and 
Design Projects 29-33 
Table 29-1 Other Authorized Projects 29-33 
Table 29-J Deauthorized Projects 29-34 
Table 29-K Lake Washington Ship Canal, WA, Principal 
Features of Double Lock and Dam 29-34 
Table 29-L Flood Control Activities Pursuant 
to Section 205, Public Law 80-858 29-35 
Table 29-M Environmental Activities Under Special 
Authorization 29-35 
29-1- 
1. 
2. 
3. 
4. 
5. 
6. 
7. 
8. 
9. 
10. 
11. 
12. 
13. 
29-12 
29-12 
29-12 
29-12 
29-13 
29-13 
29-13 
29-13 
29-14 
29-14 
29-14 
14. 
15. 
16. 
17. 
18. 
19. 
20. 
21. 
22.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 2000 
Navigation 
1. BELLINGHAM HARBOR, WA 
Location. Part of Bellingham Bay, an arm of Puget Sound, at 
Bellingham, in northwestern Washington. (See NOAA Survey 
Chart 18424.) 
Existing project. Channel 30 feet deep in Whatcom Creek 
Waterway from deep water to head of harbor, 363.2 feet wide 
to 750 feet from inner end, thence 18 feet deep for inner 750 
feet; I&J Street Waterway, a channel 100 feet wide and 18 feet 
deep at mean lower low water for a distance of 3,200 feet; 
Squalicum Creek Waterway, including dredging an entrance 
channel 200 feet wide and 26 feet deep from deep water in the 
bay to main pierhead line, and maintenance of southerly half 
and westerly end of Squalicum Creek basin to 26 feet deep, 
provided that no dredging can be done within 75 feet of 
wharves, piers, or similar structures; and small-boat basin 
adjacent to Squalicum Creek Waterway by construction and 
maintenance of two sections of rubblemound breakwater with 
combined length of 5,400 feet, including maintenance of 
minimum depths of 12 feet in entrance to basin. Plane of 
reference is mean lower low water. Range between mean 
lower low water and mean higher high water is 8.6 feet. 
Extreme range is about 16 feet. The small-boat basin 
expansion from 3,900 feet to 5,400 feet at Squalicum Creek 
Waterway and channel at I&J Street Waterway were 
constructed under authority of Section 107, P.L. 86-645. 
Construction costs for these features are recorded in Table 29- 
C. Project was completed in October 1980. (For further 
details see Annual Report for 1981. For details relating to 
previous project see page 797 of Annual Report for 1907.) 
Local cooperation. Fully complied with. Requirements are 
described in full on page 38-2 of FY 1980 Annual Report. 
Terminal facilities. Of the 40 wharves and piers in 
Bellingham Harbor, 9 are on Whatcom Creek Waterway, 3 on 
Squalicum Creek Waterway, 3 on I&J Street Waterway, and 9 
on Bellingham Bay. Two wharves on Whatcom Creek 
Waterway serve general cargo terminals. One is publicly 
owned and operated and is suitable for use by ocean-going 
vessels; the other one is privately owned and operated. There 
is one publicly owned terminal and small-boat harbor with 11 
wharves handling private craft and fishing boats. (See Port 
Series No.37 - Ports of Port Angeles, Port Townsend, Everett, 
Anacortes, and Bellingham, WA, revised 1987.) 
Operations during fiscal year. Maintenance, hired labor: 
Channel condition surveys were conducted. Sediment 
sampling and characterization studies were completed for the 
Squalicum Waterway Federal channel and port berthing areas. 
A multi-year (FY 2001-05) public notice was issued and the 
required environmental coordination completed. 
Maintenance, contract: None. 
2. BLAIR WATERWAY, TACOMA, WA 
Location. The waterway is located within the Port of Tacoma 
on Commencement Bay in south Puget Sound in the northeast 
section of Tacoma, approximately 30 miles south of Seattle, 
WA. 
Existing project. Improvement consists of modifying 2.6 
miles of the existing Federal navigation project for the Blair 
Waterway by deepening the channel and turning basin to -51 
feet mean lower low water - this to accommodate state-of-theart, 
post Panamax container ships. Estimated project cost is 
$4,532,000 ($1,956,000 Federal and $2,576,000 non-Federal), 
with completion in FY 2001. 
Local cooperation. Under current cost sharing requirements, 
the local sponsor (Port of Tacoma) will provide 50% of the 
costs allocated to the general navigation during construction 
and an additional 10% upon project completion. Concurrent 
with subject project, the contractor will dredge berth areas at 
100% sponsor cost. A Project Cooperation Agreement (PCA) 
was signed on September 10, 1999. 
Terminal facilities. There are many terminal facilities 
located in Tacoma Harbor which is comprised of 
Commencement Bay and its waterways. The Blair and Sitcum 
Waterways provide the primary container ship facilities for the 
Port of Tacoma. 
Operations during fiscal year. New work, hired labor: 
Supervised dredging contract. 
New work, contract: Dredging contract work under way. 
3. EVERETT HARBOR AND SNOHOMISH 
RIVER, WA 
Location. On Port Gardner Bay, at northern end of 
Possession Sound, an arm of Puget Sound at Everett, in 
northwestern Washington; and Snohomish River for 6.3 miles 
above mouth. (See NOAA Survey Chart 18444.) 
Existing project. Training dike extending from a point 
opposite 23rd Street northward 12,550 feet to outlet of 
Snohomish River, with spur dike extending 400 feet to 
pierhead line from north end of main dike; spur dike extending 
1,410 feet westward from Preston Point; removal of a section 
of training dike north of Snohomish River outlet; channel 150 
to 425 feet wide and 15 feet deep from deep water in Port 
Gardner Bay to 14th Street dock; thence a settling basin 700 
feet wide, 1,200 feet long, and 20 feet deep, thence a channel 
150 feet wide and 8 feet deep upriver to head of Steamboat 
Slough, a total distance of about 6.3 miles; settling basin 
within upper channel reach about 1 mile long with a capacity 
of 1 million cubic yards and maintaining East Waterway to 30 
feet deep. Plane of reference is mean lower low water. Range 
between mean lower low water and mean higher high water is 
29-2

SEATTLE. WASHINGTON DISTRICT 
11.1 feet. Extreme tidal range is about 19 feet. Project was 
completed in April 1963. (For further details, see page 1683 of 
Annual Report for 1963. For details relating to previous 
projects, see page 704 of Annual Report for 1905, page 2005 
of Annual Report for 1915, and page 1883 of Annual Report 
for 1938.) 
Local cooperation. Fully complied with. Requirements are 
described in full on page 38-3 of FY 1981 Annual Report. 
Terminal facilities. There are 42 piers and wharves in the 
Port of Everett, 17 in Port Gardner and 25 on the Snohomish 
River. These include: 19 publicly owned terminals with 4 
berths handling ocean-going vessels and 1 publicly owned 
terminal and small-boat basin handling fishing and pleasure 
craft. A portion of the East Waterway has been deepened and 
modified by the U.S. Navy for a Homeport. (See Port Series 
No. 37 - Ports of Port Angeles, Port Townsend, Everett, 
Anacortes, and Bellingham, WA, revised 1987.) 
Operations during fiscal year. Maintenance, hired labor: 
Channel condition surveys were conducted throughout the 
year. Aerial survey of the Jetty Island habitat development site 
was performed. Prepared plans and specifications for 
maintenance dredging and awarded contract. Monitored 
maintenance dredging contract. 
Maintenance, contract: A continuing contract for pipeline 
maintenance dredging, awarded in FY 1999, was completed in 
December. Dredging of the upstream settling basin resulted 
in 253,506 cy of shoal material being removed at a cost of 
$914,626. A portion of the material was rehandled from the 
city disposal site to the EPA Superfund cleanup site located on 
the Tulalip Indian Reservation. 
4. FRIDAY HARBOR, WA 
Location. Friday Harbor is located on the eastern shore of 
San Juan Island on the inland waters of northwestern 
Washington, about 28 nautical miles east of Victoria, British 
Columbia, and 60 nautical miles north of Seattle, WA. San 
Juan Island is one of over 170 islands in the San Juan 
Archipelago. Friday Harbor is the San Juan Island county seat 
and a United States Customs Port of Entry. (See NOAA 
Survey Chart 18425.) 
Existing project. Concrete floating breakwater (1,600 feet) 
to protect the existing port facilities and to allow the Port of 
Friday Harbor to provide 294 additional permanent moorage 
spaces and 44 additional transient spaces. Construction was 
completed in March 1984. 
Local cooperation. Fully complied with. Requirements are 
described in full on page 38-4 of FY 1981 Annual Report. 
Operations during fiscal year. Maintenance, hired labor: 
Routine coordination with the Port of Friday Harbor, U.S. 
Coast Guard, and navigation users. A detailed underwater 
inspection of the anchorage system for the concrete floating 
breakwater was performed by the Naval Facilities Engineering 
Service Center (NFESC). The NFESC recommended the 
replacement of 20 anchor chain legs and hardware and 
arranged for work by contract with completion in November 
2000. 
Maintenance, contract: None. 
5. GRAYS HARBOR AND CHEHALIS 
RIVER, WA 
Location. Harbor lies at mouth of Chehalis River, in 
southwestern part of Washington, 45 miles north of entrance to 
Columbia River. Chehalis River rises in southwestern part of 
Washington about 40 miles east of Pacific Ocean, flows 
generally northwesterly and empties into eastern part of Grays 
Harbor. (See NOAA Survey Chart 18502.) 
Existing project (including navigation Improvements to 
date). Provides for an entrance channel across the bar and 
through entrance 600 to 1000 feet wide and 38 to 46 feet deep, 
to be secured by a south jetty 13,734 feet long and a north jetty 
17,200 feet long, and by dredging; maintenance of channel 36 
feet deep and 350 feet wide from deep water in Grays Harbor 
14 miles to Cow Point; thence 30 feet deep and 200 feet wide, 
suitably widened at bends, to a point 13,700 feet upstream 
from Union Pacific Railroad bridge at Aberdeen, a distance of 
4.125 miles; a turning basin 30 feet deep, 550 feet wide, and 
1,000 feet long at upstream end of 30-foot channel near 
Cosmopolis; three breakwaters at, and maintenance of entrance 
channel to Westhaven Cove; protection of Point Chehalis for 
an exposed length of about 7,500 feet; and removal of 350- 
foot southwestern extension of the breakwater, replacing it 
with an 865-foot northeastern extension, and adding a 200-foot 
spur breakwater along the southerly entrance, constructed 
under authority of Section 107, P.L. 86-645. Construction cost 
for this feature is recorded in Table 29-C. Plane of reference is 
mean lower low water. Tidal range between mean lower low 
water and mean higher high water is 8.9 feet at Point Chehalis, 
10.1 feet at Aberdeen, and 8.1 feet at Montesano. Extreme 
range is 17.5 feet at Point Chehalis, 17.8 feet at Aberdeen, and 
23.8 feet at Montesano (river flood of 1935). ( For details 
relating to previous projects, see pages 2002-03 of Annual 
Report for 1915 and page 1863 of Annual Report for 1938.) 
Improved project. Authorized by Section 202 of the Water 
Resources Development Act of 1986. Project construction was 
started in April 1990. Completed project features are: deepen 
and widen 20 miles of existing 30-foot channel across ocean 
bar (46 feet deep and 1,000 feet wide), through the harbor 
entrance (46-38 feet deep and 1,000-600 feet wide), through 
South to Cow Point Reaches (36 feet deep and 350 feet wide); 
expand and deepen Cow Point and Junction City turning 
basins; deepen two downstream local berths; construct fish and 
initial crab mitigation; deepen last four miles of upstream 
existing 30-foot channel to 32 feet; and expand Cow Point 
another 50 feet to accommodate large cruise vessels. 
29-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVL WORS ACTIVITIES FOR 2000 
Modification of Union Pacific Railroad bridge was deleted 
from project scope in 1995. Construction of final crab 
mitigation, the last remaining project feature, was completed 
in FY 2000. Completion of project is currently scheduled for 
early 2001. Estimated project cost is $28,100,000 
($18,200,000 Federal; $9,900,000 non-Federal). 
Local cooperation. Fully complied with. Local Cooperation 
Agreement with Port of Grays Harbor, local sponsor for 
improvement project, was executed on February 16, 1990. The 
Port is contributing 35 per cent of improved project cost. In 
complying with terms of local cooperation, the Port is required 
to furnish lands and diked disposal areas and assure relocation 
of utility lines. 
Terminal facilities. There are 20 waterfront facilities (piers, 
wharves, and docks), exclusive of those available to 
recreational craft, at Grays Harbor, of which 5 are publicly 
owned. In foreign and domestic trade, they serve various 
purposes which include the receipt and/or shipment of: logs 
and lumber, paper, wood pulp, aluminum ingots, granite, other 
break bulk commodities, woodchips, conventional general 
cargo, seafood and fishing supplies, sand and gravel, and 
construction materials. Other uses include: mooring and icing 
fishing boats, mooring small vessels for outfitting and repair, 
and mooring company owned tugs. Those piers operated by 
the U.S. Coast Guard moor government owned vessels. 
Operations during fiscal year. New work, hired labor: 
Coordinated with Port of Grays Harbor (local sponsor), 
resource agencies, and Grays Harbor pilots. 
Maintenance, hired labor: Channel condition surveys were 
conducted throughout the year. The Corps hopper dredges 
Essayons and Yaquina dredged in the Entrance and Bar 
Channels, removing 536,952 cy and 209,288 cy, respectively 
at a cost of $1,268,950 and $513,050, respectively. Dredged 
material was placed at South Jetty disposal site. Initiated 
O&M navigation program study of submerged spur off end of 
North Jetty. Crab mitigation sites were surveyed for juvenile 
crab to determine mitigation credit. Plans and specifications 
were prepared for maintenance dredging. Supervised contract 
work. 
Maintenance, contract: Maintenance dredging of the inner 
harbor by clamshell dredge was completed at a cost of 
$2,705,489 with 916,057 cy of material being removed. 
Maintenance dredging of the outer harbor by hopper dredge 
was completed at a cost of $1,147,787 with 494,291 cy of 
material being removed, all of which was placed at the Pt. 
Chehalis disposal site. Contract was awarded to perform 
maintenance of approximately 5,000 feet of degraded North 
Jetty. Total contract cost is $6,200,000 with completion in FY 
2001. A continuing contract was awarded for South Jetty 
rehabilitation with completion in FY 2002. 
6. LAKE WASHINGTON SHIP CANAL, WA 
Location. Entirely within city of Seattle and extends from 
Puget Sound through Shilshole Bay, Salmon Bay, Lake Union, 
Portage Bay, and Union Bay to deep water in Lake 
Washington. (See NOAA Survey Chart 18447.) 
Existing project. Provides for a double lock and fixed dam 
from gated spillway and necessary accessory works, including 
fishladder, at the Narrows at entrance to Salmon Bay, about 
1.25 miles from deep water in Puget Sound; for a channel 34 
feet deep and 300 feet wide from Puget Sound to Burlington 
Northern Railway bridge, about 5,500 feet, with a passing 
basin 34 feet deep and log basin 8 feet deep at turn below 
railway bridge; then 34 feet deep and 150 feet to 200 feet wide 
to locks, about 900 feet; and a guide pier 600 feet long; for 
revetment of canal banks between locks and Lake Union and 
between Lakes Union and Washington; and for a channel 30 
feet deep with a width of 100 feet from locks to Lake Union, 
200 feet thence to Portage Cut, 100 feet through Portage Cut, 
and thence 200 feet wide through Union Bay to Lake 
Washington. Section included in project is about 10 miles 
long. Plane of reference is mean lower low water. Extreme 
tidal range is 19.3 feet. Range between mean lower low water 
and mean higher high water is 11.3 feet, and between mean 
lower low water and extreme low water is 4.6 feet. Ordinary 
fluctuation in upper pool is 24,inches; extreme fluctuation has 
been 3.6 feet Principal features of double lock and dam are set 
forth in Table 29-K. Project was completed in 1934. (For 
further details, see Annual Report for 1935. For details relating 
to previous projects, see page 2003 of Annual Report for 1915, 
and page 1880 of Annual Report for 1938.) 
Local cooperation. Fully complied with. 
Terminal facilities. The 18 waterfront facilities at Lake 
Washington Ship Canal are used for fuel oil, seafood, marine 
repair, drydocking, outfitting, mooring fishing vessels and 
repairs to the locks' equipment. Project is a part of Seattle 
Harbor's inner harbor. (See Port Series No. 36, revised 1993.) 
Operations during fiscal year. Maintenance, hired labor: 
Locks were operated and maintained all year, conducting 
16,752 lockings, passing 8,579 commercial vessels, 44,014 
pleasure vessels, and 1,744,908 tons of commerce. The 
fishladder passed more than 459,000 fish and there were 
1,469,066 project visitors. Prepared plans and specifications 
for controls replacement for the project 75-ton stiff leg crane, 
repaving the project circular drive, and window and exit door 
replacement for the project transformer house. 
Maintenance, contract: Contracts were initiated for upgrade 
of the large lock gate machinery, project pumpwell repair, and 
window and exit door replacement for the project transformer 
house. 
29-4

SEATTLE. WASHINGTON DISTRICT 
7. OLYMPIA HARBOR, WA 
Location. Near southern end of Puget Sound at head of Budd 
Inlet, about 45 miles southwest of Tacoma. (See NOAA 
Survey Chart 18456.) 
Existing project. Provides for a channel between deep water 
in Budd Inlet and port terminal, 30 feet deep at mean lower 
low water and 500 feet wide, with suitable additional width at 
bend; a turning basin adjacent to port terminal 30 feet deep, 
3,350 feet long, and 500 to 960 feet wide; and construction of 
a 656-foot concrete floating breakwater and dredging of the 
entrance and access channels and turning basin, constructed 
under authority of Section 107, P.L. 86-645. Construction cost 
for this feature is recorded in Table 29-C (East Bay Small 
Boat Basin). Extreme tidal range is 22.5 feet. Range between 
mean lower low water and mean higher high water is 14.4 feet. 
Existing project was completed in 1985. (For details relating 
to previous projects, see page 1369 of Annual Report for 1934 
and page 1873 of Annual Report for 1938.) 
Local cooperation. Fully complied with. 
Terminal facilities. Five port facilities are located in 
Olympia at Budd Inlet, exclusive of the numerous waterfront 
facilities in the port used by recreational craft. The industrial 
docks are used for conventional general cargo, logs, timber 
products and miscellaneous mooring. (See Port Series No. 35 - 
Ports of Tacoma, Olympia, and Grays Harbor, WA, revised 
1993.) 
Operations during fiscal year. Maintenance, hired labor: 
Maintained project coordination. Performed water quality 
monitoring at East Bay Marina during the seasonal periods of 
poor water quality. A surface inspection of the floating 
concrete breakwater was performed. Further coordinated with 
the Port of Olympia on proposed channel maintenance. 
Maintenance, contract: None. 
8. PROJECT CONDITION SURVEYS 
Hydrographic surveys and inspections to determine 
navigation conditions at boat basins, small navigation projects, 
and channels not funded on a project basis for the current 
fiscal year. Soundings and visual inspections in subject areas 
are conducted in order to evaluate shoaling conditions. 
Hydrographic charts are prepared and distributed. Fiscal year 
costs were $251,818. Total costs to date are $4,402,497. 
SURVEYS CONDUCTED 
Neah Bay, WA 
Tacoma Harbor, WA 
Waterway Connecting Port Townsend 
and Oak Bay, WA 
January, March 2000 
September 2000 
June 2000 
9. PUGET SOUND AND ITS TRIBUTARY 
WATERS, WA 
Location. Puget Sound is in the western part of Washington. 
Cities of Seattle, Tacoma, Olympia, Everett, Bellingham, and 
many small towns are on its bays and inlets. (See NOAA 
Survey Charts 18440, 18441, and 18448.) 
Existing project. Maintenance of Puget Sound and its 
tributary waters by snagging and dredging; and removal, in 
cooperation with the U.S. Coast Guard and city of Seattle, of 
floating debris from the Seattle Harbor area. Work consists of 
collecting large pieces of drift, waterlogged pilings, logs and 
other debris considered hazardous to navigation from Puget 
Sound and federally authorized channels. (For details relating 
to previous projects, see page 2003 of Annual Report for 1915 
and page 1869 of Annual Report for 1938.) 
Local cooperation. None required. Cities of Seattle, 
Tacoma, Olympia, Everett and Bellingham and the State of 
Washington are cooperating in a program for control of 
floating debris in their harbors and setting up collection sites 
for our debris vessel. 
Terminal facilities. Terminal facilities at numerous localities 
on Puget Sound and its tributary waters are, in general, 
considered adequate for existing commerce. 
Operations during fiscal year. Maintenance, hired labor: 
The debris vessel Puget operated continuously throughout 
Puget Sound and its tributary waters and removed 
approximately 2,700 tons of floating debris and hazards to 
navigation. Debris was disposed of locally or loaded aboard 
barges and disposed of by contract. Snagging operations were 
accomplished at Blaine Harbor, Bellingham Harbor, 
Swinomish Channel, Skagit River, Everett Harbor, Snohomish 
River (upstream to town of Snohomish), Lake Washington 
Ship Canal, Lake Washington, Tacoma Harbor, Olympia 
Harbor, Duwamish River, and Elliott Bay. 
Maintenance, contract: One thousand tons of harbor debris 
were disposed of at a cost of $89,000. Contractor continues to 
recycle much of the debris, reducing the cost of disposal by 
contract. Remainder of debris is placed in a demolition landfill 
or recycled through other government agencies. 
10. QUILLAYUTE RIVER, WA 
Location. River is formed by junction of Soleduck and 
Bogachiel Rivers, in northwestern Washington, and flows 
westerly 5 miles to Pacific Ocean at La Push, about 30 miles 
south of Cape Flattery. (See NOAA Survey Chart 18480.) 
Existing project. Provides for: jetty 15 feet high on easterly 
side of river mouth and a dike on westerly side, with a view of 
stabilizing entrance; channel 10 feet deep and 100 feet wide 
extending 2,000 feet upstream from deep water; basin 10 feet 
deep, 300 to 425 feet wide, and 2,400 feet long upstream of 
channel; and, maintenance of an ocean spit. Plane of reference 
29-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 2000 
is mean lower low water. Range between mean lower low 
water and mean higher high water at La Push is 8.3 feet. 
Extreme range is about 15 feet. The spit is nourished with 
dredged material in conjunction with channel dredging. The 
spit was rehabilitated with quarry rock in 1974, in 1979-80, 
and in 1982; in addition, a 500-foot breakwater section 
paralleling the channel and extending the spit was constructed. 
In 1995, the revetment on the downstream end of the ocean 
spit was extended 200 feet. In 1996, after the river breached 
the natural spit, the revetment on the ocean spit was extended 
approximately 1,700 feet to the north and the boat basin 
training wall was raised from elevation +9.0 to elevation + 16.0 
- all under O&M authority. Project was completed in February 
1997. 
Local cooperation. Fully complied with. 
Terminal facilities. There is one Quileute Tribe-owned dock 
at La Push, near the mouth of the Quillayute River. There is 
also a protected boat basin owned by the Quileute Tribe Port 
Authority which is used by fishing boats, pleasure craft, and 
the Coast Guard, which has a separate pier. 
Operations during fiscal year. Maintenance, hired labor: 
Condition surveys were made of the river channel. Prepared 
plans and specifications for contract work. Advertised and 
awarded a dredging contract. 
Maintenance, contract: A maintenance dredging contract was 
completed. The entrance channel and boat basin were dredged 
(79,193 cy) at a cost of $733,111. 
11. SEATTLE HARBOR, WA 
Location. Harbor at Seattle, WA, includes all waterways 
within city limits. Chief anchorage basin is Elliott Bay, an arm 
of Puget Sound. (See NOAA Survey Chart 18450.) 
Existing project. Maintenance of East and West Waterways, 
34 feet deep and 750 feet wide for 6,500 and 5,200 feet, 
respectively, from pierhead line in Elliott Bay, the 30-foot by 
200-foot wide channel from West Waterway to Ist Avenue 
South Bridge, and the 20-foot by 150-foot-wide channel from 
1st Avenue South Bridge to 8th Avenue; dredging Duwamish 
Waterway 150 feet by 15 feet from 8th Avenue to a point 
about 1.4 miles above 14th Avenue South Bridge, and turning 
basin 500 by 250 feet and 15 feet deep at the upper end of the 
waterway; maintenance of East Waterway between upper end 
of 750-foot section and Spokane Street, 34 feet deep, 700 feet 
long and 400 feet wide, and a turning basin, including head of 
East Waterway at junction of waterways south of Chicago, 
Milwaukee, St. Paul & Pacific Railroad bridge, to 30 feet 
deep, after these sections of waterway are dredged by local 
interests to full project dimensions. Total length of all 
waterways included in project is about 7.5 miles. Plane of 
reference is mean lower low water. Range between mean lower 
low water and mean higher high water is 11.3 feet Extreme 
tidal range is 19.3 feet. Project was completed in 1931, 
excluding maintenance of East Waterway above the 750-foot 
section. Turning basin, constructed under authority of R&H 
Act of Mar. 3, 1925, in 20-foot deep waterway was 
deauthorized by P.L. 99-662 dated Nov. 17, 1986. (For further 
details, see Annual Report for 1932.) 
Local cooperation. Fully complied with. Local sponsor has 
no maintenance responsibility. 
Terminal facilities. There are 203 piers, wharves, and docks 
located on the inner and outer harbors at Seattle, WA. Salmon 
Bay, Lake Union, Portage Bay and Lake Washington form the 
inner harbor; Elliott Bay and East, West and Duwamish 
Waterways form the outer harbor. (Lake Washington Ship 
Canal, a part of the inner harbor, is a separate project in this 
report.) These terminals serve a variety of purposes which 
include cargo handling, bunkering vessels, ferry service 
(vehicular, passenger and rail car), marine repair/ outfitting/ 
drydocking/ conversion, shipbuilding, handling supplies and 
equipment, and mooring company owned equipment, 
excursion vessels, fire boats, fishing vessels, government 
equipment, harbor craft/tugs, and oceanographic research 
vessels. The numerous waterfront facilities in the port used 
exclusively by recreational craft are not included. (See Port 
Series No. 36, revised 1993.) 
Operations during fiscal year. Maintenance, hired labor: 
Condition surveys were made of channels. 
Maintenance, contract: A maintenance dredging and 
deepening contract of the East Waterway was completed in 
March which resulted in clamshell dredging of 211,717 cy of 
material at a cost of $6,821,130. Approximately 86,000 cy of 
the dredged material were contaminated, requiring costly 
rehandling to a suitable upland disposal site. 
12. SWINOMISH CHANNEL, WA 
Location. An inland passage, I miles long, between 
Saratoga Passage and Padilla Bay, in northwestern part of 
Washington, about 60 miles north of Seattle. (See NOAA 
Survey Charts 18400, 18427 and 18421.) 
Existing project. A channel 100 feet wide and 12 feet deep 
for 11 miles from deep water in Saratoga Passage to deep 
water in Padilla Bay, by dredging and dike construction where 
necessary; and removal of protecting rocky points of McGlinn 
and Fidalgo Islands obstructing navigation at "Hole-in-the- 
Wall". Plane of reference is mean lower low water. Range 
between mean lower low water and mean higher high water is 
11.5 feet at south end of channel, 8.4 feet at north end, and 10 
feet at La Conner. Extreme tidal range is about 19.5 feet at 
south end of channel and about 16 feet at north end. Project 
was completed in March 1965. (For further details, see Annual 
Report for 1965.) 
Local cooperation. Fully complied with. 
29-6

SEATTLE. WASHINGTON DISTRICT 
Terminal facilities. There are 18 wharves, docks, and piers 
on Swinomish Channel, all but 3 of which are privately owned. 
Of these, one is used for handling general cargo; five are used 
exclusively for moorage, unloading and servicing of fishing 
vessels; two are used for handling petroleum products; three 
facilities are used for log dumps; and two for handling nonmetallic 
minerals. Three publicly owned facilities for 
launching, mooring, and servicing small craft are within the 
city limits of La Conner. 
Operations during fiscal year. Maintenance, hired labor: 
Maintained project coordination with Port of Skagit County, 
Port of Anacortes, U.S. Coast Guard, and navigation users. 
Channel condition surveys were conducted. Prepared plans 
and specifications for clamshell dredging and supervised the 
contract. 
Maintenance, contract: A contract was awarded to clamshell 
dredge 35,000 cy of shoal material at a cost of $196,200. The 
dredged material was rehandled to a contractor-fiurnished, 
remediation clean up pilot project in Bellingham Harbor. 
13. WILLAPA RIVER AND HARBOR AND 
NASELLE RIVER, WA 
Location. Willapa Harbor consists of lower reaches of 
Willapa River and Bay, an inlet of Pacific Ocean about 30 
miles north of mouth of Columbia River in Washington. 
Willapa River rises about 30 miles east of harbor, flows 
generally westerly, and empties into the bay. Naselle River 
enters the bay near its southerly end. (See NOAA Survey 
Chart 18504.) 
Existing project. Provides for: channel over bar at mouth of 
Willapa Bay, 26 feet deep and at least 500 feet wide; channel 
24 feet deep and 200 feet wide from deep water in Willapa 
Bay to foot of Ferry Street at South Bend, thence 300 feet 
wide to westerly end of narrows, thence 250 feet wide to forks 
of river at Raymond, including a cutoff channel 3,100 feet 
long at narrows and a closing dike at Mailboat Slough; channel 
24 feet deep and 150 feet wide up south fork to deep basin 
above Cram Lumber Mill, and up north fork to 12th Street, 
with a turning basin 250 feet wide, 350 feet long, and 24 feet 
deep at latter point; channel 10 feet deep and 40 feet wide 
from deep water in Palix River to Bay Center dock, with 
widening at shoreward end to provide a small mooring basin; 
mooring basin 15 feet deep, 340 feet wide, and 540 feet long 
adjacent to port wharf at Tokeland; entrance channel at 
Nabcotta 10 feet deep and 200 feet wide, and mooring basin 
10 feet deep, 500 feet wide, and 1,150 feet long, protected by 
a rubblenxund breakwater about 1,500 feet long; and removal 
of snags, piles, and other obstructions in navigable channel of 
Naselle River between Naselle and mouth. Project includes 
about 26 miles of channel from entrance through Willapa 
River forks, 2,800 feet of Palix River-Bay Center channel, and 
9 miles of Naselle River upstream of U.S. Highway 101 
Bridge. Plane of reference is mean lower low water. Tidal 
range between mean lower low water and mean higher high 
water is 8.9 feet at Toke Point, 9.9 feet at Raymond, 8.9 feet at 
Bay Center, and 10.8 feet near Naselle. Extreme range is 18 
feet at Toke Point, 19.3 feet at Raymond, 16 feet at Bay 
Center, and 18 feet near Naselle. Project was completed in 
November 1958. (For further details, see Annual Report for 
1959. For details relating to previous projects, see page 968 of 
Annual Report for 1910, page 2001 of Annual Report for 
1915, and page 1861 of Annual Report for 1938.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are 24 wharves on Willapa River 
and Harbor, including 5 in Willapa Bay, 4 in Bay Center, 12 in 
Raymond and South Bend, and 1 in Tokeland. Two of the 
wharves at Raymond and South Bend are suitable for use by 
ocean-going vessels. One of these is publicly owned and 
operated as a general cargo terminal, and one is located at a 
sawmill. The other wharves, including three which are publicly 
owned and operated, are used by shallow-draft vessels. These 
facilities are considered adequate for existing commerce. 
Operations during fiscal year. Maintenance, hired labor: 
Frequent condition surveys on the Willapa bar channel were 
performed at the request of the U.S. Coast Guard. The 
alignment of the Willapa bar thalweg continues to be a concern 
for safe navigation. Phase I of a technical study at Willapa Bay 
to determine if a safe, reliable bar navigation channel is 
feasible (the report completed in FY 1999) was published in 
April 2000. Monitored maintenance dredging contract. 
Maintenance, contract: A Bay Center Entrance Channel 
maintenance dredging contract resulted in 175,000 cy of clean, 
sandy dredged material to be placed at the Cape Shoalwater 
unconfined open water disposal site. The material was used 
beneficially to nourish an eroding off-shore dune line which 
protects the Shoalwater Tribal Reservation. The optimum 
dredging and disposal plan incorporated many technical 
findings of the Phase I report. 
Navigation activities pursuant to Section 107, Public Law 
86-645 (preauthorization). 
Fiscal year costs were: Entrance Channel Improvements, 
Neah Bay, WA, $6,677; Ocean Shores Marina, WA, $14,306; 
Port of Port Townsend, WA, $8,294 (terminated); Section 107 
Coordination, $9,488, a total of $38,765. 
Shore Protection 
Shore protection activities pursuant to Section 103, 
Public Law 874, 87th Congress, as amended 
(preauthorization). 
Fiscal year costs were: Shoalwater Bay, Tokeland, WA, 
$97,374. 
29-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORS ACTIVITIES FOR 2000 
Flood Control Local cooperation. Fully complied with. 
14. CEDAR RIVER, RENTON, WA 
Location. Project is located along the lower 1 1/4 miles of 
the Cedar River in the city of Renton, King County, WA, 
immediately southeast of the city of Seattle. 
Existing project. Dredging of the lower river channel 
approximately four feet from the mouth upstream to Logan 
Avenue bridge (one mile), gradually decreasing the slope 
upstream another 1/2 mile to meet the existing grade. Raise 
levees and floodwalls along both banks from the mouth to 
Williams Avenue 1 1/4 miles to contain the 100 year flood just 
prior to redredging. The interval for maintenance dredging 
will be approximately 3 years on average. Estimated total 
project cost is $9,442,000 ($5,000,000 Federal and 
$4,442,000 non-Federal). Flood control effort has been 
completed. Landscaping a mitigation site is the only 
remaining work to be accomplished. 
Local cooperation. Under current cost sharing requirements, 
the local sponsor (city of Renton) will .pay 47% of project 
implementation costs. A Project Cooperation Agreement 
(PCA) was executed May 9, 1998. 
Operations during fiscal year. New work, hired labor: 
Supervised contract work. 
New work, contract: Contract for landscaping underway. 
15. HOWARD A. HANSON DAM, WA 
Location. Green River, in northwestern Washington, flows 
westerly for 40 miles to Auburn, thence northerly 32 miles to 
its mouth in Elliott Bay at Seattle. Dam is at river mile 64, 6 
miles southeast of Kanaskat, and I mile downstream from 
mouth of north fork. (See Geological Survey topographic 
sheet, "Cedar Lake Quadrangle, WA".) 
Existing project. Rockfill dam about 235 feet high, with 
gated spillway having a concrete weir at elevation 1,176 feet 
above mean sea level and top of gates at elevation 1,206, 
creating a reservoir with capacity of 106,000 acre-feet. Dam 
along crest is about 675 feet long. Project is designed to 
control flooding in Green River Valley to alleviate agricultural 
and urban flood damage, and make possible further expansion 
of Seattle industrial area. It also supplements Tacoma water 
supply which was included as a betterment. Project was 
completed in June 1963. (For further details, see Annual 
Report for 1963.) Under the dam safety assurance program, 
the reservoir outlet control tower and bridge were strengthened 
to withstand the maximum, credible earthquake. Work was 
completed in FY 1998. 
Operations during fiscal year. Maintenance, hired labor: 
Operation continued all year. Routine maintenance was 
accomplished on roads, gages, debris booms, ditches, 
powerline, and other project features. Stilling basin inspection 
was accomplished. Work continued on water quality and 
sediment surveys. 
Maintenance, contract: Replaced sub-standard metal building 
with a new structure. 
16. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Inspections are made of federally constructed local flood 
protection projects which are maintained by local interests, and 
agencies responsible for their operation and maintenance are 
advised of any needed repairs. During the fiscal year 
inspections were made on Chehalis River at Aberdeen, Green 
River at Tukwila and Kent, Okanogan River at Omak and 
Oroville, Sammamish River at Redmond, Shelton Creek at 
Shelton, Skykomish and Wallace Rivers at Startup, 
Swinomish Channel at LaConner, American Lake, Wynoochee 
Dam and Yakima River at Yakima in Washington State; 
Lightning Creek at Clark Fork, Placer Creek at Wallace, Coeur 
d'Alene River at Coeur d'Alene, and St. Joe River at St.Maries 
in Idaho; and Clark Fork River at Missoula in Montana. Fiscal 
year costs were $179,600. Total costs to date have been 
$2,051,611. 
17. LONG ROAD, CHEHALIS RIVER, WA 
Location. The project is within Lewis County, Washington, 
immediately south of the city of Centralia. The levee ties into 
the Interstate Highway 5 embankment near milepost 81. 
Existing project. The project is a reverse L-shaped levee 
which includes an 800-foot-long east-west segment extending 
from the Interstate Highway 5 embankment across a field to 
the edge of an intermittent wetland. From there it bends north 
for a 1,300-foot-long north-south segment which parallels the 
Tacoma Eastern Railroad embankment to tie into high ground 
at South Street. Levee protection is limited to approximately 
the 35-to40-year events. The project was 95% complete in 
FY 2000. Estimated project cost is $467,000 ($303,550 
Federal and $163,450 non-Federal) with completion in FY 
2001. 
Local cooperation. Under current cost sharing 
requirements, the local sponsor (Lewis County Flood Control 
District 2 (Long Road District)) will pay 35% of project costs. 
A Project Cooperation Agreement (PCA) was executed April 
23, 1999. 
29-8

SEATTLE. WASHINGTON DISTRICT 
Operations during fiscal year. New work, hired labor. 
Completed plans and specifications, prepared bid documents 
and supervised contract work. 
New work, contract: Work underway by equipment rental 
contract. 
18. MUD MOUNTAIN DAM, WA 
Location. On White River, principal tributary of Puyallup 
River, near Mud Mountain, 28 miles above its confluence with 
Puyallup River, and 38 miles above mouth of Puyallup River. 
Dam is 6 miles upstream and southeast of Enumclaw, in 
northwestern Washington, and 38 miles east of Tacoma. (See 
Geological Survey topographic sheet "Cedar Lake 
Quadrangle, Washington".) 
Existing project (including dam safety assurance 
improvements to date). Rockfill dam, 700 feet long at crest 
elevation, rises 432 feet above bedrock. Reservoir has storage 
capacity of about 106,000 acre-feet. Flood control outlet 
works are in right abutment and permit an authorized, 
controlled discharge of 17,600 cubic feet per second through 
two concrete-lined tunnels, with a maximum capacity 
discharge of 21,500 cfs. Uncontrolled discharge over the 
spillway is maximum capacity for 245,000 cubic feet per 
second. Project affords flood protection to White and Puyallup 
River Valleys and protects Tacoma industrial district in 
conjunction with Puyallup River project at Tacoma against 
floods about 50 percent greater than maximum discharge of 
record. Original project was completed in June 1953. To date, 
the Corps has constructed two vista areas, a picnic area, a 
wading pool, and playground adjacent to the project office, a 
reservoir access point for hunters and fishermen, and a 1,760- 
foot trail leading to the lower vista area. Installation of an 
approximately 400-foot-deep concrete cutoff wall in the core 
of the dam was completed in November 1990 under the major 
rehabilitation program. Under dam safety assurance, spillway 
walls were raised, the dam crest was heightened, river 
diversion facilities required for excavation for the new tower 
were completed, the 9-foot diameter and the 23-foot diameter 
tunnels were refurbished, and a new reservoir outlet tower was 
constructed. 
Local cooperation. None required. 
Operations during fiscal year. Maintenance, hired labor: 
Project features were operated all year. Maintenance was 
accomplished on dam facilities, intake structure, gages, debris 
booms, power lines, roads, ditches, hiking trails, vista 
observation deck, recreation area, and fish facilities. 
Approximately 22,800 fish were transported from the fish 
collection facility to the upstream release point. Project staff 
continues to partially renovate the 40-year-old administration 
building. Prepared plans and specifications for corrosion 
control of project water supply tanks. 
Maintenance, contract: Rehab of fish trap facility was 
accomplished under contract. 
Dam Safety Assurance. New work, hired labor: Study is ongoing 
to identify problem areas with the new dam safety 
features. Design work for right bank stabilization was 
initiated. 
New work, contract: Installed steel armor on the floor of the 
23-foot tunnel. 
19. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
Flood control storage space was available in Hungry Horse 
Reservoir, MT, Flathead Lake, MT (controlled by Kerr Dam), 
Grand Coulee project, WA, Wynoochee Dam, WA, Upper 
Baker and Ross Reservoirs, WA. Issues relating to project 
operations were addressed. Regulation instructions were 
provided for flood control operations. Guidance forecasts were 
made during the flood control season, as required. No Lost 
Valley storage replacement was requested at Rocky Reach, 
Priest Rapids, and Wells Dams. Daily and/or hourly data were 
collected and tabulated as required to check compliance with 
operating criteria. Coordination necessary in preparation or 
revision of reservoir regulation manuals was carried on during 
the year with agencies responsible for the operation of these 
projects. Fiscal year costs were $428,279. Total costs to date 
have been $6,179,670. 
20. STILLAGUAMISH RIVER, WA 
Location. Formed by confluence of its north and south forks 
at Arlington, in northwestern Washington, Stillaguamnish River 
flows westerly 22 miles to Puget Sound, entering Port Susan 
through Hat Slough and South Pass, and Skagit Bay through 
West Pass. (See NOAA Survey Chart 18441, and Geological 
Survey Quadrangles Stanwood, Marysville, and Stillaguamish, 
WA.) 
Existing project. Works to reduce bank erosion and channel 
changes on Stillaguamish River 15 miles between Arlington 
and head of Hat Slough, and on Cook Slough, 3 miles long, as 
follows: revetment at 26 places on river and Cook Slough; 
concrete weir (including a fishway) 275 feet long between 
steel sheet pile piers at head of Cook Slough to limit flow 
through Slough; and two cutoff channels, each about 900 feet 
long, to eliminate sharp bends in Cook Slough. Tidal influence 
extends about 3 miles into improved section. Flood stages of 
16 feet above low water at Cook Slough weir have been 
observed. Project was completed in July 1939. (For further 
details, see Annual Report for 1940.) 
Local cooperation. None required. 
Operations during fiscal year. Maintenance, hired labor: 
Utilized in-house labor to supervise removal of brush from the 
29-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVL WORKS ACTIVITIES FOR 2000 
entire project along slopes of levee and construct rip rap 
repair. 
Maintenance, contract: Awarded equipment rental contracts 
to achieve removal of brush and repair erosion damage with 
rip rap. 
21. TACOMA, PUYALLUP RIVER, WA. 
Location. Puyallup River has its source in glaciers on 
western slopes of Mount Rainier, flows northwesterly 50 
miles, and empties into Commencement Bay, an arm of Puget 
Sound, at Tacoma, WA. Work covered by this project is on 
Puyallup River, within city limits of Tacoma. (See NOAA 
Survey Chart 18453.) 
Existing project. A channel with a capacity of 50,000 cubic 
feet per second between East 11th Street Bridge and lower end 
of inter-county improvement, a distance of about 2.2 miles, by 
straightening channel, building levees, revetting channel and 
levees, and making necessary bridge changes. The I Ith Street 
Bridge at lower end of project is 0.75 mile above mouth of 
Puyallup River. Diurnal tidal range at mouth of river is 11.8 
feet and extreme range is 20 feet. Project was planned in 
conjunction with Mud Mountain Dam and affords protection 
against floods about 50 percent greater than maximum 
discharge of record. A real estate design memorandum, 
approved by Office of the Chief of Engineers on October 2, 
1985, changed the project boundary to allow the Port of 
Tacoma to create a wetland adjacent to the project. This action 
resulted in the Corps acquiring approximately 2,450 linear feet 
of setback levee in fee simple. Maintenance funds to cover the 
increased length of the project have been provided by the Port 
of Tacoma for the project life. Project was completed in May 
1950. (For further details, see Annual Report for 1950.) 
Local cooperation. Fully complied with. 
Operations during fiscal year. Maintenance, hired labor: 
Utilized in-house labor to supervise removal of brush and 
noxious weeds from the entire project along slopes of levee. 
Coordinated annual clean-up with Citizens for a Healthy Bay, 
a tax-exempt, nonprofit organization.. 
Maintenance, contract: Awarded equipment rental contracts 
to achieve removal of brush and noxious weeds. 
22. WILLAPA RIVER, RAYMOND, WA 
Location. The project is located in Pacific County, 
southwestern Washington State. 
Existing project. The city of Raymond owns and operates a 
wastewater treatment plant adjacent to the Willapa River. 
Approximately 300 linear feet of the containment levee 
between the river and the sewage lagoon was in a damaged 
condition and the erosion threatened the levee stability. The 
riverward portion of the levee section has been excavated and 
rebuilt with embankment material and a protected toe 
constructed of armor rock and woody debris. The project was 
physically completed in August 2000. Total project cost is 
$120,605 ($82,378 Federal and $38,227 non-Federal), with 
final fiscal requirements remaining. 
Local cooperation. Under current cost sharing requirements, 
the local sponsor (city of Raymond) will pay 35% of costs 
beyond the first $40,000. A Project Cooperation Agreement 
(PCA) was executed November 23, 1999. 
Operations during fiscal year. New work, hired labor: 
Completed planning and design analysis, prepared bid 
documents, and supervised construction contract work. 
New work, contract: Completed construction contract work 
by equipment rental. 
Flood control activities pursuant to Section 205, Public 
Law 858, 80th Congress, as amended (preauthorization). 
See Table 29-L 
Flood control activities pursuant to Section 14, Public 
Law 526, 79th Congress as amended (preauthorization). 
Fiscal year costs were: Bogachiel River, WA, $42,930; 
Section 14 Coordination, $14,740; Upper Hoh Road, Forks, 
WA, $0 (terminated); and Willapa Bay, WA, $0 (construction 
initiated in FY 2000), a total of $57,670. 
Emergency flood control activities - repair, flood fighting, 
and rescue work (Public Law 99, 84th Congress, and 
antecedent legislation). 
Fiscal year costs were $1,786,435. 
Multiple-Purpose Power Projects 
23. ALBENI FALLS DAM, ID 
Location. On Pend Oreille River about 25 miles west of 
Sandpoint, in northern Idaho, and 50 miles northeast of 
Spokane, WA. Dam is 838 and 90 miles upstream from 
mouths of Columbia and Pend Oreille Rivers, respectively. 
(See Geological Survey topographic sheets, Sandpoint, ID, and 
Newport, WA.) 
Existing project. Provides flood control, hydroelectric 
power, and related water uses on Pend Oreille River as a part 
of the multiple-purpose plan for development of Columbia 
River Basin, including recreation development. At the dam, 
the river channel was formerly divided by an island and a low 
waterfall of about 7 feet Dam is a gated, gravity-structure 
spillway in left channel and a powerhouse having an 
installation of 42,600 kilowatts in right channel, creating a 
reservoir with a usable storage capacity of 1,153,000 acre-feet. 
29-10

SEATTLE, WASHINGTON DISTRICT 
Project was completed in June 1957. (For further details, see 
Annual Report for 1957.) Recreational facilities for public use 
have been provided at Albeni Cove, Priest River, Riley Creek, 
Johnson Creek, Trestle Creek, Strongs Island, and Springy 
Point. (Strongs Island was closed in FY 1982 to reduce O&M 
costs.) (Refer to Albeni Falls Master Plan dated June 1981 for 
further planned development.) 
Local cooperation. None required. 
Operations during fiscal year. Maintenance, hired labor: 
Reservoir was operated through its annual cycle of storage and 
release. Routine structural, mechanical, and electrical 
maintenance was performed on spillway, dam, powerhouse, 
and equipment. Prescribed testing and replacement of the 
exciters as part of the power system reliability improvements 
continued with funds provided by Bonneville Power 
Administration (Section 2406). 
Maintenance, contract: Contracts were completed for exterior 
concrete repairs and for powerhouse chiller installation. 
Contract for replacement of excitation system has completed 
the first unit, and continues. Contracts were awarded to finish 
the visitor center basement and to install powerhouse smoke 
evacuation equipment. 
24. CHIEF JOSEPH DAM - RUFUS WOODS 
LAKE, WA 
Location. On Columbia River in north central Washington, 
at River Mile 545, just upstream from mouth of Foster Creek, 
1.5 miles upstream from town of Bridgeport. (Geological 
Survey topographic sheet, Okanogan, WA, shows general 
locality.) 
Existing project. A concrete gravity structure which consists 
of a 19-gate spillway and a 27-unit powerhouse. The 
powerhouse has sixteen 88,274 kilowatt and eleven 95,000 
kilowatt generators with nameplate capacity of 2,457,384 
kilowatts. 
Local cooperation. None required. 
Operations during fiscal year. Maintenance, hired labor: 
Routine structural, mechanical, and electrical maintenance 
work was performed on powerhouse, spillway, dam and 
equipment. Prescribed testing for power system improvements 
and replacement DACS continued with funds provided by 
Bonneville Power Administration (Section 2406). 
Maintenance, contract: Contracts for service and tailrace 
deck repair and bridge pier footing repair were completed. 
Contract for re-roof of the powerhouse and warehouse was 
awarded. Contracts for the station service transformer 
replacement and the station service governor electronics 
retrofit are continuing with funds provided by Bonneville 
Power Administration (Section 2406). 
25. LIBBY DAM - LAKE KOOCANUSA, MT 
Location. On Kootenai River in Lincoln County, MT, about 
17 miles upstream from Libby, and 219 miles upstream from 
confluence of Kootenai and Columbia Rivers. (See Geological 
Survey topographic sheet, Thompson Lakes, MT.) 
Existing project. Provides storage for local flood control 
protection in Montana and Idaho, and main stem flood control 
in Lower Columbia River, hydroelectric power generation atsite 
and at downstream plants through storage release. Project 
is operated as a unit of a comprehensive system for 
improvement of Columbia River basin for flood control, 
navigation, hydroelectric power, and other purposes. Lake 
Koocanusa is 90 miles long, backing water 42 miles into 
Canada and has a usable storage capacity of 4,965,000 acrefeet 
at 50 percent drawdown. Construction of dam was in 
accordance with a treaty between United States and Canada 
relating to international cooperation in water resource 
development of the Columbia River basin. Dam is a straightaxis 
concrete gravity overflow type, 420 feet high, 3,055 feet 
long, with normal full pool at elevation 2,459 feet above mean 
sea level. Powerhouse has an initial installed capacity of 
480,000 kilowatts from four hydroelectric generating units. A 
fifth generating unit (Libby Additional Units Project) was 
completed in 1984 with an additional capacity of 120,000 
kilowatts. Fabrication of generators for units 6 through 8 is 
completed and parts have been stored at the site. Project is 
completed with units I through 5 operational. Units 6 through 
8 have been reclassified inactive. The Libby Reregulating 
Dam Project provides for construction of a reregulating dam 
about 10 miles downstream of Libby Dam. Funds were 
allocated for a construction start in 1977; however, courts have 
found that Congress did not authorize construction of the dam. 
In FY 1982, all work was terminated due to court direction. 
The Libby Reregulating Dam - Power Units Project 
provides for installation of three hydroelectric generating units 
at the reregulating dam with 78,900 kilowatt installed capacity. 
(For further details, see Annual Report for 1995). 
Local cooperation. Fully complied with. 
Operations during fiscal year. Maintenance, hired labor: 
Reservoir was operated through its annual cycle of storage and 
release. Routine structural, mechanical, and electrical 
maintenance was performed on spillway, dam, powerhouse and 
equipment. Cleaning of foundation drains began, and 
continues. Fish hatchery operations continued under contract 
to the State of Montana. Prescribed testing for power system 
reliability improvements continued with funds provided by 
Bonneville Power Administration (Section 2406). 
Maintenance, contract: Contracts were completed for project 
road repair construction and for new air compressors 
supplying air to breakers and governors. Contracts were 
awarded for replacement of the visitor center 
heating/ventilation system and for asbestos abatement on the 
project's water supply system. Design contract for 
29-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 2000 
modernization of intake crane was underway and initial repairs 
were begun at year-end. 
Environmental 
26. DEEPWATER SLOUGH, WA 
Location. The project is located on the Skagit River (South 
Fork), near Milltown, Skagit County, WA. 
Existing project. Construct approximately 8,300 linear feet 
of new dikes, augment and rehabilitate 10,000 linear feet of 
existing dikes, install two drainage structures, a bridge 
crossing for Deepwater Slough, provide native species 
planting, and placement of large, woody debris. Breach the 
existing dikes in three locations at Milltown Island to restore 
tidal and riverine influence. Completed project will reconnect 
portions of the wildlife area to tidal inundation and periodic 
flooding to re-establish inter-tidal marsh, shrub, and forested 
communities. Project was physically complete in FY 2000. 
Monitoring will continue through FY 2005. 
Local cooperation. Under current cost sharing requirements 
the local sponsor (Washington State Department of Fish and 
Wildlife) has provided 25% of project cost and any project 
betterments. A Project Cooperation Agreement (PCA) was 
signed on May 7, 1999. 
Operations during fiscal year. New work, hired labor: 
Supervised and administered equipment rental contract. 
New work, contract: Construction completed by equipment 
rental contract. 
27. GOLDSBOROUGH CREEK, WA 
Location. The restoration site is located in southwest 
Washington State, just east of the city of Shelton in Mason 
County at river mile 2.3 on Goldsborough Creek. 
Existing project. Dam structure and associated channel 
degradation/instability have created a bottleneck in a system 
which hinders upstream and downstream passage of fish. 
Restoration consists of removing the existing dam, placing fill 
material downstream, and constructing weirs to allow for fish 
passage. Habitat features have been incorporated to support 
ecosystem functions. Estimated project cost (including 
monitoring) is $5,147,000 ($3,345,000 Federal and 
$1,802,000 non-Federal), with construction complete in FY 
2002. Monitoring will continue through FY 2006. 
Local cooperation. Under current cost sharing requirements 
the local sponsor (Washington State Department of Fish and 
Wildlife) will provide 35% of project cost. A Project 
Cooperation Agreement (PCA) was signed July 6, 2000. 
Operations during fiscal year. New work, hired labor: 
Completed plans and specifications and prepared bid 
documents. 
New work, contract: None. 
28. LAKE WASHINGTON SHIP CANAL, WA 
Location. Entirely within city of Seattle and extends from 
Puget Sound through Shilshole Bay, Salmon Bay, Lake Union, 
Portage Bay, and Lake Union to deep water in Lake 
Washington. (See NOAA Survey Chart 18447.) 
Existing project. Lake Washington is fed by the 
Sammamish and Cedar River systems, and supports large 
anadromous salmon runs. A fish ladder at the Hiram A. 
Chittenden Locks provides for upstream migration of returning 
salmon adults. However, there are significant mortalities 
among salmon smolt leaving the lake system and passing 
through the lock chambers to salt water. Project construction 
reduces outmigrating mortalities. Elements of work included a 
strobe light system at the large lock entrance to reduce smolt 
entry into the locks, slower lockages to reduce turbulance, 
removal of barnacles in the large lock filling conduits, and a 
smolt slide to pass fish over the spillway gates near the fish 
ladder. Project was physically complete in FY 2000. 
Monitoring will continue through FY 2001. 
Local cooperation. Under current cost sharing requirements, 
the local sponsor (King County) has provided 25% of project 
cost. A Project Cooperation Agreement (PCA) was signed in 
September 1999. 
Operations during fiscal year. New work, hired labor: 
Completed plans and specifications, prepared bid documents, 
and supervised contract work. 
New work, contract: Completed contract work. 
29. PORTER LEVEE, WA 
Location. The project is located at river mile 35 on the left 
bank of the Green River, 30 miles southeast of Seattle, WA, in 
King County. 
Existing project. Restored flow into and out of existing 
former river meanders/side channels behind the Porter Levee 
isolated by the construction of the levee. Project purpose 
provides for eight acres of off-channel habitat similar to the 
side channel habitat which existed prior to the construction of 
Howard Hanson Dam. Specific features of the project are 1) 
upstream and downstream connections between river and old 
meander/ponds, 2) connections from old meander/pond to 
existing wetland, 3) revegetate riparian zone with native 
plants, and 4) remove culvert at Green Valley Road which was 
blocking fish passage. Project was physically complete in FY 
1999. Monitoring will continue through FY 2004. 
29-12

SEATTLE, WASHINGTON DISTRICT 
Local cooperation. Under current cost sharing requirements, 
the local sponsor (King County) has provided 25% of project 
cost. A Project Cooperation Agreement (PCA) was signed on 
June 17, 1999. 
Operations during fiscal year. New work, hired labor: 
Completed first year of monitoring. 
New work, contract: None. 
30. PUGET CREEK, WA 
Location. The project is located behind Kellogg Island at 
river mile 3 on the left bank of the Duwamish River in the city 
of Seattle, WA. 
Existing project. The effort restores about 0.5 acre of 
valuable estuary habitat within the authorized Seattle Harbor 
project. Development plans include creation of inter-tidal mud 
flats and a tidal marsh, with associated riparian buffer. By 
excavating 5,000 cy of materials along the banks of Puget 
Creek, the Duwamish River estuary will return to its natural 
shallow water and low bank condition. Project was physically 
complete in FY 1999. Monitoring will continue through FY 
2004. 
Local cooperation. Under current cost sharing requirements, 
the local sponsor (Port of Seattle) has provided 25% of project 
cost. A Project Cooperation Agreement (PCA) was signed on 
September 28, 1998. 
Operations during fiscal year. New work, hired labor: 
Completed fiscal requirements. 
New work, contract: None. 
31. SAMMAMISH RIVER WEIR 
RESTORATION, WA 
Location. Project is located near upstream end of the 
Sammamish River in Redmond, WA, 22 miles northeast of 
Seattle, in Marymoor Park. The Sammamish River (length 
13.7 miles) flows downstream from Lake Sammamish into 
Lake Washington. 
Existing project. Sammamish River Channel Improvements 
were constructed in 1965. Project provided major drainage 
improvement and flood protection for floods after March 1. 
The river channel was deepened an average of 5 feet and 
widened an average of 20 feet. Mouths of major tributaries 
were also deepened and widened. A previous Section 1135 
project was completed in FY 1995 at three locations 
downstream of Redmond, WA. Features included regrading of 
banks, placement of low flow habitat enhancement elements, 
and planting of riparian trees and shrubs. Current project 
provides for modification of the grade control sill (weir) and 
the right bank of the river adjacent to the sill and upstream for 
1,200 feet. Work provides fish passage improvements at the 
sill and a connected fish and wildlife habitat corridor from 
Lake Sammamish to the sill. Bank improvements additionally 
reduce severe bank erosion and water quality problems by 
channeling public access to designated areas. Construction 
work was physically complete in August 1998, with 
monitoring to continue for 5 years. 
Local cooperation. The local sponsor (King County) 
provided 25% of the project costs and is responsible for all 
operation and maintenance activities. A Project Cooperation 
Agreement (PCA) was executed on May 21, 1998. 
Operations during fiscal year. New work, hired labor: 
Monitoring was conducted for year two in FY 2000 by Corps 
staff. 
New work, contract: None. 
32. THORNTON CREEK, WA 
Location. Project is located in King County, at Lake 
Washington, in northeast Seattle, WA. 
Existing project. The project area consists of the portion of 
Matthews Beach Park which is south of Thornton Creek and 
which is frequently saturated. Restoration features include: 1) 
restoration of native riparian vegetation along lower 300 feet 
of the creek, 2) creation of a fish rearing pond adjacent to the 
creek with outflow to the creek, 3) diversion of water from a 
small creek at south end of the park in surface channel to 
supply pond, 4) planting of native vegetation around pond and 
along diversion (inflow) channel, 5) "softening" over a 
lakeshore bulkhead with fill, root wads and rocks, and 6) 
human access and viewing areas. Project was physically 
complete in September 1999. Monitoring will continue 
through FY 2003. 
Local cooperation. Under current cost sharing 
requirements, the local sponsor (city of Seattle, Parks and 
Recreation Department) provided 25% of project costs. A 
Project Cooperation Agreement (PCA) was executed 
September 4, 1998. 
Operations during fiscal year. New work, hired labor: 
Monitored biological values, functions, and final planting. 
New work, contract: None. 
33. TURNING BASIN #3, SEATTLE, WA 
Location. The restoration site is just south of the city of 
Seattle in King County, WA, near turning basin #3, which is 
near river mile 6.2 on the left bank of the Duwamish River. 
Existing project. Restore 6.2 acres of fish and wildlife 
habitat at the upstream limit of the Seattle Harbor project. 
Habitat development includes creation of inter-tidal mud flats, 
29-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 299000 
a tidal marsh, a new meandering stream channel, and 
"daylighting" the mouth of Hamm Creek into the Duwamish 
River. The downstream Hamm Creek stream length will be 
increased from the current 800 linear feet to 2,300 linear feet. 
Hamm Creek improvements will facilitate fish passage. 
Project is 95% complete, with minor construction items 
remaining. Estimated project cost is $2,600,000 ($1,950,000 
Federal and $650,000 non-Federal), with completion in FY 
2001. 
Local cooperation. Under current cost sharing requirements, 
the local sponsor (King County Department of Metropolitan 
Services (METRO)) will provide 25% of project cost. A 
Project Cooperation Agreement (PCA) was signed on May 17, 
1999. 
Operations during fiscal year. New work, hired labor: 
Supervised equipment rental contract. 
New work, contract: Completed work by equipment rental 
contract 
Environmental activities (Section 1135, Public Law 99- 
662, as amended; Section 206, Public Law 104-303). 
See Table 29-M. 
General Investigations 
34. SURVEYS 
Fiscal year costs were $147,694 for navigation studies, 
$187,124 for flood damage prevention studies, $60,361 for 
shoreline protection studies, $689,064 for special studies, 
$464,949 for review of authorized projects, $205,961 for 
miscellaneous activities, and $287,717 for coordination with 
other agencies and non-Federal interests, a total of $2,042,870. 
In addition, contributed funds were expended for the 
following: $59,834 for navigation studies, $85,020 for flood 
damage prevention studies, $355,611 for special studies, 
$224,565 for review of authorized projects, and $347,203 for 
coordination with other agencies and non-Federal interests, a 
total of $1,072,233. 
35. COLLECTION AND STUDY OF BASIC 
DATA 
The work programmed for collection and study of basic data 
covers international water studies, flood plain management 
services, and hydrologic studies. Work on international water 
studies included checking Kootenay Lake storage 
computations to determine compliance of West Kootenay 
Power & Light Co. with orders of International Joint 
Commission, and coordination with International Kootenay 
Lake and Osoyoos Lake Boards of Control in enforcement of 
International Joint Commission orders. Technical assistance 
was provided other Federal and non-Federal agencies and 
Indian tribes in flood hazard evaluation, flood reduction 
methods, and related services as requested. Fiscal year costs 
were $44,849 for international water studies, $209,939 for 
flood plain management services, and $7,991 for hydrologic 
studies, a total of $262,779. 
36. PRECONSTRUCTION ENGINEERING 
AND DESIGN 
See Table 29-H. 
Centralia, WA 
The city of Centralia lies in west central Washington at the 
confluence of the Chehalis and Skookumchuck Rivers, about 
midway along the Chehalis River from its source in the 
Willapa Hills to its mouth at Aberdeen in Grays Harbor. 
Floods of record on Skookumchuck, Newaukum, and 
Chehalis Rivers occurred in February 1996. 
The plan of improvement authorized in P.L. 99-662 would 
substantially reduce flooding in the Skookunmchuck River 
valley for the 22 miles between Skookumchuck Dam and the 
river mouth, including a major portion of Centralia, and 
provide minor reductions along the Chehalis River 
downstream from Centralia for about 20 miles to Oakville. 
The improvement, as recommended in the feasibility report, 
consisted of structural modifications (flood control outlet 
tunnel and spillway gate) which would enable the existing, 
private water supply dam to provide flood control storage 
during winter months. 
Preconstruction Engineering and Design (PED) was started in 
FY 1988 to refine the project design recommended in the 
feasibility report. In FY 1990, refinement of project design to 
a less costly, gated spillway sluice and reevaluation of 
hydrology, existing local levees and embankments, estimated 
flood damages, and potential flood reduction benefits were 
completed. Studies determined that the Skookumchuck Dam 
modification no longer appeared economically justifiable and 
further work was suspended. In FY 1992 a wrap-up report 
presenting results of the technical analyses completed to date 
was provided to local governments. 
Following the severe flooding in the Centralia-Chehalis area 
in 1996 there was a renewed public interest in flood damage 
reduction. Using state and local funding sources, Lewis 
County reviewed past study efforts and developed a revised 
flood damage reduction plan that would combine the 
authorized dam modification with overbank excavation and 
flow bypass measures. The revised project would provide 
substantial benefits to both Centralia and Cbehalis and 
appeared to be economically justified. In July 1998, Lewis 
County requested resumption of PED for the project with a 
view toward preparing a General Reevaluation Report and 
Environmental Impact Statement for an expanded project. 
Work resumed soon thereafter. 
29-14

SEATTLE. WASHINGTON DISTRICT 
Accomplishments during the fiscal year included the 
completion of the 2-foot topographic maps for Centralia and 
Chehalis Basins. Performed the geotechnical studies at 
Skookumchuck Dam for liquefaction analyses. Initiated a 
contract for restoration and mitigation opportunities within the 
study area. Performed cultural resource investigations 
throughout the study area. Processed numerous rights-of-entry 
for field investigations. Worked on the recon level 
alternatives for the study in order to select the preferred 
alternative in FY 2001. Prepared concept level design 
drawings for the alternative for flood storage at 
Skookumchuck Dam. Fiscal year costs were $1,479,587. 
Total costs to date have been $3,409,411. 
Howard Hanson Dam, WA 
Howard Hanson Dam is an existing earthfill and rockfill 
structure located at river mile 64.5 on the Green River, King 
County, WA, 35 miles southeast of Seattle and 35 miles 
northeast of Tacoma. 
Work under Preconstruction Engineering and Design (PED) 
commenced in FY 1998 to refine the project design 
recommended in the feasibility report. A Project Cooperation 
Agreement was signed on March 12, 1999. Site surveys and a 
general model study were initiated in FY 1999. 
Accomplishments during the fiscal year include coordination 
with the local sponsor (city of Tacoma Water Division), and 
continuation of PED activities on the tower, fish passage, and 
habitat mitigation/restoration sites. Technical reviews and 
value engineering reviews were initiated. Fiscal year costs 
were $1,735,274. Total costs to date have been $2,595,034. 
In addition, $793,063 contributed funds were expended in FY 
2000. Total contributed funds expended to date have been 
$793,688. 
Other Activities 
37. NATIONAL EMERGENCY 
PREPAREDNESS PROGRAM (NEPP) 
Fiscal year costs were $135,831, provided for activities 
required for local and national preparedness. 
38. GENERAL REGULATORY FUNCTIONS 
PROGRAM 
Permit Evaluation $2,687,222 
Enforcement 542,296 
Other Navigation Regulations 3,854 
Appeals 14,152 
TOTAL $3,247,524 
29-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 2000 
TABLE 29-A COST AND FINANCIAL STATEMENT 
See 
Section Total To 
in Text Project Funding FY 97 FY 98 FY99 FY00 Sep. 30, 2000 
1. Bellingham Harbor, WA 
(Federal Funds) 
(Contrib. Funds) 
2. Blair Waterway, 
Tacoma, WA 
(Federal Funds) 
(Contrib. Funds) 
3. Everett Harbor and 
Snohomish River, 
WA 
(Federal Funds) 
(Contrib. Funds) 
4. Friday Harbor, WA 
(Federal Funds) 
(Contrib. Funds) 
5. Grays Harbor and 
Chehalis River, WA 
(Federal Funds) 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
99,293 
99,293 
1,566,839 
1,566,839 
3,189,549 
3,189,549 
29,421 
29,421 
9,103 
9,103 
165,000 1,687,000 
157,784 1,682,740 
95,000 1,788,500 
95,000 1,590,788 
815,117 1,559,000 1,533,569 607,486 
933,473 1,562,712 1,550,729 608,903 
6,000 
2,624 
_ 13,084 
2,581 18,885 
76,000 49,225 1,006,167 
45,369 38,064 563,491 
335,098 
335,098 
-79,105 
310,710 
5,731,000 9,173,000 10,597,000 20,623,703 
5,802,808 6,127,575 13,627,581 20,637,890 
2,332,000 
2,320,524 3 
1,883,500 
1,685,788 
1,723,745 
1,723,745 4 
18,661,979 
18,661,938 5 
116,618 
116,618 
548,090 
548,090 
1,575,500 
1,575,500 6 
509,134 
509,134 
1,267,881 
1,267,881 
23,280,248 7 
23,177,615 8 
178,281,726 
178,268,237 9 
29-16

SEATTLE, WASHINGTON DISTRICT 
TABLE 29-A COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section Total To 
In Text Project Funding FY 97 FY 98 FY 99 FY00 Sep. 30, 2000 
Minor Rehab. 
(Contrib. Funds) 
6. Lake Washington 
Ship Canal, WA 
(Federal Funds) 
(Contrib. Funds) 
7. Olympia Harbor, WA 
9. Puget Sound and its 
Tributary Waters, WA 
10. Quillayute River, WA 
(Federal Funds) 
(Contrib. Funds) 
Approp. 
Cost 
Major Rehab. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major Rehab. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
29,000 
14,073 
200,000 
12,766 201,984 
100,000 
89,335 
7,349,000 6,345,750 6,873,858 7,242,000 
7,427,043 6,364,615 6,917,916 7,317,690 
40,000 
39,964 
4,000 35,000 217,927 
2,479 33,177 221,721 
15,640 
15,640 
1,000,000 898,000 626,351 627,364 
954,534 962,993 630,755 628,750 
6,663,584 1,206,000 891,202 
6,641,436 1,245,470 897,390 
803,917 
840,772 
29-17 
9,592 
9,592 10 
4,606,145 
4,606,145 
6,396,000 
6,369,759 11 
55,889 
55,889 
4,611,436 
4,611,436 
144,172,703 
144,133,897 
7,465,230 
7,465,230 
250,000 
250,000 
40,000 
39,964 
337,709 
337,709 
1,071,162 
1,071,162 
12 
13 
14 
15 
16 
43,337 
43,337 
26,940,465 
26,940,301 17 
18 
521,850 
521,850 
26,404,011 
26,402,460 
20,000 
20,000

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 2000 
TABLE 29-A COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section Total To 
In Text Project 
11. Seattle Harbor, WA 
(Federal Funds) 
(Contrib. Funds) 
12. Swinomish Channel, WA 
(Federal Funds) 
(Contrib. Funds) 
13. Willapa River and Harbor 
and Naselle River, WA 
(Federal Funds) 
(Contrib. Funds) 
14. Cedar River, Renton, WA 
(Federal Funds) 
(Contrib. Funds) 
15. Howard A. Hanson Dam, WA 
(Federal Funds) 
(Contrib. Funds) 
17. Long Road, Chehalis River, WA 
(Federal Funds) 
Funding 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
FY 97 FY 98 FY 99 FY00 Sep. 30, 2000 
170,335 
. _ 170,335 
529,000 1,230,000 1,794,091 3,254,349 
543,729 1,180,241 1,800,724 3,305,056 
17,508,813 19 
17,508,652 20 
69,333 
69,333 
_ 2,262,975 
_ 2,038,749 
238,000 238,000 91,108 
234,383 239,049 93,261 
250,630 
249,796 
546,383 2,490,000 1,215,172 2,051,158 
553,263 1,487,978 2,222,054 2,050,231 
2,357,450 21 
2,133,224 22 
808,332 
808,332 
8,877,711 
8,875,377 
32,000 
32,000 
379,248 
379,248 
1,386,955 
1,386,955 
21,340,073 
21,338,810 
78,372 
78,372 
77,500 2,480,011 2,035,300 
88,897 1,315,128 2,931,585 
31,900 1,617,000 1,365,260 
137,287 833,290 1,293,232 
900,000 
936,177 
261,220 
181,895 
883,414 
3,773 
4,474 
1,100,000 924,426 1,447,743 1,657,000 
1,123,583 972,991 1,472,651 1,669,894 
-3,958 
13,700 -3,958 
20,000 34,000 305,500 
5,717 15,460 41,346 181,399 
23 
24 
25 
26 
4,999,311 
4,985,849 
3,492,155 
3,337,718 
38,311,834 
38,311,834 27 
23,618,498 
23,610,961 28 
2,009,742 
2,009,742 
483,500 
344,061 
29-18

TABLE 29-A 
SEATTLE, WASHINGTON DISTRICT 
COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section Total To 
In Text Project Funding FY 97 FY 98 FY 99 FY00 Sep. 30, 2000 
(Contrib. Funds) 
18. Mud Mountain Dam, WA 
(Federal Funds) 
(Contrib. Funds) 
20. Stillaguamish River, WA 
(Federal Funds) 
(Contrib. Funds) 
21. Tacoma, Puyallup River, WA 
(Federal Funds) 
(Contrib. Funds) 
22. Willapa River, Raymond, WA 
(Federal Funds) 
(Contrib. Funds) 
23. Albeni Falls Dam, ID 
24. Chief Joseph Dam- 
Rufus Woods Lake, WA 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Minor Rehab. 
Approp. 
Cost 
Major Rehab. 
Approp. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
6,745 -64 
119,632 
5,053 
271,000 842,227 3,780,000 4,400,000 
181,214 867,658 1,866,410 4,794,889 
1,909,000 1,774,823 2,289,429 2,862,000 
1,857,312 1,790,974 2,380,528 2,854,976 
145,000 183,000 174,000 
146,279 184,132 174,684 
165,108 
164,776 
163,032 
48,086 
89,538,075 29 
88,519,553 30 
40,992,568 
40,967,461 
285,908 
285,908 
30,437,500 
30,437,500 
3,928 
3,928 
134,595 
134,595 
3,820,632 
3,820,126 
31 
32 
21,000 
21,000 
106,000 71,000 66,000 
105,642 71,934 66,961 
425 24,055 12,900 
I1,000 
5,592 
42,585 
42,514 
4,534 
82,311 
76,786 
52,500 
38,227 
5,366,568 5,011,487 4,553,193 6,522,770 
5,277,760 4,587,411 4,744,550 6,767,724 
246,000 -176,000 
173,193 -108,174 
-5,000 
20,303 231 
3,947,853 
3,947,853 
1,235,952 
1,235,733 
54,405 
49,250 
93,311 
82,378 
52,500 
38,227 
31,741,561 
31.741,561 
33 
34 
90,773,488 35 
90,319,808 36 
540,341,235 37 
540,341,224 38 
29-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 2000 
COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section Total To 
In Text Project 
25. Libby Dam- Lake 
Koocanusa, MT 
(Federal Funds) 
(Contrib. Funds) 
26. Deepwater Slough, WA 
(Federal Funds) 
(Contrib. Funds) 
27. Goldsborough Creek, WA 
(Federal Funds) 
(Contrib. Funds) 
28. Lake Washington Ship Canal, WA 
(Federal Funds) 
(Contrib. Funds) 
29. Porter Levee, WA 
(Federal Funds) 
(Contrib. Funds) 
30. Puget Creek, WA 
(Federal Funds) 
(Contrib. Funds) 
31. Sammamish River Weir 
Restoration, WA 
(Federal Funds) 
(Contrib. Funds) 
32. Thornton Creek, WA 
(Federal Funds) 
Funding 
Maint. 
Approp. 
Cost 
Major Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
ew Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
FY 97 FY 98 FY 99 FY 00 Sep. 30, 2000 
12,716,493 16,576,485 
12,647,268 15,907,903 
20,548,412 233,696,818 39 
17,164,718 228,838,830 40 
12,592,890 
12,285,641 
297,630 
297,630 
543,726,140 
543,726,140 41 
8,623,021 6,926,169 8,917,402 
8,562,756 6,943,323 8,800,690 
8,072,488 105,481,641 42 
7,196,483 104,298,777 43 
1,458,252 
1,458,252 
165,000 845,000 
120,738 740,930 
263,000 
75,641 
_ 40,000 690,000 
_ 12,205 484,511 
215,000 220,000 
171,310 238,311 
_ 162,800 
_ 115,992 
24,000 
6,972 
30,000 81,000 
8,509 90,417 
664,000 
598,381 
175,250 
237,475 
295,000 
471,023 
373,000 
1,234,000 
1,216,076 
557,000 
514,126 
-18,000 
28,524 
8,389 
-9,000 
373 
9,000 
4,650 
68,000 112,000 -6,000 
64,299 77,479 33,346 
38,250 
25,764 
49,000 162,500 
39,472 30,768 
11,176 
-40,500 
83,546 
1,011 
-1,011 
7,000 
22,509 
44 
1,674,000 
1,460,049 
438,250 
313,116 
1,025,000 
967,739 
373,000 
1,669,000 
1,625,697 
557,000 
514,126 
144,800 
144,516 
24,000 
15,361 
102,000 
99,299 
9,000 
4,650 
180,000 
178,351 
38,250 
35,929 
265,000 
262,775 
29-20 
TABLE 29-A

SEATTLE, WASHINGTON DISTRICT 
TABLE 29-A COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section Total To 
In Text Project Funding FY 97 FY 98 FY 99 FY 00 Sep. 30, 2000 
(Contrib. Funds) New Work 
Contrib. 106,700 - 106,700 
33. Turning Basin #3 
Seattle, WA 
Cost 
New Work 
Approp. 
Cost 
35,445 
160,000 40,000 836,200 
122,067 67,664 678,468 
1. Includes $56,582 appropriated and expended for previous 
project. Excludes $13,000 Coast Guard funds expended. 
2. Includes $1,092 appropriated and expended for previous 
project. 
3. Includes $480,000 for Preconstruction Engineering and 
Design, appropriated and expended. 
4. Includes $418,209 appropriated and expended for 
previous project. Excludes $43,000 Coast Guard funds 
expended. 
5. Includes $5,869 for previous project and $120,000 for 
Maintenance and Operation of Dams and Other 
Improvements of Navigable Waters, appropriated and 
expended. 
6. Includes $1,180,500 expended under Productive 
Employment Appropriation Act of 1983 (P.L.98-8). 
7. Includes $23,042,169 appropriated for all projects (current 
project is $18,160,287 including $3,530,000 PED), 
$124,945 for recreation facilities at completed project 
(Code 710), and $113,134 for previous project. Excludes 
$161,909 Navy funds and $6,000 Coast Guard funds. 
8. Includes $22,939,536 expended for all projects (current 
project is $18,057,654 including $3,530,000 PED), 
$124,945 for recreation facilities at completed project 
(Code 710), and $113,134 for previous project. Excludes 
$161,909 Navy funds and $6,000 Coast Guard funds. 
9. Includes $37,415 for previous project and $1,923,511 for 
Maintenance and Operation of Dams and Other 
Improvements of Navigable Waters, appropriated and 
expended. Excludes $409,660 Emergency Relief funds 
and $57,000 Public Works Administration funds 
expended. 
10. Excludes $111,000 Public Works Acceleration Act funds 
expended. 
11. Excludes $3,418,000 contributed by Port of Grays Harbor 
in fulfilling requirements of local cooperation. 
12. Includes $779,655 for recreation facilities at completed 
project (Code 710) and $485,002 for previous project, 
appropriated and expended. Excludes $246,567 expended 
by State of Washington and $742,071 expended by King 
County. Excludes $192,516 Public Works Administration 
funds expended. 
13. Includes $1,631,195 (1916 to 1936) and $338,163 
subsequently appropriated and expended under 
Maintenance and Operation of Dams and Other 
Improvements of Navigable Waters. 
14. Previous project. 
15. Includes $183,257 appropriated and expended for previous 
projects. Excludes $105,467 Public Works Administration 
funds expended. 
16. Includes $14,418 appropriated and expended for previous 
project. 
17. Includes $64,996 appropriated and expended for previous 
project. 
18. Excludes Navy funds expended on dredging river channel 
in 1944 and Coast Guard funds expended for channel 
dredging in 1948 and 1949. 
19. Includes $3,197,512 appropriated for East Waterway. 
20. Includes $3,197,511 expended for East Waterway. 
21. Includes $2,262,975 appropriated for East Waterway. 
22. Includes $2,038,749 expended for East Waterway. 
23. Excludes $1,000 Coast Guard funds expended. 
24. Includes $228,084 appropriated and expended for previous 
project. Excludes $40,000 Coast Guard funds and 
$192,314 Emergency Relief funds expended. 
25. Includes $309,177 appropriated and expended for previous 
projects. Excludes $78,532 Public Works Administration 
funds expended. 
26. Includes $6,597 expended for previous projects. 
27. Includes $37,048,061 appropriated and expended for 
original project and $1,263,773 appropriated and expended 
for Dam Safety Assurance. 
28. Includes $66,678 appropriated and expended under 
Maintenance and Operation of Dams and Other 
Improvements of Navigable Waters. 
29. Includes $13,182,063 appropriated for original project, 
$87,785 appropriated for recreation facilities at completed 
project (Code 710) and $76,268,227 appropriated for Dam 
Safety Assurance. Excludes $26,000 Emergency Relief 
funds. 
30. Includes $13,182,063 expended for original project, 
$87,785 expended for recreation facilities at completed 
project (Code 710) and $75,249,705 expended for Dam 
Safety Assurance. Excludes $26,000 Emergency Relief 
funds expended. 
31. Includes $198,578 appropriated and expended under 
Maintenance and Operation of Dams and Other 
Improvements of Navigable Waters. 
32. Excludes $281,000 Works Progress Administration funds 
and $85,999 Emergency Relief funds expended. 
33. Includes $5,035 appropriated and expended for recreation 
facilities at completed project (Code 710). 
34. Includes $30,769,614 for original project and $971,947 for 
recreation facilities at completed project (Code 710), 
appropriated and expended. Excludes $136,736 Public 
Works Acceleration Act funds expended for recreation 
facilities at completed project (Code 710). 
35. Includes funds appropriated for project O&M 
($80,526,170), Special Recreation Use Fees ($174,776), 
Maintenance and Operation of Dams and Other 
Improvements of Navigable Waters ($1,875,446), 
BPA/COE Merged, CAT 390 ($6,983,932) and BPA-4045 
Large Capital Subagreements, CAT 300 ($1,213,164). 
36. Includes funds expended for project O&M ($80,493,184), 
Special Recreation Use Fees ($174,776), Maintenance and 
Operation of Dams and Other Improvements of Navigable 
Waters ($1,875,446), BPA/COE Merged, CAT 390 
($6,852,310) and BPA-4045 Large Capital Subagreements, 
CAT 300 ($924,092). 
37. Includes $144,338,252 appropriated for original project, 
$395,855,000 for additional units, and $147,983 for 
recreation facilities at completed project (Code 710). 
29-21 
-9,555 
673,700 
809,069 
25,890 
1,709,900 
1,677,268 
5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 2000 
TABLE 29-A 
(Continued) 
COST AND FINANCIAL STATEMENT 
Excludes $58,000 Public Works Acceleration Act funds for 
recreation facilities at completed project (Code 710). 
38. Includes $144,338,252 expended for original project, 
$395,854,989 for additional units, and $147,983 for 
recreation facilities at completed project (Code 710). 
Excludes $58,000 Public Works Acceleration Act funds for 
recreation facilities at completed project (Code 710). 
39. Includes funds appropriated for project O&M 
($196,805,943), Maintenance and Operation of Dams and 
Other Improvements of Navigable Waters ($774,561), 
BPA/COE Merged, CAT 390 ($27,466,431), and BPA- 
4045 Large Capital Subagreements, CAT 300 
($8,649,883). 
40. Includes funds expended for project O&M ($196,772,616), 
Maintenance and Operation of Dams and Other 
Improvements of Navigable Waters ($774,561), BPA/COE 
Merged, CAT 390 ($27,210,047), and BPA-4045 Large 
Capital Subagreements, CAT 300 ($4,081,606). 
41. Includes $484,753,143 appropriated and expended for 
original project, $42,221,634 for additional units, 
$16,276,363 for reregulating dam, and $475,000 for power 
planning. 
42. Includes funds appropriated for project O&M 
($89,830,170), Maintenance and Operation of Dams and 
Other Improvements of Navigable Waters ($774,561), 
BPA/COE Merged, CAT 390 ($13,267,220), and BPA- 
4045 Large Capital Subagreements, CAT 300 
($1,609,690). 
43. Includes funds expended for project O&M ($89,815,640), 
Maintenance and Operation of Dams and Other 
Improvements of Navigable Waters ($774,561), BPA/COE 
Merged, CAT 390 ($13,176,771), and BPA-4045 Large 
Capital Subagreements, CAT 300 ($531,805). 
44. Excludes $161,849 expended by Federal Aviation Agency, 
$32,000 expended by Lincoln County- City of Libby Joint 
Airport Board, $8,000 expended by Bonneville Power 
Administration, and $379,555 expended by U.S. Forest 
Service. 
29-22

SEATTLE, WASHINGTON DISTRICT 
AUTHORIZING LEGISLATION 
Act Project and Work Authorized 
BELLINGHAM HARBOR, WA 
June 25, 1910 Whatcom Creek Waterway 26- and 18-foot channels. 
July 3, 1930 Entrance channel in Squalicum Creek Waterway. 
Aug. 26, 1937 Maintenance of southerly half and westerly end of 
Squalicum Creek Basin. 
Sep. 3, 1954 Small-boat basin adjacent to Squalicum Creek Waterway. 
July 14, 1960 Expansion of small-boat basin. 
as amended 
July 3, 1958 
July 14, 1960 
as amended 
2. July 14, 1960 
as amended 
Whatcom Creek Waterway, 30-foot channel. 
Channel 3,200 feet long, 100 feet wide, and 18 feet deep 
in I&J Street Waterway. 
BLAIR WATERWAY, TACOMA, WA 
Deepen channel and turning basin to -51 feet mean lower low 
water. 
EVERETT HARBOR AND SNOHOMISH RIVER, WA 
June 25, 1910 Training dike 10,500 feet long extending across bar at 
outlet of old river channel. 
July 3, 1930 Raise 6,000 feet of training dike, extend spur dike, widen 
gap in dike as required, maintain East Waterway and 
channel to gap. 
June 20, 1938 Abandon project for Snohomish River and redesignate as 
Everett Harbor and Snohomish River. Provide settling 
basin near 14th Street. 
Sep. 3, 1954 Construct spur dike at Preston Point, remove training dike 
north of river outlet, enlarge channel to 14th Street, and deepen 
settling basin. 
July 14, 1960 Widen channel from settling basin to gap; extend channel 
to head of Steamboat Slough; and a settling basin within 
upper channel reach. 
4. 
5. 
July 14, 1960 
as amended 
June 3, 1896 
Mar. 2, 1907 
Mar. 2, 1907 
June 25, 1910 
June 25, 1910 
Aug. 8, 1917 
Jan. 21, 1927 
Aug. 30, 1935 
Aug. 30, 1935 
Dec. 22, 1944 
as amended 
Mar. 2, 1945 
June 30, 1948 
FRIDAY HARBOR, WA 
Construction of 1,600 feet of concrete floating breakwater. 
GRAYS HARBOR AND CHEHALIS RIVER, WA 
South jetty. 
A north jetty 9,000 feet long. 
The 18-foot channel. 
Extend north jetty 7,000 feet; length of south jetty 
fixed at 13,734 feet. 
A 6-foot channel above Cosmopolis. 
Dredging in bar channel. 
Dredging in bar channel. 
Reconstruct north and south jetties to an elevation of 
16 feet above mean lower low water. 
Maintain 26-foot channel below Aberdeen (as authorized 
by Public Works Administration Dec. 1 I, 1933) and 
combining projects for Grays Harbor and bar entrance and 
Grays Harbor, inner portion, and Chehalis River under 
a modified project for Grays Harbor and Chehalis River. 
Construction, operation, and maintenance of recreation 
facilities. 
Maintain 30-foot depth in channel from deep water in Grays 
Harbor to Port of Grays Harbor Commission terminal 
which was deepened from 26 to 30 feet with Navy funds. 
14-foot channel to Bay City; breakwater at Westhaven; 
and maintenance of Westhaven entrance channel. 
in Text Documents 
1. 
29-23 
TABLE 29-B 
See Date 
Section Authorizing 
H. Doc. 1161, 60th Cong., 2d Sess. 
H. Doc. 187, 70th Cong., Ist Sess. 
Rivers and Harbors Committee 
Doc. 70, 74th Cong., 1st Sess. 
H. Doc. 558, 82d Cong., 2d Sess. 
Sec. 107, P.L. 86-645 
Authorized by Chief of Engineers 
Feb 10, 1976. 
S. Doc. 46, 85th Cong., Ist Sess. 
Sec. 107, P.L. 86-645 
Authorized by Chief of Engineers 
May 5, 1965. 
Sec. 107, P.L. 86-645. 
Authorized by Chief of Engineers 
Sep. 17, 1999 
H. Doc. 1108, 60th Cong., 2d Sess. 
H. Doc. 377, 71st Cong., 2d Sess. 
H. Doc. 546, 75th Cong., 3d Sess. 
H. Doc. 569, 81st Cong., 2d Sess. 
H. Doc. 348, 86th Cong., 2d Sess. 
Sec. 107, P.L. 86-645. 
Authorized by Chief of Engineers 
July 9, 1981. 
Annual Report, 1895, pp. 3517-3533. 
Rivers and Harbors Committee 
Doc. 2, 59th Cong., 2d Sess. 
H. Doc. 507, 59th Cong., Ist Sess. 
Rivers and Harbors Committee 
Doc. 29, 61st Cong., 2d Sess. 
H. Doc. 1125, 60th Cong., 2d Sess. 
H. Doc. 1729, 64th Cong., 2d Sess. 
H. Doc. 582, 69th Cong., 2d Sess. 
Rivers and Harbors Committee 
Doc. 2, 74th Cong., Ist Sess. 
H. Doc. 53, 73rd Cong., Ist Sess. 
Rivers and Harbors Committee 
Doc. 2, 74th Cong., Ist Sess. 
P.L. 78-534 
Report in Office, Chief of Engineers 
H. Doc. 635, 80th Cong., 2d Sess.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 2000 
TABLE 29-B 
(Continued) 
AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Dredging and maintenance of a 30-foot channel and 
turning basin from Aberdeen to Cosmopolis. 
Additional breakwater, 1,400 feet long, at Westhaven Cove. 
Westhaven Cove small boat basin. 
Improve project features with accompanying fish mitigation. 
LAKE WASHINGTON SHIP CANAL, WA 
June 25, 1910 Provides for a double lock and fixed dam with gated 
Mar. 4, 1913 spillway and necessary accessory works at entrance to 
Salmon Bay, dredging a channel from locks to deep water 
in Puget Sound, and excavation by local interests of 
a channel from locks into Lake Washington. 
Aug. 8, 1917 Dredging below locks and revetting canal banks. 
Sep. 22, 1922 Increased dimensions of channel between Puget Sound 
and locks and a 600-foot extension of lower guide pier. 
June 26, 1934 1 Operating and care of locks and dam provided for with 
funds from War Department appropriations for Rivers 
and Harbors. 
Aug. 30, 1935 2 Enlarge channel between locks and Lake Washington. 
Dec. 22, 1944 Construction, operation, and maintenance of recreation 
as amended facilities. 
July 24, 1956 Government Locks to be known as Hiram M. Chittenden 
Locks. 
Jan. 21, 1927 
July 3, 1930 
Aug. 30, 1935 
Aug. 26, 1937 
July 14, 1960 
as amended 
July 13, 1892 
July 3, 1930 
Mar. 2, 1945 
Sep. 3, 1954 
Mar. 2, 1919 
OLYMPIA HARBOR, WA 
Channel 22 feet deep and 150 feet wide. 
Increase channel to 26-foot depth on east side of harbor. 
Elimination from project of 12-foot channel on east and 
west sides of harbor, and for a channel 30 feet deep and 
300 feet wide between Budd Inlet and port terminal, with 
turning basin of same depth. 
Widen outer portion of channel to 500 feet, and widen 
entrance to turning basin. 
656-foot concrete floating breakwater and dredging 
of entrance and access channels and turning basin. 
PUGET SOUND AND ITS TRIBUTARY WATERS, WA 
Maintenance of the rivers tributary to Puget Sound by 
snagging and dredging, and removal of floating debris 
from Seattle Harbor. 
QUILLAYUTE RIVER, WA 
Jetty (5 feet high) on easterly side of mouth, and a dike on 
westerly side, to stabilize entrance. 
Maintenance dredging to provide a channel 6 feet deep 
and of suitable width from ocean to within river mouth. 
Raising jetty to 15 feet; channel 10 by 100 feet, 2,000 feet 
long; moorage basin. 3 
SEATTLE HARBOR, WA 
Maintenance of East and West Waterways 750 feet wide 
and 34 feet deep, and of Duwamish Waterway 20 feet deep 
and 150 feet wide as far south as Eighth Avenue South Bridge. 
Sep. 3, 1954 
Sep. 3, 1954 
July 14, 1960 
as amended 
Nov. 17, 1986 
29-24 
H. Doc. 412, 83d Cong., 2d Sess. 
H.Doc. 30, 84th Cong., Ist Sess. 
Sec. 107, P.L. 86-645. 
Authorized by Chief of Engineers 
Feb. 7, 1979 
P.L. 99-662. 
H. Doc. 953, 60th Cong., Ist Sess. 
H. Doc. 800, 64th Cong., Ist Sess. 
H. Doc. 324, 67th Cong., 2d Sess. 
H. Doc. 140, 72d Cong., Ist Sess. 
P.L. 78-534 
P.L. 84-779 
H. Doc. 244, 69th Cong. 1st Sess. 
Rivers and Harbors Committee 
Doc. 5, 71st Cong., Ist Sess. 
Rivers and Harbors Committee 
Doc. 21, 73rd Cong., 2d Sess. 
Rivers and Harbors Committee 
Doc. 75, 74th Cong., 2d Sess. 
Sec. 107, P.L. 86-645. 
Authorized by Chief of Engineers 
May 13, 1981 
Annual Report for 1893, page 3425 
H. Doc. 125, 71st Cong., Ist Sess. 
H. Doc. 218, 78th Cong., Ist Sess. 
H. Doc. 579, 81st Cong., 2d Sess 
S. Doc. 313, 65th Cong., 3d Sess. 
6.
10. 
11.

SEATTLE, WASHINGTON DISTRICT 
AUTHORIZING LEGISLATION 
Project and Work Authorized 
Enlargement of Duwamish Waterway. 
Aug. 30, 1935 Maintenance of East Waterway between 750-foot section 
and Spokane Street, and turning basin at junction of East 
and Duwamish Waterways. 
Oct. 12, 1996 East Waterway channel deepening. 
SWINOMISH CHANNEL, WA 
July 13, 1892 Channel 4 feet deep and 100 feet wide, and dike 
Aug. 30, 1935 
13. 
construction. 
Enlargement of channel to present project dimensions. 
Oct. 23, 1962 Removal of navigation hazards at "Hole-in-the-Wall". 
WILLAPA RIVER AND HARBOR AND NASELLE 
RIVER, WA 
July 27, 1916 Channel 24 feet deep, 200 feet wide in Willapa River, and 
150 feet wide in the forks. 
Aug. 30, 1935 2 
Aug. 30, 1935 4 
Mar. 2, 1945 
Sep. 3, 1954 
Maintenance of channel over bar to a depth of 26 feet 
and minimum width of 500 feet. 
For cutoff channel at Narrows. 
Channel from deep water in Palix River to Bay Center dock. 
Widen Willapa River channel to 360 and 250 feet between 
South Bend and the forks; Tokeland and Nahcotta basins; 
and Naselle River clearance. Willapa River and Harbor redesignated 
as Willapa River and Harbor and Naselle River. 
TABLE 29-B 
(Continued) 
See Date 
Section Authorizing 
in Text Act 
Mar. 3, 1925 
July 3, 1930 
CEDAR RIVER, RENTON, WA 
June 30,1948 Dredging of lower river channel 
as amended and raising of levees and floodwalls 
along both river banks. 
HOWARD A. HANSON DAM, WA 
May 17, 1950 Eagle Gorge flood control dam on Green River. 
Aug. 6, 1958 Redesignation of project as Howard A. Hanson Dam. 
LONG ROAD, CHEHALIS RIVER, WA 
June 30, 1948 Levee protection. 
as amended 
MUD MOUNTAIN DAM, WA 
June 22, 1936 Flood control dam on White River. 
Dec. 22, 1944 Construction, operation, and maintenance of 
as amended recreation facilities. 
STILLAGUAMISH RIVER, WA 
June 22, 1936 Improvement of flood channel by clearing and bank revetment 
at 26 sites; concrete weir at head of Cook Slough; 
and 2 cutoff channels in Cook Slough. 
June 28, 1938 Maintenance of improvements. 
Sec. 205, P.L. 80-858 
Authorized by Chief of Engineers 
June 1, 1998 
H. Doc. 271, 81st Cong., Ist Sess. 
P.L. 85-592 
Sec. 205, P.L. 80-858 
Authorized by Chief of Engineers 
July 17, 2000 
S. Committee Print, Puyallup 
River, WA, 74th Cong., 2d Sess. 
P.L. 78-534. 
H. Doc. 657, 71st Cong., 3d Sess. 
P.L. 75-761 
29-25 
Documents 
H. Doc. 108, 68th Cong., Ist Sess. 
H. Doc. 126, 71st Cong., 2d Sess. 
H. Doc. 211, 72d Cong., Ist Sess. 
P.L. 104-303 
H. Doc. 31, 52d Cong., Ist Sess. and 
Annual Report for 1892, p. 2752 
S. Committee Print, 73rd Cong., 
I st Sess. 
H. Doe. 499, 87th Cong., 2d Sess. 
H. Doc. 706, 63d Cong., 2d Sess. 
Rivers and Harbors Committee 
Doc. 41, 72d Cong., Ist Sess. 
Rivers and Harbors Committee 
Doc. 37, 73rd Cong., 2d Sess. 
H. Doc. 481, 76th Cong., 2d Sess. 
H. Doc. 425, 83d Cong., 2d Sess. 
12. 
14. 
15. 
17. 
18. 
20. 
- - -- -- ---- --- 
-- ----

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 2000 
TABLE 29-B 
(Continued) 
AUTHORIZIfNOEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
TACOMA, PUYALLUP RIVER, WA 
June 22, 1936 Channel improvement to protect people and industrial 
section of city of Tacoma. 
Dec. 22, 1944 Construction, operation, and maintenance of 
as amended recreation facilities. 
WILLAPA RIVER, RAYMOND, WA 
July 24, 1946 Rebuild damaged levee section to protect a wastewater 
as amended treatment plant. 
May 17, 1950 
Dec 22, 1944 
as amended 
ALBENI FALLS DAM, ID 
Multi-purpose dam with powerhouse. 
Construction, operation, and maintenance of 
recreation facilities. 
CHIEF JOSEPH DAM - RUFUS WOODS LAKE, WA 
July 24, 1946 Multi-purpose dam and powerhouse on Columbia River 
at Foster Creek. 
June 30, 1948 Redesignation of the project as Chief Joseph Dam. 
July 9, 1952 Designation of reservoir as Rufus Woods Lake. 
Dec. 22, 1944 Construction, operation, and maintenance of 
as amended recreation facilities. 
Oct. 22, 1976 School facilities for education of dependents of 
as amended 
May 4, 1977 
May 17, 1950 
Nov. 7, 1966 
Jan. 2, 1968 
Aug. 13, 1968 
June 19, 1970 
Dec. 31, 1970 
Dec. 31, 1970 
construction personnel. 
LIBBY DAM - LAKE KOOCANUSA, MT 
Multi-purpose dam and powerhouse, and reregulating 
facilities. 
School facilities for education of dependents of construction 
personnel, Libby project. 
Airport facility at Kelley Flats, MT. 
Design standards for relocation of Montana State 
Highway 37 to be those adopted by State of Montana 
pursuant to provisions of Highway Safety Act of 1966. 
Participation with State of Montana in construction, 
operation and maintenance of fish hatchery facilities. 
Designation of lake formed by the waters impounded 
by Libby Dam as Lake Koocanusa. 
Design and construction of sewage collection and sewage 
treatment facility as part of relocation of municipal 
facilities of Rexford, MT; and compensation for railroad 
employees suffering long-term economic injury through 
reduction of income as result of the relocation of rail 
transportation facilities due to the construction of 
Libby Dam. 
S. Committee Print, Puyallup 
River, WA, 74th Cong., 2d Sess. 
P.L. 78-534. 
Sec. 14, P.L. 79-526 
Authorized by Chief of Engineers 
Nov. 24, 1999. 
S. Doc. 9, 81st Cong., Ist Sess. 
P.L. 78-534. 
H. Doc. 693, 79th Cong., 2d Sess. 
P.L. 858, 80th Cong., 2d Sess. 
P.L. 469, 82d Cong., 2d Sess. 
P.L. 78-534. 
P.L. 94-587 
P.L. 95-26 
H. Doc. 531, 81st Cong., 2d Sess. 
P.L. 89-789 
P.L. 90-239 5 
P.L. 90-483 6 
P.L. 91-282 7 
P.L. 91-625 
P.L. 91-611 
29-26 
21. 
22. 
23. 
24. 
25.

SEATTLE, WASHINGTON DISTRICT 
AUTHORIZiNO6LEGISLATION 
Act Project and Work Authorized 
Mar. 7, 1974 Phase I design memorandum stage for installation of 
power generating facilities at Libby Reregulating Dam. 
Mar. 7, 1974 Construction of fish production measures to compensate 
for fish losses attributed to the project, and for acquisition 
of necessary real estate, construction of access roads and 
utilities (amends P.L. 91-282 by increasing limitation from 
$750,000 to $4,000,000). 
Mar. 7, 1974 Acquisition of land (not to exceed $2,000,000) for prevention 
of wildlife grazing losses caused by the project. 
Mar. 7, 1974 Reimbursement (not to exceed $350,000) to Boundary 
County, ID, for reconstruction of Deep Creek Bridge 
made necessary by duration of high flows during drawdown 
operations at Libby Dam. 
Mar. 7, 1974 Compensation (not to exceed $1,500,000) to Drainage 
Districts and owners of leveed and unleveed lands in 
Kootenai Flats, Boundary County, ID, for damages caused 
by duration of higher flows during drawdown operations 
at Libby Dam. 
Oct. 22, 1976 Amends P.L. 93-251 by increasing limitation from $350,000 
to $380,000 for reimbursement to Boundary County, ID, 
for reconstruction of Deep Creek Bridge. 
Nov. 17, 1988 Alleviate low water impact on existing facilities and protect 
Indian archeological sites exposed during course of 
operations, at an estimated cost of $750,000. 
Nov. 17, 1986 
as amended 
Oct. 12, 1996 
28. 
29. 
Nov. 17, 1986 
as amended 
Nov. 17, 1986 
as amended 
Nov. 17, 1986 
as amended 
Nov. 17, 1986 
as amended 
30. 
31. 
DEEPWATER SLOUGH, WA 
Environmental restoration. 
GOLDSBOROUGH CREEK, WA 
Aquatic ecosystem restoration. 
LAKE WASHINGTON SHIP CANAL, WA 
Environmental restoration. 
PORTER LEVEE, WA 
Environmental restoration. 
Documents 
S.Doc. 29, 93d 
P.L. 93-251 
P.L. 93-251 
Cong., Ist Sess., 
P.L. 93-251 
P.L. 93-251 
P.L. 93-251 
P.L. 94-587 
H. Doc. 1098, 100th Cong., 2d Sess. 
P.L. 100-676 
Sec. 1135, P.L. 99-662 
Authorized by Chief of Engineers 
June 24, 1999 
Sec. 206, P.L. 104-303 
Authorized by Chief of Engineers 
August 14, 2000 
Sec. 1135, P.L. 99-662 
Authorized by Chief of Engineers 
October 22, 1999 
Sec. 1135, P.L. 99-662 
Authorized by Chief of Engineers 
July 9, 1999 
PUGET CREEK, WA 
Environmental restoration. Sec. 1135, P.L. 99-662 
Authorized by Chief of Engineers 
Oct. 9, 1998 
SAMMAMISH RIVER WEIR RESTORATION, WA 
Modification of the grade control sill (weir) and the right 
bank of the river adjacent to the sill and upstream for 1,200 feet. 
Sec. 1135, P.L. 99-662 
Authorized by Chief of Engineers 
29-27 
TABLE 29-B 
(Continued) 
See Date 
Section Authorizing 
in Text 
26. 
27. 
j

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 2000 
TABLE 29-B 
(Continued) 
AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
June 1, 1998 
32. THORNTON CREEK, WA 
Nov. 17, 1986 Restoration features include planting vegetation, Sec. 1135, P.L. 99-662 
as amended creating a fish pond, water diversion, "softening" Authorized by Chief of Engineers 
over a bulkhead, and provide human access and viewing areas. Sep. 21, 1998 
33. TURNING BASIN #3, SEATTLE, WA 
Nov. 17, 1986 Environmental restoration. Sec. 1135, P.L. 99-662 
as amended Authorized by Chief of Engineers 
July 26, 1999 
1. Permanent Appropriations Repeal Act. 5. Supplemental Appropriations Act of 1968, 
2. Included in Public Works Administration program. Section 502. 
3. Maintenance of these items, as well as sandspit north of 6. Flood Control Act of 1968, Section 212. 
James Island, is included in this modification. 7. River Basin Monetary Authorization and Miscellaneous Civil 
4. Included in Emergency Relief program, May 28, 1935. Works Amendments Act of 1970, Section 7. 
TABLE 29-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to Sep. 30, 2000 
Full Report Operation 
See Annual And 
Project Status Report For Construction Maintenance 
Anacortes Harbor, WA Completed 1999 $222,345 6 1,207,484 7 
Anacortes Navigation Channel, WA I 
Bellingham Harbor, WA (I&J Street Waterway)l 
Blaine Harbor, WA 
Columbia River, Wenatchee to Kettle Falls, WA 
East Bay Small Boat Basin, Olympia, WAI 
Ediz Hook, WA 
Edmonds Harbor, WA2 
Flathead River, MT 
Grays Harbor, Point Chehalis, WA3 
Hammersley Inlet, WA 
Hoquiam River, WA 
Kenmore Navigation Channel, WAI 
Keystone Harbor, Admiralty Inlet, WAI 
Kingston Harbor, WA 
Kootenai River, ID and MT 
Lake Crockett, WA 
Mats Mats Bay, WAI 
Neah Bay, WAI 
Neah Bay, WA 
Okanogan and Pend Oreille Rivers, WA 
Poison Bay, Flathead Lake, MT 
Port Angeles Harbor, WA4 
Port Gamble Harbor, WA 
Port Orchard Bay, WAS 
Port Townsend, WA 
Prototype Breakwater Test Program, WAI 
Shilshole Bay, Seattle, WA 
Skagit River, WA 
Squalicum Small Boat Harbor, Bellingham, WAl 
Tacoma Harbor, WA 
Waterway Connecting Port Townsend 
and Oak Bay, WA 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Abandoned 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
1977 
1966 
1958 
1923 
1985 
1999 
1987 
1901 
1998 
1950 
1950 
1998 
1993 
1967 
1933 
1999 
1970 
1997 
1999 
1913 
1918 
1960 
1953 
1928 
1999 
1985 
1962 
1950 
1981 
1992 
1987 
825,263 
125,634 
346,650 
274,391 
1,619,956 
5,878,740 
9,811 
1,421,000 
9,000 
18,921 
946,000 
264,000 
262,570 
9,255 
377,990 
137,679 
3,874,920 
2,057,266 
63,879 
4,491 
470,873 
11,911 
42,804 
480,899 
1,461,590 
2,575,091 
102,330 
1,744,025 
2,383,891 
73,322 
8
9 
10 
11 
12 
14 
15 
16 
18 
19 
20 
21 
22 
23 
24 
25 
26 
7,693 
2,085,838 
224,756 
10,683 
5,316 
925,342 
5,000 
5,643 
1,179,275 
2,083,057 
7,634 
259 
13,337 
118,656 
36,258 
1,537,150 
378,753 
13 
17 
27 
29-28

SEATTLE, WASHINGTON DISTRICT 
Westhaven Cove Small Boat Basin, WAI Completed 
TABLE 29-C OTHER AUTHORIZED 
(Continued) 
1. Authorized by Chief of Engineers under authority of Section 
107, Public Law 86-645. 
2. Constructed by local interests at a cost of $415,000. Excludes 
$1,000 Coast Guard funds expended for new work. Corps of 
Engineers is responsible for maintenance. 
3. Authorized by Chief of Engineers under authority of Section 
111, Public Law 90-483. 
4. Maintenance by Port of Port Angeles. 
5. No maintenance required. 
6. Excludes $2,000 Coast Guard funds and $59,524 contributed 
7. 
8. 
9. 
10. 
11. 
12. 
13. 
14. 
15. 
funds expended. 
Excludes $5,000 contributed funds expended. 
Excludes $457,200 contributed funds expended. 
Excludes $2,500 Coast Guard funds expended. 
Includes $8,005 appropriated and expended for previous 
project. 
Excludes $2,184,766 contributed funds expended. 
Excludes $385,850 contributed funds expended. 
Excludes $229,501 contributed funds expended. 
Excludes $32,373 Emergency Relief funds expended. 
Excludes $114,272 contributed funds expended. 
1981 2,000,000 28 
I NAVIGATION PROJECTS 
16. Excludes $390,753 contributed funds and $3,000 Coast Guard 
funds expended. 
17. Mitigation of shore damages study. 
18. Includes $117,750 appropriated and expended for recreation 
facilities at completed project (Code 710). 
19. Excludes $28,288 contributed funds and $9,000 Coast Guard 
funds expended. 
20. Excludes $528,188 contributed funds expended. 
21. Excludes $21,260 contributed funds expended. 
22. Excludes $92,423 contributed funds expended. 
23. Excludes $15,000 Coast Guard funds expended. 
24. Includes $2,500 appropriated and expended for previous 
project. 
25. Excludes $1,570,886 contributed funds expended. 
26. Includes $159,585 appropriated and expended for previous 
project. Excludes $51,609 Public Works Administration funds 
and $1,147,208 contributed funds expended. 
27. Includes $5,347 appropriated and expended for previous 
projects. Excludes $222,500 contributed funds expended. 
28. Excludes $1,230,035 contributed funds expended. 
TABLE 29-D OTHER AUTHORIZED SHORE PROTECTION PROJECTS 
For Last Cost to Sep. 30, 2000 
Full Report Operation 
See Annual and 
Project Status Report For Construction Maintenance 
Lincoln Park Beach, Seattle, WA Completed 1997 $925,500 1 
Lummi Shore Road, WA Completed 1999 1,980,391 2 
1. Excludes $391,126 contributed funds expended. 2. Excludes $924,195 contributed funds expended. 
29-29 
--- --~~-

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 2000 
TABLE 29-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to Sep. 30, 2000 
Full Report 
See Annual Contributed 
Project Status Report For Construction Funds 
American Lake, Vicinity of Fort Lewis, WAI Completed 1957 $59,582 $10,000 
Bear Creek, Flathead CountyBridge, near Essex, MT2 Completed 1971 1,424 
Bitterroot River, Florence, MT2 Completed 1990 180,950 49,759 
Blackfoot River, Matt Little Road, MT2 Completed 1964 17,836 
Bogachiel River, Highway 101, near Forks, WA2 Completed 1981 156,000 
Bogachiel River, Undie Road, Forks, WA2 Completed 1981 57,000 
Cedar River, King County, WA3 Completed 1953 3,229 
Cedar River, Renton, WA2 Completed 1949 32,264 
Chehalis River, City of Chehalis Raw Water 
Pumphouse, WA2 Completed 1966 35,454 
Chehalis River, Independence Road, Thurston 
County, WA2 Completed 1965 47,916 
Chehalis River, Montesano, WA2 Completed 1977 140,080 
Chehalis River at South Aberdeen and Cosmopolis, WA Completed 1998 8,301,833 5 1,538,784 
Clallam Bay, Sekiu, WA2 Completed 1977 48,698 
Clallam Bay at Sekiu, Clallam County, WA2 Completed 1994 178,800 39,818 
Clallam River, Highway 112, WA2 Completed 1981 43,500 
Clark Fork River, near Garrison, MT2 Completed 1993 80,611 16,973 
Clark Fork River, Drummond, MT2 Completed 1978 18,660 
Clark Fork River, Missoula, MT2 Completed 1978 31,548 
Clark Fork River, Superior, MT2 Completed 1971 28,357 
Clark Fork River, Vicinity of Plains, MT2 Completed 1950 27,947 
Clearwater River, Jefferson County Road, WA2 Completed 1968 50,000 24,728 
Clearwater River, Queets River Bridge, WA2 Completed 1950 49,165 
Coeur d'Alene, Spokane River, ID Completed 1941 152,872 
Coeur d'Alene River, Springston, ID2 Completed 1950 25,452 
Coffee Creek, WA3 Completed 1966 15,000 
Columbia River Basin, Local Protection Projects, 
ID, MT, and WA 
Clark Fork River, Missoula, MT Completed 1983 384,862 6 13,500 
Lightning Creek, Clark Fork, ID Completed 1959 42,726 
Deschutes River, Gleason Road Bridge near 
Tumwater, WA2 Completed 1965 26,292 
Deschutes River, Rich Road Bridge, near East 
Olympia, WA2 Completed 1967 22,956 
Dungeness River, Area 5, WA2 Completed 1950 2,155 Dungeness 2,155 River, Area 8, WA2 Completed 1950 2,895 2,895 Dungeness River, Clallam County, WAI Completed 1964 52,040 7 
Dungeness River, Sequim, WA2 Completed 1981 99,000 
Dungeness River, Clallam County, WA2 Completed 1986 47,500 
Dungeness River, Taylor Cut-off Road, WA2 Completed 1961 14,093 3,314 Elwha Klallam Reservation, Elwha River, WAI Completed 1991 1,455,023 119,449 Elwha River, Clallam County, WA2 Completed 1951 17,303 
Entiat River, WA3 Completed 1971 49,300 
Entiat River, Chelan County, WA2 Completed 1978 38,000 
Flathead River, MT2 Completed 1972 20,940 
Flathead River, Bradley Channel Area, MT2 Completed 1955 26,265 
Flathead River, near Kalispell, MT1 Completed 1995 81,500 13,467 Flathead River, near Kalispell, MT2 Completed 1948 33,347 
Flathead River, Old Steel Bridge, near Kalispell, MT2 Completed 1964 13,438 
Flathead River (North Fork), MT Completed 1999 79,105 
Flower and Parmenter Creeks, MT 3 Completed 1950 2,320 
Foster Creek, West Fork, WA 2 Completed 1958 19,513 Foster Creek Road, Douglas County, WA2 Completed 1962 50,000 
Green River between Kent and Auburn, WA and 
Allentown, WA2 Completed 1972 24,605 
Green River, State Highway 181, WA2 Completed 1976 27,001 
29-30

SEATTLE, WASHINGTON DISTRICT 
Henderson Bay, Purdy, WA2 
Hoh River, County Road 216, WA2 
Hoh River, U.S. Highway 101, WA2 
Hoh River Road, Jefferson County, WA (HO 1360)2 
Hoh River Road, Jefferson County, WA (HO 1361)2 
TABLE 29-E 
(Continued) 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
Cost to Sep. 30, 2000 
-- 
Contributed 
Project Funds 
Hoh River Road, Jefferson County, WA (HO 1362)2 
Hoh River, near Forks, WA2 
Hoko River, Sekiu, WA2 
Hood Canal, Hoodsport, WA2 
Hoquiam River, WA2 
Horseshoe Bend, WAI 
Jackman Creek, Skagit River, WA 3 
Kootenai River, Bonners Ferry, ID2 
Kootenai River, Kootenai Flats Area, District # 1, ID2 
La Conner, WA 
La Conner, Swinomish Channel, WA2 
Lower Green River, King County, WAI 
Lummi Shore Road, Whatcom County, WA2 
Methow River, WA (MET 1-74)2 
Methow River, WA (MET 2-74)2 
Methow River, WA (MET 3-74)2 
Methow River, Barclay Canal, WA2 
Methow River, State Highway No. 16 Bridge, 
Twisp, WA2 
Methow River, Twisp-Carlton Highway, Vicinity of 
Twisp, WA2 
Methow River, Vicinity of Pateros, WA2 
Mineral Creek, Lewis County, WA2 
Missoula, MT (Sewage Treatment Plant)2 
Moclips River, Moclips, WA2 
Naches River, Naches, WA2 
Neah Bay, Clallam County, WA2 
Newaukum River, Lewis County, Hamilton, WA2 
Nisqually River, near Elbe, WA2 
Nisqually River, Thurston County, WA2 
Nisqually River, Vicinity of Elbe, WA2 
Nooksack River, WA3 
Nooksack River, Acme, WA2 
Nooksack River, Guide Bridge Location, WA2 
Nooksack River, Middle Fork, Deming, WA2 
Nooksack River, above Highway 12 Bridge, WA2 
Okanogan River, WA2 
Okanogan River at Outlet of Osoyoos Lake, WA3 
Okanogan River, Tonasket Creek and Osoyoos Lake, 
WA3 
Okanogan River, Omak, WAI 
Okanogan River, Oroville, WAI 
Pilchuck River, WA3 
Pilchuck River, WA2 
Pilchuck River, WA2 
Pilchuck River, Everett, WA2 
Pilchuck River, State Highway 92, Granite Falls, WA2 
Placer Creek, ID 
Powell County High School, Deer Lodge, MT2 
Puyallup River, WA 
Pysht River, Sekiu, WA2 
Queets River, Jefferson County Sewage Lagoon, WA2 
Quillayute River. Quileute Tribal Float and Bridge, WA2 
Quinalt River, Grays Harbor, WA2 
Quinalt River Road, Jefferson County, WA2 
Rock Creek, Granite County, MT2 
Rock Creek, Missoula County, MT2 
Rock Creek Road, MT2 
Status 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
For Last 
Full Report 
See Annual 
Report For 
1964 
1983 
1977 
1977 
1977 
1997 
1962 
1950 
1965 
1996 
1979 
1993 
1995 
1974 
1974 
1974 
1976 
1949 
1951 
1951 
1972 
1965 
1977 
1982 
1991 
1972 
1948 
1960 
1952 
1948 
1985 
1950 
1986 
1960 
1974 
1949 
1953 
1981 
1982 
1948 
1985 
1971 
1980 
1971 
1986 
1964 
1937 
1977 
1981 
1972 
1981 
1961 
1974 
1973 
1980 
29-31 
Completed 
Completed 
Completed 
Completed 
Completed 
1977 
1980 
1980 
1956 
1961 
37,359 
143,000 
194,000 
22,082 
11,916 
21,807 
IL- --- Jl 
Construction -- 
$41,622 
173,000 
21,083 
59,812 
52,600 
204,989 
24,000 
42,325 
14,885 
955,000 
40,525 
912,000 
482,000 
15,700 
11,200 
13,450 
19,810 
31,783 
33,300 
11,726 
11,836 
50,000 
17,608 
59,000 
253,995 
24,792 
37,636 
26,790 
19,345 
24,006 
77,300 
6,075 
79,000 
10,807 
10,100 
52,100 
7,987 
2,231,030 
1,787,630 
25,401 
81,000 
10,713 
54,000 
30,973 
5,865,000 
11,291 
50,000 
86,160 
125,000 
39,300 
208,000 
15,928 
49,657 
31,565 
50,000 
$9,146 
9 246,889 
120,518 
134,772 
6,786 
11,726 
78,433 
6,075 
4,943 
10

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 2000 
Rye Creek, MT2 
St. Maries, St. Joe River, ID 
St. Regis River, MT3 
St. Regis River at St. Regis, MT3 
Sammamish River, WA 
Project 
Sauk River, WA2 
Sauk River, Skagit County, WA2 
Shelton Creek, WAI 
Skagit River at Burlington Bend, WA2 
Skagit River, Cape Horn Road, WA2 
Skagit River, Deadman's Slough, WA2 
Skagit River, Pressentin Creek, WA2 
Skagit River, South Skagit Highway, WA2 
Skagit River, South Skagit Highway, WA (Job 66-1) 
Skagit River, South Skagit Highway, WA (Job 67-1) 
Skykomish River, North Fork, Index, WA2 
Snohomish River, Lowell-Snohomish River Road, WA2 
Snohomish River, Snohomish, WA2 
Snoqualmie River, West Snoqualmie, WA2 
Soleduck River Bridge, WA2 
Soleduck River, near Mora Road Bridge, WA2 
Spokane River, Spokane, WA 2 
Startup, Skykomish and Wallace Rivers, WAI 
Stillaguamish River, South Fork, Mountain Loop 
Highway, near Robe, WA2 
Stillwater River, MT2 
Stillwater and Whitefish Rivers, MT2 
Strong Creek, Hope, ID2 
Tahola, WA2 
Upper Puyallup River, WA4 
Wynoochee Lake, WA 
Wynoochee River, County Road 141, WA2 
Wynoochee River, near Montesano, WA2 
Wynoochee River, near Montesano, WA (WR-1-72)2 
Yakima, Yakima River, WA 
Yakima River, Cle Elum, WA2 
Yakima River, below mouth of Teanaway River 
near Cle Elum, WA2 
Yakima River, West Richland, WA2 
Yakima River, Yakima WA2 
Status 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
For Last 
Full Report 
See Annual 
Report For 
1974 
1989 
1979 
1949 
1966 
1980 
1980 
1963 
1966 
1967 
1981 
1969 
1970 
1977 
1961 
1963 
1989 
1970 
1964 
1973 
1977 
1970 
1979 
1938 
1994 
1976 
1969 
1972 
1948 
1949 
1947 
1977 
1983 
Cost to Sep. 30, 2000 
Construction 
20,860 
119,600 
872,021 
50,000 
46,489 
93,000 
137,000 
40,753 
17,719 
50,000 
222,500 
44,227 
60,900 
15,565 
16,437 
11,433 
122,138 
271,713 
50,000 
17,457 
34,513 
8,442 
223,893 
71,495 
23,494,445 
111,072 
50,000 
50,000 
381,961 
8,047 
48,272 
36,768 
125,500 
13 
14 
15 
16 
1. Authorized by Chief of Engineers under authority of Section 
205, Public Law 858, 80th Congress, as amended. 
2. Authorized by Chief of Engineers under authority of Section 
14, Public Law 526, 79th Congress, as amended. 
3. Authorized by Chief of Engineers under authority of Section 
2, Public Law 406, 75th Congress, as amended. 
4. Authorized by Works Progress Administration Project No. 
OP 65-93-917. 
5. Includes $2,212,000 for Preconstruction Engineering and 
Design, appropriated and expended. 
6. Includes $7,850 appropriated and expended for recreation 
facilities at completed project (Code 710). 
7. Excludes $340,066 Public Works Acceleration Act funds 
expended. 
8. Productive Employment Appropriation Act of 1983 (P.L. 98- 
8). Excludes $189,000 Federal Highway Administration 
funds expended. 
9. Includes $183,000 for Preconstruction Engineering and 
Design, appropriated and expended. 
10. Emergency Relief funds, Works Progress Administration. 
11. Excludes amount expended by Works Progress 
Administration which is not available. 
12. Excludes $1,000 Coast Guard funds expended. 
13. Emergency Relief funds, Works Progress Administration. 
14. Includes $102,200 appropriated and expended for recreation 
facilities at completed project (Code 710). Excludes 
$17,070,670 for project maintenance and $66,678 for 
Maintenance and Operation of Dams and Other 
Improvements of Navigable Waters, appropriated and 
expended. 
15. Excludes $17,988 Office of Emergency Planning funds 
expended. 
16. Includes $118,000 expended under Productive Employment 
Appropriation Act of 1983 (P.L. 98-8). 
29-32 
TABLE 29-E 
(Continued) 
Completed 
Completed 
Completed 
Completed 
Completed 
1973 
1942 
1942 
1951 
1967 
22,819 
357,698 
7,234 
2,983 
2,582,536 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
11 
12 696,923 
Contributed 
Funds 
32,778 
24,488 
14,307 
1,960 
79,311 
46,182 
13,704 
21,311

SEATTLE, WASHINGTON DISTRICT 
TABLE 29-F OTHER AUTHORIZED MULTIPLE-PURPOSE POWER 
PROJECTS 
For Last Cost to Sep. 30, 2000 
Full Report Operation 
See Annual and 
Project Report For Construction Maintenance 
Priest Rapids Dam, Columbia River, WA 1954 $350,000 1 
1. For partnership planning. Excludes funds expended for acquisition of lands under partnership arrangement for Priest Rapids and Wanapum 
Dams, in accordance with Public Law 544, 83d Congress. Project constructed by Grant County Public Utility District. 
TABLE 29-G OTHER AUTHORIZED ENVIRONMENTAL PROJECTS 
For Last Cost to Sep. 30, 2000 
Full Report 
See Annual Contributed 
Project Status Report For Construction Funds 
Sammamish River Restoration, Washington I Completed 1995 326,900 64,333 
1. Section 1135, Public Law 99-662, as amended. 
TABLE 29-H OTHER PRECONSTRUCTION ENGINEERING AND DESIGN 
PROJECTS 
For Last Cost to Sep. 30, 2000 
Full Report Federal 
See Annual Funds 
Project Status Report For Expended 
Blair and Sitcum Waterways, Tacoma Harbor, WA Under Const. 1989 $1,310,000 1 2 
East, West and Duwamish Waterways, Seattle Harbor, WA Deferred 1988 663,000 
Grays Harbor, Chehalis and Hoquiam Rivers, WA Under Const. 1989 5,670,000 3 
Yakima River at Union Gap, WA Deferred 1988 502,000 
1. Includes $300,000 appropriated and expended under Section 3. $3,530,000 of which is included in construction costs. 
101(c). 
2. $480,000 of which is included in construction costs. 
TABLE 29-I OTHER AUTHORIZED PROJECTS 
For Last Cost to Sep. 30, 2000 
Full Report 
See Annual Contributed 
Project Status Report For Construction Funds 
Aquatic Plant Control Completed 1997 $6,023,906 
Green River, King County, WA Completed 1985 498,320 
Oak Harbor, WA Completed 1983 519,000 
29-33

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 2000 
TABLE 29-J DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Date Funds Funds 
Project Report For Deauthorized Expended Expended 
Calispell Creek, WAI 1968 1968 $25,000 14 
Columbia River Basin, Local Protection Projects, 
ID, MT, and WA 
Crab and Wilson Creeks, WA2 1958 1964 9,000 14 
Entiat River, WA3 1958 1986 - 
Methow River, WA3 1958 1986 
Okanogan River, WA3 1958 1986 1,100 14 
St. Regis River, MT4 1958 1978 1,400 14 
Wenatchee River, WA4 1958 1978 
Yakima River at Ellensburg, WA3 1980 1986 44,300 14, 15 
Everett Harbor and Snohomish River, WA (RH 68) 6 1973 1990 52,000 14 
Flathead River at Kalispell, MT7 1981 1995 300,000 14 - 
Grays Harbor and Chehalis River, WA (RH 48) 
(Unconstructed Portion) 6,8 1962 1990 
Grays Harbor and Chehalis River, WA (RH 30) 6,9 1933 1990 35,834 $35,834 
Hammersley Inlet, WA (RH 30) (Unconstructed Portion)4,10 1950 1978 
Hoquiam, Aberdeen, and Cosmopolis, Chehalis River, WA 5 1948 1952 83,631 14 
Olympia Harbor, WA (RH 45) 6 1973 1990 21,606 14,16 
Port Angeles Harbor, WA (RH 35) 4 1960 1977 
Port Gamble Harbor, WA) (RH 35)4 1953 1977 
Quillayute River, WA(RH 30) (Unconstructed Portion)3,11 1986 1986 
Seattle Harbor, WA (RH 30) (Unconstructed Portion) 3,12 1986 1986 
Skagit River, WA (RH 10) (Unconstructed Portion) 4,13 1950 1978 
Skagit River, WA (RH19) 4 1950 1978 
Skagit River, WA (Avon Pass) 6 1968 1990 54,468 14 
Skagit River, WA (Levee and Channel Improvements)7 1982 1995 1,934,792 
Spokane River, Spokane, WA3 1939 1986 2,944 14 
Stillaguamish River, WA (RH 45)3 1946 1986 4,234 17 
Wenatchee, Canyons 1 and 2, WA 6 1978 1990 544,331 14 
Willapa River at Raymond, WA7 1982 1995 508,130 14, 18 
1 h toI 
I. AutLorLlty tor project e;xpireUU Utotr L, 1 a8. 
2. Authority for project expired July 1964. 
3. Deauthorized under authority of Section 1002, P.L. 99-662 
dated November 17, 1986. 
4. Deauthorized under authority of Section 12, P.L. 93-251 
dated March 7, 1974. 
5. Authority for project expired in October 1952. 
6. Deauthorized under authority of Section 1001 (b) (1), P.L. 
99-662 dated November 17, 1986. 
7. Deauthorized under authority of Section 1001 (b) (2), P.L. 
99-662 dated November 17, 1986. 
8. 2200 linear feet of revetment at Point Chehalis. 
9. 
10. 
11. 
12. 
13. 
14. 
15. 
16. 
17. 
18. 
16-foot channel from Cosmopolis to Montesano. 
Deepening shoal area near Cannery Point from 10 to 13 feet. 
Groin feature of the project. 
Settling basin at upper end of existing Duwamish Waterway, 
about 1.4 miles above 14th Avenue South Bridge. 
5500-foot extension of training dike. 
Preconstruction planning only. 
Includes $14,300 expended for restudy, 
FY 1970. 
Includes $18,700 expended for restudy, FY 1968-1973. 
Economic restudy only. 
Includes $8,888 expended for restudy, FY 1967-1972. 
LAKE WASHINGTON SHIP CANAL, WA PRINCIPAL 
FEATURES OF DOUBLE LOCK AND DAM 
(SEE SECTION 6) 
Large Lock Small Lock 
Miles above mouth 
Clear width of chamber Feet 
1 1 
80 28 
29-34 
TABLE 29-K 
Cannonr 
v "" Il 

SEATTLE, WASHINGTON DISTRICT 
Maximum available length 
Lift 
Depth on upper miter sill 
Depth on intermediate miter sill 
Depth on lower miter sill 
Character of foundation 
TABLE 29-K LAKE WASHINGTON SHIP CANAL, WA PRINCIPAL 
FEATURES OF DOUBLE LOCK AND DAM 
(SEE SECTION 6) 
(Continued) 
Kind of dam Fixed dam with Fixed dam with 
gated spillway gated spillway 
Type of construction Concrete Concrete 
Year completed 1916 1916 
Cost 3 3 
I. Low water in upper pool. 3. Cost of double lock and dam was $2,382,200 and the 
2. Mean lower low water in Puget Sound. emergency gates, completed in 1923, $262,300. 
TABLE 29-L FLOOD CONTROL ACTIVITIES PURSUANT TO SECTION 205, 
PUBLIC LAW 858, 80TH CONGRESS, AS AMENDED 
(PREAUTHORIZATION) 
Study Identification Fiscal Year Costs (2000) 
Cataldo, ID $16,380 
Lincoln County, MT 9,221 1 
Long Road, F.C. District, Chehalis River, WA 0 2 
Northbend, WA 9,358 
Section 205 Coordination 14,926 
Snoqualmie River, WA 82,624 3 
Stillaguamish River Valley, Stanwood, WA 102,499 
St. Maries, ID 52,061 
TOTAL $287,069 
1. Terminated 3. Excludes $1,273 contributed funds expended. 
2. Construction initiated in FY 2000. 
TABLE 29-M ENVIRONMENTAL ACTIVITIES UNDER SPECIAL AUTHORIZATION 
Study Identification Fiscal Year Costs (2000) 
Bear Creek Restoration, Washington $82,338 2 
Goldsborough Creek, WA 0 1 3 
Hanson Anadromous Fish and Wildlife, WA 31,923 2 
Initia! Appraisals, General 14,685 2 
Lake Washington Ship Canal, WA 0 1 2 
Loomis Lake Restoration, WA 8,974 3 
Metzler/O'Grady Side Channels, WA 222 2 
Preliminary Restoration Plans 44,886 3 
Section 206 Coordination 18,446 3 
Section 1135 Coordination 16,328 2 
Union Slough, WA 80,535 2 
Wynoochee Anadromous Fish, WA 8,528 2 
TOTAL $306,865 
1. Construction initiated in FY 2000. 3. Section 206, Public Law 104-303. 
2. Section 1135, Public Law 99-662, as amended. 
29-35 
Feet 
Feet 
Feet 
Feet 
Feet 
760 
26 
33 '/2 
29 
29 
Clay 
123 
26 
16 
16 
Clay
WALLA WALLA, WA, DISTRICT* 
This U.S. Army Corps of Engineers (Corps), 
Walla Walla District (District), consists of all 
Columbia River drainage and tributaries thereto 
between the head of the McNary Reservoir (Lake 
Wallula) (river mile 345.4) and Umatilla Bridge 
(river mile 290.5) below McNary Lock and Dam, 
except the Yakima River Basin above the Van Giesen 
Street Bridge (river mile 8.4) near 
Richland, WA. The primary tributary drainage area 
is the Snake River that includes more than 107,000 
square miles in six states: Washington, Oregon, 
Idaho, Wyoming, and small portions of Nevada and 
Utah. 
IMPROVEMENTS 
Flood Control 
1. Columbia River Basin, Local Flood 
Protection Projects ................................ 30-2 
2. Inspection of Completed 
Flood Control Projects ........................... 30-2 
3. Jackson Hole, WY ........ ........... a.......... 30-2 
4. Lucky Peak Lake, ID............................. 30-3 
5. Mill Creek, Bennington Lake, WA............. 30-3 
6. Scheduling Flood Control 
Reservoir Operations .............................. 30-4 
Multipurpose Projects, Including Power 
7. Columbia River Juvenile Fish 
Mitigation Program (Walla Walla Projects), 
OR, WA, and ID........................... 30-4 
8. Dworshak Dam and Reservoir, ID..............30-5 
9. Ice Harbor Lock and Dam, 
Lake Sacajawea, WA .............................. 30-6 
10. Little Goose Lock and Dam, 
Lake Bryan, WA ................................... 30-7 
11. Lower Granite Lock and Dam, 
Lower Granite Lake, WA ........................ 30-7 
12. Lower Monumental Lock and Dam, 
Lake Herbert G. West, WA...................... 30-8 
13. Lower Snake River Fish and Wildlife 
Compensation Plan, WA, 
OR, and ID ......................................... 30-9 
14. McNary Lock and Dam, Lake 
Wallula, OR and WA ............................30-9 
15. Snake River Downstream from 
Johnson Bar Landing, OR, 
WA, andID.................................. 30-10 
16. Miscellaneous Work Under 
Special Authorization ........................ 30-10 
General Investigations 
17. Surveys................... ............... 30-11 
18. Collection and Study of Basic Data........ 30-12 
19.Preconstruction, Engineering, 
and Design .................................... 30-12 
Tables 
Table 30-A Cost and Financial Statement... 30-13 
Table 30-B Authorizing Legislation .......... 30-16 
Table 30-C Other Authorized Navigation 
Projects........................... 30-20 
Table 30-D Not Applicable 
Table 30-E Other Authorized Flood 
Control Projects 30-21 
Table 30-F Other Authorized Multipurpose 
Projects, Including Power........ 30-22 
Table 30-G Deauthorized Projects............30-22 
Table 30-H Columbia River Basin, Local 
Flood Protection Projects.........30-23 
Table 30-I Inspection of Completed 
Flood Control Projects..........30-23 
Table 30-J Principal Data Concerning 
Navigation Lock, Spillway Dam, 
Powerplant, and Impoundment...30-24 
Table 30-K Snake River Downstream from 
Johnson Bar Landing, OR, 
WA, and ID ......................... 30-29 
30-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL 
WORKS ACTIVITIES FOR 1999 
Flood Control 
1. COLUMBIA RIVER BASIN, LOCAL FLOOD PROTECTION PROJECTS 
Location. Improvements included in this project are along the Columbia River and its tributaries. 
Existing project. The Flood Control Act of 1950 approved a general comprehensive plan for the Columbia River 
Basin for flood control and other purposes based on plans in H. Doc. 531, 81st Congress, 2nd Session, and authorized 
$75 million to be appropriated for partial accomplishment of certain projects. From that authorization, an amount (not 
to exceed $15 million) was allotted for construction of local flood protection works throughout the Columbia River 
Basin, subject to conditions that all work undertaken pursuant to authorization would be economically justified prior to 
construction, and local cooperation specified in the Flood Control Act of 1936, as amended, should be required (see 
tables 30-B and H, for projects in the District). 
Local cooperation. Section 3, Flood Control Act of June 22, 1936, applies. 
Operations during the fiscal year (FY). No projects were deauthorized. 
2. INSPECTION OF COMPLETED FLOOD CONTROL PROJECTS 
Federal law requires local interests to maintain and operate completed local protection projects in accordance with 
regulations prescribed by the Secretary of the Army. Inspections were made to determine the extent of compliance and 
to advise local interests, as necessary, of measures required to correct deficiencies (see table 30-I for inspections made 
during the FY). 
The FY costs were $19,647. Total costs in September 30, 2000, were $2,944,387. 
3. JACKSON HOLE, WY 
Location. This project is located on the banks of the Snake River, Teton County, west of 
Jackson, WY. 
Existing project. On the Snake River, approximately 23.5 miles of Federally-constructed levees consist of the 
following: (1) On the right bank: a series of levees, off-set levees, and bank protection structures, all with full riprap 
protection from 10 miles upstream of the Jackson-Wilson Bridge to 3.5 miles below the bridge for a total of 13.5 miles; 
(2) On the left bank: a series of Federally-constructed levees and bank protection structures, all with full riprap 
protection, extending from 10 miles upstream of the Jackson-Wilson Bridge to 5 miles upstream. It resumes 1.5 miles 
immediately upstream of the same bridge and continues to 3.5 miles below the bridge for a total of 10 miles. In 
addition, a series of Federal and non-Federal constructed levees, with a total length of approximately 5 miles, most 
having some or full riprap protection, are interspersed along both banks of the Snake River from Highway 26 Bridge to 
4 miles downstream of the Jackson-Wilson Bridge. 
On the Gros Ventre River, approximately 2 miles of riprap protected levees on the left bank from 1.5 miles west of 
Cattlemen's Bridge and extending to 0.5 miles east of the same bridge. On the right bank, a series of levees extending 
from 
0.5 miles west of Cattlemen's Bridge to approximately 0.3 miles east of the same bridge. 
The Project is authorized by Public Law (PL) 81-516, Flood Control Act of 1950, for flood control protection by 
channel improvements consisting of channel rectification, levees, and revetments along the Snake River in the vicinity of 
Wilson, WY. The PL 104-303 modified the original PL 81-516 to ensure the operation, maintenance, modifications, 
and additions to the project become Federal responsibility. 
Local cooperation. Non-Federal sponsors pay the initial $35,000 in cash or materials of any such costs expended 
in any 1 year, plus inflation as of the date of enactment of the Water Resources Development Act of 1986. 
30-2

WALLA WALLA, WA, DISTRICT 
Since 1978, $60,622,000 (adjusted to October 
2000 price index) in potential flood damaged habr 
been prevented by the levees. 
Operations during FY. Teton County, under 
their Local Cooperative Agreement, worked with the 
Corps performing levee maintenance. The FY costs 
were $1,133,473. 
4. LUCKY PEAK LAKE, ID 
Location. This project is located on the Boise 
River in southwestern Idaho about 10 miles southeast 
of the city of Boise, ID. 
Existing project. The project includes a rolled 
earthfill dam about 250 feet above the streambed and 
1,700 feet long at the crest, with a lake providing a 
total storage at upper operating lake level of 306,000 
acre-feet. The project provides for flood control, 
irrigation, and recreation (for details, see page 2,000 
of the 1962 Annual Report). 
Construction of the existing project was 
initiated in November 1949 and completed in June 
1961. Since 1961, $472,293,000 (adjusted to 
October 2000 price index) in potential flood damages 
have been prevented by the project. 
During a detailed study of outlet capacity and 
potential for adding hydropower to the existing 
project, a need for an auxiliary outlet became 
apparent. Construction of an auxiliary outlet was 
authorized in the Water Resource Development Act 
of 1976. In FY 78, an Interim Feasibility Report on 
Modification of Lucky Peak Dam and Lake (power 
facilities) was submitted to the Board of Engineers 
for Rivers and Harbors and approved. States, 
agencies, and the Chief of Engineers commented on 
the report to the Secretary of the Army. The report 
was forwarded to the Office of Management and 
Budget in February 1982. 
A license to construct and operate power 
facilities at the project was issued by the Federal 
Energy Regulatory Commission (FERC) (Project 
#2832) to the Boise Project Board of Control on June 
10, 1980, and modified on October 9, 1980, and in 
1982. Construction of the auxiliary outlet facility 
began in May 1984 and was completed in August 
1986. Construction of modifications to the existing 
outlet tunnel and powerhouse excavation began in 
August 1986 and was completed January 1987. 
Powerhouse general contract construction began in 
April 1986. The project was completed and 
dedicated on October 7, 1988. Power on-line for all 
units was August 18, 1988. A Federally-authorized 
second outlet was deauthorized in FY 90. 
Recreation facilities at Lucky Peak Lake consist 
of 20 picnic/day-use areas, 4 boat launch ramps, and 
3 swimming areas. The FY visitation to Lucky Peak 
Lake was 751,000. 
Local cooperation. None required. 
Operations during FY. Operation and 
Maintenance: Normal operation and maintenance, 
which included the dam structures and recreation 
areas, continued. The FY costs were $1,099,314. 
5. MILL CREEK, BENNINGTON LAKE, WA 
Location. This project is located in and 
upstream from Walla Walla, WA, on Mill Creek, a 
tributary of the Walla Walla River. 
Existing project. The project includes an offstream 
earthfill storage dam, about 125 feet above the 
streambed and 3,200 feet long at the crest, two 
concrete-lined outlet channels, an earthfill diversion 
dam, and diversion structures. The Project provides 
for flood control and recreation. Authorizing 
legislation to provide a channel through the city of 
Walla Walla was added to the project in 1941. 
Recreation was added to the project purposes through 
the Federal Water Project Recreation Act 
of 1965. 
Construction of the dam and appurtenant works 
was completed in 1942. Paving of the channel 
through the city of Walla Walla was completed in 
1966 (for details, see page 2,005 of the 1962 Annual 
Report). Since 1942, $46,655,000 (adjusted to 
October 2000 price index) in potential flood 
damages have been prevented by the combined 
storage and channel operation. 
Rehabilitation of the existing project was 
initiated in FY 78 and completed in FY 79. The plan 
of rehabilitation included action to correct the 
seepage and internal erosion that has occurred during 
each subsequent filling of the reservoir. A cutoff wall 
was constructed but did not alleviate the seepage 
problem, thus requiring limited flood control use of 
the project. The seepage and internal erosion create a 
high vulnerability for dam failure. 
Mill Creek/Bennington Lake offers visitors 
three day-use/picnic areas and one boat launch ramp. 
30-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 00 
Visitation to Mill Creek/Bennington Lake for the FY 
was 174,500. 
Local cooperation. Fully complied with (for 
details, see page 2,006 of the 1962 Annual Report). 
Operations during FY. Operation and 
Maintenance: Normal operation and maintenance 
continued, which included regulation of water control 
structures and care of recreation areas. Initiated right 
abutment test grouting contract. The FY costs were 
$866,919. 
6. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
Functional regulation of non-Corps projects was 
accomplished under several authorities. Regulation 
was accomplished as authorized under Section 7, 
Flood Control Act of 1944, and coordinated with the 
Bureau of Reclamation for Palisades, Little Wood, 
and Anderson Ranch Reservoirs, ID; and Bully 
Creek, Warm Springs, Agency Valley, and Mason 
Reservoirs, OR. 
Flood control operations at Jackson Lake, WY, 
Arrowrock Reservoir and Lake Lowell, ID, were in 
accordance with formal agreements with the Bureau 
of Reclamation. Flood control regulation was 
accomplished under informal agreements for the 
Owyhee Reservoir, OR; and American Falls, Magic, 
Mackay, Cascade, and Deadwood Reservoirs, ID. 
Brownlee and Oxbow Reservoirs, OR, and Hells 
Canyon Reservoir, OR and ID, provided flood control 
regulation in accordance with provisions of the 
Federal Power Commission license to Idaho Power 
Company. The FY costs were $332,000. 
Multipurpose Projects, Including Power 
7. COLUMBIA RIVER JUVENILE FISH 
MITIGATION PROGRAM (WALLA WALLA 
PROJECTS), OR, WA, AND ID 
Location. This project is located at Ice Harbor, 
Lower Monumental, Little Goose, and Lower Granite 
Locks and Dams on the lower Snake River in the 
State of Washington and McNary Lock and Dam on 
the Columbia River in the States of Oregon and 
Washington. 
Existing project. The eight Corps 
hydroelectric projects on the Columbia and lower 
Snake Rivers have been identified as a major 
contributing factor in causing mortality to 
downstream migrating juvenile salmon and steelhead. 
Without adequate bypass facilities to guide these 
juvenile fish away from the power turbines at the 
dams, mortalities incurred through project passage 
severely impact the commercial, recreational, and 
Indian fisheries. The Corps has recognized the need 
to reduce juvenile fish mortality and has undertaken 
bypass measures that include mechanized fish bypass 
systems with barge and truck transportation. Spill as 
an additional bypass route over the spillways has 
been used to divert fish from entering turbine units, 
but it is a significant adverse economic factor due to 
lost power revenues. Congress passed, and the 
President signed, the FY 89 Energy and Water 
Development Appropriation Act (PL 100-371), which 
mandated the expenditure of funds for the design, 
testing, and construction of new or improved fish 
bypass facilities for the Columbia River fish 
mitigation projects. Completion of bypass and 
transportation facilities will significantly increase the 
survival of migrating downstream juvenile fish. The 
mitigation study will determine the overall scope of 
the fish mitigation facilities for these Columbia and 
lower Snake River dams. The mitigation study 
project was added to the President's FY 91 budget. 
The plan of improvement includes the following 
facilities: (1) Ice Harbor Lock and Danrm: screens, 
new gantry crane, collection bypass facility, intake 
gate raise, spillway deflectors, surface bypass, and 
fish ladder temperature control; (2) Lower 
Monumental Lock and Dam: hold/load and collection 
bypass facility, screens, passive integrated 
transponder tag (PIT-Tag) facility, barge load facility 
modifications, barges, gate raise modifications, gantry 
crane, fish ladder temperature control, and surface 
bypass; (3) Little Goose Lock and Dam: screens, 
gantry crane modification, collection bypass facility, 
outfall pipe, fish ladder temperature control, fallout 
fences, gate raise, deck screen modifications, PITTag 
facility, and surface bypass; (4) Lower Granite 
Lock and Dam: juvenile fish facility, gantry crane, 
gate raise, outfall pipe, fish barges, screens, 
additional moorage facility, fish slot closures, 
juvenile fish facility improvements, barge exit 
modifications, deck screen modifications, fish ladder 
temperature control, surface bypass, PIT-Tag facility, 
and fallout fences; and (5) McNary Lock and Dantm: 
gantry crane, screens, hold/load facility, gate raise 
modifications, tilted weirs fish ladder, maintenance 
facility, fish ladder exits, hold/load facility, 
adult/juvenile collection channel stoplogs, juvenile 
fish facility, surface bypass, and gantry crane 
modifications. 
30-4

WALLA WALLA, WA, DISTRICT 
In response to the 1995 Biological Opinion 
issued by the National Marine Fisheries Service, the 
District is conducting a feasibility study (Lower 
Snake River Juvenile Salmon Migration Feasibility 
Study) to evaluate salmon migration problems on the 
lower Snake River. The objective of the study is to 
improve salmon migration conditions through the 
four Corps-operated dams and reservoirs on the lower 
Snake River. The study focuses on how these dams 
can be changed to improve survival and recovery 
prospects for Snake River salmon stocks under the 
Endangered Species Act The total estimated cost of 
the study is $25.5 million. Expenditures to date are 
$24.8 million. 
The District is currently managing a surface 
bypass and collection technology development effort 
that focuses on improving juvenile fish passage for 
endangered and threatened salmon migration past all 
Corps hydroelectric projects on the Columbia and 
lower Snake Rivers. It is an aggressive, 
nontraditional approach to prototype development 
that involves fast-track design, construction, testing, 
and evaluation. 
The fully-funded Federal project cost is 
estimated at $682,700,000 for Walla Walla projects. 
Local cooperation. None required. 
Operations during FY. At Ice Harbor Lock 
and Dam, work was completed on phase II of the 
spillway deflector contract and on the completion 
contract. A contract was awarded for McNary Lock 
and Dam juvenile fish collection channel bulkheads. 
At Little Goose Lock and Dam, a contract was 
awarded for the trash boom, and a mechanical and 
biological test was completed on the new extendedlength 
submersible bar screens (ESBS) perforated 
plate design. At Little Goose and Lower Granite 
Locks and Dams, handrail work was completed, and 
fishway orifice backflush automation was completed 
at Lower Granite Lock and Dam. 
Several Columbia River fish mitigation studies 
continued, including the Turbine Model Study at 
McNary Lock and Dam, and the System Gas 
Abatement Study. In addition, field studies and 
physical modeling work were initiated on several 
projects related to design of additional or modified 
flow deflectors. 
For the fourth consecutive year, a prototype 
surface collection test was conducted at Lower 
Granite Lock and Dam. 
The technical analysis continued for the Lower 
Snake River Juvenile Salmon Migration Feasibility 
Study. The public involvement aspects of the study 
were expanded to meet the intense regional interest. 
This involvement included a number of public 
information meetings, focus meetings, workshops, 
newsletters, newspaper inserts, traveling displays, and 
pamphlets. Coordination efforts continued with a 
number of established regional recovery groups, as 
well as tribal consultation efforts. Work continued in 
many other areas, including cultural resources, 
National Environmental Policy Act, Coordination Act 
Report, wildlife, and water quality. 
The FY costs were $30,656,582. Total project 
costs are $339,370,105. 
8. DWORSHAK DAM AND RESERVOIR, ID 
Location. The dam is on the North Fork of the 
Clearwater River, 1.9 miles above its junction with 
the Clearwater River, near Orofino, ID, and about 
35 miles east of Lewiston, ID. 
Existing project. The project includes a dam, 
powerplant, public parks, and appurtenant facilities. 
The Project provides for flood control, navigation, 
hydroelectric power generation, recreation, and area 
redevelopment. The reservoir has a normal operating 
range between the elevations of 1,600 and 1,445 
mean sea level (msl). The reservoir has a gross 
storage capacity of 3,468,000 acre-feet (2 million 
acre-feet of which are effective for both local and 
regional flood control and for at-site and downstream 
power generation). In addition, the reservoir, 
extending 59 miles into rugged and relatively 
inaccessible timberland, provided cost-effective 
transportation for moving marketable logs. The 
reservoir is habitat for elk, deer, and other wildlife. 
The dam structure is about 3,287 feet long and about 
717 feet above the streambed. Fish passage is not 
feasible due to the height of the dam. A hatchery has 
been built below the dam to assure continuance of 
anadromous fish runs. The powerhouse has two 
90,000 kilowatts (kW) and one 220,000 kW 
generating units in operation for a capacity of 
400,000 kW. Provisions had been made for three 
additional 220,000 kW generating units for an 
ultimate installed capacity of 1,060,000 kW. 
A reconnaissance report justifying the feasibility and 
cost benefits for the addition of a 200,000 kW fourth 
generating unit was completed in FY 78. However, 
environmental and economic studies on additional 
generating units have been curtailed due to public 
30-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 00 
opposition. Unit 4 is undeveloped. Units 5 and 6 
were deauthorized FY 90, and Unit 4 was 
deauthorized in FY 95. Principal project data are set 
forth in table 30-J4. 
Construction of the project began in July 1966. 
It was placed in operation in 1972 and was completed 
in 1986. Since the project became operational in 
June 1972, it has prevented about $2,836,000 
(adjusted to October 2000 price index) in potential 
flood damages. Power generation through September 
2000 was 46.54 billion kW hours. 
At Dworshak Reservoir, recreation facilities 
consist of 12 day-use/picnic areas, 6 camp areas, 
6 boats launches, and 2 swim areas. Total visitation 
to Dworshak Reservoir for the FY was 147,200. 
Local cooperation. None required. 
Operations during FY. Operation and 
Maintenance: Management of wildlife habitat browse 
continued on project lands to provide winter browse 
for elk and deer. Completed paving contract at 
recreation areas. During the FY, 1.99 billion kW 
hours of electrical power were generated by the three 
generating units. The FY costs were $9,535,939. 
Brood Year (BY) 1999 Steelbhead: 
Approximately 2.15 million BY 1999 steelhead 
smolts were released from Dworshak National Fish 
Hatchery (DNFH) in April 1999. The fish averaged 
201 millimeters (mm) in total length, just over the 
target of 200 mm. A total of 370,919 pounds of 
steelhead were released in 2000, compared with 
318,000 pounds in 1999 and 353,000 pounds 
in 1998. 
The BY 2000 Steelbhead: A total of 2,882 adult 
steelhead returned to DNFH in the fall of 1999 and 
spring of 2000 compared with 5,419 the previous BY. 
A total of 2.7 million eggs went into DNFH's 
production program. The DNFH provided 957,000 
eyed eggs to Clearwater Hatchery, 1.66 million green 
eggs to Magic Valley Hatchery, and 20,000 for 
school projects. 
The BY 1998 Chinook Salmon: The DNFH 
released 1,017,873 BY 1998 spring chinook salmon, 
weighing 42,395 pounds, as part of the Lower Snake 
River Compensation Plan. This was just under the 
compensation plan goal of 1,050,000 smolts. 
The BY 1999 Chinook Salmon: There were 
957 spring chinook salmon that returned to DNFH 
and Kooskia National Fish Hatchery (NFH) in 1999. 
Of this number, 752 were jacks, which left 215 adults 
for spawning. These fish produced 338,000 eyed 
eggs. Approximately 295,000 fingerlings were on 
station at the end of FY 2000. 
The BY 2000 Chinook Salmon: Adult returns 
totaled 3,202 fish to DNFH in 2000. Another 1,851 
adults returned to Kooskia NFH. A total of 1.78 
million eyed eggs are being reared from these adult 
returns. 
9. ICE HARBOR LOCK AND DAM, LAKE 
SACAJAWEA, WA 
Location. This dam is located on the Snake 
River, 9.7 miles above the river mouth at the head of 
Lake Wallula (McNary Reservoir) and 12 miles east 
of Pasco, WA. 
Existing project. The project includes a dam, 
powerplant, navigation lock, two fish ladders, 
recreation areas, and appurtenant facilities. The 
project provides navigation, hydroelectric power 
generation, recreation, and incidental irrigation. The 
reservoir has a normal operating range between 
elevations 440 and 435 msl. Lake Sacajawea extends 
upstream about 31.9 miles and provides slack water 
to Lower Monumental Lock and Dam. The dam 
structure is about 2,822 feet long and about 130 feet 
above the streambed. The fish passage facilities 
include two fish ladders. The Powerhouse has three 
90,000 kW units and three 111,000 kW generating 
units in operation for a capacity of 603,000 kW. 
The spillway dam is 590 feet long, and the 
overflow crest at elevation 391 msl is surmounted by 
10 tainter gates, 50 feet wide and 52.9 feet high, that 
provide the capacity to pass a design flood of 850,000 
cubic feet per second (cfs). The deck is at elevation 
453 msl and provides a service road and track for a 
gantry crane. The navigation lock is a single-lift type 
with clear plan dimensions of 86 by 675 feet and a 
16-foot minimum depth over the sills. A navigation 
channel 250 feet wide, 14 feet deep, and 41.6 miles 
long is provided from the mouth of the Snake River 
to the dam and from the dam to Lower Monumental 
Lock and Dam. Principal data are set forth in table 
30-J. 
Construction of the original project began in 
December 1955. It was placed in operation in 1961 
and completed in 1971. Construction of the 
additional generating units was started in 1971 and 
30-6

WALLA WALLA, WA, DISTRICT 
completed in 1981. Power generation through 
September 2000 was 83.13 billion kW hours. 
Recreation areas on Lake Sacajawea include 
11 picnic/day-use sites, 4 camping areas, 7 areas with 
boat launching, and 4 swimming areas. Total 
visitation on Lake Sacajawea for the FY was 459,700. 
Local cooperation. None required. 
Operations during FY. Operation and 
Maintenance: During the FY, 2.21 billion kW hours 
of electrical power were generated by the six 
generating units. Traffic through the navigation lock 
consisted of grains, petroleum products, fertilizer, 
wood products, and miscellaneous cargo and 
amounted to 4,559,900 tons during calendar year 
1999. The FY costs were $9,123,794. 
10. LITTLE GOOSE LOCK AND DAM, LAKE 
BRYAN, WA 
Location. The dam is 70.3 miles above the 
mouth of the Snake River and at the head of Lake 
Herbert G. West (Lower Monumental Reservoir), 
about 40 miles northerly of Walla Walla, WA, and 50 
miles westerly of Lewiston, ID. 
Existing project. The project includes a dam, 
powerplant, navigation lock, fish ladder, and 
appurtenant facilities. The project provides for 
navigation, hydroelectric power generation, 
recreation, and incidental irrigation. The reservoir 
has a normal operating range between elevations 638 
and 633 msl. Lake Bryan extends upstream about 
37.2 miles and provides slack water to Lower Granite 
Lock and Dam. The dam structure is 2,655 feet long 
and about 165 feet above the streambed. Fish 
passage facilities include one ladder with entrances 
on both shores and a fish channel through the 
spillway, which connects to the powerhouse fish 
collection system and south shore ladder. The 
powerhouse has six 135,000 kW generating units in 
operation for a capacity of 810,000 kW. The 
spillway dam is 512 feet long, and the overflow crest 
at elevation 581 msl is surmounted by eight tainter 
gates, 50 feet wide and 60 feet high, that provide the 
capacity to pass a design flood of 850,000 cfs. The 
navigation lock is a single-lift type with clear plan 
dimensions of 86 by 668 feet and a 15-foot minimum 
depth over the sills. A navigation channel 250 feet 
wide, 14 feet deep, and 37.2 miles long is provided 
from the dam to Lower Granite Lock and Dam. 
Relocations along the lake included 32 miles of 
Camas Prairie Railroad, 6.8 miles of county roads, 
2.2 miles of state highways, and the Central Ferry 
Bridge. Principal project data are set forth in table 
30-J. 
Construction of the original project began in 
1963. It was placed in operation in 1970 and 
completed in 1976. Construction of additional 
generating units started in 1974 and was completed in 
1984. Power generation through September 2000 
was 76.39 billion kW hours. 
Lake Bryan provides seven day-use sites, five 
campgrounds, five boat launching areas, and two 
swimming areas. Total FY visitation was 197,800 for 
Lake Bryan. 
Local cooperation. None required. 
Operations during FY. Operation and 
Maintenance: During the FY, 3.21 billion kW hours 
of electrical power were generated by the six 
generating units. Traffic through the navigation lock 
consisted of grains, petroleum products, fertilizer, 
wood products, and miscellaneous cargo and 
amounted to 3,109,100 tons during calendar year 
1999. The FY costs were $6,476,682. 
11. LOWER GRANITE LOCK AND 
DAM, LOWER GRANITE LAKE, WA 
Location. This dam is at river mile 107.5 on 
the Snake River at the head of Lake Bryan (Little 
Goose Reservoir) and about 33 miles downstream 
from Lewiston, ID. 
Existing project. The project includes a dam, 
powerplant, navigation lock, fish ladder, appurtenant 
facilities, and includes about 8 miles of slack water 
levees along the Snake and Clearwater Rivers at 
Lewiston, ID. The project provides for slack water 
navigation, hydroelectric power generation, 
recreation, and incidental irrigation. The reservoir 
has a normal operating range between elevations 738 
and 733 msl in Lewiston, ID, and Clarkston, WA. 
The Lower Granite Lake extends upstream about 38 
miles and provides slack water to the confluence of 
the Snake and Clearwater Rivers. The dam structure 
is about 3,200 feet long and about 146 feet above the 
streambed. Fish passage facilities include one ladder 
with entrances on both shores with a fish channel 
through the spillway that connects to the powerhouse 
fish collection system and south shore ladder. The 
powerhouse has six 135,000 kW generating units in 
operation for a capacity of 810,000 kW. The 
spillway dam is 512 feet long, and the overflow crest 
30-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 00 
at elevation 681 msl is surmounted by eight tainter 
gates, 50 feet wide and 60 feet high, which provide 
the capacity to pass a design flood of 850,000 cfs. 
The navigation lock is single-lift type with clear plan 
dimensions of 86 by 674 feet and 15-foot minimum 
depth over the sills. A navigation channel 250 feet 
wide, 14 feet deep, and 39.3 miles long is provided 
from the dam to the confluence of the Snake and 
Clearwater Rivers. Principal data are set forth in 
table 30-J. 
Construction of the original project started in 
July 1965. It was placed in operation in 1975 and 
completed in 1984. Construction of additional 
generating units was started in 1974 and completed in 
1979. Power generation through September 2000 
was 67.57 billion kW hours. Approximately 
$16,746,000 (adjusted to October 2000 price index) 
in potential flood damages have been prevented since 
the levees became functional. 
Lower Granite Lake offers visitors 16 dayuse/
picnic sites, 6 sites with camping, 12 boat launch 
ramps, and 4 swimming areas. Total recreation 
visitation to Lower Granite Lake for the FY was 
1,061,700. 
Local cooperation. None required. 
Operations during FY. Operation and 
Maintenance: During the FY, 3.14 billion kW hours 
of electrical power were generated by the six 
generating units. Traffic through the navigation lock 
consisted of grains, petroleum products, fertilizer, 
wood products, and miscellaneous cargo and 
amounted to 2,264,100 tons during calendar year 
1999. The FY costs were $9,121,087. 
Juvenile Fish Transportation Program. As 
the first collector dam on the Snake River, Lower 
Granite Lock and Dam is a primary component of the 
Juvenile Fish Transportation Program. Transport 
began in the late 1960's as a research program on 
how to bypass juvenile salmon and steelhead around 
dams and reservoirs of the Corps' Snake and 
Columbia River dams. Transport became an 
operational program in 1981 with collection and 
transport from Lower Granite, Little Goose, and 
McNary Locks and Dams. Transport was expanded 
in 1993 to include Lower Monumental Lock and 
Dam. Development and improvement of collection 
and bypass systems continues with a new collection 
system completed at McNary Lock and Dam in 1994, 
a new bypass system completed at Ice Harbor Lock 
and Dam in 1996, and ESBS's installed at Lower 
Granite, Little Goose, and McNary Locks and Dams 
in 1996 and 1997. 
The 2000 juvenile fish transport season was 
marked by below average flows after four either 
average or very high flow years. Juvenile fish 
collection at Lower Granite Lock and Dam was 
8,300,546 compared with 5,879,114 in 1999 and 
6,977,250 in 1998. A total of 342,507 fish were 
bypassed back to the river in 2000 and 7,650,648 
were transported. At Little Goose Lock and Dam, a 
total of 2,818,520 juvenile salmon and steelhead were 
collected in 2000 compared to 7,004,421 in 1999. 
No fish were bypassed back to the river in 2000 
compared to 182,295 in 1998. The larger number of 
fish bypassed in 1998 was due to collection numbers 
exceeding barging capacity on 2 days in late May. A 
total of 2,809,463 juvenile fish were transported from 
Little Goose Lock and Dam in 2000. At Lower 
Monumental Lock and Dam, 1,587,203 juvenile 
salmon and steelhead were collected compared to 
4,068,558 in 1999. A total of 47,171 fish were 
bypassed from Lower Monumental Lock and Dam in 
2000 compared to 407,965 in 1999. At McNary 
Lock and Dam, all fish collected were bypassed until 
late June in keeping with fishery agency 
requirements. A total of 11,045,785 juvenile salmon 
and steelhead were collected in 2000 compared to 
7,841,978 in 1999. Approximately 2,400,354 of the 
fish collected were bypassed back to the river to meet 
fishery agency requirements. A grand total of 
23,752,054 juvenile salmon and steelhead were 
collected at all projects in 2000 compared to 
24,794,071 in 1999. A total of 20,880,896 fish (88 
percent of those collected) were transported in 2000. 
Of the fish transported, 19,983,988 were transported 
by barge (96 percent) and 896,908 were trucked (4 
percent). 
12. LOWER MONUMENTAL LOCK AND 
DAM, LAKE HERBERT G. WEST, WA 
Location. This dam is on the Snake River at 
the head of Lake Sacajawea (Ice Harbor Reservoir), 
about 45 miles northeast of Pasco, WA, and 41.6 
miles above the river mouth. 
Existing project. The project includes a dam, 
powerplant, navigation lock, two fish ladders, and 
appurtenant facilities. The project provides for 
navigation, hydroelectric power generation, 
recreation, and incidental irrigation. The reservoir 
has a normal operating range between elevations 540 
and 537 msl. Lake Herbert G. West extends 
upstream about 28.7 miles and provides slack water 
30-8

WALLA WALLA, WA, DISTRICT 
to Little Goose Lock and Dam. The dam structure is 
about 3,791 feet long and about 135 feet above the 
streambed. The fish passage facilities include two 
fish ladders, one at each end of the dam. The 
powerhouse has six 135,000 kW generating units in 
operation for a capacity of 810,000 kW. The 
spillway dam is 572 feet long, and the overflow crest 
at elevation 483 msl is surmounted by eight tainter 
gates, 50 feet wide and 60 feet high, that provide 
capacity to pass a design flood of 850,000 cfs. The 
Deck is at elevation 553 msl and provides a service 
road and track for a gantry crane. The navigation 
lock is a single-lift type with clear plan dimensions of 
86 by 666 feet and a 15-foot minimum depth of the 
sills. A navigation channel 250 feet wide, 14 feet 
deep, and 28.1 miles long is provided from the dam 
to Little Goose Lock and Dam. Relocations along the 
lake included railroads and highways. Principal data 
are set forth in table 30-J. 
Construction of the original project started in 
June 1961. It was placed in operation in 1969 and 
completed in 1976. Construction of the additional 
generating units started in 1975 and was completed in 
1981. Power generation through September 2000 
was 90.68 billion kW hours. 
Lake West offers seven day-use areas, five areas 
offering camping, five boat launch areas, and one 
designated swimming beach. Total visitation on Lake 
West for the FY was 151,576. 
Local cooperation. None required. 
Operations during FY. Operation and 
Maintenance: During the FY, 3.54 billion kW hours 
of electrical power were generated by the six 
generating units. Traffic through the navigation lock 
consisted of grains, petroleum products, fertilizer, 
wood products, and miscellaneous cargo and 
amounted to 7,109,500 tons during calendar year 
1999. The FY costs were $7,775,230. 
13. LOWER SNAKE RIVER FISH AND 
WILDLIFE COMPENSATION PLAN, WA, OR, 
AND ID 
Location. This project is at various locations 
within the Columbia and Snake River drainages in the 
States of Idaho, Oregon, and Washington. 
Existing project. The project consists of a 
series of fish hatcheries, wildlife development areas, 
and purchase of off-site project lands for fishing and 
hunting access. The project will compensate for loss 
of wildlife habitat and anadromous and resident 
fishery inundated as a result of construction of four 
multipurpose dams and reservoirs on the lower Snake 
River (Ice Harbor, Lower Monumental, Little Goose, 
and Lower Granite Locks and Dams). 
The real estate design memorandum and feature 
design memorandums on all hatcheries and satellites, 
the off-project wildlife lands, and the site selection 
report have all been approved. A final Environmental 
Impact Statement was filed with the Council on 
Environmental Quality on November 2, 1977. The 
DNFH Expansion: Irrigon, Hagerman, Lyons Ferry, 
Lookingglass, McCall, Sawtooth, Magic Valley, 
Tucannon, Wallowa, and Clearwater Hatcheries 
(including their respective satellite facilities) are all in 
operation. Transfer actions have been completed 
except for Irrigon, Clearwater, and Captain John 
Rapids Acclimation Facilities. Transfer for these 
remaining facilities is scheduled to be complete by 
the end of FY 00. Fencing is complete at all wildlife 
development areas. Off-project land acquisition is 
100 percent complete. Habitat development 
continues at many of these sites. Development of fall 
chinook salmon acclimation facilities and 
Lookingglass Hatchery water treatment has 
progressed, in accordance with Senate Conference 
Report (103-672, page 7). The compensation plan is 
scheduled for completion in FY 02. 
Estimated Federal cost for the project is 
$232,000,000. 
Local cooperation. None required. 
Operations during FY. Different alternatives 
for water treatment at Lookingglass Hatchery have 
been coordinated with U.S. Fish and Wildlife Service, 
Oregon Fish and Wildlife, and Confederated Tribes 
of the Umatilla Indian Reservation. An amendment 
to the design memorandumn will be completed based 
on the recommended alternative. 
14. McNARY LOCK AND DAM, LAKE 
WALLULA, OR AND WA 
Location. This dam is on the Columbia River, 
292 miles above the mouth, near Umatilla, OR, and 3 
miles above the mouth of the Umatilla River. 
Existing project. The project includes a dam, 
powerplant, navigation lock, two fish ladders, 
appurtenant facilities, and a system of levees and 
pumping plants. The project provides for slack water 
navigation, hydroelectric power generation, 
30-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 00 
recreation, and incidental irrigation. The reservoir 
has a normal operating range between elevations 340 
and 335 msl. Lake Wallula extends upstream about 
64 miles and provides slack water to Ice Harbor Lock 
and Dam. The dam structure is 7,365 feet long and 
about 183 feet above the streambed. Fish passage 
facilities include two fish ladders. The powerhouse 
has fourteen 70,000 kW generating units in operation 
for a capacity of 980,000 kW. The spillway dam is 
1,310 feet long, and the overflow crest is at elevation 
291 msl and is surmounted by 22 vertical lift gates, 
50 feet wide and 51 feet high, which provide the 
capacity to pass a design flood of 2.2 million cfs. 
The navigation lock is a single-lift type with clear 
plan dimensions of 86 by 683 feet and a 15-foot 
minimum depth over the sills. A navigation channel 
(250 feet wide, 14 feet deep, and 32 miles long) is 
provided from the dam to the mouth of the Snake 
River. Relocations along the lake included railroad 
bridges over the Columbia and Snake Rivers in order 
to eliminate hazards to navigation. Principal project 
data are set forth in table 30-J. 
Construction began in May 1947. It was placed 
in operation in 1953 and was completed in 1982. 
Power generation through September 2000 was 
289.81 billion kW hours. 
Local cooperation. None required. 
Operations during FY. Operation and 
Maintenance: During the FY, 6.61 billion kW hours 
of electrical power were generated by the 14 
generating units. Traffic through the navigation lock 
consisted of grains, petroleum products, fertilizer, 
wood products, and miscellaneous cargo and 
amounted to 8,461,600 tons during calendar year 
1999. The FY costs were $16,002,925. 
Recreation areas on Lake Wallula include 19 
sites offering day-use or picnicking, 5 campgrounds, 
14 boat launching ramps, and 9 swimming areas. The 
Pacific Salmon Visitor Information Center at McNary 
Lock and Dam, staffed by park rangers, provides a 
regional overview of Corps efforts in salmon 
recovery issues. Total visitation on Lake Wallula for 
the FY was 4,237,800. 
15. SNAKE RIVER DOWNSTREAM FROM 
JOHNSON BAR LANDING, OR, WA, AND ID 
Location. This project is on the Snake River, 
downstream from Johnson Bar Landing, river mile 
230. The Snake River, which is the largest tributary 
of the Columbia River, rises in Yellowstone National 
Park in western Wyoming, flows generally in a 
westerly direction for about 1,000 miles, and empties 
into the Columbia River, near Pasco, WA, 324 miles 
from the Pacific Ocean. 
Existing project. The River and Harbor Act of 
1945 authorized construction of dams, as necessary, 
for power, incidental irrigation, and open channel 
improvements for purposes of providing slack water 
navigation and irrigation between the mouth of the 
Snake River and Lewiston, ID. That authorization 
modified previous authorizations only for the portion 
of improvement below Lewiston, ID. Acts of 
June 13, 1902, and August 30, 1935, as they pertain 
to open river improvement from Lewiston, ID, to 
Johnson Bar Landing, remain part of the existing 
project. 
Improvements included in existing projects are 
Ice Harbor Lock and Dam, Lake Sacajawea; Little 
Goose Lock and Dam, Lake Bryan; Lower Granite 
Lock and Dam; Lower Monumental Lock and Dam, 
Lake Herbert G. West; and open-river improvement, 
Lewiston to Johnson Bar Landing. Each of the four 
locks and dams is described in an individual report, 
and cost and financial data for the entire project are 
shown on tables 30-A and K. 
Ice Harbor, Lower Monumental, Little Goose, 
and Lower Granite Locks and Dams are in full 
operation (see individual reports for details). For 
further details, see the following Annual Reports: 
page 2,246 for 1903; page 1,986 for 1906; page 
1,991 for 1915; and page 1,981 for 1962. 
Local cooperation. None required. 
Terminal facilities. On the Snake River from 
the mouth to Johnson Bar Landing, there are 
18 privately-owned barge terminals in use for 
shipping grain, petroleum products, fertilizers, wood 
products, cement, and other general cargo. There are 
also 5 marinas and 28 small-boat launching ramps, all 
open to the public. The facilities serve slack water 
navigation to river mile 140, the site of Lewiston, ID. 
That slack water reaches the Lewiston, ID, and 
Clarkston, WA, area since the lake behind Lower 
Granite Lock and Dam was filled in February 1975. 
Operations during FY. See individual reports 
for Ice Harbor, Lower Monumental, Little Goose, and 
Lower Granite Locks and Dams. On the Snake River 
from Lewiston, ID, to Johnson Bar Landing, 
reconnaissance and condition surveys were conducted 
and survey markers were maintained. No costs were 
incurred this FY. 
30-10

WALLA WALLA, WA, DISTRICT 
16. MISCELLANEOUS WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to Section 
205, PL 858, 80th Congress, as amended: 
The FY costs were $203,750 with five 
continuing flood control activities: (1) Section 205 
coordination ($16,808); (2) Negro Creek, Sprague, 
WA ($29,543); (3) Lawyers Creek, Kamiah, ID 
($10,971); (4) Coppei Creek, WA ($84,953); (5) Mill 
Creek, WA ($43,290). One new flood control 
activity: Weiser River, ID ($18,184). 
Emergency flood control activities-repair, 
flood fighting, and rescue work (PL 99, 84th 
Congress, and antecedent legislation): 
There were no Federal costs this FY. 
Emergency bank protection (Section 14, 
Flood Control Act of 1946, PL 526, 79th 
Congress): 
The FY costs were $46,702 for continuation of 
four feasibility studies: (1) Section 14 Coordination 
($7,385); (2) Big Wood River, Deer Creek, Bridge, 
ID ($31,099); (3) Willow Creek, Whitman County, 
WA ($6,177); and (4) Payette River, Payette, ID 
($2,041). 
Snagging and clearing of navigable streams 
and tributaries in interest of flood control (Section 
208, Flood Control Act of 1954, PL 780, 83rd 
Congress): 
The FY costs were $1,973 for Section 208 
Coordination. 
Project modification for the improvement of 
the environment (Section 1135(b), PL 99-662, as 
amended): 
The FY costs were $1,732,163 for continuation 
of three studies, and initial appraisal and coordination 
fuinds including: (1) Initial Appraisals, General 
($15,911); (2) Coordination Account ($3,150); (3) 
Walla Walla River, OR and WA ($1,492,922); (4) 
Grande Ronde River, OR ($117,556); and(5) Milton- 
Freewater, OR ($102,624). 
General Investigations 
17. SURVEYS 
Jackson Hole River and Wetland 
Restoration and Flood Control, WY. The Water 
Resources Development Act of 1986 authorized the 
Corps to operate and maintain a system of Federal 
and non-Federal levees along the Snake River in the 
vicinity of Jackson Hole, WY. A draft 
reconnaissance study with the potential for improving 
the system with levee raises, extensions, or 
relocations was completed in FY 90. The final 
reconnaissance study was combined with the Jackson 
Hole Restoration Study. The Jackson Hole River and 
Wetland Restoration and Flood Control 
Reconnaissance Study was initiated to restore fish 
and wildlife habitat in the 500-year floodplain of the 
leveed reach of the Snake and Gros Ventre Rivers at 
Jackson, WY. The study evaluated losses resulting 
from levee construction over the past 30 years and 
determined restoration measures for these losses. The 
report was approved in FY 94. A 4-year feasibility 
study was initiated in FY 96. The feasibility 
studywas completed in July 2000. 
Lower Boise River and Tributaries, ID. A 
reconnaissance study was re-initiated for the lower 
Boise River and tributaries in June 1994. An interim 
reconnaissance report was completed in May 1995. 
The interium report included economically feasible 
alternatives for flood control and environmental 
restoration. Completion of the study is scheduled for 
March 2001 ($13,913). 
Walla Walla River Watershed Study, OR, 
and WA. A reconnaissance study was initiated on 
August 29, 1996. The study objectives are riparian 
and wetland restoration, fish and wildlife restoration 
and enhancement, flood damage reduction, water 
quality improvements, water supply, erosion control, 
low flow augmentation, and recreation ($24,948). 
Little Wood River Gooding, ID. A 
reconnaissance study was initiated and completed for 
the Little Wood River in FY 00. The study 
determined that there is a Federal interest in restoring 
and replacing the Lava Rock Little Wood River 
Containment System. A feasibility study will be 
initiated in April 2001. Alternatives will be studied 
to provide flood protection to the city of Gooding, ID 
($66,834). 
The FY costs for surveys were $557,607, 
including Special Studies: Jackson Hole Restoration, 
($188,803); Walla Walla River Watershed, $24,949); 
and Tri-Cities Area Rivershore Enhancement 
($6,780). Miscellaneous Activities [Special 
30-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 00 
Investigations, FERC Licensing Activities, North 
American Waterfowl Management Plan, Inteijgency 
Water Resource Development ($109",903)]; 
Coordination with other Federal Agencies ($19,231); 
and Planning Assistance to States ($127,194). In 
addition, $67,621 contributed funds were expanded 
for the Jackson Hole Restoration. Floodplain 
management service ($128,029). 
18. COLLECTION AND STUDY OF BASIC 
DATA
During the FY, flood hazard data for a number 
of locations in the District were collected and 
analyzed. Flood information was provided to several 
Federal agencies; to the States of Idaho, Oregon, and 
Washington; to various cities and counties in those 
states; and to some private organizations. 
Total cost of collection and study of basic data 
during the FY was $156,842, which included: Flood 
Plain Management Services ($19,985); Technical 
Services ($39,533); Quick Responses ($4,959); and 
Special Studies ($92,365). 
19. PRECONSTRUCTION, ENGINEERING, 
AND DESIGN 
No preconstruction, engineering, and design 
studies were conducted during the FY. 
30-12

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 00 
TABLE 30-A COST AND FINANCIAL STATEMENT 
See Total to 
Section Project Funding FY 97 (S) FY 98 () FY 99 (S) FY 00 ($) Sep 30, 2000 
In Text ($) 
3. Jackson Hole, WY New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
(Contributed funds) Maint. 
Contrib. 
Cost 
4. Lucky Peak Lake, ID New Work 
Approp. 
Cost 
Maint. 
5. Mill Creek, WA 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab 
Approp. 
Cost 
7. Columbia River Fish New Work 
Mitigation Approp. 
Program, OR, WA, Cost 
and ID 
8. Dworshak Dam and New Work 
Reservoir, ID Approp. 
Cost 
Maint. 
Approp. 
Cost 
9. Ice Harbor Lock and New Work 
Dam, WA Approp. 
Cost 
Maint. 
Approp. 
Cost 
10. Little Goose Lock and New Work 
Dam, WA Approp. 
Cost 
Maint. 
Approp. 
Cost 
i1. Lower Granite Lock New Work 
and Dam, WA Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Contrib. 
Cost 
12. Lower Monumental New Work 
Lock and Dam, Approp. 
WA Cost 
Maint. 
Approp. 
Cost 
1,047,000 
851,718 
47,822 
806,417 
846,762 
671,761 
864,762 
48,182 
48,182 
943,300 
907,880 
1,140,500 852,890 
818,871 1,281,659 
- - 2,525,070 
- - 2,525,069 
827,918 1,140,507 7,663,686' 
842,552 1,133,473 8,381,567' 
48,906 - 378,798 
48,906 - 412,909 
- - 19,652,0812 
- - 19,648,9812 
1,039,123 1,419,675 24,891,349' 
1,076,698 1,099,314 24,560,8383 
- - 2,258,4954 
- - 2,258,4954 
1,613,387 
1,546,048 
836,06 
866,91 
42,149,000 37,281,000 34,851,000 25,696,99 
39,338,812 39,581,675 28,949,699 30,656,58 
- - - 
13,877,500 8,036,175 9,652,318 9,524,65 
11,009,351 11,076,208 9,752,198 9,535,93 
7,844,600 7,045,100 9,419,807 9,077,28 
8,233,742 7,064,312 9,452,036 9,123,79 
4,275,800 4,232,800 
4,468,078 4,190,318 
6,230,953 6,307,45 
6,199,714 6,476,68 
8,960,400 9,365,300 10,052,838 9,416,29 
8,990,729 9,219,308 10,294,807 9,121,08 
- - -. 
4,791,900 5,048,600 6,250,690 7,831,7C 
5,165,048 5,039,295 6,157,881 7,775,23
4 17,962,781 
9 17,898,949 
- 17,714,102 
- 17,714,102 
9 341,164,999' 
2 339,370,1059 
- 327,482,1965 
- 327,482,1975 
9 160,154,6826 
9 160,033,7246 
- 168,028,7577 
- 168,029,756' 
5 161,487,197a 
4 161,431,8908 
- 233,361,0219 
- 233,361,0109 
3 111,624,564'0 
12 111,572,0100 
- 374,836,315" 
- 374,836,315" 
)7 156,967,30312 
7 156,557,12012 
- 20,000 
- 20,000 
- 238,612,732" 
- 237,222,733 ' 
)5 115, 17,90414 
30 114,890,361" 
30-13

WALLA WALLA, WA, DISTRICT 
TABLE 30-A (Continued) COST AND FINANCIAL STATEMENT 
See Section Total to 
In Text Project Funding FY 97 () FY 98 (S) FY 99 (S) FY 00 (s) Sep 30, 2000 
13. Lower Snake Fish New Work 
and Wildlife Approp. 4,238,000 2,907,000 1,304,000 1,230,032 229,959,273 
Compensation, Cost 4,162,680 2,653,234 1,620,153 1,061,330 229,397,317 
ID, OR, and WA 
New Work 
(Contributed Funds) Contrib. - - - 223,965 
Cost - 223,965 
14. McNary Lock and New Work 
Damr, Lake Approp. - 326,293,705's 
Wallula, OR, and Cost - 360,103,408' 5 
WA 
Maint. 
Approp 11,958,900 12,627,724 14,193,157 15,675,724 286,125,50916 
Cost 11,990,155 11,696,358 14,908,297 16,002,925 285,988,61516 
(Contributed Funds) Maint. 
Contrib. - - - - 43,707 
Cost - - - - 43,707 
15. Snake River New Work 
Downstream Approp. 11,266,000 5,932,000 8,491,000 7,331,000 1,136,239,589' 
from Johnson Bar Cost 12,057,266 6,373,000 6,555,000 8,445,000 
Landing, OR, 1,135,371,587' 
WA, and ID 
Maint. 
Approp. 25,872,702 25,691,800 31,954,288 32,632,740 545,789,471" 
Cost 26,857,597 25,513,233 32,104,438 74,163,551 586,706,558" 
From the county, $39,000 of the cost-sharing funds were received in FY 
90, but were not expended until FY 91. 
2 Includes $570,831 appropriated and expended for Code 710, Recreation 
Facilities at Completed Projects. 
Includes $66,700 allotted and expended under Maintenance and 
Operation of Dams and Other Improvements of Navigable Waters. 
Excludes $80,000 contributed funds, but includes $96,340 appropriated 
and expended for Code 710, Recreation Facilities at Completed 
Projects. 
5 Includes $2,046,100 regular project construction funds appropriated for 
and expended by Department of Interior in FYs 69 through 72 for 
hatchery operations. Includes $655,000 appropriated and expended for 
additional unit. 
6 Includes $20,137,847 regular project operation and maintenance funds 
expended by Department of Interior starting FY 72 for hatchery 
operations. The FY's 72 through 78, funds of $6,097,000 were charged 
to project as a cost, but not as an expenditure for accounting purposes. 
Includes $48,182 appropriated and expended under Special Recreation 
Use Fees. After FY 92, special recreation use fees included with O&M. 
Includes $1,310,750 appropriated and expended under Maintenance 
and Operation of Dams and Other Improvements of Navigable Waters. 
7 Excludes $82,500 contributed for artificial spawning channel. Includes 
$36,748,021 appropriated and expended for additional Units 4 through 
6. Includes $914,256 appropriated and expended for Code 710, 
Recreation Facilities at Completed Projects. Includes $789,000 
appropriated and $788,999 expended for Columbia River Fish 
Mitigation Program. 
Includes $48,919 appropriated and expended under Special Recreation 
Use Fees. After FY 92, special recreation fees included with O&M. 
Includes $641,063 appropriated and expended under Maintenance and 
Operation of Dams and Other Improvements of Navigable Waters. 
Excludes $178,000 appropriated and expended - Bonneville Power 
Administration funds. 
9 Includes $60,941,807 appropriated and expended for additional Units 4 
through 6. Includes $12,006,000 appropriated and $12,006,000 
expended for Columbia River Fish Mitigation Program. 
'o Includes $621,063 appropriated and expended under Maintenance and 
Operation of Dams and Other Improvements of Navigable Waters. 
Excludes $31,000 appropriated and expended - Bonneville Power 
Administration funds. 
" Includes $46,212,534 appropriated and expended for additional Units 4 
through 6. Excludes $405,819 contributed funds on lock and dam 
project. Includes $63,800 appropriated and expended for Code 710, 
Recreation Facilities at Completed Projects. Includes $10,645,966 
appropriated and $7,056,001 expended for Columbia River Fish 
Mitigation Program. 
12 Includes $338,163 appropriated and expended under Maintenance and 
Operation of Dams and Other Improvements of Navigable Waters. 
Excludes $32,000 appropriated and expended - Bonneville Power 
Administration funds. 
13 Includes $51,661,371 appropriated and expended for additional Units 4 
through 6. Includes $2,239,000 appropriated and $2,239,000 expended 
for Columbia River Fish Mitigation Program. 
'4 Includes $372,376 appropriated and expended under Maintenance and 
Operation of Dams and Other Improvements of Navigable Waters. 
Excludes $36,000 appropriated and expended - Bonneville Power 
Administration funds. 
's Includes $1,976,586 appropriated and expended for Code 710, Recreation 
Facilities at Completed Projects. Includes $3,778,000 appropriated and 
$3,778,000 expended for Columbia River Fish Mitigation Program. 
16 Includes $28,851 appropriated and expended under special recreation use 
fees and $1,035,860 appropriated and expended under Maintenance 
and Operation of Dams and Other Improvements of Navigable Waters. 
After FY 92, Special Recreation Use Fees included with O&M. 
Excludes $505,500 appropriated and $301,258 expended - Bonneville 
Power Administration funds. 
7 Includes $400,150 for new work on previous projects (Pasco to Lewiston), 
and $34,613 for new work appropriation used for maintenance prior to 
1953. Excludes $167,500 contributed funds for new work consisting 
of $85,000 for new work on existing projects (Pasco to Riparia), plus 
$82,500 for new work on existing artificial spawning channel. 
30-14

WALLA WALLA, WA. DISTRICT 
Is Includes $186,570 appropriated and expended for maintenance of 
previous projects (Pasco to Lewiston) and $401,019 appropriated and 
$390,527 expended open river Pasco to Lewiston and Lewiston to 
Johnson Bar Landing. 
19 This does not include the appropriations and cost from the mitigation 
analysis under the Columbia River Fish Program, which will be 
allocated at the conclusion of the analysis. 
30-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 00 
TABLE 30-B AUTHORIZING LEGISLATION 
See Section Date 
In Text Authorizing Project and Work Authorized Documents 
Act 
May 17, 1950 
CATHERINE CREEK, OR 
Sep 24, 1954 Organic debris removal along Catherine Creek. 
COLUMBIA RIVER BASIN, LOCAL FLOOD PROTECTION 
PROJECTS 
Blackfoot Area, Snake River, ID. Levee left bank. Blackfoot 
River, ID. Levees, channel improvement, and rectification 
works. 
Boise Valley, Boise River, ID. Channel improvement and 
enlargement, levees, and revetments in Ada County. Canyon 
County unit was deauthorized April 18, 1967. Ada County Unit 
was deauthorized in 1986. 
Camas Creek, ID. Channel deepening and rectification of a 20-mile 
reach of Camas Creek. Deauthorized in 1965. 
Gooding Area, Little Wood River, ID. Channel improvement. 
Grande Ronde Valley, OR. Levees and channel clearing, 
straightening, and realignment; would complement stream 
regulation by upstream storage projects. Deauthorized in 1986. 
Heise-Roberts Extension, Snake River, ID. Channel clearing and 
rectification, levees, and bank protection. Henrys Fork Unit 
deauthorized in 1986. 
Jackson Hole, Snake River, WY. Flood protection. 
Kendrick, Potlatch River, ID. Revetted levee. 
Little Wood River, ID. Flood protection in immediate area. 
Deauthorized in 1965. 
Malheur River, OR. Channel rectification, levees, and bank 
protection at Vale. Willow Creek unit was deauthorized on 
October 14, 1969. 
Mud Lake, ID, Idaho Falls Area. Flood protection. Deauthorized 
in 1990. 
Palouse River, WA. Flood protection for urban and rural areas 
at Garfield and near Maiden. Deauthorized in 1986. 
Payette Valley, ID. Channel rectification, levees, and bank 
protection along 38 miles of Payette River below Black Canyon 
Dam. Payette Valley was deauthorized on October 3, 1978. 
Portneuf River and Marsh Creek, ID. Concrete-lined channel 
through Pocatello. Inkom-Marsh Creek unit was deauthorized 
on October 14, 1969. 
Shelley Area, Snake River, ID. Bank protection. 
South Fork Clearwater River, ID. Emergency construction of 
levees and revetments. Deauthorized in 1986. 
Teton River, ID. Flood protection. Deauthorized in 1986. 
Tomanovich-Salmon City, Salmon, ID. Channel improvement. 
Weiser River, Weiser Area, ID. Intermittent channel realignment 
and improvement, levees, and bank protection, lower river area. 
Project deauthorized in 1990. 
Whitebird Creek, ID. Flood protection. Deauthorized in 1986. 
CATHERINE CREEK LAKE, OR 
Flood control and multipurpose dam on Catherine Creek near 
Union, OR. Project deauthorized in 1990. 
30-16 
H. Doc 531, 81st 
Congress, 2nd Session 
H. Doc. 280, 89th 
Cong., Ist Session. Oct 
27, 1965 
Sec 208, PL 83-780, 
Authorized by Chief 
Engineers. Sep 3, 1985 
Oct 27, 1995 
Table 30-G 
Table 30-E

WALLA WALLA, WA, DISTRICT 
TABLE 30-B (Continued) AUTHORIZING LEGISLATION 
See Date 
Section In Authorizing Project and Work Authorized Documents 
Text Act 
CLEAR AND BURNT RIVER, OR 
Jul 24, 1946 Construction of riprap bank protection at city of Huntington Waste 
Water Lagoon. 
COLFAX, PALOUSE RIVER, WA 
Dec 22, 1944 Provides for flood control works in vicinity of and through Colfax, 
WA, by channel enlargement and modification, levees, floodwalls, 
revetments, and modification of railroad bridges. 
LUCKY PEAK LAKE, ID 
Jul 24, 1946 Dam for flood control, irrigation, and recreation. 
Oct 22, 1976 
Dec 22, 1944 
as amended 
Jul 28, 1938 
as amended 
Aug 18, 1941 
Second outlet for streamflow maintenance. Deauthorized in 1990. 
Construction, operation, and maintenance of recreation facilities. 
MILL CREEK, WALLA WALLA, WA 
Off-stream storage project upstream from Walla Walla. 
Channel improvement through Walla Walla; concrete-lined 
Channel. 
Oct 31, 1992 Redesignation of reservoir to the Virgil B. Bennington Lake. 
OWYHEE RIVER, OR 
Sep 24, 1954 Gravel, brush, and small tree removal from 12 miles of Owyhee 
as amended River. 
ZINTEL CANYON DAM, WA 
Oct 27, 1965 Local protection reservoir to provide flood protection to portions of 
the city of Kennewick, WA. 
COLUMBIA RIVER FISH MITIGATION PROGRAM 
Jul 19, 1988 Design, test, and construct fish bypass facilities at Lower 
Monumental, Ice Harbor, Little Goose, Lower Granite, and 
McNary Locks and Dams. 
(BRUCES EDDY) DWORSHAK DAM AND RESERVOIR, 
ID 
Jul 3, 1958 Preparation of detailed plans. 
Table 30-E 
Table 30-E 
4. 
30-17 
Sec 14, PL 79-526, 
Authorized by Chief of 
Engineers. Jul 10, 1985 
Flood Control Act of 
1944 
H. Doc. 888, 77th 
Cong., 2nd Session 
PL 79-526, Chief of 
Engineers Report, dated 
May 13, 1946. 
PL 94-587 
Sec. 4, Flood Control 
Act of 1944 
H. Doc. 578, 75th 
Cong., 3rd Session 
H. Doc. 719, 76th 
Cong. 
Sec 377, PL 77-228, 
Cong. 3rd Session 
Sec. 118 PL 102-580 
102nd Cong. 
Sec. 208, PL 83-780 
Authorized by Chief of 
Engineers. Feb 11, 
1985 
PL 89-298, Sec. 201 
PL 100-371 
S. Doc. 51, 84th Cong., 
Ist Session 
5. 
Table 30-E 
Table 30-E 
7. 
8.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 00 
TABLE 30-B (Continued) AUTHORIZING LEGISLATION 
See Date 
Section In Authorizing Project and Work Authorized Documents 
Text Act 
Aug 15, 1963 Redesignation of project as Dworshak Dam and Reservoir. 
Oct 23, 1962 Dworshak Dam added Units 4, 5, and 6, Idaho. Units 5 and 6 were 
deauthorized in FY 1990. Unit 4 was deauthorized in FY 95. 
ICE HARBOR LOCK AND DAM, LAKE SACAJAWEA, WA 
Mar 2, 1945 Unit I of 4, Lower Snake River Project. Lock and dam for 
navigation, power, recreation, and incidental irrigation. 
Dec 22, 1944 Construction, operation, and maintenance of recreation facilities. 
as amended 
LITTLE GOOSE LOCK AND DAM, LAKE BRYAN, WA 
Mar 2, 1945 Unit 3 of 4, Lower Snake River Project. Lock and dam for 
navigation, power, recreation, and incidental irrigation. 
Dec 31, 1970 Designation of reservoir as Lake Bryan. 
LOWER GRANITE LOCK AND DAM, LOWER GRANITE 
LAKE, WA 
Mar 2, 1945 Unit 4 of 4, Lower Snake River Project. Lock and dam for 
navigation, power, recreation, and incidental irrigation. 
LOWER MONUMENTAL LOCK AND DAM, LAKE 
HERBERT G. WEST, WA 
Mar 2, 1945 Unit 2 of 4, Lower Snake River Project. Lock and dam for 
navigation, power, recreation, and incidental irrigation. 
May 25, 1978 Designation of reservoir as Lake Herbert G. West. 
Oct 22, 1976 
as amended 
Nov 17, 1986 
Mar 2, 1945 
Dec 22, 1944 
as amended 
Nov 17, 1986 
Oct 22, 1976 
Dec 29, 1981 
Jul 30, 1983 
LOWER SNAKE RIVER FISH AND WILDLIFE 
COMPENSATION PLAN, WA, OR, AND ID 
Fish hatcheries and replacement of wildlife habitat. 
Changes to land acquisition authority. 
McNARY LOCK AND DAM, LAKE WALLULA, OR AND 
WA 
Lock and dam for navigation, power, recreation, and 
irrigation. 
Construction, operation, and maintenance of recreation 
facilities. 
Construction, operation, and maintenance of a second 
powerhouse. 
McNary Lock and Dam Second Powerhouse automatically 
deauthorized on Nov 16, 1991. 
LEWISTON-CLARKSTON BRIDGE, ID AND WA 
Four-lane highway bridge and approaches. 
Increase of authorized amount to $23,200,000. 
Approach roadway from bridge to Sixteenth Avenue in 
Clarkston, WA. Increase of authorized amount to 
$24,000,000. 
PL 88-96 
PL 87-874 
H. Doc. 704, 75th 
Cong., 3rd Session 
Sec. 4, Flood Control 
Act of 1944 
H. Doc. 704, 75th 
Cong., 3rd Session 
PL 91-638 
H. Doc. 704, 75th 
Cong., 3rd Session 
H. Doc. 704, 75th 
Cong., 3rd Session 
PL 95-285 
PL 94-587 
H.R. 6 PL 99-662 
H. Doc. 704, 75th 
Cong., 3rd Session 
Sec. 4, Flood Control 
Act of 1944 
H.R. 6, PL 99-662 
Sec. 1001, PL 99-362 
PL 94-587 
PL 97-140 
PL 98-63 
30-18 
9. 
10. 
11. 
12. 
13. 
14. 
Table F

WALLA WALLA, WA, DISTRICT 
TABLE 30-B (Continued) AUTHORIZING LEGISLATION 
See Date 
Section In Authorizing Project and Work Authorized Documents 
Text Act 
SNAKE RIVER TO JOHNSON BAR, OR, WA, AND ID 
Jun 13, 1902 Open-river navigation Riparia to Pittsburg Landing. 
Jun 25, 1910 Mouth to Riparia. 
Aug 30, 1935 Pittsburg Landing to Johnson Bar. 
Mar 2, 1945 Supersedes previous legislation mouth to Lewiston, ID, 
only. See Ice Harbor, Lower Monumental, Little Goose, 
and Lower Granite Locks and Dams. 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
Table E Aug 18, 1941 Dayton, Touchet River, WA. Flood protection. 
Milton-Freewater, Walla Walla River, OR. Flood protection. 
Nov 17, 1986 Malheur Lake, OR. Flood damage. 
Table E Dec 22, 1944 Heise-Roberts Area, Snake River, ID. Channel improvement. 
Malheur Improvement District, Snake River, OR. Flood 
protection. 
Table E Jul 11, 1956 Esquatzel Coulee, Connell, WA. Levees and protective work. 
Lower Dry Creek, Lowden, WA. Channel improvement. 
Mission and Lapwai Creeks, ID. Construction of levee. 
Table E Oct 23, 1962 Bear Creek, Kendrick, ID. Channel improvement. 
Lapwai Creek Culdesac, ID. Construct left bank levee 
Lyman Creek near Rexburg, ID. Channelization 
Tucannon River, Camp Wooten, WA. Levee and channel work. 
Oct 23, 1962 Ririe Lake, Willow Creek, ID. Storage for flood control. 
3. and May 17, 1950 Jackson Hole, WY. Flood control protection by channel 
Table E improvement consisting of channel rectification, levees, and 
revetment along Snake River in vicinity of Wilson, WY. 
Nov 17, 1986 Also operation, maintenance, modifications, and additions are 
Federal responsibility. 
Nov 17, 1986 Little Wood River, ID. Flood protection. 
Table G Oct 23, 1962 Blackfoot Reservoir, Blackfoot River, ID. Modification to increase 
spillway capacity. Authorized in Oct 1962 and 
Nov 17, 1986 deauthorized in 1986. 
Oct 27, 1965 Grande Ronde Lake, OR. Flood control, irrigation, and water. 
Supply, anadromous fish, downstream, and resident trout 
fishery, recreation, and downstream power. 
Nov 17, 1986 Deauthorized in 1986. 
Table G Nov 17, 1986 Cottonwood Creek Dam, ID. Protection to highly-developed 
urban and suburban areas against flash floods. Authorized 
Oct 1962, PL 89-298. Deauthorized in 1986. 
Table G Dec 22, 1944 Pullman, Palouse River, WA. Flood protection. 
Authorized Dec 1944. Deauthorized in 1986. 
Table G Nov 7, 1966 Stuart Gulch Dam, ID. Protection to highly-developed 
urban and suburban areas against flash floods. Authorized 
Nov 7, 1966. Deauthorized in 1979. 
H. Doc. 127, 56th Cong, 
2nd Session 
H. Doc. 411, 55th Cong, 
2nd Session 
Rivers and Harbors 
Committee, Doc. 25, 
72nd Cong, Ist Session 
H. Doc. 704, 75th Cong., 
2nd Session 
H. Doc. 662, 76th Cong., 
3rd Session 
H. Doc. 719, 76th Cong., 
3rd Session 
PL 99-662 
H. Doc. 452, 77th Cong., 
ist Session 
PL 87-685 
PL 87-874 
PL 87-874 
PL 81-188 
PL 99-662 
PL 99-662 
PL 87-874 
PL 99-662 
PL 89-298 
PL 89-298 
PL 99-662 
H.D. 452, 77th Cong., 
Ist Session 
PL 89-789, Section 201 
30-19 
15.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 00 
OTHER AUTHORIZED 
TABLE 30-C NAVIGATION PROJECTS 
For Last Full Cost to Sep 30, 2000 
Report See Operation and 
Project Status Annual Report Construction Maintenance 
For: 
Columbia River and Tributaries above Completed 1968 $1,851,195 
Celilo Falls to Kennewick, WA 
1. Obviated by The Dalles, John Day, and 
McNary Projects. 
30-20

WALLA WALLA, WA, DISTRICT 
OTHER AUTHORIZED 
TABLE 30-E FLOOD CONTROL PROJECTS 
For Last Full Cost to Sep 30, 2000 
Project Status Report See Annual Construction Operation and 
Report For: (S) Maintenance ($) 
Asotin Creek, Asotin, ID' Completed 1951 12,019 
Bear Creek, Kendrick, ID' Completed 1970 133,518 
Big Wood River, ID Completed 1985 784,930 
Boise River, IDs Completed 1985 236,500 
Catherine Creek, OR Completed 1990 28,800 
Clear and Burnt River, OR Completed 1990 99,500 
Colfax, Palouse River, WA Completed 1990 5,810,240 
Connell, WA' Completed 1967 60,000 
Cottonwood Creek Community Church, Completed 1984 23,400 
Culdesak, ID2 
Dayton, Touchet River, WA Completed 1966 380,617 
Dry Creek, WA' Completed 1961 384,426 
Esquatzel Coulee, Connell, WA' Completed 1967 293,092 
Esquatzel Coulee, Mesa, WA' Completed 1969 38,631 
Gooding Area, ID' Completed 1954 86,126 
Graves Creek, IDI Completed 1953 75,469 
Heise-Roberts Area, Snake River, ID Completed 1955 1,586,439 
Jackson Hole, Snake River, WY Completed 1978 2,504,245 
Lapwai Creek, Culdesac, ID' Completed 1972 176,833 
Lava Hot Springs, Portneuf River, ID' Completed 1973 113,296 
Little Wood River, ID6 Active 1993 353,534 
Lower Dry Creek, Lowden, WA' Completed 1972 17,600 
Lyman Creek, ID' Completed 1971 230,315 
Malheur Lake Project, OR7 Completed 1990 4,729,348 
Malheur Improvement District, Snake Completed 1957 138,608 
River, OR 
Milton-Freewater, Walla Walla River, OR3 Completed 1968 2,327,578 
Mission and Lapwai Creeks, ID' Completed 1965 54,538 
Orofino Creek and Clearwater River, Inactive 1949 23,050 
Orofino, ID'2 
Owyhee River, OR Completed 1990 69,316 
Rapid Creek, ID' Completed 1985 19,500 
Pataha Creek, Pomeroy, WA2 Completed 1977 110,815 
Pataha Creek at Pomeroy, WA2 Completed 1993 308,511 
Payette River, Emmett Sewage Lagoon, ID2 Completed 1967 39,172 
Riverside Area, Pasco, WA' Completed 1972 28,839 
Ririe Lake, ID Completed 1983 39,677,448 
Sewage Lagoon, Vale, OR2 Completed 1985 75,000 
Shobe Canyon, Heppner, OR' Completed 1970 5,000 
Snake River, Blackfoot, ID' Completed 1980 131,700 
Snake River, Heise Bridge Location, 11D Completed 1952 8,501 
Snake River, Stevens, Blackfoot, ID' Completed 1968 32,425 
South Fork, Boise River, IDs Completed 1985 44,400 
South Fork Clearwater River, Completed 1973 61,055 
Kooskia-Sites, ID 
Tomanovich-Salmon City, ID' Completed 1955 128,635 
Touchet River, Waitsburg, WA' Completed 1973 72,140 
Tucannon River, Wooten, WA' Completed 1971 74,305 
Umatilla River, OR' Completed 1961 161,540 
Wallowa River, Weaver Bridge, OR2 Completed 1960 16,118 
Weiser River, IDs Completed 1985 293,739 
30-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 00 
OTHER AUTHORIZED 
TABLE 30-E (Continued) FLOOD CONTROL PROJECTS 
For Last Full Cost to Sep 30, 2000 
Project Status Report See Annual Construction Operation and 
Report For: ($) Maintenance (S) 
Willow Creek, ID' Completed 1963 976 
Willow Creek Lake, OR Completed 1985 37,231,332 
Yakima River, West Richland, WA"' Completed 1964 229,890 
Zintel Canyon Dam, WA' Completed 1995 6,801,788 
Authorized by Chief of Engineers pursuant to Section 205, 
PL 80-858. 
Authorized by Chief of Engineers pursuant to Section 14, 
PL 79-526. 
3 Exclusive of $6,300 contributed funds. 
4 Exclusive of $9,000 contributed funds. 
5 Authorized by Chief of Engineers pursuant to Section 208, 
PL 83-780. 
6 Authorized by Chief of Engineers pursuant to PL 99-662. No 
funds authorized until Fiscal Year 1990. 
7 Exclusive of $853,712 contributed funds. 
' Authorized by Chief of Engineers pursuant to PL 89-298. 
Construction began in 1992. 
OTHER AUTHORIZED 
TABLE 30-F MULTIPURPOSE PROJECTS, INCLUDING POWER 
For Last Full Cost to Sep 30, 2000 
Project Report See Annual Construction Operation and 
Report For: (s) Maintenance (S) 
Lewiston-Clarkston Bridge, ID and WA 1990 23,409,832 
TABLE 30-G DEAUTHORIZED PROJECTS 
For Last Full Contributed 
Project Report See Annual Date Federal Funds Funds 
Report For: Deauthorized Expended (5) Expended (S) 
Asotin Dam, Snake River, ID and WA 
Blackfoot Reservoir, ID 
Boise Valley, ID 
Ada County Unit 
Canyon County Unit 
Camas Creek, ID 
Catherine Creek Lake, OR 
Cottonwood Creek Dam, Boise, ID 
Dworshak Unit 4 
Dworshak Units 5 and 6, ID 
Grande Ronde Lake, OR 
Grande Ronde Valley, OR 
Heise-Roberts Extension, ID 
Henrys Fork Unit 
Little Wood River, ID 
Lower Walla Walla River, WA 
Lucky Peak 2nd Outlet, ID 
Malheur River, OR 
Willow Creek Unit 
McNary Second Powerhouse, OR and WA 
Mill Creek, WA 
1964 
1980 
1963 
1963 
1960 
1978 
1972 
1993 
1990 
1966 
1958 
1968 
1960 
1953 
1988 
1961 
1991 
1958 
1975 
1986 
1986 
1967 
1965 
1990 
1986 
1995 
1990 
1986 
1986 
1986 
1965 
1986 
1990 
1969 
1991 
1977 
267,626 
46,084 
10,600 
9,080 
1,552,000 
195,686 
655,000 
169,195 
21,334 
4,000 
13,000 
5,671,000 
3,537 
30-22

WALLA WALLA, WA DISTRICT 
TABLE 30-G (Continued) DEAUTHORIZED PROJECTS 
For Last Full Contributed 
Project Report See Annual Date Federal Funds Funds 
Report For: Deauthorzed Expended ($) Expended (s) 
Mud Lake Area, ID 1957 1990 5,994 
Palouse River, WA 1958 1986 2,000 
Payette Valley, ID 1960 1978 23,178 
Portneuf River, Inkom-Marsh Creek, ID 1969 1969 
Pullman, Palouse River, WA 1964 1986 289,109 - 
S. Fork Clearwater River, ID 1973 1986 3,899 - 
Stuart Gulch Dam, Boise, ID 1974 1979 234, 100 - 
Teton River, ID 1955 1986 10,387 - 
Touchet River, WA 1957 1977 11,198 
Weiser River, Weiser Area, ID 1960 1990 112,757 
Whitebird Creek, ID 1957 1986 1,896 
COLUMBIA RIVER BASIN, LOCAL FLOOD PROTECTION 
TABLE 30-H PROJECTS (SEE SECTION 1 OF TEXT) 
Estimated 
Project Status Federal Cost to Sep 30, 
Cost (5) 2000 ($) 
Blackfoot Area, Snake River, ID Completed - 209,403 
Blackfoot River, ID Completed - 391,143 
Heise-Roberts Extension, ID, Snake River Unit Completed - 3,402,958 
Kendrick, Potlatch River, ID Completed - 85,873 
Malheur River, OR, Vale Unit Completed - 333,581 
Mud Lake, ID Inactive 1,187,000 5,996 
Portneuf River and Marsh Creek, ID, Pocatello Unit Completed - 6,456,032' 
Shelley Area, Snake River, ID Completed - 32,348 
TOTAL 10,917,34 
Exclusive of $36,800 contributed funds. 
INSPECTION OF COMPLETED FLOOD CONTROL 
TABLE 30-I PROJECTS (SEE SECTION 2 OF TEXT) 
Inspection 
project Complete 
Clearwater River, ID August 2000 
Columbia River, WA September 2000 
Lyman Creek, ID August 2000 
Palouse River, WA September 2000 
Portneuf River, ID July 2000 
Potlatch River, ID June 2000 
Salmon River, ID August 2000 
Snake River, ID July 2000 
Touchet River, WA September 2000 
Tucannon River, WA September 2000 
Walla Walla River, OR September 2000 
Walla Walla River, WA November 2000 
30-23

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIL~P URK Y UU 
PRINCIPAL DATA CONCERNING NAVIGATION LOCK, 
SPILLWAY DAM, POWERPLANT. AND IMPOUNDMENT 
Project 
Dworshak Dam and 
Reservoir, ID 
(see Section 8 of text) 
SPILLWAY DAM 
Type of Construction 
Completed 
Maximum Capacity 
Crest Elevation 
Control Gates: 
Type 
Size, Width by Height 
Number 
POWERPLANT 
Length 
Generating Units: 
Number Installed 
Rating, Each 
Total Capacity Installed 
Space for Additional 
Rating, Each 
Total Potential Capacity 
Maximum Structural Height 
First Power-On-Line 
IMPOUNDMENT 
Elevations: 
Normal Operating Range 
Maximum 
Flood Control Storage 
Lake Length 
Lake Water Surface Area at Elevation 1,600 
Length of Shoreline 
Ice Harbor Lock and Dam, WA 
(see Section 9 of Text) 
Concrete Gravity 
September 1974 
150,500 cfs' 
1,545 ft2 
Tainter 
50 by 56.4 ft 
2 
428 ft 
3 
2 @ 90,000 kW 
I @ 220,000 kW 
400,000 kW
3 
3 @ 220,000 kW 
1,060,000 kW 
717 ft 
March 1973 
1,600 to 1,445 ft 
1,605 ft 
2,000,000 ac-ft 
53.6 mi4 
17,090 ac5 
175 mi 
NAVIGATION LOCK 
Clear Width 
Clear Length 
Lift: 
Minimum 
Average 
Maximum 
Minimum Water Depth Over Sills 
Open to Navigation 
86 ft 
675 ft 
97 ft 
100 ft 
105 ft 
16 ft 
May 1962 
SPILLWAY DAM 
Type of Construction 
Completed 
Maximum Capacity 
Crest Elevation 
Control Gates: 
Type 
Size, Width by Height 
Number 
Concrete Gravity 
January 1962 
850,000 cfs 
391 ft 
Tainter 
50 by 52.9 ft 
10 
30-24 
TABLE 30-J

WALLA WALLA, WA, DISTRICT 
TABLE 30- (Continued) 
PRINCIPLE DATA CONCERNING NAVIGATION LOCK, 
SPILLWAY DAM, POWERPLANT, AND IMPOUNDMENT 
Project 
POWERPLANT 
Length 
Generating Units: 
Number Installed 
Rating, Each 
Total Capacity Installed 
Maximum Structural Height 
First Power-On-Line 
671 ft 
3 @ 90,000 kW 
3 @ 111,000 kW 
603,000 kW 
226 ft 
December 1961 
Little Goose Lock and Dam, WA 
(see Section 10 of text) 
IMPOUNDMENT 
Elevations: 
Normal Operating Range 
Maximum 
Lake Length 
Lake Water Surface Area at Elevation 440 
Navigation Channel, Depth by Width 
Length of Shoreline 
NAVIGATION LOCK 
Clear Width 
Clear Length 
Lift: 
Minimum 
Average 
Maximum 
Minimum Water Depth Over Sills 
Opened to Navigation 
SPILLWAY DAM 
Type of Construction 
Completed 
Maximum Capacity 
Crest Elevation 
Control Gates: 
Type 
Size, Width by Height 
Number 
POWERPLANT 
Length 
Width 
Generating Units: 
Number Installed 
Rating, Each 
Total Capacity Installed 
Maximum Structural Height 
First Power-On-Line 
440 to 437 ft 
446 ft 
31.9 mi 
8,375 ac 
14 by 250 ft 
80 mi 
86 ft 
668 ft 
93 ft 
98 ft 
101 ft 
15 ft 
May 1970 
Concrete Gravity 
January 1970 
850,000 cfs 
581 ft 
Tainter 
50 by 60 ft 
8 
656 ft 
243 ft 
6 
135,000 kW 
810,000 kW 
226 ft 
March 1970 
30-25

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 00 
TABLE 304 (Continued) 
PRINCIPLE DATA CONCERNING NAVIGATION LOCK, 
SPILLWAY DAM, POWERPLANT. AND IMPOUNDMENT 
Project 
Lower Granite Lock and Dam, WA 
(see Section 11 of text) 
IMPOUNDMENT 
Elevations: 
Normal Operating Range 
Maximum 
Lake Length 
Lake Water Surface Area at Elevation 738 
Navigation Channel, Depth by Width 
Length of Shoreline 
NAVIGATION LOCK 
Clear Width 
Clear Length 
Lift: 
Minimum 
Average 
Maximum 
Minimum Water Depth Over Sills 
Opened to Navigation 
SPILLWAY DAM 
Type of Construction 
Completed 
Maximum Capacity 
Crest Elevation 
Control Gates: 
Type 
Size, Width by Height 
Number 
POWERPLANT 
Length 
Width 
Generating Units: 
Number Installed 
Rating, Each 
Total Capacity Installed 
Maximum Structural Height 
First Power-On-Line 
IMPOUNDMENT 
Elevations: 
Normal Operation Range 
Maximum 
Lake Length 
Lake Water Surface Area at Elevation 738 
Navigation Channel, Depth by Width 
Length of Shoreline 
Concrete Gravity 
February 1975 
850,000 cfs 
681 ft 
Tainter 
50 by 60 ft 
8 
656 ft 
243 ft 
6 
135,000 kW 
810,000 kW 
228 ft 
April 1975 
738 to 733 ft 
746.5 ft 
39.3 mi 
8,900 ac 
14 by 250 ft 
91 mi 
30-26 
638 to 633 ft 
646.5 ft 
37.2 mi 
10,025 ac 
14 by 250 ft 
92 mi 
86 ft 
674 ft 
95 ft 
100 ft 
105 ft 
15 ft 
May 1975

WALLA WALLA, WA, DISTRICT 
TABLE 30-J (Continued) 
PRINCIPLE DATA CONCERNING NAVIGATION LOCK, 
SPILLWAY DAM, POWERPLANT, AND IMPOUNDMENT 
Lower Monumental Lock and Dam, 
WA (see Section 12 of text) 
McNary Lock and Dam, OR 
and WA (see Section 14 of text) 
NAVIGATION LOCK 
Clear Width 
Clear Length 
Lift: 
Minimum 
Average 
Maximum 
Minimum Water Depth Over Sills 
Opened to Navigation 
SPILLWAY DAM 
Type of Construction 
Completed 
Maximum Capacity 
Crest Elevation 
Control Gates: 
Type 
Size, Width by Height 
Number 
POWERPLANT 
Length 
Width 
Generating Units: 
Number Installed 
Rating, Each 
Total Capacity Installed 
Maximum Structural Height 
First Power-On-Line 
IMPOUNDMENT 
Elevations: 
Normal Operating Range 
Maximum 
Lake Length 
Lake Water Surface Area at Elevation 540 
Navigation Channel, Depth by Width 
Length of Shoreline 
NAVIGATION LOCK 
Clear Width 
Clear Length 
Lift: 
Minimum 
Average 
Maximum 
Minimum Water Depth Over Sills 
Open to Navigation 
86 ft 
666 ft 
97 ft 
98 ft 
103 ft 
15 ft 
April 1969 
Concrete Gravity 
March 1969 
850,000 cfs 
483 ft 
Tainter 
50 by 60 ft 
8 
656 ft 
243 ft 
6 
135,000 kW 
810,000 kW 
242 ft 
May 1969 
540 to 537 ft 
548 ft 
28.7 mi 
6,590 ac 
14 by 250 ft 
78 mi 
86 ft 
683 ft 
67 ft 
75 ft 
83 ft 
15 ft 
November 1953 
30-27 
Ppjject

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 00 
TABLE 30-J (Continued) 
PRINCIPLE DATA CONCERNING NAVIGATION LOCK, 
SPILLWAY DAM, POWERPLANT, AND IMPOUNDMENT 
Project 
SPILLWAY DAM 
Type of Construction 
Completed 
Maximum Capacity 
Crest Elevation 
Control Gates: 
Type 
Size, Width by Height 
Number 
POWERPLANT 
Length 
Generating Units: 
Number Installed 
Rating, Each 
Total Capacity Installed 
Maximum Structural Height 
First Power-On-Line 
Concrete Gravity 
October 1953 
2,200,000 cfs 
291 ft 
Vertical Lift 
50 by 51 ft 
22 
1,348 ft 
14 
70,000 kW 
980,000 kW 
220 ft 
November 1953 
IMPOUNDMENT 
Elevations: 
Normal Operating Range 
Maximum 
Lake Length 
Lake Water Surface Area at Elevation 340 
Navigation Channel, Depth by Width 
Lenth of Shoreline 
340 to 335 ft 
356.5 ft 
64 mi 
38,800 ac 
14 by 250 ft 
242 mi 
cubic feet per second 
2 feet 
Skilowatt 
Smiles 
acres 
30-28 
cubic feet per second 
2 
feet 
3 
kilowatt 
4 
miles 
5 acres

WALLA WALLA, WA, DISTRICT 
SNAKE RIVER DOWNSTREAM FROM 
JOHNSON BAR LANDING, OR, WA, AND ID 
TABLE 30-K (SEE SECTION 15 OF TEXT) 
Estimated Cost 
(Corps of New Work Maintenance to Percent Constr. 
Project Engineers Funds to September 30, 2000 September 30, 2000 Completed Started 
Only) Approp. Cost Approp. Cost 
Ice Harbor Lock and Dam 
Initial Project $129,578,480 $129,578,480' $129,578,480' $161,487,197 $161,431,890 100 FY 56 
Code 710 Rec Facilities 914,256 914,256 914,256 0 0 100 FY 57 
Power Units 4-6 36,748,021 36,748,021 36,748,021 0 0 100 FY 71 
Fish Bypass Program 87743 ' 40 429 000 40.388.000 0 0 46 FY 91 
Totals 254,983,757 207,669,7574 207,628,757' 161,487,197 161,431,890 81 
Little Goose Lock and 
Dam 
Initial Project 160,413,215 160,413,2155 160,413,215 111,624,564 111,572,010 100 FY 63 
Power Units 4-6 60,941,807 60,941,807 60,941,807 0 0 100 FY 74 
Fish Bypass Program 72.626.000' 38.525.000 38.145.000 0 0 23 FY 89 
Totals 293,981,022 259,880,022' 259,500,022 s 111,624,564 111,572,010 88 
Lower Granite Lock and 
Dam
Initial Project 321,503,981 321,503,9816 321,503,9796 156,967,303 156,557,120 100 FY 65 
Code 710 Rec Facilities 63,800 63,800 63,800 0 0 100 FY 84 
Power Units 4-6 46,212,534 46,212,534 46,212,534 0 0 100 FY 74 
Fish Bypass Program 83,351,000' 31,427.000 31,411,000 0 0 38 FY 88 
Totals 451,131,315 399,207,3156 399,191,3136 156,967,303 156,557,120 88 
Lower Monumental Lock 
and Dam 
Initial Project 184,712,361 184,712,3617 184,712,3617 115,117,904 114,890,361 100 FY 61 
Power Units 4-6 51,661,371 51,661,371 51,661,371 0 0 100 FY 75 
Fish Bypass Program 97.480.000 32.674.000 32.243.000 0 0 33 FY 90 
Totals 333,853,7323 269,047,732 268,616,732 115,117,904 114,890,361 80 
Open River Lewiston to 
Johnson Bar Landing 34,613 34,613' 34,613 401,5832 397,498 
Open River Pasco to 
Lewiston 0 0 0 4.350 4,350 
Totals Existing Project 1,333,984,439 1,135,839,439 1,134,971,437 545,602,901 544,853,229 85 
Previous Projects Pasco to 
Lewiston 400,150 400,150 400,150 186,570 186,570 
Totals Authorized Project $1,334,384,589 $1,136,239,589' $1,135,371,5873 $545,789,471 $545,039,799 
New work appropriations used for maintenance prior to 1953. 
2 Includes $2,064 appropriated and $3,180 expended in FY 96 for 
project condition survey cost. 
Does not include mitigation analysis. 
Includes $203,000 appropriated and $201,931 expended for 
Columbia River Fish Mitigation Program. 
5 Includes $370,000 appropriated and $358,589 expended for 
Columbia River Fish Mitigation Program. 
6 Includes $1,628,000 appropriated and $1,626,084 expended for 
Columbia River Fish Mitigation Program. 
7 Includes $11,132,000 appropriated and $10,949,493 expended for 
Columbia River Fish Mitigation Program. 
' Includes $13,333,000 appropriated and $13,136,097 expended for 
Columbia River Fish Mitigation Program. 
30-29
HONOLULU ENGINEER DISTRICT* 
The civil works responsibilities of the Honolulu District 
encompasses the State of Hawaii, the Territory of 
Guam, the Territory of American Samoa, and the 
Commonwealth of the Northern Mariana Islands. The 
division is unique in that its area of responsibility is 
totally comprised of islands dispersed over an ocean 
environment exceeding 6 million square miles. 
IMPROVEMENTS 
Navigation Page 
1. Kikiaola Small Boat Harbor, 
Kauai, Hawaii ........................................... 31-2 
2. Maalaea Harbor, Maui, Hawaii.................31-2 
3. Reconnaissance and Condition Surveys ...... 31-2 
4. Inspection of Completed Flood Control 
and Beach Erosion Control Projects ............31-2 
5. Navigation Work Under Special 
Authorization ................................ 31- 2 
Erosion Control 
6. Alii Drive Shoreline Protection, Hawaii 
Hawaii .. ............................................... 3.1..- 3 
7. Beach Erosion Work Under Special 
Authorization .............................. ........... 31-3 
Flood Control 
8. Flood Control Work Under Special 
Authorization ............................................ 31-3 
General Investigations 
9. Surveys .................................... ..... 31-3 
10. Collection and Study of Basic Data ............. 31-3 
11. Preconstruction Engineering and Design.....31-4 
Tables 
Table 31-A Cost and Financial 
Statement.....................................1-5 
Tables (Contd.) Page 
Table 31-B Authorizing Legislation ........... 31-6 
Table 31-C Other Authorized Navigation 
Projects .................................... 31-7 
Table 31-D Other Authorized Beach 
Erosion Control Projects ............. 31-8 
Table 31-E Other Authorized Flood 
Control Projects ...................... 31-9 
Table 31-F Other Authorized Multiple Purpose 
Projects, Including Power........... 31-9 
Table 31-G Deauthorized Projects ............... 33 1-10 
Table 31-H Condition Surveys of 
Navigation Projects................... 31-11 
Table 31-I Inspection of Completed Flood 
Control and Beach Erosion 
Control Projects ........................ 31-11 
Table 31-J Navigation Activities Pursuant to 
Section 107 ................................. 31-12 
Table 31-K Emergency Streambank and 
Shoreline Protection Activities 
Pursuant to Section 14.................31-13 
Table 31-L Beach Erosion Control Activities 
Pursuant to Section 103 ...............3 1-13 
Table 31-M Flood Control Activities Pursuant 
to Section 205 ....................... 31-13 
Table 31-N Project Modification for Improvement 
of Environment Pursuant to 
Section 1135 ............. ................ 31-14 
Table 31-0 Aquatic Ecosystem Restoration 
Pursuant to Section 206 ............... 31-14 
31-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Navigation 
1. KIKIAOLA SMALL BOAT 
HARBOR, KAUAI, HAWAII 
Location. Kikiaola Harbor is located on the 
southwest coast of the island of Kauai, approximately 1 
mile southeast of Kekaha and approximately 2 miles 
west of Waimea (See NOAA Chart 19386) 
Existing project. The authorized project consists of 
removing a 150-foot long portion from an existing outer 
east stub breakwater; removing and reconstructing a 85- 
foot long inner east stub breakwater; modifying 220- 
foot long portion of the existing west breakwater; 
modifying 820-foot long portion of the existing east 
breakwater; dredging a new 700-foot long entrance 
channel to a depth of 11-feet and varying in width from 
105 to 205-feet; and dredging a 320-foot long access 
channel to a 7-foot depth and varying in width from 70 
to 105-feet. 
Local cooperation. The Project Cooperation 
Agreement (PCA) is being prepared and negotiated with 
the local sponsor. 
Terminal facilities. There is a existing 1280-foot 
long east breakwater with two short stub breakwaters; a 
600-foot long west breakwater; a 150-foot long by 10- 
foot wide wooden wharf; a 50-foot long loading dock 
and adjacent launch ramp, all constructed by the State 
of Hawaii. 
Operations during fiscal year. Work during the 
Fiscal Year included continuation of plans and 
specifications and environmental coordination. The 
plans and specifications phase were approximately 95% 
complete as of September 30, 2000. Total costs 
incurred during the Fiscal Year were $60,330. 
2. MAALAEA HARBOR, MAUI, 
HAWAII 
Location. Maalaea Bay is situated on the southwest 
coast of Maui, approximately 7 miles south of Wailuku, 
the county seat of Maui. (See NOAA Chart 19350) 
Existing project. For a description of the existing 
project, see page 36-3 of the FY89 Annual Report. 
(See Table 36-B for Authorizing Legislation) 
Local cooperation. The Project Cooperation 
Agreement (PCA) is delayed due to resolution of 
environmental concerns as a result of the Supplemental 
Environmental Impact Statement. The PCA is being 
coordinated with the local sponsor for execution prior to 
construction. 
Terminal facilities. There is an existing 1,000-foot 
long south breakwater, a 870-foot long east breakwater, 
300-foot long wharf, 90-foot wide entrance channel, 
and a single lane launch ramp, all constructed by the 
State of Hawaii. 
Operations during fiscal year. Work during the 
Fiscal Year included continuing coordination with the 
local sponsor and various agencies on controversial 
environmental issues, continuing development of 
acceptable mitigation features for impacts to 
environmental resources and performing a physical 
model study of the alternatives to address 
environmental concerns. Total costs incurred during the 
Fiscal Year were $602,203. The plans and 
specifications phase was approximately 80% complete 
as of September 30, 2000. 
3. RECONNAISSANCE AND 
CONDITION SURVEYS 
Condition surveys were conducted by contract at 
Aunuu, Auasi, Ofu and Tau Harbors in American 
Samoa and Hilo Harbor on the island of Hawaii in April 
2000. Total cost to conduct these surveys was $84,324. 
Inspections of navigation projects were performed 
during the fiscal year. See Table 31-H for projects 
inspected. 
4. INSPECTION OF COMPLETED 
FLOOD CONTROL AND BEACH 
EROSION CONTROL PROJECTS 
Inspection of completed local flood protection projects 
is performed periodically in compliance with Section 
208.10, of Title 33, Code of Federal Regulations, which 
contains regulations for operation and maintenance of 
local flood-protection works approved by the Secretary 
of the Army in accordance with authority in Section 3, 
Flood Control Act of June 22, 1936. 
Inspection costs for completed flood control and beach 
erosion control projects incurred during the Fiscal Year 
were $268,627. See Table 31-I for inspections 
performed during this fiscal year. 
5. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation activities pursuant to Section 107, Public 
Law 86-645, as amended (Preauthorization). 
See Table 31-J. 
31-2

HONOLULU DISTRICT 
Beach Erosion Control 
6. ALII DRIVE SHORELINE 
PROTECTION, HAWAII, HAWAII 
Location. The project is located along Alii Drive in 
the town of Kailua-Kona on the western coast of the 
Island of Hawaii. The Island of Hawaii is located 
approximately 180 miles southeast of Honolulu, Hawaii 
and approximately 2,600 miles southwest of Los 
Angeles, California. (See NOAA Chart 19320) 
Existing project. The project construction consists of 
pumping concrete into geotextile bags that are placed 
into existing voids along the 700-foot reach Alii Drive 
seawall. 
Local cooperation. The Project Cooperation 
Agreement (PCA) was executed in March 1999. 
Requirements are described in full on Page 31-3 of the 
FY99 Annual Report. 
Terminal facilities. There is a 700-foot long seawall 
along Alii Drive, constructed by the County of Hawaii. 
Operations during fiscal year. A construction 
contract was awarded in June 1999 and physically 
completed in January 2000. Total costs incurred during 
the Fiscal Year were $29,688. 
7. BEACH EROSION WORK UNDER 
SPECIAL AUTHORIZATION 
Emergency streambank and shoreline protection 
activities pursuant to Section 14, Public Law 79-526, 
as amended (Preauthorization). See Table 31-K. 
Beach Erosion control activities pursuant to Section 
103, Public Law 87-874, as amended 
(Preauthorization). See Table 31-L. 
Flood Control 
8. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to Section 205, 
Public Law 80-858, as amended (Preauthorization). 
See Table 31-M. 
Project Modifications for Improvements of 
Environment pursuant to Section 1135, Public Law 
99-662, as amended (Preauthorization). 
See Table 31-N. 
Aquatic Ecosystem Restoration pursuant to Section 
206, Public Law 104-303. (Preauthorization) 
See Table 31-0. 
Emergency flood control activities pursuant to 
Public Law 84-99. 
Federal cost during the fiscal year for Flood Control and 
Coastal Emergencies appropriation was $304,058 of 
which $290,438 was for disaster preparedness; and 
$10,351 for emergency operations; $3,269 for field 
investigations. 
General Investigations 
9. SURVEYS 
Fiscal year costs were $777,068 of which $223,031 was 
for navigation studies; $107,900 was for flood damage 
prevention studies; $37,134 for special studies; $51,407 
for miscellaneous activities; and $357,596 for 
coordination with other agencies. In addition, $78,265 
in non-Federal funds for coordination with other 
agencies; -$24,662 for cost-shared flood damage 
prevention studies; and $248,047 for cost-shared 
navigation studies. 
10. COLLECTION AND STUDY OF 
BASIC DATA 
Flood plain management services. The Flood Plain 
Management Services Program is authorized and 
implemented under Section 206, PL 86-645, 1960 
Flood Control Act, as amended. Through technical 
services and planning guidance, the program provides 
information on floods and flood related information to 
improve planning for the careful use of the nation's 
flood plains, thereby reducing the potential for losses to 
life and property from floods and wave actions. Non- 
Federal agencies are assisted with flood hazard 
evaluation and planning information for flood and 
coastal hazard areas without charge. 
As of November 1991, Federal agencies and private 
entities were also offered these services on a cost 
recovery basis. This assistance is in the form of local 
flood plain regulations, National Flood Insurance 
Requirements, and Executive Order 11988 requirements 
for federal agencies. Such assistance may include flood 
information and timing, floodwater velocity, extent of 
flooding, duration of flooding, flood frequency and 
regulatory floodway limits. 
31-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
10. COLLECTION AND STUDY OF 
BASIC DATA (Contd.) 
Services accomplished during fiscal year. Requests 
and responses for technical services and planning 
assistance totaled 2,200, which included services to 
Federal agencies, state and local government agencies, 
individuals, realtors, corporations, lending institutions, 
engineers, architects and other private parties. Costs for 
providing these services during the fiscal year were 
$303,584. 
Hydrologic Studies. Storm studies cost was $2,691. 
Total costs for collection and study of basic data during 
the fiscal year were $306,275. 
11. PRECONSTRUCTION 
ENGINEERING AND DESIGN 
Kaumalapau Harbor, Lanai, HI - As directed by the 
Energy and Water Development Appropriations Act of 
1998, preconstruction engineering and design studies 
were continued in Fiscal Year 2000. Work during the 
Fiscal Year consisted of continued coordination with 
local sponsors and other interested parties; continued 
preparation of environmental documentation and 
construction plan and specifications. Total costs 
incurred during the Fiscal Year were $63,361. 
31-4

HONOLULU DISTRICT 
TABLE 31-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
In Text Project Funding FY97 FY98 FY99 FY00 Sept. 30, 2000 
1. Kikiaola Small New Work: 
Boat Harbor, Approp. 326,000 218,000 100,000 75,000 1,295,000 
Kauai, HI Cost 286,100 183,846 140,237 60,330 1,246,475 
(Federal Funds) 
2. Maalaea Harbor New Work: 
Maui, HI Approp. 359,700 649,000 372,000 484,000 3,749,700 
(Federal Funds) Cost 412,454 575,013 330,836 602,203 3,707,623 
6. Alii Drive Shore- New Work: 
line Protection Approp. 50,000 0 103,000 0 360,000 
Hawaii, HI Cost 13,783 33,262 95,198 29,688 357,875 
(Federal Funds) 
(Contributed Contrib. 0 0 126,000 0 126,000 
Funds) Cost 0 0 66,117 53,115 119,232 
31-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 31-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
In Text Act Project and Work Authorized Documents 
KIKIAOLA SMALL BOAT HARBOR, KAUAI, HAWAII 
A 700-foot long, 105 to 205-foot wide, and I1 -foot deep 
entrance channel; a 320-foot long, 70 to 105-foot wide, and 
7-foot deep access channel; modification of 220-foot portion of 
the existing west breakwater; and modification of 820-foot portion 
of the existing east breakwater; removal and reconstruction of 
a 85-foot long inner east breakwater; removal of a 150-foot long 
portion of the existing outer east stub breakwater. 
MAALAEA HARBOR, MAUI, HAWAII 
A 620-foot long extension of the south breakwater, 
a new 610-foot length, 150 to 180-foot width, 12 to 
15-foot depth entrance channel, a 1.7 acre and 12-foot 
depth turning basin and a 720-foot length, 80-foot 
width and an 8-foot deep access channel. 
Sec 101, PL 90-483 
Cong., 2nd sess. 
Sec 101, PL 90-483 
Cong., 2nd sess. 
31-6 
Aug. 3, 1968 
Aug. 3, 1968

HONOLULU DISTRICT 
TABLE 31-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to September 2000 
Full Report 
See Annual Operations and 
Project Status Report for: Construction Maintenance 
Agana Small Boat Harbor, Guam Completed 1978 $ 937,798 ' $ 52,555 
Agat Harbor, Guam Completed 1989 2,000,000 2 
Auasi Harbor, American Samoa Completed 1982 1,033,015 ' 141,797 
Aunuu Harbor, American Samoa Completed 1982 1,783,129 4 1,413,179 
Barbers Point Harbor, Oahu, Hawaii Completed 1990 53,519,193 s 2,247,953 
Haleiwa Small Boat Harbor, Oahu, Hawaii Completed 1978 527,047 6 498,402 
Hilo Harbor, Hawaii, Hawaii Completed 1991 5,512,440 4,106,308 
Honokohau Small Boat Harbor, Hawaii, Hawaii Completed 1971 781,036 7 63,693 
Honolulu Harbor, Oahu, Hawaii Completed 1985 16,044,095 ' 4,803,957 
Kahului Beach Road, Maui, Hawaii Completed 1976 751,867 9 --- 
Kahului Harbor, Maui, Hawaii Completed 1984 7,203,221 't 8,222,952 
Kalaupapa Harbor, Molokai, Hawaii Completed 1968 157,997 9 3,127 
Kaulana Bay Boat Harbor, Hawaii, Hawaii Inactive 1990 171,400 --- 
Kawaihae Harbor, Hawaii, Hawaii Completed 1998 12,043,839 " 61,800 
Keehi Lagoon, Oahu, Hawaii Completed 1956 3,348,000 12 41,857 
Kikiaola Small Boat Harbor, Kauai, Hawaii Active 1981 193,000 --- 
Laupahoehoe Harbor, Hawaii, Hawaii Completed 1990 3,623,450 3--- 
Manele Bay Small Boat Harbor, Lanai, Hawaii Completed 1986 372,000 14 495,256 
Nawiliwili Harbor, Kauai, Hawaii Completed 1987 2,127,724 '5 11,047,279 
Nawiliwili Small Boat Harbor, Kauai, Hawaii Completed 1976 584,513 16 30,707 
Ofu Small Boat Harbor, American Samoa Completed 1976 980,018 7 5,054,930 
Pohoiki Bay, Hawaii, Hawaii Completed 1979 432,523 9 --- 
Port Allen Harbor, Kauai, Hawaii Completed 1984 752,645 "1 3,081,225 
Rota Harbor, CNMI Completed 1985 2,000,000 9 436,200 
Saipan Small Boat Harbor, CNMI Deferred 1982 194,000 --- 
Tau Small Boat Harbor, American Samoa Completed 1985 1,991,569 20 546,600 
Waianae Small Boat Harbor, Oahu, Hawaii Completed 1979 1,940,011 21 122,400 
Welles Harbor, Midway Island Completed 1950 2,448,056 22 2,111 
IAuthorized by the Chief of Engineers. In addition, Contributed 
Funds of $282,474 for Construction. 
2In addition, Contributed Funds of $1,239,364 for Construction. 
3Authorized by the Chief of Engineers. In addition, Contributed 
Funds of $86,563 for Construction. 
4Authorized by the Chief of Engineers. In addition, Contributed 
Funds of $231,437 for Construction. 
SIn addition, Contributed Funds of $2,402,909 for Construction. 
6Authorized by the Chief of Engineers. In addition, Contributed 
Funds of $410,077 for Construction and $84,388 for Operation and 
Maintenance. 
71n addition, Contributed Funds of $630,568 for Construction. 
aIn addition, Contributed Funds of $201,282 for Construction. 
9Authorized by the Chief of Engineers. 
1 n addition, Contributed Funds of $30,200 for Construction. 
1In addition, Contributed Funds of $499,328 for Construction. 
12Abandonment authorized by R & H Act of 1965 (HD 98, 89th 
Congress, Ist Session). 
1
3Authorized by the Chief of Engineers. In addition, Contributed 
Funds of $364,757 for Construction. 
14In addition, Contributed Funds of $370,845 for Construction. 
1s5 n addition, Contributed Funds of $223,261 for Construction. 
16 Authorized by the Chief of Engineers and completed in November 
1974. In addition, Contributed Funds of $405,471 for Construction. 
'7 Authorized by the Chief of Engineers. In addition, Contributed 
Funds of $61,953 for Construction. 
sI1n addition, Contributed Funds of $200,000 for Construction. 
19Authorized by the Chief of Engineers. In addition, Contributed 
Funds of $774,373 for Construction. 
20Authorized by the Chief of Engineers. In addition, Contributed 
Funds of $54,034 for Construction. 
21In addition, Contributed Funds of $1,791,068 for Construction. 
22Completed in 1941 and Maintenance transferred to Department of 
Navy. 
11-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 31-D OTHER AUTHORIZED BEACH EROSION CONTROL PROJECTS 
For Last Cost to September 2000 
Full Report 
See Annual Operations and 
Project Status Report for: Construction Maintenance 
Afono Area and Aoa Area, American Samoa Completed 1978 $ 254,015 ' $ 
Asquiroga Bay, Guam Completed 1986 227,181 2 
Haleiwa Beach, Oahu, Hawaii Completed 1967 240,148 
Kaaawa Beach, Oahu, Hawaii Completed 1976 176,488 4 
Kapaa Town, Kauai, Hawaii Completed 1977 158,916 5 
Kekaha Beach, Kauai, Hawaii Completed 1981 999,996 6 
Kihei Beach, Maui, Hawaii Completed 1972 154,313 7 
Kualoa Regional Park, Oahu, Hawaii Terminated 1982 355,472 
Lepua Area, American Samoa Completed 1992 1,706,225 9 
Masefau Bay, American Samoa Completed 1992 500,000 2 
Matafao Shoreline, American Samoa Completed 1984 225,000 2 
Ofu Airstrip, American Samoa Completed 1987 189,500 
Pago Pago Airport, American Samoa Completed 1984 174,941 2 
Pago Pago to Nuuuli, American Samoa Deferred 1978 394,187 "o 
Poloa Area, American Samoa Completed 1978 136,040 " 
Saipan Beach Road, CNMI Completed 1992 176,000 2 
Sand Island, Oahu, Hawaii Completed 1981 301,879 12 
Sand Island Shore Protection, Oahu, Hawaii Completed 1992 1,313,400 13 
Vatia Area, American Samoa Completed 1978 154,309 14 
Waikiki Beach, Oahu, Hawaii Deferred 1979 729,087 '5 183,00( 
'Authorized by the Chief of Engineers. In addition, $209,549 in 
Contributed Funds. 
2Authorized by the Chief of Engineers. 
3In addition, $160,098 in Contributed Funds. 
4Authorized by the Chief of Engineers. In addition, $97,075 in 
Contributed Funds. 
5Authorized by the Chief of Engineers. In addition, $56,916 in 
Contributed Funds. 
6 Authorized by the Chief of Engineers. In addition, $1,672,524 in 
Contributed funds. 
7Authorized by the Chief of Engineers. In addition, $1,672,524 in 
Contributed Funds. 
SAuthorized by the Chief of Engineers and terminated in April 1980 
as a Circuit Court ruled sand mining to be illegal. In addition, 
$177,300 in Contributed Funds. 
9Authorized by the Chief of Engineers. In addition, $485,371 in 
Contributed Funds. 
1oAuthorized by the Chief of Engineers. In addition, $312,480 in 
Contributed Funds. 
IIAuthorized by the Chief of Engineers. In addition, $101,547 in 
Contributed Funds. 
12Authorized by the Chief of Engineers. In addition, $255,728 in 
Contributed Funds. 
13Authorized for construction by Public Law 100D71. In addition, 
$1,226,486 in Contributed Funds. 
'4Authorized by the Chief of Engineers. In addition, $132,075 in 
Contributed Funds 
15In addition $82,000 in Advanced Funds and $17,640 in 
Contributed Funds. 
31-8

HONOLULU DISTRICT 
TABLE 31-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to September 2000 
Full Report 
See Annual Operations and 
Project Status Report for: Construction Maintenance 
Agana River, Guam Inactive 1989 $ 250,000 $ 
Alenaio Stream, Hawaii, Hawaii Completed 1997 11,231,121 -7 
Asan Village, Guam Completed 1986 1,275,500 
Hanapepe River, Kauai, Hawaii Completed 1967 784,867 1 
lao Stream, Maui, Hawaii Completed 1985 12,621,108 356,523 
Kahawainui Stream, Oahu, Hawaii Completed 1998 4,672,021 2--- 
Kahoma Stream, Maui, Hawaii Completed 1990 10,988,750 3 
Kaneohe-Kailua Area, Oahu, Hawaii Completed 1985 25,552,400 4 
Kaunakakai Stream, Molokai, Hawaii Completed 1950 73,478 5 
Kawainui Marsh, Oahu, Hawaii Completed 1987 4,345,899 
Kawainui Swamp, Oahu, Hawaii Completed 1967 1,265,567 
Kuliouou Stream, Oahu, Hawaii Completed 1971 1,000,000 6 
Namo River, Guam Completed 1982 2,416,314 5 
Paauau Stream, Hawaii, Hawaii Completed 1985 1,978,514 
Wailoa Stream and Tributaries, Hawaii, Hawaii Completed 1966 1,044,888 -- 
'In addition, $11,953 in Contributed Funds. 5Authorized by the Chief of Engineers. 
2Authorized by the Chief of Engineers. In addition, $679,205 6Authorized by the Chief of Engineers. In addition, $540,335 
in Contributed Funds. in Contributed Funds. 
31n addition, $645,992 in Contributed Funds. 7In addition, $787,426 in Contributed Funds. 
4Includes Non-Federal reimbursement of recreation sAuthorized by the Chief of Engineers. In addition, 
construction cost of $5,668,300. In addition, $8,175 in $1,234,147 in Contributed Funds. 
Contributed Funds. 
TABLE 31-F OTHER AUTHORIZED MULTIPLE PURPOSE 
PROJECTS, INCLUDING POWER 
For Last Cost to September 2000 
Full Report 
See Annual Operations and 
Project Status Report for: Construction Maintenance 
Nanpil River Hydropower, Pohnpei, Completed 1994 $ 8,000,000 $ 
Federated States of Micronesia 
31-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 31-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Date Federal Contributed 
See Annual and Funds Funds 
Project Report for: Authority Expended Expended 
Ala Wai Harbor, Oahu, Hawaii 1976 November 1986 S 40,117 $ 
PL 99-662 
Hana Small Boat Harbor, Maui, Hawaii 1967 November 1977 
HD #94-413 
Hanalei Small Boat Harbor, Kauai, Hawaii 1967 November 1981 
HD #97-59 
Hanapepe Bay, Kauai, Hawaii 1965 November 1986 
PL 99-662 
Heeia-Kea Small Boat Harbor, Oahu, Hawaii 1972 January 1990 1,481 
PL 99-662 
Kailua Small Boat Harbor, Oahu, Hawaii 1967 January 1990 
PL 99-662 
Kaimu Black Sand Beach, Hawaii, Hawaii 1975 July 1981 86,235 
Director of 
Civil Works 
Kapaakea Homestead Flood Control, 1979 July 1981 221,500 
Molokai, Hawaii Director of 
Civil Works 
Kaunakakai Deep Draft Harbor, 1966 January 1990 133,188 292,441 
Molokai, Hawaii PL 99-662 
Kaunakakai Small Draft Harbor, --- January 1990 
Molokai, Hawaii PL 99-662 
Kewalo Harbor, Oahu, Hawaii 1976 September 1975 98,800 
Director of 
Civil Works 
Lahaina Small Boat Harbor, Maui, Hawaii 1977 January 1990 186,937 
PL 99-662 
Maunalua Bay Small Boat Harbor, 1972 January 1990 30,378 
Oahu, Hawaii PL 99-662 
Nawiliwili Deep Draft Harbor, Kauai, Hawaii --- January 1990 
PL 99-662 
Rainmaker Hotel, American Samoa --- November 1991 
PL 99-662 
Reeds Bay Small Boat Harbor, Hawaii, Hawaii 1967 January 1990 
PL 99-662 
31-10

HONOLULU DISTRICT 
TABLE 31-G (Contd.) DEAUTHORIZED PROJECTS 
For Last 
Full Report Date Federal Contributed 
See Annual and Funds Funds 
Project Report for: Authority Expended Expended 
Saipan Harbor, Northern Marianas --- November 1991 
PL 99-662 
Talofofo Bay Shore Protection, Guam --- August 1981 80,764 
Director of 
Civil Works 
Waimea Beach, Kauai, Hawaii --- November 1986 
PL 99-662 
Wake Island Harbor, Wake Island 1950 November 1986 
PL 99-662 
TABLE 31-H INSPECTION OF COMPLETED 
NAVIGATION PROJECTS 
Location Dates of Inspection 
Navigation Projects 
Haleiwa Small Boat Harbor, Oahu, Hawaii April 2000 
Honokohau Small Boat Harbor, Hawaii, Hawaii June 2000 
Kahului Deep Draft Harbor, Maui, Hawaii July 2000 
Laupahoehoe Harbor, Hawaii, Hawaii February 2000 
Pohoiki Launch Ramp Facility, Hawaii, Hawaii February 2000 
Rota Harbor, CNMI May 2000 
Waianae Small Boat Harbor, Oahu, Hawaii June 2000 
TABLE 31-I INSPECTION OF COMPLETED FLOOD CONTROL 
AND BEACH EROSION CONTROL PROJECTS 
Location Dates of Inspection 
Flood Control Projects 
Alenaio Stream, Hawaii, Hawaii 
Asan Village, Guam 
Hanapepe River, Kauai, Hawaii 
Iao Stream, Maui, Hawaii 
Kahawainui Stream, Oahu, Hawaii 
Kahoma Stream, Maui, Hawaii 
Kaneohe-Kailua Dam, Oahu, Hawaii 
January 2000 
December 1999 
December 1999 
November 1999 
November 1999 
November 1999 
November 1999 
31-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 31-I (Contd.) INSPECTION OF COMPLETED FLOOD CONTROL 
AND BEACH EROSION CONTROL PROJECTS 
Dates of Inspection 
Flood Control Projects 
Kaunakakai Stream, Molokai, Hawaii 
Kawainui Marsh, Oahu, Hawaii 
Kuliouou Stream, Oahu, Hawaii 
Namo River, Guam 
Paauau Stream, Hawaii, Hawaii 
Wailoa Stream, Hawaii, Hawaii 
Beach Erosion Control Projects 
Afono Area, American Samoa 
Aoa Area, American Samoa 
Asquiroga Bay, Guam 
Lepua Area, American Samoa 
Masefau Bay, American Samoa 
Matafao Shoreline, American Samoa 
Ofu Airstrip, American Samoa 
Pago Pago Airport, American Samoa 
Pago to Nuuuli, American Samoa 
Poloa Area, American Samoa 
Sand Island, Oahu, Hawaii 
Vatia Area, American Samoa 
November 1999 
November 1999 
November 1999 
May 2000 
January 2000 
January 2000 
November 1999 
November 1999 
May 2000 
November 1999 
November 1999 
November 1999 
November 1999 
November 1999 
November 1999 
November 1999 
July 2000 
November 1999 
TABLE 31-J NAVIGATION ACTIVITIES PURSUANT TO 
SECTION 107, PUBLIC LAW 86-645, AS AMENDED 
(PREAUTHORIZATION) 
Study Fiscal year Costs 
Hilo Light Draft Navigation, Hawaii, Hawaii $4,222 
Kahului Small Boat Harbor, Maui, Hawaii 55,835 
Keehi Lagoon, Oahu, Hawaii 1,713 
Rota East Harbor, CNMI 60,583 
Coordination Account 10,397 
TOTAL $132,750 
31-12 
Location

HONOLULU DISTRICT 
TABLE 31-K EMERGENCY STREAMBANK AND SHORELINE 
PROTECTION ACTIVITIES 
PURSUANT TO SECTION 14, 
PUBLIC LAW 79-526, AS AMENDED 
(PREAUTHORIZATION) 
Study Fiscal year Costs 
Hauula Highway, Oahu, Hawaii $965 
Kaaawa Highway, Oahu, Hawaii 3,969 
Launiupoko, Maui, Hawaii 6,818 
Power Plant Road, Guam 6,703 
Punaluu Highway, Oahu, Hawaii 8,575 
South Agat, Guam 24,602 
Coordination Account -1,478 
TOTAL $50,154 
TABLE 31-L BEACH EROSION CONTROL ACTIVITIES 
PURSUANT TO SECTION 103 
PUBLIC LAW 87-874, AS AMENDED 
(PREAUTHORIZATION) 
Study Fiscal year Costs 
Commercial Port Road, CNMI $41,492 
TOTAL $41,492 
TABLE 31-M FLOOD CONTROL ACTIVITIES 
PURSUANT TO SECTION 205, 
PUBLIC LAW 80-858, AS AMENDED 
(PREAUTHORIZATION) 
Study Fiscal year Costs 
Keopu-Hienaloli Stream, Hawaii, Hawaii 56,616 
Wailele Stream, Oahu, Hawaii 76,418 
Coordination Account 6,259 
TOTAL $139,293 
31-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 31-N PROJECT MODIFICATIONS FOR IMPROVEMENTS 
OF ENVIRONMENT PURSUANT TO 
SECTION 1135, PUBLIC LAW 99-662 
AS AMENDED (PREAUTHORIZATION) 
Study Fiscal year Costs 
Kaunakakai Stream, Molokai, Hawaii $30,508 
Kawainui Marsh, Oahu, Hawaii 1,945 
Initial Appraisal Reports 4,832 
Coordination Account 7,904 
TOTAL $45,189 
TABLE 31-0 AQUATIC ECOSYSTEM RESTORATION 
PURSUANT TO SECTION 206, 
PUBLIC LAW 104-303 
(PREAUTHORIZATION) 
Study Fiscal year Costs 
Kaunakakai Harbor, Molokai, Hawaii 
Saipan Lagoon, CNMI 
Preliminary Restoration Plans 
Coordination Account 
TOTAL 
$300,652 
46,569 
9,912 
12,086 
$369,219 
31-14
ALASKA DISTRICT* 
This District consists of the State of Alaska. 
IMPROVEMENTS 
Navigation 
1. Anchorage Harbor, AK ........................................ 
2. Cook Inlet, AK ......... .............. ...... ................. 
3. Chignik Harbor, AK .............. .......... ................... 
4. Dillingham Harbor, AK........... ............. ................. 
5. Douglas Harbor, AK .............. ........... ................. 
6. False Pass Harbor, AK ................ ...... ........... 
7. Homer Harbor, AK ..................... ..... .......... 
8. Kake Harbor, AK ............... .............. 
9. Metlakatla Harbor, AK............ ............ ................ 
10. Ninilchik Harbor, AK ............. ............. ................. 
11. Sitka Harbor, AK ..... .......... .. .. ............. 
12. St. George, AK .............. ......... ................. 
13. St. Paul Island Harbor, AK........................... ........ 
14 Unalaska Harbor, AK .............. ........ ................. 
32-2 
32-2 
32-2 
32-2 
32-3 
32-3 
32-3 
32-3 
32-4 
32-4 
32-4 
32-5 
32-5 
32-5 
Flood Control 
15. Bethel Bank Stabilization, AK ........................... ..... 32-5 
16. Chena River Lakes, AK ........ ........... ................ 32-5 
17. Dillingham Emergency Bank Stabilization .......... 32-6 
18. Homer Spit Erosion, AK ........ ......... ............3..2. -6 
19. Flood Control Work Under 
Special Authorization ........ .............................. 32-6 
20. Inspection of Completed Flood 
Control Project ........ ............. ........................ 32-6 
General Investigations 
21. Surveys .................... ..... ................. 32-6 
22. Collection and Study of Basic Data ...... .............. 32-6 
23. Preconstruction Engineering and Design............... 32-7 
Tables 
Table 32-A Cost & Financial Statement ................ 32-9 
Table 32-B Authorizing Legislation ......................... 32-13 
Table 32-C Other Authorized Navigation Projects ....... 32-17 
Table 32-D Not Applicable 
Table 32-E Other Authorized Flood 
Control Projects ........ ......................... 32-18 
Table 32-F Not Applicable 
Table 32-G Deauthorized Projects .......................... 32-18 
Table 32-H Navigation Work Under Special 
Authorization ............ ............................ 32-19 
Table 32-I Project Condition Surveys ........ .............. 32-19 
Table 32-J Stream Bank Erosion Work Under Special 
Authorization ............................. ................. 32-20 
Table 32-K Environmental Activities ........ .............. 32-20 
-32-1- 
_

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 2000 
Navigation 
1. ANCHORAGE HARBOR, AK 
Location. Anchorage is in south-central Alaska on the 
southeast shore of Knik Arm, north of Turnagain Arm near its 
junction with Cook Inlet. (See NOAA Charts 16660 and 
16664.) 
Existing project. Provides for dredging along 3,300 foot 
baseline adjacent to the port of Anchorage dock to a depth of 36 
feet below mean lower low water. The tidal range between 
mean lower low water and mean higher high water is 29 feet 
with an extreme range of 41 feet. 
Local cooperation. Fully complied with. 
Terminal facilities. The Port of Anchorage facility consists 
of two POL terminals at the southern end and three general 
cargo terminals northward. The northernmost terminal, 
completed during 1976 and 1977, was outside the Federal 
project limits. Extension of the limits from 2,070 feet 
northward to 3,000 feet was authorized by Public Law 94-587 
and funded in FY 1978. 
Operations during fiscal year. The Corps hopper dredge 
ESSAYONS was mobilized to perform emergency dredging in 
late Nevember and early December. There was 565,000 cubic 
yards removed by the ESSAYONS to free the port for vessel 
traffic. Maintenance dredging by contract was conducted in 
three periods from May until the end of October. A total of 
893,236 cubic yards was removed from the project in FY 00. 
The fourth and final year of the continuing contract was carried 
out by J.E. McAmis of Chico, California. 
2. COOK INLET NAVIGATION, AK 
Location. Southern flank of Knik Arm Shoal about 6 miles 
southwest of Anchorage, AK. 
Existing project. Navigation channel 310-meters (1,017) 
feet wide, 11.5 meters (38-feet) deep, about 3,330-meters 
(10,925-feet) long. Limiting natural depths along the 
navigation range line are about 9.0 meters for a width of 1,000 
meters, an additional 60-meters width for advance maintenance 
is authorized. 
Local cooperation. Fully complied with. 
Terminal facilities. This project would reduce delays for 
the container ships that supply cargo for 80 percent of the 
Alaskan people. Ships have to wait for high tide to safely cross 
the Knik Annrm Shoal and would rarely have to wait once the 
authorized channel is complete. 
Operations during fiscal year. The PCA was executed 
on 9 Jan 98. Construction contract was awarded on 2 Dec 98 
and was completed in September 2000 for a combined Federal 
and Contributed Cost of $10,507,100. A total of 1,459,543 
cubic yards were removed in the two seasons of dredging by 
Manson Constructiion. 
3. CHIGNIK HARBOR, AK 
Location. The city of Chignik is located on the south side of 
the Alaska Peninsula about 450 miles southwest of Anchorage. 
Existing project. The city of Chignik is situated on the 
south shore of Alaska Peninsula in Southwestern Alaska. It is 
an active and growing island port whose economy is heavily 
dependent on commercial fishing. The local fleet presently 
anchors in the ice free, but inadequately protected harbor or ties 
up at the exposed city dock. At present boats are subject to 
overcrowding and hazardous mooring conditions between 
fishing periods. The anchorage is exposed to all storms from 
the southeast clockwise to the northwest. The violent southeast 
and northwest storms often damage and sometimes destroy 
boats by forcing them ashore or on the exposed rock reefs at 
low tides. 
Local cooperation. Fully complied with. 
Terminal facilities. The proposed project would provide a 
protected harbor, which would produce benefits in the form of 
reduced boat damage, increased fish harvest, and a harbor of 
refuge. The average annual navigation benefits attributable to 
the project are currently estimated at $1,695,400. 
Operations during fiscal year. Endangered species 
coordination was completed during Fiscal Year 2000. The 
Plans and Specifications were being completed for 
advertisement in Fiscal Year 2001. The PCA was executed on 
18 August 2000. 
4. DILLINGHAM HARBOR, AK 
Location. Dillingham Harbor is located at the head of 
Nushagak Bay, an arm of Bristol Bay, on the right bank of 
Nushagak River, just below its confluence with Wood River; 
about 470 miles northeast of Dutch Harbor and 300 miles 
southwest of Anchorage. (See NOAA/NOS Chart #16660.) 
Existing project. A small-boat basin 230,000 square feet in 
area with a depth of 0.0 feet mean lower low water along 
Scandinavian Creek with an entrance channel 250 feet long and 
40 feet wide in Scandinavian Creek and a rock sill across its 
outlet. Tidal range between mean lower low water and mean 
higher high water is 19.8 feet. Extreme range is 30 feet. 
Local cooperation. Fully complied with. 
Terminal facilities. There are four docks at the city of 
Dillingham three privately owned, one owned by the city. 
-32-2-

ALASKA DISTRICT 
Four publicly owned small boat floats located in the Harbor 
basin were installed in June 1982. They are removed before 
fall freezeup and replaced each spring. Facilities are inadequate 
for the number of boats using the harbor. 
Operations during fiscal year. Annual maintenance 
dredging was carried out by Nehalem River Dredging in June 
with the removal of 76,475 cubic yards. This was year 1 of a 2 
year continuing contract. 
5. DOUGLAS HARBOR, AK 
Location. The City of Douglas is located about 2 miles 
southeast of Juneau along the Gastineau Channel on Douglas 
Island in southeast Alaska. (See NOAA charts 17315, 17300, 
and 16016.) 
Existing Project. Provides for a 5.2 acre small boat basin 
with an entrance channel both to a depth of 12 feet below 
MLLW. A rock jetty 105 feet in length protects the project 
from wave damage. 
Local cooperation. Fully complied with. 
Terminal facilities. The small boat basin has three main 
floats with power, lighting, and water; a launch ramp is 
available for public use. The city dock is located at the 
harbor entrance. Fuel, repair facilities, and lodging are 
available in Juneau. 
Operations during fiscal year. The last maintenance 
dredging was accomplished by J.E. McAmis in September 
1997. The entrance channel was widened, straightened, and 
dredged to 2 feet over project depth; 24,242 cubic yards were 
removed from the project. The next scheduled project 
condition survey is scheduled for Fiscal Year 2000. 
6. FALSE PASS, AK 
Location. False Pass is a small community located on the 
east side of Unimak Island, which is the east end of the Aleutian 
Island chain in Southwest Alaska. False Pass is approximately 
700 air miles from Anchorage. 
Existing project. The recommended plan will 
accommodate a fleet of 88 vessels in a 5.2 acre basin protected 
by two rubble-mound breakwaters, 1,300 feet and 600 feet in 
length. The project will require dredging of the inner basin and 
the entrance channel. Plans and specifications are being 
completed for construction in Fiscal Year 2003. 
Local cooperation. Fully complied with. 
Operation during fiscal year. The feasibility study was 
initiated in 1999. The project was authorized in the Water and 
Resources Development Act of 2000. Plans and specifications 
are currently being developed. 
7. HOMER HARBOR, AK 
Location. In Kachemak Bay, on Kenai Peninsula, 152 miles 
by water, southwest of Anchorage. The harbor site is near the 
extremity of Homer Spit, a narrow extension of land protruding 
southeasterly some 4.5 miles into the bay. (See NOAA/NOS 
Chart #16645.) 
Existing project. Provides for a sheltered small-boat 
harbor, relocated and based within Homer Spit, about 50 acres 
in area. Project depth varies from 10 feet mean lower low water 
in the west end of the harbor to 20 feet below mean lower low 
water in the entrance channel and the east end. The entrance 
channel is protected by a main rock breakwater 1,018 feet long 
and secondary rock breakwater 238 feet long. Tidal range 
between mean lower low and mean higher high water is 18.1 
feet, with an extreme range of 30.4 feet. (For details relating to 
previous projects, see page 1593 of Annual Report for 1964.) 
Local cooperation. Fully complied with. 
Terminal facilities. The facilities consist of one publicly 
owned and operated wharf capable of handling oceangoing 
vessels for passengers and general cargo. Small boat facilities in 
the basin include publicly owned mooring floats, a publicly 
owned wharf, and an industrial wharf. Construction has tripled 
the size of the harbor. The city of Homer has tripled the size of 
its fish dock located at the southern end of the harbor. 
Operation during fiscal year. Maintenance: Annual 
maintenance dredging was conducted by Nehalem River 
Dredging during September. Removed from the project 
entrance were 7,500 cubic yards of material, and 3,000 cubic 
yards were dredged from the Coast Guard berth. 
8. KAKE HARBOR, AK 
Location. Kake, a community of 700, is located in 
Southeastern Alaska about 40 miles west of Petersburg and 800 
miles northwest of Seattle. 
Existing project. Commercial fishing and logging are the 
primary industries in the area. A feasibility report was 
completed in 1968, and the recommended project was 
authorized for construction. The authorized project, adjacent to 
the city, was estimated to cost $13.2 million in 1986 dollars. 
The project includes construction of a rubblemound breakwater 
at the Portage Cove site. The average annual benefits amount 
to $785 thousand, all for commercial navigation. The benefit to 
-32-3-

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 2000 
cost ratio is 1.5, based on the authorized interest rate. The city 
of Kake is the local sponsor, with financial support from the 
State. 
Local cooperation. A Project Cooperation Agreement was 
signed on 26 Nov 1997. 
Operation during fiscal year. Construction contract was 
awarded on 29 April 1998 to Kake Tribal Logging & Timber 
Corporation for $14,554,257. The breakwater is physically 
completed in October 2000 at a total cost of $15,825,588. 
9. METLAKATLA HARBOR, AK 
Location. Metlakatla is located in the southern portion of 
Port Chester, a small bay on the northwest coast of Annette 
Island in southeastern Alaska, 18 miles south of Ketchikan. 
(See Coast and Geodetic Charts 8074, 8075, and 8102.) 
Existing project. Consists of two small boat basins. The 
existing basin is 2.18 acres in extent with a depth of 10 feet 
below mean lower low water, protected by a rubblemound 
breakwater 900 feet long. The new basin consists of two 
rubblemound breakwaters, 1,255 and 1,150 feet long, and an 
entrance channel and maneuvering area, 1,100 feet long, 100 
feet wide, dredged to a depth of 15 feet below mean lower low 
water and a basin area of 6.25 acres dredged to a depth of 15 
feet below mean lower low water. Tidal range between mean 
lower low water and mean higher high water is 14.7 feet, with 
an extreme range of 24 feet. 
Local cooperation. Fully complied with. 
Terminal facilities. Publicly owned facilities consist of one 
general cargo dock, one barge ramp, and a small boat float 
system in existing basin. Privately owned facilities are one oil 
pier and one industrial wharf. Facilities are not adequate for 
mooring the commercial fishing vessels operating from 
Metlakatla. The existing protected harbor area is fully utilized. 
Operations during fiscal year. The project is physically 
complete; contractor claims are pending. 
10. NINILCHIK HARBOR, AK 
Location. Ninilchik Harbor is located at the mouth of Ninilchik 
River in Cook Inlet, at the village of Ninilchik. The 
community of Ninilchik, AK, is about 40 miles upcoast from 
Homer and 112 miles southwest of Anchorage. (See 
NOAA/NOS Chart #16640.) 
Existing project. A small-boat basin 400 feet long by 150 
feet wide is dredged to an elevation of 2 feet above mean lower 
low water, with an approach channel 400 feet long and 50 feet 
wide dredged to an elevation of 9 feet above mean lower low 
water; protected by two rock jetties. Modifications for river 
channel diversion, the 2 armor rock jetties, and beach protection 
were accomplished in 1967 and 1969. Range between mean 
lower low water and mean higher high water is 19.1 feet, with 
an extreme range of 29.3 feet. 
Local cooperation. Fully complied with. 
Terminal facilities. Facilities, which are limited to shallowdraft 
vessels and accessible from Cook Inlet only at half-tide or 
higher, are a cannery dock along Ninilchik River available for 
offloading fish, and small boat floats in the project basin, 
provided by the state of Alaska. Other supplies are landed on 
beach or brought by road from deep draft ports in the vicinity. 
Facilities are extremely inadequate for the number of boats 
presently using the harbor. Expansion of facilities would 
require construction of additional protected harbor area. 
Operations during fiscal year. Maintenance dredging of 
the harbor and entrance channel was accomplished during May 
2000 by Nehalem River Dredging. During that time 9,000 
cubic yards of material was removed, and temporarily stored in 
a bermed site on the upper beach adjacent to the harbor. The 
Alaska DOT utilizes the material on local roadways. 
11. SITKA HARBOR, AK 
Location. The city of Sitka is located in southeastern 
Alaska, about 95 miles south-southwest of Juneau. It is situated 
on the western coast of 1,600 square mile Baranof Island. Sitka 
is about 20 miles from the open Pacific Ocean on the east side 
of Sitka Sound. 
Existing project. The recommended plan, also known as 
the Channel Rock plan, consists of three rubblemound 
breakwaters constructed across the northern end of the western 
anchorage, and an inner harbor facility placed adjacent to 
Thomsen Harbor. This project created a large protected harbor 
in which moorage basins could be developed using minimal or 
no wave protection structures. The three breakwaters are 480 
feet, 1,200 feet, and 320 feet long. Navigation openings in the 
breakwater, 325 feet and 190 feet wide at the design depth, are 
located at natural channels where water depths are 50 to 55 feet 
at mean lower low water. Two gaps allow for vessel traffic 
separation, which may be particularly important when log rafts 
or barges are being towed through the western anchorage. The 
two breakwaters forming the southern opening overlap to minimize 
ocean swell in Thomsen Harbor. The breakwaters are 
placed directly on the submerged rock reefs forming the 
northern boundary of western Anchorage. 
Local cooperation. A Project Cooperation Agreement was 
executed on 7 December 1993. 
Operations during fiscal year. The Channel Rock 
Breakwaters were physically completed in 1995. During 
construction 192,318 cubic yards of core rock, 65,330 cubic 
yards of secondary rock, and 52,867 cubic yards of armor stone 
were placed. Construction was completed in June 1996. A 
study on the breakwater effect on the herring population was 
-32-4-

ALASKA DISTRICT 
completed in 1998 and showed no ill effects on the fish 
population. 
12. ST. GEORGE, AK 
Location. The city of St. George is located on St. George 
Island, the southernmost island of the Pribilof Islands, near the 
edge of the southwest Bering Sea shelf. 
Existing project. The project was authorized in the Energy 
and Water Development Appropriations Act of 1993, P.L. 102- 
377. The work consists of excavating the St. George Harbor 
entrance channel to 20 feet below mean lower low water in 
accordance with cost-sharing provisions in P.L. 99-662. 
Local cooperation. The portion of the project was done by 
the Local Sponsor under Section 215, P.L. 90-483 with 
reimbursement to the Local Sponsor by the Government for its 
share on completion. 
Operations during the fiscal year. The Local Sponsor 
completed the portion of the project under the Section 215 
agreement. Work on the remainder of the project is scheduled 
to be initiated in FY 2002. 
13. ST. PAUL ISLAND HARBOR, AK 
Location. St. Paul Island Harbor is located on the shore of 
Village Cove, the southern side of St. Paul Island, the largest 
and most populated island of the Pribilof group in the central 
southeast Bering Sea. 
Local cooperation. The Project Cooperation Agreement 
was submitted for approval. 
Operations during the fiscal year. Congress authorized 
improvements to the breakwater, the entrance channel, and the 
maneuvering area in WRDA of 1996. Model testing and design 
work on these improvements continued during 1998. The 
construction contract for Phase I to build the three underwater 
reefs was awarded 19 March 1999 for $10,411,000 and is 55% 
complete at the end of the 2000 season. The Phase II 
construction contract for dredging the harbor will be awarded in 
FY 2002. 
A small boat harbor was authorized in WRDA 99 and it will be 
added to the Phase II construction contract. 
14. UNALASKA HARBOR, AK 
Location. Unalaska is located on Unalaska Island on the east 
end of the Aleutian chain in Southwest Alaska. Unalaska is 
approximately 800 air miles from Anchorage. 
Existing project. The community enjoys a strategic 
position as the center of a rich fishing area, and for trans - 
shipment of cargo between Pacific Rim trading partners. The 
proposed Little South America Harbor would be on the south 
end of Amaknak Island. The harbor would be protected by 
stub rubblemound and floating breakwaters. The estimated 
project cost is $20 million, and the benefit cost ratio is 
estimated at 1.3. The City of Unalaska is the sponsor for the 
project. 
Local cooperation. Fully complied with. 
Operation during fiscal year. The feasibility study was 
initiated in 1999. Authorized for construction in WRDA 
2000 contingent upon the Chief's report being completed by 
31 December 2001. 
Flood Control 
15. BETHEL BANK STABILIZATION, AK 
Location. Bethel, AK is located in southwestern Alaska on 
the north bank of the Kuskokwim River 400 miles west of 
Anchorage. 
Existing project. The project consists of rock riprap toe 
protection to be installed on the unprotected river bank and 
at locations where existing city construction bulkheads are 
threatened by erosion. This includes 4,000 feet of unprotected 
riverbank and 4,200 feet of previously installed bulkheads. The 
construction contract was awarded on 26 May 1995. 
Emergency erosion protection for the Bethel Cargo Dock and 
the Mission Road Bulkhead began in July 1995 and continued 
through FY 1995 due to accelerated erosion that accumulated 
after spring runoff. 
Location cooperation. A Project Cooperation Agreement 
was signed on 3 March 1994. 
Terminal facilities. The POL tank farm is situated at the 
downstream end of the project and the city's general cargo dock 
is at the upstream end of the project. 
Operations during fiscal year. The project was physically 
complete in September 1997, except for seeding the sloped 
riverbanks. The total project cost was $24,000,000 of which 
Bethel contributed $6,000,000. Credit for land and rights of 
way is pending. Contractor claims are pending. 
16. CHENA RIVER LAKES, AK 
Location. Chena River Lakes is located in the vicinity of 
Fairbanks, AK, and encompassing the Tanana River, Chena 
River, Little Chena River, and their tributaries. (See USGS map 
Fairbanks, C1, D1, D2, and Big Delta D6.) 
-32-5-

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 2000 
Local cooperation. Fully complied with. 
Existing project. Moose Creek is located 17 miles east of 
Fairbanks with control works on the Chena River. The dam 
itself extends from a bluff one mile north of the Chena River 
and south past the control works for approximately seven miles 
to the Tanana River. The dam connects with a completed 22 
mile levee system along the north boundary of the Tanana river 
to a point south and west of Fairbanks. 
Operations during fiscal year. The lower Chena River 
dredging that was initiated in 1999 was completed over the 
winter with the removal of an additional 24,000 cubic yards of 
material. The boat launch at the Federal project is also dredged 
during the winter months. 
17. DILLINGHAM EMERGENCY BANK 
STABILIZATION, AK 
Location. Dillingham is located 350 miles southwest of 
Anchorage, Alaska. The project is located along the 
southeastern edge of Dillingham adjacent to the Nushagak 
River. Erosion of the toe of the bluff in this area is endangering 
critical utilities and numerous buildings and homes. 
Existing project. The authorized project consists of a 
1,600-foot long steel sheetpile bulkhead along the toe of the 
bluff from the Dillingham City Cargo dock to Snag Point. An 
additional 600 feet of bulkhead with riprap revetment was 
constructed at the small boat harbor. The sheetpile wall will 
be constructed to an elevation of 28 feet MLLW. Mitigation 
measures including emergency access ladders and eyebolts for 
anchoring setnets used for by subsistence fishermen are 
included in the project. 
Local cooperation. A Project Cooperation Agreement was 
signed in January 1998. 
Terminal Facilities. Dillingham has a general cargo dock 
adjacent to the authorized project. 
Operations during fiscal year. A construction contract 
was awarded in September 1998 in the amount of 1,798,850. 
Construction of the project was performed and a mod was 
awarded for $1,389,472. A second construction contract was 
awarded to complete the construction of the storm drain 
removed from the original contract. 
18. HOMER SPIT, AK 
Location. The project is located near the town of Homer, 
Alaska, 120 miles southwest of Anchorage. Part of the city is 
located on a 4.5 mile long finger of land that varies in width 
from 30 to 500 yards wide extending into Kachemak Bay. 
Existing Project. The authorized project, which was 
constructed in 1994, consists of 1,400 feet of rock revetment. 
The revetment was extended an additional 3,700 feet along the 
road by the Fiscal Year 1996 Appropriation Bill. 
Local Cooperation. A Project Cooperation Agreement was 
signed detailing cost sharing of the project. 
Operations during fiscal year. The contract for the 
additional 3700 feet of revetment was completed and closed out 
in June 1998. Surveys are scheduled to be done annually and 
the beach replenished in 2004. 
19. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Emergency flood control activities-repair, flood fighting, 
and rescue work (Public Law 99, 84th Congress, and 
antecedent legislation). 
Federal costs for the fiscal year were $411,956 for disaster 
preparedness, and field investigations. 
20. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Inspections were made of the following flood control works: 
Bethel Bank Stabilization at Bethel; Deering Streambank 
Protection at Deering; Metlakatla Erosion Protection at 
Metlakatla; Homer Spit Revetments at Homer; Tanana River 
Levee at Fairbanks, Talkeetna River at Talkeetna; Lowell Creek 
at Seward; Klutina River at Copper Center; Skagway River at 
Skagway; Gold Creek at Juneau; and Emmonak Streambank 
Protection on the Yukon River at Emmonak. An inspection 
was made of the shore protection works at Nome. 
General Investigation 
21. SURVEYS 
Fiscal year costs were $2,798,982 of which $2,087,769 was 
for navigation studies, $18,504 for flood damage prevention 
studies, $157,956 for special studies, $110,579 for 
miscellaneous studies, and $339,826 for coordination studies 
with other agencies. In addition contributed funds in the 
amount of $1,475,860 were expended: $10,984 for Wrangell 
Harbor navigation studies, $182,213 for preconstruction 
engineering and design works under Sand Point, and $172,220 
for coordination studies with other agencies. 
22. COLLECTION AND STUDY OF BASIC 
DATA 
Technical assistance, information, flood plain manage-ment 
guidance, and other flood plain management services have been 
provided to military and nonmilitary Federal agencies, local 
communities, state agencies, Architectural Engineering firms,

ALASKA DISTRICT 
lending institutions, and private individuals at a fiscal year cost 
of $171,918. 
Fiscal year costs for Hydrologic Studies were $21,862. 
23. PRECONSTRUCTION ENGINEERING 
AND DESIGN 
SAND POINT, AK 
Location. Sand Point is a commercial fishing community 
on the Pacific coast off the southwestern Alaska Peninsula. 
Sand Point is about 570 air miles southwest of Anchorage and 
about midway between Kodiak and Dutch Harbor. The harbor 
provides close access to one of the State's most productive 
fishing areas. For the past few years the population has been 
stable at around 1,000. The economy is based almost wholly 
on commercial fishing. 
This study is in partial response to the Rivers and harbors in 
Alaska study resolution, adopted by the U.S. House of 
Representatives Committee on Public Works on 2 December 
1970. The study was requested by the Aleutians East Borough 
to investigate navigation improvements at Sand Point, Alaska. 
The harbor currently provides no permanent protected 
moorage for vessels larger than 80 feet. In recent years, the 
fleet operating in the Bering Sea/Aleutian Island area, made up 
primarily of vessels ranging from 80 to 160 feet, has grown 
significantly. Skippers fishing in the Sand Point area currently 
travel long distances to secure protected moorage. 
Existing Project. The proposed harbor improvements at 
Sand Point consist of construction of a 570-foot and a 730-foot 
breakwater from shore to form the basin and entrance channel 
of the new harbor. The crest height of the rubblemound 
breakwaters would be +16 ft MLLW. The breakwaters would 
be designed to withstand the forces of a 6.6 foot wave. The 
entrance channel would be dredged to -18 ft MLLW, it would 
be 120 feet wide to allow one-way traffic of vessels 150 feet in 
length with a 34-foot beam and 10.5 foot draft. The mooring 
basin would be dredged to a depth of-17 ft MLLW and would 
provide room for 37 vessels. 
Local Cooperation. A Preconstruction Engineering and 
Design Agreement was signed on 10 July 1998. 
Operations during fiscal year. The feasibility report was 
approved by Pacific Ocean Division on 14 May 1998. Plans 
and specifications were initiated and are scheduled to be 
completed in November 2000. 
SEWARD HARBOR, AK 
Location. Seward, located on the Kenai Peninsula is about 
125 miles south of Anchorage, Alaska by road. The town is 
located at the northern end of Ressurection Bay off the Gulf of 
Alaska and can be reached by air, sea and rail as well as road. 
It lies at about 60 degrees 6 minutes N Latitued and 149 degrees 
2 minutes W longitude. 
Existing Project. The current harbor is filled to capacity 
with a waiting list of more than 330 boats. The Feasibility 
Report recommends expansion of the existing harbor eastward. 
The recommended project would accommodate 339 additional 
vessels and cost $11,930,000. 
Local Cooperation. A Pre-construction Engineering and 
Design Agreement was signed on 23 April 1999. 
Operations during fiscal year. The feasibility study was 
completed 28 September 1998. Plans and specifications were 
initiated and are scheduled to be completed. No federal 
construction funding was available for the project, so plans and 
specifications were delayed. The plans and specifications will 
be completed when funding is provided for construction. 
NOME HARBOR, AK 
Location. Nome Harbor is located at the mouth of the Snake 
River at the city of Nome, AK, on the northerly shore of Norton 
Sound, an arm of the Bering Sea. It is a shallow open roadstead, 
581 nautical miles north of Dutch Harbor and 545 air miles 
northwest of Anchorage. (See NOAA/NOS Chart #16206.) 
Existing project. The federal navigation project, at 8 feet 
below mean lower low water, consists of a dogleg entrance 
channel 75 feet wide by 1550 feet long running form Norton 
Sound to a turning basin 250 feet wide by 600 feet long, located 
at the confluence of the Snake River with Dry and Bourbon 
Creeks. The entrance is flanked to seaward by a 400 foot 
eastern jetty and a 240 foot western jetty and is further 
protected through its length by a steel sheet pile revetment on 
both sides. The eastern waterfront is protected by a 3350 foot 
long seawall that extends from the eastern jetty. Range between 
mean lower low water and mean higher high water is 1.6 feet 
and extreme tidal range is 7.5 feet, but water levels are 
influenced more by wind than tide. Levels of 5 feet below mean 
lower low water have been observed during offshore winds, and 
a level of 14 feet above mean lower low water has been 
observed during a southerly storm. 
Local cooperation. Fully complied with. 
Terminal facilities. Cargoes and passengers from ocean 
vessels are lightered to and from shore, a distance of about 2 
miles. Traffic enters the dredged channel and is handled over 
revetment, where a lighterage company has transfer facilities 
-32-7-

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 2000 
which are open to the public. Facilities are considered 
inadequate for existing commerce. In July 1984, the city of 
Nome received Department of Army authorization (permit) 
to construct a 3,600-foot gravel filled causeway. Construction 
of the causeway began in July 1985. Due to lack of complete 
funding, the length of the causeway was shortened to 2,700 
feet. Construction was completed in May 1987. Use of this 
causeway for off-loading petroleum products was delayed until 
the September 1987 arrival of a required berthing barge. 
Operations during fiscal year. Received authorization for a 
project consisting of a harbor complex that includes a new 
breakwater that protects the existing causeway docks. Provides 
for a new entrance to the existing small boat harbor and a 
sediment management scheme to keep the channel open. A 
design agreement was fashioned. 
Annual maintenance dredging was carried out in the northsouth 
portion of the entrance channel in June with the removal 
of 3,300 cubic yards. The work was accomplished by Portable 
Hydraulic Dredging of Portland, Oregon. 
WRANGELL HARBOR, AK 
Location. Wrangell Harbor is located on the northwest side of 
Wrangell Island, 824 miles from Seattle and 160 miles from 
Juneau. (See U.S. Coast and Geodetic Survey Charts Nos. 
8164, 8161, and 8201.) 
Existing project. The project consists of a rubblemound 
breakwater 300 feet long to protect the southern portion of the 
outer harbor; a mooring basin 600 feet long, 400 feet wide, and 
10 feet deep below mean lower low water within the protected 
area; an inner basin in the tide flat area east of Shakes Island, 
325 feet wide and 550 feet long; a connecting channel 120 feet 
wide and approximately 530 feet long; a connecting channel 
120 feet wide and approximately 530 feet long from the outer 
mooring basin all at a depth of 10 feet at mean lower low water; 
and construction of a rock mound breakwater 320 feet long on 
the reef north of Shakes Island. The range between mean lower 
low water and mean higher high water is 15.7 feet. The 
extreme tidal range is 26 feet. Heavy swells, dangerous to small 
fishing boats, are caused by the wind, which causes an 
additional rise of about one foot. 
Construction of the breakwater north of Shakes Island was 
placed on inactive status as material to be used from the inner 
basin was unsuitable and the breakwater considered 
unnecessary for safe moorage of vessels. The cost of this 
portion was last revised in 1956 and estimated to be $6,500. 
(See table 40-B for authorizing legislation.) 
The Heritage Harbor was authorized to be built in the Cemetery 
Point site in WRDA 99. This project will consist of two 
breakwaters and dredging an entrance channel and inner harbor 
area. 
Local cooperation. The Project Cooperation Agreement will 
be executed when construction funds are appropriated. 
Terminal facilities. There are eight wharves and floats in 
Wrangell Harbor. Two privately owned wharves serving 
general cargo and passenger terminals, one of which includes a 
cold storage facility, are open for public use. The remaining 
wharves serve various industrial purposes. One of the floats is 
publicly owned and is open for public use for mooring and 
servicing of small craft, and two privately owned floats serve 
oil handling facilities. 
Operations during fiscal year. A feasibility study for a 
new harbor was initiated in FY 97 and was authorized in 
WRDA 99. 
-32-8-

ALASKA DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
In Text Project Funding FY 97 FY 98 FY 99 FY 00 30 Sep 00 
Anchorage Harbor, AK 
(Contrib. Funds) 
Cook Inlet 
Navigation, AK 
(Contrib. Funds) 
Chignik Harbor, AK 
(Contrib. Funds) 
Dillingham Harbor, AK 
(Contrib. Funds) 
Douglas Harbor, AK 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost. 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost. 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost. 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
986,000 
967,277 
1,849,400 
967,277 
533,235 
533,235 
1,650,210 6,816,434 41,425,156 
1,657,733 6,812,665 41,408,112 
638,080 
638,080 
104,000 4,488,928 179,000 2,837,000 8,057,928 
162,013 338,426 3,979,208 3,133,052 8,003,307 
25,000 2,428,000 2,797,031 
25,000 1,483,671 1,852,645 
14,500 
14,772
n 
701 
8,562 
364,500 
357,989 
383,000 
386,332 
166,000 97,000 
214,978 108,929 
619,699 
622,572 
92,660 
91,258 
389,076 379,152 11,178,210 
390,355 381,114 11,192,815 
1,700 
1,700 
100,000 
35,461 
670,411 -10,556 
657,850 2,004 
57,831 6,701 
100,000 
99,993 
1,101,855 
724,226 
-32-9- 
TABLE 32-A 
2.
4.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 2000 
COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section Total to 
In Text Project Funding FY 97 FY 98 FY 99 FY 00 30 Sep00 
6. False Pass Harbor, AK Mt .. r 
(Contrib. Funds) 
Homer Harbor, AK 
Kake Harbor, AK 
(Contrib. Funds) 
Metlakatla Harbor, AK 
(Contrib. Funds) 
Ninilchik Harbor, AK 
11. Sitka Harbor, AK 
(Contributed Funds) 
eiNw WorK 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
150,000 230,000 
67,962 252,472 
85,000 222,113 
23,648 219,312 
158,000 
161,980 
149,800 
147,221 
194,333 
198,107 
195,325 
195,766 
380,000 
320,434 
307,113 
242,960 
3,512,350 
3,512,350 
6,187,571 
5,866,593 
67,974 
67,974 
294,658 3,381,000 6,779,000 4,279,000 14,733,658 
250,469 2,735,073 6,580,523 4,931,274 14,497,339 
580,000 632,000 375,000 1,587,000 
- 53,856 509,710 764,683 1,328,249 
68,500 15,000 
76,666 25,905 36,813 
5,258,941 
3,179 55,:225577,,887744 
148,520 
148,520 
890,144 
724,651 
428,720 
428,720 
152,000 160,800 187,451 193,859 5,697,549 
150,531 159,906 188,825 195,361 5,696,937 
100,000 
104,333 2061 
182,888 17,663 
6,639,144 
6,569,280 
325,000 1,238,400 
5624 1,240,519 
-32-10- 
TABLE 32-A 
8. 
9. 
10.

ALASKA DISTRICT 
TABLE 32-A COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section Total to 
In Text Project Funding FY 97 FY 98 FY 99 FY 00 30 Sep 00 
St. George, AK 
(Contrib. Funds) 
13. St. Paul Island Harbor, 
AK 
(Contrib. Funds) 
14. Unalaska Harbor, AK 
(Contrib. Funds) 
15. Bethel Bank 
Stabilization, AK 
(Contributed Funds) 
16. Chena River Lakes, AK 
(Contrib. Funds) 
12. 
29,176 
-23,278 
58 
554 
7,000,000 
9,375 5,027,182 
3,004,000 
2,777,682 
339,000 2,313,000 4,254,452 22,287,200 
229,584 1,570,220 4,765,051 21,393,749 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost. 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
6,728 
191,000 101,000 
80,445 204,320 
224,662 150,000 
356 245,576 
5,898,000 2,384,000 
9,523,085 2,406,578 
3,190,000 
3,177,444 
2,229,725 
2,150,698 
936,000 
957,145 
425,474 
425,464 
1,819,836 
425,360 
292,000 
284,765 
374,662 
245,932 
19,484,854 
16,327 19,261,438 
4,690,000 
4,275,000 
214,063,928 
214,054,134 
1,825,500 3,066,448 2,124,267 18,849,297 
1,246,709 3,725,421 2,131,442 16,861,492 
12,000 2,194,300 
12,000 2,157,929 
-32-11- 
4987 195,010 
4987 195,000 
1,593,450 
200,000

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 2000 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
In Text Project Funding FY 97 FY 98 FY 99 FY 00 30 Sep 00 
17. Dillingham Emergency New Work 
Bank Stabilization Approp. 
Cost 
18. Homer Spit Erosion, AK 
(Contrib. Funds) 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
2,130,946 -84,000 2,400,000 
259,967 125,079 3,484,210 
713,382 
24,870 1,274,934 
-80,000 4,682,515 
478,403 4,641,037 
7,540,000 
12,692 38,880 4,165,949 
1,605,522 
2,781,128 
-32-12- 
TABLE 32-A 
(Continued)

ALASKA DISTRICT 
Table 32-B 
See Date 
Section Authorizing 
in Text Act 
AUTHORIZING LEGISLATION 
Project and Work Authorized 
Jul. 3, 1958 
Oct. 22, 1976 
Oct. 12, 1996 
ANCHORAGE HARBOR, AK 
Deep winter harbor, adjacent to docks, dredge to 35 feet 
below mean lower low water, protected by two jetties.' 
Extension of project limits. 
COOK INLET NAVIGATION, AK 
Deepen the entrance channel to -30 feet. Enlarge and deepen the 
maneuvering basin to -29.0 feet with an area of 415 by 830 feet. 
Wave spending beach to +4 feet. Three offshore reefs each, 
1,300 feet long, constructed to a depth of-12 feet. Wave 
energy channel 100 feet wide with bottom elevation of +2 feet. 
CHIGNIK HARBOR, AK 
Deepen the entrance channel to -30 feet. Enlarge and deepen the 
maneuvering basin to -29.0 feet with an area of 415 by 830 feet. 
Wave spending beach to +4 feet. Three offshore reefs each, 
1,300 feet long, constructed to a depth of-12 feet. Wave 
energy channel 100 feet wide with bottom elevation of +2 feet. 
DILLINGHAM HARBOR, AK 
Basin 230,000 square feet in area with depth of 2 feet above 
MLLW along Scandinavian Creek, with entrance channel 1,100 
feet long and 40 feet wide. 
FALSE PASS HARBOR, AK 
Dredging of the inner basin and the entrance channel to 
accommodate a fleet of 88 vessels in a 5.2 acre basin protected by 
two rubble-mound breakwaters, 1,300 feet and 600 feet in length. 
DOUGLAS HARBOR, AK 
Basin 5.2 acres with entrance channel both to a depth of-12 feet 
MLLW and protected by a rock jetty about 90 feet long off the 
northerly shore of Juneau Isle adjacent to the basin entrance. 
HOMER HARBOR, AK 
Basin 2.7 acres in area with depth of 12 feet below mean lower 
low water, and rock breakwater 1,260 feet long. 
Relocation and rehabilitation of project destroyed by 
March 27, 1964 earthquake, by construction of basin 10 
acres in area with 12-foot depth over 2.75 acres and 15-foot 
depth over 7.25 acres protected by rock breakwaters, 1,018 feet 
and 238 feet long. 
Increased width and depth of entrance channel and an enlarged 
staging area. Basin enlarged from 16.5 to 50 acres. 
KAKE HARBOR, AK 
Provides for a 1,580 foot long west breakwater and a 900 foot 
long south breakwater enclosing a 7 acre berthing area at -15 feet 
MLLW. 
-32-13- 
Documents 
H.Doc. 34, 85th Cong., Ist Sess.2 
P.L. 94-587 
Section 101(b)(2), Water Resources 
Development Act of 1996. 
Energy and Water Development 
Appropriations Act, 1999. 
P.L. 105-245. 
P.L. 104-303, Water Resources 
Development Act of 1996. 
FY 1999 Congressional Add 
H. Doc. 390, 84th Cong., 2d Sess.2 
House Report 106-1020, 
Section 101 (b)(1) (2), 
Water Resources Development 
Act of 2000, 106" Congress 
H. Doc. 286, 84th Cong., 2d Sess.2 
H.Doc. 34, 85th Cong., 1st Sess. 2 
P.L. 88-451 
Section 107, P.L. 86-645 
Authorized by Chief of Engineers, 
Nov. 13, 1981 
S. Doc. 249, 75th Cong., Ist Sess. 
Oct. 12, 1996 
Jul. 3, 1958 
Oct. 31, 2000 
6. Jul. 3, 1958 
Jul. 2, 1958 
Aug. 19, 1964 
Jul. 14, 1960 
Aug. 13, 1968 
-

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 2000 
Table 32-B 
(Continued) 
AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Mar. 2, 1945 
Oct. 27, 1965 
10. 
Jul. 3, 1958 
11. 
Aug. 8, 1917 
Aug. 30, 1935 
Jun. 16, 1948 
Aug 17, 1999 
12. Aug 17, 1999 
13. Aug 17, 1999 
14. Aug 17, 1999 
15. Oct 31, 1992 
METLAKATLA HARBOR, AK 
Dredging small boat basin 2.18 acre in extent to a depth of 10 
feet below plane of mean lower low water; construction of 
rubblemound breakwater 900 feet long. 
Entrance channel and two rubblemound breakwaters enclosing a 
7.0 acre basin. 
NINILCHIK HARBOR, AK 
Basin 320 feet long by 150 feet wide with depth of 2 feet above 
mean lower low water, approach channel 400 feet long and 50 
feet wide with depth of 9 feet above mean lower low water, 
protected by 410 foot jetty. 
NOME HARBOR, AK 
Two jetties, easterly 335 feet and westerly 460 feet long revetment, 
channel and basin 200 feet wide and 250 feet long. 
Extension of the jetties and enlarging basin to 250 feet wide and 
600 feet long.' 
Seawall 
New entrance to Nome Harbor; 2,986 feet long breakwater; 230 
feet long causeway spur; 3,450 feet long entrance channel with 
depth to 22 feet; sediment traps and causeway bridge. 
OUZINKIE HARBOR, AK 
Adding approximately 300 ft of breakwater and dredging at the 
entrance channel of rock pinnacles. 
SAND POINT HARBOR, AK 
Construct a mooring basin adjacent and south of the existing 
harbor. It incorporates the southern breakwater and causeway to 
the city dock by extending the existing breakwater. 
SEWARD HARBOR, AK 
Provide more moorage space. Project would accommodate 339 
additional vessels. 
SITKA HARBOR, AK 
Boat harbor consisting of 3 rubblemound breakwates. 
H.Doc. 138, 76th Cong., 91st Sess. 
Section 201, P.L. 89-298 
S. Doc. 92-64, 92d Cong., 2d Sess. 2 
Authorized Oct. 12, 1972 
H.Doc. 34, 85th Cong., Ist Sess.2 
H.Doc. 1932, 64th Cong., 1st Sess.2 
H.Doc. 404, 71st Cong., 2d Sess., 
and Rivers and Harbors Committee 
Doc. 38, 73d Cong., 2d Sess. 
Reports of Chief of Engineers 
dated March 8, 1948 
Report of Chief of Engineers as 
amended, dated August 2, 1999. 
Section 302, P.L. 106-53 
Water Resource Development Act of 
1999, 106th Cong. 
Section 303, P.L. 106-53 
Water Resource Development Act of 
1999, 106th Cong. 
Section 101 (a) (3), P.L. 106-53 
Water Resource Development Act of 
1999, 106th Cong. 
Water Resources Development Act of 
1992, H. Doe. 103-37, 103" Cong.,l" 
Sess. 
-32-14-

ALASKA DISTRICT 
Table 32-B 
(Continued) 
See Date 
Section Authorizing 
in Text Act 
AUTHORIZING LEGISLATION 
Project and Work Authorized 
16. 
Nov. 17, 1986 
17. 
Nov. 17, 1986 
Oct. 12, 1996 
Aug 17, 1999 
18. Oct. 31, 2000 
18. 
Sep. 22, 1922 
Aug. 30, 1935 
Mar. 2, 1945 
Aug 17, 1999 
Nov. 17, 1986 
Aug. 13, 1968 
19. 
20. 
21. Dec. 19, 1985 
ST. GEORGE, AK 
Dredging the maneuvering area from an average depth of 3 feet 
above mean lower low water to 18 feet below mean lower low 
water and dredging the entrance channel from an average depth 
of 14 feet below mean lower low water to 20 feet below mean 
lower low water. 
ST. PAUL ISLAND, AK 
Add 1,050 feet of breakwater at existing crest height, 37 below 
feet mean lower low water and 1,000 feet long with a crest height 
of 18 above mean lower low water. 
Deepen the entrance channel to -30 feet. Enlarge and deepen the 
maneuvering basin to -29.0 feet with an area of 415 by 830 feet. 
Wave spending beach to +4 feet. Three offshore reefs each, 
1,300 feet long, constructed to a depth of -12 feet. Wave 
energy channel 100 feet wide with bottom elevation of +2 feet. 
Added small boat harbor with entrance channel and maneuvering 
area to -20MLLW and appropriate wave protection features. 
UNALASKA HARBOR, AK 
Provide harbor protection by stub rubblemound and floating 
breakwaters. 
WRANGELL HARBOR, AK 
Breakwater 300 feet long to protect southern portion of harbor. 
Mooring basin 600 feet long, 400 feet wide, and 10 feet deep. 
Inner basin and connecting channel from the existing mooring 
basin, both 10 feet deep at mean lower low water, and 
breakwater 320 feet long on the reef north of Snakes Island. 
Project for navigation, Heritage Harbor, AK 
BETHEL BANK STABILIZATION, AK 
Streambank protection by placing riprap along 8,500 feet of 
riverbank. 
CHENA RIVER LAKES, AK 
Provides for construction of a dam and floodway for the Chena 
River (17 miles east of Fairbanks) for a dam and reservoir on the 
Little Chena River, and for a 27 mile long levee system with 
interior drainage works on the north side of the Tanana River. 
DILLINGHAM EMERGENCY BANK STABILIZATION, AK 
Install 1,600 feet of steel sheetpile bulkhead along the toe of the 
bluff from the Dillingham city cargo dock to Snag Point. 
Section 107 of The Rivers and Harbors 
Act of 1960, Public Law 
86-645, as amended. 
Section 202, P.L. 99-662 
Section 101(b)(3), P.L. 104-303 
Water Resources Development Act of 
1996. 
Section 302, P.L. 106-53 
Water Resource Development Act of 
1999, 106th Cong. 
House Report 106-1020, 
Section 101 (b)(1) (2), 
Water Resources Development 
Act of 2000, 106 Congress 
H.Doc. 161, 67th Cong., 2d Sess. 
H.Doc. 202, 72nd Cong., Ist Sess. 
H.Doc. 284, 76th Cong., Ist Sess. 
Section 101 (a) (3), P.L. 106-53 
Water Resource Development Act of 
1999, 106th Cong. 
Section 202, P.L. 99-662 
H. Doc. 148, 90th Cong., 2nd Sess. 
P.L. 90-483 
Sec. 114 P.L. 99-190 
-32-15- 
Documents 
- 
- -

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 2000 
Table 32-B 
(Continued) 
AUTHORIZING LEGISLATION 
Project and Work Authorized 
HOMER SPIT, AK 
Extension of an existing rubblemound revetment along an 
existing sheetpile wall to provide protection and nourishment 
along a 1400 foot portion of State highway. 
Documents 
Sec. 101, Water Resource Development 
Act of 1990, 
P.L. 101-640, 101st Cong. 
P.L. 104-65, Energy and Water 
Development Appropriation Act of 
1996 
1. Purchase of dredge and deepwater jetties deauthorized 
November 6, 1977 under section 12, Public Law 93-251. 
2. Contains latest published map. 
3. Extension of jetties classified "inactive". 
4. Little Chena Dam deauthorized in 1991. 
-32-16- 
See 
Section 
in Text 
22. 
Date 
Authorizing 
Act 
Nov. 28, 1990 
Nov. 13,1995 
--

ALASKA DISTRICT 
Project 
Apoon Mouth of Yukon River, AK' 
Bar Point Harbor, AK2 
Bethel Small Boat Harbor, AK 
Cook Inlet Shoals, AK 
Cordova Harbor, AK2 
Cordova, AK 
Craig Harbor, AK 
Douglas Harbor, AK 
Dry Pass, AK 
Egegik River, AK 
Elfin Cove, AK 
Gastineau Channel, AK 
Haines Harbor, AK 2 
Homer Harbor, AK2 
Hoonah Harbor, AK 
Humboldt Harbor, AK 
Iliuliuk Harbor, AK 
Juneau Harbor, AK 
Kake Harbor, AK 
Kasilof Harbor, AK2 
Ketchikan Harbor, AK 
Kodiak Harbor, AK 
Mekorykuk, AK 
Myers Chuck Harbor, AK 
Naknek River, AK 
Neva and Olga Straits, AK 
Old Harbor, Kodiak Island, AK2 
Pelican Harbor, AK 
Petersburg Harbor, AK 
Port Alexander, AK 
Port Lions, AK2 
Rocky Pass, AK 
St. Michael Canal, AK 
Seldovia Harbor, AK 
Sergius Whitestone, AK 
Seward Harbor, AK 
Sitka Harbor, AK 
Skagway Harbor, AK 
Stikine River, AK 
Valdez Harbor, AK 
Wrangell Narrows, AK 
1. Abandonment recommended in H.Doc. 467, 69th Cong., Ist 
Sess. 
2. Authorized by Chief of Engineers (Sec. 107). 
3. In addition, $272,779 of State funds. 
4. Includes $656,240 for Sec. 107 project. 
5. In addition, $925,500 of State funds. 
6. In addition, $973,875 of State funds. 
Status 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Active 
Completed 
Completed 
Completed 
Completed 
Inactive 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
-32-17- 
TABLE 32-C OTHER AUTHORIZED NAVIGATION PROJECTS 
- - - 
For Last Cost to Sep. 
Full Report O 
See Annual 
Report for Construction Mail 
1920 128,896 
1983 2,000,0003 
1985 1,520,272 
1977 1,220,000 
1978 843,534 
1986 9,642,000 
1983 1,033,5004 
1963 282,019 
1983 943,351 
1972 4,441 
1959 154,191 
1964 789,461 
1977 1,000,00 5 
1987 2,000,000 
1983 4,255,0006 
1977 3,679,6837 
1941 66,037 
1974 1,381,150 
1991 870,700 
1975 109,848 
1979 1,602,417 
1973 1,891,2128 
1986 1,372,139 
1970 9,700 
1961 20,789 
1960 155,009 
1972 370,415 
1964 369,683 
1972 252,932 
1949 17,000 
1986 1,825,311 
1960 337,668 
1916 377,062 
1974 1,051,8839 
1973 1,798,010 
1973 712,36910 
1973 1,611,009 
1972 133,180 
1987 
1968 649,740" 
1979 3,562,343 
7. In addition, $857,000 of State funds. 
8. Includes $594,163 for rehabilitation. 
9. Includes $400,000 for rehabilitation. 
10. Includes $90,026 for rehabilitation and $2,528 Code 710. 
Recreation facilities at Completed projects. 
11. Includes $73,000 for rehabilitation and $2,713 Code 710. 
Recreation facilities at Completed projects. 
30. 1994 
Operation 
and 
ntenance 
2,154 
5,000 
488,156 
72,500 
23,466 
3,107 
102,701 
260,991 
331,256 
37,946 
132,946 
18,973 
26,800 
560 
5,518 
1,934 
219,789 
15,400 
32,665 
8,804 
221,498 
309,260

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 2000 
TABLE 32-E 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to Sep. 30, 1994 
Full Report Operation 
See Annual and 
Project Status Report for Construction Maintenance 
Bethel Bank, Kuskokwim River' Completed 1985 553,970 
Fairbanks, Tanana River & Chena Slough, AK Completed 1943 557,000 
Gold Creek, AK Completed 1975 876,0062 4,301 
Klutina River, Copper Center, AK Completed 1973 260,681 
Lowell Creek, AK4 Completed 1945 416,3825 30,771 
Salmon River, AK Completed 1963 37,77067 162,925' 
Talkeetna River, AK Completed 1981 516,694 
1. Section 14. 5. In addition $25,000 expended from contributed funds. 
2. In addition, $25,000 expended fiom contributed funds. 6. Includes $34,197 of PWA funds. 
3. Authorized by Chief of Engineers (Sec. 205). 7. In addition, $7,000 expended from contributed funds. 
4. During FY88, $551,690 was expended from FC and CE. 8. In addition, $27,400 expended from contributed funds. 
TABLE 32-G 
DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Date Funds Funds 
Project Report for Deauthorized Expended Expended 
Allison Lake, AK (Valdez Hydropower) 1992 
Anchorage Harbor, AK (Uncompleted Portion) 1967 1977 
Bradley Lake, AK 1983 1983 1982 46,701,000 
Ketchikan Harbor, AK (West Breakwater) 1979 1979 
Port Alexander, AK (Inner Harbor) 1949 1977 
Tolovana River, AK (Snagging) 1931 1977 
Little Chena River Dam 1983 1990 
Long Lake Dam 1975 1990 
Myers Chuck Harbor, AK 1970 1991 9,700 
Scammon Bay, AK 1992 
Skagway River, AK 1966 1991 26,385 
-32-18-

ALASKA DISTRICT 
TABLE 32-H 
NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
NAVIGATION ACTIVITIES PURSUANT TO SECTION 107, 
PUBLIC LAW 86-645, AS AMENDED 
(PREAUTHORIZATION) 
Study Identification Fiscal Year Costs 
King Cove, AK 3,489,933 
Larsen Bay, AK 2,125,229 
Metlakatla, AK 36,813 
Ouzinkie, AK 851,241 
Tatitlek, AK 40,412 
Ketchikan, AK 9,427 
Haines, AK 61,260 
Unalaska, AK 52,856 
6,667,171 
TOTAL 
TABLE 32-I 
PROJECT CONDITION SURVEYS 
Name of Project Date Date Survey Conducted 
Cordova Harbor June 2000 
Douglas Harbor May 2000 
Dry Pass Channel May 2000 
Haines Small Boat Harbor May 2000 
Kodiak, Near Is. Channel and St. Herman's Harbor June 2000 
Petersburg, North Harbor May 2000 
Seldovia Harbor and Deep Draft Channel June 2000 
Skagway Small Boat Harbor and Deep Draft Dock May 2000 
Valdez Small Boat Harbor June 2000 
-32-19-

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 2000 
TABLE 32-J 
STREAM BANK EROSION WORK UNDER 
SPECIAL AUTHORIZATION 
EROSION ACTIVITIES PURSUANT TO SECTION 14, 
PUBLIC LAW 79-526, AS AMENDED 
(PREAUTHORIZATION) 
Study Identification Fiscal Year Costs 
Emmonak, AK 66,947 
Glacier Street, Whittier, AK 3,320 
Noatak, AK 1,957 
Barrow Landfill, AK 32,280 
Barrow Public Facilities 10,300 
Big Delta State Historical Park, AK 50,353 
Levelock Public Facilities, AK 7,624 
Port Graham Public Facilities, AK 2,904 
TOTAL 175,685 
TABLE 32-K 
ENVIRONMENTAL ACTIVITIES 
PURSUANT TO SECTION 1135, 
PUBLIC LAW 99-662 
Study Identification Fiscal Year Costs 
Gold Creek Salmon Restoration, AK 41,175 
-32-20- 
- --
LOS ANGELES, CA, DISTRICT* 
This district (total area about 230,000 square miles) 
comprises those drainage basins tributary to the Pacific 
Ocean that are in California between the Mexican boundary 
and Cape San Martin (about 265 miles north of the entrance 
to the Los Angeles Harbor). The lower Colorado River 
drainage basin (below Lee Ferry, AZ) which is southeastern 
California, southeastern Nevada, southwestern Utah, and all 
of Arizona, except the northeastern comer; that part of the 
Great Basin that is in southern Nevada and southeastern 
California; and the southern Arizona that drain southward into 
Mexico. 
IMPROVEMENTS 
Navigation 
1. Channel Islands Harbor, CA 
2. LA-LB Harbors (LA Harbor), CA 
3. Marina Del Rey, CA 
4. Morro Bay Harbor, CA 
5. Newport Bay Harbor, CA 
6. Oceanside Harbor, CA 
7. Oceanside Harbor Sand Bypass, CA 
8. Port Hueneme, CA 
9. Port of Long Beach (Deepening), CA 
10. Redondo Beach Harbor (King Harbor), CA 
11. San Diego Harbor, CA 
12. San Diego River and Mission Bay, CA 
13. Santa Barbara Harbor, CA 
14. Santa Monica Breakwater, CA 
15. Surfside, Sunset and Newport Beach, CA 
16. Ventura Harbor, CA 
Flood Control 
17. 
18. 
19. 
20. 
21. 
22. 
23. 
24. 
25. 
26. 
27. 
28. 
29. 
30. 
31. 
32. 
33. 
34. 
35. 
Alamo Dam, AZ 
Clifton, AZ 
Hansen Dam, LACDA (Recreation 
Development), CA 
Lake Elsinore, CA 
Los Angeles County Drainage Area, CA 
Los Angeles River (Recreation 
Development), CA 
Mojave River Dam, Mojave River Basin, CA 
Nogales Wash, AZ 
Norco Bluffs, Santa Ana River, CA 
Painted Rock Dam (Gila River), AZ 
Pine and Mathews Canyons Dam, 
Colorado RB, NV 
Rillito River, AZ 
Santa Ana River Mainstem, CA 
Santa Ana River Basin and 
Orange County, CA 
Santa Paula Creek, CA 
San Luis Rey River, CA 
Sepulveda Dam 
(Recreation Development), CA 
Sweetwater River, CA 
Tropicana and Flamingo Washes, NV 
Page 
33-2 
33-2 
33-2 
33-3 
33-3 
33-3 
33-4 
33-4 
33-4 
33-4 
33-4 
33-5 
33-5 
33-5 
33-5 
33-6 
33-6 
33-6 
33-6 
33-6 
33-7 
33-7 
33-7 
33-8 
33-8 
33-8 
33-8 
33-8 
33-8 
33-9 
33-9 
33-9 
33-9 
33-10 
33-10 
36. Tucson Diversion Channel 
(Recreation Development), AZ 
37. Whitlow Ranch Dam, Queen Creek, AZ 
38. Inspection of Completed Flood Control 
Projects 
39. Scheduling Flood Control Reservoir 
Operations 
40. Flood Control Work Under Special 
Authorization 
41. Emergency Response Activities Program 
General Investigations 
42. Surveys 
43. Collection and Study of Basic Data 
44. Preconstruction Engineering and Design 
44A. Rio Salado, Phoenix Reach, AZ 
44B. Rio Salado, Tempe Reach, AZ 
44C. Tucson Drainage Area, AZ 
Tables 
Table 33-A Cost and Financial Statement 
Table 33-B Authorizing Legislation 
Table 33-C Other Authorized 
Navigation Projects 
Table 33-D Other Authorized Shore Protection 
(formerly Beach Erosion Control) 
Projects 
Table 33-E Other Authorized Flood 
Control Projects 
Table 33-G Deauthorized Projects 
Table-33-H Reconnaissance and 
Condition Surveys 
Table-33-I Inspection of Completed Beach 
Erosion Control Projects/ 
Flood Control Projects 
Table 33-J Flood Control Work Under Special 
Authorization Flood Control 
Activities Pursuant to Section 205, 
Public Law 80-858, As Amended 
(Preauthorization) 
33-1 
Page 
33-10 
33-10 
33-11 
33-11 
33-11 
33-11 
33-11 
33-12 
33-12 
33-12 
33-12 
33-12 
33-13 
33-17 
33-27 
33-28 
33-29 
33-31 
33-32 
33-33 
33-34

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FISCAL YEAR 2000 
Navigation 
1. CHANNEL ISLANDS HARBOR, CA 
Location. On the coast of southern California about a 
mile northwest of Port Hueneme, 65 miles northwest of 
Los Angeles Harbor, and 345 miles south of San 
Francisco. (See Coast and Geodetic Survey Charts 
5007 and 5202.) 
Existing project. For details see page 33-2 of Annual 
Report for 1981. 
Local cooperation. Fully complied with. 
Terminal facilities. For details see page 33-2 of 
Annual Report for 1989. 
Operations during fiscal year. A six-year, three-cycle 
dredging contract was designed and awarded in 
FY2000. The contract covers FY2001 through 
FY2006. Mobilization and dredging activities began in 
September 2000 and continue into FY2001. Total 
O&M General obligations for FY2000 were 
$1,067,000. Project condition is good. 
2. LOS ANGELES - LONG BEACH 
HARBORS, CA 
Location. On the coast of southern California in San 
Pedro bay about 25 miles south of the city of Los 
Angeles, about 96 miles northwest of San Diego 
Harbor, and about 410 miles southeast of San Francisco 
Harbor. 
Existing project. The project consists of four 
increments of dredging to be constructed in two stages 
- deepening the existing entrance channel for the Port 
of Los Angeles and providing new channels to existing 
and new port facilities. The dredge material will be 
used for fill to create Pier 400. Estimated cost (October 
1998) for existing project is $401,000,000 (includes an 
allowance for estimated inflation through the 
construction period), of which $115,200,000 is Federal 
($114,900,000 Corps and $300,000 U.S. Coast Guard) 
and $285,800,000 is non-Federal. 
Local cooperation. All items of local cooperation 
required under the terms of the previous authorizing 
acts have been fully complied with. See page 33-3 of 
Annual Report for 1981 for requirements under the 
terms of the 1976 Water Resources Development Act. 
The revised recommended project was changed due to 
the withdrawal of the Port of Long Beach on October 
1, 1991. The Port of Los Angeles, the local sponsor, 
received credit, for advance work (Stage 1) performed 
per WRDA 1988. Project Cooperation Agreement 
executed March 18, 1997. 
Terminal Facilities. Of the 82,553 feet of wharves in 
the Los Angeles Harbor, 75,729 feet are owned by the 
city and 6,824 feet are owned by private interests. The 
final report presented and recommended four project 
increments. Increment No. 2 would deepen the existing 
Los Angeles Harbor approach and entrance channels 
to Pier 300 to provide better access to dry bulk 
facilities. Increment No. 3 would further deepen the 
Los Angeles approach and entrance channel to Pier 300 
and part of Pier 400, and deepen a south channel to 
provide access to the eastern side of Pier 400 and liquid 
bulk facilities. Increments No. 4 and 5 would extend 
Increment No. 3 of Los Angeles to provide access to 
container terminals that would be located on part of 
Pier 300 and Pier 400. The material obtained from the 
dredging was used to create new landfill within the port 
and shallow water habitat for the least tern. 
Operations during fiscal year. An Assessment Report 
of the San Pedro Breakwater was initiated; completion 
is expected in FY2002. The Appropriations Committee 
provided an additional $900,000 for activities 
associated with maintenance dredging: 1) a Dredge 
Disposal Management Plan, 2) engineering and design 
on contract dredging of the East and West Basins and 
the Los Angeles River Estuary, 3) a hydrographic 
survey of the entire Federal project, and 4) the 
monitoring and study of Least terns at the Los Angeles 
River Estuary and vicinity. Total O&M General 
obligations were $630,000. Construction of Stage 2 
was completed June 2000. Project condition is good. 
3. MARINA DEL REY, CA 
Location. Marina del Rey is located on Santa Monica 
Bay, 15 miles west of downtown Los Angeles, 29 miles 
northwest of Los Angeles Harbor and 390 miles southeast 
of San Francisco Bay. 
Existing project. For details see page 33-3 of Annual 
Report for 1981. Existing Federal navigation project 
consists of two jetties a breakwater and navigation 
channels. Contaminated materials, causing costly 
maintenance and a potential threat to navigation, 
complicate a severe shoaling problem in the harbor. 
Local cooperation. County of Los Angeles 
Department of Beaches and Harbors requested a new 
study, and expressed local support by letter dated 
August 5, 1992. Feasibility Cost Sharing Agreement 
signed February 21, 1997. 
Terminal facilities. Marina del Rey is homeport to 
about 15 commercial fishing boats and 50 other transit 
boats with an annual fish catch valued at approximately 
$10 million. There are about ten charter boat and five 
tour boat operations used by over 100,000 people each 
year and over 6,000 berths servicing recreational craft 
33-2

LOS ANGELES, CA, DISTRICT 
within the harbor. Eight yacht clubs call the marina 
homeport. The marina offers sailing instruction, boat 
rental, repair and storage, harbor tours, sport fishing, 
retail facilities, coffee shops, snack bars and fine 
restaurants. The U.S. Coast Guard has a cutter 
permanently assigned to the harbor. 
Operations during fiscal year. The Appropriations 
Committee included a Congressional Add of $3.5 
million. This was combined with existing funds and 
Contributed Funds from the local sponsor to dredge the 
North and South Entrances and Main Channel. Contract 
dredging was completed in February 2000. Total O&M 
General obligations were $3,247,000. Project condition 
is good. 
4. MORRO BAY HARBOR, CA 
Location. On coast of southern California 110 miles 
south of Monterey Bay, 120 miles northwest of Santa 
Barbara Harbor, and nearly midway between San 
Francisco and Los Angeles. (see Coast and Geodetic 
Survey Chart 5387). 
Existing project. For details, see page 33-4 of Annual 
Report for 1980. 
Local cooperation. Project Cooperation Agreement 
executed on April 7, 1995. 
Terminal facilities. Facilities which are adequate for 
existing commerce, comprise 640 feet of existing piers 
and 150 feet of floating docks constructed by San Luis 
Obispo County; 263 feet of floating docks constructed 
by California Department of Parks and Recreation; 
1,396 feet of floating docks constructed by the city of 
Morro Bay; 1,398 feet of privately-owned piers; and 
5,435 feet of privately-owned floating docks. 
Operations during the fiscal year. In FY2000, the 
Entrance, Transition, and Main Channels were dredged. 
Repairs to the South Breakwater were initiated and 
completed. A hydro survey was conducted September 
2000. Total O&M General obligations were $3,402,000. 
Project condition is good. 
5. NEWPORT BAY HARBOR, CA 
Location. Forty miles southeast of Los Angeles. 
Existing project. Provides rubblemound entrance 
jetties, 920-foot deep and 500-foot wide entrance 
channel and main channel, inner channels, a turning 
basin, and anchorage areas. Upper Newport is a shallow 
800-acre marine estuary. Navigation project is maintained 
by Corps of Engineers. Pursuant to Section 841 
and subject to Section 903(b) of WRDA 1986, the 
project for navigation for the harbor is modified to 
dredge and maintain a 250-foot wide channel in Upper 
Newport Bay to the boundary of Upper Newport Bay 
State Ecological Preserve to a depth of 15 feet. 
Local cooperation. In a resolution dated August 20, 
1996, Orange County Board of Supervisors indicated 
strong support of feasibility study and understanding of 
cost sharing requirements. 
Operations during fiscal year. A hydrographic survey 
of the harbor was conducted. Total O&M General 
obligations were $40,000. Project condition is adequate. 
6. OCEANSIDE HARBOR, CA 
Location. On the coast of southern California at Oceanside, 
about 30 miles north of city of San Diego and 80 
miles south of Los Angeles. 
Existing project. For details, see page 33-4 of Annual 
Report for 1981. 
Local cooperation. Fully complied with. Oceanside 
Small Harbor Craft District sent letter of support dated 
April 1985 and Letter of Intent in March 1989. Project 
Cooperation Agreement executed in January 1993. 
Terminal Facilities. Berthing for 957 boats, single-tie 
slips, 38 double-tie slips and 136 side-ties, of which 54 
are visitors' slips; 12 dry storage spaces at Oceanside 
Marine Center; a fuel dock; a boat hoist; a launching 
ramp, which can accommodate 4 launchings at the same 
time; parking for 1,732 cars; with temporary parking for 
about 141 boat trailers; a boat-repair facility; a pump-out 
facility; a Coast Guard cutter; restaurants; retail stores; 
yacht brokers; a hotel/motel; condominiums; and a 
sport-fishing facility. Navigation improvements include 
new dredging and biannual dredging of expanded 
entrance channel area. 
Operations during fiscal year. Annual contract 
maintenance dredging was performed. Total O&M General 
obligations were $1,155,000. Project condition is fair. 
7. OCEANSIDE HARBOR SAND BYPASS, 
CA 
Location. On the coast of southern California along 
Oceanside Beach near jetty, about 30 miles north of city of 
San Diego and 80 miles south of Los Angeles. 
Existing project. Underwater experimental pumping 
system with the pumps, fluidizers, and submerged pipeline 
to remove sand from harbor entrance and deposit it to down- 
33-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FISCAL YEAR 2000 
coast beaches, on a continual basis. Phase I and Phase II 
have both been completed and successfully tested. The 
experiment is complete and we have determined the bypass 
technology can be installed with a successful operation but, 
not at Oceanside. 
Local Cooperation. City of Oceanside officials are in full 
support of the closure of the experimental bypass project. 
Operations during fiscal year. Project close out 
completed. 
8. PORT HUENEME, CA 
Location. On the coast of southern California about 65 
miles northwest of Los Angeles and Long Beach Harbors, 
about one mile southeast of Channel Islands Harbor, 
immediately west of the city of Port Hueneme, four miles 
southwest of the city of Oxnard, and 10 miles southeast of 
the city of Ventura. 
Existing Project. Authorized in 1970 for restudy of 
completed project. The harbor serves both military and 
commercial uses with port facilities consisting of terminals, 
wharves, and warehouses serving a wide variety of products. 
The existing Federal project consists of an approach 
channel, entrance channel, central basin, and two 
rubblemound jetties. The Navy has plans to utilize the 
harbor more extensively for vessel berthing and repair; 
effectively reducing maneuverability in the harbor. Harbor 
District would like to use deeper draft wood pulp carrier 
vessels and possibly tankers. 
Local cooperation. Requirements are described in full on 
page 33-3 of Annual Report for 1976. The Oxnard Harbor 
District reviewed and agreed to sign the Feasibility Cost 
Sharing Agreement on January 3, 1996. 
Operations during fiscal year. Repairs to the East and 
West Jetties were completed in September 2000. Total 
O&M General obligations were $1,411,000. Project 
condition is good. 
9. PORT OF LONG BEACH (DEEPENING), 
CA 
Location. On the coast of southern California along the 
Pacific Coast in San Pedro Bay about 20 miles south of 
downtown Los Angeles. 
Existing Project. The recommended plan consists of 
deepening the approach channel to -76 MLLW, from 
breakwater seaward, a distance of about 2 miles to 
accommodate deep draft crude tankers. WRDA 1996 
authorized project in accordance with the July 1996 Chief of 
Engineers Report. The estimated cost of the project 
33-4 
(October 1998) is $43,350,000. 
Local cooperation. The Port of Long Beach is the local 
sponsor. The Project Cooperation Agreement was executed 
in July 1998. 
Operation during the fiscal year. The base contract was 
awarded August 1998 to dredge -69 feet MLLW. Awarded 
option to base contract in July 1999 to dredge -72 feet 
MLLW. 
10. REDONDO BEACH HARBOR (KING 
HARBOR), CA 
Location. On the coast of southern California on the 
southern portion of Santa Monica Bay, about 17 miles 
southwest of Los Angeles. 
Existing project. For details, see page 33-4 of Annual 
Report for 1981. WRDA of 1986 (H.R. 6) Conference Bill, 
Title VIII - Project Modification, Section 809 - King 
Harbor, Redondo Beach, CA, modifies the King Harbor 
Project in order to carry out maintenance dredging and for 
breakwater construction, and authorized the Secretary to 
restore the breakwater to a height of 22 feet and maintain 
breakwater at such height to provide greater protection from 
heavy wave action. 
Local cooperation. City of Redondo Beach officials are in 
full support of the study and have indicated desire to 
construct improvements to reduce continued storm related 
damages. 
Operations during fiscal year. No operations or 
maintenance were performed. Project condition is good. 
11. SAN DIEGO HARBOR, CA 
Location. On the coast of southern California just north of 
the Mexican border, about 109 miles southeast of Los 
Angeles and Long Beach Harbors. (See Coast and Geodetic 
Survey Chart 5107). 
Existing project. For details, see pages 33 and 34 of 
Annual Report for 1980. 
Local cooperation. Requirements are described in full on 
pages 33 and 34 of Annual Report for 1980. 
Terminal facilities. Consists of 45,070 feet of wharves, 
exclusive of Government-owned and 24,000 feet are 
privately owned. Government-owned wharves at North 
Island are restricted to military use only. 
Operations during fiscal year. A hydrographic survey 
was conducted under Project Condition Surveys. Total 
O&M General obligations were $52,800. Project 
condition is good.

LOS ANGELES, CA, DISTRICT 
12. SAN DIEGO RIVER AND MISSION 
BAY, CA 
Location. The project is located at the mouth of the San 
Diego River about six miles northwest of the San Diego 
business district, San Diego County, California. 
Existing project. For details, see page 33-3 of Annual 
Report for 1991. Authorized by the Flood Control Act of 
1944, the existing project consists of a levee channel, 
entrance channel, main channel, altered railroad bridge, 
anchorage basins (West Anchorage and Quivira) and three 
jetties. Construction of a 1,200-foot-long weir restored 
design conveyance capacity at the mouth of the San Diego 
River. A sand plug in mouth of river reduced flood-carrying 
capability from 115,000 cfs to 35,000 cfs, equal to a 100- 
year flood. The temporary timber pile breakwater at Quivira 
Basin was replaced with a permanent rubble mound 
breakwater. 
Local cooperation. The Project Cooperation Agreement 
was executed July 1996 with the city of San Diego. 
Operations during fiscal year. A hydrographic survey was 
conducted under Project Condition Surveys. Total O&M 
General obligations were $17,400. Project condition is fair. 
13. SANTA BARBARA HARBOR, CA 
Location. On the coast of southern California, 90 miles 
northwest of Los Angeles Harbor. 
Existing project. For details on original, see page 33-4 
Annual Report for 1983. For reevaluation details see 
WRDA, 1986. The recommended plan includes acquiring 
a permanent dredge for the city and they will assume the 
operation and maintenance of the channel. 
Local cooperation. See page 1015 of Annual Report for 
1969, for items of local cooperation under 1962 authorized 
modification of existing project. The city reaffirmed its 
support on February 8, 1994. 
Operations during fiscal year. Routine annual 
maintenance dredging (two-cycle) was performed. Total 
O&M General obligations were $1,087,000. Project 
condition is fair. 
14. SANTA MONICA BREAKWATER, CA 
Location. Santa Monica Breakwater is located seaward of 
the Santa Monica Pier, approximately 15 miles west of 
downtown Los Angeles. Existing breakwater is 2,000 feet 
long and lies 1,300 feet from the shoreline. 
Existing project. The project plan comprises reconstruction
33-5 
of 900 feet of the southern end of the existing breakwater to 
an elevation of +10 feet MLLW for storm damage 
prevention and constructing an offshore boulder-field for 
fish habitat. The local sponsor will provide 12 moorings 
and other boating support facilities to reestablish commercial 
boating opportunities. WRDA 1996 authorized the project. 
The estimated cost of the project is $7,200,000 (Federal cost 
is $4,700,000 which includes $40,000 US Coast Guard; 
Non-Federal cost is $2,500,000). 
Local cooperation. City of Santa Monica, the local 
sponsor, indicated its support for the recommended plan and 
its willingness and intent to execute the Project Cooperation 
Agreement scheduled to be signed October 2000. 
Operations during fiscal year. Negotiate Project 
Cooperation Agreement. 
15. SURFSIDE, SUNSET AND NEWPORT 
BEACH, CA 
Location. Project extends along Orange County coastline, 
17 miles from San Gabriel River mouth down coast to 
Newport Bay Harbor entrance. 
Existing project. Authorization Section 101 of Rivers and 
Harbors Act 1962. Project is a periodic continuing 
construction project. 
Local cooperation. State of California, Orange County, 
Cities of Newport and Huntington Beach, and Surfside 
Colony. Letter of Intent dated August 11, 1995 from the 
State of California Department of Boating and Waterways, 
coordinating sponsor. Funding agreement with the State of 
California was executed on April 30, 1996. 
Operations during fiscal year. None. 
16. VENTURA HARBOR, CA 
Location. Located 65 miles northwest of Los Angeles and 
six miles northwest of Channel Islands Harbor. 
Existing project. For details, see page 33-5 of the Annual 
Report for 1981. Reevaluation under WRDA 1990 consists 
of modification to the existing harbor by constructing a 
separate South Beach groin, extending the offshore 
breakwater, adding a spur groin to the north jetty and 
detached breakwater, and deepening and extending the 
entrance channel and sand trap. 
Local cooperation. Fully complied with. 
Operations during fiscal year. Routine annual maintenance 
dredging was performed. Total O&M General obligations 
were $2,484,000. Project condition is fair.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FISCAL YEAR 2000 
parking lots, and landscaping. 
17. ALAMO DAM, AZ 
Location. About 70 miles southeast of Kingman, Arizona on 
the Bill Williams River, Arizona a tributary of the Colorado 
River. 
Existing project. For details, see page 33-7 of Annual 
Report 1981. 
Local cooperation. Fully complied with. 
Operations during fiscal year. The Alamo Risk 
Assessment Study begun in FY98 was completed in FY2000. 
This study will provide information useful to the Alternate 
Spillway Study. Also, a Spillway Erodibility Study initiated 
in FY2000 will by completed in FY2001. Total O&M 
General obligations were $975,000. Project condition is 
good. 
18. CLIFTON, AZ 
Location. Located on San Francisco River approximately 
170 miles northeast of Tucson in Greenlee County, AZ. 
Existing project. The project consists of both structural 
and nonstructural elements, including an earthfill levee 
about 3,000 feet long, with floodgates and floodwalls. 
Implementation will involve flood proofing of 11 businesses, 
flood plain evacuation plans, and recreation development. 
Estimated cost (October 1998) for existing project is 
$24,100,000 (includes $2,600,000 cash contribution and 
$5,400,000 other costs). 
Local cooperation. The State of Arizona, Division of 
Emergency Services, is the local sponsor. Project 
Cooperation Agreement executed on July 30, 1993. 
Operations during fiscal year. Construction of the levee 
and floodwall was completed August 1995 and turned over 
to sponsor December 1996. Completed non-structural 
relocation in December 1998. 
19. HANSEN DAM, LACDA, (RECREATION 
DEVELOPMENT), CA 
Location. In the San Fernando Valley area of the city of 
Los Angeles about 20 miles northwest of downtown Los 
Angeles. Recreation lake and facilities lie within flood 
control basin boundaries. 
Existing project. Original project authorized under Flood 
Control Act 1936, and modified by WRDA 1986, Section 
847 Energy and Water Development Act 1992 (PL 102- 
104). Project consists of two phases. Phase 1 is the 
excavation of the lake, and rough grading of the roadways 
and building pad locations. Phase 2 is the construction of 
a 10.5-acre recreation lake, picnic facilities, access roads, 
33-6 
Local cooperation. Project is 50/50 cost shared with the 
city of Los Angeles. 
Operations during fiscal year. One-year plant 
monitoring program "walk-through" was held on Friday, 
December 29, 2000. Plant monitoring program is 
complete. Total O&M General obligations were $46,300. 
Project condition is good. 
20. LAKE ELSINORE, CA 
Location. In Riverside County, about 70 miles southeast 
of downtown Los Angeles, and 30 miles southeast of the 
city of Corona. 
Existing project. The project consists of an earthentrapezoid 
outlet channel about 2.5 miles long, with a 30- 
foot to 80-foot base and IV on H. side slopes. The outlet 
channel will relieve flooding at the 100-year-flood level 
around the perimeter of the lake. The project included 
building six bridges and protecting an endangered species 
habitat. The project was completed in September 1993. 
Construction contract closed out September 1997. 
Amendment to Local Cooperation Agreement executed 
August 27, 1998. Confirmation of real estate credit 
initiated August 1998. 
Local cooperation. Riverside County Flood Control Water 
Conservation District signed a Local Cooperation 
Agreement March 27, 1992. Amended August 27, 1998 to 
reflect Federal expenditures for the flood control project at 
$7,500,000. 
Operations during fiscal year. Initiated Section 205 study 
report addressing advisability of modifying the project for 
flood control. Confirmation of real estate credit initiated 
August 1998 and credit reimbursement was completed July 
1999. 
21. LOS ANGELES COUNTY DRAINAGE 
AREA, CA 
Location. Along Los Angeles and San Gabriel Rivers, Rio 
Hondo, and Compton Creek, CA. 
Existing project. Project consists of channel improvement 
to lower Los Angeles, Rio Hondo Rivers, Compton Creek, 
and modification/replacement of as many as 27 bridges 
necessitated by the channel improvements. A map of the 
rehabilitation plan is in "General Design Memorandum, Los 
Angeles River Rehabilitation under the Major 
Rehabilitation Program," dated January 1984 and revised in 
March 1984. Estimated cost (October 1999) for existing 
project is $200,000,000 of which $150,000,000 is Federal 
and $50,000,000 is non-Federal (includes $43,968,000 cash 
contribution and $6,032,000 other costs). 
Flood Control

LOS ANGELES, CA, DISTRICT 
Local cooperation. In February 1992, the Los Angeles 
County Department of Public Works, the local sponsor, 
affirmed its support and willingness to financially 
participate in the construction of the project at a level 
consistent with the current cost-sharing policy for 
construction. The Project Cooperation Agreement was 
executed August 7, 1995. 
Operations during fiscal year. Routine operations and 
maintenance activities were performed. Periodic 
Inspections at Hansen, Lopez, & Sepulveda Dams and 
Haines Canyon Debris Basin were completed early in 
FY2001. The Whittier Narrows Seepage Control Measures 
Contract was awarded in FY2000 with the work completing 
in FY2001. A log boom design was completed for Hansen 
Dam. The estimated construction cost is &600,000. An 
Operations & Maintenance Efficiency Study was underway. 
Environmental consultants were contracted to produce the 
necessary documentation (i.e., Environmental Assessments) 
required to perform maintenance work in the soft-bottom 
flood control channels and within the reservoir areas behind 
each dam. Total O&M General obligations were 
$6,195,000. Project condition of Dams and Channels is 
good. 
22. LOS ANGELES RIVER, SEPULVEDA 
TO ARROYO SECO, (RECREATION 
DEVELOPMENT), CA 
Location. Upper Los Angeles River from Sepulveda Flood 
Control Basin (located 25 miles northwest of the city of Los 
Angeles) to the confluence of the Arroyo Seco channel, a 
distance of 20 miles. 
Existing project. The Upper Los Angeles River consists 
primarily of a rectangular channel from the Sepulveda Basin 
to a point approximately four miles above the Arroyo Seco 
as a trapezoidal channel of the Arroyo Seco. 
Local cooperation. Project is 50/50 cost shared with City 
of Los Angeles Department of Transportation. 
Operations during fiscal year. Routine operations and 
maintenance activities were performed. U.S. Forest Service 
has informed the District of a lawsuit filed pursuant to the 
Endangered Species Act by the Southwest Center for 
Biological Diversity on behalf of the endangered Arroyo 
Toad. The lawsuit alleges the USFS is allowing "talking" 
of the endangered species. As a property owner the Corps 
may be implicated as well. Local agencies have indicated 
interest in operating and maintaining recreational 
development immediately upstream and downstream of the 
dam. This will help in control access. We have initiated 
informal Section 7 consultation and have implemented other 
physical restraints as well including fencing. Total O&M 
General obligations were $225,000. Project condition is 
good. 
23. MOJAVE RIVER DAM, MOJAVE 
RIVER BASIN, CA (MOJAVE RIVER 
RESERVOIR) 
Location. On Mojave River at the Forks site, just downstream 
from the mouth of Deep Creek and about 14 miles 
upstream from Victorville, in Mojave River Basin, CA. 
Existing project. For details, see page 33-8 of Annual 
Report for 1983. 
Local cooperation. None required. 
Operations during fiscal year. A periodic inspection was 
conducted and routine O&M activities were performed. 
Project condition is good. U.S. Forest Service has informed 
the District of a lawsuit filed pursuant to the Endangered 
Species Act by the Southwest Center for Biological Diversity 
on behalf of the endangered Arroyo Toad. The lawsuit 
alleges the USFS is allowing "taking" of the endangered 
species. As a property owner the Corps may be implicated 
as well. Local agencies have indicated interest in operating 
and maintaining recreational development immediately 
upstream and downstream of the dam. This will help in 
control access. 
24. NOGALES WASH, AZ 
Location. At the Mexican Border, in extreme southern 
Arizona in central and northern portions of the city of Nogales, 
about 60 miles south of Tucson. 
Existing project. Current plan includes a flood warning 
system in Mexico and United States. Estimated cost (October 
2000) for existing project is $560,000, $420,000 of which is 
Federal and $140,000 is non-Federal. 
Local cooperation. Project Cooperation Agreement 
scheduled for execution in the last quarter of Fiscal Year 2001. 
Negotiating agreement with Mexico through U.S. 
International Boundary and Water Commission. 
Operations during fiscal year. Continue coordination with 
IBWC. No construction scheduled in Fiscal Year 2000. 
25. NORCO BLUFFS, SANTA ANA RIVER, 
CA 
Location. Located approximately 40 miles southeast of Los 
Angeles, in the city of Norco, along a 3.75-mile stretch of the 
south bank of the Santa Ana River. 
Existing Project. The project consists of a structural solution 
of reverted-buttress fill using existing and imported fill 
material one reach, a distance of one mile. The bluff 
33-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FISCAL YEAR 2000 
stabilization protects a 65-foot-high bluff from further retreat 
into a residential neighborhood, which results when flood 
flows occur in the Santa Ana River. Estimated cost (October 
1999) is $10,700,000 of which $8,025,000 is Federal and 
$2,675,000 is non-Federal. 
Local cooperation. Local sponsor, Riverside County Flood 
Control District. Project Cooperation Agreement executed in 
January 1999. 
Operations during fiscal year. Construction contract 
awarded May 1999 and completed January 2000. 
26. PAINTED ROCK DAM (GILA RIVER), AZ 
Location. About 20 miles northwest of Gila Bend, and 120 
miles southwest of Phoenix, Arizona. 
Existing project. For details, see page 33-9 of Annual 
Report for 1981. 
Local cooperation. Requirements are described in full on 
33-9 of Annual Report for 1981. 
Operations during fiscal year. Routine operations and 
maintenance activities were performed. Total O&M 
General obligations were $759,000. Project condition is 
good. 
27. PINE AND MATHEWS CANYONS 
DAMS, COLORADO RIVER BASIN, NV 
Location. In Lincoln County, NV, about 100 miles north of 
Hoover Dam and about 17 and 20 miles, respectively, east 
of Caliente, NV. 
Existing project. For details, see page 33-13 of Annual 
Report for 1981. 
Local cooperation. Fully complied with. 
Operations during fiscal year. Routine operations and 
maintenance activities were performed. Total O&M 
General obligations were $177,000. Project condition is 
good. 
28. RILLITO RIVER, AZ 
Location. The project is located in Tucson metropolitan 
area of Pima County, AZ. 
Existing project. Plan of improvement includes: 1) an 
upstream equestrian staging area; 2) an upstream rest area; 
3) a downstream rest area; 4) esthetic treatment planting; 5) 
construction of 16 pedestrian bridges; and 6) continue work 
on the Limited Reevaluation Report for Tanque Verde. 
Estimated cost (October 1998) for existing project is 
$40,000,000 (includes an allowance for estimated inflation 
33-8 
through the construction period), of which $28,600,000 is 
Federal and $11,400,000 is non-Federal. Flood control 
portion is $34,215,468 and recreation is $5,784,532. 
Local cooperation. Pima County Transportation and Flood 
Control District submitted letters of assurance on February 
24, 1986 and May 6, 1987. Project Cooperation Agreement 
(PCA) was executed in June 1994. Amendment to PCA for 
third increment was executed on September 16, 1998. 
Operations during fiscal year. Phase III construction 
contract was awarded September 1998 and is scheduled for 
completion in Fiscal Year 2000. 
29. SANTA ANA RIVER MAINSTEM, CA 
Location. Along a 75-mile reach of the Santa Ana River 
in San Bernardino, Riverside, and Orange Counties, 
emptying into the Pacific Ocean between the cities of 
,Newport Beach and Huntington Harbor, 50 miles south of 
Los Angeles, and 90 miles north of San Diego. 
Existing project. For details, see page 33-9 of the Annual 
Report for 1987. Plan of improvement: Seven Oaks Dam, 
management of overflow area - Seven Oaks to Prado; raise 
Mill Creek Levee; additional storage at Prado; 
improvements along: Oak Street Drain/Riverside Co., 
Santiago Creek/Orange Co., San Timoteo Creek/San 
Bernardino Co., and Lower Santa Ana River; recreation 
development: mitigation and preservation. Estimated cost 
(October 2000) for existing project is for $1,365,000,000 
(includes an allowance for estimated inflation through the 
construction period), of which $924,000,000 is Federal and 
$441,000,000 is non-Federal ($73,429,000 cash contribution 
and $367,571,000 other cost). 
Local cooperation. Counties of San Bernardino, Riverside, 
and Orange. Project Cooperation Agreement was 
signed on December 14, 1989. 
Operations during fiscal year. Continue engineering and 
design on the Lower Santa Ana River, Santiago Creek, 
Prado Dam and San Timoteo Reach 3B. Continue 
construction on Lower Santa Ana River, Reach 8. 
30. SANTA ANA RIVER BASIN AND 
ORANGE COUNTY, CA 
Location. On the Santa Ana River and tributaries and on 
other streams in Orange, Riverside, and San Bemrnardino 
Counties, CA. 
Existing project. For details on units, see Annual Report 
for 1968. 
Local cooperation. Fully complied with. Orange County 
Water District advocated an increase in water conservation 
at Prado Dam up to elevation 505 feet. Prado Basin

LOS ANGELES, CA, DISTRICT 
includes significant riparian wetlands, including nesting 
areas of the endangered least Bell's vireo. The basin is 
currently under review as proposed critical habitat for the 
vireo. 
Operations during fiscal year. Routine operations and 
maintenance activities were performed. Environmental 
consultants were contracted to produce the necessary 
documentation (i.e. Environmental Assessments) required 
to perform maintenance work in the soft-bottom flood 
control channels and within the reservoir areas behind each 
dam. Total O&M General obligations were $2,837,000. 
Project condition of Dams and Channels is good. 
31. SANTA PAULA CREEK, CA 
Location. Santa Paula Creek is a tributary of the Santa 
Clara River in the vicinity of the city of Santa Paula, 
Ventura County, about 16 miles from the ocean and 
approximately 60 miles northwest of downtown Los 
Angeles. 
Existing project. Authorized by Flood Control Act of 
1970, Public Law 91-611 (HD 443/80/1) and for details 
see Annual Report Fiscal Year 1991, page 33-10. 
Estimated cost (October 1999) for existing project is 
$37,700,000, of which $36,100,000 is Federal and 
$1,600,000 is non-Federal (includes $0 cash contribution 
and $1,600,000 other costs). 
Local cooperation. Ventura County Flood Control 
District. No authorization is required; therefore, the 
existing Section 221 Agreement is still binding and was 
amended in September 1996. 
Operations during fiscal year. Upstream channel 
contract awarded November 1998, scheduled to complete 
March 2001. 
32. SAN LUIS REY RIVER, CA 
Location. Along the lower 7.2 miles of the San Luis Rey 
River, in and around the city of Oceanside, San Diego 
County, about 86 miles south of Los Angeles. 
Existing project. A double levee, 5.4 miles long; stone 
protected channel with a soft bottom; 1,330 feet of parapet 
walls at the ocean on the north and south levees; six 
interior drainage ponds; and a five-mile bike trail. The 
Water Resources Development Act of 1996 reauthorized 
the project. Estimated cost (October 1998) $81,600,000 
of which $61,100,000 is Federal and $20,500,000 is non- 
Federal (including $4,100,000 cash contribution). 
Local cooperation. Final Local Cooperation Agreement 
signed by city of Oceanside and Secretary of Army May 
13, 1988. 
Operations during fiscal year. Construction contract for 
relief wells completed January 2000. 
33. SEPULVEDA DAM, (RECREATION 
DEVELOPMENT), CA 
Location. The project is located between the communities 
of Encino and Van Nuys and 15 miles northwest of Los 
Angeles. 
Existing project. Flood Control Act 1936 and Public Law 
77-387 1941, and 1989-1972. Primary project purpose is 
flood control. Subsequent Act of Congress authorized a 
secondary project purpose for park and recreation. 
Local cooperation. The recreation project is 50/50 cost 
shared with the city of Los Angeles. Federal funds will 
complete Lake Balboa and park with comfort station, trails, 
fencing, irrigation, children=s play area and revegetation 
and develop an additional wildlife area. The city will 
continue reclaimed water distribution and develop several 
park areas. 
Operations during fiscal year. Project construction 
physically completed January 1999. 
34. SWEETWATER RIVER, CA 
Location. The project empties into San Diego Bay in the 
city of Chula Vista and National City and unincorporated 
San Diego County, four miles south of the city of San 
Diego, and eight miles north of the Mexican Border. 
Existing project. Construction of 3.2 miles of channel 
improvements along the Sweetwater River from Interstate 
805 to San Diego Bay, in combination with State Route 
54 and Interstate 5 construction; and construction of two 
railroad bridges and 188 acres of preservation and 
mitigation land. 
Local cooperation. San Diego County signed 221 
Agreement in December 1984. 
Operations during fiscal year. None. 
35. TROPICANA AND FLAMINGO 
WASHES, NV 
Location. The project area is located west of and through 
urbanized Las Vegas community along both Tropicana and 
Flamingo Washes in southern Nevada. 
Existing project. The recommended plan will provide 
urban flood reduction, erosion control and wildlife enhancement 
for portions of Las Vegas and the surrounding 
areas to the west and southwest, including the rapidly 
33-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FISCAL YEAR 2000 
developing alluvial fan immediately west of Las Vegas. 
The plan recommends construction of two debris basins, 
four detention basins, modifications to two existing 
detention basins, 28 miles of channels connecting these 
project elements, 43 miles of lateral collectors, environmental 
mitigation, and recreation facilities. The estimated 
cost (October 2000) for the existing project is 
$291,000,000 (includes an allowance for estimated 
inflation), of which $214,800,000 is Federal and 
$76,200,000 is non-Federal (includes $32,500,000 cash 
contribution and $43,700,000 other costs). 
Local cooperation. The Clark County Regional Flood 
Control District and the Department of Public Works are 
the local sponsors for flood control. The Clark County 
Recreation Department is the potential local sponsor for the 
recreation feature. The Project Cooperation Agreement 
(PCA) was executed on February 7, 1995. The Section 211 
PCA was executed December 17, 1999. 
Operations during fiscal year. Continued construction 
of Blue Diamond Dam, Lower Red Rock Channel, and 
Blue Diamond Beltway Channel, Segment 10A. 
Completed construction of Lower Blue Diamond Channel 
and Tropicana Outlet Channel. 
36. TUCSON DIVERSION CHANNEL 
(RECREATION DEVELOPMENT), AZ 
Location. The Tucson Detention Basin and Diversion 
Channel are located in southeast Arizona. The project area 
initiates within the basin and proceeds approximately five 
miles downstream until it meets Interstate 19. 
Existing project. The recreational development consists 
of a bicycle and hiking trail; four rest areas at the basin's 
inlet and outlet areas, near the intersection of Park Avenue 
and Ajo Way, across the street from Wakefield Middle 
School and near Interstate 19, where the project ends; four 
channel under crossing areas at Ajo Way (near the basin's 
outlet), Interstate 10; Kino Parkway; and Benson Highway; 
a restroom facility and five to seven car parking area 
located near the end of the project area; lighting at rest 
areas; benches; pedestrian bridges; and landscaping. The 
flood control channel maintains a 30-40 foot width, with a 
average 30-foot right-of-way on each side of the channel. 
The trail system is primarily located along the north bank 
of the channel. 
Local cooperation. Pima County is the local sponsor. 
Operations during fiscal year. Construction of abovementioned 
features completed September 1998. 
37. WHITLOW RANCH DAM, QUEEN 
CREEK, AZ 
Location. Fifty miles southeast of Phoenix, AZ in Pinal 
County, on Queen Creek, Arizona a tributary of Gila River, 
about 10 miles west of Superior, Arizona. 
Existing project. For details see page 33-10 of Annual 
Report 1981. Project element earthfill Dam, circular 
conduit outlet works and reservoir. 
Local cooperation. Fully complied with. 
Operations during fiscal year. Routine operations and 
maintenance activities were performed. The Spillway 
Erodibility Study begun in FY99 was completed in 
FY2000. Findings: "The entire spillway is generally 
erodible, however, the duration of the expected maximum 
flow event is so short that a sill breach probably would not 
occur." Total O&M General obligations were $130,000. 
Project condition is good. 
38. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Inspection of 24 completed local flood control projects 
consisting of the following: 375 miles of channels, six 
dams, and appurtenances, and 23 debris basins. Total 
O&M General obligations were $775,000. 
39. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
In accordance with Section VII, Flood Control Act of 
1944, studies of reservoir operations for flood control were 
conducted; and preparation of regulations for the use of 
storage allocated for flood control was continued. The 
flood control structures were Hoover, Twitchell, and Tat 
Momolikot Dams. Total O&M General obligations were 
$177,000. 
40. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood Control Activities Pursuant to Section 205 of the 
1948 Flood Control Act, Public Law 858, 80th 
Congress, as Amended: 
Federal cost for Section 205 was $518,307 of which 
$505,624 was used for studies and $12,683 for 
Coordination Account. See Table 33-i for list of projects. 
Emergency Streambank Protection Activities Pursuant 
to Section 14 of the 1946 Flood Control Act, Public Law 
526, 79th Congress, as Amended 
Federal cost for Section 14 was $52,083. 
Snagging and Clearing Navigable Streams and 
Tributaries in interest of Flood Control, Section 208, 
33-10

LOS ANGELES, CA, DISTRICT 
1954 Flood Control Act, Public Law 780, 83d Congress. 
Federal cost for Section 14 was $0. 
Modifications to Structures and Operations of 
Constructed Corps Projects to Improve the Quality of 
the Environment, Pursuant to Section 1135 of the 1986 
Water Resources Development Act, Public Law 662, 
99th Congress, as amended. 
Federal cost for Section 1135 was $1,495,476. 
Aquatic Ecosystem Restoration Pursuant to Section 206 
of Water Resources Development Act of 1986 
Federal cost for Section 206 was $382,841 of which 
$15,792 was Coordination Account and $367,049 was 
Preliminary Restoration Plans. 
41. EMERGENCY RESPONSE 
ACTIVITIES - FLOOD CONTROL AND 
COASTAL EMERGENCIES 
Emergency Flood Control Activities - repair, flood 
fighting, and rescue work (Public Law 99, 84th Cong., and 
antecedent legislation). 
A. Disaster: This program encompasses all the activities 
associated with preparedness, which includes preparation 
of plans and policy documents, exercises, training, 
coordination with outside agencies and governments, 
maintaining supplies and equipment, and the like. The 
district developed and published an Emergency Operations 
Center (EOC) Standard Operating Procedures, which 
codified the many procedures and processes attendant to 
EOC operations. The district also compiled the 
information for revisions to its Flood Response and 
Earthquake Response Plans. 
B. Operational Program Areas: Fiscal Year cost for 
disaster preparedness was $566,385; emergency operations 
cost was $3,934; repair and restoration of damaged Federal 
flood control works cost was $2,802,776 and $156,532 for 
non-Federal flood control works; inspection of non-Federal 
flood control works cost was $42,019. 
C. Emergency Work in Support of Other Federal 
Agencies. 
Support work was performed for Federal Emergency 
Management Agency (FEMA) following hurricanes 
George and Dennis and the Oklahoma tornado at a cost of 
$576,188. 
General Investigations 
42. SURVEYS 
Total Fiscal Year costs were $8,629,880 of which 
$1,038,575 was for navigation studies; $1,922,775 was for 
flood damage prevention studies; $392,938 was for 
shoreline protection studies; $3,524,797 was for special 
studies; $328 for review of completed projects; $864,968 
was for Miscellaneous Activities (includes $86,476 for 
special investigations; $0 for FERC licensing activities; 
$31,943 for Interagency Water Resources Development; 
$2,876 for National Estuary Studies; $0 for North 
American Waterfowl Management Plan); and $62,023 for 
Coordination Studies with other Agencies and Non-Federal 
Interests, ($33,896 was for Planning Assistance to States 
- $12,198 for Arizona, and $21,698 for California). 
43. COLLECTION AND STUDY OF BASIC 
DATA 
Fiscal Year costs totaling $325,900 were associated with 
the following tasks under the Flood Plain Management 
Services Program, FPMS Unit $55,163; Technical Services 
$62,538; Quick Responses $9,933; and Special Studies 
$179,032 and $19,234 for hydrologic studies. 
44. PRECONSTRUCTION ENGINEERING 
AND DESIGN 
Fiscal Year expenditures were $2,335,813 of which 
$866,971 was for projects not yet authorized for construction 
and $1,468,842 were for projects fully authorized. 
44A. RIO SALADO, PHOENIX REACH, AZ 
Location. The project area is located in the city of 
Phoenix, Arizona, along 7 miles of the Salt River. 
Existing project. Two sites have been identified with a 
Federal interest in environmental restoration involving 
riparian habitat restoration, water quality improvement and 
recreation that are incidental or complimentary to the 
primary project purpose. The first site is 1.5 miles on 
Indian Bend Wash, from McKellips Road downstream to 
the confluence with the Salt River in Tempe; the second 
site is located along 7 miles of the Salt River, from the 
Interstate Highway 10 Bridge to 19th Avenue in Phoenix. 
Local cooperation. The city of Phoenix and the Corps of 
Engineers executed the Preconstruction Engineering 
Design Agreement on July 31, 1998. 
Operations during fiscal year. The preconstruction 
engineering and design phase was completed in September 
2000. 
33-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FISCAL YEAR 2000 
44B. RIO SALADO, TEMPE REACH, AZ 
Location. The project area is located along 1.5 miles on 
Indian Bend Wash, from McKellips Road downstream to 
confluence with Salt River in Tempe, Arizona. 
Existing project. There is a Federal interest in 
environmental restoration involving riparian habitat 
restoration, water quality improvement and recreation that 
are incidental or complimentary to the primary project 
purpose. 
Local cooperation. The city of Tempe and the Corps of 
Engineers executed the Design Agreement February 25, 
1999. 
Operations during fiscal year. The preconstruction 
engineering and design phase was completed in September 
2000. 
44C. TUCSON DRAINAGE AREA, AZ 
Location. Located along Tucson Arroyo/Arroyo Chico 
Watershed, within the Tucson city limits in Arizona. 
Existing project. Both the reconnaissance report and the 
feasibility study identified the Tucson Arroyo/Arroyo 
Chico watershed area (approximately 11.4 square miles) as 
the major drainage channel within downtown Tucson. The 
recommended plan has two main features consisting of two 
detention basin complexes - one on Arroyo Chico in the 
headwaters of the drainage area (referred to as Randolph 
Golf Course Detention Basin Complex), and one on 
Tucson Arroyo/Arroyo Chico in the approximate center of 
the watershed (referred to as Park Avenue Detention Basin 
Complex). The local sponsor completed the Randolph 
Golf Course Detention Basin Complex in May 1996 using 
Section 104 credit consideration. 
Local cooperation. Pima County Flood Control District 
and the Corps of Engineers executed the Design 
Agreement on May 3, 1999. 
Operations during fiscal year. Preconstruction 
engineering and design phase was initiated in May 1999. 
33-12

TABLE 33-A 
LOS ANGELES, CA, DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section in 
Text Project Funding FY 97 FY 98 FY 99 FY 00 
Channel Islands, 
CA 
Los Angeles and 
Long Beach 
Harbor, CA 
Model Study: 
Marina del Rey, 
CA 
Morro Bay 
Harbor, CA 
Newport Bay 
Harbor, CA 
Oceanside 
Harbor, CA 
Oceanside Harbor 
Sand By-Pass, 
CA 
Port Hueneme, 
CA 
Port of Long 
Beach, CA 
Redondo Beach 
(King Harbor) 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp 
Cost 
Maint: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp 
Cost 
Maint: 
Approp. 
Cost 
1,699,000 2,836,000 
1,650,614 2,705,897 
15,000,000 34,975,000 
14,858,465 34,621,306 
1,569,000 1,664,000 
1,104,714 1,690,138 
162,000 162,000 
136,734 177,125 
-30,000 1,081,000 
-44,286 1,065,448 
0 0 
9,052 25,539 
970,000 3,437,000 
973,031 3,361,325 
1,654,000 605,000 
1,654,991 332,009 
-62 0 
-62 0 
531,000 1,014,000 
400,307 1,138,823 
0 -1,400,000 
766,469 1,343,660 
0 0 
0 0 
244,000 4,135,000 
245,149 583,170 
0 200,000 
0 101,201 
33-13 
Total Cost 
30 Sep 00 
2,761,065 
2,795,900 
57,000,000 
57,039,881 
1,264,000 
1,777,478 
147,000 
157,751 
2,882,033 
2,863,614
0
0 
1,002,000 
1,034,465 
1,554,000 
1,818,904
0
0 
692,000 
689,545
0 
228,385 
152,935 
160,570 
8,279,000 
4,941,257 
938,000 
1,026,039 
1,060,000 
1,064,207 
-13,000 
405,352 
620,000 
662,713 
160,000 
158,367 
3,193,000 
3,254,931
0
0 
3,383,000 
3,434,179 
39,000 
39,200
0
0 
1,140,000 
1,155,433 
134,000 
203,139 
1,422,000 
1,410,006 
-1,047,000 
5,858,648 
-4,000 
6,111 
46,631,185 
46,626,015 
111,402,000" 
111,329,738 
15,593,842 
15,588,148 
9,708,887 
9,707,213 
17,425,807 
17,425,578 
1,524,000 
1,474,261 
25,989,471 
25,985,023 
4,562,700 
4,554,349 
3,734,9382 
284,938 
14,724,787 
14,722,465 
23,490,900 
23,490,724 
3,056,100 
3,043,110 
12,117,000 
12,080,808 
6,369,343 
6,368,646 
10. 
__ 
- --- ~ 
- -- - -- ~e 
I

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 33-A 
Project 
COST AND FINANCIAL STATEMENT 
Funding FY 97 FY 98 FY 99 
11. San Diego 
Harbor, CA 
12. San Diego River 
and Mission 
Bay, CA 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
142,000 
139,732 
-400,000 
913,897 
37,000 
30,482
0 
14,014 
0 
7,975
0 
14,272 
0 5,507,191 
2,355 5,502,091 
0 7,884,345 
424 7,877,905 
13. Santa Barbara 
Harbor, CA 
14. Santa Monica 
Breakwater, CA 
15. Surfside, Sunset 
and Newport 
Beach, CA 
16. Ventura Harbor 
(Ventura Marina), 
CA 
17. Alamo Dam, AZ 
18. Clifton, AZ 
19. Hansen Dam, 
LACDA, CA 
(Recreation) 
20. Lake Elsinore, 
CA 
21. Los Angeles 
County Drainage 
Area, CA 
22. Los Angeles 
River, Sepulveda 
Maint: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp 
Cost 
New Work: 
Approp 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp 
Cost 
Maint: 
Approp. 
Cost 
Maint 
Approp. 
19,000 
16,820 
1,318,000 
1,239,512 
10,000 
19,316
0 
5,521 
5,804,000 
5,505,594
0 
-6,633 
2,095,000 
1,973,632 
1,328,000 
857,414 
604,000 
651,722 
0 33,000 3,613,689 
0 36,142 3,613,688 
1,235,000 1,550,967 1,083,000 
1,160,838 1,719,917 1,087,088 
0 
1,860 
1,409,000 
19,503
0 
184,886 
7,000
0 
0 
7,665 
-1,099,000 
90,791 
10,000 
4,766 
-135,000 
21,536 
410,000 
404,113 
400,000' 
356,829 
0 292,000 21,701,100 
65,407 242,918 21,572,629 
-787 
12,846 
0 5,286,213 
0 5,286,213 
6,391,000 3,126,000 2,471,000 44,389,332 
5,729,589 3,978,788 2,488,326 44,687,277 
974,000 
1,389,276 
2, 160,000 
824,611 
0 982,000 
0 330,598 
(500,000)
0 
936,000 958,000 18,605,859 
1,014,326 990,791 18,580,061 
-105,000 370,000 14,325,0004 
966,059 593,506 14,278,921 
0 
1,541,652 
68,000 2,432,000 
59,026 2,439,039 
0 6,457,000 
121,150 6,425,025 
0 7,500,000 
1,935 7,500,000 
14,424,800 16,941,000 50,744,000 35,475,300 168,250,600' 
14,392,147 16,246,471 50,625,406 33,273,990 163,311,959 
5,612,000 7,219,500 4,727,500 6,176,000 103,180,702 
4,791,637 6,817,931 6,410,108 6,277,137 103,200,316 
400,000 
33-14 
See 
Section 
In Text FY 00 
Total Cost 
30 Sep 00 
- ---- -- - 
- -- --

TABLE 33-A 
LOS ANGELES, CA, DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section in 
Text Project Funding FY 97 FY 98 FY 99 FY 00 
to Arroyo Seco, CA 
(Recreation) 
23. Mojave River 
Dam, Mojave 
River Basin, CA 
24. Nogales Wash, 
AZ 
25. Norco Bluffs, 
CA 
26. Painted Rock, 
AZ (Gila River) 
27. Pine & Mathews 
Canyons Dam, 
Colorado River 
28. Rillito River, 
AZ 
29. Santa Ana River 
Mainstem, CA 
30. Santa Ana River 
Basin OC, CA 
31. Santa Paula 
Creek, CA 
32. San Luis Rey 
River, CA 
33. Sepulveda Dam, 
CA, (Recreation) 
34. Sweetwater 
River Basin, CA 
35. Tropicana and 
Flamingo Washes, 
NV 
36. Tucson Diversion 
Channel, AZ 
(Recreation) 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
0 28,835 
181,000 
189,578 
-66,800 
42,509 
180,000 
78,176 
1,494,000 
913,109 
106,000 
111,531 
6,000 
1,004,659 
65,346,000 
64,794,41 1 
2,461,000 
2,287,217 
1,923,000 
1,802,238 
-1,000,000 
354,927 
1,961,000 
1,319,802 
-100,000 
-73,499 
9,709,061 
9,531,822 
0 
396,738 
191,000 
187,992 
214,000 
72,279 
1,000,000 
101,739 
2,063,000 
1,547,326 
92,000 
91,424 
757,000 
587,266 
70,916,000 
66,607,143 
3,067,000 
2,802,171 
4,457,000 
4,379,650 
2,371,000 
2,348,438
0 
840,797
0 
22,330 
i7,783,000 
14,578,276 
0 
1,745,123 
33-15 
Total Cost 
30 Sep 00 
28,751 
182,000 
188,341
0 
83,199 
4,400,000 
2,152,527 
1,102,000 
2,205,677 
228,000 
221,974 
2,600,00 
1,622,868 
37,507,000 
39,429,995 
3,716,000 
4,105,912 
8,519,000 
5,689,913 
220,000 
579,000 
-700,000 
1,359,424
0 
20 
15,987,000 
14,977,745 
0 
97,082 
4,674 
213,000 
221,164
0 
15,142 
2,404,000 
4,826,561 
749,000 
835,873 
169,000 
178,607 
2,090,000 
3,261,442 
37,787,700 
40,442,313 
2,795,000 
2,890,071 
7,745,000 
9,938,532 
1,850,000 
2,000, 129 
40,000 
267,035
0
0 
28,110,000 
30,756,251 
0 
5,199 
398,855 
6,198,536 
6,193,210 
592,200" 
547,436 
7,984,000 
7,159,003 
27,991,183 
27,973,523 
2,908,329 
2,905,716 
27,647,0002' 
27,540,159 
665,654,700 
649,698,346 
53,659,494 
53,162,766 
32,350,020 
31,073,372 
59, 141,000 
58,718,762 
16,800,940 
16,708,257 
37,082,503 
37,081,583 
90,908,000ly 
89,028,780 
3,050,000 
3,047,641 
- --

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 33-A 
Project 
COST AND FINANCIAL STATEMENT 
Funding FY 97 FY 98 FY 99 
37. Whitlow Ranch 
Dam, Queen 
Creek, AZ 
Maint: 
Approp. 
Cost 
65,000 
63,606 
135,000 
120,083 
138,000 128,000 
154,096 129,412 
PRECONSTRUCTION ENGINEERING AND DESIGN 
44A Rio Salado, Phoenix 
Reach, AZ 
44B Rio Salado, Tempe 
Reach, AZ 
44C Tucson Drainage 
Area, AZ 
FOOTNOTES: 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
0 330,000 1,725,000 1,320,000 
0 221,962 1,474,974 1,631,079 
00 
30,000
0 
49,000 
28,221 
20,000 
30,264 21,590 
225,000 308,000 
139,954 233,481 
130,000 319,000 
415,312 
3,375,000 
3,328,015 
582,000 
401,656 
499,000 
467,166 
1/ Excludes non-Federal funds and costs; includes PED appropriation of $4,090,000 and cost of $3,833,223. 
2/ Excludes non-Federal sponsors funds $1,913,000 and cost of $1,685,758; includes PED Work Allowance of $647,000 and cost 
of $647,000. 
3/ Excludes non-Federal funds and costs; includes PED appropriation of $750,000 and costs of $739,000. 
4/ Excludes non-Federal funds $376,000 and cost of $367,712; includes PED appropriation $1,600,000 and cost of $1,600,000. 
5/ Includes PED Work Allowance of $9,650,000 and cost of $9,648,146. Excludes non-Federal Work Allowance of $6,191,000 
and cost of $4,299,586. 
6/ Excludes non-Federal funds and costs. Excludes PED appropriation and cost due to portions of the project reclassified 
to "Deferred" and Ainactive" categories. 
7/ Excludes non-Federal funds and costs; includes PED appropriation $3,825,000 and cost of $3,825,000 
8/ Excludes non-Federal funds and costs; includes PED appropriation $25,643,000 and costs of $25,643,000. 
9/ Excludes non-Federal funds and costs; includes PED appropriation $225,000 and costs of $224,756. 
10/ Excludes non-Federal funds and costs; includes PED appropriation $180,000 and costs of $78,176. 
11/ Excludes non-Federal funds and costs; includes PED appropriation of S 7,174,000 and costs of $7,174,000 
33-16 
See 
Section 
In Text FY 00 
Total Cost 
30 Sep 00 
2,086,850 
2,085,276 
-- 
-

LOS ANGELES, CA, DISTRICT 
TABLE 33-B AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Sep 3,1954 
CHANNEL ISLANDS HARBOR, CA 
Harbor for light-draft vessels and shore protection works. 
LOS ANGELES AND LONG BEACH HARBORS, CA 
June 3, 1988 A breakwater 8,500 feet long, east of Point Fermin. 
June 25,1896 Extend said breakwater to shore, making a total length of 1 1,152 
feet from Point Fermin. 
July 25, 1912 Dredge Los Angeles outer harbor west of entrance channel. 
Aug. 8, 1917 For silt-diversion works. 
Sep. 22, 1922 Triangular area approach to Los Angeles inner harbor entrance 
channel. 
Mar 3, 1925 Dredge Los Angeles Harbor main channel and entrance 35 feet deep 
and 1,000 feet wide; dredge inner harbor turning basin 35 feet deep; 
and reclamation of Reservation Point. 
July 3, 1930 A detached breakwater 12,500 feet long in prolongation of existing 
breakwater (authorized by act of 1896). 
Widen fairway on east side of entrance to Los Angeles inner harbor; 
dredge a channel 35 feet deep and 400 feet wide in Cerritos channel 
from U.S. station 406 to Long Beach turning basin; entrance 
channel to Long Beach Harbor 35 feet deep and 500 feet wide; and 
maintenance of the Long Beach breakwater south of outer end pier 
A. This act provides that in no case shall dredging be done within 
50 feet of established pierhead lines of existing piers and wharves. 
Dredge 1,000-bfoot wide entrance channel to Los Angeles outer 
Aug 30, 1935 harbor to 40-foot depth and a turning basin 3,500 feet long and 
1,500 feet wide to same depth; and enlarge entrance to inner harbor 
by dredging to 35-fobot depth a triangular area at its junction with 
turning basin. 
Dredge to a depth of 40 feet area A and B adjacent to 40-foot-depth 
Oct 17, 1940 entrance channel; construct and maintain a rubble mound 
breakwater of composite type 21,000 feet long in eastward 
therefrom to Belmont pier; maintenance dredging of A and B, and 
at mouth of Los Angeles River diversion channel; all subject to 
such modifications as in discretion of the Chief of Engineers may be 
advisable to meet requirements of the Navy. 
H-.Doc.362,83d Cong., 2d sess. 
S. Doc. 18, 55th Cong., Ist sess. 
H.Doc. 969, 60th Cong., Ist 
sess. 
Rivers and Harbors Committee 
Doc.8, 62d Cong., 2d sess. 
Rivers and Harbors Committee 
Doc.9, 64th Cong.,2d sess. 
H.Doc. 1013, 661th Cong.,3d 
sess. 
H. Doc.349, 68th Cong., Ist 
sess. 
Rivers and Harbors Committee 
Doc.33, 71st Cong., 2d sess. 
S.Doc. 130, 71st Con.,2d sess. 
S.Committee print, 74th Cong., 
Ist sess. 
l1.Doc.843, 76th Cong., 3d sess 
33-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 33-B AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Sep 3, 1954 Dredge to a depth of 35 feet in West Basin as a modification of 
existing project. This act provides that the Secretary of the Army is 
authorized to reimburse local interests for work they have done upon 
this project prior to July 1, 1953, at actual cost to local interests so far 
as same shall be approved by Chief of Engineers and found to have 
been done in accordance with the project hereby adopted and that 
such reimbursement shall be subject to appropriations applicable 
thereto or funds available therefore and shall not take precedence over 
other pending projects of higher priority for harbor improvements; 
and that such payments shall not exceed $500,000. 
July 14, 1960 Dredge to a depth of 35 feet in West Basin as a modification of 
existing project. 
Oct 22, 1976 Dredge Los Angeles Harbor entrance channel 45 feet deep, 1,000 feet 
wide, and about 5,500 feelton g; Los Angeles channel 45 feet deep, 
750 feet wide, and about 12,500 feet long; inner harbor turning basin 
45 f'et deep, 1,350 feet wide, and about 1,650 feet long; East Basin 
channel 45 feet deep, 400 feet wide, and about 6,000 feet long; West 
Basin 45 feet deep, friom 350 to 1,350 feet wide, and about 3,800 feet 
long; and East Basin 45 feet deep, from 400 to 950 feet wide, and 
about 2,000 feet long. This act provides that no dredging shall be 
done within 125 feet of established pier head lines, wharves, or other 
structures. 
Oct 17, 1986 Deepen the entry channel to the Los Angeles Harbor and Long Beach 
Harbor to 70 feet and 76 feet respectively, including the creation of 
800 acres of land from the project. 
Nov 17, 1988 If non-Federal interest carry out any work associated with such 
project which is later recommended by the Chief of Engineers and 
approved by the Secretary, the Secretary may credit such non-Federal 
interest an amount equal to the Federal share of the cost of such work, 
without interest. 
Nov 28, 1990 Section 4(d) of WRDA 1988 (102 Stat. 4015) is amended by inserting 
after "approved by the Secretary" in the first sentence the following: 
"or which is carried out after approval of the final report by the 
Secretary and which is determined by the Secretary to be compatible 
with the project". 
Sep 25, 1996 The sewer outfall relocated by the Port of Los Angeles at a cost of 
approximately $12,000,000 shalble considered tob e a relocation. 
The cost of such relocation shalble credited as a payment provided by 
the non-Federal interest. 
IH.D oc. 161, 83d Cong., Ist 
Sess 
HI.Doc.401,86th Cong., 2d sess. 
H.Doc.401,86th Cong., 2d sess. 
WRDA 86, Sec 201. 
WRDA 88, Sec 4 
WRDA 90, Sec 102 
WRDA 96 Sec 307 
33-18

LOS ANGELES, CA, DISTRICT 
TABLE 33-B AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
MARINA DEL REY, LOS ANGELES COUNTY, CA 
Sep 3, 1954 Harbor for light-draft vessels. 
Sep 28, 1994 Determine advisable modifications in interest of navigation, hurricane 
and storm damage reduction, environmental restoration and disposal of' 
contaminated sediments from the entrance channel at Marina Del Rey 
Harbor 
MORRO BAY HARBOR, CA 
Mar 2, 1945 Adoption and improvement of existing entrance channel to bay, a 
breakwater extending south by west from Morro Rock, and bay channels 
and basins at locations and of dimensions substantially as shown on the 
Navy Department map on file in the Office of the Chief of Engineers. 
May 22, 1991 
NEWPORT BAY HARBOR (& REVIEW), CA 
Maintenance and improvement of main and inner channels. 
Initiate feasibility phase studies re-environmental preservation benefits 
associated with modification of existing Federal project to extend 
channels into the Upper Newport Bay. 
OCEANSIDE HARBOR, CA 
Maintenance of general navigation teatures of Del Mar Boat Basin and 
Oct 27, 1965 of Oceanside Harbor. 
Navigation and storm damage reduction, repair, operate, and maintain 
Oct 27, 1990 the extension of south jetty. 
OCEANSIDE HARBOR SAND BY-PASS SYSTEM, CA 
Maintenance of general navigation features of Del Mar boat Basin and of 
May 22, 1991 Oceanside Harbor. 
PORT HUIENEME, CA 
Adoption and maintenance of existing harbor for deep-draft vessels; 
Aug 13, 1968 dredged central basin to 35 feet deep, and extend southern-most interior 
channel. 
PORT OF LONG BEACH, CA 
Navigation project. 
Sep 25, 1996 The project for navigation, Port of Long Beach (Deepening), CA; Report 
of the chief of Engineers, dated July 26, 1996, at a total cost of 
$37,288,000 with an estimated Federal cost of $14,318,000 and an 
estimated non-Federal cost of $22,970,000. 
H.Doc.389, 83d Cong., 2d 
sess. 
Sec 216, Flood Control 
Act of 1970, supp. by 
House Resolution Sep. 
28, 1994. 
11.Doc.283, 77th Cong., 
Ist sess. 
Doc.PL99-662 (WRDA 
1986, Sec841). R&H 
Acts 1937 & 1945 
S. Doc. 138 78th Cong. 
WRDA 1986, Sec. 841 
(PL-9962) 
H.Doc.76, 89th Cong., Ist 
sess. 
PL 101-640 (WRDA 
1990) WRDA 1992. PL 
102-580 
EWDA Act 1992 
H.Doc.362, 90th Cong., 
2d sess. 
WRDA 1996, Sec 101(d) 
4. 
33-19 
3. 
7. 
8. 
9.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 33-B AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
REDONDO BEACH HARBOR (KING HARBOR), CA 
Maintain harbor dredging and breakwaters. 
Construct and maintain breakwater to height of 22 feet. 
SAN DIEGO HARBOR, CA 
Diversion dike. 
R&H Act 1950 (H.Doc 303 81st 
Cong.) PL99-662 (WRDA 86, 
Sec 809), Amended in WRDA 
1988. 
Authorized by Chief of 
Engineers. 
Annual Report. 1873; p.1-142 
Jetty on Zuniga Shoal. H.Ex.Doc.177, 50th Cong., 1st 
sess. (Annual Report, 1888; 
p.21 14). 
Oct 17, 1986 
Oct 1988 
Mar 3, 1875 
Sep 19, 1890 
Jun 25, 1910 
Mar 4, 1913 
Jul 27, 1916 
Aug 8, 1917 
Aug 8, 1917 
Sep 22, 1922 
Mar 3, 1925 
Jul 3, 1930 
Aug 30, 1935 
Aug 26, 1937 
Oct 17, 1940 
Mar 2, 1945 
Aug 13, 1968 
H.Doc.961, 60th Cong., Ist 
session. 
H.Doc. 1309, 62d Cong., 3d 
sess. 
H.Doc.648, 64th Cong., Ist 
sess. 
Rivers and Harbors Committee 
Doc.8, 64th Cong., 2d sess. 
H.Doc. 1i 40, 65th Cong., Is t 
Sess. 
l .Doc. 1000, 66th Cong., 3d 
sess. 
River and Harbors Committee 
Doc.2, 68th Cong., Ist sess. 
S.Doc.81, 71st Cong., 
2d sess. 
IH.Doc.223, 73d Cong., 2d sess 
Rivers and Harbors Committee 
Doc.89, 74th Cong., 2d sess. 
H.Doc.844, 76th Cong., 3d sess. 
H.Doc.390, 77th Cong., 1st 
sess. 
H.Doc.365, 90th Cong., 2d sess. 
1 
33-20 
10. 
II. 
Mar 21, 1950 
Dredge channel through outer bar 30 feet deep and 600 feet wide, 
and a channel through middle ground to 30 feet deep. 
Dredge channel through outer bar 570 feet wide and 35 feet deep, 
and a channel through middle ground 32 feet deep. 
Widen approach (area B) to San Diego municipal pier by 
dredging area C (north of area B). 
Dredging area A (south of area B). 
Dredge 35-foot channel through middle ground. 
Dredging areas D and E. 
Widen approach (area C) to San Diego municipal pier I by 
dredging an portion of area F (north of area C). 
Deepen to 40 feet channel through outer bar; along south and 
north banks, main channel; dredge turning basin, widen area H, 
and dredge a channel to National City and Chula Vista. 
Widea bay channel to 2,200 feet with depth of 35 feet from the 
vicinity of Whalers Bight in lower bay to Naval Air Station 
opposite turning basin. 
Dredging areas Q.Q-1, M, N, and 0. 
Dredge a seaplane basin (area S.) of about 3,000 acres, 10 feet 
deep, and fill an area of about 110 acres adjacent to southern end 
of basin. 
Dredge triangular approaches to 26-and 35-foot anchorages, area 
M. 
Deepen and extend existing navigation channels, delete 
uncompleted parts, and extend maintenance.

LOS ANGELES, CA, DISTRICT 
TABLE 33-B AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
SAN DIEGO RIVER AND MISSION BAY, CA 
Modification of existing flood control project lor San Diego 
River, CA, to include a multiple-purpose project for flood control 
on San Diego River and small-boat navigation on Mission Bay. 
SANTA BARBARA HARBOR, CA 
Maintenance dredging present depths into harbor formed by 
breakwater constructed by local interests. 
Permits maintenance by means of a fixed sand-intercepting plant 
to be provided and operated by and at expense of local interests. 
United States to contribute to operating expense an amount not to 
exceed $30,000 annually, whenever funds are allotted therefore; 
funds thus contributed to be reduced by actual cost of harbor 
maintenance if and when intercepting plant has been installed. 
Project for navigation; report of the Chief of Engineers, dated 
April 26, 1994 
Modification of existing project. 
Dredging and maintenance by United States. 
Complete plans and specifications. 
SANTA MONICA BREAKWATER, CA 
Ilurricane and storm damage reduction act. 
The project bfohr urTicane and storm damage reduction, Santa 
Monica Breakwater, Santa Monica, CA; Report of the chief of 
Engineers, dated June 7, 1996, at a total cost of $6,440,000, with 
an estimated Federal cost of $4,220,000 and an estimated non- 
Federal cost of $2,220,000. 
SURFSIDE, SUNSET & NEWPORT BEACH, CA 
Beach erosion. 
Protective measures that comprise a protective and feeder beach 
at Surfside, and on offshore breakwater at Newport Beach to 
provide and impounding area from which sand would be dredged 
and returned periodically to the feeder beach, all substantially in 
accordance with the plan of the DE. 
VENTURA HARBOR (VENTURA MARINA), CA 
Adoption and maintenance of existing general navigation features 
of harbor, excluding interior basins; construction of an offshore 
breakwater; dredging a sand trap in lieu of breakwater; repairing 
existing north and middle jetties; and construction of recreational 
fishing facilities on jetty crests. 
The Harbor commonly known as Ventura Marina, located in 
Ventura County, CA, and adopted and authorized by section 101 
of Public Law 90-483, shall hereafter be known and designated as 
"Ventura Harbor". 
H.Doc.760, 79th Cong., 2d sess. 
I 
S.Committee Print, 73d Cong., 
2d sess. 
H. Doc.348, 77th Cong., Ist 
sess. 
Il Doc.518, 87th Cong., 2d sess. 
None. 
Sec 101, H Doc 1160, Water 
Resources Project 
Authorization. 
WRDA 1996, Sec 101(d)7. 
Sec 101 of R&H Act 1992. 
H.Doc.356, 90th Cong., 2d sess. 
Public Law 100-676. 
33-21 
12. 
Jul 24, 1946 
13. 
Aug 30, 1935 
Mar 2, 1945 
Oct 23, 1962 
Dec 31, 1970 
Sep 25, 1996 
Sep 25, 1996 
14. 
15. 
Oct 23, 1962 
16. 
Aug 13, 1968 
Nov 17, 1988

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 33-B AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
17. 
18. 
H.Doc.625, 78th Cong., 2d sess. 
WRDA 1996 Sec 301. 
WRDA 1990, Sec 101(3a) 
modified WRDA 1986. 
PL 102-377 Energy & 
Water Appropriation Act, 1993. 
Sec 205, 1948 Flood 
Control Act (I). 
None 
None 
H. Doc. 838, 76th Cong., 3d 
Sess. 
Dec 22, 1944 
Jan 3, 1996 
Sep 25, 1990 
Oct 2, 1992 
Feb 24, 1948 
Jun 22, 1936 
May 15, 1992 
Jun 28, 1936 
33-22 
ALAMO LAKE, BILL WILLIAMS RIVER, AZ 
Multiple-purpose dam and reservoir. 
CLIFTON, AZ 
Reauthorized the flood control project at a total cost of 
$21,100,000. 
Flood control. 
HANSEN DAM, CA 
Develop water conservation on existing spreading grounds. 
LAKE ELSINORE, CA 
Flood Control in downtown area as well as around perimeter of 
lake. 
LOS ANGELES COUNTY DRAINAGE AREA, CA 
Reservoirs and flood channels for flood control and related 
purposes at an estimated construction cost not to exceed $70 
million. 
Added flood channels on Ballona Creek and tributaries to project. 
Provision of lands, easements, and rights-of-way and relocations 
by Federal Government instead of by local interests. (Resultant 
Additional cost to the United States, $12,541,000). 
Project extended to include additional flood 
control reservoirs, flood control channels, and debris basins for 
flood control and related purposes. Also authorized to be 
appropriated $25 million for further accomplishment of plan. 
Authorized to be appropriated an additional $25 million bor 
prosecution of comprehensive plan approved in Flood Control Act 
of Aug. 18, 1941. 
Authorized to be appropriated an additional $25 million for 
further prosecution of comprehensive plan. 
Rio Hondo channel improvement, Whittier Narrows Reservoir to 
Los Angeles River (in lieu of enlarging channel and bridges on 
San Gabriel River Downstream from reservoir). Also authorized 
to be appropriated an additional $40 million for further 
prosecution of comprehensive plan. 
Authorized to be appropriated an additional $12,500,000 for 
further prosecution of comprehensive plan. 
Authorized to be appropriated an additional $44 million for 
further prosecution of comprehensive plan. 
Authorized to be appropriated an additional $32 million for 
further prosecution of comprehensive plan. 
Authorized to be appropriated an additional $3,700,000 
For further prosecution of comprehensive plan. 
19. 
20. 
21. 
None 
None 
None 
None 
None 
None 
None 
None 
Aug 18, 1937 
Dec 22, 1944 
Jul 24, 1946 
May 17, 1950 
Sep 3, 1954 
Jul3 ,1 958 
Jul 14, 1960 
Oct 23, 1962

LOS ANGELES, CA, DISTRICT 
TABLE 33-B AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Dec 30, 1963 
Nov 17, 1986 
Nov 17, 1988 
None 
None 
None 
Authorized to be appropriated an additional $30 million for 
further prosecution of comprehensive plan. 
Authorized modifications of Hansen Dam by removing and 
selling dredged material to facilitate flood control, recreation, and 
water conservation. 
The Secretary may convey to the city of South El Monte, CA, 
approximately 7.778 acres of real property, together with 
improvements thereon, located within the Whittier Narrows Flood 
Control Basin. 
The project for flood control, Los Angeles County Drainage Area, 
Califobmia, at a total cost of $327,000,000, with an estimated first 
Federal cost of $163,500,000, with an estimated first Federal cost 
of $163,500,000, is authorized to be prosecuted by the Secretary 
in accordance with a final report of the Chief of Engineers and 
with such modifications as are recommended by the Secretary. 
No construction on the project may be initiated until such a report 
of the Chief of Engineers is issued and approved by the Secretary. 
Authorized project for flood control. Authorized by Chief of 
Engineers Report. 
LOS ANGELES RIVER (SEPULVEDA DAM TO ARROYO 
SECO), CA 
Recreation development for bicycle/hiking trails along the upper 
Los Angeles River 
MOJAVE RIVER DAM, MOJAVE RIVER BASIN, CA 
Dam and reservoir, and an earthfill dike. 
Evaluate opportunities for water conservation, environmental 
restoration, and enhanced flood control, along the Mojave River 
and Tributaries downstream of the darn. 
NOGALES WASH, AZ 
Flood Control Protection and Flood Warning System. 
Flood warning gauges in Mexico 
Modifies Section 101(a)(4) of WRDA 1990 to direct the Secretary 
to permit the non-Federal contribution fbr the project to be 
determined in accordance with section 103 of WRDA 1986 and 
direct the Secretary to enter into negotiations with non-Federal 
interests pursuant to 103(1) of such Act concerning the timing of 
the initial payment of the non-Federal contributions. 
Conduct a study of the relationship of flooding in Nogales and 
floodlows emanating in Mexico. Transmit a report which 
includes a recommendation of the appropriate level of non- 
Federal participation in the authorized flood control project. 
NORCO BLUFFS, CA 
The project for bluff stabilization, Norco Blutffs, Riverside 
county, California, at a total cost of $8,600,000, with an estimated 
Federal cost of $6,450,000 and an estimated non-Federal cost of 
$2,150,000. 
PAINTED ROCK DAM (GILA RIVER), GILA RIVER 
BASIN, AZ 
33-23 
WRDA 1990, Sec Ol0(b)(PL 
101-640), Project Subject to 
Favorable Report of the chief of 
Engineers. 
P L 101-640, W R DA 1990 
Flood Control Act 1936, PL 
77387 1941, PL 103-126 
Ii.Doc.164, 86th Cong., Ist 
sess. 
HR 2479, Mar. 7, 1996 
Energy and Water Development 
Appropriation bill 1990, 
H .Doc2696, 10lst Cong, Ist 
session 
WRDA 1990, Sec 101 (a)(4) 
WRDA 1996, Sec 303, 
Public Law 104-303 
WRDA 1996, Sec 404; 
Public Law 104-303 
WRDA 96, Sec 101(b) 
Oct 30, 1990 
Nov 28, 1990 
22. 
Jul 14, 1960 
May 17, 1950 
23. 
24. 
Jun 20, 1989 
Oct 27, 1990 
Oct 12, 1996 
Sep 25, 1996 
25. 
26.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 33-B AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Oct 17, 1986 
Sep 26, 1997 
31. May 20, 1991 
Nov 28, 1990 
Dam and flood control basin. 
PHOENIX, AZ, AND VICINITY (INCLUDING NEW 
RIVER), GILA RIVER BASIN 
Detention basins, diversion channels, and channel improvements. 
Cover Arizona canal Diversion channel, east of Central Avenue 
of Phoenix, property line of Arizona Biltmore on Phoenix, and 
east of 32d Street to the Cudia City Wash spillway in Paradise 
Valley. 
PINE AND MATHEWS CANYONS DAMS, COLORADO 
RIVER BASIN, NV 
Dams and flood control basins. 
RIO SALADO (SALT RIVER), PHOENIX AND TEMPE, AZ 
Report of the Chief of Engineers dated Aug 20, 1998, at a total 
cost of $88,048,000 with an estimated Federal cost of 
$56,355,000 and estimated non-Federal cost of $31,693,000. 
RILLITO RIVER, AZ 
Flood damage protection. 
Bank erosions control and flood protection. 
Section 114 of Public Law 101-101, Energy and Water 
Development Appropriations Act, 1990, is amended by striking 
Atotal cost of'$ 19,000,000" and inserting in lieu thereof, Atotal 
cost of $40,000,000. 
SANTA ANA RIVER MAINSTEM, CA 
Flood control along 75 miles reach of Santa Ana River, recreation 
development, and mitigation and preservation. 
The project for flood control, Santa Ana Mainstem, including 
Santiago Creek, CA, is modified to authorize the Secretary to 
develop recreational trails and facilities on lands between Seven 
Oaks Dam and Prado Dam, including flood plain management 
areas. 
27. 
33-24 
July 6, 1949 
Oct 27, 1965 
H.Doc.331, 81st Cong., Ist sess 
I1.Doc.216, 89th Cong., Ist sess 
National Defense Authorization 
Act of Fiscal Year 1992 and 
1993. 
H.Doc.530, 81st Cong., 2d sess. 
WRDA 1999, PL106-53 Section 
101(a) (4) 
Energy and Water Development 
Appropriations Act 1990 
WRDA 1986, PL99-662, Sec 
601(a). 
Energy and Water Development 
Appropriations Act, 1988 
WRDA 1986, PL 99-662, 
Energy and Water 
Development Appropriations 
Act 1988, and WRDA 1988. 
H.Doc 94-594,94th Cong., 2d 
sess. 
28. 
29. 
May 17, 1950 
Aug 17, 1999 
30. 
June 20, 1989

LOS ANGELES, CA, DISTRICT 
TABLE 33-B AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
32. 
Jun 22, 1936 
Jun 28, 1938 
Aug 18, 1941 
Dec 22, 1944 
Jul 3, 1958 
33. 
34. 
Oct 22, 1976 
Dec 17, 1970 
Sep 25, 1996 
35. Oct 22, 1976 
36. 
Jun 11, 1964 
SANTA ANA RIVER BASIN (AND ORANGE 
COUNTY), CA 
Reservoirs and flood channels for flood 
control and related pulposes for protection 
of metropolitan area of Orange County, at 
an estimated construction cost not to exceed 
$13 million. 
San Antonio and Chino Creeks channel portion of improvement. 
Authorized to be appropriated $6,500,000 for initiation and partial 
accomplishment of plans for those creeks. 1936, providing that 
local interests pay for relocations, lands, easements, and rights-ofway. 
(Estimated resultant additional cost to United States. 
$3,500,000). 
Authorized to be appropriated an additional $2,500,000 for 
prosecution of projects approved in above flood control acts. 
Authorized to be appropriated an additional $10 million for 
prosecution of projects adopted in above-mentioned flood control 
acts, including projects on Lytle and Cajon Creeks for local flood 
protection at San Bemardino and Colton, CA. 
Authorized to be appropriated an additional $8 million fbr 
prosecution of projects approved in abovementioned flood control 
acts. 
SANTA PAULA CREEK, CA 
Flood control improvements and prevention. 
Authorize for flood control. 
SAN LUIS REY RIVER, SAN LUIS REY RIVER BASIN, CA 
Channel and levee, and beautification features. 
The project for flood control of the San Luis Rey river, CA, 
authorized pursuant to section 201 of Flood Control Act of 1965 
(42 U.S.C. 1962d-5; 79 stat 1073-1074) is modified to authorize 
the secretary to construct the project substantially in accordance 
with the report of the corps of Engineers dated may 23, 1996 at a 
total cost of $81,600,000 (Fed $61,100,000, non-Fed $20,500,000) 
SEPULVEDA DAM, CA RECREATION FACILITIES 
SWEETWATER RIVER BASIN, CA 
Channel improvement, as part of a combined flood control and 
highway project. 
H. Doc. 688, 75th cong., 
3d sess. 
I1.Doc.688, 75th Cong., 3d sess 
None. 
H. Doc. 534, 78th Cong., 
2d sess. I 
None. 
1948 Flood Control Act, 
H.Doc.443,80th Cong., Ist sess 
S.Doc.91-106, 91st Cong., 2d 
sess 
Title III Project Related 
Provisions Sec 301 Project 
Modifications 
FC Act 1936, (Amended 1937, 
1941, 1950) and Fed Water 
Project Recreation Act of 1965 
IC Act 1965,H.Doc. 240 and 
309, 88th Cong., 2d sess 
33-25

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 33-B AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
37. TROPICANA AND FLAMINGO WASHES, NV 
Flood reduction, erosion control, and wildlife enhancement. 
Authorizes project to demonstrate the potential advantages and 
effectiveness of non-Federal implementation of flood control 
projects, and provides that the Secretary shall enter into an 
agreement, pursuant to Section 211 of WRDA 96, with the non- 
Federal interests for development of that project. Proposed 
agreement would allow the non-Federal sponsor to construct any 
discrete segment of the authorized project as approved by the 
Army corps of Engineers. 
An Federal costs associated with the project, incurred by the non- 
Federal interest to accelerate for modify construction of the 
project, in cooperation with the Corps of Engineers, shall be 
eligible to reimbursement by the Secretary. 
TUCSON DIVERSION CHANNEL (RECREATIONAL 
DEVELOPMENT), AZ 
The project for recreational development along the Tucson 
Diversion channel. 
TUCSON DRAINAGE AREA, AZ 
Report of the Chief of Engineers Report dated May 20, 1998, at a 
total cost of $29,900,000, with an estimated Federal cost of 
$16,768,000 and an estimated non-Federal cost of $13,132,000. 
WHITLOW RANCH DAM, QUEEN CREEK, GILA RIVER 
BASIN, AZ 
Dam and flood control basins. 
I. Contains latest published map. 
2. Date approved by Chief of Engineers under provisions of section 205. Public Law 80-858, as amended. 
3. Final date of approval by House of Senate Public Works Committees resolution under provisions of Section 201, Public Law 89-298. 
33-26 
WRDA 1992, Sec 101 (13) 
WRDA 1996, Sec 211 (f)(5), 
Public Law 104-303 
WRDA 1999, Sec 370; 
Public Law 106-53 
FC Act 1936 (Amended 1937) 
1941, 1950 and Fed Water 
Project Recreation Act of 1965. 
WRDA 1999, PL l06-53 Sec 
101(a) (5) 
H.Doc.220, 80th Cong., Ist 
sess. 
Oct 31, 1992 
Sep 25, 1996 
Aug 17, 1999 
38. 
Oct 22, 1976 
39 
Aug 17, 1999 
40. 
Jul 24, 1946

LOS ANGELES, CA, DISTRICT 
TABLE 33-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to 30 Sep 2000 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Dana Point, Harbor, CA Completed 1984 $ 4,737,550' 555,147' 
Harbor office at Monro Bay, CA3 
Los Angeles and Long Beach Active 53,627,729 13,147,957 
HIarbors, San Pedro Bay, CA3 
Newport Bay Harbor, CA3 Inactive and 1982 796,897 2,696,245' 
Active (mod) 
Port San Luis, CA Completed and 1984 1,426,0506 1,042,352' 
Active (mod) 
Redondo Beach -larbor Completed and 1984 4,766,898' 5,237,313'0 
(King Harbor), CA' Active (mod) 
Sunset Harbor (Bolsa Chica Bay), CA' 
1. 
2. 
3. 
4. 
5. 
6. 
7. 
8. 
9. 
10. 
Excludes $4,777,000 required contributed funds and Coast Guard costs. 
Includes $45,147 for reconnaissance and condition surveys. 
Authorized by Water Resources Development Act of 1986, Public Law 99-662, November 17, 1986, subject to favorable report. 
Public Works Administration funds. Excludes $796,897 required contributed funds and $1,100 preauthorization costs. 
Includes $137,622 for reconnaissance and condition survey costs since Fiscal Year 1958. Excludes $7,000 other contributed iunds. 
Includes $568,417 tfor new work prior to modification by 1965 River and Harbor Act. Excludes Coast Guard costs. Includes $104,031 expended 
in Fiscal Year 1987. 
Includes $54,715 for maintenance for project prior to modification by 1965, River and Harbor Act, and $18,958 for reconnaissance and 
condition surveys. Includes $90,130 expended in Fiscal Year 1987. 
Authorized by Water Resources Development Act of 1986, Public Law 99-662, November 17, 1986. 
Excludes Coast Guard costs. 
Includes $20,517 for reconnaissance and condition survey costs since Fiscal Year 1958. Includes $293,167 expended in Fiscal Year 1987. 
33-27

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 33-D OTHER AUTHORIZED SHORE PROTECTION PROJECTS 
For Last Cost to 30 Sep 2000 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Anaheim Bay Harbor Orange Completed 1967 $ 89,119 
County, CA' 
Bird Rock Area, La Jolla Completed 1967 25,881l 
San Diego County, CA2 
Coast of California, Point Mugu, Completed 1972 1,253,5944 
to San Pedro Breakwater, CA 
Doheny Beach State Park (Doheny Completed 1968 578,717' 
State Beach), CA 
Imperial Beach, CA Active 1986 2,875,4726 
Las Tunas Beach, San Diego County, CA Active 1976 107,484 
Ocean Beach, San Diego County, CA7 Completed 1960 7,912 
Oceanside, San Diego County, CA Completed 1982 4,367,442' 
San Diego (Sunset Cliffs), CA Active 1979 365,000' 
San Gabriel River to Newport Bay Active 1985 9,722,100'0 
(Surfside-Sunset and Newport Beach), 
Orange County, CA 
Surfside-Sunset-Newport, CA (Stage I ) Active 1997 292,000 
Ventura-Pierpont area, CA Completed (part) 1969 71 5,819" 
and Deferred (part) 
1I The project authorized by the Act of Congress of October 23, 1962, IH.Doc.602, 87th Cong., 2d sess., in lieu of part of the original Anaheim Bay Harbor 
project is covered under San Gabriel River to Newport Bay (Surfside-Sunset and Newport Beach), Orange County, CA 
2. Authorized by Chief of Engineers under authority of Section 103, Public Law 87-874. 
3. Excludes 475,614 required contributed funds. 
4. Excludes $1,238,418 required contributed funds. 
5. Excludes $431,260 required contributed funds. 
6. Excludes $919,437 required contributed funds; $66,124 other contributed funds; and Coast Guard costs. 
7. Plant in service. 
8. Excludes $604,817 other contributed funds. 
9. Excludes $180,438 required contributed funds. 
10. Excludes $4,626,638 for required contributed funds. Includes $10,772 expended in Fiscal Year 1987. 
I1. Excludes $1117,406 other contributed funds for beach-nourishment betterments and $618,949 required contributed funds. 
33-28

LOS ANGELES, CA, DISTRICT 
TABLE 33-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to 30 Sep 2000 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Allenville, AZ' 
City Creek levee, San 
Bernardino County, CA' 
Clifton, San Francisco River, AZ 
Coyote and Berryessa Creeks CA 
Gila River Basin, AZ: 
Camelsback Dam (Gila River) 
Gila and Salt Rivers levee 
and channel improvements 
Indian Bend Wash 
Lower Gila River levee and 
channel improvements (Gila 
River and tributaries downstream 
from Painted Rock Dam) 
Middle Gila River channel 
improvements, upper end of Safford 
Valley to Buttes dam site (Camelsback 
damsite to Salt River) 
Pinal Creek channel improvements 
(Globe) 
Santa Rosa Wash (Tat Momolikot 
Dam and Lake St. Clair) 
Tucson Diversion Channel 
Goleta, CA, and Vicinity 
Hansen Dam, Los Angeles County 7 
Drainage Area, CA (mod) 
Holbrook levee Little Colorado 
River, Colorado River Basin, AZ 
Little Colorado River at Holbrook 7 
Needles, San Bernardino Co. 
Nogales Wash and Tributaries, AZ 
Oceanside Harbor, CA 
Oro Grande Wash channel improvements, 
Mojave River Basin, CA' 
Phoenix, AZ and Vicinity 
(Gila River) 
Quail Wash levee, Joshua Tree, 
San Bernardino Co. CA 
Ridgecrest, Kern County, CA' 
Rose Creek channel improvements, 
San Diego, CA' 
San Diego River Basin, CA 
Santa Ana River Basin, CA: 
Devil, East Twin, and Warm 
Creeks channel improvements and 
Lytle Creek levee 
Mill Creek levees 
Riverside levees 
San Jacinto River levee and 
Bautista Creek channel 
Santa Clara River levee improvement, 
Santa Clara River Basin, CA 
Santa Maria Valley levees, Santa 
Maria River Basin, CA 
Santa Paula Creek channel and 
debris basins (including Mud 
Creek), Santa Clara River Basin, CA 
Completed 
Completed 
Active 
Active 
Deferred 
Active (part) and 
Deferred (part) 
Completed 
Inactive 
Active 
Deferred 
Completed 
Completed 
Active 
Completed 
Completed 
Completed 
Active 
Completed 
Completed 
Completed 
Completed 
Terminated 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Complcted 
Active 
33-29 
1984 
1988 
1989 
1963 
1966 
1985 
1975 
1970 
1968 
1982 
1986 
1982 
1950 
1996 
1973 
1989 
1989 
1970 
S 3,000,0002 
400,0002 
12,510,000 
56,300,000 
73,201 " 
31,809,294' 
2,413,051 
402,867 
121,5094 
10,218,900 
6,922,6336 
500,000 
335,000 
1,000,0001 
I 1,100,000 
5,100,000 
i,000,0009 
212,745 
1973 
1972 
1962 
1961 
1959 
1985 
1961 
1984 
1983 
195,194 
982,432"' 
7,753,937" 
617,89012 
2,104,478 
9,258,207' 3 
2, 126,672 
10,079,927' 4 
4,790,173"5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
Sespe Creek at Fillmore, Ventura Completed 
County, CA' 
South Fork of the Santa Clara Active 
River, Santa Clarita Valley, CA' 
Telegraph Canyon Creek, Chula Completed 
Vista, CA' 
Tijuana River Basin, CA Completed 
Ventura Harbor, CA Active 
Ventura River Basin, CA: 
Stewart Canyon debris basin and Completed 
channel 
Ventura River levee Completed 
Whitewater River, CA: 
Banning Levee-San Gorgonio Completed 
River, Riverside County' 
Chino Canyon improvements, Palm Completed 
Springs' 
Tahchevah Creek detention basin Completed 
and channel improvements 
Tahquitz Creek Inactive 
Winslow (tributaries of Little Completed 
Colorado River), Little Colorado and Deferre 
River Basin, AZ 
1. Authorized by Chief of Engineers under authority 
of Section 205, Public Law 80-858, as amended. 
2. Excludes $187,965 required contributed funds. 
3. Excludes $371,058 other contributed funds. 
4. Advance planning only. 
5. Excludes $304,720 required contributed funds and 
$3,130,762 other contributed tiunds. Includes $31,071 expanded 
6. Includes $1,158,006 Code 710 funds since Fiscal Year 1977. 
Excludes $749,058 required contributed funds and $394,364 funds. 
7. Authorized by Water Resources Development Act of 
1986, Public Law 99-662, November 17, 1986. 
8. Excludes $619,912 required contributed funds and 
$91,160 other contributed funds. I 
9. Excludes $514,806 required contributed funds and 
$176,295 other contributed funds. 
10. Excludes $251,000 required contributed funds and 
$154,733 other contributed funds. 
22. Excludes $74,718 required contributed funds. 
(part) 
ad (part) 
1984 
1985 
1985 
1979 
1990 
1964 
1950 
1966 
1973 
1967 
1974 
1973 
4,000,0001' 
632,158 
844,73217 
1,703,03118 
6,455,000 
939,908'9 
1,349,63820 
97,868 
819,87821 
1,420,55222 
1,063,600 
1,831,300 
11. Excludes $200,000 required contributed 
funds and $1,641,668 other contributed funds. 
12. Excludes $35,830 other contributed funds. 
13. Excludes $712,000 other contributed tiunds. 
14. Excludes $106,364 other contributed funds. 
Includes $74 expended in Fiscal Year 1987. 
15. Excludes non-Federal costs of $295,000 for 
local cooperation items for required and $49,458 
16. Excludes $559,525 required contributed other funds. 
17. Includes $3,846 expended in Fiscal Year 1987. Excludes 
$104,941 other contributed funds. 
18. International Boundary & Water Commission funds 
9. Excludes $179,148 other contributed funds. 
20. Includes $6,000 Code 710 funds since Fiscal Year 1977. 
Excludes $17,006 other contributed funds. 
21. Excludes $8,718 required contributed funds; 
$53,470 other contributed funds. 
33-30 
TABLE 33-E

LOS ANGELES, CA, DISTRICT 
TABLE 33-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Date Federal Contributed 
See Annual and Funds Funds 
Project Report For Authority Expended Expended 
Hodges Dam, San Dieguito 
River Basin, CA 
Las Vegas Wash Tributaries, 
Colorado River Basin, NV 
Santa Ana River Basin (and 
Orange County), CA: 
1958 
1964 
1978 
Sec. 12, Public 
Law 93-251 
1977 
Sec. 12, Public 
Law 93,251 
295,191 
Aliso Creek Dam, CA 
San Juan Dam, CA 
Trabuco Dam, CA 
Villa Park Dam, CA 
Sierra Madre Wash Channel 
Los Angeles County Drainage 
Area, CA 
Lower Mission Creek 
Santa Barbara, CA 
San Diego River Mission 
Valley, CA 
University Wash and Spring 
Brook, Riverside, CA 
1950 
1986 
Sec. 1002 Public 
Law 99-662 
1986 
Sec. 1002, Public 
Law 99-662 
1986 
Sec. 1002, Public 
Law 99-662 
1978 
Sec. 12, Public 
Law 93-251 
1986 
Sec. 1002, Public 
Law 99-662 
1986 
1988 
1978 
1975 
67,361 
1988 1,641,144 
Sec. 1001(A), Public 
Law 99-662 
1978 
Sec 1001 (B)(2), Public 
Law 99-662 1,708,437 
1986 
Sec. 1002, Public 
Law 99-662 
213,313 
33-31

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 33-H RECONNAISSANCE AND CONDITION SURVEYS 
Project Date 
Channel Islands Harbor Sep 2000 
Dana Point Harbor Aug 2000 
Los Angeles-Long Beach Harbors, CA (Port of Los Angeles) Apr 2000 
Port of Long Beach, CA Apr 2000 
Los Angeles River Estuary, CA Apr 2000 
Marina Del Rey, CA Mar 2000 
Morro Bay Harbor, CA Aug 2000 
Newport Bay Harbor, CA May 2000 
Oceanside Harbor, CA Feb 2000 
Port Hueneme, CA Jun 2000 
San Diego Harbor, CA Sep 2000 
San Diego River-Mission Bay, CA Mar 2000 
Santa Barbara Harbor, CA May 2000 
Ventura Harbor, CA Jan 2000 
33-32

LOS ANGELES, CA, DISTRICT 
TABLE 33-1 INSPECTION OF COMPLETED 
BEACH EROSION CONTROL PROJECTS/FLOOD CONTROL PROJECTS 
Project 
Rose Creek Channel Improvements, San Diego, CA 
San Diego River Channel and Levees, San Diego River Basin, CA 
33-33 
Date 
July 1987 
July 1987 
--

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 33-J FLOOD CONTROL WORK UNDER SPECIAL 
AUTHORIZATION FLOOD CONTROL ACTIVITIES 
PURSUANT TO SECTION 205, PUBLIC LAW 80-858, 
AS AMENDED (PREAUTHORIZATION) 
(See Section 40 of Text) 
Fiscal 
Year 
Study Stage Cost 
(Federal) 
Arizona State Flood Warning, AZ Construction $ 59,236 
Arroyo Grande Creek, AZ Feasibility 64,390 
Foxfield Corridor, Lancaster, CA Feasibility 39,211 
City of Laguna Beach, CA Feasibility 244,158 
Ephriam Canyon Wash, AZ Feasibility 34,005 
Lake Elsinore, Riverside County, CA Completed 1,935 
Little Tijuana River, San Diego County, CA Feasibility 30,371 
San Jose Creek Near Hollister, CA Feasibility 32,318 
Section 205 Coordination Account 
$518,307 
* No further Federal interest 
33-34
SAN FRANCISCO, CA, DISTRICT* 
This district comprises the Klamath River Basin in 
southern Oregon and portions of northern and western 
California consisting of drainage basins tributary to the 
Pacific Ocean from the Oregon-California State line on 
the north to Cape San Martin, CA, on the south except for 
basins tributary to the San Francisco Bay system which lie 
east of the Benecia-Martinez Bridge. 
IMPROVEMENTS 
Navigation Page 
1. Crescent City Harbor, CA ................................ 34-1 
2. Humboldt Harbor, CA...................................... 34-2 
3. Oakland Harbor, CA ........................................ 34-2 
4. Richmond Harbor (Deepening), CA .................... 34-4 
5. San Francisco Bay to Stockton, CA 
(John F. Baldwin and Stockton 
Ship Channels) ....................................... 34.4 
6. Sonoma Baylands Wetlands 
Demonstration Project, CA............................... 34-5 
7. San Francisco Bay and Delta Model, CA. .......... 34-5 
8. San Francisco Bay Long Term 
Management Strategy (LTMS), CA .................... 34-6 
9. Reconnaissance and Condition 
Surveys ............................... .... .............. 34-7 
10. Navigation Work under Special 
Authorization 34-7 
11. Beach Erosion Control Work under 
Special Authorization..................... ............. 34-7 
Flood Control 
12. Corte Madera Creek, CA.................................. 34-7 
13. Petaluma River, Petaluma, CA .......................... 34-8 
14. Russian River Basin, including Dry Creek 
(Warm Springs Lake) and Lake 
Mendocino (Coyote Valley Dam), CA .............. 34-9 
15. San Pedro Creek, Pacifica, CA......................... 34-10 
16. Inspection of Completed Flood 
Control Projects ........................... 34-10 
17. Flood Control Work under Special 
Authorization .................................................... 34-10 
Navigation 
1. CRESCENT CITY HARBOR, CA 
Location. The project is located in Crescent City, Del 
Norte County approximately 350 miles north of San 
Francisco and 17 miles south of the Oregon border. 
Existing project. There are two existing Federally 
maintained navigation channels at Crescent City Harbor. The 
Entrance Channel begins at the outer breakwater and is -20 
feet MLLW (Mean Lower Low Water), 2,600 feet long, and 
320 to 200 feet wide. The Entrance Channel connects to the 
Page 
18. Scheduling Flood Control 
Reservoir Operations ........................................ 34-11 
19. Miscellaneous Work under Special 
Authorization................. ......................... 34-11 
General Investigations 
20. Surveys ................................. 34-11 
21. Collection and Study of Basic Data .................... 34-11 
22. Preconstruction Engineering 
and Design 
Tables 
Table 34-A Cost and Financial 
Statement ..................................... 34-15 
Table 34-B Authorizing 
Legislation ................................... 34-21 
Table 34-C Other Authorized 
Navigation Projects....................... 34-25 
Table 34-D Not Applicable 
Table 34-E Not Applicable 
Table 34-F Not Applicable 
Table 34-G Deauthorized Projects ................... 34-25 
Table 34-H Inspection of Completed Flood 
Control Projects ............................ 34-26 
Table 34-1 Russian River Basin, CA: 
Estimated Cost for New Work ........ 34-27 
Table 34-J Russian River Basin, CA: 
Project Features and 
Estimated Costs ..... ........... 34-27 
Inner Harbor Basin, which is 1,500 feet long and extends 
from the Entrance Channel along the lee side of the inner 
breakwater. The Inner Harbor Basin is authorized to -20 feet 
MLLW, but since 1993 has been maintained at -15 feet 
MLLW due to economic justification. 
The proposed project would extend the 1965 authorized 
project approximately 350 feet from the Inner Harbor Basin 
to reach the entrance of the Small Boat Basin, which was 
constructed in 1974. The new access channel would vary in 
width from 140 feet to 210 feet, extend 1,200 feet in length 
with a channel depth of -14 feet MLLW plus one foot of 
advanced maintenance. An estimated 24,000 cubic yards of 
dredged material would be disposed at an upland site. 
34-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Project cost is $1,834,000 of which $1,446,000 is Federal 
cost and $388,000 is non-Federal cost. 
Local cooperation. The local sponsor is the Crescent 
City Harbor District. The Project Cooperation Agreement 
was signed in June 2000 and would satisfy the requirements 
of the Water Resources Development Act of 1986, as 
amended, PL 99-662. The agreement includes the following 
requirements: 1) provide lands, easements, rights-of-way, 
and dredged material disposal areas; 2) pay 10 percent of the 
costs of construction; and 3) pay an additional 10 percent 
plus interest of the project costs allocated to general 
navigation features within a period of 30 years following 
completion of construction. 
Terminal facilities. The Harbor contains acommercial 
small boat basin with 240 permanent berths and temporary 
moorings for approximately 20 vessels, a 250 slip 
recreational mooring facility, two fish processing plants with 
docks, a main dock, a marine repair facility, a U.S. Coast 
Guard dock, and other auxiliary commercial and recreational 
facilities. 
Operations during fiscal year. New Work: 
Construction commenced in August 2000 and was completed 
in November 2000. Maintenance: Operations and 
maintenance includes engineering and design for fall 
dredging on a 5 year dredging cycle. Approximately 12,000 
cubic yards in the Inner Harbor Basin were dredged 
concurrent with the Channel Improvement Project in FY 
2000. 
2. HUMBOLDT HARBOR, CA 
Location. The project is located in Humboldt Bay, 
about 280 miles north of San Francisco. 
Existing project. Adopted by Acts of March 3, 1881, 
July 5, 1884, August 5, 1886, July 3, 1892, March 3, 1889, 
June 25, 1910, July 3, 1930, August 30, 1935, August 26, 
1937, July 16, 1952, and August 1968. The project consists 
of: 1) a Bar and Entrance Channel -48 feet deep, taped from 
a width of 1,600 feet at seaward mile 0.9 to 500 feet at 
seaward mile 0.2 and then 500 feet wide to mile 0.8; 2) a 
North Bay Channel -38 feet deep and 400 feet wide between 
mile 0.75 and mile 4.29; 3) an Outer Eureka Channel 35 feet 
deep and 400 feet wide between mile 4.29 and mile 5.0; 4) 
an Inner Eureka Channel between mile 5.0 and mile 6.30 
which is 26 feet deep and 400 feet wide; 5) a Samoa Channel 
-38 feet deep and 400 feet wide between mile 4.29 and mile 
5.84; 6) a Turning Basin beyond mile 5.84 at the upper end 
of the Samoa Channel which is -38 feet deep and 1,000 feet 
wide by 1,000 feet long; 7) an Anchorage Area 35 feet and 
1,200 feet wide by 1,200 feet long in the North Bay between 
the Entrance Channel and Gunther Island (the anchorage area 
is not maintained); 8) a Fields Landing Channel 26 feet deep 
and 300 feet wide and a turning basin at mile 3.16 which is 
600 feet wide and 800 feet long; and 9) Arcata Channel 
located in the extreme North Bay (18 feet deep and 150 feet 
wide) is no longer used for commercial navigation and has 
not been maintained since 1931. 
The Water Resources Development Act of 1996 
authorized deepening the Bar and Entrance Channel to a 
depth of -48 MILLW; deepening the North Bay Channel, 
Samoa Channel, and Samoa Turning Basin to a depth of -38 
feet MLLW; widening the north side of the Entrance Channel 
an additional 200 to 275 feet; moving the southern edge of 
the Entrance Channel away from the South Jetty and to the 
north by 100 feet; and widening and realigning the entrance 
to the Samoa Turning Basin. Project cost is $16,689,000 of 
which $12,099,000 is Federal cost (includes $200,000 Coast 
Guard cost) and $4,590,000 is non-Federal cost (includes 
$1,680,000 non-Federal reimbursements). 
Local cooperation. The local sponsor is the Humboldt 
Bay Harbor, Recreation and Conservation District The 
Project Cooperation Agreement was signed in March 1999 
and satisfied the requirements of the Water Resources 
Development Act of 1986, as amended, PL 99-662. The 
agreement includes the following requirements: 1) provide 
lands, easements, rights-of-way, and dredged material 
disposal areas; 2) pay 25 percent of the costs of construction; 
and 3) pay an additional 10 percent plus interest of the 
project costs allocated to deep draft navigation within a 
period of 30 years following completion of construction. 
Terminal facilities. The harbor serves six deep water 
breakbulk terminals with storage space for 120,000,000 
FBM of logs/lumber and 100,000 MT of woodchips and 
warehouse space for 1,000,000 FBM of lumber and 51,000 
MT of woodpulp and particle board. 
Operations during fiscal year. New Work: 
Construction commenced in June 1999 and was completed in 
April 2000. Maintenance: Normal O&M dredging was 
performed with the Essayons and Yaquina. A combined 
total of 672,802 cubic yards were removed at a cost of 
$2,025,000 of which 648,329 cubic yards were from the Bar 
& Entrance Channel at a cost of $1,623,150; 23,505 cubic 
yards from the Eureka Channel at a cost of $337,950; and 
968 cubic yards from the Fields Landing Channel at a cost of 
$63,900. All dredged material was deposited in the 
permanently designated, Government-furnished, Humboldt 
Open Ocean Disposal Site (HOODS). 
3. OAKLAND HARBOR, CA 
Location. Oakland Harbor is located in the City of 
Oakland, California, on the eastern shore of central San 
34-2

SAN FRANCISCO, CA, DISTRICT 
Francisco Bay immediately south of San Francisco-Oakland 
Bay Bridge. 
Existing project. Adopted by Acts of June 23, 1874, 
June 25, 1910, September 22, 1922, January 21, 1927, April 
28, 1928, July 3, 1930, March 2, 1945 and October 23, 
1962. The project was completed February 1975, except for 
deepening the tidal canal to 35 feet from Fortman Basin to 
Park Street, and to 25 feet above Park Street which was 
deauthorized November 1977. Reconstruction of the 
Fruitvale Avenue Highway Bridge was completed in 
December 1973 and turned over to local interests for 
operation and maintenance. Project consists of entrance 
channel to Oakland Outer Harbor, -42 feet deep from deep 
water in San Francisco Bay and 800 feet wide across the 
shoal southeast of Yerba Buena Island, narrowing to 600 feet 
at Oakland Mole; thence, a channel and turning basin -42 feet 
deep and from 600 to 950 feet wide in outer harbor to the 
Army Base. Project also provides entrance channel to 
Oakland Inner Harbor, -42 feet deep and 600 feet wide to 
Howard Terminal and 35 feet deep to west end of 
Government Island, with additional widening to within 75 
feet of the pierhead line in front of Grove and Market Street 
(formerly municipal) piers and along the south side of the 
channel from Harrison Street eastward to harbor line point 
119 in Brooklyn Basin; a channel 35 feet deep and 500 feet 
wide through Brooklyn Basin; for a triangular area 35 feet 
deep about 2,700 feet long and maximum width of 300 feet 
at western end of Brooklyn Basin; a channel along north side 
of Brooklyn Basin which is 35 feet deep and 300 feet wide 
for 1,300 feet, thence 25 feet deep and 300 feet wide for 
3,700 feet to a turning basin at east end of Brooklyn Basin 
which is 35 feet deep, 500 feet wide, and 1,200 feet long; a 
channel in the tidal canal 35 feet deep and 275 feet wide 
from Brooklyn Basin to Park Street, thence 18 feet deep to 
San Leandro Bay; a total channel length of 8-1/2 miles from 
San Francisco Bay to San Leandro Bay. Project also 
includes parallel rubblemound jetties at entrance to inner 
harbor, north jetty 9,500 feet long and south jetty 12,000 feet 
long; three highway bridges across the tidal canal, two of 
which (at Park Street and High Street) have been replaced by 
local interests and the Fruitvale Avenue Bridge constructed 
by Federal Government has been transferred to Alameda 
County. The railroad bridge has been transferred to the 
County for operation and maintenance. The Federal 
Government will reimburse the County for the cost of 
operating and maintaining the railroad bridge. 
Oakland Harbor is the 2" largest port on the West 
Coast and the fifth largest container port in the nation. 
Traffic consists primarily of containers and containers ships. 
Ports around the world are increasing channel depths and 
expanding throughput capacity to compete for the next 
generation of deep-draft container ships. The Port is 
proposing to deepen the federal channels of the Oakland 
Harbor and Port-maintained berths to depths of 50' below 
MLLW. In constructing this project, the Port expects to 
dredge up to 12.9 million cubic yards of sediment, which 
will require reuse and disposal. If the Port does not get 
down to -50', shipping companies will bypass the Port of 
Oakland. This will hurt not just the Port of Oakland, but the 
overall Bay Area economy as well. The 
recommended/Locally Preferred Plan has a benefit-cost-ratio 
greater than 6.4 to 1. The estimated construction cost is 
$252.3 million, including $38 million of local service 
facilities (LSF) (berth rehabilitation & deepening). Disposal 
options for dredged material include the San Francisco Deep 
Ocean Disposal Site (SF-DODS), Middle Harbor or the Fleet 
and Industrial Supply, Oakland (FISCO), Hamilton Airfield, 
Montezuma wetland restoration project, together with upland 
disposal/reuse at Mare Island and Alameda Point. Water 
Resources Development Act (WRDA) of 1999 authorized 
this project for $252.3 million. 
Local cooperation. A draft Project Cooperation 
Agreement satisfying the requirements of the Water 
Resources Development Act of 1986, PL 99-662 was sent to 
Corps Headquarters for review and approval in early Feb 
2001. The agreement includes the following requirements: 
(1) provide lands, easements, rights-of-way, and dredged 
material disposal areas; (2) pay 25 percent of the costs 
allocated to deep draft navigation during construction to a 
depth in excess of 20 feet but not in excess of 45'; (3) pay 
50% of the costs allocated to deep draft navigation during 
construction in excess of 45';and (4) pay additional 10 
percent plus interests of the costs allocated to deep draft 
navigation within a period of 30 years following completion 
of construction. Deepening to 42' MLLW was completed in 
July 1998. The Port of Oakland completed a feasibility 
study to deepen Oakland Harbor to -50' MLLW at 100% 
Port cost under the authority of Section 203 of WRDA 86. 
The estimated project cost is $254 million with an average 
annual navigation benefit of $178 million. Project was 
authorized in WRDA 99. Construction is scheduled to begin 
in spring of 2001. 
Terminal facilities. The port occupies 19 miles on the 
mainland shore of San Francisco Bay. There are 550 acres of 
marine terminal facilities, 28 deepwater berths and 25 
container cranes, including 5 of the post Panamax type. 
On-dock covered storage space exceeds 600,000 square feet 
Three major railroads, Santa Fe, Southern Pacific and Union 
Pacific serve the port. 
Operations during fiscal year. New Work: 
Construction to a depth in excess of 20 feet but not in excess 
of 45'. Maintenance: Operations and maintenance of 
Fruitvale Avenue R.R. Bridge including engineering and 
design by hired labor, cost $289,600; operations and 
maintenance of Miller-Sweeney Highway Bridge, cost 
$180,900; and operations and maintenance of Oakland 
Harbor 517,153 cubic yards removed at a cost of 
34-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
$10,388,484. San Francisco Deep Ocean Disposal Site (SFDODS) 
was utilized for material disposal. 
4. RICHMOND HARBOR, CA 
Location. Richmond Harbor is located in central San 
Francisco Bay, in Contra Costa County in the City of 
Richmond. 
Existing project. The existing navigation channel 
extends from deep water in San Francisco Bay into the Port 
of Richmond. The Southampton Shoal Channel and Long 
Wharf Maneuvering Area, at the entrance to the harbor 
channels are maintained to -45 feet MLLW. The Entrance 
Channel, Potrero Reach Channel, Potrero Sharp Turn, Inner 
Harbor and about half of the Santa Fe Channel, to -38 feet 
and the remainder of the Santa Fe Channel from the 
Lauritzen Channel confluence to -30 feet. The width of the 
navigation channel is 600 feet for most of its length to Point 
Richmond with one maneuvering area: in front of the Long 
Wharf. At Potrero Reach, the 500 foot width flares to about 
600 feet at Point Potrero with a turn at the point, 1,200 feet 
wide and 38 feet deep. Thence, the channel continues into 
the Inner Harbor at a width of 850 feet in a northerly 
direction to the entrance of the Santa Fe Channel. The Santa 
Fe Channel extends northwesterly at a width of 200 feet into 
the upper basin terminus. A turning basin is provided at 
Point Richmond, and a rubble-mound training wall extending 
10,000 feet westerly from Brooks Island is also provided in 
the Potrero Reach. For details, see page 1977 of Annual 
Report for 1915 and page 1646 of Annual Report for 1938. 
Improvements consisted of a construction plan 
involving four and one-half miles of channel between 
Richmond Long Wharf and the Santa Fe Channel. The 
project deepened the existing 35-foot channels to 38 feet, and 
provided a turning basin of 1,200 feet near Point Potrero. 
Approximately 2,200,000 cubic yards of sediment were 
dredged and transported to aquatic and upland disposal sites. 
Construction was completed in August 1998. 
The project cost is $40,000,000 of which $28,300,000 
is Federal cost (includes $130,000 Coast Guard costs) and 
$11,700,000 is non-Federal cost (includes $1,310,000 non- 
Federal reimbursements). 
The existing project was authorized on October 27, 
1965. Previous projects were authorized by Acts adopted in 
1917, 1930, 1935, 1938, 1945 and 1954. The proposed 
improvements are authorized by the Water Resources 
Development Act of 1986, PL 99-662. 
Local cooperation. In accordance with the cost 
sharing and financing concepts reflected in the Water 
yesources Development Act of 1986, the local sponsor must 
comply with the following requirements: (1) pay 10 percent 
of the costs to 20 feet below mean lower low water and 25 
percent of costs between 20 and 45 feet below mean lower 
low water and (2) reimburse an additional 10 percent with 
interest of the costs allocated to general navigation facility of 
the project within a period of 30 years following completion 
of construction; and (3) provide all lands, easements, 
rights-of-way, relocation and dredged material disposal areas 
necessary for the projects. The value of lands, easements, 
rights-of-way and dredge disposal areas can be credited 
toward the payment required under item (2) above. 
Terminal activities. The Port of Richmond 
encompasses nine privately-owned terminals and seven 
terminals owned by the Port. 
Operations during fiscal year. New Work: 
Construction project completed in May 1998. Maintenance: 
Operations and maintenance dredging of Richmond Outer 
Harbor was performed by the U.S. Hopper dredge 
"Essayons." The Essayons removed 145,304 cubic yards of 
shoal material from the Outer Harbor, cost $861,120. The 
Inner Harbor portion was deferred because of lack of 
shoaling due to the recent completion of the Deepening 
Project. 
5. SAN FRANCISCO BAY TO 
STOCKTON, CA 
(JOHN F. BALDWIN AND STOCKTON 
SHIP CHANNELS) 
Location. The location is the John F. Baldwin Ship 
Channel. Navigation channels extending from entrance to 
San Francisco Bay to Suisun Bay near Martinez through San 
Francisco, Marin, Contra Costa, and Solano Counties. (See 
National Ocean Service Charts 18649, 18654 and 18656 for 
respective areas.) 
Existing project. Project provides for modification of 
the existing San Francisco Harbor, Richmond Harbor, San 
Pablo Bay and Suisun Bay Channels to the vicinity of Pt.. 
Avon to provide depths of 55 feet for San Francisco Bar 
Channel, 45 feet (currently 35 feet) for main internal bay 
channels upstream to the vicinity of Pt.. Avon; enlargement 
and deepening to 45 feet (currently 35 feet) of maneuvering 
areas adjacent to major petroleum refinery terminals along 
the channel route. San Francisco Harbor Main Channel was 
completed in February 1974. The South Hampton Shoal 
Channel and the Richmond Long Wharf maneuvering area 
were completed in December 1986. For the approved cost 
estimate (1996) of Federal cost (Corps), see Sacramento 
District Annual Report. Existing project was adopted by 
1965 River and Harbor Act (H. Doc. 208, 89th Cong., 1st 
sess., contains latest published map). Estimated volume of 
dredged material is 9 million cubic yards. A new alternative 
initially proposed by the sponsor would create a pipeline 
34-4

SAN FRANCISCO, CA, DISTRICT 
terminal north of the Richmond/San Rafael Bridge. 
Dredging of less than 50k CY and a greatly shortened 
navigation channel 2 miles long by 600 feet wide by 45-foot 
deep would eliminate or minimize the serious issues facing 
project construction including salinity intrusion, disposal site 
selection, air quality, and endangered species preservation. 
In February 1999, this sponsor withdrew support for a 
pipeline terminal. 
Local cooperation. See Sacramento District Annual 
Report. The local sponsor, Contra Costa County, supports 
the project. 
Terminal facilities. See Port Series No. 30, revised 
1991, No. 31, revised 1991, and No. 32, revised 1986, titled 
respectively: "The Ports of San Francisco, Redwood City, 
and Humboldt Bay, Calif."; "The Ports of Oakland, 
Alameda, Richmond, and the Ports on Carquinez Strait, 
Calif."; and "The Ports of Sacramento, Stockton, Pittsburg, 
and Antioch, Calif." Facilities are considered adequate for 
existing commerce and will be adequate for future commerce 
upon completion of new terminal facilities. 
Operations during fiscal year. New Work: 
Continued planning engineering and design activities. 
6. SONOMA BAYLANDS WETLANDS 
DEMONSTRATION PROJECT, CA 
Location. The Sonoma Baylands site is located in 
Sonoma County, CA, approximately 25 miles north of San 
Francisco near the mouth of the Petaluma River, on the 
northern shoreline of San Pablo Bay. 
Existing project. Authorized by Water Resources 
Development Act of 1992. The project includes restoration 
of tidal wetlands on 348 acres of diked lands, including 
construction of 11,645 feet of replacement levee around the 
landward periphery of the site, fifteen internal peninsulas for 
wave protection, three weirs for the discharge of dredged 
material supernatant, and modification of three existing high 
voltage electrical towers. Project included placement of 
207,000 cubic yards of maintenance-dredged material from 
the Petaluma River navigation channel in a pilot project area 
and placement of 1.7 million cubic yards of suitable dredged 
material from the Oakland Harbor deepening projects on the 
remainder of the site. Placement of material was completed 
on November 6, 1995. 
The project cost is $8,900,000, of which $6,675,000 is 
Federal cost and $2,225,000 is non-Federal cost. Oakland 
deepening to -42' MLLW was completed in July 1998. 
Local cooperation. The California State Coastal 
Conservancy signed a Project Cooperation Agreement on 
May 6, 1994 satisfying the requirements of the Water 
Resources Development Act of 1992, PL 102-580 and 
signed an amendment on December 9, 1994 to include the 
placement of Oakland Harbor dredged material. The local 
sponsor must comply with the following requirements: (1) 
provide lands, easement, and right of ways; (2) modify or 
relocate utilities, roads, bridges (except railroad bridges) and 
other facilities, where necessary in the construction of the 
project; (pay 25 percent of the total project cost in 
accordance with Section 106 of the Water Resources 
Development Act of 1992. The local sponsor has also 
agreed to make all required payments concurrently with 
project construction. 
Terminal facilities. N/A 
Operations during fiscal year. The project was 
restored to tidal action on October 25, 1996. Monitoring of 
the project is continuing. Project was turned over to 
California Coastal Conservancy in August 1998 for 
operation, maintenance, repair, replacement, and 
rehabilitation of the functional portion of the project. 
7. SAN FRANCISCO BAY-DELTA 
MODEL STRUCTURE, CA 
Location. The model, including a Class A regional 
visitor center, is located in Sausalito, CA, adjacent to San 
Francisco Bay about two miles north of the Golden Gate 
Bridge. 
Existing project. The San Francisco Bay/Delta Model, 
which covers 17 miles of the Pacific Ocean beyond the 
Golden Gate, all of San Francisco Bay proper, San Pablo 
Bay, Suisun Bay, and all of the Sacramento-San Joaquin 
Delta east of Suisun Bay to the cities of Sacramento on the 
northeast and Stockton and Tracy on the south, was 
constructed in a rehabilitated warehouse at Sausalito, CA, as 
a part of the San Francisco Bay and Tributaries, CA, Study 
authorized by the River and Harbor Act of May 17, 1950 (PL 
81- 516, Section 110). The model was authorized as an 
operation and maintenance project in the Water Resources 
Development Act of 1974 (PL 93-251, Section 8). The 
model successfully reproduces to the proper scale the rise 
and fall of the tide, flow and currents of water, salinity 
intrusion, and trends in disposition of sediments. It is a useful 
tool to examine forces existing in the bay and estuarine 
system and to predict results of proposed changes. 
Local cooperation. None required. 
Operations during fiscal year. Maintenance: 
Operations and maintenance of the model continues. 
34-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Historical summary. Original model construction was 
initiated 1956 and completed 1957. The addition of the 
Sacramento-San Joaquin Delta to the original model was 
initiated 1966 and completed 1969. Annual visitation to the 
model averages between 140,000 to 150,000 people. The 
central exhibits were completed in December 1981. 
Extensive exhibit upgrade for the Visitor Center and 
development of Cooperative Association completed 
September 30, 1989. The Cooperative Association provides 
financial and educational support to both engineering 
operations and visitor center programming. An active 
volunteer program exists at the Visitor Center providing 
approximately 300 hours of effort monthly. The hydraulic 
engineering department closed 4 January 2000. The Visitor 
Center operations continues to offer public informationeducational 
services via programs, exhibits, and special 
events. The Visitor Center is currently developing new 
interpretive and exhibit plans. 
Total cost of regional visitor exhibits and model as of 
September 30, 2000, was $37,001,373 of which $15,125,563 
was for the regional visitor center, $1,383,324 for exhibits, 
and $20,492,486 for maintenance. 
8. SAN FRANCISCO BAY LONG TERM 
MANAGEMENT STRATEGY (LTMS), 
CA 
Location. The San Francisco Bay Long-Term 
Management Strategy (LTMS) for dredged material disposal 
covers deep and shallow draft navigation channels of the San 
Francisco Bay region including Central San Francisco Bay, 
South Bay, San Pablo Bay and Suisun Bay environs. 
Existing project. The San Francisco Bay region has an 
annual disposal requirement of approximately 6 million 
cubic yards (mcy) to maintain navigation channels. The Bay 
also has a one-time new civil works requirement of 
approximately 16 mcy for the Oakland Harbor, Richmond 
Harbor, and John F. Baldwin Phase III ship channel. In 
January 1990, the Army Corps of Engineers, the 
Environmental Protection Agency, Region IX, the San 
Francisco Bay Water Quality Control Board and the San 
Francisco Bay Conservation and Development Commission 
convened with approximately thirty interested agencies and 
organizations with concerns regarding dredged material 
disposal in San Francisco Bay. These four agencies have the 
responsibility for regulation of the waters of the US and 
California for disposal of dredged material. 
The four agencies and the concerned navigation 
interests formed the LTMS to develop technically feasible, 
economically prudent, and environmentally acceptable long 
range solutions to the dredging and disposal needs for the 
San Francisco Bay region over the next fifty years. In 
determining acceptable dredged material disposal locations, 
the LTMS is evaluating a broad array of potential ocean, 
in-Bay and non-aquatic beneficial uses disposal alternatives. 
Local cooperation. Pursuant to their regulatory 
responsibilities, the Division Commander of the South 
Pacific Division, Corps of Engineers; the Regional 
Administrator of the Environmental Protection Agency, 
Region IX; the Chair of the San Francisco Bay Regional 
Water Quality Board and the Chair of the San Francisco Bay 
Conservation and Development Commission agreed to 
jointly undertake the development and implementation of a 
Long Term Management Strategy (LTMS) for dredging and 
disposal of dredged materials from the region. Based on the 
outputs from the LTMS, the Regional Water Quality Control 
Board (RWQCB) and the Bay Conservation and 
Development Commission (BCDC) will consider 
modifications to the dredging elements of their respective 
Basin and Bay Plans for San Francisco Bay. 
Regulatory Streamlining: Besides identifying 
implementable disposal options, the LTMS will: (1) develop 
coordinated regional disposal policies between federal and 
state agencies; (2) provide a local decision-making 
framework for dredging and disposal projects; (3) streamline 
existing permit and testing procedures; and (4) provide a long 
term site monitoring apparatus and feedback mechanism. 
Operations during fiscal year. In 1994, the 
Environmental Protection Agency (EPA) designated a deep 
ocean disposal site. In 1996, the Corps, EPA, and the State 
of California implemented a joint agency Dredged Material 
Management Office (DMMO) for dredging permit 
processing. 
The Final LTMS EIS is scheduled to be released in 
October 1999. The EIS will identify Alternative 3 as the 
preferred alternative that would limit future disposal to 20% 
in the San Francisco Bay, 40% in the ocean, and 40% for 
upland beneficial reuse. Final comments and response to 
comments as well as a Draft Record of Decision (ROD) were 
reviewed by Corps Headquarters in July 1999. The Division 
Commander and EPA's Regional Administrator signed the 
Final ROD in August 1999. The signing of the ROD initiates 
implementation for Federal agencies. 
The implementation efforts will be finalized through 
the development of a management plan detailing the policies 
and procedures for implementing the selected alternative. 
Adoption of the management plan will require amending the 
Bay and Basin Plans. BCDC amended the San Francisco 
Bay Plans in December 2000 and the RWQCB is scheduled 
to amend the San Francisco Bay Plans in April 2001. 
34-6

SAN FRANCISCO, CA, DISTRICT 
In general, the programmatic EIS requires future 
project-by-project analysis for "practicability" in terms of 
fiscal and environmental impacts. This effort will be 
accomplished with the Dredge Material Management Plan 
for San Francisco Bay. This two year study was initiated in 
FY 01. 
9. RECONNAISSANCE AND 
CONDITION SURVEYS 
Reconnaissance and condition surveys of channels to be 
dredged in years other than Fiscal Year 2000 and jetty 
structures were conducted on the following projects: 
Berkeley; Bodega Bay; Crescent City Harbor; Islais Creek; 
Mare Island Strait; Monterey Harbor; Moss Landing Harbor, 
Noyo River, Petaluma River, Pillar Point; Pinole Shoal; 
Redwood City; Richmond Harbor, San Leandro Marina; San 
Rafael; Santa Cruz; Sausalito Canal; and Suisun Channel; all 
in California. Fiscal year costs were $907,112. 
10. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation activities pursuant to Section 107, Public 
Law 86-645 (preauthorization). 
None. 
Mitigation of shore damages activities pursuant to 
Section 111, Public Law 90-483 (preauthorization). 
None. 
11. BEACH EROSION CONTROL WORK 
UNDER SPECIAL AUTHORIZATION 
Beach erosion control activities pursuant to Section 
103, Public Law 87-874 (preauthorization). 
Fiscal year costs were $9,504 for East Cliff Drive, 
Santa Cruz, CA. 
Flood Control 
12. CORTE MADERA CREEK, CA 
Location. Creek and tributaries drain an area of 28 
square miles in Marin County, CA, and flow into west side 
of San Francisco Bay about 9 miles north of Golden Gate. 
Existing Project. Provided for about 11 miles of 
channel improvements, including realignment, enlargement, 
levees, riprap, rectangular concrete sections, interior drainage 
facilities, bridge relocations, and debris removal on Corte 
Madera Creek and lower reaches of its tributaries, and a 
continuous channel rights-of-way to deep water in San 
Francisco Bay reserved to assure channel outlet in the event 
of future tideland reclamation. Water Resources 
Development Act of 1986 modified existing project to direct 
construction of Unit 4 from Lagunitas Road Bridge to Sir 
Francis Drake Boulevard, and to include construction of 
flood proofing measures as necessary to individual properties 
and other necessary structural measures in vicinity of 
Lagunitas Road Bridge to insure proper functioning of 
completed portions of authorized project. Portion of project 
upstream of Sir Francis Drake Boulevard previously 
classified inactive was modified on November 17, 1986 to 
eliminate any channel modification. Current project has 3 
miles of channel enlargement and levees, about 1.8 miles of 
rectangular concrete channel improvements, and 450,000 
cubic yards of redredging on lower Corte Madera Creek. 
Local Cooperation. Local interests must provide 
lands and rights-of-way, including suitable areas for disposal 
of waste material, modify or relocate all bridges and utilities 
necessary for construction and maintenance; hold and save 
the United States free from damages due to the construction 
works; maintain and operate the project after completion in 
accordance with the regulations prescribed by the Secretary 
of the Army, and prevent encroachment on flood channels 
that would result in decreasing the effectiveness of project 
for flood control; adjust all claims regarding water rights that 
might be affected by the project; and contribute in cash 1.5 
percent of Federal construction cost of Ross Valley units 1-4 
and tidal areas. Marin County Flood Control and Water 
Conservation District previously furnished resolution of local 
assurances dated March 29, 1966, March 28, 1967, August 
15, 1967, and July 8, 1969, and Marin County Board of 
Supervisors reaffirmed by letter dated September 28, 1978. 
Project was authorized by the State of California by 1965 
Statute, Chapter 1388. Board of Supervisors of Marin 
County Flood Control and Water Conservation District 
furnished assurances of willingness and ability to meet 
requirements for portion of project below Sir Francis Drake 
Boulevard. 
On December 13, 1983, Marin County Board of 
Supervisors reconfirmed assurances of local cooperation 
because a Superior Court judgment ordered that county to 
take all steps required by law to complete channel 
downstream of Sir Francis Drake Boulevard (Unit 4) and 
maintain entire project as agreed. A Local Cooperation 
Agreement for redredging the lower reach of Corte Madera 
Creek was executed on June 29, 1985. Marin County also 
provided support for Ross Valley Unit 4 by resolution on 
March 24, 1987 and by the resolution on September 13, 
1988.
Operations during fiscal year. New Work: The 
flood control project has been built in separate units. The 
34-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 II I I II l I I 1 I 
current project focuses on the design and construction of unit 
4 with modifications to units 2 and 3. Unit 4 includes a 
natural flood control channel and a sedimentation basin 
located at the town of Ross. 
The General Reevaluation Report (GRR) was initiated 
in February 1999. As long as the originally authorized 
project remains the recommended project, the 1966 
authorized cost sharing and financing requirements will be 
applicable. A community-based Design Advisory 
Committee has been created with representatives from Ross, 
Kentfield, Corte Madera, and Larkspur to provide 
community input on the conceptual plan. The conceptual 
plan is based on the Marin County Board of Supervisors' 
Design Guidelines for a consensus plan which was approved 
in 1996. 
The GRR will be developed in two phases. Phase I will 
develop alternatives based on the design guidelines and 
determine if the project benefits exceed the costs. Phase HI 
will complete the GRR and environmental documentation. 
Phase I is scheduled for completion in July 2001, and Phase 
II in September 2003. Construction of Unit 4 and attendant 
feature in the downstream units is being determined. 
The communities of Corte Madera, Larkspur, Kenfield 
and Ross have reviewed the alternatives screening conference 
report and have provided recommendations for a locally 
preferred plan. The non-Federal sponsor, Marin County 
Flood Control District 9 will make consolidated 
recommendation by July 01 that will guide the final 
development of the GRR during Phase II. Local interest in a 
watershed study for Corte Madera Creek is being pursued 
through a separate study authority. 
Historical summary. Project responsibility was 
transferred to Sacramento District on April 1, 1982 and back 
to the San Francisco District on October 1, 1996. Resolution 
96-26 was passed on February 1, 1996 by the Marin County 
Board of Supervisors in support of a 40-year project. 
Project is about 77 percent complete considering the 
portion being held in abeyance upstream of Sir Francis 
Drake Boulevard. Work remaining: Design construction of 
the remaining 3,000 feet of channel downstream of Sir 
Francis Drake Boulevard and Ross Creek. The portion of 
Corte Madera Creek upstream of intersection of Sir Francis 
Drake Boulevard and Corte Madera Creek in Ross, near the 
city of San Anselmo, was classified as "inactive" on July 11, 
1984, due to lack of local support. 
A Local Cooperation Agreement for redredging lower 
reach of Corte Madera Creek was executed June 29, 1985. 
Construction on Lower Corte Madera Creek Channel was 
completed and transferred to Marin County Flood Control 
and Water Conservation District by letter of May 28, 1987, 
San Francisco District monitors maintenance and operation 
of the project. The project was transferred from Sacramento 
District in October 1996. Design process began in the San 
Francisco District to complete Unit 4. 
13. PETALUMA RIVER, PETALUMA, CA 
Location. The Petaluma River Basin is situated in the 
Sonoma and Marin Counties, California, on the northwestern 
shore of San Pablo Bay. The project site extends upstream 
approximately 500 feet from Lynch Creek to the spur line 
Railroad Bridge located approximately 600 feet downstream 
of the Lakeville Street Bridge. 
Existing project. The project was re-authorized under 
Section 112 of the Water Resources Development Act of 
2000. The scope of the project consists of constructing the Ushaped 
channel, an earthen trapezoidal channel including the 
channel excavation and widening, the two hundred (200) feet 
concrete constriction weir, an approximately one - mile - 
long sheet pile flood / retaining wall along both sides of the 
main channel, two (2) storm drain pump stations, twelve (12) 
storm drain outlet structures in various locations of the 
channel, two (2) large mitigation areas including planting in 
the embankment slope throughout the project site, two 
hundred (200 ) feet long transition channel work, replacing 
two (2) vehicular bridges and two (2) railroad bridges, and 
demolishing the existing railroad wood trestle. 
Present estimated cost of the project is $32,277,000 of 
which $20,947,000 is Federal cost and $11,279,000 is non- 
Federal cost. 
Local cooperation. The project was executed based 
on the original Petaluma River Project Cooperation 
Agreement in July 1996 under the continuing Authorities 
Program, Section 205 - Small Flood Control Projects. The 
project costs have exceeded the Continuing Authorities 
Program cost limits and was specifically authorized in 
WRDA 2000, Section 112. Further, Congressional direction 
in the House Report 106-693 accompanying the Energy and 
Water Development Appropriations Bill 2001 provides 
guidance to the Corps to utilize the available federal funds to 
continue project construction. 
Operations during fiscal year. New work: The 
construction of Contract #1 for the U-shaped channel portion 
was completed in December 1998. The construction of the 
Payran Bridge and Lackville Bridge was completed under the 
local sponsor's contract in 1996 and 1998, respectively. The 
construction contract #2 for the trapezoidal channel was 
awarded in May 1999. The features of work in contract #2 
completed in September 2000, included the floodwall \ 
retaining wall in both sides of the channel, the channel 
widening and excavation, the constriction weir, the flood 
34-8

SAN FRANCISCO, CA, DISTRICT 
control features including the two (2) Storm Pump Stations 
and the storm drain outlets and the mitigation planting 
throughout the project site. Contract #2 is scheduled for 
completion in early May 2001. The remainder of the work to 
be completed including the correction of the mitigation areas 
in the Homlberg site and finalizing the deficient items in the 
punch list. The mainline Railroad Bridge, one of the two 
railroad bridges is currently under construction by the local 
sponsor's contract, and is scheduled for completion in early 
April 2001. Contract #3 for the Channel Transition is 
tentatively scheduled for completion in November FY01, 
Contract #4 for the mainline railroad approach and 
demolition of the existing railroad wood trestle in FY02, and 
Contract #5 for replacing the downstream spur line railroad 
bridge in FY03. Maintenance: Operations and maintenance 
of Petaluma River Channel including engineering and design. 
No contract dredging scheduled in FY01. 
14. RUSSIAN RIVER BASIN, CA 
Location. Russian River rises in Coast Range in 
northwestern California, flows southerly for 87 miles, and 
then turns westerly to flow for 23 miles to Pacific Ocean at 
Jenner, 60 miles northwest of San Francisco, CA. (For 
general location see Geological Survey map for California.) 
Existing project. Active authorized project provides 
for construction of a dam on East Fork of Russian River at 
Coyote Valley to a height of 160 feet; a dam on Dry Creek at 
Warm Springs to a height of 319 feet; and channel 
stabilization works on Russian River between mouth and 
mile 98, on lower reaches of several tributaries, and on Dry 
Creek downstream from dam. Project also provides for 
expansion of fish hatchery capacity at Dry Creek, Warm 
Springs, to compensate for fish losses on Russian River 
attributed to operation of Coyote Dam component of project. 
Coyote Valley Dam (Lake Mendocino), completed in 1959, 
is operated and maintained by the United States. (See tables 
34-I and 34-J for latest approved estimated costs.). 
Local cooperation. Fully complied with for Coyote 
Valley Dam and channel improvements accomplished to 
date. For the Dry Creek portion, local interests are required 
by the authorizing act to comply with the usual a., b., c. 
requirements for channel improvements and, in addition, 
prevent any encroachment in the channel of Dry Creek which 
would interfere with proper functioning of the channel 
improvement works; adjust all claims concerning water rights 
arising from the construction and operation of the 
improvements, including acquisition of water rights needed 
for preservation of fish and wildlife resources affected by the 
project; and reimburse the United States in accordance with 
the Water Supply Act of 1958, as amended, for that part of 
the joint-use construction cost, (30.2 percent currently 
estimated at $103,760,000) and an ultimate 32.5 percent of 
the annual operation, maintenance, and replacement joint-use 
costs allocated to municipal and industrial water supply. The 
estimated annual cost to local interests for maintenance of 
channel improvement works is $80,000. Sonoma County 
Water Agency (formerly Sonoma County Flood Control and 
Water Conservation District) provided assurances of 
willingness and ability to meet requirements by Resolutions 
No. DR 00793-1, September 25, 1961, No. DR 4770-1, 
December 17, 1962 and No. DR 45759, August 5, 1974, for 
Dry Creek (Warm Springs) Lake and Channel. By letter 
dated March 7, 1967, Sonoma County Flood Control and 
Water Conservation District further indicated their interest in 
optimization of the Dry Creek (Warm Springs) damsite to 
provide additional water supply storage. Reimbursement to 
the United States for Dry Creek (Warm Springs) Lake and 
Channel costs allocated to 212,000 acre-feet of water supply 
storage is specified in a water supply contract with the local 
sponsor approved in October 1982. Local interests have 
expended approximately $1,000,000 to provide partial flood 
protection in project area and have constructed facilities at an 
approximate cost of $20,000,000 to distribute water from the 
completed Coyote Valley reservoir. 
Operations and results during fiscal year. New 
work: Coyote Valley Dam: Major work includes replacing 
wooden water tanks with aluminum at Kyen & Bushay 
campgrounds and Overlook day-use area; repaving roads at 
Overlook, Mendocino Drive Road, and Southboat Ramp 
Parking lot; and repairing the emergency slide gate in the 
control tower. Dry Creek (Warm Springs) Lake and Channel: 
Engineering activities continued. Major work includes 
repairing the Liberty Glen Campground Entrance Road using 
ERFO funds and the stabilization of the Control Tower 
Access Road. Maintenance: Coyote Valley Dam: Operation 
and maintenance continued. Structures were maintained in 
serviceable condition. Runoff of East Fork Russian River at 
Coyote Dam was normal for the year. Maximum storage of 
93,699 acre-feet occurred on May 15, 2000. Maximum 
hourly inflow to reservoir was 3,187 cubic feet per second on 
February 12, 2000. Maximum release of 3,812 cubic feet 
per second occurred on February 17, 2000. During the year, 
83,718 acre-feet was released for flood control, and 122,480 
acre-feet was released for irrigation and other purposes. Dry 
Creek (Warm Springs) Lake and Channel: Operation and 
maintenance continued. Structures were maintained in 
serviceable condition. Runoff of Dry Creek at Warm 
Springs Dam was normal for the year. Maximum storage of 
270,139 acre-feet occurred February 15, 2000. Maximum 
hourly inflow to reservoir was 8,196 cubic feet per second on 
February 14, 2000. Maximum release of 4,079 cubic feet 
per second occurred February 16, 2000. During the year, 
64,524 acre-feet was released for irrigation and other 
purposes. Releases for flood control amounted to 103,179 
acre-feet 
34-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Historical summary. Entire project, exclusive of 
recreation facilities at completed project (Lake Mendocino), 
is about 99 percent complete. Coyote Valley Dam, initiated 
November 1958, was completed April 1959 (cost 
$17,550,000, of which $11,952,000 was Federal; and 
$5,598,000 contributed). Work, including removal of slides 
resulting from storms in 1958, was completed April 1959. 
Bank stabilization work on Russian River near Geyserville 
was completed in 1957 and channel improvements in 
remaining reaches on Russian River and East Fork of Russian 
River were completed in 1974 (cost $2,483,900). In April 
1982, responsibility was transferred to the Sacramento 
District. Responsibility for civil works operations & 
maintenance functions for the two projects was transferred 
back to San Francisco District October 1, 1996. 
Warm Spring construction completion include fish 
hatchery in December 1980, project overlook in May 1981, 
reservoir clearing in July 1981, downstream stabilization sills 
in October 1981, dam closure in October 1982, spillway 
repair at Warm Springs Dam in September 1985, boat 
launching facilities, Phase I, in September 1985, Rockpile 
Road Upgrade, Yorty Creek Beach, and remedial work at 
Liberty Glen camping area in September 1990, fish hatchery 
expansion in September 1992, final control tower grouting, 
dam access road repair, spillway stabilization, fish hatchery 
emergency water supply in September 1993, and Liberty 
Glen wastewater system and contaminated soil remediation. 
Initial filing of Warm Springs reservoir was commenced on 
November 1, 1984. Responsibility for construction was 
transferred to Sacramento District in August 1983. Dam 
safety assurance studies were initiated at Coyote Valley Dam 
in fiscal year 1984. Responsibility for civil works operations 
and maintenance functions for the two projects was 
transferred back to San Francisco District October 1, 1996. 
15. SAN PEDRO CREEK, PACIFICA, CA 
Location. The study area is located along San Pedro 
Creek in the lower Linda Mar area of Pacifica, in San Mateo 
County, just south of San Francisco, California. 
Existing Project. The project is authorized by Section 
205 of the Flood Control Act of 1948. The Linda Mar area of 
Pacifica has experienced periodic flood damages caused by 
stream bank overflow from events greater than the 4-year flood. 
In the most recent severe flood (1982), 183 residential and 10 
commercial properties suffered $4,000,000 in damages. 
The NED plan, which will provide protection against the 
one-percent event, is the recommended plan. The NED plan is 
a wetland-diversion plan which involves an upstream diversion 
structure at the Adobe Drive bridge with flood flows being 
diverted via an underground pipeline to a wetland/flood basin 
which would discharge through concrete culverts under the 
Highway 1 bridge. The wetland/flood basin will replace a 
freshwater wetland, which existed in the area before the turn of 
the century. An 800-foot long floodwall will be constructed 
along the northern bank of the creek near the newly 
reconstructed wetland. This floodwall will extend downstream 
to Highway 1. The BCR for the Recommended Plan is 2.4 to I 
and the Detailed Project Report was finished in January 1998. 
Present estimated total cost for the project $16,600,000 of which 
$7,000,000 is Federal cost and $9,600,000 is non-Federal cost. 
Local Cooperation. City of Pacifica signed a 
Project Cooperation Agreement in March 2000, satisfying the 
requirement of the Water Resources Development Act of 1986, 
PL 99-662. 
Operations During Fiscal Year. Construction of 
Phase I-channel realignment and wetland 
restoration-began at the end of FY 00. Phase II 
construction is scheduled for an early FY 02 start and 
consists of the same features. The Phase III construction 
plans for the underground pipeline is currently on hold. 
Scheduled completion date is March 2003. 
16. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Section 3, Flood Control Act of June 22, 1936, as 
amended and supplemented, included a requirement that 
local interests maintain and operate completed flood control 
works in accordance with regulations prescribed by the 
Secretary of War. Inspections made throughout the year to 
determine effectiveness of operation and maintenance by 
local interests of completed local protection projects and 
works constructed under emergency and special authorities of 
Sections 205 and 208 of the 1948 Flood Control Act, Section 
14 of the 1946 Flood Control Act, and Public Law 99, 84th 
Congress. In addition, encroachments to Federal Projects 
such as new bridges, etc. must be reviewed and approved 
prior to construction by the local sponsor, as well as in 
compliance with the Clean Water Act permit and endangered 
species concerns regarding their operations and maintenance 
activities. Fiscal year cost was $204,922. Total cost to 
September 30, 2000 was $3,279,190. See Table 34-H for 
inspections made this fiscal year. 
17. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood Control activities pursuant to Section 205, 
Public Law 858, 80th Congress, as amended 
(preauthorization). 
Fiscal year costs were $1,434,213 for preauthorization 
studies of which $11,895 were for Petaluma River, Sonoma 
34-10

SAN FRANCISCO, CA, DISTRICT 
County, CA; $1,235,218 for San Pedro Creek, Pacifica, CA; 
$104,188 for White Slough, Solano County, CA; $9,980 for 
Novato Creek Tributary, Novato, CA; $61,603 for Coyote 
Creek at Rock Springs, CA; and $11,329 for Section 205 
Coordination Account. 
Emergency flood control activities-repair, flood 
fighting and rescue work (Public Law 99, 84th Congress, 
and antecedent legislation). 
Fiscal year cost incurred for emergency flood control 
activities were $3,949,897 of which $2,899,113 were for 
Disaster Preparedness; $9,500 for Emergency Operations and 
$1,041,284 for Rehabilitation. 
Emergency bank protection (Section 14,1946 Flood 
Control Act, Public Law 526, 79th Congress). 
Fiscal year total costs were $43,586 of which $375 was 
for Cliff Drive, Capitola, CA; $36,313 was fro Shelter Cove, 
Humboldt County, CA; and $6,898 for Section 14 
Coordination Account. 
18. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
In accordance with sec. 7, Flood Control Act of 1944, 
summaries of monthly reservoir operations at Del Valle, CA 
were prepared. No water control manual revisions were 
completed due to environmental issues. Corps personnel 
provided advice as requested during flood control operations 
at the reservoir. Fiscal year cost was $52,920. 
19. MISCELLANEOUS WORK UNDER 
SPECIAL AUTHORIZATION 
Project Modification for Improvement of 
Environment (Section 1135, PL 99-662). 
Fiscal year total costs were $72,759 of which $7,023 
were for Initial Appraisals; and $65,736 for Wildcat Creek 
Restoration, CA. 
Aquatic Ecosystem Restoration (Section 206, PL 
104-303). 
Fiscal year total costs were $1,466 of which was 
Coordination Account funds. 
General Investigations 
20. SURVEYS 
Fiscal year costs for surveys were $1,569,417 of which 
$147,369 were for navigation studies; $278,399 for flood 
damage prevention; $1,074,408 for special studies; $59,655 
for miscellaneous activities; and $9,586 for coordination 
studies with other agencies. 
21. COLLECTION AND STUDY OF 
BASIC DATA 
Fiscal year total costs of $17,130 were incurred, of 
which $11,214 was for Flood Plain Management Service 
Program and, $5,916 for Hydrologic Studies. 
22. PRECONSTRUCTION ENGINEERING 
AND DESIGN 
HAMILTON AIRFIELD 
WETLAND RESTORATION, CA 
Hamilton Airfield is a 700-acre parcel consisting of an 
inactive runway and adjacent taxi areas. It is located 4 miles 
east of the City of Novato, on San Pablo Bay, in Marin 
County, California. The area, currently protected by levees, 
has subsided below the elevation of surrounding properties, 
including the tidal wetlands immediately adjacent to San 
Pablo Bay. Storm water runoff from adjacent properties is 
collected on the airfield and transferred to San Pablo Bay 
from the site by a drainage system including a pump station 
and concrete ditches. In conjunction with the ongoing Base 
Realignment and Closure (BRAC) cleanup process, the Base 
Reuse Authority would like to restore the area to a tidal 
wetland. Wetlands would be created with the use of dredged 
material from San Francisco Bay navigation projects, 
including the Oakland 50' deepening project. 
The Final Feasibility Study and EIS/EIR was completed 
December 15, 1998 with the issuance of the Division 
Engineer's Public Notice followed by the Report of the Chief 
of Engineers in August 1999, and authorization in the 1999 
Water Resources Development Act (WRDA). For the 
BRAC portion, the airfield is being closed with the City of 
Novato acting as the Reuse Authority. The US Army Corps 
of Engineers, Sacramento District, is managing the 
environmental cleanup and closure of the base. 
Remaining tasks in the BRAC process are; completing 
the site risk assessment, remediation, and transfer of the 
airfield property to the state of California State Coastal 
Conservancy by the end of FY 2000. The site does have 
existing contamination in the form of DDT, hydrocarbon 
compounds and heavy metals, the magnitude of which is 
being determined in the risk assessment. A Memorandum of 
Agreement (MOA) has been formalized between the 
Department of Defense (DOD)/BRAC command and the 
34-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Conservancy to ensure that the clean up of the site is suitable 
for wetland restoration for endangered species. 
A Pre-construction Engineering and Design (PED) cost 
sharing agreement was signed in August 1999 for $1.2 
million dollars between the Corps and the Conservancy. An 
additional $1.2 million dollar modification to the design 
agreement was signed in February 2001. The first phase of 
construction is scheduled to begin in FY 2001. An adjacent 
State Lands Commission owned parcel will be remediated 
under the Formally Used Defense Sites (FUDS) program at 
a future unknown date. A second MOA for the FUDS parcel 
will be formalized between DOD and the Conservancy 
before the BRAC transfer of the airfield occurs. This MOA 
will ensure that the estimated $26 million dollar clean up of 
the site is suitable for wetland restoration for endangered 
species and occurs at a future date that meets the construction 
schedule for the rest of the restoration site. 
An Ecosystem Restoration Initial Appraisal (WRDA 
1999, Section 204) for another adjacent parcel (1600 acre 
Bel Marin Keys (BMK) property) was completed in October 
2000. It identified the federal interest and recommended that 
this parcel be added to the Hamilton Wetlands Restoration 
Project (HAAF). The Conservancy has subsequently 
purchased the BMK parcel. A new FCSA will be executed in 
May 2001 for BMK feasibility level tasks required to 
incorporate the parcel within the existing Hamilton Wetlands 
Restoration Project. 
LLAGAS CREEK, CA 
The project is located in southern Santa Clara 
County, California, in the vicinity of the communities of 
Morgan Hill, San Martin, and Gilroy. The project primarily 
consists of channel improvements and a diversion channel 
providing a 100-year level of flood protection to urban areas 
and 10-year protection to agricultural areas at a benefit-tocost 
ratio of 1.1. 
The Natural Resources Conservation Service 
(NRCS) has constructed about half of the authorized project, 
Reaches 1, 2, 3, part of 4, 9, 10, 11, 12 and 13. A 
supplemental environmental evaluation is currently being 
prepared by the NRCS to address Reaches 4, 5, 6, 7 and 14. 
These reaches would complete work on the remainder of the 
project with the exception of Reach 8 through the town of 
Morgan Hill. The supplemental environmental evaluation 
will update biological surveys including potential existence 
of the endangered red-legged frog as well as Section 404 
(Clean Water Act) jurisdictional determinations for wetlands. 
The 1999 Water Resources Development Act 
(WRDA) authorized the Corps of Engineers to complete 
construction of this project. Alternatives are being studied 
for Reach 8 to develop a locally desired alternative different 
from the concrete channel previously considered for this 
portion of the work. The Corps' San Francisco District will 
initiate a $250,000 effort to develop alternatives for a 
diversion channel in Reach 7A. A Memorandum of 
Understanding (MOU) between the NRCS and the Corps for 
design support on the project is under review. As design of 
Reaches 4 through 7 is complete, pending environmental 
clearance and funding, preparation of construction plans and 
specifications and construction could proceed following 
construction of the diversion channel. However, design of 
Reach 8 is not complete. Consequently, preparation and 
approval of a cost-shared Detailed Design Memorandum 
(DDM) could accomplish validation of project justification. 
Plans and specifications for construction of Reach 8 would 
follow such documentation. Construction is forecasted to 
begin in the 2" quarter of FY 04. 
NOYO RIVER AND HARBOR, CA 
Noyo River rises in the Coast Range, flows westerly, 
and empties into Noyo Harbor. Noyo Harbor is a cove on 
the California Coast about 87 miles south of Humboldt Bay 
and 135 miles northwest of San Francisco. The 1962 Rivers 
and Harbors Act, modified by the 1976 Water Resources 
Development Act, authorized up to two breakwaters as 
necessary to provide protection. The 1976 Water Resources 
Development Act, as modified by the Water Resources 
Development Act of 1986, authorized construction of 
additional channel improvements. Recommended plans of 
improvement for the breakwater and channel improvement 
were previously considered as a single project Due to 
significant differences in the time required for planning and 
construction, each part is now reported separately. 
The plan of improvement for Noyo River and Harbor 
(Breakwater), CA provides for one detached offshore 
400-foot breakwater aligned in a north-south direction along 
the southern portion of Noyo Cove, west of the entrance 
channel in Noyo Harbor. The plan also provides for a 
60-foot wide channel, 7 feet deep, for a distance of about 
3,000 feet upstream from the end of the existing Federal 
project to the Dolphin Isle Marina. The June 1995 draft 
GDM estimated the breakwater cost at $23,312,000 of 
which $18,712,000 is Federal cost and $4,600,000 is non- 
Federal cost Subsequent to the draft GDM, the Conference 
Report on H.R. 1905, Energy and Water Development 
Appropriation Act of 1996 directs the Corps to investigate 
the viability of a pre-fabricated steel structure in lieu of a 
rubble mound breakwater, including modeling. A special 
report, which documented this evaluation, was completed in 
January 1997. A meeting with the Local Sponsor, PG&E 
and the City of Fort Bragg was held 5 February 1997 to 
discuss the Corps' findings. Integrating wave power 
generation to the breakwater does not decrease the Sponsor's 
34-12

SAN FRANCISCO, CA, DISTRICT 
annualized cost because the Sponsor is required to pay all 
costs associated with power generation. Two letters from the 
Noyo Harbor District, dated 26 February 1997, requested the 
Corps finalize the GDM and discontinue study of integrating 
wave power generation into the breakwater. Due to sponsor's 
inability to fulfill its cost-sharing requirements, preparation 
of a final GDM was terminated. 
This project has been put in an inactive category at the 
request of the sponsor. 
PAJARO RIVER AT 
WATSONVILLE, CA 
The Pajaro River is the dividing line between Santa 
Cruz and Monterey County located approximately 100 miles 
south of San Francisco on Monterey Bay. Flooding in the 
city of Watsonville, the town of Pajaro, and surrounding 
agricultural lands prompted a re-examination of flood 
damage prevention in the Pajaro basin. 
The project provides for modification of the existing 
levee system built by the Corps in 1949 and includes 2.5 
miles of flood control levees and/or floodwalls on 
Salsipuedes Creek and Corralitos Creek, tributaries of the 
Pajaro River, as well as pump systems located outside of 
existing levees on the Pajaro River. The tributaries are 
located 6 miles from the river mouth. Since the only 
alternative with Federal interest was within the existing 1966 
Rivers and Harbor Act construction authority, the 
reconnaissance study was certified in August 1994 with the 
recommendation to proceed directly to a General Reevaluation 
Report (GRR) on raising levees along a portion of 
Corralitos and Salsipuedes Creeks. Flooding along the main 
stem of the Pajaro River in January and March 1995 caused 
in excess of $65,000,000 in damages. Additional damages 
were incurred during the floods of January 1997 and 
February 1998. It is likely that we will incorporate a reexamination 
of main stem alternatives in the ongoing GRR 
for the creeks. Consequently, the Corps will proceed with 
technical tasks, including a geotechnical investigation of the 
Pajaro River levees as part of the GRR. Contingent on 
funding, the GRR is scheduled to be completed in FY 2002. 
If the GRR finds a federal interest in flood control 
improvements along either the Pajaro mainstem or 
Salsipuedes and Corralitos creeks, construction contract plans 
and specifications would be prepared in FY 2003. If 
funded, local real estate acquisition and construction could 
proceed the following fiscal year. 
OAKLAND HARBOR 50', CA 
Oakland Harbor is located in the City of Oakland, on 
the eastern shore of central San Francisco Bay, immediately 
south of the San Francisco-Oakland Bay Bridge. Behind Los 
Angeles, Oakland Harbor is the second largest port on the 
West Coast and the fifth largest container port in the nation. 
Traffic consists primarily of containers and container ships. 
Ports around the world are increasing channel depths and 
expanding throughput capacity to compete for the next 
generation of deep-draft container ships. The project is 
proposing to deepen the federal channels of the Oakland 
Harbor and Port-maintained berths from 42' to depths of 50' 
below Mean lower Low Water (MLLW). In constructing this 
project, up to 12.8 million cubic yards of sediment would be 
dredged, which will require disposal. The recommended 
plan has a benefit-cost-ratio greater than 6.4 to 1. The 
estimated construction cost is $253 million, including $38 
million of local service facilities (berth rehabilitation and 
deepening). Approximately 7.0 mcy of dredged material 
would be deposited in the middle harbor enhancement area 
(MHEA); 2.5 mcy of dredged material would be transported 
to the proposed Hamilton Wetlands Restoration project 
(HWRP); 2.9 mcy of dredged material would be disposed of 
at the existing Montezuma Wetlands Restoration project 
(MWRP); 0.3 mcy of dredged material would be transported 
to the Vision 2000 upland site; and 0.1 mcy of dredged 
material would be sent to an upland land fill. 
The -42' deepening project was completed in July 1998. 
A feasibility study and environmental impact 
statement/report for the -50' project was prepared by the Port 
under the authority of Section 203 of Public Law 99-662, 
and submitted to the Assistant Secretary of the Army for 
Civil Works in February 1999. Chief's Report was signed 
21 April 1999 and the Design Agreement for the -50' project 
Pre-construction, Engineering and Design (PED) was 
executed 24 March 1999. This project was authorized in the 
1999 Water Resources Development Act. The PED of the - 
50' deepening project started in April 1999 with completion 
scheduled by February 2001. Construction contract award is 
scheduled in April 2001. 
SAN RAFAEL CANAL, CA 
San Rafael Canal is located on the northwestern 
shoreline of San Francisco Bay in the city of San Rafael, 
about 17 miles north of the city of San Francisco. The Canal 
is surrounded by San Rafael's central business district and 
dense residential areas. The Study was authorized by a 
resolution adopted by the Committee on Public Works and 
Transportation of the United States House of Representatives 
on August 8, 1984, Section 142 of the Water Resources 
Development Act (WRDA) of 1976 (Public Law 94-587), as 
subsequently amended in Section 705 of WRDA of 1986 
(Public Law 99-662). The project was authorized for 
construction in Section 101 of WRDA of 1996. 
The Feasibility Study recommended the South 
Floodwall Plan. This plan consists of approximately 9,500 
linear feet of floodwall constructed along the south bank of 
34-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
the canal and 1,600 feet of sheet-pile floodwall along the 
crest of the Bayfront levee on the east side of the canal ways 
tract. The South Floodwall Plan has a benefit-to-cost ratio of 
2.0 to 1. Total costs during the fiscal year were $42,351 with 
General Investigations funds. The estimated project cost is 
$32,200,000 of which $20,930,000 is Federal cost and 
$11,270,000 is non-Federal cost. Preconstruction 
Engineering and Design was initiated in October 1992. The 
Corps is proposing a continuous floodwall design which is 
estimated to save between $11.6 to $14.1 million compared 
to the South Floodwall Plan, as recommended in the 
Feasibility Study. A letter was sent to the City of San Rafael 
in December 1996 requested Sponsor's agreement with the 
Corps proposal to finalize the project design based on the 
continuous flood wall concept. A District Engineer letter to 
the Mayor, City of San Rafael, dated 25 September 1997, 
informed the City that the_ project has been placed in a 
suspended status. 
UPPER GUADALUPE RIVER, CA 
The Upper Guadalupe River Feasibility Study area is 
located in the City of San Jose, Santa Clara County, 
California. The reach of the river proposed for improvement 
begins at interstate Highway 280 at the edge of downtown 
San Jose and extends south for about 5.5 miles. 
The feasibility study evaluated a variety of nonstructural 
and structural plans of improvement for flood 
protection in the Upper Guadalupe basin. The final 
feasibility study report and Environmental Impact 
Statement/Report was submitted to South Pacific Division on 
January 30, 1998. This report recommended Federal 
participation in a project providing a 50-year level of flood 
protection. The locally preferred plan, presently requiring 
additional sponsor (Santa Clara Valley Water District) 
funding, would provide a 100-year level of protection. The 
Division Engineer's Public Notice was issued on February 
27, 1998 and a Chief of Engineer's Report was signed 
August 19, 1998. The project has been authorized for 
construction in the 1999 Water Resources Development Act 
The Design Agreement for the follow-on Preconstruction 
Engineering and Design (PED) phase was 
signed on February 25, 1999. PED was initiated in April 
1999. PED is scheduled to complete by the end of FY 2002. 
34-14

SAN FRANCISCO, CA, DISTRICT 
TABLE 34-A COST AND FINANCIAL STATEMENT 
Section Total Cost to 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 Sep. 30, 2000 
InR n Rayv CA New Work 
12. Corte Madera 
Creek, CA 
(Federal Funds) 
(Required Contrib. 
(Contrib. Funds, 
Other) 
1. Crescent City 
Harbor, CA 
(Contrib. Funds, 
Other) 
Fisherman's Wharf 
Areas, San Francisco 
Hamilton Airfield 
Wetland Restoration, 
CA 
(Contrib. Funds, 
Other) 
2. Humboldt Harbor 
and Bay, CA 
(Contrib. Funds, 
Other) 
Klamath River, 
Klamath Glen 
Levee, CA 
Larkspur Ferry Channel, 
CA 
Llagus Creek, CA 
Moss Landing 
Harbor, CA 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work. 
Contrib. 
Cost 
New Work 
A prop. 
Cost 
New Work. 
Contrib. 
Cost 
Maint. 
Approp 
Cost 
Major rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp 
Cost 
New Work 
Approp. 
Cost 
New Work. 
Contrib. 
Cost 
New Work 
A prop. 
ost 
New Work. 
Contrib. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work. 
Contrib. 
Cost 
New Work. 
Contrib. 
Cost 
New Work 
AProp. Cst 
&PJJM~b4 "A.T. 1-6-A %.F&AV 
465,000 465,000 
203,610 203,610 
- 338,215 
- 338,215 
34-15 
12 40 
1340 
440 
440 
5
5 
1,226,765 
1,226,765 
39,421 5,423 47,441 95,044 1,369,250 
39,421 5,423 47,441 93,344 1,367,550 
- - 397,779 
- - - - 397,779 
89,000 304,000 565,000 329,000 13,745,725 
56,750 232,311 595,772 348,755 13,680,358 
- - - 190,355 
- - - - 190,213 
- 804,761 
- - - 804,761 
337,000 511,000 96,000 744,000 11,142,972 
326,886 144,972 268,976 526,892 10,722,698 
-- - - 249,290 249,290 
79,707 833,791 36,704 460,298 26,208,797 
79,707 644,254 226,230 242,621 25,991,109 
- - - 525,000 
525,000 
9,199,000 
9, 199,000 
1,170 - - 11,882 400,370 
1,170 - - 11,882 400,370 
- - 75,000 538,000 613,000 
-- 8,007 459,633 467,640 
- - - 302,000 302,000 
S- - 302,608 302,608 
2,525,000 40,000 6,799,000 1,056,000 20,802,299 
352,308 381,280 6,292,068 3,353,115 20,726,841 
-- - 2,295,000 1,405,000 3,700,000 
S- 1,899,999 691,087 2,591,086 
2,655,000 2,398,890 3,933,480 3,956,700 92,842,777 
2,285,181 2,676,508 4,022,327 3,963,217 92,535,642 
(109,000) - (23,000) - 558,000 
483,298 (21,439) - - 557,818 
- - - 3,240,000 3,240,000 
- - - 131,396 131,396 
1140 
1140 
62 
62
63 
63 
64 
64 
640 
640 
740 
740 
88 
414850 
414950 
51 
51 
940 
940 
1040 
1040 
65 
65 
_

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 34-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project 
Napa River, CA 
Noyo River and 
Harbor, CA 
3. Oakland Harbor, 
CA 
(Federal Funds) 
(Contrib. Funds) 
Oakland Harbor 
50', CA 
(Federal Funds) 
(Contrib. Funds) 
Pajaro River at 
Watsonville, CA 
13. Petaluma River, CA 
(Contributed Funds) 
Pillar Point 
Harbor, CA 
Redwood City 
Harbor, CA 
Removal of 
Sunken Vessels 
4. Richmond Harbor, 
CA 
(Federal Funds) 
Funding 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Aprop. 
Cost 
Maint. 
Approp. 
Cost 
Minor rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
FY 97 FY 98 FY 99 FY 00 Sep. 30, 2000 
-- --- - - - IPOAf 
1,061,475 624,030 1,092,591 525,347 9,958,073 
955,370 491,269 1,305,020 548,684 9,948,957 
- - 1,021,274 
- - - - 1,021,274 
975,090 476,000 1,335,000 5,000 7,764,763 
829,180 280,615 1,627,680 53,423 7,758,901 
103,000 (24,000) - - 4,121,000 
194,562 8,564 - - 4,120,596 
370,997 - 78,899 857,713 10,277,848 
324,323 69,423 79,968 462,231 9,882,366 
-- 222,810 
222,810 
9,744,000 26,131,000 - (100,000) 93,302,684 
10,207,445 26,025,231 634,964 186,363 93,266,240 
3,041,973 3,877,727 3,287,279 10,310,940 67,061,514 
3,020,151 3 ,458,835 3,700,050 10,410,524 67,061,478 
2,447,239 6,995,637 46,000 5,000 24,241,142 
5,039,611 8,891,780 517,029 2,563 24,114,505 
- - 752,000 2,438,000 3,190,000 
- - 651,580 2,427,815 3,079,395 
- - 824,340 365,189 1,189,529 
- - 458,735 627,415 1,086,150 
568,000 408,000 141,000 615,000 2,701,100 
561,854 380,036 197,039 507,590 2,588,679 
978,000 800,000 1,286,166 - 5,474,751 
405,274 1,012,935 1,787,369 11,895 5,301,474 
406,102 1,852,000 (296,000) 175,966 16,855,504 
458,020 756,114 799,886 174,413 16,853,951 
- 759,000 4,000,000 4,535,000 9,294,000 
- 1,178,338 2,142,728 4,843,203 8,164,269 
- - - - 6,697,396 
- - - - 6,697,396 
2,744 38,626 4,745 41,004 2,394,134 
2,744 38,626 4,745 41,004 2,394,134 
- - - - 1,672,722 
- - - - 1,672,722 
(312,476) 638,075 2,474,538 130,108 21,589,994 
(362,474) 243,519 2,919,092 129,394 21,276,804 
- - - 283,068 
-.. 283,068 
1,235,400 17,809,000 (877,000) (150,000) 30,160,427 
948,950 16,156,205 619,718 369,847 30,132,995 
34-16 
12 40 
1240 
13 40 
1340 
13 1440 
13 14 40 
15 16 40 
15 17 40 
18 19 40 
1819 40 
20 40 
20 40 
21 
21 
22 
22 
23 40 
23 40 
2440 
2440 
43 44 
43 44 
4445 
4445 
25 40 
25 40 
2640 
2640 
27 28 
27 28

SAN FRANCISCO, CA, DISTRICT 
TABLE 34-A (Cont'd) COST AND FINANCIAL STATEMENT 
Section Total Cost to 
in Text Project 
(Contributed Funds) 
14. Russian River Basin, 
CA, Coyote Valley 
Dam (Lake 
Mendocino) and 
Channel Improvements 
(Fed Funds) 
(Contrib. Funds, 
Other) 
Dry Creek (Warm 
Springs) Lake 
and Channel 
Improvements, CA 
(Federal Funds) 
(Contrib. Funds, 
Other) 
San Clemente 
Creek, CA 
5. San Francisco Bay 
to Stockton, CA 
(John F. Baldwin 
and Stockton Ship 
Channels) 
(Contributed Funds) 
7. San Francisco Bay 
and Delta Model, 
CA 
8. San Francisco Bay 
Long Term 
Management 
Strategy (LTMS), CA 
Funding 
Maint 
Approp. 
Cost 
Minor rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
-Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
FY 97 FY 98 FY99 FY 00 Sep. 30, 2000 
4,336,736 6,515,445 2,947,219 2,557,179 
4,315,263 6,491,813 2,991,913 2,563,937 
3,437,000 4,487,200 
1,033,730 6,681,933 
(5,000) 
20,523 
53,190,298 
53,185,712 
164,689 
164,689 
7,919,200 
7,736,186 
29 40 
29 40 
- - - - 14,435,869 _4 
- - - - 14,435,869 54 
2,834,378 2,869,000 3,023,000 3,761,000 57,516,902 sS 
2,572,324 2,766,987 3,040,923 4,071,397 57,469,385 5s 
- - - - 589,911 6 
- - - - 570,774 57 
S- - 333,108,645 5 
S- - 333,081,773 58 
4,295,991 5,508,000 4,133,000 4,144,000 
3,661,869 5,069,869 4,923,360 4,159,938 
198,000 (198,000) 
623,000 320,000 
1,091,643 310,637 
- 88,316 
1,990,000 
1,970,461 
550,000 
367,759 
1,805,000 
1,896,557 
40,000 
29,048 
51,275,934 59 
49,919,980 59 
230,574 6062 
228,732 6163 
- - 38,837,200 42 
124,167 (37,422) 38,778,337 42 
(5,000) 
3,397 
88,316 
3,937 
2,042,000 2,254,300 37,233,217 
2,073,435 2,228,816 37,001,374 
214,766 
11,951,000 
11,951,000 
San Francisco New Work 
Harbor, CA 
San Francisco New Work 
Harbor and Bay, CA 
(Removal of Drift) 
San Leandro 
Marina, CA 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Atpprop. 
Cost 
- - - - 2,689,356 283040 
2,689,356 283040 
1,384,000 1,109,542 1,056,480 1,892,650 43,517,329 3140 
1,389,663 1,090,286 1,080,511 1,893,895 43,517,314 3140 
1,960,000 2,067,000 1,498,000 2,039,700 45,468,280 40 
2,023,648 1,616,890 1,661,854 2,351,227 45,412,683 40 
34-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 34-A (Cont'd) COST AND FINANCIAL STATEMENT 
SSeecet ion I Total Cost to 
in Text Project 
San Pablo Bay 
and Mare Island 
Strait, CA 
15. San Pedro Creek, 
Pacifica, CA 
(Federal Funds) 
(Contrib. Funds) 
San Rafael 
Canal, CA 
San Rafael 
Creek, CA 
Santa Cruz 
Harbor, CA 
(Federal Funds) 
(Contrib. Funds) 
6. Sonoma Baylands 
Wetlands Demo 
Project, CA 
(Contrib. Funds) 
Suisun Bay 
Channel,CA Approp. 
Suisun Channel, CA 
Upper Guadalupe 
River, CA 
(Contrib. Funds) 
Fundinga 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp 
231,090 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
A prop. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Aprop. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint. 
Approp. 
Cost 
New Work 
A prop. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
FY 97 FY 98 FY99 FY00 Sep. 30, 2000 
22,316 
2,602,504 
2,616,786 
400,000 
741,705 
(881) 
67,280 
67,282 
1,700,000 
1,235,218 
258,981 
(2,000) 
917,600 78,000 
837,178 136,106 
- 51,037 
- 51,037 
1,027,000 388,341 
1,034,130 387,584 
- 398,500 
24,237 47,189 
1,200 
10,539 
(37,000) 
42,351 
4,509 
(1,000) 
4,659,439 32 
4,659,439 32 
1,420,409 283340 
1,420,409 283340 
47,305,634 3440 
47,305,636 3440 
3,070,100 
2,570,862 
667,300 
419,127 
2,180,000 
2,179,197 
32,359 
32,359 
1,222,602 476,413 100,778 48,694 
1,149,852 535,858 163,428 46,619 
4047 
4047 
6,885,736 4046 
6,883,661 46 
4,126,808 52 
4,126,808 52 
160,000 
160,000 
4,690 33,205 
4,690 33,205 
500,000 720,000 
872,566 707,798 
- 75,000 
231,090 8,567 
65,563 29,419 
65,563 29,419 
69,876 
97,560 
70,908 
5,000 
35 
35 
9,861,63640 53 
9,861,636 4053 
6,320,100 
6,312,064 
906,560 
796,980 
200,928 36 
200,928 36 
178,400 3,299,252 1,664,500 2,640,365 16,670,861 37 
320,469 3,142,611 1,832,423 2,653,929 16,670,823 37 
- - - - 217,677 38 
- - - - 217,677 38 
75,505 
75,505 
- 100,217 
- 100,217 
50,000 233,000 
4,185 261,202 
- 385,000 
284,088 
11,231 
11,231 
1,008,000 
1,019,028 
1,320,000 
101,902 
3,002,462 39 
3,002,462 39 
1,291,000 
1,284,415 
1,705,000 
385,990 
1. Includes $641,800 for jetties, bulkheads, main 
Bodega Bay Channel and turning basin completed in 1943. 
2. Includes $585,000 for Preconstruction Planning 
($456,000 Construction, General funds and $129,000 
General Investigation funds). 
3. Includes $585,000 Preconstruction Planning costs 
($456,000 Construction General costs and $129,000 
General Investigation costs). 
4. Includes $873,207 for reconnaissance and 
condition surveys, FY 1956-2000. Excludes contributed 
funds of $385,134. 
34-18 
it 9- - --- @ 
woomm

SAN FRANCISCO, CA, DISTRICT 
5. Excludes contribution funds of $2,000. 
6. Excludes contributed funds of $271,116 and 
$2,138 surplus material from Corps military activities. 
7. Excludes contributed funds of $44,340. Includes 
$797,592 for reconnaissance and condition surveys, FY 
1956-2000. 
8. Excludes $2,000 contributed funds in lieu of 
royalty-free rock. 
9. Includes $2,261,371 for previous project. 
Excludes $95,000 contributed funds for existing project. 
10. Includes $98,206 for previous project and 
$26,457 for reconnaissance and condition surveys, FY 
1956-2000. 
11. Excludes $5,337 previous project costs. 
12. Excludes $8,539 surplus material from Corps' 
military activities. Includes $310,954 for reconnaissance 
and condition surveys, FY 1956-2000. Excludes 
contributed funds of $290,653. 
13. Excludes previous project costs. 
14. Includes $943,187 for reconnaissance and 
condition surveys, FY 1956-2000. Excludes $496,307 
contributed funds. 
15. Includes $11,985 for previous project. Excludes 
$7,180 contributed funds for previous project. 
16. Includes $4,145,000 for Preconstruction Planning 
($3,565,000 for Breakwater of which $500,000 allocated 
under Construction, General and $3,065,000 under 
General Investigations); ($580,000 for Channel Extension 
of which $165,000 allocated under Construction, General 
and $415,000 under General Investigations). 
17. Includes $4,112,031 Preconstruction cost 
($3,532,031 for Breakwater of which $500,000 was under 
Construction, General and $3,032,031 under General 
Investigations); ($580,000 for Channel Extension of which 
$165,000 was under Construction, General and $415,000 
under General Investigations). 
18. Includes $37,810 for previous project and 
$202,279 for reconnaissance and condition surveys, FY 
1956-2000. Excludes contributed funds of $820 for 
previous project. 
19. Excludes contributed funds of $4,000 in lieu of 
providing dike disposal areas on existing project. 
20. Excludes contributed funds of $1,700. 
21. Includes $2,899,232 for previous projects. 
Excludes $397,266 contributed funds on previous 
projects. 
22. Includes $684,028 for previous projects and 
$136,234 for reconnaissance and condition surveys, FY 
1956-2000. Excludes contributed funds of $43,474. 
23. Includes $212,083 for previous project. Excludes 
contributed funds of $15,559 for previous project. 
24. Includes $314,692 for previous project and 
$536,990 for reconnaissance and condition surveys, FY 
1956-2000. Excludes contributed funds of $192,424. 
25. Includes previous project costs $31,443. 
Excludes $119,572 contributed funds for existing project. 
26. Includes $837,004 for reconnaissance and 
condition surveys, FY 1956-2000. 
27. Excludes contributed funds of $524,778. 
Includes $105,000 Public Works Administration funds. 
28. Excludes modification authorized October 27, 
1965, under project "San Francisco Bay to Stockton, CA 
(John F. Baldwin and Stockton Ship C annels)." 
29. Excludes $115,536 contributed funds. Includes 
$238,825 for reconnaissance and condition surveys, FY 
1956-2000. 
30. Includes $1,030,399 for previous projects. 
Excludes $134,591 contributed funds for existing project. 
Includes $193,000 Public Works Administration funds. 
31. Includes $475,321 for previous projects and 
$813,611 for reconnaissance and condition surveys, FY 
1956-2000. 
32. Authorized by FC Act of 1965 (Sec. 201); 
Maintenance R&H Act of 1970 (Sec. 103). Includes 
$321,488 for reconnaissance and condition surveys FY 
1979-2000. See FY 1977 Annual Report for last full 
report. Excludes contributed funds of $879,454. 
33. Includes $1,086,703 for previous projects. 
34. Includes $1,359,380 for previous projects and 
$128,516 for reconnaissance and condition surveys, FY 
1956-2000. 
35. Excludes $810,046 contributed funds on previous 
project. 
36. See Sacramento District FY 1974 Annual Report 
for detail. 
37. Project maintenance responsibility to Point Edith 
was transferred to San Francisco District January 1, 1974. 
Excludes Sacramento District's portion. Includes $48,735 
for reconnaissance and project condition surveys, FY 
1976-2000. 
38. Project maintenance assigned to San Francisco 
District from Sacramento District January 1, 1974. See 
Sacramento District 1972 Annual Report for full report. 
39. Includes $746,637 for reconnaissance and 
condition surveys, FY 1978-2000. Includes $727,510 for 
previous project. Excludes $121,386 contributed funds. 
40. See FY 1981 Annual Report for last full report. 
41. Excludes Contributed Funds of $709,624. 
42. See Sacramento District FY 1985 Annual Report 
for full report. 
43. Excludes $100,000 contributed funds and 
$105,000 contributed in lieu of royalty-free rock. 
44. See FY 1979 Annual Report for last full report. 
45. Includes $240,334 for reconnaissance and 
condition surveys, FY 1970-2000. 
46. Includes $445,915 for reconnaissance and 
condition surveys, FY 1970-2000. Excludes $93,500 
contributed funds. 
47. Excludes $41,094 contributed funds. 
48. Includes $9,199,000 funds of which $8,499,000 
was under Construction, General and $700,000 under 
General Investigations. 
49. Includes $9,199,000 costs of which $8,499,000 
was under Construction, General and $700,000 under 
General Investigations. 
50. See FY 1987 Annual Report for last full report. 
51. Includes $77,340 for reconnaissance and 
condition surveys, FY 1989-2000. 
52. See FY 1988 Annual Report for last full report. 
53. Includes $179,294 for reconnaissance and 
condition surveys, FY 1993-2000. 
54. Excludes $5,598,000 contributed funds: $400,000 
for recreation facilities at completed projects funded under 
Public Works Acceleration Program; and $1,628,411 for 
recreation facilities at completed projects funded under 
Code 711 at Coyote Valley Dam, Lake Mendocino. 
55. Includes $94,459 special recreation use fees and 
costs (FY 1982-1983), but excludes prior special 
recreation fees and cost for Coyote Valley Dam, Lake 
Mendocino. 
56. Includes $251,911 contributed funds, other from 
City of Ukiah for Coyote Valley Dam, Lake Mendocino, 
hydropower studies; and $338,000 from California 
Department of Boating and Waterways for launching 
facility at Lake Mendocino. 
57. Includes $250,117 contributed funds, other costs 
for Coyote Valley Dam, Lake Mendocino, hydropower 
studies; and $320,657 for California Department of 
34-19

IIR - -EPOI-R TI l OF THEl SECRETARYI OF TIIH E ARMY ONI CIVIL IW OIRKS ACTIVITIES FOR FY 2000 
Boating and Waterways for launching facility at Lake 
Mendocino. 
58. Includes $253,421,793 previous San Francisco 
construction funds and costs through August 1983 for Dry 
Creek, Warm Springs Dam. 
59. Includes $964,114 previous San Francisco 
maintenance funds and costs through April 1982 for Dry 
Creek, Warm Springs Dam. 
60. Includes $208,074 contributed funds, other, from 
Sonoma County for Dry Creek, Warm Springs, 
hydropower studies; and $22,500 from City of Ukiah for 
hatchery pump design at Lake Mendocino. 
61. Includes $208,074 contributed funds, other, costs 
for Dry Creek, Warm Springs hydropower studies; and 
$20,658 costs for hatchery pump design. 
62. Includes $7,303,725 San Francisco District 
construction funds and costs for Corte Madera Creek 
63. $8,695 contributed funds transferred to 
Sacramento District in FY 1983. Includes $97,400 San 
Francisco District required contributed funds and costs. 
64. Contributed funds, other, and costs, from Marin 
County including $536,921 for miscellaneous bridge and 
road relocations and $267,840 for additional expenses for 
disposal sites at Corte Madera Creek. 
65. See FY 1998 Annual Report for last full report. 
34-20

SAN FRANCISCO, CA, DISTRICT .. .. . .II � I 
AUTHORIZING LEGISLATION 
See 
Section 
in Text 
1. 
Project and Work Authorized 
Date of 
Authorizing 
Act 
Jul. 18, 1918 
Sep. 22, 1922 
Jan. 21, 1927 
Aug. 30, 1935 
Aug. 26, 1937 
Mar. 2, 1945 
Mar. 2, 1945 
Oct. 27, 1965 
HUMBOLDT HARBOR, CA 
Mar. 3, 1881 Channel 10 feet deep by 350 feet wide to be dredged 
along Eureka waterfront, thence 8 feet deep by 200 
feet wide west to natural channel; dredging Mad 
River Shoal to 8 feet deep. 
Jul. 5, 1884 Construct South Jetty and continue channel 
improvements. 
Aug. 5, 1886 $75,000 continued improvement of Harbor with 
provision for title to 12 acres of land to be 
conveyed to the U.S. 
Jul. 3, 1892 Map and cost estimates for continuing Harbor 
improvements with provision for two parallel 
jetties. 
Mar. 3, 1899 
Jun. 25, 1910 
Continuing Harbor improvements with provision 
for two parallel jetties. 
Rebuilding the jettles and channel improvements 
to Arcata and Hookton. 
Jul. 3, 1930 Eureka Channel 20 feet deep and 300 feet wide; 
Samoa Channel 20 feet deep and 250 feet wide; 
Arcata Channel 18 feet deep and 150 feet wide; 
Fields Landing Channel 20 feet deep and 250 feet wide. 
Aug. 30, 1935 Entrance Channel 30 feet deep and 500 feet wide. 
Aug. 26, 1937 Eureka Channel 26 feet deep and 400 feet wide; 
Samoa Channel 26 feet deep and 300 feet wide; 
Fields Landing Channel 26 feet deep and 300 feet wide; 
CRESCENT CITY HARBOR, CA 
A breakwater bearing S. 26-1/4 E. from Battery Point 
to Fauntleroy Rock and breakwater from the shore to 
Whaler Island. 
Modified condition of local cooperation which required 
that local interests construct a railroad from Grants 
Pass, Oregon to Crescent City so that a State Highway 
to Grants Pass would be an acceptable alternate. 
Extension of the breakwater to a length of 3,000 feet 
and a reduced cash contribution required of local 
interests. 
Maintaining by dredging of an outer harbor basin, 
1,800 feet long, 1,400 feet wide and 20 feet deep, 
except in rock. 
Construction of a sand barrier from Whaler Island to 
the mainland and for maintenance dredging in the 
vicinity of the seaward end of the sand barrier. 
Extension of existing breakwater 2,700 feet to Round 
Rock (modified by Chief of Engineers, 1952). 
Construction of inner breakwater and removal of 
pinnacle rock and other material from the harbor to a 
depth of 12 feet and a harbor basin with a project depth 
of 10 feet. 
Extension of inner breakwater and dredging of T-shaped 
harbor basin to depth of 20 feet. 
34-21 
TABLE 34-B 
2. 
-- 
Documents 
H. Doe. 434, 64th 
Cong., 1st sess. 
Rivers & Harbors 
Committee Doc. 4, 
67th Congress, 2nd 
sess. 
H. Doc. 595, 69th 
Cong., 2nd sess. 
Rivers & Harbors 
Committee Doc. 
40, 74th Cong. 
Senate Committee 
Print, 75th Cong., 
1st sess. 
H. Doc. 688, 76th 
Cong., 3rd sess. 
Report on file in 
office, Chief of 
Engineers. 
H. Doc. 264, 89th 
Cong., Ist sess. 
H. Doc. 59 
Cong., 3rd sess. 
River & Harbor 
Approp Act of 1884 
River & Harbor 
Approp Act of 1886 
Chief of Engrs 
Annual Report 
(p.3120) Annual 
River & Harbor, 
Approp Acts 1892- 
1899 
H. Doc. 528, 55th 
Cong., 2nd sess. 
H. Doc. 950, 60th 
Cong., 1st sess., 
H. Doc. 204, 61st, 
Cong., 2nd sess., 
H. Doe. 326, 61st 
Cong., 2nd sess. 
H. Doc. 755, 69th 
Cong., 2nd sess. 
Rivers and Harbors 
Committee Doe. 14 
74th Cong.,lst sess 
Rivers & Harbors 
Committee, Doe. 
11, 75th Cong., 1st

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 - II I- I I I I I I - I � II I I 
TABLE 34-B (Cont'd) AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Turning Basin (off Fields Landing wharf) channel 
26 feet deep, 600 feet wide and 800 feet long. 
Bar & Entrance Channel 40 feet deep, tapered from 
1,600 feet to 500 feet wide; North Bay Channel 30 feet 
deep and 400 feet wide; Eureka Channel 30 feet deep 
to mile 5.0; Samoa Channel 30 feet deep. 
North Bay Channel 35 feet deep; Samoa Channel 35 
feet deep; widen turns at mile 0.75 and 2.6; provide 
a 1,200 by 1,200 foot anchorage in North Bay. 
Bar and Entrance Channel 48 feet deep; North Bay 
Channel, Samoa Channel and Samoa Turning Basin 
38 feet deep; widen the north side of the Entrance 
Channel an additional 200 to 275 feet; relocate the 
southern edge of the Entrance Channel away from the 
South Jetty and to the north by 100 feet; and widen 
and realign the entrance to the Samoa Turning Basin. 
June 23, 1874 Jetties. 
OAKLAND HARBOR, CA 
June 25, 1910 North channel in Brooklyn Basin, 25 feet deep, 
and tidal canal to 18 feet. 
Sep. 22, 1922 Channel across shoal southeast of Yerba Buena 
Island and thence to Webster St.; South 
channel in Brooklyn Basin; Turning Basin at 
east end of Brooklyn Basin; and channel in 
Tidal Canal from Brooklyn Basin to Park St., 
30 feet deep. 
Jan. 21, 1927 2 Channel from Webster St. to Brooklyn Basin, 
maintain area to within 75 feet of pierhead 
line south of channel from Harrison St. to 
Harbor Line Point 119 in Brooklyn Basin; 
dredge a triangular strip about 2,700 feet long 
and maximum width of 300 feet at western 
end of Brooklyn Basin, 30 feet deep. 
Apr. 28, 1928 Local cooperation requirements modified to 
provide alteration or replacement of bridges by 
local interests shall apply only to that feature of 
project covering deepening tidal canal to 25 feet. 
Drawbridges across Tidal Canal were required by 
1882 Decree of Court in condemnation proceedings 
whereby title was obtained to nghtof-
way for tidal canal. 
July 3, 1930 Entrance channel to outer harbor, 800 to 600 
feet wide. 
Mar. 2, 1945 Eliminated requirement that local interests contribute 
10 cents per cubic yard toward deepening 
tidal canal. 
Mar. 2, 1945 Maintenance of 35-foot depth in channel to outer 
harbor and in outer harbor channel and turning 
basin. 
Oct. 23, 1962 3 Deepen inner harbor 35-foot channels and lower 
1,300 feet of north channel in Brooklyn Basin 
to 35 feet. 
Nov. 17, 1986 Deepen Inner and Outer Harbor channels to 42 
feet. Widen entrance channel to 1,000 feet; 
Jul. 16, 1952 
August 1968 
Oct. 12, 1996 
34-22 
sess. 
Rivers & Harbors 
Committee, Doc. 
143, 82nd Cong., 
1st sess. 
H. Doc. 330, 90th 
Cong., 2nd sess. 
1996 WRDA, Public 
Law 104-303, 
Section 101 
Annual Report, 
Part II, 1874, 
p. 378. 
H. Doc. 647, 61st 
Cong., 2d sess. 
H. Doec. 144, 67th 
Cong., 2d sess. 
H. Doc. 407, 69t 
Cong., 1st sess. 
Public Res. 28, 
70th Cong. 
Rivers and Harbors 
Committee Doc. 
43, 71st Cong., 2nd 
sess. 
H. Doec. 466, 77d 
Cong., 1st sess. 
Report on File in 
Office, Chief of 
Engineers 
H. Doc. 353, 87th 
Cong., 2d sess. 
1986 WRDA, Public 
Law 99-662 
3. 
]
t

SAN FRANCISCO, CA, DISTRICT 
TABLE 34-B (Cont'd) AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
relocate Outer Harbor turning basin 3,000 feet 
westward and widen turning basin to 1800 feet. 
Construct 1,200 foot turning basin in Inner 
Harbor. 
RICHMOND HARBOR, CA 
Aug. 8, 1917 Channel 24 feet deep and 600 feet wide from San 
Francisco Bay to Ellis Slough (Santa Fe Channel); 
a turning basin at Point Potrero; a training wall. 
July 3, 1930 A 30-foot channel with lessened widths; a turning 
basin at head of navigation. 
Aug. 30, 1935 4 Increase project widths in inner harbor, maintenance 
of Santa Fe channel to 30 feet; approach areas 
in outer harbor to 32 feet. 
June 20, 1938 
Mar. 2, 1945 
Sep. 3, 1954 
Oct. 27, 1965 
Nov. 17, 1986 
6. 
Oct. 5, 1992 
12. 
Oct. 23, 1962 
Nov. 7, 1966 
Widen channel at Point Potrero and north thereof; 
enlarge and maintain to 30-foot depth turning 
basin at Terminal No. 1. 
Channel 20 feet deep, 150 feet wide, in San Pablo 
Bay north of Point San Pablo. 
Channel 35 feet deep and 600 feet wide adjacent 
to Southampton Shoal; enlarge and deepen to 35 
feet approach area to Richmond Long Wharf; 
widen and deepen inner harbor and entrance 
channels; deepen turning basin at Point Richmond 
and southerly 2,000 feet of Santa Fe Channel. 
Eliminate restriction that widening north of 
Point Potrero will not be undertaken until local 
interests furnish assurances industries will avail 
themselves of improved navigation facilities 
and reclamation of Reservation Point. 
West Richmond channel 45 feet deep, 600 feet 
wide; enlarge and deepen to 45 feet maneuvering 
area at Richmond Long Wharf (Sacramento Dist. 
"San Francisco Bay to Stockton, Calif. (John 
F. Baldwin and Stockton Ship Channels)"). 
Deepen channel to 38 feet between Richmond 
Long Wharf and Santa Fe Channel. Construct 
1,200 feet turning basin. 
SONOMA BAYLANDS WETLANDS 
DEMONSTRATION PROJECT, CA 
Restoration of tidal wetland on a 348-acre site using 
dredged material and construction of a replacement 
levee around the landward periphery of the site. 
CORTE MADERA CREEK, CA 
Levees and channel improvements, lower 11 miles 
of Corte Madera Creek and tributaries, as modified 
by Chief of Engineers. 
Local cooperation requirements modified to provide 
1.5 percent cash contribution toward cost of Ross 
Valley unit. 
H. Doc. 515, 63rd 
Cong., 2d sess. 
Rivers and Harbors 
Committee Doc. 
16, 70th Cong., Ist 
sess. 
Rivers and Harbors 
Committee Doc. 7, 
73rd Cong., 1st 
sess., and 10, 74th 
Cong., Ist sess. 
H. Doc 598, 75th 
Cong., 3rd. sess. 
H. Doc. 715, 76th 
Cong., 3rd. sess. 
H. Doc. 395, 83rd 
Cong., 2nd sess. 
H. Doc. 208, 89th 
Cong., 1st sess. 1 
1986 WRDA, Public 
Law 99-662 
Section 106, 
1992 WRDA, 
Public Law 
102-580 
H. Doec. 545, 87th 
Cong., 2nd sess. 
Sec. 204, 1966 
Flood Control Act 
34-23 
4.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 34-B (Cont'd) AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Nov. 17, 1986 Modify existing project to direct construction of Unit 
4 from Lagunitas Road Bridge to Sir Francis Drake 
Boulevard, and to include construction of floodproofing 
measures in vicinity of Lagunitas Road Bridge to 
insure proper functioning of completed portions of 
authorized project. Further modify project to eliminate 
any channel modifications upstream of Sir Francis 
Drake Boulevard. 
PETALUMA RIVER, PETALUMA, CA 
Jun. 30, 1948 Floodwalls and channel improvements along 3,600 feet 
of the Petaluma River and tributaries. 
Jan. 24, 2000 Provide a 100-year level of flood protection to the city 
of Petaluma. 
May 17, 1950 
Feb. 10, 1956 
Oct. 23, 1962 
Mar. 7, 1974 
RUSSIAN RIVER BASIN, CA 
Coyote Valley Dam (Lake Mendocino): Channel 
improvements on lower 98 miles of Russian River 
and lower reaches of tributaries. 
Increased appropriation authorization for initial 
stage of project development. 
Dry Creek (Warm Springs) Lake; Channel 
Improvements on Dry Creek below dam. 
Dry Creek (Warm Springs) Lake and channel; 
compensate for fish losses on the Russian River 
which may be attributed to the operation of the 
Coyote Dam component of the project through 
measures such as possible expansion of the 
capacity of the fish hatchery at the Warm 
Springs Dam component of the project. 
Sec. 823, 1986 
WRDA 
Flood Control Act 
of 1948, Public 
Law 80-858, 80th 
Cong., 2nd sess. 
2000 WRDA, Publig 
Law 106-541, 106 
Cong., 2d sess. 
H. Doc. 585, 81st 
Cong., 2d sess. 
PL 404, 84th Cong., 
2d sess. 
H. Doc. 547, 87th 
Cong., 2d sess. 
Sec. 95, 1974 
WRDA 
SAN PEDRO CREEK, PACIFICA, CA 
Jun. 30, 1948 Channel realignment and wetland restoration. Flood Control Act 
of 1948, Public 
Law 80-858, 80th 
Cong., 2nd sess. 
1. Contains latest published map. 
2. Included deepening of tidal canal above Park 
Street Bridge to 25 feet, which was deauthorized 
November 6, 1977. 
3. Reconstruction of Fruitvale Avenue 
Highway Bridge (S. Doc. 75, 87th Cong., 2d sess.) which 
was deauthorized November 6, 1977. 
4. Included in part in Public Works Administration 
Program, September 6, 1933. 
34-24 
12. 
14. 
15.
_

SAN FRANCISCO, CA, DISTRICT 
TABLE 34-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to Sep. 30 2000 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Berkeley Harbor, CA ' Completed 1966 $ 155,550 2 $104,699 9 
Berkeley Marina, CA ' Completed 1979 505,201 ' 
Monterey Harbor, CA Completed 1971 1,108,182 4 2,016,547 s 
San Francisco Harbor (Islais 
Creek), CA 1 Completed 1976 848,227 7 156,995 " 
San Francisco Marina (Gas 
House Cove), CA Completed 1974 180,472 6 97,513 10 
San Ieandro Marina (Breakwater), 
CA' Completed 1976 210,390 8 148,785 12 
Sausalito Canal, Richardson 
Bay, CA Inactive 1963 103,095 131,409 '3 
1. Authorized by Chief of Engineers (Sec. 107, 7. Includes $94,550 preauthorization costs. 
Public Law 86-645). 8. Includes $72,000 preauthorization costs and 
2. Excludes $155,551 contributed funds. excludes contributed funds $138,189. 
3. Excludes $378,989 contributed funds. 9. Includes $104,699 for jetty condition surveys for 
4. Includes $207,800 Public Works Administration FY 1987-2000. 
funds and breakwater modifications (1960 Act) placed 10. Includes $97,513 for reconnaissance and 
inactive 1974. The barrier groin and sandtrap feature of condition survey for FY 1990-2000. 
the project was deauthorized November 17, 1986, by 11. Includes $156,995 for reconnaissance and 
WRDA of 1986. condition survey for FY 1994-2000. 
5. Includes $562,313 for reconnaissance and 12. Includes $148,785 for reconnaissance and 
condition survey for FY 1956-2000. condition survey through FY 2000. 
6. Includes preauthorization costs $26,855 and 13. Includes $61,244 for reconnaissance and 
excludes contributed funds $153,618. condition survey through FY 2000. 
TABLE 34-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Date Funds Funds 
Project Report For Deauthorized Expended Expended 
Humboldt Bay (Buhne Point), CA 
Lower San Francisco Bay, CA 
Knights Valley Lake, R.R. 
Basin, CA 
Oakland Harbor, CA (Deepen 
Tidal Canal) 
Oakland Harbor, CA (Fruitvale 
Avenue Bridge) 
San Lorenzo Creek, CA 
(Upper Portion) 
San ablo Bay and Mare 
Island Strait, CA (Approaches 
to Vallejo and South Vallejo) 
Santa Cruz County, CA 
1958 
1935 
1974 
1981 
1981 
1962 
1982 
1966 
Jan. 1, 1990 
Jan. 1, 1990 
Aug. 5, 1977 
Nov. 6, 1977 
Nov. 6, 1977 
Nov. 6, 1977 
Nov. 6, 1977 
Jan. 1, 1990 
$ 2,000 
245,639 
34-25 
-

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 II I- I- I- I I _ I I I I I II 
TABLE 34-H INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
(See Section 10 of Text) 
Dates of Inspection 
Alameda Creek 
Corte Madera Creek 
Coyote Creek, Marin County 
Coyote Creek, Santa Clara County 
Dry Creek 
East Weaver Creek 
Eel River at Sandy Prairie 
Guadalupe River 
Klamath River 
Mad River at Blue Lake 
Pajaro River, Monterey County 
Pajaro River, Santa Cruz County 
Pinole Creek 
Redwood Creek 
Rheem Creek 
Rodeo Creek 
Russian River, Mendocino County 
Russian River, Sonoma County 
San Leandro 
San Lorenzo Creek 
San Lorenzo River 
San Pablo Creek 
Uvas Creek 
Wildcat Creek 
May 2000 
May 2000 
May 2000 
Sep 2000 
Aug 2000 
Jun 2000 
Jun 2000 
Jul 2000 
Jun 2000 
Jun 2000 
Apr 2000 
Apr 2000 
Apr 2000 
Jun 2000 
Apr 2000 
Apr 2000 
Jun 2000 
Jun 2000 
May 2000 
Apr 2000 
Jul 2000 
Apr 2000 
Jul 2000 
Aug 2000 
34-26 
Location 
-- 
-

SAN FRANCISCO, CA, DISTRICT 
TABLE 34-I RUSSIAN RIVER BASIN, CA: ESTIMATED 
COST FOR NEW WORK 
(See Section 15 of Text) 
Estimated Cost 
Non-Federal 
Project Feature Federal Contribution Total 
Coyote Valley Dam (Lake Mendocino): 
Channel Improvements below Dam 
on lower 98 miles of Russian River $ 14,436,000 $ 5,598,000 $ 20,034,000 
Dry Creek (Warm Springs) Lake and 
Channel Improvements below Dam 259,240,000 103,777,000 2 363,017,000 
Total $273,676,000 109,375,000 $ 383,051,000 
1. Exclusive of $1,628,000 for recreation facilities at be paid over a period not to exceed 50 years after use of 
completed projects. storage is initiated and inclusive of lands and damages. 
2. Reimbursements by local interests to Federal 
Government for costs allocated to water supply storage to 
TABLE 34-J RUSSIAN RIVER BASIN, CA: PROJECT 
FEATURES AND ESTIMATED COST 
(See Section 15 of Text) 
Height of 
Nearest City Distance Height of Capacity Estimated 
Name (California) Above Mouth Dam (Acre-Ft) Cost 
Tvype 
Coyote Valley Dam Mile 0.8 East Fork 160 Feet- 
Mendocino) Ukiah of Russian River Earthfill 122,500 $ 17,550,000 
Channel Improvements (East 
Fork) Ukiah Mile 0 to 0.8 East Fork 
below Coyote Valley Dam 24,484,000 
and lower 98 miles of Mile 0 to 98, Russian 
Russian River Guernville River - 
319 Feet- 
Dry Creek (Warm Springs Healdsburg Mile 14.4 Dry Creek Earthfill 181,000 363,017,000 
Channel Improvements (Dry 
Creek) below Dry Creek 
(Warm Springs Dam) Healdsburg Mile I to 14.4 Dry Creek - - 2,864,000 
1. Exclusive of $1,628,000 for recreation facilities at 
completed projects. 
34-27
SACRAMENTO, CA, DISTRICT* 
This district comprises basins of Suisun Bay and San 
Joaquin and Sacramento Rivers in California; Goose 
Lake in Oregon; basins of the Great Salt Lake and 
Sevier Lake in Utah; an intervening portion of Great 
Basin in northern Nevada, northern California, and 
southeastern Idaho; and the upper Colorado River 
basin, which is in southwestern Wyoming, eastern 
Utah, northeastern Arizona and western Colorado, 
west of the Continental Divide. 
IMPROVEMENTS 
Navigation Page 
1. Sacramento River, CA.................................. 35-2 
2. Sacramento River, Deep Water 
Ship Channel, CA........ .......... ...................... 35-3 
3. San Francisco Bay to Stockton, CA 
(John F. Baldwin and Stockton 
Ship Channels) ..................... ................. 35-4 
4. San Joaquin River, CA ................................. 35-4 
Flood Control 
5. American River Watershed, CA 
(Common Features) .................. .......... 35-6 
6. American River (Natomas) .................... 35-6 
7. Buchanan Dam-H.V. Eastman Lake, 
Chowchilla River, CA ..................... ......... 35-5 
8. Cache Creek Settling Basin, CA .................. 35-6 
9. Calaveras River and Littlejohn Creek and 
Tributaries, including New Hogan Lake 
And Farmington Dam, CA ............................ 35-7 
10. Colorado River at Grand Junction, CO ......... 35-8 
11.Corte Madera Creek, CA ..... ...................... 35-9 
12. Coyote and Berryessa Creeks, CA ........... 35-9 
13. Fairfield Vicinity Streams, CA ................... 35-10 
14. Guadalupe River, CA ................................... 35-11 
15. Hidden Dam-Hensley Lake, Fresno 
River, CA ................ ........................ 35-11 
16. Isabella Lake, Kern River, CA .................. 35-12 
17. Kaweah and Tule Rivers, including 
Terminus Dam and Success Lake, CA..........35-14 
18. Little Dell Lake, UT ..................................... 35-15 
19. Martis Creek Lake, Martis Creek 
NV and CA .................................................. 35-16 
20. Merced County Streams, CA.....................35-17 
21. Merced County Stream Group, CA...... 35-18 
22. Napa River, CA .............................. 35-18 
23. Pajaro River, CA ...................... 35-19 
24. Pine Flat Lake and Kings River, CA ............ 35-19 
25. Redbank and Fancher Creeks, CA ............ 35-21 
26. Russian River Basin, including Dry Creek 
(Warm Springs Lake) and Lake 
Mendocino (Coyote Valley Dam), CA .......... 35-22 
Flood Control (Cont'd) Page 
27. Sacramento River and Tributaries, CA 
from Collinsville to Shasta Dam ................ 35-23 
28.San Lorenzo, CA ................................... 35-25 
29. Upper Jordan, UT..................................... 35-26 
30. Walnut Creek, CA........................................35-27 
31. West Sacramento, CA .............................. 35-28 
32. Wildcat and San Pablo Creeks, CA............35-29 
33. Inspection of Completed Flood 
Control Projects.......................................... 35-30 
34. Flood Control Work under Special 
Authorization . ..................................................... 3 5-30 
35. Scheduling Flood Control 
Reservoir Operations ............................... 35-31 
Multiple-Purpose Projects Including Power 
36. New Melones Lake, CA ............................... 35-31 
General Investigation 
37. Surveys ........................ ................ ........... 35-32 
38. Collection and Study of Basic Data ............. 35-32 
39. Research and Development..........................35-33 
40. Preconstruction Engineering & Design........35-33 
41. Other Work under Special Authority ......... 35-34 
Tables Page 
Table 35-A Cost and Financial 
Statement ............................ 35-38 
Table 35-B Authorizing 
Legislation .......................... 35-49 
Table 35-C Other Authorized 
Navigation Projects.............35-52 
Table 35-D Not Applicable 
Table 35-E Other Authorized Flood 
Control Projects ..................... 35-53 
Table 35-F Not Applicable 
Table 35-G Deauthorized Projects ............ 35-56 
Table 35-H Sacramento River, CA: 
Tidal and Flood Conditions 
Prevailing ............................... 35-57 
Table 35-1 San Joaquin River, CA: 
Total Cost of New Work 
For Projects ......................... 35-57 
35-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Table 35-J San Joaquin River, CA: 
Project Units (1950 Modification) 
Reclassified and Excluded from 
Project Cost ........................ 35-58 
Table 35-K Merced County Stream Group, 
CA, Maximum Inflow, Storage, 
And Outflow for Projects ...... 35-58 
Table 35-L Russian River Basin, CA: 
Estimated 
Cost for New Work ............... 35-59 
Table 35-M Russian River Basin, CA: 
Project Features and 
Estimated Costs .................. 35-59 
Table 35-N Sacramento River and 
Tributaries, CA, Collinsville 
To Shasta Dam: Project Units 
Units Reclassified and Excluded 
From Cost Estimate ............... 35-60 
Table 35-0 Sacramento River and 
Tributaries, CA, from Collinsville 
To Shasta Dam: Construction 
Accomplished and Contract 
Costs ...................................... 35-60 
Table 35-P Flood Control Work Under 
Special Authorization Flood 
Control Activities Pursuant 
To Section 205, Public Law 
80-858, as Amended 
(Preauthorization) ............. 35-61 
Navigation 
1. SACRAMENTO RIVER, CA 
Location. Rises in Trinity Mountains in north-central 
California, flows generally southerly about 374 miles 
and empties into Suisun Bay, an arm of San Francisco 
Bay, at Collinsville, CA. (See Geological Survey 
topographic map of Sacramento Valley, CA.) 
Previous projects. For details see page 1985 of 
Annual Report for 1915 and page 1708 of Annual 
Report for 1938. 
Existing project. For description of Sacramento 
Deep Water Ship Channel, see Annual Report for 1969. 
Table 35-Q Aquatic Ecosystem Restoration 
Under Special Authorization 
Pursuant to Section 206, Public 
Law 104-303 .......................... 35-61 
Table 35-R Snagging and Clearing Under 
Special Authorization Pursuant to 
Section 208, 1954 Flood Control 
Act Public Law 83-790 ......... 35-62 
Table 35-S Surveys .................................. 35-62 
Table 35-T Emergency Streambank and 
Shoreline Protection .............. 35-62 
Total first cost for completed portion was $43,932,558 
($39,560,558 Federal (Corps), $300,000 (Coast Guard), 
and $4,072,000 non-Federal for lands and damages, 
including relocations) and excludes local Interests cost 
$10,741,000 (June 1963) for 30-foot deep connecting 
canal basic terminal facilities required under terms of 
project authorization. Project also provided for a 
shallow-draft channel 10 feet deep at mean lower low 
water 150 to 200 feet bottom width, from Suisun Bay to 
Sacramento, CA, 60 miles; a depth of 6 feet at low 
water between Sacramento and Colusa, 85 miles; a 
depth of 5 feet at low water between Colusa and Chico 
Landing, 50 miles; and such depths as practicable 
between Chico Landing and Red Bluff, 53 miles, a total 
distance of 248 miles. However, shallow-draft channel 
feature Colusa to Red Bluff (including Colusa to Chico 
35-2

SACRAMENTO, CA, DISTRICT 
Landing, 50 miles and Chico Landing to Red Bluff, 53 
miles) was deauthorized by 1986 Water Resources 
Development Act on November 17, 1986 (Public Law 
99-662). (See table 35-H on tidal and flood conditions 
prevailing.) 
Local cooperation. Fully complied with for deep 
water ship channel project. None required on 
shallow-draft feature. 
Terminal facilities. Piers, wharves, and docks at Port 
of Sacramento for shallow-draft navigation are open-pile 
structures with timber decks, some of which are 
designed to meet extreme high waters of flood stages. 
All main wharves at Sacramento have rail connections. 
Three of above facilities are owned by city of 
Sacramento and remainder by private interests; all are 
privately operated. For full description see "Port and 
Terminal Facilities at the Ports of Sacramento, Stockton, 
Pittsburg and Antioch, Calif., 1986." Deep water 
terminal facilities comprise wharves and piers, 
administration and storage buildings, and belt railroad 
facilities. Majority of these facilities are owned and 
operated by Sacramento-Yolo Port District; remainder 
are privately owned and operated. Facilities are 
considered adequate for existing commerce. 
Operations during fiscal year. New work, Deep 
Water Ship Channel: None. Maintenance: Shallow Draft 
Channel: Maintenance and operation activities continued 
in Sacramento River, Sacramento upstream to Colusa. 
Deep Water Ship Channel: Maintenance and operation 
activities continued. 
Historical summary. Construction of 7-foot 
shallow-draft channel below Sacramento was initiated in 
September 1899 and completed in 1904. Modified 
10-foot shallow-draft channel up to Sacramento was 
initiated in FY 1928 and completed in 1931. 
Shallow-draft channel above Sacramento was begun in 
April 1946 but new work was discontinued when about 
48 percent complete. In February 1974, remaining work 
for shallow-draft portion of project, provision of a 5-foot 
depth between Colusa and Chico Landing (50 miles), 
was reclassified as "deferred." Channel is navigable all 
year; however, there is no regular navigation above 
Colusa, 145 miles above river mouth. On November 17, 
1986, remaining shallow-draft feature, Colusa to Red 
Bluff(including Colusa to Chico Landing, 50 miles and 
Chico Landing to Red Bluff, 53 miles) was 
deauthorized by 1986 Water Resources Development 
Act (Public Law 99-662). Construction of 30-foot deep 
water ship channel was initiated in July 1949; 
improvement dredging by continuing contracts resulted 
in provision of an operational facility for oceangoing 
vessels during June 1963. Bascule bridge was 
completed in April 1960, barge lock in August 1961, 
barge canal in November 1961, and entire deep water 
ship channel in June 1970. 
2. SACRAMENTO RIVER DEEP WATER 
SHIP CHANNEL, CA 
Location. The project is located on the Sacramento 
River, between Collinsville and the Port of Sacramento, 
a distance of approximately 43 miles, in the counties of 
Sacramento, Contract Costa, Solano and Yolo, CA. 
Existing project. Existing waterways are inadequate 
to efficiently accommodate vessels currently using the 
channel. Because of the depth restriction, only 20% of 
the world's fleet can currently load to full design depth. 
Once deepened, the Port of Sacramento will be able to 
accommodate 70% of the world's fleet at full design 
draft. The project plan is to deepen the existing 30 feet 
Sacramento River Deep Water Ship Channel from N.Y. 
Slough to the Port of Sacramento, a distance of about 43 
miles, to 35 feet, and widen the channel as necessary. 
The project provides for establishment of wetland 
habitat and upland habitat to mitigate for such losses. 
Recreation was also authorized although no local 
sponsor has been identified. Current project estimate is 
$50,000,000 and is comprised of Federal cost (Corps) of 
$24,900,000; Federal cost (Coast Guard-for navigation 
aids) of $300,000 and non-Federal cost of $24,800,000. 
Local cooperation. A Local Cooperation Agreement 
(LCA) was signed with the local sponsor, the Port of 
Sacramento, in June 1986. A modification to the LCA, 
necessitated by the Water Resources Development Act 
of 1986, was executed in December 1988. The local 
sponsor will provide lands, easements, rights of way and 
dredged material disposal areas; modify or relocate 
buildings, utilities, roads, bridges (except railroad 
bridges) and other facilities, where necessary in the 
construction of the project; and pay 25 percent of the 
costs allocated to deep draft navigation during 
construction. 
35-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
costs total $9,475. 
Terminal facilities. All main wharves at Sacramento 
have rail connections. Three facilities are owned by the 
City of Sacramento and the rest are privately owned; all 
are privately operated. For full description, see "Port 
and Terminal Facilities at the Ports of Sacramento, 
Stockton, Pittsburg and Antioch, Calif., 1986". 
Deepwater terminal facilities are comprised of wharves, 
piers, administration and storage buildings and belt 
railroad facilities. The majority of these facilities are 
owned and operated by the Sacramento-Yolo Port 
District and the rest are privately owned and operated. 
The facilities are considered adequate for existing 
commerce. 
Historical summary. Funds to initiate preconstruction 
planning were appropriated in fiscal year 
1982. Project construction was authorized by the 
Supplemental Appropriations Act of 1985 and modified 
by the WRDA 1986. The General Design Memorandum 
was approved and the Record of Decision was signed in 
May 1987. The modified LCA was executed in 
December 1988. The first construction contract for 
deepening was awarded in February 1989 and completed 
in July 1990. A second construction contract was 
awarded in September 1990 and completed in August 
1991. Construction from River Mile 43 to River Mile 
35 has been completed. In fiscal year 1996, the sponsor 
requested indefinite suspension of the project due to 
their inability to meet their cost share requirements. 
Based on Congressional direction in Conference Report 
105-749, dated September 25, 1998, the Corps has 
developed a study plan outlining the scope, schedule and 
costs to prepare a Engineering Documentation Report 
(EDR). This preliminary assessment has been submitted 
to the sponsor for their review and a determination will 
be made as to proceeding with the EDR. This plan, 
together with the sponsor's financing plan, will serve as 
the basis for requesting additional Federal funds for 
costs associated with the EDR. Section 305 of WRDA 
2000 "authorized credit toward the non-Federal share of 
the cost of the project the dredged material from the 
project that is purchased by public agencies or nonprofit 
entities..." 
Operations during fiscal year. Completed the study 
plan and continued project coordination. Fiscal Year 
3. SAN FRANCISCO BAY TO STOCKTON, 
CA (JOHN F. BALDWIN AND 
STOCKTON SHIP CHANNELS) 
Reported on by the San Francisco District. Refer to 
Report of the Secretary of the Army on Civil Works 
Activities for FY 1995. 
4. SAN JOAQUIN RIVER, CA 
Location. Rises in east central California and flows 
westerly and northwesterly about 340 miles to its 
confluence with Sacramento River at head of Suisun 
Bay, 48 miles northeast of San Francisco. Deep water 
channel in San Joaquin River extends 41 miles from its 
mouth in Suisun Bay at Pittsburg to city of Stockton. 
Waterborne access to city provided by Stockton 
Channel, an artificial cut extending from river about 2 
miles into city. (See Coast and Geodetic Survey Sheet 
5527.) 
Existing project. For description of completed 
improvement, modifications, and authorizing acts, see 
Annual Report for 1967. (See table 35-1 for total cost of 
new work for project completed in May 1960.) 
Projects units (1950 modification) reclassified and 
excluded from project cost are set forth in table 35-J. 
Modification of existing project is included as one 
unit of San Francisco Bay to Stockton, CA, (John F. 
Baldwin and Stockton Ship Channels) project, 
authorized by 1965 River and Harbor Act (H. Doc. 209, 
89th Cong., Ist sess.); this modification is reported in 
detail under Sacramento District, improvement No. 3 
and San Francisco District, Improvement No. 3. 
Local cooperation. Fully complied with for 
completed portion of project; for details of required 
cash contributions on completed, inactive and deferred 
portions of project, see Existing project paragraph, 
Annual Report for 1967. 
Terminal facilities. For description of harbor 
facilities at Port of Stockton, CA, see Port Series 32, 
"The Ports of Sacramento, Stockton, Pittsburg and 
35-4

SACRAMENTO, CA, DISTRICT 
Antioch, Calif.," revised 1986. Downstream from 
Stockton, traffic is accommodated by bank landings and 
sheds except at Antioch and near Pittsburg, where there 
are wharves for shallow- and deep-draft vessels. 
Terminal transfer facilities at public ocean terminal of 
Port of Stockton are adequate for present and immediate 
future. 
Operations and results during fiscal year. 
Maintenance: Condition studies and miscellaneous 
Flood Control 
5. AMERICAN RIVER WATERSHED, 
(Common Features) 
Location. The project is located in Placer, El Dorado, 
and Sacramento Counties on the North, Middle and 
South Forks of the American River and along the lower 
American River and Sacramento Rivers. 
Existing Project. Recent evaluations indicate that the 
level of flood protection along much of the American 
River and in the Natomas area is less than the 100-year 
level. The project consists of levee improvements 
including a slurry wall along 21 miles of the lower 
American River, levee modifications along 12 miles of 
the Sacramento River, telemetered gages above Folsom 
Dam, improving the flood warning system for the lower 
American River, installing a closure structure at 
Mayhew Drain, 3 miles of levee modifications along 
lower American River, and levee modifications along 10 
miles of the Natomas Cross Canal. Cost estimate 
(October 2000) is $96,000,000 (includes an allowance 
for estimated inflation through the construction period), 
of which $72,200,000 is Federal cost and $23,800,000 is 
non-Federal cost (which includes $17,670,000 cash 
contribution). 
Local cooperation. In accordance with cost sharing 
requirements specified in Water Resources Development 
Act (WRDA) of 1986, local interests are required to 
provide lands, easements, rights-of-way, and borrow and 
excavated or dredged material disposal areas; modify or 
relocate utilities, roads, bridges (except railroad bridges), 
and other facilities, and pay 18 percent of the costs 
allocated to flood control to bring the total non-Federal 
share of flood control costs to 25 percent, and bear all 
inspections and reports were accomplished by hired 
labor. Dredging was initiated and completed at contract 
cost of $2,870,625. (Repair or restoration of wavewash 
protection is required by legislation authorized by 
Improvement No. 3.) 
Historical Summary. Active portion of existing 
project was completed in May 1960. Construction of 
project was initiated in December 1877. 
costs of operation, maintenance, repair, rehabilitation 
and replacement of flood control facilities. The non- 
Federal sponsor has also agreed to make all required 
payments concurrently with project construction. 
Project cooperation agreement (PCA) was signed July 
13, 1998. 
Operations and results during fiscal year. 
Construction contract for levee improvements along the 
right bank of the lower American River continued with 
a fiscal year cost of $8,120,000. Construction contracts 
were awarded for levee improvements along the left 
bank of the lower American River with a fiscal year cost 
of $4,436,000. Remaining fiscal year cost of 
$4,365,000 was for associated engineering and design 
and construction management costs. 
Historical summary. The Defense Appropriations 
Act for FY 1993 authorized construction of the Natomas 
feature of the project, which includes levee 
improvements around the perimeter of the Natomas 
basin, a 300-acre detention area in North Natomas, and 
recreation trails. The local sponsor has already 
constructed much of the project. Federal Construction 
General funds were appropriated in FY 1998 to initiate 
reimbursement to the sponsor for the Federal share of 
the project. Initial reimbursement of $15 million was 
made to the sponsor in September 1999. The Defense 
Appropriations Act for Fiscal Year 1993 also directed 
the Corps to reevaluate other features recommended in 
the Feasibility Report and a Supplemental Information 
Report (SIR) was completed in March 1996. The Chief 
of Engineer's Report recommended implementation of 
elements common to the final candidate plans presented 
in the SIR. These "common elements" were authorized 
for construction in WRDA 96 and Federal Construction 
General funds were appropriated in FY 1998 for 
initiation of construction. Sec. 366 of WRDA 99 
authorized additional levee improvements as part of the 
overall project. 
35-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
6. AMERICA RIVER, CA (Natomas) 
See PED's 35-30 
7. BUCHANAN DAM-H.V. EASTMAN 
LAKE, CHOWCHILLA RIVER, CA 
Location. On Chowchilla River about 36 miles above 
its mouth and about 16 miles northeast of city of 
Chowchilla, CA. (See Geological Survey quadrangles 
for area.) 
Existing project. Provides for construction of a 
205-foot high rockfill dam to create a reservoir with 
gross storage capacity of 150,000 acre-feet for flood 
control, irrigation, recreation, and fish and wildlife. In 
conjunction with dam, project plan provides for about 12 
miles of downstream levee and channel construction on 
Ash Slough to accommodate a project design flow of 
5,000 cubic feet per second within slough and 7 miles of 
levee and channel improvement on Berenda Slough. 
Operation and maintenance of dam and reservoir is the 
responsibility of the Federal Government. Total first cost 
for existing project is $28,919,597, of which 
$27,369,597 is Federal cost, including $4,580,000 for 
basic recreation facilities, and $1,550,000 non-Federal 
costs for lands and damages, including relocations for 
downstream levee and channel improvements. Local 
interests have contracted with the Bureau of Reclamation 
for irrigation service. For future non-Federal 
reimbursement, see Local cooperation paragraph. Local 
interests have also, over a period of years expended 
about $500,000 for construction of low levees and 
clearing downstream channels to provide some local 
flood protection in project area. This work is inadequate 
during major floods. Existing project was adopted by 
1962 Flood Control Act (S. Doc. 98, 87th Cong., 2d 
sess., contains latest published map). Lake formed by 
Buchanan Dam on Chowchilla River was designated 
"'H.V. Eastman Lake" by Public Law 93-217. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. New 
work: None. Maintenance: Maintenance and operation 
activities were continued. Runoff of Chowchilla River 
above Buchanan Dam was above normal for the year. 
Maximum storage of 129,189 acre-feet occurred May 
29, 2000. Maximum hourly inflow to reservoir was 
7,467 cubic feet per second on February 14, 2000. 
Maximum release of 437 cubic feet per second on 
March 7, 2000, was above maximum permissible flood 
release. During the year, a total of 53,871 acre-feet of 
water was released for irrigation and other purposes. 
Releases for flood control purposes totaled 11,470 
acre-feet. 
Historical summary. Construction began in July 
1971 and was completed in May 1979. Construction of 
Buchanan and Hidden dam and appurtenances was 
combined under one contract. Project was completed in 
September 1983, except for installation of piezometers 
(now deferred indefinitely). Dam closure was in March 
1975; dam was completed in January 1976. Reservoir 
clearing and boundary marking were completed May 
1975. Bifurcation structure was completed in February 
1976. Channel improvement, Ash and Berenda Sloughs, 
was completed in March 1976. Recreation areas: Phase 
I was completed in January 1976; Phase 11 was 
completed in February 1978. Residences, administration 
building, and visitors center contract was completed in 
May 1978. Landscaping was completed in May 1979 
and erosion control was completed in April 1979. A 
resources interpretive display and road relocation were 
completed in FY 1982. Dam safety assurance studies 
were initiated in FY 198 1. Solar heating was installed at 
Chowchilla recreation area in FY 1984. An hydrilla 
eradication (spraying) program was initiated in FY 
1989. Final land audit was approved on December 3, 
1985. 
8. CACHE CREEK BASIN, CA (CACHE 
CREEK SETTLING BASIN) 
Location. At the mouth of Cache Creek in Yolo 
County where it enters the Yolo Bypass about 2 miles 
east of city of Woodland and about 15 miles northwest 
of city of Sacramento, CA. 
Existing project. Provides for raising the perimeter 
levees of the existing settling basin an average of 12 
feet, extending the levees upstream to County Road 102 
to provide 50-year sediment storage capacity, enlarging 
and reconstructing the cobble weir, and degrading 
35-6

SACRAMENTO, CA, DISTRICT 
existing training levees and rebuilding them adjacent to 
western perimeter levee to provide 50 years of sediment 
storage capacity (340 acre-feet annually.). Estimated 
cost (October 1999) for existing project is $26,950,000 
(includes an allowance for estimated inflation through 
the construction period), of which $16,860,000 is 
Federal and $10,090,000 is non-Federal (which includes 
$1,340,000 cash contribution). For future non-Federal 
reimbursement, see Local cooperation paragraph. 
Existing project was adopted by Water Resources 
Development Act of 1986, Public Law 99-662, 
November 17, 1986 (HD 98-134, 98th Cong., I st sess, 
contains published map.) Project as authorized included 
development of a national wildlife refuge within the 
settling basin; however, the Department of the Army 
determined that such refuge would be more 
appropriately funded and developed by the U.S. Fish and 
Wildlife Service. Refuge feature was reclassified to 
deferred category on April 11, 1988. 
Local cooperation. Local interests are required to 
provide lands, easements, rights-of-way, and dredged 
material disposal areas; modify or relocate buildings, 
utilities, roads, bridges (except railroad bridges) and 
other facilities where necessary in construction of the 
project; pay 5 percent of cost allocated to flood control 
to bring total non-Federal share of flood control costs to 
25 percent of which $1,340,000 is cash contribution, and 
bear all costs of operation, maintenance and replacement 
of flood control facilities. Local interests have agreed to 
make all required payments concurrently with project 
construction. Local Cooperation Agreement was 
executed March 12, 1990. 
Operations and results during fiscal year. 
Engineering activities were continued. Levee repair 
contract was awarded in August 1996. Cache Creek 
Settling Basin work was transferred to local interests for 
operation and maintenance in December 1993. 
Historical summary. Local Cooperation Agreement 
was executed March 12, 1990. Cache Creek Settling 
Basin enlargement (multicomponent) construction 
contract was awarded August 5, 1991, completed in 
September 1993, and work was transferred to local 
interests for operation and maintenance on December 2, 
1993. 
9. CALAVERAS RIVER AND 
LITTLEJOHN CREEK AND 
TRIBUTARIES, INCLUDING NEW 
HOGAN LAKE AND FARMINGTON 
DAM, CA 
Location. Streams comprising Calaveras River and 
Littlejohn Creek groups rise in Sierra Nevada and its 
foothills, flow easterly across flatlands of San Joaquin 
Valley and empty into San Joaquin River directly, or 
through various sloughs, in vicinity of Stockton, CA. 
Littlejohn Creek is in Calaveras, Stanislaus, and San 
Joaquin Counties. The three principal stream systems of 
the group are, from south to north, Lone Tree Creek, 
Littlejohn Creek, and Duck Creek. Calaveras River 
group is in Calaveras and San Joaquin Counties. The 
two principal streams of the groups are, from south to 
north, Calaveras River and Bear Creek. (See Geological 
Survey Valley Springs quadrangle for New Hogan 
reservoir area and Trigo and Bachelor Valley 
quadrangles for Farmington reservoir area.) 
Existing project. For description of completed 
improvements consisting of Farmington Dam, New 
Hogan Lake, and Bear Creek levee and channel 
improvement, and authorizing act, see Annual Report 
for 1967. (a) Farmington: Total first cost (July 1955) for 
project was $3,995,684, of which $3,676,384 was 
Federal and $319,300 non-Federal for lands and 
damages including relocations. (b) New Hogan: Federal 
cost for project is $ i 5,906,150, including $543,514 for 
basic recreation facilities. For future non-Federal 
reimbursement, see Local cooperation paragraph. 
Federal cost for recreation facilities funded from Code 
710 appropriations is $897,742. (c) Bear Creek: Project 
cost is $6,485,734, of which $3,242,867 is Federal, 
including reimbursement ($488,096) to local interests of 
one-half of excess local interest cost of lands, 
rights-of-way, and relocations over estimated Federal 
construction cost in accordance with section 3, Public 
Law 738, 74th Congress. Non-Federal cost included in 
above amount is $3,242,867 for relocations and lands 
and damages, exclusive of above Federal reimbursement. 
Local cooperation. Fully complied with. New 
35-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Hogan: Local interests must pay portion of first cost and 
annual operation and maintenance costs allocated to 
conservation functions of project. These costs are 
estimated at 36.2 percent of first cost and 38 percent of 
annual costs. In addition, local interests contributed land, 
the (July 1964) market value of which was $556,000. 
For years 1961 through 1970, an interim contract 
between the Bureau of Reclamation and local water 
users provided for storage and payment of irrigation 
water; a long-term contract between that agency and 
local water users was executed August 25, 1970. Local 
interests paid $4,973,499 through December 31,2000. A 
concessionaire at New Hogan Marina provided public 
use facilities in accordance with lease agreement with 
the Secretary of the Army at an estimated cost to date of 
$234,000. 
Operations and results during fiscal year. New 
work: New Hogan Lake, regular funds: None. Code 710 
funds: None. Bear Creek, San Joaquin County: None. 
Maintenance: Farmington Dam Maintenance and 
operation activities continued; structures were 
maintained in serviceable condition. During rainflood 
season, maximum flow of Duck Creek Diversion was 
1,088 cubic feet per second on February 12, 2000. 
Maximum flow of Littlejohn Creek at Farmington was 
680 cubic feet per second on February 12, 2000. 
Maximum flow of Duck Creek near Farmington was 
2,102 cubic feet per second on February 15, 2000. 
Maximum storage in reservoir was 19,414 acre-feet on 
February 15, 2000, and maximum estimated inflow to 
reservoir was 10,013 cubic feet per second on February 
12, 2000. Maximum release of 1,968 cubic feet per 
second on February 24, 2000, was above maximum 
permissible flood release. During the year, 73,795 
acre-feet was released for flood control. New Hogan 
Lake Maintenance and operation activities continued. 
Structures were maintained in serviceable condition. 
Runoff of Calaveras River above New Hogan was above 
normal for the year. Maximum storage of 221,231 
acre-feet occurred February 15, 2000. Maximum hourly 
inflow to reservoir was 13,762 cubic feet per second on 
January 25, 2000. Maximum release of 3,690 cubic feet 
per second on February 15, 2000, was above maximum 
permissible flood release. During the year, 72,336 
acre-feet was released for irrigation and other purposes. 
Release for flood control purposes amounted to 109,950 
acre-feet. 
Historical summary. Farmington Dam: Construction 
of Farmington project was initiated in July 1949 and 
completed for beneficial flood control operation in 
1952. Duck Creek channel improvement was completed 
in November 1951; and channel improvement on south 
Littlejohn Creek was completed in May 1955. There are 
no recreation facilities or public-use areas. All work 
completed. Dam safety assurance studies were initiated 
in FY 1982. New Hogan Lake: Construction was 
initiated May 1960, main dam closure November 1963, 
project completed for operational use in June 1964, and 
all work completed October 1973. Recreation facilities 
have been provided from Code 710 appropriations. See 
page measurement weir constructed in June 1980. Dam 
safety assurance studies were initiated in FY 1980. Bear 
Creek, San Joaquin County: Construction began in June 
1963 and was completed in June 1967. Final cash 
contribution was made to local interests December 23, 
1970. Solar heating was installed at recreation facilities 
in FY 1984. A cultural resources survey was completed 
in FY 1984. 
10. COLORADO RIVER AT GRAND 
JUNCTION, CO 
Location. On north bank of Colorado River from 9th 
Street west to the Denver Rio Grande Western Railroad 
Bridge at city of Grand Junction, CO, in Mesa County. 
Existing project. Provides for construction of a 
3,200 foot levee located on north side of Colorado 
River, one road ramp over levee for accessing Watson 
Island, 3 detention basins, a relief well system and a 
550-foot-long impermeable blanket to prevent seepage 
though railroad embankment. Estimated cost 
(September 1994) is $1,651,200, of which $1,086,700 is 
Federal cost and $564,500 is non-Federal cost for lands 
and damages and includes a cash contribution of 
$63,000. Existing project was approved by Chief of 
Engineers on February 28, 1994, under provisions of 
section 205, 1948 Flood Control Act, as amended. 
Local cooperation. Local sponsor shall furnish to 
the Government all lands, easements, and rights-of-way, 
including suitable borrow and dredged material disposal 
35-8

SACRAMENTO, CA, DISTRICT 
areas, as determined by the Government to be necessary 
for construction, operation, and maintenance of the 
project, and shall furnish to the Government evidence 
supporting local sponsor's legal authority to grant 
rights-of-entry to such lands. Necessary lands, 
easements, and rights-of-way may be provided 
incrementally, but all lands, easements, and 
rights-of-way determined by the Government to be 
necessary for work to be performed under a construction 
contract must be furnished prior to advertisement of the 
construction contract. 
Local sponsor shall provide or pay to the Government 
the cost of providing all retaining dikes, wasteweirs, 
bulkheads, and embankments, including all monitoring 
features and stilling basins that may be required at any 
dredged material disposal areas necessary for project 
construction. 
Upon notification from the Government, local sponsor 
shall accomplish or arrange for accomplishment at no 
cost to the Government all relocations (excluding 
railroad bridges and approaches thereto) determined by 
the Government to be necessary for project construction. 
Local sponsor shall comply with all applicable 
provisions of the Uniform Relocation Assistance and 
Real Property Acquisition Policies Act of 1970, Public 
Law 91-646, as amended by Title IV of the Surface 
Transportation and Uniform Relocation Assistance Act 
of 1987 (Public Law 100-17), and the Uniform 
Regulations contained in 49 CFR Part 24, in acquiring 
lands, easements, and rights-of-way for construction and 
subsequent operation and maintenance of the project, 
and inform all affected persons of applicable benefits, 
policies, and procedures in connection with said Act. 
Local sponsor shall provide such documentation as 
contracting officer requires to demonstrate compliance. 
The Local Cooperation Agreement (LCA) between the 
Department of the Army and the City of Grand Junction, 
CO, was signed April 8, 1994. 
Operations and results during fiscal year. O&M 
Manual and As-Built drawings were finalized. Project 
audit, close-out activities and fiscal completion 
continued. 
Historical summary. Plans and specifications were 
completed in August 1994. Non-Federal cash 
contribution of $63,000 for construction was received 
September 27, 1994. First construction contract in 
amount of $575,830 was awarded September 30, 1994. 
11. CORTE MADERA CREEK, CA 
Reported on by San Francisco District. Refer to 
Report of the Secretary of the Army on Civil Works 
Activities for FY 1996. 
12. COYOTE CREEK, CA (KNOWN AS 
COYOTE AND BERRYESSA 
CREEKS) 
Location. Project is located in the cities of San Jose 
and Milpitas immediately south of San Francisco Bay in 
Santa Clara County, CA. 
Existing project. Plan of improvement on Coyote 
Creek consists of overflow channels and offset levees. 
Improvement on Berryessa Creek includes two 
sedimentation basins at the upstream end of the concrete 
lined trapezoidal channel and offset levees. Combinedplan 
would provide flood protection from Coyote and 
Berryessa Creeks to cities of San Jose and Milpitas, 
which include large industrial complexes and some 
residential development. Estimated cost (October 1998) 
for the Coyote Creek element of the existing project is 
$61,750,000 (includes an allowance for estimated 
inflation through the construction period), of which 
$30,890,000 is Federal and $30,860,000 is non-Federal 
(which includes $3,100,000 cash contribution). For 
future non-Federal reimbursement, see Local 
cooperation paragraph. Estimated cost (October 1998) 
for the Berryessa Creek element of the existing project 
is $16,525,000 (includes an allowance for estimated 
inflation through the construction period), of which 
$12,425,000 is Federal and $4,100,000 is non-Federal 
(which includes $1,830,000 cash contribution). 
Existing project was authorized under Section 101 (a)(5) 
of WRDA 1990, Public Law 101-640 (HD 101-126, 
101st Cong., 2d sess.). 
Local cooperation. (Coyote Creek) Local interests 
are required to provide lands, easements, rights-of-way, 
and borrow and excavated or dredged material disposal 
35-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
areas, which may be reduced for credit allowed based on 
prior work (Sec. 104 of WRDA 86 ($8,633,000), Sec. 26 
of WRDA 88 (not to exceed $3,000,000) and Sec. 215 
of the Flood Control Act of 1968 (not to exceed 
$3,000,000) after reductions for such credit have been 
made in the required cash payments; modify or relocate 
utilities, roads, bridges (except railroad bridges), and 
other facilities, and perform prior work under Sec. 104 
of WRDA 86, Sec. 26 of WRDA 88, and Sec. 215 of the 
Flood Control Act of 1968, where necessary for the 
construction of the project; and pay 5 percent of the 
costs allocated to flood control, and bear all costs of 
operation, maintenance, repair, rehabilitation and 
replacement of flood control facilities. Local interests 
will receive an estimated Federal reimbursement of 
$8,280,000 for one-half of non-Federal costs allocated to 
flood control in excess of Federal costs (Sec. 103 of 
WRDA 86). (Berryessa Creek) Local interests are 
required to provide lands, easements, rights-of-way, and 
borrow and excavated or dredged material disposal 
areas; modify or relocate utilities, roads, bridges (except 
railroad bridges), and other facilities, where necessary in 
the construction of the project; and pay 1 I percent of the 
costs allocated to flood control to bring the total 
non-Federal share of flood control costs to 25 percent, 
and bear all costs of operation, maintenance, repair, 
rehabilitation and replacement of flood control facilities. 
The non-Federal sponsor has also agreed to make all 
required payments concurrently with project 
construction. 
Operations and results during fiscal year. Coyote 
Creek mitigation contract continued at a fiscal year cost 
of $162,711. 
Historical summary. Separate General Design 
Memorandums were prepared for Coyote and Berryessa 
Creeks. General Design Memorandum for Coyote was 
submitted in May 1993. Local interests have completed 
construction of Reach I (Sec 104, Water Resources 
Development Act (WRDA), Reach 2 (Sec 26, WRDA) 
and Reach 3A (Sec 215, WRDA). National Defense 
Authorization Act for FY 1994 directed the Secretary of 
the Army to construct project notwithstanding sec 902, 
WRDA. Project Cooperation Agreement was executed 
in September 1994. Coyote Creek Reach 3B 
construction contract was completed at a final cost of 
$5,308,925. Preconstruction engineering and design 
cost is $4,410,000. Total reimbursement of $7,400,000 
for costs in excess of 50% maximum requirement and 
credit payments of $14,633,000 for prior integral work, 
have been made to the local sponsor as of September 
30, 1997. 
13. FAIRFIELD VICINITY STREAMS, 
CA 
Location. On five streams in vicinity of cities of 
Fairfield and Suisun, Solano County, CA. 
Existing project. See Annual Report for 1996, p.35- 
8. 
Local cooperation. Fully complied with. In 
accordance with FY 1985 Supplemental Appropriations 
Act (Public Law 99-88) and sec. 117 of the Further 
Continuing Appropriations Act for FY 1986 (Public 
Law 99-190), a Local Cooperation Agreement for flood 
control and recreation (Sec. 221) was executed June 3, 
1986. 
Operations and results during fiscal year. Project 
close-out activities were on-going. 
Historical summary. Construction was initiated in 
October 1986. Enlargement of McCoy Creek and 
construction of Laurel Creek Diversion Channel, Phase 
I, was transferred to local interests in July 1987; Laurel 
Creek Diversion Channel, Phase II, was transferred to 
local interests in November 1988; Laurel Creek 
Diversion Channel, Phase III, was transferred to local 
interests in April 1990; and Laurel Creek Diversion, 
Phase IIA, was transferred to local interests in 
December 1990 for maintenance. Channel 
improvement contract for Ledgewood Creek Channel, 
Phase IV, was completed and transferred to local 
interests in December 1991 for maintenance. Mitigation 
planting on Ledgewood Creek was completed in April 
1993; maintenance inspection has been completed. 
Construction of Laurel Creek pedestrian bridge 
overcrossing was completed and transferred to local 
interests on July 8, 1993. 
35-10

SACRAMENTO, CA, DISTRICT 
14. GUADALUPE RIVER, CA 
Location. On Guadalupe River in downtown area of 
city of San Jose, Santa Clara County, CA. 
Existing project. Authorized plan provides for 
widening and deepening one or more sides of Guadalupe 
River for 2.5 miles from Interstate Highway 280 to 
Interstate Highway 880 in downtown San Jose, CA, and 
channel modifications with provisions for fish and 
wildlife mitigation, as necessary. Non-Federal sponsor 
must pay 100 percent of incremental construction cost of 
locally preferred plan. Project is an integral component 
of a much larger regional park plan being undertaken by 
the San Jose Redevelopment Agency. 
Estimated cost (October 1997) is $182,800,000 (which 
includes an allowance for estimated inflation through the 
construction period) of which $78,500,000 is Federal 
and $104,300,000 is non-Federal including 
reimbursement, see Local cooperation paragraph. 
Existing project was adopted by Water Resources 
Development Act of 1986, Energy and Water 
Development Appropriation Act of 1990 which directed 
the Secretary of the Army to construct the project 
notwithstanding Sec. 902 of the Water Resources 
Development Act of 1986 regarding project cost 
limitations, and Energy and Water Development 
Appropriations Act of 1992 which directed the Secretary 
of the Army to modify and construct the project in 
accordance with the January 1991 GDM; it is consistent 
with the Guadalupe River Park plan requested by the 
local sponsor and with cost sharing policy. 
Local cooperation. Local interests, through a public 
body legally authorized and financially capable, must 
give assurances they will furnish lands, easements, 
rights-of-way, and dredged material disposal areas, 
which are partially offset by a credit ($5,701,000) 
allowed for prior work (Sec. 104, Water Resources 
Development Act of 1986); credit was approved by the 
Assistant Secretary of the Army; modify or relocate 
buildings, utilities, roads, bridges (except railroad 
bridges), and other facilities, where necessary in the 
construction of the project; pay 5 percent of the costs 
allocated to flood control; and bear all costs of 
operation, maintenance, and replacement of flood 
control facilities. Federal reimbursement will be made 
to non-Federal sponsor for one-half of non-Federal costs 
allocated to flood control in excess of Federal costs. 
Local interests have agreed to make all required 
payments concurrently with project construction. 
On June 2, 1989, the local sponsor, the Santa Clara 
Valley Water District, expressed intent to provide all 
needed cost sharing funds. On September 21, 1990, the 
San Jose Redevelopment Agency requested 
modification of project to include recreation facilities 
and confirmed that they intend to participate as local 
sponsor for recreation. Local Cooperation Agreements 
for both flood control and recreation were executed 
March 30, 1992. 
Operations and results during fiscal year. 
Construction contract No. 2 (Hedding Street to Coleman 
Avenue), was completed with fiscal year cost of 
$257,000 (Interstate 880 to Hedding Street). Fiscal year 
mitigation costs included Early Plant collection for 
Contract 2 (Hedding Street to Coleman Avenue) of 
$15,000 and River Street Historic Salvage and 
Demolition $560,000.. 
Historical summary. Final General Design 
Memorandum (GDM) reflecting locally preferred plan, 
was approved by the Assistant Secretary of the Army on 
March 26, 1992, with comments. Revision of GDM to 
address comments was completed in July 1993. Local 
Cooperation Agreements for both flood control and 
recreation were executed March 30, 1992. Construction 
contract No. I for channel improvement (Highway 880 
to Hedding Street) was awarded August 10, 1992; and 
was essentially completed and transferred to local 
interests for maintenance and operation on August 11, 
1994. Construction contract No. 2 (Hedding Street to 
Coleman Avenue) was awarded July 8, 1994, and was 
essentially completed and transferred to local interests 
for maintenance and operation on October 25, 1996. 
15. HIDDEN DAM-HENSLEY LAKE, 
FRESNO RIVER, CA 
Location. On Fresno River about 50 miles above its 
mouth and about 15 miles northeast of Madera, CA (See 
Geological Survey quadrangles for area.) 
35-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Existing project. Provides for construction of a 
163-foot high earthfill dam to create a reservoir with 
gross storage capacity of 90,000 acre-feet for flood 
control, irrigation, recreation and other purposes. In 
conjunction with the dam, the project provides for about 
13 miles of downstream levee and channel 
improvements on Fresno River immediately upstream of 
Chowchilla Canal crossing to accommodate project 
design flow of 5,000 cubic feet per second. Operation 
and maintenance of dam and reservoir is the 
responsibility of the Federal Government. Total first cost 
for existing project is $31,785,426, of which 
$30,555,426 is Federal cost, including $3,564,168 for 
basic recreation facilities, and estimated $1,230,000 
non-Federal cost for lands and damages including 
relocations for downstream levee and channel 
improvements. Local interests have contracted with the 
Bureau of Reclamation for irrigation service. For future 
non-Federal reimbursement, see Local cooperation 
paragraph. Local interests have also, over a period of 
years, expended about $300,000 for construction of low 
levees and clearing downstream channels to provide 
some local flood protection in the project area. This 
work is inadequate during major floods. Existing project 
was adopted by 1962 Flood Control Act (S. Doc. 37, 
87th Cong., Ist sess., contains latest published map). 
Lake created by Hidden Reservoir project on Fresno 
River was designated "Hensley Lake" by Public Law 
93-603. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. New 
work. None. Maintenance: Maintenance and operation 
activities were continued. RunoffofFresno River below 
Hidden Dam was above normal for the year. Maximum 
storage of 66,465 acre-feet occurred April 23, 2000. 
Maximum hourly inflow to the reservoir was 5,021 
cubic feet per second on February 14, 2000. Maximum 
release of 618 cubic feet per second on February 29, 
2000, was above maximum permissible flood release. 
During the year, 59,556 acre-feet was released for 
irrigation and other purposes and 21,240 acre-feet was 
released for flood control. 
Historical summary. Construction began in July 
1971 and was completed in January 1979. Dam closure 
was in March 1975; dam was completed November 
1975. Instrumentation was completed in January 1976. 
Downstream channel improvement, Fresno River, was 
completed April 1976. Recreation areas: Phase I was 
completed in March 1976; Phase II was completed in 
June 1978. Residences, administration building, 
grounds, and utilities contract was completed in 
February 1978. Landscaping was completed in 
December 1978 and erosion control was completed in 
January 1979. Project was completed in September 
1980. Final land audit was approved February 5, 1980. 
Dam safety assurance studies were initiated in FY 1980. 
Piezometer installation was completed in September 
1982. Solar heating was installed at County relinquished 
all administration of recreation and development and 
maintenance of public use areas at the recreation areas 
in FY 1984. 
16. ISABELLA LAKE, KERN RIVER, CA 
Location. About 35 miles northeast of city of 
Bakersfield, CA, near confluence of north and south 
forks of Kern River; auxiliary dam is about one-half 
mile east of main dam. (See Geological Survey 
quadrangles of area.) In 1991, Isabella Lake and 16,000 
acres of surrounding land was transferred to the Forest 
Service in exchange for about 2,500 acres of Forest 
Service land near Pine Flat Lake. 
Existing project. For description of completed 
improvement and authorizing act, see Annual Report for 
1967. Federal cost for new work is $22,027,452. For 
future non-Federal reimbursement see Local 
cooperation and Licenses paragraphs. Federal cost 
funded from Code 710 appropriations is $2,199,085. 
Operation and maintenance of dam and reservoir is 
Federal responsibility. 
Local cooperation. California officially adopted 
project by chapter 1514 of statutes of 1945, State of 
California. Local interests, represented by North Kern, 
Buena Vista, and Tulare Lake Basin Water Storage 
Districts and La Hacienda Water District, were required 
to reimburse the Federal Government the portion of first 
cost and annual operation and maintenance costs 
allocated to irrigation functions of project. These costs, 
35-12

SACRAMENTO, CA, DISTRICT 
based on a cost allocation study completed in December 
1955, are $4,573,000 of first cost and 21.7 percent of 
annual operation and maintenance cost. For the years 
1956 through 1964, an interim contract between the 
Bureau of Reclamation and local water users provided 
for storage and payment of irrigation water. Under 
provisions of this interim contract, local interests paid 
$1,936,229 through December 31, 1964. A long-term 
contract between the Bureau and local water users was 
executed October 23, 1964. Balance due on allocated 
first cost of $4,573,000 was paid by the water users on 
March 31, 1965. Kern County assumed administration 
of recreation and development and maintenance of 
public use areas at project in accordance with a 25-year 
license February 15, 1955. The agreement with Kern 
County provided for joint operation and development by 
the Corps and Kern County including permits granted to 
concessionaires by the county to provide certain 
services. As of September 30, 1971, Kern project. A 
State law permitting the Department of Boating and 
Waterways (known as the Department of Navigation and 
Ocean Development prior to January 1979) to 
participate in inland water development with Federal 
agencies was signed by the Governor on August 11, 
1972. Isabella Lake and surrounding land, 16,000 acres 
around the lake currently being used for park and 
recreation purposes, was turned over to the Forest 
Service by the Corps on May 15, 1991, in exchange for 
approximately 2,500 acres of Forest Service recreation 
land near Pine Flat Lake. This was accomplished by 
using a memorandum of understanding (MOU) between 
the Secretary of the Army and the Secretary of 
Agriculture (Forest Service). The MOU requires an 
exchange of land between departments. Three Corps 
maintenance employees, under supervision of the 
Success Lake park manager, will stay at Isabella to 
operate the dam for flood control and water conservation 
purposes. Authority for new concessionaire operating 
permits to be issued, as well as those previously granted 
by the Corps, will be transferred to the Forest Service. 
Total cost to date of present recreation facilities 
developed by the county and the marina concessionaires 
is about $965,000; $235,000 of this was a grant from the 
California Wildlife Conservation Board and about 
$534,000 is investment by marina concessionaires. 
Licenses. In accordance with Federal Power 
Commission Docket No. E-6578, issued April 1, 1963, 
payment of $377,426 was made to the Federal 
Government by Pacific Gas and Electric Co. ($108,352) 
and Southern California Edison Co. ($269,074) for 
headwater benefits to downstream existing plants from 
Isabella Dam to cover benefits from April 15, 1954, to 
December 31, 1962. Between 1962 and 1982, the power 
companies have in the aggregate made annual payments 
of $44,650 for headwater benefits. That amount was to 
be paid each year until changes in operation, 
development, or costs indicated some modification to be 
advisable. Federal Power Commission Docket No. 
E-6578 was revised by Docket No. HB07-75-4-000 
(order issued July 11, 1983 under 24 FERC, paragraph 
62052) which modified cumulative use charges after 
1974, effective retroactively. Such charges will now 
vary each year. An adjustment (years 1974 through 
1984) was included in 1984 payment of $244,790. The 
1985 payment was $52,747; 1986 payment was 
$51,905. No payment was received in 1987. The 1988 
payment was $58,187. No payment was received in 
1989. Two payments ($60,894 and $55,443) were 
received in 1990; $60,983 was received in 1991; 
$65,975 in October 1991 (FY 1992) $77,577 in October 
1992 (FY 1993), and $62,231 in October 1993 (FY 
1994). Cumulative use charges collected by the Federal 
Power Commission (known as the Federal Energy 
Regulatory Commission since January 9, 1978) and 
returned to the U. S. Treasury through period ending 
September 30, 1995, amounted to $2,150,458. 
Operations and results during fiscal year. New 
work, regular funds: None. Code 710 funds: None. 
Maintenance: Maintenance and operation continued. 
Structures were maintained in good condition. Runoff 
of Kern River above Isabella Dam was above normal 
for the year. Maximum storage of 293,316 acre-feet 
occurred June 8, 2000. Maximum hourly inflow to the 
reservoir was 7,142 cubic feet per second on April 28, 
2000, and maximum outflow of 1,751 cubic feet per 
second occurred July 15, 2000. During the year, 
461,796 acre-feet was released for irrigation and 0 acrefeet 
was released for flood control. 
Historical summary. Construction began in March 
1948 and was completed in June 1968. Main dam, Borel 
Canal outlet works and appurtenances, and auxiliary 
dam were completed in April 1953. Storage 
impoundment began December 1952. Piezometer was 
installed in August 1982. Project is operating to provide 
35-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
flood protection and irrigation benefits for which it was 
designed. Recreation facilities were provided by Code 
710 funds. Dam safety assurance studies were initiated 
in FY 1979. A cultural resources survey was completed 
in FY 1984. On May 15, 1991, Isabella Lake and 
surrounding land, 16,000 acres around the lake currently 
being used for park and recreational purposes, was 
turned over to the Forest Service by the Corps in 
exchange for approximately 2,500 acres of Forest 
Service recreation land near Pine Flat Lake. A 
memorandum of understanding (MOU) between the 
Secretary of the Army and the Secretary of Agriculture 
(Forest Service) was used. The MOU requires an 
exchange of land between departments. Three Corps 
maintenance employees, under supervision of the 
Success Lake park manager, will stay at Isabella to 
operate the dam for flood control and water conservation 
purposes. 
17. KAWEAH AND TULE RIVERS, 
INCLUDING TERMINUS DAM 
AND SUCCESS LAKE, CA 
Location. Terminus Dam is on Kaweah River about 
20 miles east of Visalia, CA. Success Lake is on Tule 
River about 5 miles east of Porterville, CA. (See 
Geological Survey quadrangles of area.) 
Existing project. Terminus Dam: For description of 
completed improvement and authorizing act, see Annual 
Report for 1975. Federal cost of new work is 
$19,302,957, including $242,605 for basic recreation 
facilities and excluding spreading works constructed by 
local interests at an estimated (July 1957) cost of about 
$750,000. Spreading works portion of project has been 
deauthorized. The 90-day Congressional project review 
period, required by sec. 12, Public Law 93-251, as 
amended, ended August 5, 1977, and resulted in 
deauthorization of that portion of project. Federal cost of 
recreation facilities funded from Code 710 
appropriations is $700,004. Success Lake: For 
description of completion improvement and authorizing 
act, see Annual Report for 1975. Federal cost of new 
work for Success Lake is $14,247,221, including 
$253,697 for basic recreation facilities. Federal cost of 
recreation facilities funded from Code 710 
appropriations is $747,048. For future non-Federal 
reimbursements, see Local cooperation paragraph. 
Operation and maintenance of reservoirs is Federal 
responsibility. 
Local cooperation. California officially adopted 
projects by chapter 1514 of statutes of 1945, State of 
California. Local interests for Terminus Dam are 
represented by Kaweah Delta Water Conservation 
District. Local interests for Success Lake are considered 
to be represented by the Vandalia, Porterville, and 
Lower Tule River Irrigation Districts, the Tulare Lake 
Basin Water Storage District, and Pioneer Water Co., 
which represent over 90 percent of irrigated land and 
water-right holders along Tule River below damsite. 
Local interests must reimburse the Federal Government 
the portion of first cost and annual operation and 
maintenance costs allocated to irrigation functions of 
projects. These costs are estimated at 14.1 percent of 
first and annual costs for Terminus and 9.5 percent of 
first and annual costs for Success. Local interests for 
Terminus stated they will continue to operate and 
maintain spreading works and downstream channel 
systems to provide required capacity for disposal of 
floodwaters. Local interests for Success stated they will 
continue to maintain downstream channel systems to 
provide required capacity for disposal of floodwaters. 
Repayment contracts between the Bureau of 
Reclamation and local water users for irrigation supply 
from Terminus and Success reservoirs were executed 
January 11, 1965, and April 30, 1965, respectively. 
Reservoirs are being operated for irrigation storage as 
well as flood control and incidental recreation use. 
Tulare County acquired water for recreation pools at the 
projects. Local interests paid the following total 
amounts for irrigation services from the reservoirs 
through December 31,2000: Terminus, $2,438,709 and 
Success, $1,209,073. Tulare County was granted a 
25-year license for planning, development, and 
management of public recreation areas at Success, July 
10, 1960, and at Terminus, June 5, 1961. Basic 
public-use facilities constructed by Corps at the Success 
reservoir were transferred to jurisdiction of Tulare 
County on January 18, 1962; facilities at Terminus were 
transferred June 20, 1962. In March 1967, an 
amendment to the license agreements was approved by 
the Assistant Secretary of the Army. Under these 
amended licenses, Tulare County retained 
administration of only specified land areas and 
35-14

SACRAMENTO, CA, DISTRICT 
operation and maintenance of recreation facilities in 
these areas. In addition, they continued their program of 
water safety, boat inspection, and law enforcement at 
both reservoirs. The Corps took over the administration 
of the remainder of the project land areas and the 
operation and maintenance of recreation facilities in 
these areas. Calif. Department of Fish and Game 
expended funds to improve fishery resources of the 
Terminus reservoir. As of April 1, 1972, Tulare County 
relinquished all planning, development, and 
management of public recreation areas at Terminus 
Dam. Tulare County by expenditure of county funds and 
by a lease to a marina concessionaire has aided in the 
development of recreation facilities at an estimated cost 
of $199,000. Calif. Department of Fish and Game 
expended funds in conjunction with Tulare Sportsman's 
Council and developed a habitat for upland game birds 
at Success Lake. As of April 1, 1972, Tulare County 
relinquished all planning, development, and 
management of public recreation areas at Success Lake, 
except for the Bartlett Park recreation area. Tulare 
County has aided in development of recreation facilities. 
Total cost to date of present recreation facilities 
developed by the county ($360,000) and the marina 
concessionaires ($373,000) is about $733,000. 
Operations and results during fiscal year. New 
work: Terminus Dam, regular funds: None. Code 710 
funds: None 
Success Lake, regular funds: None. Code 710 funds: 
None. 
Maintenance: Terminus Dam: Maintenance and 
operation continued. Dam safety assurance studies were 
continued at a fiscal year cost of $118,300. Structures 
were maintained in serviceable condition. Runoff of 
Kaweah River above Terminus Dam was above normal 
for the year. Maximum storage of 143,844 acre-feet 
occurred on May 28, 2000. Maximum hourly inflow to 
the reservoir on February 14, 2000, was about 6,460 
cubic feet per second. Maximum outflow of 2,234 cubic 
feet per second occurred May 28, 2000. Irrigation and 
spreading releases totaled 278,312 acre-feet. Releases 
for flood control totaled 82,700 acre-feet. Success Lake: 
Maintenance and operation continued. Relief wells were 
placed at a fiscal year cost of $120,000. Structures were 
maintained in serviceable condition. Runoff of Tule 
River above Success Dam was above normal during the 
year. Maximum storage of 73,335 acre-feet occurred on 
May 31,2000. Maximum hourly inflow to the reservoir 
was 4,666 cubic feet per second on February 14, 2000, 
and maximum outflow of 643 feet per second occurred 
on July 25, 2000. Irrigation and spreading releases 
amounted to 86,055 acre-feet. Releases for flood 
control amounted to 16,300 acre-feet. 
Historical summary. Terminus Dam: Construction 
of project began in July 1957 and was completed in 
June 1968. Final land audit was approved on April 20, 
1987. Construction of main dam and appurtenances, 
initiated in February 1959, was completed in June 1962. 
Dam has been operating since November 1961 to 
provide flood protection for which it was designed; 
conservation impoundment was commenced May 1962. 
Appurtenances are in good condition. Recreation 
facilities were provided by Code 710 funds. Dam safety 
assurance studies were initiated in FY 1979 and 
completed in FY 1989. Piezometer installation and a 
cultural resources survey were completed in FY 1984. 
Success Lake: Construction of project began in 
November 1956, was completed in June 1968, and final 
audit of historical land record was approved December 
17, 1979. Construction of main dam and appurtenances, 
initiated in October 1958, was completed in May 1961. 
Dam has been operating since October 1960 to provide 
flood protection for which it was designed; conservation 
impoundment was commenced March 1962. Recreation 
facilities were survey was completed in FY 1984. 
18. LITTLE DELL LAKE, UT 
Location. On Dell Creek, a tributary of Parleys 
Creek, about 8 miles east of Salt Lake City upstream of 
Mountain Dell Reservoir in Salt Lake County, UT. 
Existing Project. Project providing for construction 
of a dam about 253 feet high to create a reservoir with a 
gross capacity of 30,000 acre-feet for flood control, 
municipal and industrial water supply, recreation and 
fish and wildlife was authorized by the 1968 Flood 
Control Act (S. Doc. 53, 90th Cong., Ist sess., contains 
published map) as modified by sec. 170, Water 
Resources Development Act of 1976, Public Law 
94-587, October 22, 1976. Facility would be operated in 
conjunction with existing downstream 3,200 acre-foot 
Mountain Dell Reservoir on Parleys Creek for flood 
control and water supply. 
35-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Authorized project has been reexamined and scaled 
down to reflect local interests' ability to pay. Current 
plan of improvement includes only flood control and 
water supply purposes. Recreation was deferred as of 
May 30, 1986, and Emigration Creek Diversion was 
deleted and placed in an inactive status. Recreation was 
reactivated in 1995 and the Recreation DM approved in 
1996. The project includes an earthfill dam 224 feet 
high, a 20,500 acre-foot reservoir, and 10,035 feet of 
pipeline to divert water from Parleys Creek. Estimated 
project cost (September 1997) is $65,300,000 (includes 
an allowance for estimated inflation through the 
construction period) of which $41,215,000 is Federal 
and $24,085,000 is non-Federal for lands and damages 
and includes a cash contribution of$19,955,000. Project 
is included in FY 1985 Supplemental Appropriations 
Act (Public Law 99-88) August 15, 1985. 
Local cooperation. Local interests are required to 
provide lands, easements, rights-of-way, and dredged 
material disposal areas; modify or relocate buildings, 
utilities, roads, bridges (except railroad bridges), and 
other facilities where necessary in the construction of the 
project; pay all costs allocated to municipal and 
industrial water supply; pay 13 percent of costs allocated 
to flood control to bring total non-Federal share of flood 
control costs to 25 percent, bear all costs of operation, 
maintenance, and replacement of flood control facilities; 
and pay a cash contribution presently 1986, and January 
24, 1986, the Metropolitan Water District allocated to 
flood control to bring total non-Federal share of flood 
control costs to 25 percent, bear all costs operation, 
maintenance, and replacement of flood control facilities; 
and pay a cash contribution presently estimated at 
$19,995,000. By letters of January 22 1986, and 
January 24,1986. The Metropolitan Water District of 
Salt Lake City and Salt Lake County indicated their 
support and willingness to proceed with a reduced scale 
project based on their "ability to pay." A Local 
Cooperation Agreement (Sec. 221) was executed on 
June 10, 1986. Water Revenue Bonds were issued 
August 27, 1986, and proceeds from the sale in the 
amount of$14,300,000 have been deposited in the Little 
Dell Construction Fund Account. 
Operations and results during fiscal year. 
Engineering activities continued. 
Historical summary. A Local Cooperation 
Agreement (Sec. 221) was executed June 10, 1986. 
Construction was initiated in April 1988. Construction 
of core trench and test fill was completed in February 
1989. Main dam and appurtenances contract was 
awarded May 12, 1989 and completed in September 
1993. Project was transferred to the local sponsor for 
maintenance and operation on March 26, 1993. Dam 
was dedicated on August 5, 1993. 
19. MARTIS CREEK LAKE, MARTIS 
CREEK, NV AND CA 
Location. Reservoir is on Martis Creek a tributary of 
Truckee River, near Truckee, CA; intermittent channel 
improvements are on Truckee River in Reno, NV. (See 
Geological Survey quadrangles for areas.) 
Existing project. For description of completed 
improvement and authorizing act, see Annual Report for 
1975. Federal cost for project was $8,503,789 including 
$289,506 for basic recreation facilities. Federal cost of 
recreation facilities funded from Code 710 
appropriations was $1,200. Construction of recreation 
facilities under Code 710 was determined to be 
infeasible. Operation and maintenance of reservoir is 
Federal responsibility. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. New 
work: None. Maintenance: Maintenance and operation 
of project, including recreation facilities, was continued. 
Structures were maintained in serviceable condition. 
Runoff above Martis Creek Dam was above normal for 
the year. Maximum storage of 1,372 acre-feet occurred 
on February 15, 2000. Maximum inflow to the 
reservoir was 483 cubic feet per second on February 14, 
2000, and maximum outflow of 85 cubic feet per 
second occurred February 18, 2000. During the year, 
4,912 acre-feet was released for irrigation purposes. 
Releases for flood control amounted to 11,927 acre-feet. 
Piezometers were replaced at a fiscal year cost of 
$27,000. 
Historical summary. Project construction began in 
August 1967; dam closure was in October 1971; dam 
35-16

SACRAMENTO, CA, DISTRICT 
completed in August 1972; basic recreation facilities 
were completed in December 1972; and project was 
completed in June 1974. Recreation facilities under 
Code 710 funding were considered infeasible. Dam 
safety assurance studies were initiated in FY 1981. 
20. MERCED COUNTY STREAMS, CA 
Location. In vicinity of city of Merced, CA, on 
streams draining from Mariposa County foothills of the 
Sierra Nevada into Merced County. Streams lie easterly 
of and drain into the San Joaquin River between 
Chowchilla River on the south and Merced River on the 
north. Drainage area represents about 1,000 square 
miles; nearly 700 square miles of foothills and 
mountains in Mariposa County and about 300 square 
miles of flood plain in Merced County. (See Geological 
Survey quadrangles for area.) 
Existing project. Project is a modification of Merced 
County Stream Group, Calif., Improvement No. 18, 
authorized by 1944 Flood Control Act (H. Doc. 473, 
78th Cong., 2d sess.) and completed in FY 1957. 
Existing project provides for construction of one new 
reservoir Haystack Mountain and enlargement of four 
existing reservoirs Bums, Bear, Owens, and Mariposa, 
providing a total capacity of 126,700 acre-feet for 
multipurpose storage; and about 52 miles of levee and 
channel improvements in lower reaches of Bear, Black 
Rascal, Mariposa, and Deadman Creeks, thereby tying 
the existing project channels into Eastside Bypass of San 
Joaquin River flood control system. Haystack Mountain, 
Bear, Bums, and Owens projects would provide flood 
control only; Castle and Bums projects, flood control 
and recreation; Marguerite project, flood control and 
irrigation; and Mariposa project, all three purposes. 
Existing project was adopted by 1970 Flood Control 
Act. 
Current plan of improvement would defer 
enlargement of existing Mariposa reservoir and the 
irrigation function associated with the latter two 
facilities, enlargement of existing Owens reservoir and 
about 32 miles of levee and channel improvement on 
Owens, Mariposa, and Deadman-Dutchman Creeks. 
Estimated total project cost (October 1996) is 
$132,700,000 (includes an allowance for estimated 
inflation through the construction period), of which 
$91,800,000 is Federal and $40,900,000 is non-Federal 
(which includes a $6,855,000 cash contribution). 
Local cooperation. Local interests are required to 
provide lands, easements, and rights-of-way and 
dredged material disposal areas; modify or relocate 
buildings, utilities, roads, and other facilities, where 
necessary in the construction of the project; pay 
one-half of the separable and joint costs allocated to 
recreation, presently estimated at $282,000, of which 
$240,000 is a cash contribution and $42,000 is for 
lands; and bear all costs of operation, maintenance, and 
replacement of flood control facilities. Total 
non-Federal share of Castle Dam first cost is $5,230,000 
and includes cash contribution of $595,000. 
The California Reclamation Board and the City of 
Merced are the local sponsors of the authorized project. 
The Reclamation Board will serve as sole sponsor for 
the Castle Dam Unit. Merced County Board of 
Supervisors reaffirmed their support for the project by 
letter of April 4, 1986. City of Merced by letter of 
March 13, 1986, reaffirmed its support for and intent to 
furnish assurances for recreation aspects of the project. 
California Reclamation Board reaffirmed its support for 
total project by letter of April 9, 1986. A Local 
Cooperation Agreement (Sec. 221) was executed for 
Castle Dam Unit on June 27, 1986. State of California 
legislation (AB3369) was enacted on September 14, 
1986 which enabled the Reclamation Board to 
financially participate in the project. A new Local 
Cooperation Agreement (LCA) was signed by the 
Assistant Secretary of the Army November 30, 1988, in 
accordance with the Water Resources Development Act 
of 1986. The California Reclamation Board, the 
Merced County Board of Supervisors and the city of 
Merced have indicated support for balance of the 
project by letters of intent dated August 29, 1991 and 
August 20, 1991, respectively. This support was again 
reaffirmed in letters of support as provided by the 
California Reclamation Board on January 9, 1996. 
Operations and results during fiscal year. 
Engineering activities continued for Bear Creek Dam 
Unit. Castle was transferred to sponsor for maintenance 
and operation in April 1995. 
Historical summary. Castle Dam multicomponent 
construction contract was awarded February 26, 1991, 
and construction was completed in March 1993. Castle 
35-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Dam check structure contract was initiated in April 1993 
and completed in January 1994. Castle Dam was 
transferred to the sponsor on April 12, 1995, and 
accepted by the sponsor in FY 2000. 
21. MERCED COUNTY STREAM 
GROUP, CA 
Location. Reservoirs and channel improvements are 
on Bear, Burns, Mariposa, and Owens Creeks, in 
foothills of Sierra Nevada about 15 to 20 miles east of 
city of Merced, CA. (See Geological Survey Haystack 
Mountain quadrangle for Burns and Indian Gulch 
quadrangle for Bear, Owens, and Mariposa areas.) 
Existing project. For description of completed 
improvements and authorizing act, see Annual Report 
for 1962. Improvements consist of reservoirs at 
Mariposa, Owens, Burns and Bear Creeks and diversions 
from Black Rascal Creek to Bear Creek and from Creek 
to Mariposa Creek. Total first cost for project was 
$3,899,259, of which $2,751,259 was Federal and 
$1,148,000 non-Federal for lands including relocations 
and channel improvement. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. 
Maintenance: Ordinary maintenance and operation of 
the four completed reservoirs continued. Structures were 
maintained in a serviceable condition. Runoff from 
drainage areas below Merced County stream group 
reservoirs was above normal for the year. See Table 
35-K for maximum inflow storage and outflow for the 
projects. Outflows were less than channel capacity rates 
in the project streams. 
Historical summary. Construction was initiated 
March 1948, with construction of Mariposa project, 
which was completed in November 1948. Construction 
of Owens project, initiated in March, was completed in 
October 1949; Burns project, initiated in July 1949, was 
completed in January 1950; and Bear project initiated in 
April, was completed in December 1954. Black Rascal 
and Owens Creek diversion channels and stream-gaging 
stations were completed in April 1956. Local interests 
completed channel enlargement and restoration of 
channel capacities of Miles, Bums, Owens, and 
Mariposa Creeks in 1956 at their expense. Improvement 
of Bear Creek and Black Rascal Slough, below their 
confluence, was deferred pending possible 
improvements downstream, outside limits of project. 
22. NAPA RIVER, CA 
Location. The project is located in the city and county 
of Napa, California. The Napa River drainage basin, 
comprising 426 square miles, is just north of San Pablo 
Bay and approximately 40 miles northeast of San 
Francisco, California. 
Existing project. A major portion of the presently 
developed area of the city is located in a high flood 
hazard area and is subject to flooding. The project 
consists of modifications to provide the project area 
with 100-year level of flood protection from Napa River 
and Napa Creek. Channel modifications include 
overbank excavation, vertical walls, floodwalls, levees, 
bridges, pumping stations and flowage easements. The 
project also includes recreation trails and incidental 
ecosystem restoration. Current total project cost 
estimate is $182,000,000 and is to be cost shared 50% 
Federal and 50% local sponsor. 
Local cooperation. In March 1998, the Napa 
County electorate passed "Measure A" to fund the non- 
Federal share of the project. In June 1999, Napa 
County Flood Control and Water Conservation District, 
the local sponsor, indicated support for the project and 
intent to cost share. The sponsor will furnish lands, 
easements, rights of way and borrow and excavated or 
dredged material disposal areas; modify or relocate 
utilities, roads, bridges (except railroad bridges) and 
other facilities where necessary for the construction of 
the project; provide 5 percent of the costs allocated to 
flood control and bear all costs of operation, 
maintenance, repair, rehabilitation and replacement for 
flood control facilities; and pay one-half of the 
separable costs allocated to recreation (except 
recreational navigation) and bear all costs of operation, 
maintenance, repair, rehabilitation and replacement or 
recreation facilities. The Project Cooperation 
Agreement was executed in February 2000. 
35-18

SACRAMENTO, CA, DISTRICT 
Operations during fiscal year. The PED phase of the 
project was completed in fiscal year 2000 at a total cost 
of$15,587,000. Construction Contract 1A, estimated at 
$2,550,000, was awarded in July 2000. Planning, 
engineering and design, construction management and 
non-Federal lands certification efforts continue. Fiscal 
Year construction costs total $2,853,452. 
Historical summary. The project was authorized by 
the Flood Control Act of 1965 for flood control and 
recreation and was modified by the Flood Control Act of 
1976 to include modifications to Napa Creek. The 
project was placed in inactive status in 1978. Following 
severe flooding in February 1986, the sponsor requested 
reactivation of the project. Funds to resume preconstruction 
engineering and design (PED) were 
appropriated in fiscal year 1989. A revised Final 
SGDM was completed in October 1998 and approved in 
May 1999. The ROD for the revised SEIS/EIR was 
issued in June 1999. Project was approved as new start 
construction for fiscal year 2000. 
23. PAJARO RIVER, CA 
Location. In the Uvas-Carnadero and Llagas Creeks 
watersheds of the upper Pajaro River Basin in south 
Santa Clara County in vicinity of the city of Gilroy 
about 75 miles south of San Francisco, CA. 
Existing project. See Annual Report for 1996, pg. 
35-15. 
Local cooperation. Fully complied with. Local 
Cooperation Agreement (LCA) for flood control was 
executed with the Santa Clara Valley Water District on 
June 25, 1987, and LCA for recreation was executed 
with the City of Gilroy on July 27, 1987. 
Operations and results during fiscal year. The 
project is fiscally completed. 
Historical summary. Responsibility for remaining 
portions of advance engineering and design, plans and 
specifications, and construction was transferred to 
Sacramento District in April 1982. Construction began 
in October 1987. Construction for the first contract 
(levee work and bike path upstream of Thomas Road 
Bridge), second contract (levee work and hiking trails), 
and third and final contract (landscaping) has been 
transferred to local interests for operation and 
maintenance. Total reimbursement of $5,583,369 has 
been made to the local sponsor. 
24. PINE FLAT LAKE AND KINGS 
RIVER, CA 
Location. Reservoir is on Kings River, about 25 
miles east of Fresno, CA, and channel improvements are 
on Kings River downstream from Lemoore weir, about 
25 miles south of Fresno. (See Geological Survey 
quadrangles of area.) Project also includes 2,500 acres 
of Forest Service recreation land near Pine Flat Lake. 
Existing project. Improvement is a unit in 
comprehensive plan for flood control and other related 
purposes for Sacramento-San Joaquin Basins. Project 
consists of a 429-foot high concrete gravity dam, 
including a gated overflow section with a maximum 
discharge capacity of 391,000 cubic feet per second, 
creating a reservoir with gross storage capacity of 1 
million acre-feet, for flood control, irrigation, and 
related purposes. Outlet provisions for future power 
development are included in dam, but Federal 
construction of power-generating facilities is not 
authorized. Improvement also includes levee and 
channel work on Kings River and its tributaries on 
valley floor about 25 miles south of Fresno. Channel 
improvement work will enlarge channel capacities and 
regulate flows in lower branches of the Kings River. 
There are nine public-use and recreation areas: One 
maintained by the Corps, four by the Forest Service, 
three jointly by the Corps and concession, and one by 
Fresno County. Also, five boat access-only areas are 
maintained by the Corps on the south side of the 
reservoir. Project cost is $42,072,330, of which 
$41,502,330 is Federal (including $13,700 for basic 
recreation facilities) and $570,000 non-Federal for 
rights-of-way for downstream channel improvements. 
For future non-Federal reimbursement, see Local 
cooperation paragraph. Federal cost of recreation 
facilities for Pine Flat Lake, funded from Code 710 
appropriations is $1,595,100 exclusive of recreation 
facilities previously provided at a cost of $13,700. In 
addition, Federal cost of recreation facilities for Pine 
Flat Lake, funded from Public Works Acceleration 
35-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Executive Act of 1962 appropriations, was $239,235 
(July 1963). Operation and maintenance of dam and 
reservoir is Federal responsibility. Existing project was 
adopted by 1944 Flood Control Act (H. Doc. 630, 76th 
Cong., 3d sess., contains latest published map). 
Local cooperation. Local interests must reimburse 
the Federal Government for first costs allocated to 
irrigation functions of reservoir portion of project in 
accordance with reclamation law. Under provision of 
War Department Civil Appropriations Act of 1947, the 
Secretary of War, with concurrence of the Secretary of 
the Interior, determined allocation of cost to irrigation 
should be set at an amount not to exceed $14,250,000. In 
addition, local interests must pay 37.4 percent of annual 
maintenance, operation, and replacement costs of dam 
and reservoir allocated to irrigation function. Repayment 
contracts between the Bureau of Reclamation and the 
local water users for the irrigation use of the reservoir 
were executed December 23, 1963. The Bureau is 
administering the contracts in accordance with 
reclamation law as amended by the Reclamation Reform 
Act of October 12, 1982. That act generally exempts the 
limitations under the early reclamation laws as being 
applicable to projects constructed by the Corps with two 
exceptions; however, all existing contracts to share 
construction and maintenance costs remain in effect. 
Prior to execution of the final contracts, the Bureau 
provided conservation water to local interests under an 
interim contract. Irrigation interests paid $14,450,234 
for irrigation services through December 31, 1999. With 
respect to the downstream channel improvements, sec. 3, 
Flood Control Act of June 22, 1936, applies. King River 
Conservation District represents local interests; 
assurances were accepted November 20, 1959. Local 
interests have furnished all requirements for construction 
rights-of-way for construction of channel improvements 
required to date. Three concessionaires each at 
Lakeridge Marina (Deer Creek), Pine Flat Marina and 
Trimmer Marina provided public-use facilities in 
accordance with lease agreements with the Secretary of 
the Army. Estimated cost to date of facilities installed by 
these concessionaires is $1,727,000. Fresno County 
developed public-use facilities on an 85-acre tract 
immediately downstream from dam for picnicking, 
camping, swimming, and playground activities, at an 
estimated cost of $476,000 under provisions of a license 
agreement. The U.S. Forest Service developed and 
operates a picnic area at the upper end of reservoir. Cost 
of site development is about $37,500. Installation of a 
hydroelectric powerplant, located at the downstream toe 
of the Corps Pine Flat Dam, was completed in January 
1984 by Kings River Conservation District. Project 
consists of an outdoor-type powerhouse containing 
three generating units with capacities of 55 megawatts 
each for a total of 165 megawatts. Conservation District 
would make use of the three existing 13.5-foot diameter 
penstocks that were installed in Pine Flat Dam when 
constructed in 1954. 
Licenses. License No. 1988, effective April 1, 1955, 
was issued by Federal Power Commission to Pacific 
Gas and Electric Co. for hydroelectric power 
development of North Fork Kings River by the 
company upstream from the Pine Flat reservoir. Under 
interim Contract No. DA-04-167-eng- 1182 with the 
Department of the Army, Pacific Gas and Electric Co. 
paid for storage of power water in the Pine Flat 
reservoir May 15, 1954, through March 31, 1955. 
Current Contract No. DA-04-167-eng-1328 with the 
Department of the Army provides for storage of power 
water at the rate of 0.1375 per acre-foot; the contract 
covers April 1, 1955, through March 31, 2005. By an 
agreement of January 1972, supplementing the 
December 1954 contract, Pacific Gas and Electric Co. 
transferred ownership of most of its Kings River system 
water to the Kings River Water Association. 
Accordingly, no further significant storage service to 
Pacific Gas and Electric Co. by the reservoir at Pine Flat 
is anticipated. Total payment under these contracts 
through June 30, 1972, (last year of payment), amounts 
to $2,478,798; these funds were paid to Sacramento 
District and deposited for return to the Treasury. 
License No. 2741, effective September 25, 1979, was 
issued by the Federal Energy Regulatory Commission to 
the Kings River Conservation District for hydropower 
development at the downstream toe of the Corps Pine 
Flat Dam. Payment to the Department of the Army for 
construction and installation of the penstocks in the 
amount of $1,044,685 was made to Sacramento District 
and deposited for return to the Treasury in November 
1985. 
Operations and results during fiscal year. New 
work, regular funds: None. Code 710 funds: None. 
Maintenance: Maintenance and operation activities 
35-20

SACRAMENTO, CA, DISTRICT 
continued. Dam safety assurance studies were continued 
at a fiscal year cost of $18,235. Structures were 
maintained in serviceable condition. Runoff of Kings 
River above Pine Flat Dam was above normal for the 
year. Maximum storage of 956,054 acre-feet occurred 
on June 5, 2000. Maximum hourly inflow to the 
reservoir was 13,490 cubic feet per second on May 
24, 2000, and maximum outflow of 7,035 cubic feet per 
second occurred on June 30, 2000. During the year, 
1,495,531 acre-feet was released for irrigation and 
spreading. There was no release for flood control. 
Historical summary. Construction began in April 
1947 and project, including channel improvement, was 
completed in September 1977. Main dam was initiated 
in January 1950, completed in June 1954, and has been 
operating since February 1954 to provide flood 
protection for which it was designed. Total of 35.2 miles 
of new and reconstructed levees and 13.2 miles of 
channel clearing have been transferred to the Kings 
River Conservation District for maintenance. Recreation 
facilities for various recreation areas under Code 710 
appropriation are complete. Completed preliminary 
design and cost estimates for Pine Flat fish barrier were 
reviewed by the State, but the State was unable to 
provide necessary assurances of local cooperation. Dam 
safety assurance studies were initiated in FY 1982. A 
cultural resources survey was completed in FY 1984. 
On May 15, 1991, Pine Flat Lake acquired additional 
acreage as part of a memorandum of understanding 
(MOU) between the Secretary of the Army and 
Secretary of Agriculture (Forest Service). The Corps 
exchanged Isabella Lake and the 16,000 acres around 
that lake currently being used for park and recreational 
purposes for approximately 2,500 acres of Forest 
Service recreation land near Pine Flat Lake. 
25. REDBANK AND FANCHER 
CREEKS, CA 
Location. Northeast and adjacent to the Fresno- 
Clovis Metropolitan Area in Fresno County about 170 
miles southeast of Sacramento, CA. 
Existing project. Provides for flood control detention 
basins on Redbank Creek, Pup Creek, and Alluvial 
Drain; construction of a dam 45.5 feet high to create a 
reservoir with gross capacity of 10,300 acre-feet for 
flood control on Fancher Creek; and enlargement of Big 
Dry Creek project to provide increased flood protection 
and recreational development. Since the local sponsor 
does not support recreational development at this time, 
the recreation feature of the project is considered to be 
inactive. The Authorization Act states "measures 
determined appropriate by the Secretary of the Army to 
minimize benefits to groundwater recharge" shall be 
included in the project. Estimated cost (October 1997) 
for existing project is $73,710,000 (includes an 
allowance for estimated inflation through the 
construction period), of which $47,460,000 is Federal 
and $26,250,000 is non-Federal (which includes 
$3,670,000 cash contribution). For future non-Federal 
reimbursement, see Local cooperation paragraph. 
Existing project was adopted by Sec. 401, Water 
Resources Development Act of 1986, Public Law 
99-662, November 17, 1986. (HD 98-147, 98th Cong., 
2d sess., contains published map.) 
Local cooperation. Local interests are required to 
provide lands, easements, rights-of-way, and dredged 
material disposal areas; modify or relocate buildings, 
utilities, roads, bridges (except railroad bridges) and 
other facilities where necessary in construction of the 
project; pay 5 percent of cost allocated to flood control 
to bring total non-Federal share of flood control costs to 
25 percent, of which $3.680,000 is cash contribution, 
and bear all costs of operation, maintenance and 
replacement of flood control facilities. Local interests 
have agreed to make all required payments concurrently 
with project construction. 
Operations and results during fiscal year. 
Engineering activities, real estate crediting, and project 
auditing were continued. 
Historical summary. Local Cooperation Agreement 
was executed on August 1, 1987. Project construction 
was begun in September 1987 with initiation of 
archaeological work on Cultural Resources 
Preservation. Construction contract for Dry Creek 
Crossing was completed and transferred to local 
interests for operation and maintenance on January 10, 
1989. Construction at Redbank Creek Detention Basin 
was completed and transferred to local interests for 
operation and maintenance on August 23, 1990. 
Construction contract for Fancher Creek Dam awarded 
May 23, 1990, was completed and transferred to local 
35-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
interests for operation and maintenance on March 13, 
1992. Construction contract for Big Dry Dam, Pup and 
Alluvial detention basins was awarded March 18, 1992. 
Big Dry Creek Dam and Pup Creek Detention Basin 
were transferred to local interests on June 22, 1994. 
Last piece of completed work, Alluvial Drain Detention 
Basin, was transferred to local interests for maintenance 
and operation on July 18, 1994. 
26. RUSSIAN RIVER BASIN, CA 
Location. Russian River rises in Coast Range in 
northwestern California, flows southerly for 87 miles, 
and then turns westerly to flow for 23 miles to Pacific 
Ocean at Jenner, 60 miles northwest of San Francisco, 
CA. (For general location see Geological Survey map 
for California.) 
Existing project. Active authorized project provides 
for construction of a dam on East Fork of Russian River 
at Coyote Valley to a height of 160 feet; a dam on Dry 
Creek at Warm Springs to a height of 319 feet; and 
channel stabilization works on Russian River between 
mouth and mile 98, on lower reaches of several 
tributaries, and on Dry Creek downstream from dam. 
Project also provides for expansion of fish hatchery 
capacity at Dry Creek, Warm Springs, to compensate for 
fish losses on Russian River attributed to operation of 
Coyote Dam component of project. Coyote Valley Dam 
(Lake Mendocino), completed in 1959, is operated and 
maintained by the United States. (See tables 35-L and 
35-M for latest approved estimated costs.) 
Local cooperation. Fully complied with for Coyote 
Valley Dam and channel improvements accomplished to 
date. For the Dry Creek portion, local interests are 
required by the authorizing act to comply with the usual 
a., b., c. requirements for channel improvements and, in 
addition, prevent any encroachment in the channel of 
Dry Creek which would interfere with proper 
functioning of the channel improvement works; adjust 
all claims concerning water rights arising from the 
construction and operation of the improvements, 
including acquisition of water rights needed for 
preservation of fish and wildlife resources affected by 
the project; and reimburse the United States in 
accordance with the Water Supply Act of 1958, as 
amended, for that part of the joint-use construction cost, 
(30.2 percent currently estimated at $103,760,000) and 
an ultimate 32.5 percent of the annual operation, 
maintenance, and replacement joint-use costs allocated 
to municipal and industrial water supply. The estimated 
annual cost to local interests for maintenance of channel 
improvement works is $80,000. Sonoma County Water 
Agency (formerly Sonoma County Flood Control and 
Water Conservation District) provided assurances of 
willingness and ability to meet requirements by 
Resolutions No. DR 00793-1, September 25, 1961, No. 
DR 4770-1, December 17, 1962, and No. DR 45759, 
August 5, 1974, for Dry Creek (Warm Springs) Lake 
and Channel. By letter dated March 7, 1967, Sonoma 
County Flood Control and Water Conservation District 
further indicated their interest in optimization of the Dry 
Creek (Warm Springs) damsite to provide additional 
water supply storage. Reimbursement to the United 
States for Dry Creek (Warm Springs) Lake and Channel 
costs allocated to 212,000 acre-feet of water supply 
storage is specified in a water supply contract with the 
local sponsor approved in October 1982. Local interests 
have expended approximately $1,000,000 to provide 
partial flood protection in project area and have 
constructed facilities at an approximate cost of 
$20,000,000 to distribute water from the completed 
Coyote Valley reservoir. 
Operations and results during fiscal year. New 
work: Coyote Valley Dam: None. Dry Creek (Warm 
Springs) Lake and Channel: Engineering activities 
continued. The Gualala Redwoods claim that their 
access to Kelly Road was cut off by Corps project 
(Warm Springs) went to trial in October 1992. 
Judgement resulting was a cost of $3,162,000 to the 
Federal Government. Major items of contract work 
included: Completion of Liberty Glen wastewater 
system at fiscal year cost of $353,795 and initiation and 
completion of contaminated soil remediation, $83,000. 
Maintenance: Coyote Valley Dam: Operation and 
maintenance continued. Dam safety assurance studies 
were continued at a fiscal year cost of $14,327. 
Structures were maintained in serviceable condition. 
Runoff of East Fork Russian River at Coyote Dam was 
above normal for the year. Maximum storage of 92,670 
acre-feet occurred on May 15, 2000. Maximum hourly 
inflow to reservoir was 4,701 cubic feet per second on 
February 13, 2000. Maximum release of 4,412 cubic 
35-22

SACRAMENTO, CA, DISTRICT 
feet per second occurred on February 16, 2000. During 
the year, 83,718 acre-feet was released for flood control, 
and 122,480 acre-feet was released for irrigation and 
other purposes. Dry Creek (Warm Springs) Lake and 
Channel: Operation and maintenance continued. 
Structures were maintained in serviceable condition. 
Runoff of Dry Creek at Warm Springs Dam was above 
normal for the year. Maximum storage of 270,139 
acre-feet occurred February 15, 2000. Maximum hourly 
inflow to reservoir was 8,196 cubic feet per second on 
February 14, 2000. Maximum release of 4,079 cubic feet 
per second occurred February 10, 1999. During the 
year, 64,524 acre-feet was released for irrigation and 
other purposes. Releases for flood control amounted to 
103,179 acre-feet. 
Historical summary. Entire project, exclusive of 
recreation facilities at completed project (Lake 
Mendocino), is about 99 percent complete. Coyote 
Valley Dam, initiated November 1958, was completed 
April 1959 (cost $17,550,000, of which $11,952,000 
was Federal; and $5,598,000 contributed). Work, 
including removal of slides resulting from storms in 
1958, was completed April 1959. Bank stabilization 
work on Russian River near Geyserville was completed 
in 1957 and channel improvements in remaining reaches 
on Russian River and East Fork of Russian River were 
completed in 1974 (cost $2,483,900). In April 1982, 
responsibility was transferred to the Sacramento District. 
Warm Springs construction completions include fish 
hatchery in December 1980, project overlook in May 
1981, reservoir clearing in July 1981, downstream 
stabilization sills in October 1981, dam closure in 
October 1982, spillway repair at Warm Springs Dam in 
September 1985, boat launching facilities, Phase 1, in 
September 1985, Rockpile Road Upgrade, Yorty Creek 
Beach, and remedial work at Liberty Glen camping area 
in September 1990, fish hatchery expansion in 
September 1992, final control tower grouting, dam 
access road repair, spillway stabilization, fish hatchery 
emergency water supply in September 1993, and Liberty 
Glen wastewater system and contaminated soil 
remediation. Initial filling of Warm Springs reservoir 
was commenced on November 1, 1984. Responsibility 
for construction was transferred to Sacramento District 
in August 1983. Dam safety assurance studies were 
initiated at Coyote Valley Dam in fiscal year 1984. 
27. SACRAMENTO RIVER AND 
TRIBUTARIES, CA, FROM 
COLLINSVILLE TO SHASTA DAM 
Location. Rises in Trinity Mountains in north-central 
California, flows generally southerly about 374 miles 
and empties into Suisun Bay, an arm of San Francisco 
Bay at Collinsville, CA. Works covered by this 
improvement are on Sacramento River and tributaries 
from Collinsville to Shasta Dam, about mile 312. 
Drainage area above Rio Vista is 26,500 square miles 
(See Geological Survey quadrangles of area for 
Sacramento River and Upper Butte Basin; Flournoy and 
Fruto quadrangles for Black Butte Lake; and Tuscan 
Buttes, Tehama, Redding, and Hooker quadrangles for 
Table Mountain Lake.) 
Existing project. Improvement of Sacramento River 
and tributaries, from Collinsville to Shasta Dam was 
authorized as a unit of a comprehensive plan for flood 
control and other related purposes in Sacramento River 
Basin. (a) Sacramento River and major and minor 
tributaries, for flood control purposes: Enlargement of 
existing levees on Sacramento River between vicinity of 
Moulton weir and Ord Bend; construction of new levees 
from present levee terminus to vicinity of Chico 
Landing; construction of a weir near Chico Landing, 
extension of Moulton weir, and construction of a bypass 
through Upper Butte Basin; construction of new levees 
in Lower Butte Basin; enlargement of existing levees in 
Sutter, Tisdale, Sacramento, and Yolo Bypasses; and 
levee construction and/or channel enlargement on 
following minor tributaries of Sacramento River: 
Antelope Creek; Chico and Mud Creeks and Sandy 
Gulch; Butte and Little Chico Creeks; Cherokee Canal; 
Elder Creek; Deer Creek (Tehama County); Thomes 
Creek; and Willow Creek. Improvement provides for 
about 155 miles of channel improvement and about 294 
miles of levees with an average height of 12 feet and a 
freeboard of 3 feet. Improvement also provides for 
revetment as required for protection of bypass levee 
slopes against erosion. Total first cost for project is 
$18,300,000 (October 1988), of which $11,900,000 is 
Federal, and $6,400,000 non-Federal for lands and 
damages, including relocations. (See table 35-N on 
project units classified and excluded from cost 
35-23

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
estimate.) (b) Sacramento River, Chico Landing to Red 
Bluff, CA: An extension of the existing Sacramento 
River Flood Control project which provides for 
construction of bank protection works and minor 
channel improvements as required on Sacramento River 
between Chico Landing and Red Bluff for flood control 
purposes. Estimated first cost (October 1987) for project 
work in Tehama, Butte, and Glenn Counties is 
$31,000,000, of which $25,700,000 is Federal cost and 
$5,300,000 non-Federal cost for lands and damages 
including relocations and cash contribution of 
$3,435,000. (c) Sacramento River, CA, Bank Protection 
Project: Includes initial phase covering 430,000 lineal 
feet of bank protection and a second phase covering 
405,000 lineal feet of bank protection under a long range 
program of bank protection, erosion control works, and 
setback levees at critical locations within limits of 
authorized or existing levees included in the Sacramento 
River Flood Control project to protect integrity of levee 
system for flood control purposes. Total estimated 
(October 1997) first cost for project is $249,400,000, 
(includes an allowance for estimated inflation through 
the construction period) of which $179,900,000 is 
Federal and $69,500,000 non-Federal comprised of 
lands and damages including relocations $26,671,000 
and required cash contribution $42,829,000 toward first 
cost. Total estimated cost for recreation facilities, 
$2,874,000 (includes both Federal and non-Federal). 
Construction in (a), (b), and (c) above supplements 
program of levee improvements as accomplished 
pursuant to 1917 Flood Control Act, as amended by 
subsequent acts, including 1941 Flood Control Act, and 
which are reported on page 35-3A under Sacramento 
River, CA, flood control. (d) Authorization also 
provided for Black Butte Lake. For description of 
completed project see Annual Report for 1975. Federal 
first cost for project is $14,508,820, including $475,507 
for basic recreation facilities. For future non-Federal 
reimbursement, see Local cooperation paragraph. 
Federal cost for recreation facilities funded from Code 
710 appropriations is $1,000,162. A concessionaire at 
Black Butte Marina provided public use facilities in 
accordance with lease agreement with the Secretary of 
the Army at an estimated cost to date of $87,000. (e) 
Authorization also provided for construction of Table 
Mountain (Iron Canyon) project, an earthfill dam on 
Sacramento River about 3 miles north of Red Bluff, CA. 
This project unit was deauthorized August 5, 1977. For 
details, see Annual Report for 1978. 
Local cooperation. (a) Sacramento River and major 
and minor tributaries: Sec. 3, Flood Control Act of June 
22, 1936, applies. Fully complied with for all work 
completed or under contract, and local interests 
indicated they will be able to fulfill requirements for 
remaining work as scheduled. Levee construction (107 
miles) total requirement for the "active" project has 
been completed, transferred to, and accepted by the 
State. (b) Sacramento River, Chico Landing to Red 
Bluff: Sec. 3, Flood Control Act of June 22, 1936, 
applies; local interests must also assume responsibility 
for flood plain zoning. Fully complied with for portions 
completed in Tehama, Butte, and Glenn Counties; 
completed work, bank protection at 36 sites, was 
transferred to and accepted by the State. (c) Sacramento 
River Bank Protection Project: Sec. 3, Flood Control 
Act of June 22, 1936, applies. Local interests must also 
contribute an amount in cash that, when added to costs 
of lands, easements, rights-of-way and utility 
modifications, equals one-third of cost of each unit of 
remedial work; this contribution is estimated (October 
1997) at $27,740,000. Water Resources Development 
Act of 1986 applies. Local interests must also 
contribute an amount in cash, that when added to the 
cost of lands easement, rights-of-way and utility 
modifications, equal one-quarter of each unit of 
remedial work; this contribution is estimated (October 
1997) at $40,970,000, First phase mitigation equals 
thirty-seven percent for acquisition of land and 
establishment and maintenance of fish and wildlife 
habitat, this contribution is estimated (October 1997) at 
$790,000. Local interests fully complied with 
requirements for all work completed or under contract, 
and indicated they will be able to fulfill requirements 
for remaining work as scheduled. In addition, for 
reaches where local interests request bank stabilization 
in lieu of more feasible levee setbacks, local interests 
will contribute costs over and above costs of setbacks, 
and provide local contribution. Completed units 
transferred to and accepted by the State. (d) Black Butte 
Lake: None required for construction. Local interests 
must pay the portion of first cost and annual operation 
and maintenance costs allocated to the conservation 
functions of the project; these costs are estimated at 39.9 
percent of first cost and 40.2 percent of annual costs. 
From March 2, 1960, to October 22, 1970, contract 
35-24

SACRAMENTO, CA, DISTRICT 
between the Bureau of Reclamation and the State of 
California provided for repayment of irrigation storage 
costs; Bureau administered contract in accordance with 
reclamation law. Local interests paid a total of $77,205 
for irrigation services during this period. Public Law 
502, 91st Cong., 2d sess., October 23, 1970, provided 
that Black Butte project be financially integrated with 
the Central Valley project, coordinated operationally 
with other Central Valley project storage units by the 
Bureau under the Secretary of the Interior, and that dam 
and reservoir at Black Butte be physically operated and 
maintained by the Corps in a manner compatible with 
recreational use of the reservoir. 
Operations and results during fiscal year. New 
work: (a) Sacramento River and major and minor 
tributaries None. (b) Sacramento River Bank Protection 
Project Complete Contract LAR 2, Site 5, Phase 2 in 
December 1999 at a cost of $677,381. Awarded 
Contract 42D,. RD 108-Colusa Basin in August 2000. 
Engineering and design efforts continue. Fiscal Year 
costs total $4,573,226. (See table 35-0 for construction 
accomplished and contract costs.) (c) Sacramento River, 
Chico Landing to Red Bluff. None. (d) Black Butte 
Lake, regular funds: None. Code 710 funds: None. 
Maintenance: Maintenance and operation activities 
continued. Structures were maintained in serviceable 
condition. Runoff above Black Butte Dam was above 
normal for the year. Maximum storage of 128,279 
acre-feet occurred May 26, 2000. Maximum hourly 
inflow to Black Butte reservoir was 11,008 cubic feet 
per second on February 14, 2000, and maximum outflow 
of 5,577 cubic feet per second occurred on February 22, 
2000. During the year, 189,986 acre-feet was released 
for flood control and 155,167 acre-feet was released for 
irrigation and other purposes. (e) Table Mountain (Iron 
Canyon) Lake: None. 
Historical summary. (a) Sacramento River and 
major and minor tributaries (active portions): 
Construction was initiated in May 1949 on Deer Creek 
and Butte Creek units; Cherokee Canal, Elder Creek, 
Chico and Mud Creeks, and Sandy Gulch units have 
been completed. Active portion of this improvement is 
about 99 percent complete. Work remaining is bypass 
levee revetment as required, which will accomplish 
under Sacramento River Bank Protection project. (b) 
Sacramento River Bank Protection Project: First phase 
(pre-Separable Element 38B and second phase (SE 38BSE42) 
have 767,000 linear feet complete. SE 40,41,42 
and 43 have 68,000 linear feet remaining. LCAs were 
executed for SE 41 in August 1988, for SE38B, 40 and 
42 in December 1988 and for first phase mitigation in 
June 1990. Contract LAR 1A l, Site 3 was awarded in 
August 1996 and completed in December 1996. 
Contract LAR 1A2, Site 3 (River Park) was awarded in 
June 1997 and completed in February 1998. Steamboat 
Slough contract was awarded in September 1997 and 
completed in November 1997. Contract LAR 1A3, Site 
(River Park) was awarded in November 1997 and 
completed in May 1999. Contract for LARIB, Sites 1, 
2, and 4 was awarded July 1998 and completed in 
December 1999. Contract LAR 2, Site 5, Phase I was 
awarded in January 1999 and completed in March 1999. 
Contract LAR 2, Site 5, Phase 2 was awarded on 
August and completed in December 1999. Overall 
project is about 91 percent complete. (c) Sacramento 
River, Chico Landing to Red Bluff: Active portion of 
project, bank protection in Tehama County, was 
initiated in June 1963 and completed in March 1964. 
Project was reopened in June 1968 to place additional 
necessary bank protection. Work at 36 sites was 
completed in Tehama, Butte, and Glenn Counties as of 
September 1985 and transferred to State for 
maintenance. Bank protection on Sacramento River, 
Tehama Countyone site, mile 215, (Unit 5), was 
completed November 1982, two sites, mile 209.5 and 
mile 217.5, (Unit 6), were completed in November 
1983, and four sites, 241.0, 237.9, 237.7, and 237.5 
(Unit 7) were completed in February 1985. (d) Black 
Butte Lake: Construction began in March 1960 and 
project is complete. Final land acquisition was 
completed in December 1966. Construction of main 
dam was initiated in June 1960 and completed in 
December 1963. Dam has been operating since 
November 1962 to provide the flood protection for 
which it was designed. Final cost allocation approved 
May 3, 1977. Dam safety assurance studies were 
initiated in FY 1980 and completed in FY 1986. 
Piezometer installation and slope for protection at dam 
were completed in FY 1983. A cultural resources survey 
was completed in FY 1984. (e) Table Mountain (Iron 
Canyon) Lake: Project unit deauthorized as of August 5, 
1977. 
28. SAN LORENZO, CA 
Location. Project is located within the city limits of 
35-25

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Santa Cruz, CA, in Santa Cruz County, about 70 miles 
south of city of San Francisco and includes the lower 2.5 
miles of San Lorenzo River which terminates at the 
Pacific Ocean. 
Existing Project. Flood control features of the 
authorized project consist of construction of 13,000 1.f. 
of levee embankment raise or floodwalls on top of 
various portions of the existing project levees on both 
sides of San Lorenzo River from the Southern Pacific 
Railroad bridge to Highway 1. Habitat restoration 
measures include revegetating the land-side slopes of the 
levees. The maximum flood of record occurred in 1955 
which inundated 410 acres and caused damages of 
approximately $7.6 million. Project was authorized by 
the Water Resources Development Act of 1996 for flood 
control and habitat restoration purposes. Streambank 
erosion control was added to the project under the Water 
Resources Development Act of 1999. Cost estimate 
(October 2000) is $26,600,000 (includes an allowance 
for estimated inflation through the construction period), 
of which $22,000,000 is Federal cost and $7,100,000 is 
non-Federal cost. 
Local cooperation. Local interests are required to 
provide lands, easements, rights-of-way, and dredged 
material disposal areas; modify or relocate utilities, 
roads, bridges (except railroad bridges), and other 
facilities where necessary in construction of project; pay 
14 percent of cost allocated to flood control to bring the 
total non-Federal share of costs to 25 percent, as 
determined under Section 103(m) of the Water 
Resources Development Act of 1986 to reflect the non- 
Federal sponsor's ability to pay as reduced for credit 
allowed based on prior work ($150,000 authorized under 
Section 215 of the Flood Control Act of 1968); pay 9 
percent of the costs allocated to fish and wildlife habitat 
restoration to bring the total non-Federal share of habitat 
restoration costs to 25 percent, as determined under 
Section 103 (m) of the Water Resources Development 
Act of 1986 to reflect the non-Federal sponsor's ability 
to pay as reduced for credit allowed based on prior work 
($400,000 authorized under Section 215 of the Flood 
Control Act of 1968), and bear all costs of operations, 
maintenance, repair, rehabilitation, and replacement of 
fish and wildlife facilities. Pay 35 percent of the costs 
allocated to stream bank erosion control, and bear all 
costs of operation, maintenance, repair, rehabilitation 
and replacement of stream bank erosion control features 
of the project, and bear all costs of operation, 
maintenance, repair, rehabilitation, and replacement. 
Local sponsor, City of Santa Cruz, expressed their 
continued support for project by letter dated October 8, 
1997. The Project Cooperation Agreement (PCA) was 
executed October 15, 1998. 
Operations and results during fiscal year. Energy 
and Water Development Appropriations Act, 1997 
provided initial construction funds of $200,000. 
Engineering and design continued, including revisions 
of plans and specifications to incorporate habitat 
restoration features into project. Construction General 
funds were used for fiscal year costs of $820,000. 
Historical summary. A flood control project, 
consisting of levee and channel improvements, was 
completed in 1959 by the Corps of Engineers. The 
project was to provide a standard project flood level of 
protection (about a 200-year event). Since that time, 
excessive sediment deposition in the streambed has 
reduced the flood carrying capacity of the existing 
project. Sediment accumulation and the resultant peak 
flows during a flood event in January 1982 caused the 
river to flow near design capacity, even though the 
storm had a recurrence level of only approximately 25- 
years. As a result of the flood threat, the City of Santa 
Cruz and the Corps of Engineers initiated a feasibility 
study of the San Lorenzo River with the signing of a 
final Feasibility Cost Sharing Agreement (FCSA) on 
August 18, 1989. Chief's Report was signed June 30, 
1994. Preconstruction engineering and design phase 
was initiated in March 1994 and completed at a cost of 
$934,000. Streambank erosion control requires an 
amendment to the PCA. A schedule is being prepared 
for a Limited Evaluation Report and associated 
environmental documentations, as well as execution of 
the PCA amendment. Budget policy considers this to be 
treated as a separable element and compete for a "new 
start" construction in FY 03. 
29. UPPER JORDAN RIVER, UT 
Location. Project is located in Salt Lake County, 
Utah just south of Salt Lake City corporate limit. 
35-26

SACRAMENTO, CA, DISTRICT 
Existing Project. The project includes construction of 
a flood control diversion and sediment control structure 
on Mill Creek, a 1.4 mile underground conduit from the 
diversion structure to a detention basin, and construction 
of a 100 acre foot Hillview Detention Basin. The project 
will divert flood flows from Mill Creek to the detention 
basin and ultimately into Big Cottonwood Creek. The 
project will provide 100 year flood protection on Mill 
Creek above State Street. 
Local Cooperation. Local interests are required to 
provide lands, easements, rights of way, and borrow and 
excavated or dredged material disposal areas. Modify or 
relocate utilities, roads, bridges (except railroad bridges), 
and other facilities where necessary in the construction 
of the project. Pay 6 percent of the costs allocated to 
flood control and bear all costs of operation, 
maintenance, repair, rehabilitation and replacement of 
flood control facilities. The non-Federal sponsor has 
also agreed to make all required payments concurrently 
with project construction. Salt Lake County will act as 
the local sponsor for the project. A Project Cooperation 
Agreement is pending completion of a limited 
reevaluation report (LRR) and required funding. 
Operations and results during fiscal year. PED was 
completed at a cost of $1,576,000. At the request of Salt 
Lake County, the design is being reevaluated to address 
potential downsizing of the diversion structure and other 
project features. Results of the reevaluation will be 
presented in the LRR. 
Historical Summary. A feasibility report was 
completed in 1987 and PED was completed in 
December 1994. Funds were added in FY 1997 to 
initiate construction. There has been a long history of 
flooding which is most commonly associated with 
snowmelt. The most recent flooding occurred in 1982, 
1983, and 1984. A General Design Memorandum 
(GDM) was approved in December 1994. A project 
Authorization Change (PAC) report was submitted in 
January 1996 to obtain Congressional reauthorization on 
a Section 902 (WRDA 86) new cost limit. The project 
was reauthorized in WRDA 96. 
30. WALNUT CREEK, CA 
Location. Project is on Walnut Creek and lower 
reaches of its principal tributaries, Pacheco, Grayson, 
San Ramon, Las Trampas, Galindo, and Pine Creeks in 
Contra Costa County, CA. Improvement will extend 
from Suisun Bay to head of project about I mile above 
southern limits of city of Walnut Creek. City of Walnut 
Creek is about 10 miles south of Suisun Bay. (See 
Geological Survey quadrangles for area.) 
Existing project. Comprises extension of existing 
levees, construction of new levees and concrete 
channels, channel rectification and enlargement, and 
utilization of improvements constructed or planned by 
local interests. Plan provides for about 21.8 miles of 
channel improvement, two reinforced-concrete drop 
structures, two stilling basins, and 13.8 miles of levees. 
Cost estimate (October 1996) is $97,100,000 (includes 
an allowance for estimated inflation through the 
construction period), of which $71,900,000 is Federal 
cost and $25,200,000 is non-Federal cost (includes 
$19,360,000 for lands and damages and relocations 
except railroad facilities, and $5,840,000 required cash 
contribution for land enhancement benefits provided by 
the project). Local interests have expended about $3 
million for flood control in the project area during the 
period 1955-1965, including the concrete conduits 
constructed through the city of Walnut Creek at an 
estimated cost of $1,000,000 considered a preproject 
condition to be incorporated in the Corps project. In 
addition, local developers have made channel 
improvements for Upper Pine Creek valued at 
$5,050,000. The cost thereof is not included in above 
costs of local cooperation. Improvement adopted by 
1960 Flood Control Act (H. Doc. 76, 86th Cong., Ist 
sess., contains latest published map). 
Local cooperation. Section 3, Flood Control Act of 
June 22, 1936, applies, except that relocation of railroad 
facilities is a Federal responsibility. In addition, local 
interests must make a cash contribution to the United 
States, in amount of 7.4 percent of cost of construction 
for land enhancement benefits provided by project. 
Cash contribution is estimated (October 1992) at 
$5,840,000. Local interests are represented by Contra 
Costa County Flood Control and Water Conservation 
District; formal assurances, including evidence of 
financial and legal ability to fulfill requirement for the 
cash contribution, were accepted by the Sacramento 
District Engineer on November 15, 1963. The Flood 
Control District furnished all rights-of-way required to 
date and indicated that it will furnish all requirements as 
35-27

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
needed for future construction. The Flood Control 
District arrange d for highway bridge modifications and 
utility relocations before start of work by the Corps 
contractor. Payment of required contributed funds will 
be made in installments in amounts equal to 7.4 percent 
of the estimated construction expenditure for each fiscal 
year. Flood Control District and city of Walnut Creek 
requested that recreation be added as a project purpose 
and will share costs in accordance with Water Resources 
Development Act of 1986. Post Authorization Change 
for recreation was approved July 27, 1987. In 1995, the 
city of Walnut Creek, decided not to proceed with the 
recreation project. 
Operations and results during fiscal year. New 
work: None. 
Historical summary. Construction was initiated June 
1964; project is about 98 percent complete. Total of 17.7 
miles of channel improvement, 9.2 miles of levee 
construction, part of channel improvement landscaping, 
Drop Structures No. I and 2 and construction under San 
Ramon Bypass Contract No. 1, Contract No. 2 and 
Contract No. 3 and Upper Pine Creek Channel contact 
have been transferred to local interests for operation and 
maintenance. Due to difficulties with Contract No. I part 
of the contract work was completed under Contract No. 
1A with a different contractor. A contract for remedial 
work on San Ramon Bypass Contract No. 2 channel 
cover was completed in August 1993. The 9-acre 
mitigation contract was completed in June 1993. Work 
remaining consists of completion of erosion control 
mitigation (8-acre Construction responsibility was 
transferred from San Francisco District on April 1, 1982. 
31. WEST SACRAMENTO, CA 
Location. Project is located in West Sacramento, Yolo 
County, in north-central California. 
Existing Project. Project consists of raising 4.9 miles 
of levees up to 5.0 feet along the Sacramento and Yolo 
Bypasses; constructing 0.9 miles of slurry cut-off wall 
approximately 50 feet deep at the waterside toe along the 
east levee of the Yolo Bypass extending into the south 
levee of the Sacramento Bypass; constructing concrete 
wing walls with stop logs at the Union Pacific Railroad; 
constructing a concrete wing wall and flow cut-off wall 
on each side of Interstate 80; and developing 
approximately 40 acres of mitigation lands for riparian 
and upland habitat loss. Project was authorized by the 
Water Resources Development Act (WRDA) of 1992. 
Project was reauthorized by the Energy and Water 
Development Appropriations Act, 1999 (P.L. 105-245) 
Estimated cost (October 1999) is $22,800,000 with a 
Federal cost of $1,710,000 and a non-Federal cost of 
$5,700,000 which includes a cash contribution of 
$2,720,000. 
Local cooperation. Local interests are required to 
provide lands, easements, rights-of-way, and dredged 
material disposal areas; modify or relocate utilities, 
roads, bridges (except railroad bridges), and other 
facilities where necessary in construction of project; pay 
12 percent of cost allocated to flood control to bring the 
total non-Federal share of costs to 25 percent, and bear 
all costs of operation, maintenance, repair, 
rehabilitation, and replacement of flood control 
facilities. The non-Federal sponsor has also agreed to 
make all required payments concurrently with project 
construction. A Project Cooperation Agreement (PCA) 
with the local sponsor, the California State Reclamation 
Board, was executed in May 1996. 
Operations and results during fiscal year. 
Engineering and design continued, including revisions 
of plans and specifications. First construction contract 
in the amount of $5,217,225 was awarded June 19, 
1998. Work began on the second contract which was 
awarded September 30, 1999. Fiscal year costs were 
$2,911,110 (Federal) and $297,663 (non-Federal 
contributed funds). 
Historical summary. Funds were appropriated in FY 
1992 to initiate preconstruction engineering and design 
(PED) for the combined American River Watershed and 
Sacramento Metropolitan studies. The two projects 
were separated when WRDA 92 authorized the West 
Sacramento Project (Sacramento Metropolitan) 
independently of the American River Watershed 
Project. Funds to initiate construction for the West 
Sacramento Project were appropriated in FY 1995. 
Design Memorandum was approved in March 1996. 
PED was completed at a cost of $1,847,000. 
35-28

SACRAMENTO, CA, DISTRICT 
32. WILDCAT AND SAN PABLO 
CREEKS, CA 
Location. Project is located in vicinity of San Pablo 
and Richmond, Contra Costa County, CA, about 20 
miles northeast of San Francisco, CA. 
Existing project. Current plan of improvement 
reflects only Reach 1, which is from San Pablo Bay to 
AT&SF Railroad tracks on both Wildcat and San Pablo 
Creeks; Reach I consists of 9,900 lineal feet of channel 
improvements on Wildcat Creek and 10,000 lineal feet 
of channel improvements on San Pablo Creek. 
Improvements include channel deepening, levees, 
stilling basins, and flow control weirs. Additionally, 
about 20 acres will be planted for mitigation of fish and 
wildlife. Reach 2, which is upstream of AT&SF 
Railroad tracks and consists of 9,400 lineal feet of 
channel and levee work on Wildcat Creek, 1,800 lineal 
feet of channel and levee work on San Pablo Creek, and 
mitigation for fish and wildlife on 8 acres, was 
determined to be economically infeasible, excluded from 
total project cost, and reclassified as inactive. Project 
also includes recreation features on Wildcat Creek. 
Approved estimated cost of new work (1996) is 
$35,200,000 (includes an allowance for estimated 
inflation through the construction period), of which 
$20,200,000 is Federal cost, and $15,000,000 is 
non-Federal cost (includes $1,593,000 cash 
contribution). Improvements adopted by House and 
Senate Public Works Committee Resolutions June 9 and 
15, 1976, respectively, under provisions of Sec. 201 of 
Flood Control Act of 1965 (H. Doc. 511, 94th Cong., 2d 
sess., contains latest published map).For details on units, 
see Annual Report for 1968. 
Local cooperation. In accordance with cost sharing 
and financing concepts reflected in the Water Resources 
Development Act of 1986, local interests are required to 
provide lands, easements, rights of way, and dredged 
material disposal areas; modify or relocate buildings, 
utilities, roads, bridges (except railroad bridges), and 
other facilities, where necessary in the construction of 
project; pay one-half of the separable costs allocated to 
recreation and bear all costs of operation, maintenance, 
and replacement of recreation facilities; pay 5 percent of 
the costs allocated to flood control and bear all costs of 
operation, maintenance, and replacement of flood 
control facilities. Local interests have agreed to make 
all required payments concurrently with project 
construction. The Board of Supervisors of Contra Costa 
County by Resolution 73-466, June 25, 1973, agreed to 
assume obligations of local cooperation. On November 
9, 1976, the Board reaffirmed sponsorship by 
Resolution 76-960. Contra Costa County Flood Control 
and Water Conservation District Board of Supervisors 
formed an Assessment District, August 3, 1982, which 
assures availability of funds for local share of 
non-Federal portion of flood control project costs for a 
modified plan of improvement. A flood control Local 
Cooperation Agreement satisfying all requirements of 
Sec. 221, Flood Control Act of 1970 (Public Law 
91-661) and consistent with the Water Resources 
Development Act of 1986 (Public Law 99-662), was 
executed on June 20, 1986 between the Department of 
the Army and the Contra Costa County Flood Control 
and Water Conservation District. By Resolution No. 
1985-12-351, adopted December 17, 1985, the East Bay 
Regional Park and Recreation District stated support for 
development of trail and recreational improvements for 
the project and indicated its intent to share in 50 percent 
of the cost of such improvements and perform operation 
and maintenance responsibility. A recreation Local 
Cooperation Agreement (LCA) was signed by the 
Assistant Secretary of the Army on April 15, 1992. 
Operations and results during fiscal year. 
Engineering and construction continued. 
Historical summary. Contact 3C completed. Local 
interests withdrew support of project in 1979. Project 
responsibility was transferred from San Francisco 
District on April 1, 1982. After 1982-1983 floods, local 
interests again indicated support of the project, and in 
October 1983, project work was resumed by 
Sacramento District. A revised final environmental 
impact statement was filed March 28, 1986, and a 
General Design Memorandum was approved May 29, 
1986. Flood Control Local Cooperation Agreement was 
executed June 20, 1986. Recreation Design 
Memorandum was approved on February 19, 1992, and 
the recreation LCA was signed on April 15, 1992. 
Construction work under Contract No. I and Contract 
No. 2 for Reach No. I of Wildcat and San Pablo Creeks 
has been transferred to local sponsor for operation and 
maintenance. In March 1990, Reach 2 was declared 
35-29

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
infeasible and is now inactive. All costs have been 
deleted from project cost estimate. Flood control 
construction of the project is about 100 percent 
complete. Final accounting of project is underway. 
Recreation features are 50 percent complete. 
33. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Approved regulations for operation and maintenance 
of flood control works, part 208, title 33, Code of 
Federal Regulations, provide for inspection of 
completed projects transferred to local interests for 
operation and maintenance to determine status of project 
and insure compliance with regulations. During fiscal 
year, inspections were made of: Completed units of 
Fairfield Vicinity Streams; completed units of 
Sacramento River and major and minor tributaries; 
completed units of Sacramento River, Chico Landing to 
Red Bluff; completed units of Sacramento River flood 
control project, Kings River Channel Improvement (Pine 
Flat Lake project), and Walnut Creek project; American 
River levees; Merced County Stream group; Middle 
Creek (Lake County); Chester, North Fork Feather 
River; levee and channel improvements on Chowchilla 
River (Buchanan project) and Fresno River (Hidden 
project); Duck Creek diversion, Green Valley Creek, 
Littlejohn Creek, Mormon Slough, Bear Creek, Kern 
River-California Aqueduct Intertie, and North Fork, Pit 
River at Alturas, all in California; Truckee River, CA 
and NV; completed units of lower San Joaquin River 
and tributaries, CA; completed units of Red Bank and 
Fancher Creeks including Big Dry Creek Dam and 
diversion, and Fancher Dam and Redbank, Alluvial 
Drain and Pup Creek detention basins, CA; Reese River, 
Battle Mountain, NV; Sevier River, Redmond and 
vicinity, Jordan River, Big Wash near Milford, and Kays 
Creek, all in Utah; various emergency flood control 
works under authority of Sec. 208, Flood Control Act of 
June 30, 1948, and September 3, 1954; Public Law 99, 
June 28, 1955, and antecedent legislation; and Sec. 14 of 
Flood Control Act of July 24, 1946. Maintenance 
inspections conducted indicate that existing agreements 
and regulations are being complied with on completed 
flood control works. Continuing effort is required to 
improve maintenance practices and active steps are 
being taken by responsible State and local agencies to 
achieve desired results. Local agencies were advised, as 
necessary, of measures required to maintain these 
projects in accordance with standards prescribed by 
regulations. Total cost of inspection for fiscal year of 
$169,800. 
34. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to sec. 205, Public 
Law 858, 80th Congress, as amended 
(Preauthorization). 
Costs for preauthorization studies for fiscal year were 
$627,038. See Table 35-P for list of studies. 
Aquatic Ecosystem Restoration activities pursuant 
to sec 206, Public Law 303, 104
'h Congress. 
Cost for studies for fiscal year were $858,586. See 
Table Q for list of studies. 
Emergency flood control activities-repair, flood 
fighting, and rescue work (Public Law 99, 84th 
Cong., and antecedent legislation). 
Federal cost for fiscal year was $16,080,219, 
$342,200 was for disaster preparedness and 
$15,738,019 for emergency flood repairs. 
Emergency bank protection (Sec. 14, 1946 Flood 
Control Act, Public Law 526, 79th Cong.). 
Federal cost for fiscal year was $19,960,494, 
$19,935,208 was for emergency operations and $25,286 
for emergency streambank and shoreline protection. 
Snagging and clearing navigable streams and 
tributaries in interest of flood control (Sec. 208, 1954 
Flood Control Act, Public Law 780, 83d Cong.). 
Federal cost for fiscal year was $251,722 all of which 
was used for snagging and clearing activities. See Table 
R for list of studies. 
35-30

SACRAMENTO, CA, DISTRICT 
Flood insurance activities (Sec. 1301-1377, 1968 
Housing and Urban Development Act, Public Law 
90-448 as amended). 
In coordination with flood control activities, four 
flood insurance studies were continued. Inter-Agency 
Agreements EMW-96-1A-0294, EMW-96-1A-0195- 
FEMA, EMW-96-IA-0195, and EMW-97-IA-0140, at a 
fiscal year cost of $101,670 under Federal Emergency 
Management Agency reimbursable order. 
35. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
In accordance with sec. 7, Flood Control Act of 1944, 
summaries of monthly reservoir operations at Big Dry 
Creek, Boca, Camanche, Del Valle, Folsom, Friant 
(Millerton Lake), Indian Valley, Los Banos Detention, 
New Bullards Bar, New Don Pedro, New Exchequer 
(Lake McClure), New Melones, Oroville, Prosser, 
Shasta, and Stampede, CA; East Canyon, Echo, 
Jordanelle, Little Dell, Lost Creek, Pineview, Red Fleet, 
Starvation, and Wanship, UT; and Blue Mesa, Lemon, 
Paonia, Ridgway, and Vallecito, CO, were prepared. No 
water control manual revisions were completed due to 
environmental issues. Corps personnel provided advice 
Sec. 7 as requested during flood control operations at all 
c. 7 reservoirs. Fiscal year cost was $1,798,700. Total 
cost to September 30, 2000, was $14,788,982. 
Multiple-Purpose Projects including Power 
36. NEW MELONES LAKE, CA 
Location. On Stanislaus River about three-quarters 
mile downstream from existing Melones Dam and about 
35 miles northeast of city of Modesto. (See Geological 
Survey quadrangles of the area.). 
Existing project. Provides for construction of (a) an 
earth and rockfill dam about 625 feet high to create a 
reservoir with gross storage capacity of about 2,400,000 
acre-feet for flood control, irrigation, power, general 
recreation, fish and wildlife, and other purposes, and (b) 
a powerplant below the dam with an installed capacity of 
300,000 kilowatts. Upon completion of construction of 
dam and powerplant by the Corps, the project became an 
integral part of Central Valley project and is being 
operated and maintained by the Secretary of the Interior 
pursuant to Federal reclamation laws, except that the 
flood control operation of the project shall be in 
accordance with rules and regulations prescribed by the 
Secretary of the Army. Maintenance of Stanislaus River 
channel from Goodwin Dam to San Joaquin River to a 
capacity of at least 8,000 cubic feet per second will also 
be Corps responsibility. Estimated (October 1996 price 
level) Federal cost is $402,000,000. For future 
non-Federal reimbursement, see Local cooperation 
paragraph. In addition, local interests expended 
$300,000 for levees along lower reaches of Stanislaus 
River. Existing project was adopted by 1962 Flood 
Control Act (H. Doc. 453, 87th Cong., 2d sess., contains 
latest published map). This act modified original 
authorization adopted by 1944 Flood Control Act. (H. 
Flood Control Committee Doc. 2, 78th Cong., 2d sess., 
contains latest published map.) The 1944 Flood Control 
act established $8 million monetary limitation for partial 
accomplishment of project. Further monetary 
authorizations of $2.5 million, $5 million, $13 million, 
$2 million, $17 million, $18 million, $44 million, $83 
million, $46 million, $6 million, and $61 million were 
provided for this project by Public Laws 235 and 780, 
83d Cong., and 85-500, 90-17, 90-483, 91-282, 92-222, 
93-251, 94-397, 95-104, and 95-189, making a total 
monetary authorization of $305,500,000 available for 
the basin plan comprising Lower San Joaquin River and 
tributaries, including Tuolumne and Stanislaus Rivers, 
CA. Since FY 1979, appropriations have not been 
subject to the river basin monetary limitation. 
Local cooperation. Based on approved preliminary 
cost allocation studies (July 1965) local interests will be 
required to pay 35.2 percent of first cost and 12.7 
percent of annual operation and maintenance costs 
allocated to irrigation. In addition, 3 1.1 percent of first 
cost and 62.5 percent of annual cost would be allocated 
to power. Local interests must also maintain existing 
private levees along Stanislaus River from Goodwin 
Dam to San Joaquin River and prevent encroachment on 
channel and floodway between levees to preserve safe 
carrying capacity throughout the reach of at least 8,000 
cubic feet per second. Recovery of costs allocated to 
irrigation and power will be the responsibility of the 
Bureau of Reclamation. Reimbursement of costs will be 
in accordance with Bureau policies and procedures for 
the Central Valley project. State of California officially 
35-31

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
adopted project by chapter 918 of statutes of 1963, and 
by chapter 1438 of those statutes authorized State 
Reclamation Board to furnish required assurances. The 
Board, by letter dated December 13, 1963, stated it 
would furnish required assurances when formally 
requested to do so. Assurances were requested by letter 
of December 30, 1977. On October 2, 1979, the Board 
reaffirmed its intent to furnish the required assurances. 
On January 6, 1983, the Board provided formal 
assurances of local cooperation. 
Operations and results during fiscal year. New 
work: Project close-out and flowage easement 
acquisition along the Lower Stanislaus River were 
continued. Maintenance: Maintenance and operation 
activities continued on Lower Stanislaus River. 
Historical summary. Construction was initiated in 
August 1966. Main dam contract which was awarded in 
March 1974 has been completed; dam dedication 
ceremonies were held July 14, 1979. Cultural resources 
preservation, water intake facilities, flood control and 
irrigation tailrace modification, reservoir area clearing, 
Tuttletown Phase I recreation area, Oakdale recreation, 
Glory Hole Phase I and Phase II recreation area, and 
operations access road contracts have all been 
completed. Glory Hole minimal recreation facilities 
contract has been completed. Boundary fencing, Lower 
Stanislaus Phase I and Phase II minimal recreation 
facilities, Lower Stanislaus Corporation Yard, and 
Lower Stanislaus Administration Building contracts 
have been completed. Tuttletown minimal recreation 
facilities, McHenry recreation area, Tuttletown 
wastewater treatment, Knights Ferry recreation area, 
Knights Ferry Covered Bridge, Glory Hole recreation 
area sanitary system, Two-Mile Bar recreation, 
administration building, and Glory Hole recreation area 
force main contracts have been completed. Parrotts 
Ferry Bridge modification (Nov 93), Widening Highway 
49 Intersection (Aug 94); Tuttletown Recreation 
Campgrounds, and Tuttletown and Glory Hole 
Improvement (Jan 94) have been completed. Remaining 
recreation facilities were unscheduled pending 
development of cost sharing agreements and/or specific 
Congressional appropriation of funds. A Memorandum 
of Understanding between the Department of the Interior 
and the Department of the Army transferring the New 
Melones dam and reservoir from the Corps of Engineers 
to the Bureau of Reclamation was executed on 
November 20, 1979. Agreement provides that the Corps 
complete land acquisition actions and retain budgeting, 
design, and construction responsibility for reservoir 
clearing and recreation development; completion of 
cultural resources mitigation in project area was vested 
in the Department of the Interior. The California State 
Water Resources Control Board's Decision 1422 of 
April 1973 established conditions which impacted on 
the planned filling and operation of the project by the 
Department of the Interior. As a result, the Department 
of Interior brought suit against the State of California 
claiming State limitations on project operation were 
contrary to Congressional intent and authority. The case 
was heard before the U.S. District Court in Fresno, CA, 
and in early March 1981, a Federal judge ruled that the 
Federal Government could fill the New Melones 
reservoir for purpose of generating electrical power, but 
not for agricultural or other purposes. Both the 
Government and the California State Resources Control 
Board appealed this decision to the 9th Circuit Court of 
Appeals in San Francisco, CA. 
On December 20, 1982, the Court upheld all 25 
requirements placed on the Federal Government by the 
State Water Resources Control Board. The decision 
reversed the lower court's decision to permit filling of 
the reservoir for generating electrical power. The 
Bureau of Reclamation subsequently filed for a permit 
from the State Water Resources Control Board to fill the 
reservoir. Permit was approved. The Bureau had 
originally started generating power on a limited basis on 
July 1, 1979; however, after the filling of the reservoir 
in spring of 1983, full power generating benefits have 
been attained. Project is about 99.9 percent complete. 
General Investigations 
37. SURVEYS 
See Table 35-S. 
38. COLLECTION AND STUDY OF 
BASIC DATA 
Technical assistance was performed for other Federal 
agencies as well as non-Federal agencies in connection 
35-32

SACRAMENTO, CA, DISTRICT 
with Flood Plain Management Services Program at fiscal 
year costs of $277,306. No Flood Plain Information 
Studies were prepared after FY 1980. 
Fiscal year costs for hydrologic studies were $25,143. 
39. RESEARCH AND DEVELOPMENT 
The Hydrologic Engineering Center was designated as 
a separate Field Operating Agency as of January 1, 
1979, in accordance with OCE permanent orders 1-1, 
January 10, 1979. In the reorganization of CEIWR, 
beginning in FY 2001 appropriations and costs will be 
reported in CEIWR's database not Sacramento District. 
Sacramento District will continue to provide advisory 
and administrative support services to HEC as specified 
in local support agreement DACW05-79-A-0038 of 
March 1979. Fiscal year costs were $1,995,700, of 
which $347,964 was for collection and study of basic 
data (including flood plain management service), 
$1,361,000 was for research and development, and 
$287,468 was for operation and maintenance activities. 
40. PRECONSTRUCTION ENGINEERING 
AND DESIGN 
AMERICAN RIVER WATERSHED, CA 
(COMPREHENSIVE PLAN) 
The projects are located in Placer, El Dorado, and 
Sacramento Counties on the North, Middle and South 
Forks of the American River and along the lower 
American River and Sacramento Rivers. 
Recent evaluations indicate that the level of flood 
protection along much of the American River and in the 
Natomas area is less than the 100-year level. The 
Supplemental Information Report (SIR) was completed 
in March 1996 as directed by the Defense 
Appropriations act for FY 1993. The Chief of 
Engineer's Report recommended implementation of 
elements common to the final candidate plans 
presented in the SIR. These "common elements", were 
authorized for construction in the Water Resources 
Development Act (WRDA) of 1996. Other alternatives 
addressed in the SIR include: Folsom outlet 
modifications, Folsom Dam raising, downstream levee 
raising along the American and Sacramento Rivers, and 
upstream storage. Efforts are being continued to define 
plans for alternatives leading to higher levels of flood 
protection for the Sacramento area and vicinity. 
The Feasibility Report for the American River 
Watershed Investigation was completed in December 
1991 and the Division Engineer's Report was issued in 
February 1992. Funds were appropriated in FY 1992 
to initiate preconstruction engineering and design 
(PED) for the combined American River Watershed 
and Sacramento Metropolitan studies. The two 
projects were separated when WRDA 92 authorized 
the American River Watershed Project independently 
of the West Sacramento Project (Sacramento 
Metropolitan). 
Sec. 566 of WRDA 99 directed additional flood 
control studies for: (a) increasing surcharge flood 
control storage at Folsom Dam and Reservoir, and (b) 
increased flood protection through levee modifications 
on the American and Sacramento Rivers, and directed 
the Corps to submit a report to Congress by March 
2000 documenting results of the studies. The Corps 
completed an interim report in January 2000. 
Sec. 101 of WRDA 99 authorized the Folsom Dam 
Modifications project as described in the Supplemental 
Information Report dated March 1996, as modified by 
the report entitled "Folsom Dam Modification Report, 
New Outlets Plan," dated March 1998, prepared by the 
Sacramento Area Flood Control Agency, at an estimated 
cost of $150,000,000, with an estimated Federal cost of 
$97,500,000 and an estimated non-Federal cost of 
$52,500,000. 
Estimated preconstruction planning cost is 
$28,600,000. 
TRUCKEE MEADOWS, NV 
Project is located in metropolitan area of Reno and 
Sparks in Washoe County, NV. 
Current plan of improvement consists of about 7 
miles of levees, 5 miles of floodwalls, 3 bridge 
replacements along Truckee River and includes limited 
channel excavation, a detention dam on Steamboat 
Creek at Huffaker Narrows, and backwater levees along 
Steamboat Creek, Boynton Slough, and the North 
35-33

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Truckee Drain just north of the Interstate Highway 80 
crossing. Plan also includes recreation facilities with 
bicycle and pedestrian paths, river overlooks, and picnic 
sites; mitigation measures (31 acres of riparian plantings 
to replace vegetation losses); and fish and wildlife 
features. Project will provide flood protection from 
Truckee River to cities of Reno and Sparks and Truckee 
Meadows urban areas. 
Project was deferred and preconstruction planning had 
been terminated as project is economically infeasible. 
Coordination with local agencies and sponsors was 
continued. Flooding remains an issue and locals 
requested a review of the project. A reconnaissance 
study is reassessing the flood control needs. 
NAPA RIVER, CA 
Project is located in city and county of Napa, CA. 
Current plan of improvement consists of geomorphic 
channel design setback, floodwalls and levees, training 
dike, a dry bypass channel, and related environmental 
mitigation measures. The improvements on Napa River 
would extend about 7 miles, from Trancas Street to 
Highway 29. Approximately one mile of Napa Creek, 
from the confluence of Jefferson, would be improved to 
increase flood protection. 
The project will provide 100-year level of flood 
protection from Napa River and Napa Creek to city of 
Napa. 
A hazardous, toxic and radioactive waste preliminary 
evaluation was conducted. The Final Supplemental 
General Design Memorandum and Supplemental 
Environmental Impact Statement/Environmental Impact 
Report were completed in October 1998. Estimated 
preconstruction planning cost is $15,000,000. 
41. OTHER WORK UNDER SPECIAL 
AUTHORITY 
ASHLEY CREEK ECOSYSTEM, UT (Section 1135) 
Project Modification for Improvement of 
Environment 
The proposed project modification consists of 
restoring 2.4 miles of stream meanders and associated 
riparian vegetation on Ashley Creek. The site is part of 
a 12-mile reach that was straightened and enlarged 
(dredged) by the Ashley Creek Clearing and Snagging 
Project constructed by the Corps in 1966. The 
restoration project would modify the features of the 
clearing and snagging project by reconstructing stream 
meanders and replanting associated riparian vegetation 
on the reach of Ashley Creek most adversely affected 
by the flood control work. Estimated project cost is 
$3,616,000. 
Current project is proceeding under authority of Sec. 
1135(b) of Water Resources Development Act (WRDA) 
of 1986. 
Fiscal year costs were $58,910. 
CHEROKEE CANAL, CA (Section 1135) Project 
Modification for Improvement of Environment 
Cherokee Canal is located approximately 10 miles 
northwest of the City of Oroville in Butte County, 
California, within the Dry Creek/Cherokee Canal 
watershed. Oroville is located approximately 68 miles 
north of Sacramento. Dry Creek/Cherokee Canal flows 
into Butte Creek, a tributary of the upper Sacramento 
River. 
The project include a 300- to 400- acre wetlands 
restoration site about 10 miles northwest of Oroville and 
preserve about 840 acres of existing wetland/riparian 
habitat along the canal downstream of the restoration 
site by controlling sediment transport. This would 
establish a rich diversity of habitats for migratory 
waterfowl, resident birds, and other wildlife, including 
several listed endangered species. Estimated project 
cost is $6,600,000. 
Preliminary Restoration Plan (PRP) has been approved 
in Jan 00. Initiated Ecosystem Restoration Report 
(ERR) in Feb 00. 
Fiscal year costs were $35,768. 
MORMON CHANNEL, CA (Section 1135) Project 
Modification for Improvement of Environment 
35-34

SACRAMENTO, CA, DISTRICT 
Project is located in San Joaquin County, including a 
portion of the City of Stockton and an area northeast of 
the City of Stockton. 
Project will restore the degraded aquatic ecosystem 
that resulted from the construction and operation of the 
Stockton Diverting Canal. Mormon Channel originates 
just downstream of New Hogan Dam and runs west 
southwest towards Stockton, roughly paralleling the 
Calaveras River. The Diverting Canal was constructed 
across Mormon Channel near Highway 99 to divert 
Mormon Channels flood waters away from eastern 
Stockton and back into the Calaveras River. The 
diversion has been an effective flood control measure, 
but has also excluded most flows from the downstream 
portion of Mormon Channel. A possible project 
alternative includes a mechanism whereby some flood 
waters are transferred from the Stockton Diverting Canal 
into the downstream portion of Mormon Channel. This 
flood water will be used as part of an ecosystem 
restoration effort encompassing the 6.3 miles of 
Mormon channel between the Diverting Canal and the 
Stockton Deepwater Ship Channel Turning Basin. 
Estimated project cost is $6,000,000. 
The PRP has been approved in Mar 99 and initiated 
Environmental Restoration Report (ERR) in May 99. 
Fiscal year costs were $104,521. 
MURPHY SLOUGH, CA (Section 1135) Project 
Modification for Improvement of Environment 
The project site is on the upper Sac River, near Chico 
Landing and within the Butte Basin Overflow Area. 
Potential restoration measures identified during the 
recon study of Murphy Slough include revegetation of 
riparian forest and development of shaded riverine 
aquatic habitat. Restoration would provide acres for 
several State and/or Federally listed endangered or 
threatened bird and fish species; e.g. willow flycatcher, 
yellow-billed cuckoo, VELB, Swainsons hawk, Chinook 
salmon and steel head trout. Physical improvements are 
desirable along the upper Sacramento River system to 
improve both flood control conveyance and F&W 
habitat. Loss and deterioration of riparian habitat is 
contributing to the extinction and elimination of several 
Wildlife species. Estimated project cost is $3,631,000. 
PCA was signed 18 September 1998. Project is in the 
construction phase. 
Current project is proceeding under authority of Sec. 
1135(b) of Water Resources Development Act (WRDA) 
of 1986. 
Fiscal year costs were $400,797. 
NUMANA DAM FISH PASSAGE, NV (Section 
1135) Project Modification for Improvement of 
Environment 
Project is located in Washoe County, Nevada about 
8.3 miles upstream from Pyramid Lake on the Lower 
Truckee River (Pyramid Lake Paiute Indian 
Reservation). 
The construction of the Corps' Truckee River project 
and several agricultural diversions has had a strong 
detrimental effect on the environmental quality of the 
Lower Truckee River and Pyramid Lake. One of the 
effects of lowered river flows has been decreased 
numbers of Lahonton Cutthroat trout (threatened) and 
Cui-ui (endangered species) making it up the river to 
spawn. The fish ladder has been very inefficient for 
Cui-ui migration. The tentatively selected plan in the 
draft ERR is to remove Numana Dam. 
The sponsor, Pyramid Lake Paiute Tribe, requested 
that no further action be taken on the project. They are 
pursuing legislation for 100% federal funding. 
Fiscal year costs were $1,891. 
PROSPECT ISLAND, CA (Section 1135) Project 
Modification for Improvement of Environment 
Project is located in Solano County, California, within 
the northwest portion of the Sacramento-San Joaquin 
Delta Region. 
Prospect Island is a long, rectangular island 
comprised of 1,580 acres bordered by the Sacramento 
Deep Water Ship Channel (SDWSC) to the west and 
Miner Slough and Ryer Island to the east. The island 
has flooded four times, in 1983, 1986, 1995, and in 
January 1997. The Corps constructed levees adjacent to 
the SDWSC, which run parallel along the length of the 
35-35

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
island. These levees are damaged by wave wash from 
passing ocean vessels in the channel. The construction 
of the ship channel and reclamation of adjacent lands 
have also contributed significantly to the loss of valuable 
wetlands in the study area. Estimated project cost is 
$6,409,000. 
PCA was executed in Sep 99. Plans and Specs to be 
completed in May 01 and initiate construction in Jun 01. 
Fiscal year costs were $272,241. 
PROSPECT ISLAND, CA (Section 1135) Project 
Modification for Improvement of Environment 
Project is located in Solano County, California, within 
the northwest portion of the Sacramento-San Joaquin 
Delta Region. 
The restoration of wetlands and fish habitat on 1,316 
acres of Prospect Island was designed to restore 
environmental resources that have been degraded by 
construction and operation of the ship channel and 
Sacramento River Flood Control Project. 
Project constructions will involve creation of long 
sinuous interior islands, channels and dead-ends sloughs, 
and interior levee benches. After the internal features 
are created, culverts and a breach will place in the 
exterior Miner Slough Levee to restore water flow to the 
Island. Water will generally flow north to south in the 
interior of the Island along a deep central channel but 
water throughout the Island will be subject to tidal 
exchange. Native vegetation will be planted along 
levees and interior islands to prevent erosion and to 
provide additional wildlife and fish habitat. Estimated 
project cost is $6,409,000. 
PCA was executed in Sep 99. Plans and Specs to be 
completed in May 01 and initiate construction in Jun 01. 
Fiscal year costs were $272,241. 
SOUTH FORK PUTAH CREEK PRESERVE, CA 
(Section 1135) Project Modification for Improvement 
of Environment 
The project site is located near the south levee of 
South Fork Putah Creek, just southeast of the city of 
Davis. Project is grading and planted for habitat 
restoration. Estimated project cost is $1,601,000. 
PCA was signed on 18 December 1998. 
The previous project was included under the 
Sacramento River Flood Control Project. Project is in 
the construction phase. Current project is proceeding 
under authority of Sec. 1135(b) of Water Resources 
Development Act (WRDA) of 1986. 
Fiscal year costs were $397,496. 
VIC FAZIO WILDLIFE AREA, CA (formerly Yolo 
Basin Wetlands, Sacramento River, CA, Section 
1135) 
The project is primarily located within the boundaries 
of the Yolo Bypass, an operative feature of the 
Sacramento River Flood Control Project. The Yolo 
Bypass extends 43 miles from Fremont Weir on the 
Sacramento River, south to the town of Rio Vista where 
it rejoins the river. 
During periods of high flows on the Sacramento 
River water is diverted through the Yolo Bypass, 
creating seasonal wetland areas. The 3,700-acre wildlife 
restoration area is expected to be a major stop for 
migratory waterfowl in the Pacific Flyway. Restoration 
of wetland habitat will attract additional waterfowl, 
wading birds and shore birds and contribute to the 
recovery of many Federal and state rare, threatened, or 
endangered species. The importance of the Yolo Bypass 
wetland to waterfowl and other water birds has 
increased due to the disappearance over recent decades 
of vital wetlands in the Central Valley. The project is 
the largest wetland restoration project west of the 
Florida everglades and consists of physical 
improvements to help create a mixture of native marsh, 
permanent and seasonal wetlands and riparian forest. 
Improvements include modifications to existing 
drainage canals or construction of small dikes and weirs 
to redirect available water sources to proposed wetland 
areas. Congress added construction of an administration 
and maintenance facility and a flood plain hydraulic 
management model as authorized project features. 
Current total project cost estimate is $17,362,000, cost 
35-36

SACRAMENTO, CA, DISTRICT 
shared 70% Federal and 30% local sponsor. 
The California State Department of Fish and Game is 
the non-Federal sponsor. The sponsor will furnish lands, 
easements, rights of way and borrow and excavated or 
dredged material disposal areas; and bear all costs of 
operation, maintenance, repair, rehabilitation and 
replacement of project modifications for improvement of 
the environment. At the sponsor's request, separate 
Local Cooperation Agreements (LCA) were prepared for 
the Putah Creek Sinks and Yolo Causeway sites. The 
LCA for the Putah Creek Sinks site was executed in 
December 1993. The LCA for the Yolo Causeway site 
was executed in April 1995. A third LCA for a 180-acre 
site was executed in October 1996. 
Efforts to complete the floodplain hydraulic 
management model and project close out and audit 
activities continue. Fiscal Year costs total $2 1,635. 
The project was authorized by the Water Resources 
Development Act (WRDA) of 1986, Public Law 99-662, 
Sec. 1135(b), as amended by Sec. 304 of WRDA 1990. 
The project was initiated in fiscal year 1991 with funds 
added by Congress to the Fiscal Year 1991 
Appropriations Bill. A Project Modification Report and 
an Environmental Assessment/Initial Study were 
completed in April 1992. Three existing sites were 
identified for wetlands restoration: Putah Creek Sink 
(3,000 acres), Yolo Causeway (182 acres) and Willow 
Slough Bypass (345 acres). Willow Slough Bypass was 
later withdrawn due to difficulty in acquiring lands. The 
project was turned over to the Department of Fish and 
Game in November 1997. The Energy and Water 
Development Appropriations Act of 1999, Sec. 508 
changed the project name from "Yolo Basin Wetlands" 
to "Vic Fazio Yolo Wildlife Area". 
YOLO WETLANDS BASIN, DAVIS SITE, 
SACRAMENTO, CA (Section 1135) Project 
Modification for Improvement of Environment 
Project is located contiguous to boundaries of Yolo 
Bypass and Willow Slough Bypass, which is a leveed 
tributary of Sacramento River on west side of Yolo 
Bypass. Yolo Bypass and Willow Slough Bypass are 
operative features of the Sacramento River Flood 
Control Project. 
Project include a 369-acre site that consists of 212 
acres of permanent wetland, 64 acres of riparian 
woodland, 64 acres of grassland/upland, and 56 acres of 
seasonal wetland, dikes, roads, gates, ponds and islands. 
Water for wetland site is available from City of Davis 
waste water treatment plant and from its storm drain 
system. Estimated project cost is $6,000,000. 
A previous Davis site was included under Yolo Basin 
Wetlands, Sacramento River project, but was with 
drawn for consideration by local sponsor due to 
difficulty in obtaining lands. Current project is 
proceeding under authority of Sec. 1135(b) of Water 
Resources Development Act (WRDA) of 1986. 
Fiscal year costs were $58,996. 
35-37

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 35-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 Sept. 30, 2000 
1. Sacramento River 
CA (Federal 
Funds) 
(Contrib. Funds. 
Other) 
2. Sacramento River 
Deep Water Ship 
(Required Contrib. 
Funds) 
(Contrib. Funds, 
Other) 
3. San Francisco Bay 
to Stockton, CA 
(John F. Baldwin 
and Stockton Ship 
Channels 
New Work 
Approp. 
Cost- 
Maint. 
Approp. 
Cost 
Maint 
Contrib. 
Cost 
New Work 
Approp. 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
40,331,192 1 
40,331,192 1 
2,167,000 5,139,000 1,055,000 1,909,000 59,231,678 2 
2,145,480 3,652,774 2,560,678 1,725,466 59,034,079 3 
85,000 4 
-50,000 
18,947 
30,000 
6,316 
62,622 
1,912 
310 
22,000 
18,236 
57,000 
37,339 
6,773 
25,000 
18,096 
- 7,816,474 5 
7,298 7,782,305 
- 2,610,000 
2,177 2,591,649 
- 15,000 
14,578 
- 64,696,000 6 
10,859 64,199,474 7 
4. San Joaquin 
River, CA 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
5,833,117 8 
5,833,117 9 
5,293,000 4,260,000 
5,252,863 3,002,863 
351,000 2,607,000 29,702,382 
1,633,119 2,617,123 30,455,969 
5. American River New Work 
Watershed Approp. 
(Common Elements Cost 
New Work 
Contrib. 
Cost 
- 5,828,000 6,738,000 13,129,000 25,745,000 
- 4,104,812 6,639,672 13,865,637 24,610,121 
- 1,325,000 
- 167,572 
6,099,000 1,121,200 8,545,200 
977,941 3,055,566 4,201,079 
35-38

SACRAMENTO, CA, DISTRICT 
TABLE 35-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 Sept. 30, 2000 
6. American River 
Watershed 
(Natomas) 
New Work 
Approp. 
Cost 
3,886,000 11,429,000 
- 15,163,184 
145,000 1,546,000 
228,709 15,391,893 
7. Buchanan Dam- New Work 
H.V. Eastman Lake Approl. 
Chowchilla River, Cost 
CA (Federal Maint 
Funds) Approp. 
Cost 
(Contrib. Funds New Work 
Other) Contrib. 
Cost 
8. Cache Creek New Work 
Settling Basin, CA Approp. 
(Federal Funds) Cost 
(Required Contrib. New Work 
Funds) Contrib. 
Cost 
(Contrib. Funds, New Work 
Other) Contrib. 
Cost 
9. Calaveras River New Work 
and Littlejohn Approp. 
Creek and Trib- Cost 
utaries including Maint 
New Hagon Lake Approp. 
& Farmington Dam Cost 
CA (Federal Funds) 
(Contrib. Funds, New Work 
Other) Contrib. 
Cost 
10. Colorado River at 
Great Junction, CO 
(Federal Funds) 
(Required Contrib. 
Funds) 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
27,369,597 
27,369,597 
1,314,000 1,463,000 1,288,000 1,657,500 25, 194,893 
1,310,283 1,276,810 1,457,826 1,657,911 25,117,574 
- - - - 1111,187 10 
-11- 1-,-187 to 
-150,000 
2,921,834 
161,564 
3,500 
120,000 
32,400 29,114 
30,000 13,641,000 
- 13,608,917 
- 1,279,000 
27,464 1,197,278 
- 724,000 Ii 
676,755 12 
23,723,144 13 
23,723,144 13 
1,834,000 4,453,000 1,969,000 2,137,900 40,663,511 
1,830,517 3,951,498 2,423,645 2,196,515 40,232,675 
203,594 
-23,566 
9,910 
101,700 
39,046 
38,802 
55,856 
38,456 
3,828 
397 
- 1,499,951 15 16 
12,131 1,487,884 15 17 
-73,200 
-33,026 
-1,545 
40,520 
834,900 
839,963 
96,773 
96,773 
35-39

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 35-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 Sept. 30, 2000 
11. Corte Madera 
Creek, CA 
(Federal Funds) 
(Required Contrib. 
Funds) 
(Contrib. Funds, 
Other) 
12. Coyote Creek, CA 
13. Fairfield Vicinity 
Streams, CA 
(Federal Funds) 
(Required Contrib. 
Funds) 
(Contrib. Funds, 
Other) 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Contrib. 
Cost 
2,325 7,276 
950,000 -939,000 
1,870,611 -778,828 
650,000 
683,435 
5,036 
59,012 
59,016 
100,000 
28,851 
1,255 
5,113 
-102,000 
74,094 
155,000 
66,964 
-5,000 
-4,979 
- 12,458,725 
- 12,451,883 
190,355 19 
190,213 19 
804,761 20 
804,761 20 
300,000 2,087,000 
113,330 2,836,863 
103,229 
905,000 
882,479 
- 14,739,000 
- 14,716,289 
- 592,382 
592,381 
3,779,000 21 
3,770,497 22 
14. Guadalupe River, 
CA 
(Required Contrib. 
(Funds) 
(Contrib. Funds. 
Other) 
15. Hidden Dam 
Hensley Lake, 
Fresno River, CA 
(Federal Funds) 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint 
Approp. 
Cost 
-403,000 1,844,000 6,509,000 
2,781,245 2,767,767 4,562,080 
690,000 
670,259 
170,000 
284,000 
124,797 
970,000 
249,832 
- 1,322,000 
104,222 582,338 
4,194,000 49,822,000 
8,297, 194 45,577,903 
2,580,509 9,537,429 
1,563,499 7,219,463 
919,491 6,341,131 23 
1,448,545 5,982,983 24 
30,555,426 
30,555,426 
1,593,000 1,335,000 1,516,000 
1,541,262 1,243,242 1,599,132 
1,491,000 26,380,818 
1,545,946 26,370,992 
35-40

SACRAMENTO, CA, DISTRICT 
TABLE 35-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 Sept. 30, 2000 
(Contrib. Funds 
Other) 
16. Isabella Lake, Kern 
River, CA 
(Federal Funds) 
Contrib. Funds, 
Other) 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
165,112 25 
165,112 25 
24,450,537 26 
24,450,537 26 
1,372,455 5,167,000 967,000 
1,087,352 5,443,327 1,107,423 
834,810 47,721,527 27 28 
836,005 47,707,342 27 28 
753,000 29 
747,718 30 
17. Kaweah and Tule New Work 
Rivers including Approp, 
Terminus Dam and Cost 
Success Lake, CA Maint 
(Federal Funds) Approp. 
Cost 
Contrib. Funds, New Work 
Other) Contrib. 
Cost 
18. Little Dell New Work 
Lake, UT Approp. 
(Federal Funds) Cost 
(Required Contrib. New Work 
Funds) Contrib. 
Cost 
(Contrib. Funds, New Work 
Other) Contrib. 
Cost 
19. Martis Creek Lake, New Work 
Martis Creek, NV, Approp. 
and CA Cost 
Maint 
Approp. 
Cost 
595,000 35,592,230 31 
261,817 35,259,047 31 
3,727,000 3,530,000 4,678,000 3,573,000 64,951,574 32 
3,761,806 3,198,416 5,082,328 3,614,081 64,908,367 32 
- - - - 633,420 33 34 
-- - - 632,695 3335 
3,213,000 1,014,000 -190,000 -400,000 40,746,900 
2,513,831 1,883,994 -160,062 -407,677 40,581,425 
36,172 
506,000 
493,233 
108,704 
471,000 
365,486 
-484,863 
422,000 
507,462 
- 19,954,500 
-242,644 19,021,525 
- 4,300,147 36 
- 4,300,147 37 
- 8,504,989 38 
- 8,504,989 38 
521,000 9,216,383 
551,391 9,210,369 
35-41

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 35-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 Sept. 30, 2000 
20. Merced County New Work 
Streams, CA Approp. 
(Federal Funds) Cost 
(Required Contrib.New Work 
Funds) Contrib. 
Cost 
(Contrib. Funds New Work 
Other) Approp. 
Cost 
21. Merced County New Work 
Stream Group, CA Approp. 
Cost 
Maint. 
Approp. 
Cost 
23. Pajaro River Basin New Work 
CA (Federal Funds) Approp. 
Cost 
(Required Contrib. New Work 
Fund Contrib. 
Cost 
24. Pine Flat Lake and New Work 
Kings River, CA Approp. 
(Federal Fund) Cost 
Maint. 
Approp. 
Cost 
(Contrib. Funds, New Work 
Other) Contrib. 
Cost 
25. Redbank and New Work 
Fancher Creeks, CA Approp. 
(Federal Funds) Cost 
(Required Contrib.New Work 
Funds) Contrib 
Cost 
(Contrib. Funds, New Work 
Other) Contrib. 
497,000 1,734,000 
451,434 1,573,751 
104,505 
109,545 
250,636 
230,000 
205,951 
179 
84,712 
-64,000 
12,150 
237,000 
118,890 
357,000 
557,234 
288 
72,000 
119,417 
13,000 
154,700 
919,000 20,840,000 
619,205 20,845,267 
- 614,505 
- 595,000 
- 4,519,938 3940 
25,539 4,560,608 3940 
- 2,751,259 41 
- 2,751,259 41 
62,000 3,250,340 
551,391 3,738,674 
8,686,968 42 
8,686,968 42 
- - - - 37,250 43 
- - - - 37,250 44 
43,356,265 45 
43,356,265 45 
2,999,000 2,361,000 3,822,000 2,256,000 51,086,046 46 
3,104,571 2,247,942 3,904,638 2,322,568 51,073,227 46 
-- - - 110,000 47 
110,000 47 
-90,000 
62,466 
3,312 
7,677 
15,271 
4,579 
12,917 
- 47,516,065 48 
3,461 47,515,188 48 
- 3,354,920 
6,180 3,257,729 
- 759,580 49 
35-42

SACRAMENTO, CA, DISTRICT 
TABLE 35-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 Sept. 30, 2000 
Cost -4,020 701,546 
26. Russian River New Work 
Basin, CA, Coyote Approp. 
Valley Dam (Lake Cost 
Mendocino) and Maint 
Channel Improve- Approp. 
ments (Federal Cost 
Funds) 
(Contrib. Funds, New Work 
Other) Contrib. 
Dry Creek (Warm 
Springs) Lake 
and Channel 
Improvements, CA 
(Federal Funds) 
(Contrb. Funds, 
Other) 
Cost 
New Work 
Approp. 
Cost 
Maint 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
-251,978 
-240,208 
90,000 
37,063 
14,435,869 so 
14,435,869 5so 
44,777,546 51 52 
44,777,546 51 52 
67,617 
11,000 
35,000 
25,978 
-279,391 
-268,282 
-581,744 
589,911 53 
581,744 54 
50,000 333,283,645 55 
38,214 333,212,431 55 
32,915,552 56 
31,836,635 57 
230,574 58 
228,732 59 
27. Sacramento River New Work 
and Tributaries, CA Approp. 
from Collinsville to Cost 
Shasta Dam Maint 
(Federal Funds) Approp. 
Cost 
(Required Contrib. New Work 
Funds) Contrib. 
Cost 
(Contrib. Funds, New Work 
Other) Contrib. 
Cost 
28. San Lorenzo, CA New Work 
(Federal Funds) Approp. 
Cost 
(Required Contrib. New Work 
Funds) Contrib. 
Cost 
29. Upper Jordan 
UT 
New Work 
Approp. 
Cost 
4,870,000 
5,478,886 
1,600,000 
1,600,525 
1,350,000 
1,214,896 
2,024 
200,000 
123,699 
4,315,000 5,400,000 2,803,000 149,163,000 6061 
3,216,875 6,133,628 3,405,859 148,821,036 60 
1,448,000 1,721,000 1,899,000 34,227,128 62 
1,355,079 1,804,978 1,915,496 34,220,120 62 
442,500 2,057,500 1,860,000 31,284,354 
768,924 1,671,788 1,167,367 29,671,914 
1,337 -925,131 
2,927,796 63 64 
2,925,131 63 64 65 
1,194,000 1,606,000 5,546,000 8,546,000 
820,003 1,620,688 5,285,178 7,849,568 
572,000 978,669 
41,470 801,038 
500,000 
149,865 
103,000 -70,000 150,000 
109,046 172,173 206,000 
1,550,669 
842,208 
683,000 
637,084 
35-43

REPORT OF THE SECRETARY OF THE ARMY ON CIVILWORKS ACTIVITIES FOR FY 2000 
TABLE 35-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 95 FY 96 FY 97 FY 98 FY 99 Sep. 30, 1999 
30. Walnut Creek, CA New Work 
(Federal Funds) Approp. 
Cost 
(Required Contrib.New Work 
Funds) Contrib. 
Cost 
(Contrib. Funds, New Work 
Other) Contrib. 
Cost 
31. West Sacramento New Work CA 
Approp. 
(Federal Funds) Cost 
(Required Contrib New Work 
Funds) Approp 
Cost 
32. Wildcat and San New Work 
Pablo Creeks, CA Approp. 
(Federal Funds) Cost 
(Required Contrib.New Work 
Funds) Contrib. 
Cost 
(Contrib. Funds, New Work 
Other) Contrib. 
Cost 
100,000 
47,659 
66,058 
- 350,000 
45,505 21,804 
8,304 91 
- 71,842,430 66 
6,995 71,512,809 67 
- 5,683,472 68 
- 5,677,857 69 
14,783,553 70 
14,783,553 70 
209,000 
308,824 
1,020,000 
147,589 
-100,000 
179,737 
15,102 
170,000 
6,944,000 618,000 3,093,000 11,863,000 
2,931,333 4,000,899 2,911,110 11,048,818 
300,000 2,500,000 
158,191 744,195 
11,245 
11,496 
141,000 
3,214 
- 3,820,000 
297,663 1,049,975 
12,000 20,373,000 
-36,689 20,335,384 
10,449 
2,518 
1,620,000 
1,598,685 
1,937,000 
71 
1,906,943 72 
36. Lower San New Work 
Joaquin River Approp. 
and Tributaries, Cost 
CA including Maint 
Tuolumne and Approp. 
Stanislaus Rivers, Cost 
CA, New Melones 
Lake, CA 
(Federal Funds) 
(Contrib. Funds, New Work 
Other) Contrib. 
Cost 
49,515 
1,182,000 
1, 163,364 
3,252 2,473 19,742 
3,001,000 957,000 1,721,000 
1,366,453 2,550,742 1,778,408 
371,142,996 73 74 
371,134,597 74 
17,528,716 
17,517,027 
80,000 75 
80,00075 
1. Includes the following amounts for new work: 
Regular Funds: Previous project, $185,198; existing 
project, $585,436 for shallow-draft and $39,650,558 for 
deep-draft. 
2. Includes the following funds for maintenance: 
Regular Funds: Previous project, $553,720; existing 
project, $17,224,432 for shallow-draft and $41,383,526 
for deep-draft; and deferred maintenance funds, $70,000 
for shallow Bdraft. 
3. Includes the following costs for maintenance: 
Regular Funds: Previous project, $553,720; existing 
project, $17,224,432 for shallow-draft and $41,194,611 
35-44 
- --

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 35-A (Cont' d) COST AND FINANCIAL STATEMENT 
for deep-draft; and deferred maintenance funds, 
$70,000 for shallow draft. 
4. Includes $85,000 contributed funds, other, 
from Sacramento-Yolo Port District for clearing and 
grubbing on dredged material deposit areas to be 
used on ship channel maintenance dredging work. 
5. Includes unobligated carryover for 
continuation of planning and engineering (CP&E) 
funds as of September 30, 1985 ($33,474) for 
Sacramento River Deep Water Ship Channel to be 
included in project cost (for cost sharing) per TWX 
of September 9, 1985. 
6. Includes $28,326,800 funds for Sacramento 
District. 
7. Includes $28,298,863 costs for Sacramento 
District. 
8. Includes $1,158,348 public work funds, of 
which $207,198 was for work done along 30-foot 
channel in Suisun Bay Channel; excludes $19,000 
expended for engineering for inactive portion of 1950 
modification. In addition, $1,342,500 was expended 
from required contributed funds 
9. In addition, $1,250 was expended from 
required contributed funds for maintenance. 
10. Contributed funds, other, from State of 
California for design and construction of downstream 
channel improvements on Ash and Berenda Sloughs 
below Buchanan Dam. 
11. Includes $724,000 contributed funds, other, 
from State of California for relocation activities 
including demolition or salvage of various pipes and 
facilities, constriction of ramps, turnouts, pipe gates 
and bank protection at Cache Creek Settling Basin. 
12. Includes $676,755 contributed funds, other, 
costs for relocation activities for State of California. 
13. Includes code 710 funds and costs for 
recreation facilities at New Hogan lake: total to date 
$897,742. 
14. Includes $99,000 special recreation use fees 
and costs at New Hogan Lake, and $826,600 
maintenance and operation of dam funds and costs 
(96X5125) at New Hogan Lake beginning in FY 
1988.
15. For miscellaneous construction under local 
cooperation requirements, primarily for Bear Creek, 
San Joaquin County; includes $108,056 as related to 
Duck and Littlejohn Creeks channel improvements as 
part of Farmington Dam project unit. 
16. Includes $393,195 contributed funds, other 
from California Department of Boating and Waterways 
for design and construction of boat launching and 
related facilities, and $30,000 for design and 
construction of a boarding float at North Shore 
recreation area at New Hogan Lake. 
17. Includes $104,000 contributed funds, other, 
and costs from Calaveras County Water District for 
New Hogan hydropower studies. 
18. Includes $6,999,725 San Francisco District 
construction funds and costs for Corte Madera Creek. 
19. $8,695 contributed funds transferred to 
Sacramento District in FY 1983. Includes $97,400 San 
Francisco District required contributed funds and costs. 
20. Contributed funds, other, and costs, from 
Marin County including $536,921 for miscellaneous 
bridge and road relocations and $267,840 for additional 
expenses for disposal sites at Corte Madera Creek. 
21. Includes $3,643,000 contributed funds, other, 
from the State of California for relocation (automotive 
type bridge) at Laurel Creek Diversion near Fairfield, 
$113,000 from City of Fairfield for Phase III contract 
for channel development on Laurel Creek, and $23,000 
from City of Suisun for Phase IIA contract for 
widening of Railroad Avenue 
22. Includes $3,638,022 contributed funds, other 
costs for relocations at Laurel Creek Diversion, 
$19,537 contributed funds, other costs for Phase III 
contract, and $112,939 for Phase IIA contract. 
23. Includes contributed funds, other: $2,905,630 
for recreation betterment, $2,195,591 for NED 
relocation and $70,000 for incremental relocations at 
Guadalupe River. 
24. Includes contributed funds, other costs: 
$2,624,578 for recreation betterment, $1,496,809 for 
NED relocations and $0 for incremental relocations at 
Guadalupe River, and $1,175,848 for flood control 
betterments. 
25. Contributed funds, other from the State of 
California for miscellaneous design and construction at 
Hidden Dam. 
26. Includes $2,199,085 code 710 funds and costs 
for recreation facilities at Isabella lake and $224,000 
Code 713 funds and costs for improvement at Tillie 
Creek and Live Oak campgrounds. 
27. Includes $407,640 special recreation use fees 
and costs at Isabella Lake. 
28. Includes $131,900 maintenance and operation 
of dam funds and costs (96X5125) at Isabella Lake 
35-45

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 35-A (Cont' d) COST AND FINANCIAL STATEMENT 
beginning in FY 1985. 
29. Includes $438,000 contributed funds, other, 
from California Department of Boating and Waterways 
for design and construction of boat launching and related 
facilities at Old Isabella Road and Isabella Peninsula and 
$337,500 for Isabella Dam hydropower studies. 
30. Includes $438,000 contributed funds, other, 
costs for boat launching and related facilities at Old 
Isabella Road and Isabella Peninsula, and $309,808 costs 
for Isabella Dam hydropower studies. 
31. Includes code 710 funds and costs for 
recreation facilities: Success Lake: Total to date 
$747,048. Terminus Dam: Total to date: $704,000. 
32. Includes $165,000 special recreation use fees 
and costs at Success Lake. 
33. Includes contributed funds, other, from State of 
California Department of Boating and Waterways and 
costs for acquisition of a boarding float at Success Lake, 
$30,000 and at Terminus Dam, $12,420. 
34. Includes contributed funds, other, from Kaweah 
River Power Authority, Visalia, California for Terminus 
Dam hydropower studies, $423,000; and from DITT, 
Inc., Paris, France, for Success Lake hydropower 
studies, $168,000. 
35. Includes contributed funds, other, costs for 
Terminus Dam hydropower studies, $422,697, and for 
Success Lake hydropower studies, $167,579. 
36. Includes $4,300,147 contributed funds, other 
from the Metropolitan Water District of Salt Lake City 
for relocation of State Highway 65 at Little Dell Lake. 
37. Includes $4,300,147 contributed funds, other, 
costs for relocation of State Highway 65 at Little Dell 
Lake.
38. Includes $1,200 initiation of plans for 
specifications for Code 710 recreation facilities, for FY 
1978. Construction of recreation facilities at Martis 
Creek Lake under Code 720 was determined to be 
infeasible. 
39. Includes contributed funds, other $4,572,938, 
for lands, easements and rights-of-way for Castle Dam 
from State of California and contributed funds, other 
costs for lands, easements and rights-of-way for Castle 
Dam.
40. Includes $274,000 contributed funds, other, 
relocation and $227,968 costs. 
41. In addition, $66,532 expended for new work 
from contributed funds, other, miscellaneous 
construction under local cooperation requirements as 
related to acquisition of right-of-way and utility 
alterations for Merced County Stream Group. 
42. Includes $1,949,968 San Francisco construction 
funds and costs and $260,000 Sacramento general 
investigation funds and costs for Pajaro River. 
43. Includes $37,250 contributed funds, other, from 
Santa Clara Valley Water District for bridge relocation 
at Pajaro River. 
44. Includes $37,250 contributed funds, other, costs 
for bridge relocation at Pajaro River. 
45. Includes code 710 funds and costs for 
recreation facilities at Pine Flat Lake: Total to date: 
$1,595,100. Includes Public Work Acceleration, 
Executive (PL 87-68) (Transfer to Corps of Engineers, 
Civil) 1963 funds and costs ($239,235) for recreation 
facilities and $19,600 Code 713 funds and costs for Pine 
Flat fish barrier. 
46. Includes $158,300 special recreation fees and 
costs at Pine Flat Lake and $799,785 maintenance and 
operation of dam funds and costs at Pine Flat Dam. 
47. Miscellaneous construction and engineering 
and design services (non-project) accomplished at 
expense of State of California under local cooperation 
requirements in connection with acquisition of rights-ofway 
and utility alterations at Pine Flat Lake. 
48. Includes unobligated carryover for continuation 
of planning and engineering (CP&E) funds as of 
September 30, 1985 ($29,065) and FY 1986 allocation 
for Redbank and Fancher Creeks to be included in 
project cost (for cost sharing) per TWX of September 9, 
1985.
49. Includes contributed funds, $759,580 other, 
from Fresno Metropolitan Flood Control District for 
road relocation and betterment=s (Nees Avenue) at 
Fancher Dam and includes $701,546 contributed funds, 
other costs for road relocation (Nees Avenue) and 
betterments at Fancher Dam. 
50. Excludes $5,598,000 contributed funds: 
$400,000 for recreation facilities at completed projects 
funded under Public Works Acceleration Program; and 
$1,628,411 for recreation facilities at completed projects 
funded under Code 711 at Coyote Valley Dam, Lake 
Mendocino. 
51. Includes $94,459 special recreation use fees and 
costs (FY 1982-1983), but excludes prior special 
recreation fees and cost for Coyote Valley Dam, Lake 
35-46

SACRAMENTO, CA, DISTRICT 
TABLE 35-A (Cont' d) COST AND FINANCIAL STATEMENT 
Mendocino. 
52. Includes $1,625,280 maintenance and operation 
of dam funds and costs at Coyote Valley Dam, Lake 
Mendocino for FY 1985 through FY 1996. 
53. Includes $251,911 contributed funds, other 
from City of Ukiah for Coyote Valley Dam, Lake 
Mendocino, hydropower studies; and $338,000 from 
California department of Boating and Waterways for 
launching facility at Lake Mendocino. 
54. Includes $250,117 contributed funds, other, 
costs for Coyote Valley Dam, Lake Mendocino, 
hydropower studies; and $331,657 for California 
Department of Boating and Waterways for launching 
facility at Lake Mendocino. 
55. Includes $253,421,793 San Francisco 
construction funds and costs through August 1983 for 
Dry Creek, Warm Springs Dam. 
56. Includes $964,114 San Francisco maintenance 
funds and costs through April 1982 for Dry Creek, 
Warm Springs Dam. 
57. Includes $75,400 maintenance and operations 
of dam funds and costs at Dry Creek, Warm Springs 
Dam.
58. Includes $208,074 contributed funds, other, 
from Sonoma county for Dry Creek, Warm Springs, 
hydropower studies; and $22,500 from City of Ukiah for 
hatchery pump design at Lake Mendocino. 
59. Includes $208,074 contributed funds, other, 
costs for Dry Creek, Warm Springs hydropower studies; 
and $20,658 costs for hatchery pump design. 
60. Excludes $614,608 for Table Mountain (Iron 
Canyon) project, deauthorized August 5, 1977, and 
$531,000 for Sacramento River and Major and Minor 
Tributaries portions which are considered inactive and 
deferred. 
61. Includes Code 710 funds and cost for recreation 
facilities at Black Butte lake: Total to date $1,000,162. 
62. Includes $104,100 special recreation use fees 
and costs at Black Butte Lake. 
63. Miscellaneous construction and engineering 
and design services (non-project) accomplished at 
expense of State of California under local cooperation 
requirements in connection with acquisition of rights-ofway 
and utility alterations (primarily for Sacramento 
River and Major and Minor Tributaries project) 
Includes State Highway Commission payment, 
$789,008, for use of excess excavation from Chico and 
Mud Creeks and Sandy Gulch (Sacramento River and 
Major and Minor Tributaries) for freeway embankment 
through the city of Chico. 
64. Includes $41,984 contributed funds, other, from 
State of California for required modification of existing 
private facilities and salmon rearing habitat, Sacramento 
River, Chico Landing to Red Bluff; $15,977 contributed 
funds, other, from State of California Department of 
Boating and Waterways for replacing a boarding float at 
Orland Buttes boat launching ramp at Black Butte Lake; 
$392,000 contributed funds, other, from the City of 
Santa Clara for hydropower studies at Black Butte Lake; 
and $59,334 contributed funds, other from State of 
California for relocation. 
65. Includes $389,335 contributed funds, other, 
costs for Black Butte hydropower studies; and $59,334 
costs for relocations. 
66. Includes $8,849,825 San Francisco construction 
funds for Walnut Creek. 
67. Includes $9,049,609 San Francisco construction 
costs for Walnut Creek. 
68. Includes $450,268 San Francisco required 
funds for Walnut Creek. 
69. Includes $525,846 San Francisco required costs 
for Walnut Creek. 
70. Includes $400,348 San Francisco contributed 
funds, other, and contributed funds costs for Walnut 
Creek. 
71. Includes $1,937,000 contributed funds, other, 
from Contra Costa Flood Control and Water 
Conservation District for replacement of sewerline in 
Richmond for Wildcat and San Pablo Creeks project. 
72. Includes $1,906,943 contributed funds, other, 
costs for replacement of sewerline in Richmond for 
Wildcat and San Pablo Creeks project. 
73. Excludes funds applicable to other units of this 
basin authorization (Lower San Joaquin River and 
Tributaries, and Tuolomne River Basin, California). 
(See Table 35-E). 
74. Includes $110,000 utilized for preparation of 
1957 Economic Feasibility Report and of Revised 
Feasibility Report (FY 1960, 1961, and 1962) applicable 
to 1962 reauthorization of project. 
75. Includes $80,000 contributed funds, other, and 
costs, from the Bureau of Reclamation for visitors center 
at Mark Twain area, New Melones Lake. 
35-47

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 35-A (Cont' d) COST AND FINANCIAL STATEMENT 
PRECONSTRUCTION ENGINEERING AND DESIGN 
See 
Section Total Cost to 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 Sept. 30, 2000 
American River New Work 
Watershed CA, Approp. 
Cost 
Caliente Creek CANew Work 
Approp. 
Cost 
Coyote and New Work 
Berryessa Creeks, Approp. 
CA Cost 
Napa River, CA New Work 
Kaweah River 
Yuba River, 
Approp. 
Cost 
New Work 
Approp 
Cost 
New Work 
CA Approp 
Cost 
South Sacramento New Work 
Approp 
San Lorenzo River, New Work 
CA Approp. 
Cost 
Truckee Meadows New Work 
NV Approp. 
Cost 
Tule River Basins New Work 
Approp. 
Cost 
Upper Jordan New Work 
River, CA Approp. 
Cost 
West Sacramento New Work 
CA Approp. 
Cost 
2,127,000 1,181,000 166,375 4,290,000 
2,004,798 814,296 642,786 4,022,524 
-41,000 
-41,111 12 
1,125,000 1,161,000 1,294,000 -123,000 
1,263,905 1,138,074 1,082,132 155,246 
527,000 1,182,930 1,182,070 651,000 
508,419 970,790 1,210,598 751,360 
11,000 
3,338 
161,000 
63,108 
27 
39,000 
41,628 
788,000 
788,291 
100,000 
39,197 
750,000 
665,701 
- 662,800 1,237,000 936,000 
- 380,752 1,260,208 982,814 
30,000 
7,913 
9,265 
15 
-15,000 
2,085 
50 
1. Beginning in FY 1982, Advance Engineering and 
Design (Preconstruction, Engineering and Design) programs 
are funded under General Investigations Appropriations. 
2. Includes FY 1985 unobligated carryover and FY 1986 
3. Excludes $2,639,955 funds and costs for a previous 
flood control project on Napa River. (See Table 35-E). 
allocation for CP&E funds and all AE&D funds to be included 
in project cost (for cost sharing) per TWX of September 9, 
1985. 
35-48 
22,759,375 
22,444,738 
60,000 
60,000 
4,368,900 
4,368,900 
12,947,000 
12,947,000 
3,551,000 
3,447,105 
150,000 
81,163 
1,699,000 
1,517, 100 
813,000 
730,243 
6,623,330 
6,411,304 
-15,000 
9,998 
1,576,000 
1,576,000 
1,817,000 
1,817,000 
R

SACRAMENTO, CA, DISTRICT 
TABLE 35-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
1. SACRAMENTO RIVER, CA 
Mar 3, 1899 A depth of 7 feet below Sacramento 
works. 
July 25,1912 
Jan 21, 1927 
Aug 30, 1935 
Aug 30, 1935 
Aug 26, 1937 
July 24, 1946 
Nov 17, 1987 
For work above Sacramento. 
The 10-foot channel up to Sacramento 
A depth of 6 feet between Sacramento and Colusa 
and 5 feet between Colusa and Chico Landing 
at a cost of $390,000 provided flow of rivers 
is increased to minimum flow of 5,000 cubic 
feet per second after Shasta Reservoir is built. 
Authority for a special direct participation of 
Federal Government of $12 million in cost 
of Shasta Reservoir. 
Transfer of authority for expenditure of above $12 
million from Secretary of War to Secretary of the 
Interior. 
Modified existing navigation project for Sacramento 
River, CA, to provide for construction of a ship 
channel 30 feet deep and 200 to 300 feet wide 
from deep water in Suisun Bay to Washington Lake, 
including such works as may be necessary to compensate 
for or alleviate any detrimental salinity 
conditions resulting from ship channel; a triangular 
basin of equal depth, 2,400 by 2,000 by 3,400 feet 
at Washington Lake; and connecting channel 13 feet 
deep and 120 feet wide, with lock and drawbridge, 
thence to Sacramento River. 
Deauthorization of shallow-draft channel, Colusa 
to Red Bluff, feature of project for navigation, 
Sacramento River, California. 
H. Doc. 186, 55th Cong., 
2d sess., and 48 55th 
Cong., 3d sess. (Annual 
Report 1898, p. 2844 
and 1899, p. 3171). 
H. Doc. 76, 62d Cong., 
Ist sess. 1 
H. Doc. 123, 69th cong., 
Ist sess. 
Rivers and Harbors 
Committee Doc. 35, 
73d Cong., 2d sess. 
Rivers and Harbors 
Committee Doc 35, 
73d Cong., 2d sess. 
S. Doc. 142, 79th Cong., 
2d sess. 
Sec. 1002, 1986 WRDA 
10. Oct 23, 1962 CORTE MADERA CREEK, CA 
Levees and channel improvements, lower 11 miles of H. Doc. 545, 87th Cong., 
Corte Madera Creek and tributaries, as modified bu 2d sess. 
Nov 7, 1966 Chief of Engineers. 
35-49

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 35-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Chief of Engineers. 
Local cooperation requirements modified to 
provide 1.5 percent cash contribution toward 
cost of Ross Valley unit. 
Modify existing project to direct construction of Unit 
4 from Lagunitas Road Bridge to Sir Francis Drake 
Boulevard, and to include construction of floodproofing 
measures in vicinity of Lagunitas Road 
Bridge to insure proper functioning of completed 
portions of authorized project. Further modify 
project to eliminate any channel modifications 
upstream of Sir Francis Drake Boulevard. 
Sec. 204, 1966 Flood 
Control Act. 
Sec 823, 1986 WRDA 
RUSSIAN RIVER BASIN, CA 
May 17, 1950 Coyote Valley Dam (Lake Mendocino): Channel 
improvements on lower 98 miles of Russian River 
and lower reaches of tributaries. 
Feb 10, 1956 Increased appropriation authorization for initial 
stage of project development. 
Oct 23, 1962 Dry Creek (Warm Springs) Lake: Channel 
Improvements on Dry Creek below dam. 
Mar 7, 1974 Dry Creek (Warm Springs) Lake and channel; 
compensate for fish losses on the Russian River 
which may be attributed to the operation of the 
Coyote Dam component of the project through 
measures such as possible expansion of the 
capacity of the fish hatchery at the Warm 
Springs Dam component of the project. 
24. 
Dec 22, 1944 
SACRAMENTO RIVER AND 
TRIBUTARIES, CA, FROM 
COLLINSVILLE TO SHASTA DAM 
Modify Sacramento River Flood Control Project 
to provide for extensions in levees and other 
structures along Sacramento River and major 
and minor tributaries; construct Black Butte 
Dam and Reservoir; construct low-level Table 
Mountain Dam and Reservoir with power 
facilities; and provision of monetary authorization 
H. Doc. 585, 81st Cong., 
2d sess. 
PL 404, 84th cong., 
2d sess. 
H. Doc. 547, 87th Cong., 
2d sess. 
Sec. 95, 1974 WRDA 
H. Doc. 649, 78th Cong., 
2d sess. 2 
35-50 
Nov 17, 1986 
23.

SACRAMENTO, CA, DISTRICT 
TABLE 35-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
of $15 million for initiation of modification. 
May 17, 1950 Improvements for protection of Upper Butte Basin 
(included full monetary authorization). 
Jul 3, 1958 Extend existing Sacramento River Flood Control 
Project to Keswick Dam for purposes of zoning 
area below dam and modification of project by 
construction of bank protection and incidental 
channel improvements between Chico Landing 
and Red Bluff (included full monetary authorization). 
Jul 3, 1958 Additional authorization of $17 million for comprehensive 
plan approved in act of December 22, 
1944. 
Jul 14, 1960 Further modification of Sacramento River Flood 
Control Project by construction of initial 10- 
year phase of bank erosion control works and 
setback levees on Sacramento River and 
authorization of $14,240,000 for prosecution 
of modification. 
May 12, 1967 Additional authorization of $7 million for bank 
protection approved in act of July 14, 1960. 
Mar 7, 1974 Initiation of construction of second phase of bank 
erosion control works and setback levees on 
Sacramento River as approved in act of July 14, 
1960, and additional authorization of $16 
million for such purpose. 3 
Jun 19, 1975 Deauthorization of Table Mountain Dam and 
Reservoir. 4 
1. Contains latest published map of section above 
Sacramento. For map of section below Sacramento, see 
II. Doc. 1123, 60"h Cong., 2d sess. And S. Doc. 142, 79 th 
cong., 2d sess. 
2. Contains latest published map. 
3. Total monetary authorization available, exclusive 
H. Doc. 3667, 81st cong., 
ist sess. 2 
H. Doc. 272, 84th Cong., 
2d sess. 2 
S. Doc. 103, 80th Cong., 
PI, 90-17 
PL 93-251 
H. Doc. 94-192, 94th 
Cong., Ist sess. 
of preauthorization studies from general investigations 
appropriations,amountsto$72,740,000 
4. The 90-day Congressional project review period, 
required by sec. 12, PL 93-251, as amended by sec. 157, 
PL 94-587, ended August 5, 1977, and resulted in 
deauthorization of project unit. 
35-51

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 35-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to Sep. 30, 2000 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Feather River, CA 1951 - $5,752 12 
Middle River and Connecting $8,354 3 
Channels, CA Completed 1974 8,500 93,494 
Mokelumne River, CA Completed 1974 2,132 56 189,152 
Navajo Reservoir, NM Completed - 
Old River, CA Completed 1970 
Stockton and Mormon 
Channels, CA Completed 1970 253,151 s 9631,128 
Suisun Bay Channel, CA Completed 1974 200,928 9 to 11 218,854 
Suisun Channel, CA Completed 1973 217,677 3,316,622 121 3 
Suisun Point Channel, CA Completed 1965 733,489 
191,728 s Is 
1. Maintenance project, channels adequate for 
commerce. 
2. Includes $10 for maintenance for previous 
project. Excludes $6,160 for previous project and 
$3,840 for existing project for maintenance expended 
from contributed funds. 
3. Includes $1,600 for previous project. 
4. Includes $790 for previous project. 
5. Authorized by Chief of Engineers under 
authority of sec. 107, Public Law 86-645, as amended. 
6. All costs transferred from Los Angeles District 
in FY 1968. 
7. Estimated cost to local interests was $3,6000 for 
lands, damages and public landings. Remaining portion 
of project, consisting of side channel at Orwood and 
completion of project channels from mouth of Old River 
to Lammers Ferry rod and from Crocker Cut to Holly 
Sugar Factory was deauthorized November 17, 1986, by 
WRDA of 1986. 
8. Upon completion of Mormon Slough, Calaveral 
River, CA in February 1970, local interests accepted 
maintenance responsibility for Mormon Slough as well 
as for Stockton and Mormon Channels CA, and Federal 
maintenance was discontinued. No Federal maintenance 
costs have been incurred since FY 1969. 
9. Includes $58, 901 for previous project. 
10. Excludes $59,551 expended from required 
contributed funds for previous project. 
11. Excludes work accomplished under existing 
project at a cost of $207,198 from Public Works 
Administration funds allotted to San Joaquin River, CA. 
12. Includes $59,817 for previous projects. 
Excludes $5,449 expended from required contributed 
funds for previous project. 
13. Maintenance responsibility transferred to San 
Francisco District, January 1, 1974. 
14. Includes reconnaissance and condition surveys 
of $5,496 and $483 for fiscal year 1963 and 1964, 
respectively. 
15. Estimated cost (July 1964) to local interests was 
$12,000 for lands, damages, and spoil retention dikes. 
35-52

SACRAMENTO, CA, DISTRICT 
TABLE 35- E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to Sep. 30, 1999 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Alameda Creek, CA Completed 
American River, CA Completed 
Aquatic Plant Control, CA Completed 
Big Dry Creek Dam and 
diversion, CA Completed 
Big Wash, Milford, Beaver 
County, UT Completed 
Burch Creek, Weber County, UT 
Cache Creek Basin, CA Active/no FY 95 
(Outlet Channel) Expenditures 
Chester, CA Active/no FY 95 
Expenditures 
Cottonwood Creek, CA Active/no FY 95 
Expenditures 
Coyote Creek, CA Completed 
Duck Creek, San Joaquin 
County, CA 
East Weaver Creek, CA 
Folsom Lake, American River, CA 
Green Valley Creek, Solano 
County, CA 
Kays Creek, UT 
Kern River-California Aqueduct 
Intertie, CA 
Klamath River, CA 
Lake Camanche, CA 
Lake Oroville, CA 
Lower San Joaquin River and 
Tributaries, including Tuolumne 
and Stanislaus Rivers, CA 
Marysville Lake, CA Actil 
Merced River, CA 
Middle Creek, CA 
Mormon Slough, CA 
Napa River Basin, CA 
New Bullards Bar, CA 
North Fork, Pit River at 
Alturas, CA 
Pinole Creek, CA 
Redwood Creek, Humboldt 
County, CA 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
ve/no FY 95 
Expenditures 
Completed 
Completed 
Completed 
Active/no FY 95 
Expenditures 
Completed 
Completed 
Completed 
Completed 
1978 
1959 
1967 
1955 
1961 
1964 
1993 
1981 
1991 
1968 
1967 
1965 
1957 
1963 
1973 
1977 
1972 
1976 
1981 
1976 
1980 
1976 
1967 
1976 
1979 
1972 
1972 
1968 
1970 
$26,995,350 
2,125,818 
1,000 
$54,778 12 
1,369,931 4 
217,879 56 
26,049 s 
3,570,000 8 
15,765,000 
705,622 
664,825 
220,636 
63,014,810 
Is 
59 
1510 
11 
136,026 512 
407,989 513 
1,503,073 5 14 
4,838,000 5 
10,252,950 is 
70,425,470 16 
27,835,263 17 
s18 
10,918,796 
2,643,499 
2,965,402 
2,639,955 
19 
20 
21 
1 22 
12,890,625 23 
904,278 5 2425 
885,750 Is 
4,620,070 126 
35-53

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 35- E (Cont'd) OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to Sep. 30, 2000 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Reese River, Battle Mountain, NV Completed 1969 133,339 527 - 
Rheem Creek, CA Completed 1962 400,000 528 - 
Rodeo Creek, CA Completed 1966 974,100 s - 
Salinas River, CA Inactive 1952 94,213 1 29 - 
Salt Lake City, Jordan River, UT Completed 1961 1,227,570 30 - 
San Leandro Creek, CA Completed 1973 1,000,000 ,1 - 
San Lorenzo Creek, CA Completed 1962 5,130,821 132 - 
San Lorenzo River, CA Completed 1966 4,314,406 133- 
Sevier River near Redmond, UT Completed 1952 919,000 134 - 
Sonoma Creek, CA Inactive 1973 781,500 135 - 
Truckee River and Tributaries, Active/no FY 95 1968 1,038,960 
CA and NV Expenditures 
I. Project responsibility transferred from San 
Francisco District to Sacramento District April 1, 1982. 
2. Scheduling of reservoir operations costs. 
3. Excludes $54,919 other contributed funds for 
miscellaneous construction for local interests pursuant to 
requirements of local cooperation were $951,000 (1959) 
for lands and relocations. 
4. Excludes $44,008 other contributed funds for 
construction in connection with bridge construction 
pursuant to requirements of local cooperation. Total 
cost to local interests for all requirements of local 
cooperation was $370,000 (9159) for lands and 
relocations. 
5. Authorized by Chief of Engineers under 
authority of sec. 205, Public Law 80-858, as amended. 
6. Excludes $22,000 for preauthorization studies. 
7. Project not economically feasible; preconstruction 
planning was terminated in FY 1993. 
8. Excludes $69,262 other contributed funds from 
State of California for two low water crossings and 
appurtenances at Chester. A fish ladder modification 
project was continued under sec. 1135 in FY 1995 at 
fiscal year cost of $172,565. 
9. Excludes $50,000 for preauthorization studies. 
Estimated costs to local interests were $665,000 for 
lands and damages including relocations. 
10. Includes $174,938 Public Works Acceleration 
Program Funds. 
11. Transferred to Bureau of Reclamation in May 
1956 for operation and maintenance by that agency in 
conjunction with other units of Central Valley project. 
12. Excludes $20,000 for preauthorization studies. 
13. Includes $30,000 for preauthorization studies. 
Estimated costs (FY 1973) to local interest for all 
requirements of local cooperation were $150,117 for 
lands and damages including relocation. 
14. Includes $73,000 for preauthorization studies. 
Non-Federal (Kern County Water Agency) cost for road 
relocation was $18,260 (required contributed funds). 
15. Constructed by East Bay Municipal Utility 
District. Final Federal contribution of $51,202 made 
July 18, 1978 (total $10,111,684). Non-Federal costs 
$34,988,53616. 
16. Constructed by State of California. Final 
Federal contribution of $64,186 was made on February 
9, 1981 (total $69,994,105) for flood control reservation. 
17. Cherry Valley and New don Pedro Reservoirs 
constructed by local interests. Federal contribution of 
$9,000,000 and $5,464,000, respectively, for flood 
control reservation. Final Federal contribution of 
$308,898 was made on January 18, 1972, for New don 
Pedro. Excludes $3,004,946, contributed funds, other, 
for miscellaneous engineering and construction (nonproject) 
at local interest expense under local cooperation 
requirements for acquisition of rights-of-way for levee 
and channel improvement on Lower San Joaquin River 
and Tributaries. Unconstructed portion of snagging and 
clearing project modification of Lower San Joaquin 
River and Tributaries) was classified as "deferred" on 
April 9, 1993. For full report see Annual Report for FY 
35-54

1993.
18. Planning and any future development is 
uncertain awaiting State of California=s position on 
support of Marysville project. 
19. Constructed by Merced Irrigation District, Final 
Federal contribution of $839 was made December 2, 
lands and relocations. Federal contribution of $599,336 
made to State Reclamation Board. 
22. This project was reclassified as "active" on 
August 3, 1987. 
23. Constructed by Yuba County Water Agency. 
Final Federal contribution of $33,470 was made in FY 
1972 (total $12,759,127) for flood control reservation. 
24. Includes $41,800 for preauthorization studies. 
25. Excludes $146,000 other contributed funds for 
miscellaneous construction and engineering and design 
services under local cooperation requirements in 
connection with acquisition of rights-of-way, relocation 
and utility alterations. 
26. Includes $107,000 costs for remedial work to 
drainage system completed in FY 1977. 
27. Includes $52,549 contributed funds. 
29. Cost includes engineering and design prior to 
June 30, 1952 and costs of $4,288 (FY 1962-1963) to 
determine if project classification to an active category 
1975 (total $10,818,638) for flood control reservation. 
20. Estimated costs (FY 1967) to local interests for 
all requirements of local cooperation were $1,340,000 
for lands and damages including relocation. 
21. Non-Federal cost $2,965m402 (FY 1976) for 
was justified. 
30. Estimated cost to local interest for all 
requirements of local cooperation were $463,000 (July 
1962) for lands and damages including relocations. 
Project prevented $4,544,000 in damages from the 
April-May 1994 snowmelt runoff. 
31. Excludes $285,329 contributed funds. 
32. Excludes $200,000 estimated value of work 
performed in lieu of cash contribution. 
33. Excludes $421,182 contributed funds. 
34. Excludes $48,000 required contributed funds 
toward first cost. Costs to local interests for all 
requirements of local cooperation, including required 
contributions, were $118,000 (1951). Project prevented 
$9,000 in damages from the April-May 1994 snowmelt 
runoff. 
35. Place inactive 1974. 
35-55

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 35-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Date Funds Funds 
Project Report For Deauthorized Expended Expended 
Alhambra Creek, CA 1981 1986 $300,000 
Bear River, CA 1980 1986 
Cottonwood Creek 1991 1998 15,765,000 
Eel River, CA 1971 1986 1,272,816 
Gleason Creek, NV 1977 1986 215,826 
Humbolt River and 
and Tributaries, NV 1982 1986 1,532,932 
Lakeport Lake, CA 1 1976 1993 2,353,000 
Little Valley Wash, Magna, UT 1951 1977 
Lower San Joaquin River 
and Tributaries, CA 1993 1998 27,835,263 
Mad River Basin, CA 1973 1986 4,243,750 
Sacramento River, Chico 
Landing to Red Bluff, CA 1997 1998 
Sacramento River Major 
and Minor Tributaries 1997 1998 
Spanish Fork River, UT 1955 1977 20,000 
Weber River and Tributaries, UT 1974 1972 75,120 
(Morgan County) 
Wildcat and San Pablo Creek 
Reach 2, CA 1997 1998 
1. Lakeport Lake was deauthorized on November 17, 
1988; and deauthorized November 18, 1993. 
35-56

SACRAMENTO, CA DISTRICT 
TABLE 35-H SACRAMENTO RIVER, CA: 
TIDAL AND FLOOD CONDITIONS PREVAILING 
(See Section 1 of Text) 
Range in Feet 
Miles from Mean Extreme Ordinary Extreme 
Mouth of Tidal i Tidal 2 Flood 3 Flood 4 
Place River 
Collinsville 0 4.3 7 8 10 
Sacramento 59 2.0 2 3 20 28 
Verona (Mouth of Feather River) 80 - Trace 22 30 
Colusa 144 - - 26 32 
Chico Landing 193 - - 20 25 
Red Bluff 248 - - 24 30 
I. Mean lower low water to mean higher high water. 
2. Tide at low water season only. 
3. Mean lower low water to flood stage. 
4. Extreme low water to indicated flood condition. 
TABLE 35-I SAN JOAQUIN RIVER, CA: 
TOTAL COST OF NEW WORK FOR PROJECT 
(See Section 4 of Text) 
Federal Non-Federal 2 
Corps of Coast Required Lands and 
Engineers Guard Cash Damages (includ- Total Total 
Modification (Construction) (Construction) Contribution ing Relocations) Project 
Prior to 1950 
Modification $4,009,938 $80,000 $1,307,500 $1,042,000 $2,349,500 $6,439,438 
1950 Modification 1,823,179 - 35,000 135,00 170,000 1,993,170 
Total 5,833,1 17 80,000 1,342,500 1,177,000 2,519,500 8,432,617 
.. I I I " I�II 
1. Completed in May 1960. 
2. Excludes $5,865,000 (Feb 1954) local interests costs 
for Stockton Deep Water Channel terminal facilities 
required under terms of project authorization. 
35-57

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 35-J SAN JOAQUIN RIVER, CA: 
PROJECT UNITS (1950 MODIFICATION) RECLASSIFIED AND 
EXCLUDED FROM PROJECT COST, 
(See Section 4 of Text) 
Non-Federal 
Federal Required Lands and 
Corps of Cash Damages (includ- Total 
Unit Engineers Contributions ing Relocations) Total Project 
Settling Basin above head 
of Burns Cutoff i $1,073,000 $30,000 $200,000 $230,000 $1,303,000 
Burns Cutoff improvement; 
new turning basin; dredging 
Mormon Channel 2 5 7,882,000 3 431,000 1,455,000 1,886,000 9,768,000 
Upper Stockton Channel 
enlargement 4 5 535,000 34,000 15,000 49,000 584,000 
1. July 1959 price index. Deauthorized August 5, 1977. of San Francisco Bay to Stockton Channel, Sacramento 
2. Deferred; July 1960 price index. District, Improvement No. 3. 
3. For lands and construction. 5. Deauthorized November 17, 1986. 
4. Deleted by 1965 River and Harbor Act authorization 
TABLE 35-K MERCED COUNTY STREAM GROUP, CA 
MAXIMUM INFLOW, STORAGE, AND OUTFLOW FOR PROJECTS 
(See Section 19 of Text) 
Maximum 
Inflow Maximum Maximum 
(c.f.s.) Storage Outflow 
Stream (hourly) (acre-feet) (c.f.s.) 
Burns 
Bear 
Owens 
Mariposa 
4,241 
4,545 
762 
5,080 
1,500 
2,231 
942 
5,949 
1,646 
1,493 
137 
899 
35-58

SACRAMENTO, CA DISTRICT 
TABLE 35-L RUSSIAN RIVER BASIN, CA: ESTIMATED 
COST FOR NEW WORK 
(See Section 23 of Text) 
Estimated Cost 
Non-Federal 
Project Feature Federal Contribution Total 
Coyote Valley Dam (Lake Mendocino): 
Channel Improvements below Dam 
on lower 98 miles of Russian River 14,436,000 $5,598,000 $20,034,000 1 
Dry Creek (Warm Springs) Lake and 
Channel Improvements below Dam 259,240,000 103,777,000 2 363,017,000 
Total $273,676,000 $109,375,000 $383,051,000 
I. Exclusive of $1,628,000 for recreation facilities at to be paid over a period not to exceed 50 years after use 
completed projects. of storage is initiated and inclusive of lands and 
2. Reimbursement by local interests to Federal damages. 
Government for costs allocated to water supply storage 
TABLE 35-M RUSSIAN RIVER BASIN, CA: ESTIMATED 
FEATURES AND ESTIMATED COSTS 
(See Section 23 of Text) 
Height of Reservoir 
Nearest City Distance Dam and Capacity Estimated 
Name (California) Above Mouth Type (Acre-Ff) Cost 
Coyote Valley Dam (Lake Ukiah Mile 0.8-East Fork 160 Feet- 122,500 $17,550,000 I 
Mendocino) of Russian River Earthfill 
Channel Improvements (East Ukiah Mile 0 to 0.8 East - - 484,000 
Fork) Fork 
below Coyote Valley Dam Guerneville Mile 0 to 98,Russia 
and lower 98 miles of River 
Russian River) 
Dry Creek (Warm Springs) Healdsburg Mile 14.4 Dry Creek 319 Feet- 381,000 $363,017,000 
Earthfill 
Channel Improvements Healdsburg Mile I to 14.4 Dry - - 2,864,000 
(Dry Creek) below Dry Creek Creek 
(Warm Springs Dam) 
I II I 
1. Exclusive of $1,628,000 for recreation facilities at 
completed projects. 
35-59

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 35-N SACRAMENTO RIVER AND TRIBUTARIES, CA, 
COLLINSVILLE TO SHASTA DAM: 
PROJECT UNITS RECLASSIFIED AND EXCLUDED FROM COST ESTIMATE 
(See Section 24 of Text) 
Current Estimated Cost 
Unit Classification Federal Non-Federal i Total 
944 Modification: 
Antelope Creek2 Inactive $1,400,000 $340,000 $1,740,000 
Lower Butte Basin 3 Deferred 7,286,000 2,285,000 9,571,000 
Thomas Creek 2 Deferred 1,140,000 140,000 1,280,000 
Willow Creek 2 Inactive 1,290,000 120,000 1,410,000 
Bypass Levees 4 Deferred 7,100,000 940,000 8,040,000 
Bypass Levees 4 Inactive 3,010,000 - 3,010,000 
950 Modification: 
Upper Butte Basin 2 Deferred 3,530,000 1,787,000 5,317,000 
For lands and damages, including relocation. weir (July 1954 price level). 
. July 1960 price level. 4. July 1961 price level. 
. Excludes work applicable to extension of Moulton 
FABLE 35-0 SACRAMENTO RIVER AND TRIBUTARIES, CA, 
COLLINSVILLE TO SHASTA DAM: 
CONSTRUCTION ACCOMPLISHED AND CONTRACT COSTS 
(See Section 24 of Text) 
Required 
Contract Federal Contributed Total 
Contract 42A continuation (Bank protection, 
miles 88.8-143.3, Sacramento River, 
Sacramento, Colusa, Sutter and 
Yolo Counties) 
Lower American River - River Park 
initiation (Bank Protection, 
Sacramento County). 
$803,695 
500,000 
$152,641 $956,336 
500,000 
35-60

SACRAMENTO, CA DISTRICT 
TABLE 35-P FLOOD CONTROL WORK UNDER SPECIAL 
AUTHORIZATION FLOOD CONTROL ACTIVITIES 
PURSUANT TO SECTION 205, PUBLIC LAW 80-858 
AS AMENDED (PREAUTHORIZATION) 
(See Section 32 of Text) 
Fiscal Year 
Cost 
Study Stage (Federal) 
City of Folsom Willow & Humlong Creek Reconnaissance 14,982 
Colorado River at Grand Junction, CO 1 Construction $ -33,026 
Battle Mountain, NV Plans and Specification 55,819 
Fallon, NV Reconnaissance/Feasibility 11,404 
Hamilton City, CA Reconnaissance 147 
Legewood Creek, Fairfield, CA Reconnaissance 20,378 
Magpie and Don Julio Creeks, CA Plans and Specifications 313,928 
Reno Flood Warning System Reconnaissance/Feasibility 507,636 
Rock Creek and Keefer Slough Reconnaissance 270,032 
Tehama, CA Reconnaissance 16,872 
Winters, CA Plans and Specification 3,66 
$ 627,038 2 
1. See Improvement No. 8 for construction. 
2. Excludes Coordination Account. 
TABLE 35-Q AQUATIC ECOSYSTEM RESTORATION 
(SECTION 206, PUBLIC LAW 104-303) 
(See Section 32 of Text) 
Fiscal Year 
Cost 
Study Stage (Federal) 
Blackwood Creek, CA 
City Creek Ecoysystem, Utah 
Clear Lake, CA 
Clover Creek, 
Incline & 3rd Creeks, NV 
Lower Truckee River Paiute 
Penn Mine Aquatic Ecosystem Restoration 
Soldier Hollow, Utah 
Upper Jordan River Ecosystem Restoration 
Upper Truckee River 
West Jordan River, Utah 
1. Excludes Coordination Accounts 
Reconnaissance/Feasibility 
Reconnaissance/Feasibility 
Reconnaissance/Feasibility 
Reconnaissance/Feasibility 
Reconnaissance/Feasibility 
Reconnaissance/Feasibility 
Reconnaissance/Feasibility 
Reconnaissance/Feasibility 
Reconnaissance/Feasibility 
Reconnaissance/Feasibility 
$ 87,937 
87,937 
1,340 
50,897 
37,240 
148,292 
103,453 
61,057 
104,471 
202,042 
302,644 
$ 1,149,733 1 
35-61

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 35-R SNAGGING AND CLEARING 
UNDER SPECIAL AUTHORIZATION 
PURSUANT TO (SECTION 208, 1954 FLOOD CONTROL ACT PUBLIC LAW 83-780) 
Fiscal Year 
Cost 
Study Stage (Federal) 
Blackwood Creek Planning Design Analysis $ 53,391 
San Joaquin River Firebaugh Planning Design Analysis 49,279 
Walker River, NV Planning Design Analysis 348,398 
Ward Creek Planning Design Analysis 8, 181 
$ 459,249 
TABLE 35-S SURVEYS 
(See Section 35 of Text) 
Fiscal year costs were as follows: 
Navigation Studies $-3,922 
Flood Damage Prevention Studies 1,328,160 
Required Cost Contributions 3,583,341 
Non-Federal Contributions (not required) 
Special Studies 3,297,100 
Special Investigations 44,332 
Review of FERC Licenses 14,679 
Interagency Water Resources Development 46,936 
National Estuary Program 2,490 
American Waterfowl Management Plan 3,343 
Coordination with Other Water Resource Agencies 214,630 
CAL-FED 501,968 
Planning Assistance to States 134,096 
National Marine Fisheries Service $0 
TABLE 35-T EMERGENCY STREAMBANK & SHORELINE PROTECTION 
(SECTION 14, 1946 FLOOD CONTROL ACT) 
Fiscal Year 
Cost 
Study (Federal) 
Skyrocket Creek, Ouray, CO $26,927 
35-62

PROJECTS SPECIFICALLY AUTHORIZED UNDER THE FORMER CALIFORNIA 
DEBRIS COMMISSION 
The California Debris Commission, consisting of 
three Corps officers appointed by the President with the 
consent of the Senate, created by act of March 1, 1893 
(27 Stat. L., p. 507), was organized in San Francisco, 
CA, on June 8, 1893, and has jurisdiction and duties 
extending over drainage area of Sacramento and San 
Joaquin Rivers, comprising great central valley of 
California and extending from crest of the Sierra 
Nevada on the east to that of the Coast Range on the 
west, and from Mount Shasta and Pit River Basin on 
the north to Tehachapi Mountains on the south. These 
rivers empty into head of Suisun Bay ultimately 
discharging into the Pacific Ocean through connecting 
bays and straits and the Golden Gate. Duties of the 
Commission comprise regulation of hydraulic mining 
in drainage area of Sacramento and San Joaquin Rivers, 
CA, so that debris will not be carried into navigable 
waters or otherwise cause damage; jurisdiction over 
construction and control of water storage facilities for 
domestic, irrigation, and power development purposes; 
and direction of improvements for control of floods on 
Sacramento River. On November 19, 1986, the 
Commission was abolished by the Water Resources 
Development Act of 1986 (PL 99-662) and all 
authorities, powers, functions, and duties were 
transferred to the Secretary of the Army. All acquired 
lands and other interests presently under jurisdiction of 
the Commission were authorized to be retained and 
administered under direction of the Secretary. 
IMPROVEMENTS 
Page Tables 
1. Regulation of Hydraulic Mining and 
Preparation of Plans ................ 35-1A 
2. Sacramento River and Tributaries, CA 
(debris control). .................. 35-2A 
3. Treatment of Yuba River Debris 
Situation-Restraining Barriers, CA ...... 35-3A 
Flood Control 
4. Sacramento River, CA .............. 35-3A 
Table 35-AA 
Table 35-BB 
Table 35-CC 
Cost and Financial 
Statement ............. 35-7A 
Authorizing 
Legislation .............. 35-10A 
Sacramento River, CA: Total 
Cost of Existing Project ... .35-12A 
Navigation 
1. REGULATION OF HYDRAULIC 
MINING AND PREPARATION 
OF PLANS 
Location. Operations largely limited to territory 
between Mount Lassen on the north and Yosemite 
Valley on the south, on western watershed of Sierra 
Nevada. (See Geological Survey sheets for the area, 25 
in number.) 
Existing project. Provided for regulating 
hydraulic mining operations, planning improvement of 
conditions upon Sacramento and San Joaquin Rivers 
and their tributaries affected by such operations, and 
preparation of plans to enable hydraulic mining to be 
resumed in their drainage areas. In addition, the 
Secretary of the Army is authorized to enter into 
contracts to supply storage for water and use of outlet 
facilities from debris-storage reservoirs for domestic 
and irrigation purposes and power development upon 
such conditions of delivery, use, and payment as he 
may approve. Applications of prospective miners were 
fully investigated by the former California Debris 
Commission and permits to operate were issued to 
those who provide satisfactory debris-restraining basins 
by construction of suitable dams where necessary or 
35-1A 
Navigation Page 
__

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
agree to make payment for storage in 
Government-constructed debris-restraining reservoirs 
constructed under act of June 19, 1934, as set forth 
below. For location and description of Government-
constructed, debris-restraining reservoirs for 
general hydraulic mining, see Improvement 2. 
Local cooperation. Mineowners bore all expenses 
incurred in complying with orders of the former 
Commission for regulation of mining and restraint of 
debris. 
Operations and results during fiscal year. 
Minor administrative duties were accomplished. 
Administrative work overlaps that of improvements 2, 
3, and 4, hereunder, and that of Sacramento District. 
Historical summary. The former Commission 
received 1,292 applications for hydraulic mining 
licenses; 1 mine is licensed, but does not use storage 
behind Government debris dams. Work remaining is, in 
general, continuation of above or similar operations. 
2. SACRAMENTO RIVER AND 
TRIBUTARIES, CA (DEBRIS 
CONTROL) 
Location. Project reservoirs are to be constructed 
in watersheds of Yuba, Bear, and American Rivers, CA 
(See Geological Survey sheets for basin areas, seven in 
number.) 
Existing project. For description of completed 
North Fork and Harry L. Englebright projects and 
authorizing act, see Annual Report for 1975. Initial 
recreation facilities were provided in FY 1959. 
Recreation areas at Harry L.Englebright Dam are 
maintained by the Corps. Recreation areas at North 
Fork Dam are no longer maintained and operated by 
Auburn Recreation Park and Parkway District, but have 
been turned over to the Bureau of Reclamation (known 
as the Water and Power Resources Service between 
November 6, 1979, and May 18, 1981) on a permit 
basis. Total Federal cost of new work for construction 
of these reservoirs was $4,646,872, including $40,000 
and $25,000, respectively, for basic recreation facilities 
at Englebright Dam and North Fork Dam. Reservoir 
project sites on Middle Fork of American River and on 
Bear River have been deauthorized and excluded from 
foregoing cost. The 90-day Congressional project 
review period, required by Sec. 12, Public Law 93-25 1, 
as amended, ended August 5, 1977, and resulted in 
deauthorization of that portion of the project. Estimated 
cost of that portion is $1,820,000 (1935). 
Local cooperation. Fully complied with. 
Improvements made to facilities at North Fork Dam by 
Auburn Recreation Park and Parkway District under a 
lease agreement with the Secretary of the Army and 
Auburn Boat Clubs (concessionaire) at an estimated 
cost of $46,000 since September 1953. On March 1, 
1979, lands and waters at North Fork Dam were turned 
over to the Bureau of Reclamation on a 5-year 
renewable basis. Permit No. DACW05-4-79-527 was 
renewed for 5 years on March 1, 1984, March 1, 1989, 
and on March 1, 1994. Bureau will operate and 
maintain such use until Auburn project is completed, 
then a fee transfer will be made. Actual operation and 
maintenance of the recreation resource is being done by 
State of California by contract with the Bureau. 
Licenses. Under provisions of Contract No. 
W-1105-eng-2998 with Pacific Gas and Electric Co., 
(PG&E) (a 1941 contract which expired July 31, 1991) 
payment was made to Federal Government of $18,000 
per year for first 30 years and $48,000 per year for the 
next 20 years in return for use of head at Englebright 
Dam and generation of hydroelectric power. Total 
payment through September 30, 1999, amounts to 
$1,767,109; these funds are now paid to the Secretary 
of the Army and deposited for return to the Treasury. 
PG&E has obtained a new license, Federal Energy 
Regulatory Commission License No. 1403-004, issued 
February 11, 1993, for continued operation of Narrows 
No. 1 Hydroelectric Project and has entered into a new 
storage agreement and an operation agreement with the 
Federal Government (Corps). Total payment of 
$66,070 was received in FY 1994, but only $48,000 
was reallocated to the District. In FY 1995, $18,070 
was reallocated to the District. Payments under new 
agreement are effective as of Fiscal Year 1993 and will 
be 8.2 percent of previous fiscal year's total costs for 
operation and maintenance. License No. 2246, 
effective April 9, 1970 (date New Narrows powerplant 
was put in operation) was issued by Federal Power 
Commission (known as the Federal Energy Regulatory 
Commission since January 9, 1978) to Yuba County 
Water Agency for hydroelectric power developmentof 
Yuba River by the company upstream from 
Englebright Dam. Under provisions of Contract No. 
35-2A

SACRAMENTO, CA DISTRICT 
DA-04-167-CIV-ENG-66-95 with Yuba County Water 
Agency, payment is to be made to the Federal 
Government of $100,000 per year for no more than 50 
years. First payment (partial) of $73,151 was made 
April 1, 1971; total payment through September 30, 
1997, amounts to $2,509,066. These funds are paid to 
Sacramento District and deposited for return to the 
Treasury. 
Operations and results during fiscal year. New 
work: Maintenance: Maintenance and operation 
activities continued at Harry L. Englebright Dam at a 
cost of $3,538,005, including recreation facilities. Dam 
safety assurance studies at Englebright Dam have been 
completed. 
Historical summary. Construction of dams was 
initiated in 1937; North Fork project was completed 
and in use at end of FY 1939, and Harry L. Englebright 
project was completed in January 1941. The two 
debris-control structures are in good condition. Public 
use of these reservoir recreation areas greatly overtaxes 
present capacities. Dam safety assurance studies were 
initiated at Englebright Dam in FY 1981 and were 
completed in FY 1987. 
3. TREATMENT OF YUBA RIVER 
DEBRIS SITUATION-RESTRAINING 
BARRIERS, CA 
Location. Works are on Yuba River between 
Marysville and where the river emerges from the 
foothills, near Hammonton, some 10 miles easterly 
from Marysville, or about 9 miles below the Narrows. 
(See Geological Survey Topographic map of 
Sacramento Valley, CA) 
Existing project. For description of completed 
project and authorizing act, see Annual Report for 
1975. Total cost of new work was $723,259, of which 
$361,482 was U.S. funds and $361,777 required 
contributed funds by State of California. (For details of 
project in its original form, see Annual Report, 1917, p. 
1810.) In February 1963, center section of dam failed 
and major rehabilitation of structure was completed in 
December 1964. Total cost for required rehabilitation 
was $1,660,000, of which $830,000 was Federal cost 
and $830,000 required contribution by State of 
California toward rehabilitation cost. During the 
December 24, 1964, floodflows on the Yuba River, the 
rehabilitated Daguerre Point Dam sustained 
considerable damage. (See 1965 Annual Report, p. 
1647 "Operations and results during fiscal year.") The 
reconstructed portion of the dam completed earlier in 
December 1964 was undamaged by the flood. 
Permanent repair of Daguerre Point Dam abutment and 
fish facilities was completed in October 1965 at a cost 
of $447,808 with Federal and required State 
contributed funds on a matching basis. 
Local cooperation. Fully complied with for new 
work and major rehabilitation work. Total first cost to 
local interests for new work was $361,777 (required 
contribution by State of California). In addition, 
training walls were built on each bank below Daguerre 
Point for 11,250 feet and just above Daguerre Point, on 
the south bank, for 11,000 linear feet by two 
gold-dredging companies in connection with their 
dredging operations. To build these training walls 
would have cost the United States $450,000 (1902 
estimate). Flood channels were also built by 
gold-dredging companies within confines of project 
works. Cost to the United States of equally effective 
works to restrain debris movement would have been 
more than $776,000 (1926 estimate). Total costs to 
local interests for initial and permanent major 
rehabilitation works were $830,000 and $223,904, 
respectively, (required contribution by State of 
California). State of California must contribute 
annually an amount equal to the Federal allotment for 
maintenance. 
Operations and results during fiscal year. 
Maintenance: Operations consisted of condition and 
operation studies by hired labor on Yuba River. 
Historical summary. Construction of project 
works was initiated in November 1902. Construction of 
Daguerre Point Dam was completed in May 1906; 
diversion of river over dam was completed in 1910; 
training walls and dikes were completed in 1935. 
About 149 million cubic yards of debris are held in 
lower 7 miles of Yuba River between Marysville and 
downstream end of training walls. About 20 million 
cubic feet, are confined in river channel by Daguerre 
Point Dam. Additional millions of yards of loose 
material are in mine tailing fields adjacent to project 
training walls in upper 7-mile reach of project. Initial 
rehabilitation of Daguerre Point Dam begun in July 
1963 was completed in December 1964. Contract for 
permanent rehabilitation of structure was initiated in 
July and completed in October 1965. 
35-3A

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Flood Control 
4. SACRAMENTO RIVER, CA 
Location. Works covered by this improvement 
are on Sacramento River and tributaries in north-central 
California from Collinsville to Ordbend, a distance of 
184 miles. 
Previous project. For details see page 1815 of 
Annual Report for 1917, page 1995 of Annual Report 
for 1938, and page 2262 of Annual Report for 1907. 
Existing project. Sacramento River flood control 
project is a comprehensive plan of flood control for 
Sacramento River and lower reaches of its principal 
tributaries. Improvement extends along Sacramento 
River from Ordbend in Glenn County, CA, 184 miles 
downstream to its mouth at Collinsville at upper end of 
Suisun Bay, and comprises a system of levees, 
overflow weirs, drainage pumping plants, and flood 
bypass channels or floodways designed to carry surplus 
floodwaters without inundation of valley lands. About 
980 miles of levee construction, with an average height 
of 15 feet and 98 miles of bank protection are involved 
in project. For further details, see Annual Report for 
1962, page 2115. (See table 35-BB for authorizing 
legislation.) 
Estimated (October 1987) cost for original project 
(exclusive of supplemental levee improvements), 
including new work and maintenance, is $163,925,000 
of which $68,925,000 is Federal cost and $95 million 
non-Federal ($90,050,562 for lands and damages and 
relocations and $4,949,438 required contributed funds 
for levee construction, bank protection works, and 
levee setbacks). Of this amount, $4,939,752 was for 
new work and $9,686 for maintenance. Estimated 
October 1996 total project cost is $171,950,000, of 
which $76,322,000 is Federal and $95,628,000 is 
non-Federal. Total estimate now includes remedial 
levee work for Yolo Bypass and Cache Slough (Unit 
109) and land acquisition for Little Holland Tract as 
hydraulic and environmental mitigation in potential 
projects impacting stages of the Sacramento River, but 
excludes Sacramento Urban Area; Marysville/Yuba 
City Area; Mid-Valley Area; Lower Sacramento Area; 
and Upper Sacramento Area Levee Reconstruction 
Projects. Colusa Basin Drain and Knights Landing 
(West Levee) are not incrementally economically 
feasible, but these sites have been transferred to Upper 
Sacramento Area. Knights Landing (East Levee) has 
been included with Mid-Valley Area. In addition to 
project requirements, local interests constructed several 
pumping plants for drainage of agricultural and urban 
land protected by project levees. Some channel clearing 
work was accomplished by State of California and 
other local interests to supplement project levee 
construction. Dredging below Cache Slough and 
reconstruction of Cache Creek settling basin weir are 
considered deferred and excluded from foregoing cost 
estimate. Estimated cost (July 1962) of these project 
units is $2,560,000 and $520,000, respectively, a total 
of $3,080,000 plus U.S. costs, for construction. 
Operation and maintenance of completed project will 
be responsibility of local interests; as units of project 
are completed, they are transferred to agencies of State 
of California for operation and maintenance. Existing 
project was adopted by 1917 Flood Control Act (H. 
Doc 81, 62d Cong., I st sess., as modified by Rivers and 
Harbors Committee Doc. 5, 63d Cong., 1st sess.), 1928 
Flood Control Act (S. Doc. 23, 69th Cong., Ist sess.), 
River and Harbor Act of 1937 (S. Committee print 75th 
Cong., I st sess.), and 1941 Flood Control Act (H. Doc. 
205, 77th Cong., Ist sess.). 
Phase I - Sacramento River Flood Control System 
Evaluation recommended reconstruction of 32 miles of 
Sacramento area levees. Report was approved and in 
March 1989, Sacramento Urban Area Levee 
Reconstruction project was established under authority 
of Sacramento River Flood Control Project. New 
project is located within boundaries of Sacramento 
River Flood Control System in highly urbanized area 
around city of Sacramento, near confluence of 
Sacramento and American Rivers. It includes Natomas 
area levees from Natomas Cross Canal Bypass through 
Reclamation District 900 and portions of the Yolo 
Bypass east levee in West Sacramento; and, in South 
Sacramento, the east bank of Sacramento River from 
Miller Park to town of Freeport. Estimated (October 
1995) cost for Sacramento Urban project is 
$42,900,000 of which $28,215,000 is Federal and 
$14,685,000 is non-Federal (including a cash 
contribution of $2,135,000). 
Sacramento River Flood Control Project 
(Glenn-Colusa Irrigation District) (G.C.I.D.) is part of 
35-4A

SACRAMENTO, CA DISTRICT 
the fishery/irrigation enhancement project being 
developed by G.C.I.D. Project is located between 
River Mile 202 and 206 on Sacramento River near the 
Glenn-Tehama county line, about 100 miles north of 
Sacramento, California. The Corps riffle restoration 
project includes multiple sheet pile revetments coupled 
with a stone grade to replicate natural riffle and bank 
protection to restore river hydraulic gradient to 
pre-1970 conditions. This will stabilize river 
hydraulics. Estimated (October 1995) project cost is 
$26,000,000, of which $20,000,000 is Federal and 
$6,000,000 is non-Federal. Project was established 
under authority of the 1917 Sacramento River Flood 
Control Project (see Energy and Water Development 
Appropriations Act of 1990 and Water Resources 
Development Act of 1996 and 1999). 
Phase II - Marysville/Yuba City Area Levee 
Reconstruction. Project is located within boundaries of 
the Sacramento River Flood Control System in Butte, 
Sutter and Yuba counties in north-central California. 
Area includes Feather and Yuba Rivers and their 
tributaries, Sutter Bypass, cities of Marysville and 
Yuba City and communities of Linda and Olivehurst. 
An evaluation of about 134 miles of Sacramento River 
Flood Control Project levees in Marysville/Yuba City 
area identified about 22 miles of levees as being 
structurally unstable. Project consists of reconstructing 
those levees by installing about 9 miles of slurry cut-off 
wall, 11 miles of toe drain, and 7 miles of levee 
freeboard restoration to rectify structural stability; also 
consists of raising about 10 miles of levees to restore 
design freeboard and developing about 76 acres for fish 
and wildlife mitigation. Estimated (October 1998) 
project cost is $42,970,000, of which $32,260,000 is 
Federal and $10,710,000 is non-Federal (including a 
cash contribution of $5,190,000). Project was 
established under authority of Sacramento River Flood 
Control Project. 
Phase III - Mid-Valley Area Levee Reconstruction. 
Project is located within the boundaries of the 
Sacramento River Flood Control System in Placer, 
Solano, Sutter, Yolo and Yuba Counties in 
north-central California. Area includes the Sacramento 
and Feather Rivers, Knights Landing Ridge Cut, Sutter 
and Yolo Bypasses and portions of the Bear River 
including Yankee Slough, Dry, Cache, Putah Creeks 
and the Natomas Cross Canal. Communities in the area 
include Knights Landing, Robbins, Davis and 
Woodland. An evaluation of about 240 miles of the 
Sacramento River Flood Control Project levees in the 
Mid-Valley area identified about 18 miles of levees that 
are structurally deficient. Project consists of 
reconstructing about 18 miles of levees by installing 
about 6.9 miles of landside berms with toe drains, 
relocation of ditches, about 11.2 miles of embankment 
modifications, about .2 miles of slurry cut-off walls, the 
restoration of levee height, and developing land for 
about 52 acres of fish and wildlife mitigation. 
Estimated (October 1999) project cost is $19,600,000, 
of which $14,700,000 is Federal and $4,900,000 is 
non-Federal (including a cash contribution of 
$2,400,000). Project was established under authority 
of the Sacramento River Flood Control Project. 
Phase IV - Lower Sacramento Area Levee 
Reconstruction. Project is located within the 
boundaries of the Sacramento River Flood Control 
System in Sacramento County in north-central 
California. Area includes the lower Sacramento River 
and its distributary sloughs and the city of Clarksburg. 
An evaluation of about 295 miles of the Sacramento 
River Flood Control Project levees in the Lower 
Sacramento area identified about 47 miles of levees 
that are structurally deficient. Project consists of 
reconstructing about 2.6 miles of levees by installing 
landside berms with toe drains, backfilling of existing 
drainage collector systems, slurry cut-off walls, the 
restoration of levee height, and developing land for 
about 2 acres of fish and wildlife mitigation. Estimated 
(October 1998) project cost is $6,800,000, of which 
$5,100,000 is Federal and $1,700,000 is non-Federal 
(including a cash contribution of $1,220,000). Project 
was established under authority of Sacramento River 
Flood Control Project. 
Phase V - Upper Sacramento Area Levee 
Reconstruction. Project is located within the 
boundaries of the Sacramento River Flood System in 
Colusa County in north-central California. Area 
includes the upper Sacramento River and its tributaries 
and the city of Colusa. An evaluation of about 315 
miles of the Sacramento River Flood Control Project 
levees in the Upper Sacramento area identified about 
12 miles of levees that are structurally deficient. 
Project consists of reconstruction of about 3.7 miles of 
levees by installing landside berms with toe drains, 
slurry cut-off walls, the restoration of levee height, and 
developing land for about 1.3 acres of fish and wildlife 
mitigation. Estimated October 1999 project cost is 
$7,730,000, of which $5,810,000 is Federal and 
35-5A

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
$1,920,000 is non-Federal (including a cash 
contribution of $856,000). Project was established 
under authority of Sacramento River Flood Control 
Project. 
Local cooperation. Local interests have fully 
complied with requirements for all work completed and 
indicated they will be able to fulfill requirements for 
remaining work. 
Operations and results during fiscal year. New 
work: (a) Sacramento Urban Area Levee Recontruction: 
Construction is complete, however, final 
payment and contract close-out activities remain. (b) 
Sacramento River Flood Control Project (Glenn Colusa 
Irrigation District (G.C.I.D.)): Construction was 
completed on riffle restoration on Sacramento River 
including building of multiple sheet piles coupled with 
stone to replicate natural riffle and bank protection to 
restore river hydraulic gradient to approximate 
pre-1970 conditions. Concurrently, GCID, The Bureau 
of Reclamation and the State of California are 
designing a project to build new screens near GCID 
pumping facilities. Subsequent to original authority in 
FY90 EWDAA, sponser selected a flat screen design 
and determined that a larger gradient facility was 
required for proper operation of the fish screens. As a 
result, an LRR and ROD for the larger facility was 
approved in April 1998. Plans and specs were initiated 
in January 1999. The Project Cooperation Agreement 
was executed in December 1999. The Gradient Facility 
construction contract was awarded in February 2000. 
Construction management and engineering and design 
effort continue. Fiscal Year costs total $9,760,805. (c) 
Marysville/Yuba City Area Levee Reconstruction: 
Construction is essentially complete Engineering and 
Design continue for addition work at Site 7 extension. 
(d) Mid-Valley Area Levee Reconstruction: Completed 
Contract 1D awarded in December 1999 and continued 
contract IB awarded in July 1997. Engineering 
continued for the second Project Cooperation 
Agreement for Areas 2, 3 and 4. (e) Lower Sacramento 
Area Levee Reconstruction: Engineering continued. 
(f) Upper Sacramento Area Levee Reconstruction: 
Engineering continued. In accordance with Section 
215 agreement signed September 22, 1997, local 
sponsor constructed 1,000 lineal feet of 
seepage/stability berm along the Sacramento River 
(Site E). Completed contract 3a awarded September 
1997, continued contract 2b awarded August 1997, 
continued contract 3 awarded July 1988, and continued 
maintenance period for mitigation contract awarded 
August 1995. 
Historical summary. Construction of existing 
project began in FY 1918 and is about 99 percent 
complete. Channel improvement to date has produced a 
channel with a capacity of 579,000 cubic feet per 
second in Sacramento River below Cache Slough. In 
addition, discharges up to 21,000 cubic feet per second 
can be diverted from Sacramento River through 
Georgiana Slough. Completed major project items 
include about 977 miles of levees; five weirs with a 
combined discharge capacity of 602,000 cubic feet per 
second; two cutoff channels; two sets of outfall gates; 
channel improvement and clearing in Sacramento 
River, Butte Creek, Putah Creek, and Sutter and 
Tisdale Bypasses; construction of two main bypasses or 
floodways and secondary bypasses at Tisdale and 
Sacramento weirs and at Wadsworth Canal; 
construction of Knights Landing ridge cut and of Cache 
Creek settling basin; installation of gaging stations; and 
enlargement of Sacramento River below Cache Slough. 
Cutoffs at Collins Eddy and between Wild Irishman 
and Kinneys Bends were made in 1918 and 1919, 
respectively. Sacramento weir was completed in 1917, 
Fremont weir in 1924, Tisdale and Moulton weirs in 
1932, and Colusa weir in 1933. Outfall gates at Knights 
Landing were constructed in 1930 and at mouth of 
Butte Slough in 1936. Pumping plants on Sutter Bypass 
were completed in 1944. Work items with reference to 
clearing, snagging, rectification of channels, and bank 
protection on Sacramento River and tributaries in 
Tehama County and from Red Bluff southerly, 
provided for by 1941 Flood Control Act were 
accomplished in fiscal years 1947, 1948, 1949, and 
1951. Yolo Bypass and Cache Slouth (Unit 109) was 
completed in 1990. Work remaining comprises 
completion of levee stage construction Mid-Valley 
Area; Lower Sacramento Area; and Upper Sacramento 
Area Levees. (See Table 35-CC for total cost of 
existing project to September 30, 1996.) 
35-6A

SACRAMENTO, CA DISTRICT 
TABLE 35-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 Sept. 30, 2000 
1. Regulation of 
Hydraulic Mining 
and Preparation 
of Plans 
2. Sacramento River 
and Tributaries. 
CA (Debris 
Control) 
(Contributed 
Funds Other) 
3. Treatment of 
Yuba River 
Debris Situation 
Restraining 
Barries, CA 
(Federal Funds) 
(Required 
Contributed 
Funds) 
(Contributed 
Funds, Other) 
Maint. 
Approp. 
Cost 
New York 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New York 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Contrib 
Cost 
Maint. 
Contrib. 
Cost 
Rehab. 
Approp. 
Cost 
New York 
Contrib. 
Cost 
821,325 
821,325 
5,093,999 1 2 
5,093,999 1 2 
1,287,915 
1,277,023 
1,216,222 984,716 1,129,739 
926,127 1,208,560 1,170,927 
19,333,417 3 
19,297,502 4 
323,420 
315,777 
361,482 
361,482 
307,000 
179,182 
530,000 -141,000 
322,815 193,428 
93,000 
89,034 
2,641,531 7 
2,636,894 7 
S1, 053,904 
1,053,904 
361,777 
361,777 
56,000 
70,008 
92,000 
18,047 
1,989,338 
1,883,230 
1,053,904 
1,053,904 
36,000 8 
34,000 
4 . Sacramento 
River, CA 
including 
Sacramento River 
Flood Control 
New York 
Approp. 
Cost 
Maint. 
Approp. 
61,310 
245,765 
- 1,500,000 -1,500,000 
55,419 48,158 -128,138 
35-7A 
80,739,471 9 
80,739,081 9 
1,979, 104

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 35-AA (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 Sep. 30, 1999 
Project (Federal 
Funds) 
(Contributed 
Funds) 
Sacramento 
Urban Area Levee 
Reconstruction 
(Federal Funds) 
(Required 
Contributed 
Funds) 
(Contributed 
Funds, Other) 
Sacramento 
River Flood 
Control 
(G.C.I.D), 
CA (Federal 
Funds) 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp 
Cost 
72,000 
803,419 
11,066 
11,352 
16,725 4,516 3,852 
-38,548 437,408 
13 
820,000 763,000 750,000 8,046,000 
241,207 660,133 692,144 817,877 
3,900,100 
1,855,071 
1,979,104 
10,724,085 10 
10,724,085 to 
9,686 11 
9,686 11 
28,075,000 
28,071,933 
2,157,613 
2,070,517 
5,867,1751213 
5,867,175 12 
5,226,000 14 
5,091,550 14 
3,900,100 15 
1,855,071 15 
Sacramento New Work 
River Flood Approp. 
Control Cost 
(Marysville/Yuba 
City Area levees). 
CA (Federal Funds) 
(Required Contributed 
Funds) New Work 
Contrib. 
Cost 
Sacramento New Work 
River Flood Approp. 
Control Cost 
(Mid-Valley Area New Work 
Levee Reconstruction) Approp. 
(Federal Funds) Cost 
7,174,000 18,994,794 -2,537,000 
4,930,067 15,711,402 3,421,799 
2,086,210 4,393,215 - 
267,616 4,550,494 1,856,474 
-5,000 
87,826 
133,729 
1,938,690 2,859,000 221,000 2,405,000 
1,960,224 2,472,155 726,907 2,136,419 
335,000 327,500 748,000 424,000 
357,952 502,623 243,794 495,626 
35-8A 
28,777,794 
28,695,272 
8,714,425 
7,311,819 
8,244,000 
7,922,486 
2,184,500 
1,599,995 
I

SACRAMENTO, CALIFORNIA, DISTRICT 
TABLE 35-AA (Cont=d) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 95 FY 96 FY 97 FY 98 FY99 Sep. 30, 
1999 
Sacramento New Work 
River Flood Approp. 273,000 378,000 380,000 587,000 2,222,365 
Control Cost 352,102 389,522 370,195 414,210 2,011,305 
(Lower Sacramento 
Area Levee 
Reconstruction) 
(Federal Funds) 
Sacramento New Work 
River Flood Approp. 354,000 572,226 222,000 510,000 1,658,206 
Control Cost 319,791 490,759 281,808 330,203 1,422,561 
(Upper Sacramento 
Area Levee 
Reconstruction) 
(Federal Funds) 
1. Exclusive of $644,503 appropriation and cost 
on inactive portion of project. 
2. Includes $477,127 for recreational facilities at 
North Fork ($32,473) and Harry L. Englebright 
($414,654), Code 710 appropriations and costs. 
3. Includes $17,348,051 from regular funds and 
$1,989,336 from Hydraulic Mining in California funds. 
4. Includes $17,339,858 from regular costs and 
$1,957,614 from Hydraulic Mining in California costs. 
5. Includes $12,420 contributed funds, other, from 
State of California Department of Navigation and 
Ocean Development for acquisition of a boarding float; 
and $311,000 funds from State of California 
Department of Boating and Waterways for refurbishing 
restrooms and launching facilities at Englebright Dam. 
6. Includes $12,420 costs for acquisition of 
boarding float and $280,317 costs for refurbishing 
restrooms and launching facilities at Englebright Dam. 
7. Includes deferred maintenance funds in amount 
of$207,500. 
8. Miscellaneous engineering and construction 
accomplished at expense of local interests in 
connection with rehabilitation of Daguerre Point Dam 
necessitated by December 1964 floodflows. Includes 
$2,000 from Yuba County Water Agency in May 1994. 
9. Includes appropriation and cost of $680,000 for 
new work for previous project and $1,486,469 public 
works funds for new work for existing project. 
10. Includes $680,000 required contribution for 
previous project;$4,939,752 required contributed funds 
for existing project; and $310,801 voluntary 
contribution for bank protection for existing project. 
I 1. Includes $9,686 required contributed funds for 
existing project. 
12. Includes contributed funds, other, from the 
State of California for relocation of utilities, irrigation 
ditch, access ramps, and miscellaneous small structures 
in the Natomas, Greenhaven Pocket and West 
Sacramento areas. (Sacramento Urban Area). 
13. Includes $1,328,842 contributed funds, other 
cost for relocations of utilities, irrigation ditch, access 
ramps, and miscellananeous small structures in the 
Natomas, Greenhaven Pocket, and West Sacramento 
areas.
14. G.C.I.D. construction funds received in FY 
1991, but no costs were incurred. Includes $493,000 
total funds and costs under General Investigations for 
Preconstruction Engineering and Design. 
15. Not reflected in actual annual accounting 
records for Marysville/Yuba City are $1,710,000 costs 
35-9A

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 35-BB AUTHORIZATION LEGISLATION 
See Date of 
Section Authorization 
in Text Act Project and Work Authorized Documents 
for FY 91 and FY 92 incurred under Sacramento River 
Flood Control Project for design effort. These costs are 
considered part of Marysville/Yuba City cost-shared 
project. 
35-IOA

1. 
Mar. 1, 1983 
Feb 27, 1907 
June 19, 1934 
June 25, 1938 
REGULATION OF HYDRAULIC 
MINING 
AND PREPARATION OF PLANS 
Created California Debris Commission and authorized: 
(a) Hydraulic mining under its regulation in drainage 
areas of Sacramento and San Joaquin Rivers, if possible 
without injury to navigability of these river systems or to 
lands adjacent thereto; and (b) preparation of plans by 
Commission for improvement of navigability of these 
river systems, and flood and debris-control therein. 
Authorized California Debris Commission to permit 
hydraulic mining without construction of impounding 
works, provided there is no injury to navigability of 
above river systems or lands adjacent thereto. 
Amended act of Mar. 1, 1893, which provides for 
construction of debris dams or other re- straining works 
by California Debris Commission and 
collection of a 3-percent tax on gross proceeds of each 
mine using such facilities, so as to eliminate this tax 
and substitute an annual tax per cubic yard mined, 
obtained by dividing total capital cost of each dam, 
reservoir, and rights-of-way, by total capacity of 
reservoir for restraint of debris; and authorized revocation 
of Commission orders permitting such mining, 
for failure to pay this annual tax within 30 days after 
its due date; and also authorized receipt of money 
advances, from mineowners to aid such construction, 
to be refunded later from annual payments of yardage 
taxes on material mined. 
Added at end of sec. 23 of above act, a provision that 
the Secretary of the Army is authorized to enter into 
contracts to supply storage for water and use of outlet 
facilities from debris-storage reservoirs for domestic 
and irrigation purposes and power development, upon 
such conditions of delivery, use, and payment as he 
may approve, these payments are to be deposited to 
credit of such reservoir project, reducing its capital 
cost to be repaid by tax on mining operations. 
Abolished the California Debris Commission and 
transferred all authorities, powers, functions, and 
duties to the Secretary of the Army. Authorized all 
acquired land and other interests presently under 
jurisdiction of the Commission to be retained and 
administered under direction of the Secretary. 
35-11A 
Ex. Doc. 267, 51st 
Cong., 2d sess., Ex. 
Doc. 98, 4 7tb Cong., 
I"' sess. i 
(Amendment of sec. 13, 
Act of Mar. 1, 1893.) 1 
Nov. 17, 1986 Sec. 1001, 1986 WRDA

Dec. 22, 1944 
And May 17, 
July 3, 1958 
July 14, 1960 
May 24, 1994 
SACRAMENTO RIVER, CA 
Additional levee construction and reconstruction, 
Bank protection and incidental channel improvements, 
Sacramento River from Chico Landing to Red Bluff, 
and local interests flood plain zoning above Chico 
Landing. 2 
Bank protection works at critical locations, 
Sacramento River. 2 
Acquiring and permanently restoring Little Holland 
Tract to tidal lands with seasonal and emergent 
marshlands would not only have substantial 
environmental benefits, but measurable flood control 
benefits as well. 
H. Doc. 649, 781 
Cong., 2d sess., and 
367, 81"s Cong., 
I t sess. 
H. Doc. 272, 84 th 
Cong., 2d sess 
S. Doc. 103, 86'h 
Cong., 2d sess. 
H. Doc. 533, 108 th 
Cong., 2d sess, 
1. For latest published map, see Annual Report for 
1913, p. 3170, and Rivers and Harbors Committee 
Document 50, 7 4 th Cong., 1' sess. 
2. This supplemental work is reported in detail 
under Sacramento District, Improvement No. 23. 
35-12A 
4. 
1950 
_ __ __

SACRAMENTO, CA DISTRICT 
TABLE 35-BB (Cont=d) AUTHORIZATION LEGISLATION 
See Date of 
Section Authorization 
in Text Act Project and Work Authorized Documents 
Regular $74,143,882 $1,979,104 $76,122,986 
Public Works 1,486,469 - 1,486,469 
Total U.S. 75,630,351 1,979,104 77,609,455 
Contributed Project Work 4,939,752 9,686 4,949,438 
Contributed, Other 5,104,333 - 5,104,333 
Total All Funds $85,674,436 1,988,790 $87,663,226 
1. Includes $429,671 representing book value of 
plan purchased with previous project funds and 
transferred to existing project without 
reimbursement. 
2. Excludes financial information for Sacramento 
Urban Area Levee Reconstruction, Glenn-Colusa 
Irrigation District (G.C.I.D.), Marysville/Yuba city 
Area Levee Reconstruction and Mid-Valley Area 
Levee Reconstruction, Lower Sacramento Area 
Levee Reconstruction and the Upper Sacramento 
Area Levee Reconstruction Projects, all authorized 
under the Sacramento River Flood Control Project 
(See Table 35-AA). 
35-13A

ALBUQUERQUE, NM, DISTRICT* 
The district comprises the watershed of the 
Canadian River and its tributaries in New 
Mexico; the watershed of Arkansas River and its 
tributaries in Colorado; the watershed of Rio 
Grande and its tributaries including the Pecos 
River and its tributaries upstream of Amistad 
Lake; and the San Juan River Basin in New 
Mexico; and the watersheds of the Gila, San 
Francisco and Mimbres Rivers and its tributaries 
in New Mexico. 
Note: The district watershed boundaries were 
revised in June 1986 to include the portion of 
New Mexico west of the Continental Divide. 
IMPROVEMENTS 
Flood Control............... ...........Pa.g.e...... 
1. Acequias Irrigation System.............36-1 
2. Alamogordo, NM .........................36-2 
3. Alamosa, CO..... . ........... 36- 2 
4. Conchas Lake, NM...................36-2 
5. El Paso, TX ............................... 36-3 
6. John Martin Reservoir, CO...........36-3 
7. Las Cruces, NM ........................... 36-4 
8. Rio Grande Basin, NM..................36-4 
8A. Abiquiu Dam, NM .................... 36-5 
8B. Cochiti Lake, NM ....................... 36-5 
8C. Galisteo Dam, NM ........................36-6 
8D. Jemez Canyon Dam, NM.................36-6 
8E. Middle Rio Grande Flood Protection, 
Bernalillo to Belen, NM............... 36-7 
8F. Rio Grande Floodway, NM..........36-7 
8G. San Acacia to Bosque del Apache 
Unit, NM ...............................3 6-8 
Flood Control 
1. ACEQUIAS IRRIGATION SYTEM, NM 
Location. There are about one thousand 
acequias throughout the state of New Mexico, 
most of which are located in north-central New 
Mexico. 
Proposed project. Authorized by the Water 
Resources Development Act of 1986, Section 
1113, the project consists of about one thousand 
Acequias throughout the state of New Mexico. 
These community ditch systems provide 
rrigation water to about 160,000 acres on an 
estimated 12,000 farms. Acequias have been in 
existence since the early Spanish Colonization 
Period of the 17 't and 18'"centuries and represent 
one of the oldest forms of cooperative 
institutions in the United States. They are an 
Flood Control (Continuation) 
9. Santa Rosa Dam and Lake, NM......36-8 
10. Trinidad Lake, CO.................... 36-9 
11. Two Rivers Dam, NM.................36-10 
12. Inspection of completed flood 
control projects .................... 3..6-10 
13. Scheduling of flood control 
reservoir operations .............. 36-10 
14. Other authorized flood control 
projects ............................ 36-11 
15. Flood control work under special 
authorizations .......... ....3.6..-.1.1 
General Investigations 
16. Surveys.................. ......... 36-12 
17. Collection and study of basic data...36-12 
18. Environmental Data Studies.......... 36-12 
General Investigations (Continued) 
19. Pre-construction Engineering 
and Design ........................... 36-12 
20. Other Work Under Special Authority...... 
..................................... ...... 3 6-12 
integral part of the culture and heritage of New 
Mexico. Diversion structures, many of which 
are constructed of available materials such as 
rock and brush, are frequently destroyed by 
flows greater than normal resulting from spring 
runoff or sunimer thunderstorms. Disruption of 
the ditches usually occurs during peak irrigation 
season and severely impacts crop production. 
The Water Resources Development Act of 1986 
directs the U.S. Army Corps of Engineers to 
undertake measures, without regard to economic 
analysis, as are necessary to protect and restore 
the river diversion structures and associated 
canals. 
Local Cooperation. The local sponsor, the 
State of New Mexico, has a law whereby the 
State of New Mexico provides 17.5% of the 
project costs, and low interest loans to the local 
Acequias for the remaining 7.5%. The State of 
*All costs and financial statements for projects are listed at thr end of this chapter. All other tables are referenced in text 
and also appear at the end of this chapter. 
36-1

Report of the Secretary of the Army on Civil Works Activities for FY 2000 
New Mexico has appropriated, and will 
appropriate on an annual basis, the funds 
necessary to meet the requirements of local 
sponsorship. 
Operation and results during fiscal year. 
Funds to initiate construction were received in 
Fiscal Year 1988. Construction contracts have 
been awarded in every year since FY 1988. 
Condition at end of fiscal year. There are 
several projects in various stages of design and 
construction. In the traditional Acequia 
program, El Pueblo and La Joya Phase III are 
currently being designed with construction 
scheduled for 2001. Tularosa was completed 
this year under the Section 215 program and El 
Vado de Juan Paiz and La Joya Phase II are 
under construction. 
2. ALAMOGORDO, NM 
Location. The project is located in south-central 
New Mexico in Otero County, in and near 
Alamogordo, NM. The city is situated at the 
foot of the Sacramento Mountains near the 
eastern edge of the Tularosa Basin. 
Proposed Project. The authorized project 
consists of a concrete and rip-rap lined diversion 
channel with 100-year flow capacity, which will 
intercept flows from the Sacramento Mountains 
east of the City. For a description of the 
complete improvement and authorizing 
legislation, see page 694 of Annual Report for 
1966. 
Local Cooperation. The Water Resources 
Development Act of 1986 applies. 
Condition at the end of the fiscal year. Plans 
and specifications for Phase I of the South 
Diversion Channel were completed in September 
2000. The construction contract was awarded in 
December and work began in February 2001. 
Scheduled completion is February 2002. Plans 
and specifications for Phase II of the South 
Diversion will begin in October 2000, and are 
scheduled for completion in April 2002. A reevaluation 
of the North Diversion Channel was 
initiated December 2000 at the request of local 
interests concerned with potential induced 
flooding along Red Arroyo. This study will 
evaluate the potential of replacing the North 
Diversion with a detention structure. This study 
is scheduled for completion in July 2001. 
3. ALAMOSA, CO 
Location. The project lies in south-central 
Colorado along the Rio Grande, in the 
community of Alamosa, CO. 
Project. The project consists of a levee system 
which will replace and augment the existing 
spoil bank levees. (See Table 36-B for 
authorizing legislation.) 
Local Cooperation. The Water Resources 
Development Act of 199s applies. 
Operation and results during fiscal year. 
Levee construction activities were completed 
September 1998. Environmental mitigation is 
ongoing. 
Condition at the end of the fiscal year. 
Construction completed. Environmental 
mitigation is scheduled for completion in March 
2001. 
4. CONCHAS LAKE, NM 
Location. The dam is located in San Miguel 
County, NM on the Canadian River, just below 
the confluence of the Canadian and Conchas 
Rivers. (See Geological Survey State map of 
New Mexico, scale 1:500,000, and Geological 
Survey topographic map, Tucumcari quadrangle, 
scale 1:250,000.) 
Existing project. This dam consists of a 
concrete gravity main section 1,250 feet long 
with a maximum height of 200 feet above 
streambed located in the Canadian River Canyon 
together with earth dikes on each side having an 
overall length of about 3.7 miles. The main 
section contains conduits in its base for the 
release of water from the reservoir, and an 
overflow, ungated spillway 300 feet long. The 
earth dikes vary in height up to 100 feet and the 
north dike contains a concrete ogee-type 
emergency spillway 3,000 feet long. The 
reservoir has a gross storage capacity of 513,900 
acre-feet (198,170 for flood control; 254,200 for 
water conservation and irrigation; and 61,530 
dead storage). The dam controls 7,409 squaremiles 
of drainage area. (See page 17-16 of 
Annual Report of 1983 for authorizing 
legislation.) 
Local Cooperation. None required. 
36-2
ALBUQUERQUE, NM, DISTRICT* 
Operations and results during fiscal year. The 
reservoir was operated for storage of floodwater 
and releases for irrigation purposes. Sediment 
damages of $78,000 were prevented during FY 
2000. There were no flood damages prevented 
in FY 2000. Estimated total accumulated flood 
and sediment damages prevented by the project 
through FY 2000 were $4,748,800. Estimated 
irrigation benefits for FY 2000 were $318,300. 
Estimated total accumulated irrigation benefits 
through FY 2000 were $11,513,000. The pool 
elevation at the start of FY 2000 was 4,199.16 
feet. Releases of 121,810 acre-feet were made to 
Arch Hurley Conservancy District and 2,912 
acre-feet to Bell Ranch and 0 acre-feet to the 
Canadian River channel. The pool elevation on 
September 30, 2000 was 4,184.91 feet with 
corresponding storage of 189,376 acre-feet. 
Sediment deposition during the fiscal year was 
696 acre-feet. 
Condition at the of fiscal year. The existing 
project was essentially complete in 1939. 
Irrigation of some lands downstream for the 
project began in November 1945. A cost sharing 
agreement between the Government and the 
State of New Mexico for additional Recreation 
Development at Conchas Lake was completed in 
August 1977. Costs of the facilities are 50 
percent State of New Mexico and 50 percent 
Federal. Construction of recreation facilities was 
initiated in FY 1978 and completed in FY 1983. 
Project structures are in good condition and in 
operation. 
5. EL PASO, TX 
Location. The project is located at El Paso, El 
Paso County, TX, which is on the left bank of 
the Rio Grande in the reach that forms part of the 
international boundary between the United States 
and the Republic of Mexico. (Geological Survey 
map for El Paso, TX; New Mexico quadrangle, 
scale 1:250,000.) 
Existing project. This project consists of a 
Single-purpose flood control system of detention 
dars, diversion dikes, conduits and channels to 
collect, regulate and discharge arroyo runoff into 
the Rio Grande. Runoff from the tributary 
arroyos on the eastern, southern, and western 
slopes of the adjacent Franklin Mountains often 
inundates sections of the city and its outlying 
SUburban developments. The project is divided 
into three independent elements: Northwest 
area, Central area, and Southeast area. The 
project plan satisfies the 1933 U.S. and Mexico 
agreement on limited tributary discharge into the 
Rio Grande in El Paso, Texas. (See Table 36-B 
for authorizing legislation.) 
Local cooperation. Section 2 of the Flood 
Control Act of June 28, 1938 applies for the 
Northwest and Central areas. The Local 
Cooperation Agreement for the Southeast area 
reflects the cost sharing requirements contained 
in the Water Resources Development Act of 
1986. 
Operations and results during fiscal year. 
Flood control dams in operation during FY 1998 
and dates of completion of construction are as 
follows: Northgate and Range Dams (February 
1973); Sunrise and Mountain Park Dams 
(October 1974); and Pershing Dam (March 
1977); Fort Bliss Diversion Channel (November 
1978); Oxidation Pond and Buena Vista 
Diversion and Oxidation Pond Outlet Conduit 
(November 1980); Mulberry and Thorn Drive 
Dams (June 1982); Mesa Dam (September 
1982); McKelligon Canyon Dam (October 
1982); Keystone Dam (September 1983); 
Keystone Outlet Conduit (March 1984); 
Highway Diversion Channel (May 1985); Dam 
Safety Assurance Program to the existing Range 
and Northgate Dams (May 1986); Borderland 
Diversion Channel (September 1986); and 
Phelps Dodge Basin (January 1990), and 
Americas Basin (March 1993). During FY 1996, 
flood flows and flood control storage were 
minimal, however, damages which would have 
resulted from these flows were prevented. 
Condition at the end of fiscal year. At the end 
of 1999, all construction work in Central and 
Northwest areas were complete. 
Construction was completed in January 1990 on 
the Phelps Dodge Channel, in March 1993 on 
Americas Basin, and in October 1998 on Bluff 
Channel. Construction is ongoing for the 
Lomaland System. 
6. JOHN MARTIN RESERVOIR, CO 
Location. The project is located on the 
Arkansas River , minB ent County, 1,159 miles 
upstream from its mouth, 300 miles downstream 
from its source, about 18 miles upstream from 
the city of Lamar, CO. (See Geological Survey 
36-3

Report of the Secretary of the Army on Civil Works Activities for FY 2000 
maps for Lamar and Las Animas, CO 
quadrangles, scale 1:125,000.) 
Existing Project. The project consists of a 
concrete and earthfill structure about 2.6 miles 
long with a maximum height of 106 feet above 
streambed and an overflow, gated spillway 1,174 
feet long. Total capacity of the reservoir at the 
top of flood control is 605,115 acre-feet 
(259,417 for flood control and 345,698 for 
conservation and recreation storage). This 
reservoir controls a contributing drainage area of 
18,130 square miles and is operated as a unit of 
the coordinated reservoir system for flood 
control in the Arkansas River Basin. Public Law 
89-298 modified the act of June 22, 1936 (49 
Stat. 1570) to authorize 10,000 acre-feet of 
reservoir flood control storage space for fish and 
wildlife and recreation purposes. For details of 
the completed improvement and authorizing 
legislation, see page 17-16 of Annual Report for 
FY 1973. 
Local cooperation. Section 3 of the Flood 
Control Act of June 22, 1936, applies. 
Operations and results during fiscal year. 
Operation of the dam and reservoir continued. 
Regulation of conservation storage continued 
under rules and regulations of the Arkansas 
River Compact. Sediment damages of $132,700 
were prevented during FY 2000. Estimated total 
flood and sediment damages prevented by this 
project through FY 2000 were $139,197,800. 
Estimated irrigation benefits for FY 2000 were 
$754,900. Estimated total accumulative 
irrigation benefits were $27,992,600. Maximum 
pool elevation of 3,852.29 feet with 
corresponding storage of 348,865 acre-feet 
occurred on February 22, 2000. Total releases 
for FY 2000 were 326,179 acre-feet. Releases 
attributed to irrigation benefits amounted to 
192,098 acre-feet. Sediment deposition was 
1,185 acre-feet in FY 2000. 
Condition at end of fiscal year. Storage and 
operation of the reservoir for irrigation began in 
March 1943. The project structures are in good 
condition and operational. 
7. LAS CRUCES, NM 
Location. Improvements are located in Las 
Cruces, NM, 40 miles north of El Paso, TX. 
Proposed Project. The project is authorized by 
the Water Resources Development Act of 1996. 
The project consists of enlargement and 
modifications of two existing detention basins 
and an irrigation ditch in order to provide 
increased flood protection to the downtown 
commercial and residential district of Las 
Cruces. The proposed project will be 
constructed at an estimated cost of $8,800,000 
($6,600,000 Federal and $2,200,000 non- 
Federal) 1 October 1996 price levels. 
Local cooperation. Water Resources 
Development Act of 1986 applies. The City of 
Las Cruces is the non-Federal local sponsor. 
Operations and results during the fiscal year. 
The construction contract for the project was 
awarded in January 2000. Construction will be 
complete in September 2001. 
8. RIO GRANDE BASIN, NM 
Location. Improvements are located on the Rio 
Grande and tributaries in New Mexico. More 
definite locations and descriptions of individual 
projects are in following paragraphs and 
individual reports by projects. 
Existing project. The Flood Control Act of 
1948 authorized the flood control phase of the 
comprehensive plan of development of water 
resources of the Rio Grande Basin in New 
Mexico (H.Doc 243, 81"s Congr., 1" Sess.) with 
the exception of Chiflo Dam and Reservoir and 
spillway gate structure at Chamita Darn. 
Although recommended, Chiflo Dam and 
Reservoir was deleted from the authorized plan. 
It was excluded without prejudice from future 
consideration by Congress. It was requested at 
that time, by the State of Colorado and Texas, 
that the project be deferred for restudy regarding 
required storage and methods of operation. By 
the same act, Congress also authorized for the 
construction irrigation phase of the 
comprehensive plan as recommended by the 
Bureau of Reclamation (H. Doc. 653, 81s' Cong., 
2"nd Sess.). The Act also stipulated that work 
should be prosecuted in accordance with a joint 
agreement approved by the Secretary of the 
Army and Acting Secretary of the Interior on 
November 21, 1957. In addition, under that 
agreement the Bureau of Reclamation was given 
responsibility for construction, operation, and 
maintenance of channel rectification, an 
drainage rehabilitation and extension phases of 
36-4

ALBUQUERQUE, NM, DISTRICT 
the unified plan of improvement. Authority for 
the Chamita Dam and Reservoir was abrogated 
when Cochiti Dam and Reservoir was 
authorized. (See Table 36-B for authorizing 
legislation and Table 36-C for existing projects.) 
All operations and costs for projects contained 
in the authorized plan are reflected in individual 
reports on the following pages. 
8A. ABIQUIU DAM, NM 
Location. The project is one unit of the flood 
control plan for the Rio Grande and tributaries, 
New Mexico. Abiquiu Dam is located on the 
Rio Chama near the town of Abiquiu, NM, about 
32 miles upstream from the confluence of Rio 
Chama and Rio Grande. (See Geological Survey 
Map for plan and profile of Rio Chama, NM, 
from mouth to mile 103, sheet 1, and Army Map 
Service, Aztec, NM; Colorado NJ 13-1, scale 
1:250,000.) 
Existing project. This project consists of an 
earthfill dam 1,540 feet long, 325 feet high, with 
a 12-foot diameter controlled outlet, and an 
uncontrolled spillway in a natural saddle about 
one mile north of the left abutment. The 
reservoir provides 545,784 acre-feet of flood 
control and sediment storage. Total capacity at 
the spillway crest is 1,192,801 acre-feet. For a 
detailed description of the completed 
improvements and authorizing legislation, see 
Annual Report of 1973. A major rehabilitation 
project was completed in September 1980 and 
the recreation facilities were completed in FY 
1981. A non-Federal hydropower plant was 
completed in 1990 by the County of Los 
Alamos. The capacity of this plant is 13.2 MW. 
Drainage adits were completed in 1990 to 
alleviate seepage problems in the north and south 
abutments. 
Local cooperation. None required. 
Operations and results during fiscal year. 
Operation of the dam and reservoir continued. 
Storage and flows were regulated in accordance 
with Section 203, Flood Control Act of 1960. 
On October 1, 2000, the pool elevation was 
6,217.68 feet. The maximum pool (6,219.59 
feet) and storage (182,234 acre-feet) occurred on 
March 14, 2000. On September 30, 2000, the 
Pool elevation was 6,187.55 feet with a 
Corresponding storage of 75,285 acre-feet. There 
was 921 acre-feet of sediment deposition during 
FY 2000. 
There were no flood damages prevented during 
FY 2000. 
Sediment damages prevented were $103,200. 
Accumulated flood and sediment damages 
prevented by the project since completion were 
$391,403,300 through FY 2000. 
Condition at the end of fiscal year. The project 
was placed in operation in February 1963. The 
project structures are in good condition and 
operational. 
Abiquiu Dam was originally equipped with 
Emergency Gates, however, provisions on initial 
construction were made for later installation. 
The Water Resources Development Act of 1986 
authorized construction of a set of emergency 
gates to increase safety and enhance flood and 
sediment control. Funds were appointed under 
Construction General and in May 1997, 
construction of the gates commenced. 
Installation of the gates does not meet contract 
specifications. The Corps is attempting to work 
with the contractor and surety to resolve those 
deficiencies. Project structures are in good 
condition and in operation. 
8B. COCHITI LAKE, NM 
Location. The dam is located at river mile 340 
on the Rio Grande (river mile 0 being at the 
intersection of the New Mexico-Texas state line 
with international boundary at El Paso, TX), near 
Pueblo de Cochiti, which is about 50 miles 
upstream from Albuquerque, NM. (See 
Geological Survey Maps, Cochiti Dam, NM, 
quadrangle and Santo Domingo Pueblo, NM, 
quadrangle, scale 1:24,000.) 
Existing project. This project consists of an 
earthfill dam about 5.4 miles long with a 
maximum height of 251 feet above streambed. 
The project extends generally in an east-west line 
across the Rio Grande to a point about 2 miles 
east of the Rio Grande and then southward 
across the Santa Fe River. An uncontrolled 
spillway with a 460-foot long ogee-weir and a 
160-foot notch 10.5 feet deep in the center is part 
of the embankment of the south side of the Santa 
Fe River. Operational releases for flood control 
and irrigation are made through a 3-barrel gated 
conduit in the left abutment on the Rio Grande. 
36-5

Report of the Secretary of the Army on Civil Works Activities for FY 2000 
The reservoir has a storage capacity of 582,019 
acre-feet at the spillway crest , of which 78,640 
acre-feet is dedicated for recreation and sediment 
control. The project controls flood waters from a 
11,695 square-mile drainage area. For more 
improvement details, see page 17-7 of Annual 
Report for 1980. See page 17-14 of fiscal year 
1981 Annual Report for authorizing legislation. 
Local cooperation. None required. 
Operations and results during fiscal year. 
Operation of the dam and reservoir continued. 
The project was completed in June 1975. On 
October 1, 1999, the pool elevation was 5,338.75 
feet with a corresponding storage of 47,719 acrefeet. 
The maximum pool elevation was 5,342.25 
feet with a storage of 51,945 acre-feet on 
February 6, 2000. On September 30, 2000, the 
pool elevation was 5,339.31 feet with a 
corresponding storage of 48,346 acre-feet. There 
was 757 acre-feet of sediment deposition during 
FY 2000. There were no flood damages 
prevented during FY 2000. Sediment damages 
prevented were $84,800. Accumulated total 
damages prevented are $435,262,900. 
Conditions at the end of fiscal year. The dam 
and appurtenances were placed in operation in 
1975. The Cochiti Recreation area was 
completed in 1976, with the Visitors Center 
completed in 1977. The Tetilla Peak recreation 
area was completed in 1981. Project structures 
are in good condition and in operation. 
8C. GALISTEO DAM, NM 
Location. The dam is located at river mile 12 on 
Galisteo Creek, a tributary of the Rio Grande. 
The reservoir will extend upstream from the dam 
for about 4 miles, near the village of Waldo, 
NM. (See Geological Survey Map, San Pedro 1, 
NM quadrangle, scale 1:24,000.) 
Existing project. This project consists of an 
earthfill dam 2,820 feet long with a maximum 
height of 158 feet above the streambed. The 
outlet works consists of a 10-foot diameter 
uncontrolled outlet with maximum dischaige 
capacity of 4,980 cubic-feet-per-second with a 
pool at the spillway crest elevation. The dam 
was raised 7 feet and the spillway was widened 
575 feet to provide adequate discharge capacity 
to accommodate the revised probable maximum 
flood. The dam safety modifications contract 
was awarded in February 1998 and is scheduled 
to be complete in October 1999. The project has 
79,600 acre-feet of sediment space. For more 
details of complete improvements and 
authorizing legislation, see page 17-17 of Annual 
Report for 1973. 
Local cooperation. None required. 
Operations and results during fiscal year. 
Operation of the dam and reservoir continued. 
Operation of the project began on October 11, 
1970. The reservoir was empty on October 1, 
1999. No storage occurred during FY 2000. 
Peak inflow was 1,290 CFS cfs and maximum 
outlflow was 1,290 cfs. There was 21 acre-feet 
of sediment deposition during the year and the 
reservoir was empty on September 30, 2000. 
Sediment damages prevented during the FY were 
$2,300 totaling $173,900 through FY 2000. 
There were no flood control benefits associated 
with the Project. 
Condition at end of fiscal year. The project 
was placed in operation in October 1970. The 
project structures are in good condition and in 
operation. 
8D. JEMEZ CANYON DAM, NM 
Location. The project is located in Sandoval 
County, NM, on the Jemez River about 2 miles 
upstream from the confluence of the Jemez River 
and the Rio Grande, about 5 miles northwest of 
Bernalillo, NM. (See Geological Survey Map for 
Bernalillo quadrangle, scale 1:125,000.) 
Existing project. This project consists of an 
earthfill dam 780 feet long with maximum height 
of 146.6 feet above streambed, and off-channel 
uncontrollable saddle spillway 400 feet wide, 
and a 13-foot diameter gated outlet in the left 
abutment with discharge capacity of 8,340 cubicfeet-
per-second with a pool at spillway crest 
elevation. The dam was raised 14.1 feet and the 
spillway widened 28 feet in 1986 and 1987 to 
provide adequate discharge capability to 
accommodate the revised probable maximum 
flood. The reservoir has a capacity of 97,425 
acre-feet at spillway crest (73,000 acre-feet for 
flood control and 24,425 acre-feet for sediment 
control). For more detailed description of 
completed improvements and authorizing 
legislation, see page 17-17 of Annual Repoa for 
1973. 
Local cooperation. None required. 
36-6

ALBUQUERQUE, NM, DISTRICT 
Operations and results during fiscal year. On 
October 1, 1999, the pool elevation was 5,191.38 
feet with a corresponding storage of 18,790 acrefeet. 
The maximum pool elevation was 5,194.38 
feet with a storage of 22,400 acre-feet on May I, 
1999. On September 30, 2000, the pool 
elevation was 5,182.53 feet with a corresponding 
storage of 10,702 acre-feet. The reservoir was 
regulated for sediment control during FY 2000. 
Sediment deposition during FY 2000 was 148 
acre-feet. There were no flood damages 
prevented during FY 2000. Sediment benefits 
during FY 2000 were $16,600. Estimated total 
accumulated flood and sediment damages 
prevented by the project through FY 2000 were 
$25,133,000. 
Condition at end of fiscal year. The project 
was placed in operation in October 1953. Project 
structures are in good condition and all structures 
are in operation. 
8E. MIDDLE RIO GRANDE FLOOD 
PROTECTION, BERNALILLO TO BELEN, 
NM 
Location. The project is composed of 45 
square-miles of floodplain lying along the Rio 
Grande from the vicinity of Corrales to Belen, 
New Mexico. 
Proposed project. The project is authorized by 
the Water Resources Development Act of 1986. 
The project consists of raising and rehabilitating 
51.5 miles of levees to provide the 270-year level 
of protection, and the creation of 75 acres of 
wetlands from borrow areas within the bosque, 
and acquisition of 200 acres to satisfy fish and 
Wildlife mitigation requirements. The proposed 
project will be constructed at an estimated total 
cost of $62,400,000 ($46,800,000 Federal and 
$15,600,000 non-Federal) 1 Oct 97 price levels. 
(See Table 36-B for authorizing legislation.) 
Operations and results during fiscal year. 
Construction of the Corrales Unit was completed 
in July 1997. A General Reevaluation report 
Study for the remaining units (Mountainview, 
Islet and Belen) is currently underway. The 
Study will update costs, benefits and 
environmental impacts of the project that have 
changed since the project was authorized in 
1986. The Reevaluation report is scheduled to 
be Completed in 2003. 
8F. RIO GRANDE FLOODWAY, NM 
Location. This project is one unit of the flood 
control phase of the comprehensive plan of 
improvement for the Rio Grande Basin in New 
Mexico. It is located on the Rio Grande and 
covers a section of the river commencing near 
Truth or Consequences (formerly Hot Springs) at 
about river mile 123 and extends upstream to 
Espafiola, NM, about river mile 394. (See Table 
36-D on Rio Grande Floodway.) 
Existing project. This project consists of flood 
protection and major drainage improvements by 
channel rectification, levee enlargement and 
construction, and bank stabilization work where 
needed to protect the levees. Construction of the 
project is a joint undertaking by the Bureau of 
Reclamation and the Corps. Portions to be done 
by the Corps will consist of levee enlargement, 
construction, bank protection work, with 
channel-rectification and drainage-rehabilitation 
work being the responsibility of the Bureau of 
Reclamation. Levees constructed by local 
interests exist throughout the reach of the river 
involved, but are not uniform as to grade, 
section, or standard of construction, and in many 
places are threatened by the meandering river. 
(See Table 36-D on existing project and Table 
36-B for authorizing legislation.) 
Local cooperation. In addition to the usual 
requirements, local interests are responsible for 
all highway, bridge, and public utility relocations 
or replacements required in construction of the 
project. Local interests will also be required to 
comply with requirements of Section 221, 1970 
Flood Control Act, Section 401, 1986 Water 
Resources Development Act , and PL 91-646 
Uniform Relocation Assistance Act of 1970. 
Total costs for all requirements for the completed 
Albuquerque unit under terms of project 
authorization were $75,000. There were no non- 
Federal costs in connection with the construction 
of the Cochiti to Rio Puerco unit of floodway. 
The Espaiiola Valley unit is in the deferred 
category. However, by letter dated 11 November 
1998, the City has requested a feasibility study to 
be completed to address river and tributary 
flooding in Espailola. Negotiations are 
underway to identify a non-Federal source of 
funds to cost share in the study. It is anticipated 
the study can begin in April 2000 and be 
completed in 2001. For more details, see page 
17-8 of Annual Report for 1980. 
36-7

Report of the Secretary of the Army on Civil Works Activities for FY 2000 
Operations and results during fiscal year. 
There were no flood damages prevented by the 
completed floodway project during FY 2000. 
Estimated total accumulated flood damages 
prevented by the floodway project through FY 
2000 amounted to $48,759,200. The peak flow 
of the Rio Grande through the middle valley was 
3,000 cfs at Albuquerque on August 20, 2000. 
The peak at San Acacia was 2,500 cfs on August 
21, 2000. 
Condition at end of fiscal year. Construction 
of the Albuquerque unit of the Rio Grande 
Floodway project is complete. The General 
Design Memorandum for the Bemalillo to Belen 
unit was completed in June 1986. The General 
Design Memorandum for the San Acacia to the 
Bosque del Apache unit was approved in August 
1990. Construction was completed on the Truth 
or Consequences unit in fiscal year 1991. 
8G. SAN ACACIA TO BOSQUE DEL 
APACHE UNIT, NM 
Location. The authorized project is located 
along the Rio Grande, extending from the upper 
end of the Rio Grande low-flow conveyance 
channel at the San Acacia diversion works to the 
head of Elephant Butte Reservoir. 
Proposed project. The authorized project was 
authorized by the Flood Control Act of 1948. 
The project consists of the reconstruction of 42 
miles of existing spoil bank levee which 
separates the Rio Grande low-flow conveyance 
channel from the cleared floodway. The 
proposed project would be constructed at an 
estimated total cost of $65,850,200 ($57,107,730 
Federal and $8,231,275 non-Federal) 1 Oct 98 
price levels. (See Table 36-B for authorizing 
legislation.) 
Local cooperation. The Water Resources 
Development Act of 1986 and the Water 
Resources Development Act of 1992 apply. The 
Water Resources Development Act of 1992 
modified the Local Sponsor's required 
contribution. 
Condition at the end of fiscal year. 
Construction has been postponed while 
preparation of a supplemental EIS and Limited 
Reevaluation Report (LRR) are prepared. The 
Supplemental EIS was required when two 
species, found within the project area, were 
submitted and listed as endangered species. In 
addition, the Bureau of Reclamation is currently 
studying potential changes to the location, 
configuration and operating of the low-flow 
conveyance channel. This analysis is scheduled 
for completion in 2004. Because a major portion 
of the benefits attributed to the authorized levee 
project are derived from the low-flow channel, it 
would not be prudent to proceed to construction 
with this project until the outcome of the 
operation studies in 2004. However, it is still 
possible to proceed to construction with the 7- 
mile levee adjacent to Socorro. A sponsor is 
currently being solicited for that segment of the 
authorized plan. If a sponsor cannot be found by 
June 2001, further studies will be placed on hold 
until approximately 2004. 
9. SANTA ROSA DAM AND LAKE, NM 
Location. The project is located on a lake in 
Gudalupe County, on Pecos River, at river mile 
766.4 approximately 7 miles north of Santa 
Rosa, NM. (See U.S. Geological Survey Map, 
Corazon, NM, sheet, scale 1:125,000.) 
Existing project. Operation of the project began 
in November 1979. It consists of an earth and 
rock fill dam 1,950 feet long and 212 feet 
maximum height above the streambed. The 
purposes of this project are flood control, 
irrigation and sediment retention. An unlined, 
open rock cut about 1,000 feet back from the left 
abutment serves as an uncontrolled spillway. 
The outlet works, located in the left abutment, 
consists of a control tower, intake structure with 
gates, and a 10-foot diameter concrete-lined 
tunnel with a terminal flip bucket energy 
dissipator. Storage capacity at the spillway crest 
is 439,860 acre-feet which includes 72,860 acrefeet 
sediment reserve, 200,000acre-feet irrigation 
and 167,000 acre-feet flood control storage. Ihe 
surface area of the reservoir at the spillway crest 
is 10,594 acres. The contributing drainage area 
at the dam site is 2,434 square-miles. 
For more detailed report of the authorized 
project, including the modification to existing 
Sumner Lake, see page 17-8 of fiscal year 1981 
Annual Report. For authorizing legislation, see 
page 17-14 of fiscal year 1981 Annual Report. 
Local cooperation. In addition to first costs, 
operation and maintenance of both reservoirs is 
the responsibility of the Federal Government; 
however, the Carlsbad Irrigation District is 
required to contribute to operation and 
36-8

ALBUQUERQUE, NM, DISTRICT 
maintenance costs an equal amount to what they 
now pay toward Sumner Lake. The Carlsbad 
Irrigation District also agreed to use Sumner 
Lake for flood control. Because they realize 
equivalent benefits from storage capacity in 
Santa Rosa Lake, they will continue to fulfill 
their repayment obligation. The New Mexico 
Division of Parks manages the recreation 
facilities. Activities include camping, 
picnicking, boating, and hiking. 
For more requirements and details on final 
approval in 1974 for transfer of irrigation storage 
from Sumner Lake to Santa Rosa Dam and Lake 
(formerly Los Esteros Lake), see page 17-5 of 
Annual Report of 1980. 
Operations and results during fiscal year. 
Operation of the dam and reservoir continued. 
Pool elevation at the start of the fiscal year was 
4,745.08 feet with storage of 97,365 acre-feet. 
Total releases for the fiscal year were 103,289 
acre-feet. Pool elevation on September 30, 2000 
was 4,687.06 acre-feet with a storage of 3,736 
acre-feet. The maximum elevation was 4,745.51 
feet with a storage of 98,950 acre-feet on April 4, 
2000. There was 143 acre-feet of sediment 
deposition during the fiscal year. There were no 
flood damages prevented in FY 2000. Sediment 
damages prevented during the fiscal year were 
$16,000. Accumulated flood and sediment 
damages prevented by the project since 
completion were $5,431,800 through FY 2000. 
Releases attributed to irrigation benefits were 
99,060 acre-feet. Irrigation benefits for the fiscal 
year were $346,644,600, and accumulated 
sediment damages prevented were $1,787,200. 
Condition at end of fiscal year. The project 
was completed in late 1979 and reservoir 
Operation for irrigation was started in March 
1980. Construction of the recreation area was 
completed in October 1980. Design studies for 
spillway modification were initiated in FY 1979 
and construction was completed in FY 1982. 
The project structures are in good condition and 
in operation. 
10. TRINIDAD LAKE, CO 
Location. This project is located on the 
Purgatorie River about 161 miles above its 
junction with the Arkansas River. The project is 
about 4 miles upstream from the city of Trinidad, 
o. (See Geological Survey Map, Trinidad, 
CO, quadrangle, scale 1:24,000.) 
Existing project. The project consists of an 
earthfill dam 6,610 feet long with a maximum 
height of 200 feet above the streambed, an 
uncontrolled spillway 1,000 feet wide in the left 
abutment, and a 10-foot diameter, gatecontrolled 
conduit in the right abutment with 
discharge capacity of 5,8000 cfs, with a water 
surface at top of the flood control pool. In 1985, 
a 3-foot high parapet wall on top of the upstream 
face of the dam and a supplemental 700-foot 
wide rock cut emergency spillway located on the 
right abutment were constructed to provide 
adequate discharge capability and freeboard 
allowance to accommodate the revised probable 
maximum flood. In 1989, the recreation pool 
was increased from 4,500 to 15,967 acre-feet, 
utilizing some originally unallocated space in the 
project. The reservoir provides forstorage of 
51,000 acre-feet for flood control, 35,045 acrefeet 
for sediment, 20,000 acre-feet for irrigation, 
and 17,179 acre-feet for recreation, a total of 
123,224 acre-feet. The reservoir controls a 
drainage area of 671 square-miles and is 
operated for flood and sediment control, 
irrigation, and recreation purposes. For 
authorizing legislation, see page 17-14 of fiscal 
year 1981 Annual Report. 
Local cooperation. Assurances of local 
cooperation received from City of Trinidad and 
Purgatorie River Water Conservancy District 
were formally accepted May 11, 1967, after 
execution of irrigation repayment contract. For 
complete details of requirements and costs 
pertaining to the execution of irrigation 
repayment contract and the addition of 
permanent storage for recreation facilities, see 
page 17-9 of fiscal year 1980 Annual Report. 
Operations and results during fiscal year. 
Operation of the dam and reservoir continued. 
On October 1, 1999, the pool elevation was 
6,223.43 feet with a corresponding storage of 
63,252 acre-feet. The maximum pool elevation 
was 6,230.02 feet with a corresponding storage 
of 71,053 acre-feet on March 31, 2000. On 
September 30, 2000 the pool elevation was 
6,192.42 feet with a corresponding storage of 
29,209 acre-feet. Sediment deposition during 
FY 2000 was 111 acre-feet. Sediment damages 
prevented during FY 2000 was $41,500. 
Accrued sediment benefits are $2,721,400. 
Irrigation benefits for FY 2000 were $39,554. 
Accrued irrigation benefits through FY 1999 
were $2,121,300. Irrigation benefit releases for 
36-9

Report of the Secretary of the Army on Civil Works Activities for FY 2000 
the year were 12,497 acre-feet. There are no 
flood control benefits associated with this 
project. 
Conditions at end of fiscal year. The project 
was placed in operation in 1977. The recreation 
facilities were completed in 1980. The Dam 
Safety Assurance Contract was completed in 
May 1983. The project structures are in good 
condition and in operation. 
11. TWO RIVERS DAM, NM 
Location. The project is located about 14 miles 
southwest of Roswell, NM on the Rio Hondo 
and the Rocky Arroyo. The Rio Hondo is 
formed at the confluence of the Rio Ruidoso and 
the Rio Bonito, near the village of Hondo, NM, 
in the foothills region east of Sierra Blanca in the 
southeastern part of Lincoln County, NM, and 
flows generally easterly to its confluence with 
the Pecos River near Roswell, NM. (See 
Geological Survey Map, Hondo Reservoir 
quadrangle, scale 1:24,000.) 
Existing project. The Two Rivers project 
consists of two dams: Diamond A and Rocky. 
The Diamond A Dam is an earthfill structure, 
4,885 feet long and 98 feet high, with a gated 
outlet. The Rocky Dam is an eartfill structure 
2,940 feet long and 118 feet high with an 
uncontrolled outlet. No provision is made for 
water storage, except for flood control. Flood 
releases will be controlled so that flows through 
Roswell will not exceed the Rio Hondo channel 
capacity which is about 600 cfs. A Dam Safety 
Reconnaissance Report, approved in June 1995, 
identified the need to increase the size of the 
spillway on the left abutment of the Rocky Dam 
by 1,170 feet in order to accommodate the 
revised Probable Maximum Flood flows for the 
Dam. The spillway was widened 1,170 feet in 
1998 to provide adequate discharge capability to 
accommodate the revised probable maximum 
flood. The capacity of the Two Rivers Reservoir 
at its spillway crest is 163,773 acre-feet, of 
which 13,775 acre-feet are provided for sediment 
reserve. Together these dams regulate runoff 
from 1,027 square-miles of drainage area. For 
details of completed improvement and 
authorizing legislation, see page 17-18 of Annual 
Report for 1973. 
Local cooperation. Section 2 Flood Control Act 
of 1938 applies and compliance is satisfactory. 
Operations and results during fiscil year. 
Operation of the dam and reservoir continued. 
The reservoir was empty on October 1, 1999. 
There were no flood damages prevented during 
2000. There were no sediment damages 
prevented during 2000. Estimated total 
accumulated flood and sediment damages 
prevented through FY 2000 were $190,604,600. 
There were 0 acre-feet of sediment deposition 
during FY 2000. The accrued sediment benefits 
through FY 2000 are $1,107,400. 
Condition at end of fiscal year. The project is 
completed and was placed in operation July 
1963. The project structures are in good 
condition and in operation. 
12. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Included under this heading is inspection of 
completed flood control projects transferred to 
local interests for operation and maintenance. 
Projects in Texas, Colorado, and New Mexico 
were inspected. Federal costs for fiscal year 
2000 were $490,915.24. 
13. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
Pursuant to Section 7, Flood Control Act of 
1944, five projects are operated by others for 
flood control. These projects are Platoro, 
Pueblo, Sumner, Navajo and Brantley Dams. 
Platoro Dam on the Conejos River above the 
town of Platoro, Conejos County, CO, controls 
runoff from 40 square-miles of high mountain 
area. The authorized purposes are irrigation 
storage and flood control. Platoro is operated by 
the Conejos Water Conservancy District. Total 
storage is 59,571 acre-feet with the top 6,000 
acre-feet solely for flood control. The 53,571 
acre-feet is joint-use storage with flood control 
on a forecast basis during spring runoff. Platoro 
Dam was authorized by the Interior Appropriate 
Act of 1941. (See H Doc 693, 7 6
th Cong., 3' 
Sess.) Construction of this project was 
completed by the Bureau of Reclamation in 
1952. 
On October 1, 1999, storage in Platoro 
Reservoir was 35,484 acre-feet at elevation 
10,006.12 feet. Maximum storage of 35,484 
acre-feet at elevation 10,006.12 feet occurred on 
October 1, 2000. On September 30, 2000, 
36-10

ALBUQUERQUE, NM, DISTRICT 
storage was 17,166 acre-feet at elevation 
9,977.82 feet. There were no flood damages 
prevented by the project during FY 2000. Total 
flood damages prevented to date are at 
$6,094,200. Total cost for activity, by the Corps 
of Engineers, during FY 2000 was $20,894.93. 
Pueblo Dam is part of the Fryingpan-Arkansas 
project which was authorized under Public Law 
87-590, 87"' Congress, HR 2206 on August 16, 
1962. The project was completed in August 
1975. Pueblo is operated by the Bureau of 
Reclamation and is located at river mile 1,293.7 
on the Arkansas River in Pueblo County, 
Colorado. Pueblo Reservoir has a total capacity 
of 349,940 acre-feet at the top of the flood pool 
with 27,000 acre-feet exclusive flood space and 
66,000 acre-feet joint-use space. 
Operation of Pueblo Reservoir began on 
February 10, 1974. Storage on October 1, 1999 
was 239,982 acre-feet, elevation 4,876.71 feet. 
Maximum storage during the year was 279,476 
acre-feet at elevation 4,885.26 feet on March 15, 
2000. Storage on September 30, 2000 was 
160,891 acre-feet at elevation 4,856.06 feet. 
There were no flood damages prevented in FY 
2000. Total flood damages prevented to date are 
$11,316,700. Total cost for FY 2000 activity, by 
the Corps of Engineers, was $15,955.77. 
Sumner Dam is located on the Pecos River at 
river mile 710.8 in DeBaca County, New 
Mexico. Sunmer Dam was authorized as 
Alamogordo Dam by the Secretary of the Interior 
under a Finding of Feasibility approved by the 
President of the USA on 6 November 1935, 
under the Federal Reclamation laws. The 
original project was completed in 1937. 
Modification work of raising the dam 16 feet, 
adding a spillway and limiting the service 
spillway floor to 56,000 cfs was completed in 
1957. A twenty-four inch bypass line was 
installed in 1977 to pass flows less than 100 cfs 
Sumner is operated by the Carlsbad Irrigation 
District. Storage on October 1, 1999 was 
422,374 acre-feet at elevation 4,260.45 feet. 
Maximum storage for FY 2000 was 42,232 acrefeet 
at elevation 4,260.45 feet on October 1, 
1999. Storage on September 30, 2000 was 6,742 
acre-feet at elevation 4,238.78 feet. Total cost 
for FY 2000 activity, by the Corps of Engineers, 
was $15,989.40. 
Navajo Dam and Reservoir is located on the 
San Juan River at river mile 298.6 in San Juan 
County, New Mexico. Navajo Dam was 
authorized as part of a Colorado River Storage 
Project by an act of 84 th Congress, 11 April 1956 
(PL 485). The Bureau of Reclamation 
constructed and is responsible for operation of 
the project. Construction was initiated in June 
1958 and the project was completed and placed 
in operation in March 1963. Total capacity at 
spillway crest is 1,708,600 acre-feet. The project 
controls a drainage area of 3,230 square miles. 
Storage on October 1, 1999 was 1,556,900 acrefeet, 
elevation 6,075.39 feet. Maximum storage 
for FY 2000 was 1,582,700 acre-feet, elevation 
6,077.16 feet on May 30, 2000. Storage on 
September 30, 2000 was 1,356,600 acre-feet, 
elevation 6,060.69 feet. Total Corps of 
Engineers cost for FY 2000 activity was 
$24,104.98. 
Brantley Dam, on the Pecos River, above the 
town of Carlsbad in Eddy County, NM, controls 
runoff from 13,208 square-miles of uncontrolled 
area. The authorized purposes are irrigation, 
flood control, fish and wildlife, and recreation 
for the elimination of the hazards of failure of the 
McMillan and the Avalon Dams. The total 
storage is 348,544 acre-feet with 189,700 acrefeet 
for flood control The Brantley Dam was 
authorized for construction on 20 October 1972 
by the Public Law 92-514 with the cost ceiling 
raised for the project in October 1980 by Public 
Law 96-375. On September 6, 1988 the conduits 
were closed and Brantley Dam started its initial 
filling. On September 30, 1999, the storage was 
27,333 acre-feet at elevation 3,247.97 feet. Total 
Corps of Engineers cost for FY 2000 activity 
was $15,977.87. 
14. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
S See Table 36-D. 
15. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to Section 
205, Public Law 858, 80
th Congress, as 
amended (pre-authorization). 
Costs during FY 2000 were: Little Puerco 
River, Gallup, NM ($36,000); Zuni River at 
Zuni, NM, $10; Raton Creek, Raton, NM, 
$4,532; Section 205 Coordination Account, 
$10,221; Flume at Willow Creek, Creede, CO, 
$31,337; Unnamed Arroyo, Hernandez, NM, 
$14,418. 
36-11

Report of the Secretary of the Army on Civil Works Activities for FY 2000 
Emergency flood control activities; repair, 
flood fighting, and rescue work. (Public Law 
99, 84'h Congress, and antecedent legislation.) 
There were no Federal costs in FY 2000 for 
advance preparation, none for flood emergency 
operations, and there were no repair and 
restoration costs. 
Emergency bank protection (Section 14, 1946 
Flood Control Act, Public Law 526, 79"' 
Congress.) 
Section 14 Coordination Account $8,938; Isidro 
RD Santa Fe River, NM $51,296; Rio Puerco 
River, 1-40 Bridge, Gallup, $1,280; Unnamed 
Arroyo, Hwy 371 near Crownpoint, NM, $1; 
Cibola County Road 7, Cubero, NM, $230,497; 
Chinook Lake, Fountain Creek, Pueblo, CO, 
$6,738. 
Snagging and Clearing for Flood Control 
(Section 208 of the 1954 Flood Control Act, 
83 rd Congress.) 
There were no costs in FY 2000. 
General Investigations 
16. SURVEYS 
Costs for the fiscal year were $689,290.76 for 
flood damage prevention studies, $119,151.22 
for special studies (coordination studies with 
other agencies). 
17. COLLECTION AND STUDY OF BASIC 
DATA 
Fiscal year costs were $498,314.53 for flood 
plain management and technical services. 
Hydrological studies involving collection and 
study of basic data, such as stream flow data, 
collection of suspended sediment samples, 
recording rain gage data, special studies, 
hydrometeorological studies, sedimentation 
studies, and environmental data studies 
continued. Costs during the fiscal year were 
$229,665.21. 
18. ENVIRONMENTAL DATA STUDIES 
There were no Environmental Data Study costs 
for FY 2000. 
19. PRECONSTRUCTION ENGINEERING 
AND DESIGN 
There were no Continuation of Engineering and 
Design costs in Fy 2000. 
20. OTHER WORK UNDER SPECIAL 
AUTHORITY 
FY 2000 costs for Section 1135 projects were 
$364,112.27 and Section 206 costs were 
$655,120.55. 
36-12

ALBUQUERQUE, NM, DISTRICT 
TABLE 36-A COST AND FINANCIAL STATEMENT 
See Total Cost 
Section to 
In Text Project Funding FY 97 FY 98 FY 99 FY 00 Sept. 30, 2000 
1. Acequias Irrigation New Work 
System, NM 
2. Alamogordo, NM 
Alamosa, CO 
Albuquerque 
Diversion Channels 
Project, NM 
(Federal Funds) 
(Contributed Funds) 
(Other Contributed 
Funds) 
5. Conchas Lake, NM 
6. El Paso, TX 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
946,000 94,000 
480,301 506,128 
695,000 456,000 
454,350 633,840 
465,000 
690,372 
299,000 
228,541 
95,000 2,998,000 (100,000) 
672,906 2,725,875 455,632 
550,000 
700,000 
758,867 
30,000 
12,494,000' 
802,924 
12,342,649' 
5,675,000 
5,613,373 
5,630,0002 
55,835 
5,574,1472 
17,975,450 
17,762,795 
518,356 
518,356 
854,664 
854,664 
1,189,295 1,194,201 1,477,636 1,372,500 
1,084,458 1,317,562 1,494,868 1,372,305 
13,821,4993 
13,821,4993 
27,877,856 
27,857,427 
4,878,422 6,997,000 4,849,000 2,776,000 107,549,0004 
6,507,234 5,702,520 4,824,405 3,987,235 107,237,3534 
36-13

Report of the Secretary of the Army on Civil Works Activities for FY 2000 
TABLE 36A COST AND FINANCIAL STATEMENT 
(Continued) 
See Total Cost 
Section to 
In Text Project Funding FY 97 FY 98 FY 99 FY 00 Sept. 30, 2000 
7. John Martin New Work 
Las Cruces, NM 
Rio Grande Basin, NM 
Abiquiu Dam, NM 
Cochiti Lake, NM 
Galisteo Dam, NM 
Jemez Canyon 
Dam, NM 
Middle Rio Grande 
Flood Protection, 
Bernalillo to Belen, NM 
Approp. 
Cost 
Maint 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
0
0 
15,555,3585 
15,555,5715 
1,398,000 1,718,135 2,81.1,031 2,016,748 38,774,932 
1,382,201 1,703,666 2,849,179 1,949,323 38,667,653 
405,000 
355,964 
450,000 
420,796 
651,000 2,913,000 
537,388 1,965,936 
646,000 2,840,000 3,319,000 
304,181 2,816,446 3,253,305 
4,614,050' 
3,438,917' 
100,000 34,050,028 
422,849 33,823,528 
1,420,600 1,322,320 1,185,843 1,470,574 39,464,941 
1,227,406 1,576,201 1,210,038 1,466,183 39,401,899 
- - - - 96,956,559 
- - 96,956,559 
1,837,400 1,876,600 1,964,795 
1,743,874 2,123,835 1,985,713 
292,000 2,975,000 
309,791 2,810,773 
250,300 
258,210 
245,335 
253,895 
476,000 
674,146 
273,994 
280,130 
3,151,643 33,642,605 
3,013,894 33,495,096 
- 18,283,053 
- 18,213,168 
261,564 4,307,623 
256,764 4,301,690 
6;293,972 
6,293,972 
504,000 
380,767 
1,231,000 
3,842,369 
477,000 
635,640 
562,000 
544,144 
326,310 
332,557 
224,000 
340,297 
586,700 11,726,742 
569,144 11,708,329 
515,000 8,891,0007 
448,369 9,292,194' 
36-14 
Reservoir 
8. 
9. 
10A. 
10B. 
1 OC. 
loc. 
10D. 
10OE.

ALBUQUERQUE, NM, DISTRICT 
TABLE 36-A COST AND FINANCIAL STATEMENT 
(Continued) 
See Total Cost 
Section to 
In Text Project Funding FY 96 FY 97 FY 98 FY 99 Sept. 30, 1999 
10F. Rio Grande Floodway New Work 
Rio Grande Floodway, 
San Acacia to Bosque 
del Apache, NM 
11. Santa Rosa Dam 
& Lake, NM 
12. Trinidad Lake, CO 
13. Two Rivers Dam, 
NM 
'Reflects PED funding appropriations beginning in FY 1986. 
include non-Federal contributions of $2,412,000. 
293,000 
309,015 
728,388 
875,497 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
237,000 1,475,000 
179,237 1,483,615 
304,000 
317.039 
SExcludes $59,977 
337,000 
346,573 
823,829 
860,651 
544,645 
548,131 
(20,000) 
54,973 
346,517 
356,314 
emergency 
Includes $30,000 for Code 710. 
515,000 
400,084 
852,295 
850,637 
599,977 
601,525 
253,459 
251,444 
relief funds 
4,794, 8688 
4,794,8688 
5,065,0009 
4,891,089' 
41,039,741 
41,039,056 
13,841,148 
13,835,444 
55,774,758 
55,774,758 
10,770,651 
10,767,214 
6,759,244 
6,757,619 
4,757,009 
5,754,681 
for new work. 
2PED activities were initiated in FY 1991. 
l'Includes $3,492,696 maintenance and improvement costs 
and $869,978 for emergency relief, excludes $2,279,326, cost 
of initiating project under the authority of Emergency Relief 
Appropriation Act of 1935 and $222,669, the cost for work 
Performed with funds transferred to the Corps under Public 
Works acceleration Act of 1962. 
4Does not include non-Federal contributions of $2,657,653. 
"Includes $514,741 PED funds. 
7Includes $1,177,000 PED funds. 
'Includes funds for preconstruction planning of Espafiola 
Valley unit. Excludes $1,000,011 appropriated funds 
transferred to Bureau of Reclamation under memorandum of 
agreement between that agency and the Corps. 
9Includes $1,658,000 PED funds. 
36-15 
10G. 
Approp. 
Cost 
545,000 
570,839 
926,501 
853,186 
601,000 
568,476 
493,800 
584,626 
304,000 
155.317

Report of the Secretary of the Army on Civil Works Activities for FY 2000 
TABLE 36B AUTHORIZING LEGISLATION 
Date 
Authorizing 
Act 
Nov. 17, 1986 
Oct.12, 1996 
Oct. 31, 1992 
Oct. 27, 1965 
Oct. 12,1996 
Jun. 30, 1948 
May 17, 1950 
Jul. 14, 1960 
Nov. 17, 1986 
Sep. 30, 1997 
Project and Work Authorized 
ACEQUIAS IRRIGATION SYSTEM 
An Irrigation System dating back to the eighteenth century with significant engineering 
works in the settlement and development of the western portion of the United States. 
Restoration and preservation of this system has cultural and historic values to the region. 
Measures are necessary to restore and protect the river division structures and associated 
canals. 
Except that the Federal share of reconnaissance studies carried out by the Secretary under 
this section shall be 100 percent 
ALAMOSA, COLORADO 
Authorized a flood control project for Alamosa, Colorado. 
EL PASO, TX 
A single-purpose flood control system of detention dams, diversion 
dikes and channels to collect, regulate and discharge arroyo runoff in the Rio Grande. 
Consists of four independent units (NW Area, Central Area, and two units, Copper 
System and Bluff Channel of the SE Area.) 
LAS CRUCES, NM 
The project for flood control, Las Cruces, New Mexico: Report of the 
Chief of Engineers, dated June 24, 1996, at total of $8,278,000, with 
an estimated Federal cost of $5,494,000 and an estimated non-Federal 
cost of $2,784,000. 
RIO GRANDE BASIN, NM 
Authorized to be appropriated $3,500,000 to be expended by the 
Dept. of the Army for partial accomplishment of approved general comprehensive 
plan for the Rio Grande Basin in NM and Colorado. 
Authorized to be appropriated an additional $39,000,000 for 
Department of the Army for prosecution of comprehensive plan for the Rio Grande 
Basin. 
Authorized Cochiti Dam on Rio Grande and Galisteo Dam on 
Galisteo Creek as additions to authorized comprehensive plan for Rio Grande Basin 
(Cochiti Dam was authorized in lieu of Low Chamita Dam of Chamita Reservoir 
Project on Rio Chama under "substitute plan"). Also authorized to be appropriated an 
additional $58,300,000 for Dept. of the Army for this addition to comprehensive plan 
for the Rio Grande Basin. 
Authorized installation of the Abiquiu Dam Emergency Gates by 
the Water Resources Development Act of 1986 (PL 99-662) 
The emergency gate construction project for Abiquiu Dam, New Mexico, authorized by 
section 1112 of the Water Resources Development Act of 1986 (Public Law 99-662, 100 
Stat. 4232) is modified to authorize the Secretary of the Army, acting through the Chief 
of Engineers, to construct the project at an estimated total cost of $7,000,000. The non- 
Federal share of the project shall be 25 percent of those costs of the project attributable to 
an increase in flood protection as a result of the installation of such gates. 
See 
Section 
In Text 
H. Doc. 207, 89th 
Cong., Ist 
sess.' 
Public Law 104-303 
104 Congress 
H. Doc. 243, 81st 
Cong .,st sess. 
Public Law 516, 
81st Cong ., 2nd 
sess. 
S. Doc. 94, 86th 
Cong 
Public Law 662 
99th Cong., 2nd 
sess. 
Public Law 104-206 
(Sec. 112) 
36-16 
Documents 
Public Law 662, 
99th Cong., 2nd 
sess. (Sec. 1113) 
Public Law 104-30 104'h 
Cong. ,(Sec.334) 
Public Law 102-580 
102d Congress 
(Sec. 101) 
1. 
al

ALBUQUERQUE, NM, DISTRICT 
TABLE 36B AUTHORIZING LEGISLATION 
(Continued)
Date 
Authorizing 
Act
Nov. 17, 1986 
Jun. 30, 1948 
and 
May 17, 1950 
10G. Oct. 31, 1992 
See 
Section 
In Text 
10E. 
10F. 
RIO GRANDE FLOODWAY, SAN ACACIA TO 
BOSQUE DEL APACHE UNIT, NM 
Modified the cost sharing to more equitably reflect the non-Federal 
contribution for the project by that percentage of benefits which 
is attributable to the Federal properties; except that, for purposes 
of this subsection, Federal property benefits may not exceed 50 percent 
of the total project benefits. 
Documents 
Public Law 662, 
99th Cong., 2nd 
sess. 
Cong., 1st sess.' and 
Public Law 516, 81st 
Cong , 2nd sess. 
Public Law 102-580 
102d Congress 
(Sec. 102(e)) 
36-17 
Project and Work Authorized 
MIDDLE RIO GRANDE FLOOD PROTECTION, 
BERNALILLO TO BELEN, NM 
Authorized project for flood control, Middle Rio Grande Flood Protection, 
Bernalillo to Belen, NM. Authorized increase of flood protection through the 
dredging of the bed of the Rio Grande in the vicinity of Albuquerque, NM to an 
elevation lower than existed on the date of enactment of this Act. The project shall 
include the establishment of 75 acres of wetlands for fish and wildlife habitat 
and the acquisition of 200 acres of land for mitigation of fish and wildlife losses. 
RIO GRANDE FLOODWAY, NM 
Channel rectification, levee enlargement and construction, and 
bank stabilization on Rio Grande between river mile 123 and 394 (San Acacia to Bosque 
Del Apache Unit.) 
~ --

Report of the Secretary of the Army on Civil Works Activities for FY 2000 
TABLE 36C 
RIO GRANDE BASIN, NM 
RIO GRANDE BASIN, NM: EXISTING PROJECT 
(See Section 8 of Text) 
Miles Drainage Total 
Above Nearest Area (square Estimated 
Project River Mouth Town mile) Description Cost 
Abiquiu Dam Rio Chama 32 Espafiola, 2,147 Earthfill 325 feet high 30,901,0281 
NM 1,212,000 
acre feet capacity 
Jemez Canyon Jemez Dam 2 Bernalillo, 1,034 Earthfill 136 feet high, 6,293,972 
106,100 
NM acre-feet capacity 
Rio Grande Rio Grande 123 - Channel rectification, levee 25,744,0002 
Floodway to 394' enlargement and 
construction 
Cochiti Lake Rio Grande 340' Cochiti, NM 11,695 Earthfill 251 feet high, 96,956,559 
596,300 
acre-feet capacity 
Galisteo Dam Galisteo Creek 8 Waldo, NM 596 Earthfill 158 feet high, 17,807,053 
89,000 
acre-feet capacity 
'River mile 0 is at intersection of New Mexico-Texas State Line with international boundary at El Paso, Texas. 
2Does not include non-Federal costs. 
'Includes $5,383,000 major rehabilitation, $138,900 for recreation facilities and $3,600,000 for emergency gates. 
TABLE 36D OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to September 30, 1996 
Project 
Alamogordo Diversion Channel, Tularosa (closed) Basin, New Mexico 
Alpine, Texas' 
Cibolo Creek, Texas' 
Cochiti Wetfields, New Mex"'" 
Colorado Springs, Fountain que Bouille River, Colorado 
(Templeton Gap Floodway)' 
Creede, Willow Creek, Colorado (floodway)' 
Fountain Creek, Pueblo, Colorado' 
Highway 12, Colorado' 
Holly, Colorado' 
Las Animas, Colorado2 
Las Cruces, New Mexico2 
Pecos, Texas3 
Pinon Canyon Dam, Trinidad, Colorado (Sec.212)' 
Pueblo, Arkansas River, Colorado (floodway levee extension)' 
Puerco River, Gallup, New Mexico' 
Rio Grande Floodway, T or C Unit, New Mexico l 
Santa Fe River and Arroyo Mascaras, New Mexico3 
Smith Creek, Colorado' 
Socorro Diversion Channel, Tributaries of Rio Grande, New Mexico' 
'Completed. 'Responsibility of local interests. 3 lInactive. 4Deferred. 
Full Report 
See Annual 
Operation & 
Report For 
1966 
1977 
1983 
1994 
1959 
1952 
1993 
1985 
1985 
1980 
1980 
1977 
1954 
1993 
1994 
1983 
1985 
1965 
Construction 
189,356 
130,488 
829,500 
13,921,290 
Maintenance 
881,262 
219,789 
6,564,399 
120,500 
2,021,400 
4,956,000 
4,815,236 
480,273 
130,678 
201,958 
4,678,239 
12,955,052 
1,123,900 
219,000 
2.259.328 
36-18 
a ,- -I
LITTLE ROCK, AR DISTRICT* 
LITTLE ROCK, ARKANSAS 
The civil works portion of this District covers an 
area of approximately 36,414 square miles in northern, 
western, and southwestern Arkansas and a portion of 
Missouri. This area is within the Arkansas River, Little 
River, and White River basins. In the Arkansas River 
Basin, the District is responsible for planning, design, 
construction, operation and maintenance of the navigation 
portion of the McClellan-Kerr Arkansas River 
Navigation (MCKARNS ). The District is also responsible 
for the areas included in the Arkansas River drainage 
basin from above Pine Bluff, AR, to below the 
mouth of the Poteau River, near Fort Smith, AR. In Littie 
River Basin, the District is responsible for the portion 
of the Little River and its tributaries that are in the state 
of Arkansas above its mouth near Fulton, AR. In the 
White River Basin, the District is responsible for those 
portions in southern Missouri and northern and eastern 
Arkansas in the White River drainage basin and its 
tributaries above Peach Orchard Bluff, AR. The Memphis 
District is responsible for navigation maintenance 
on the White River below Newport, AR, to the mouth of 
Wild Goose Bayou, in Arkansas County, AR. The 
White River downstream from the mouth of Wild Goose 
Bayou is part of MCKARNS. 
IMPROVEMENTS 
Navigation ................................................. ........... 2 
1. Arkansas River Basin, AR, OK, And KS .......... 2 
2. Arthur V. Ormond Lock & Dam (No.9), AR........ 3 
3. Mcclellan-Kerr Arkansas River Navigation 
System, Bank Stabilization & Channel 
Rectification, Ar ...................................... . .. 3 
4. David D. Terry Lock And Dam (No. 6), AR........ 3 
5. Emmett Sandcrs Lock And Dam, AR............ 3 
6. James W. Trimble Lock And Dam (No. 13), AR. 3 
7. Lock No. 2 And Wilbur D. Mills (No. 2), AR...... 4 
8. Joe Hardin Lock And Dam (No. 3), AR............ 4 
9. Lock And Dam No. 5, AR ............. .... 4 
10. Murray Lock And Dam (No. 7), AR................ 4 
II1. Norrell Lock And Dam (No. 1) and 
Entrance Channel, AR ................................... ..... 4 
12. Toad Suck Ferry Lock And Dam (No. 8), AR...... 5 
13. Maintenance And Repair Fleet And Marine 
Term inals, A r....................... .............. ....... 5 
14. Other Authorized Navigation Projects .................. 5 
15. Navigation Work Under Special Authorization.... 5 
Flood Control ....................... ................ 5 
16. Black River, Poplar Bluff, MO............................. 5 
17. Blue Mountain Lake, AR........................ ..... 5 
18. Clearwater Lake, M O..................................... . 5 
19. Dequeen Lake, AR...................................... 6 
20. Dierks Lake, AR .......................... ..... 6 
21. Fourche Bayou Basin, Little Rock, AR................ 6 
22. Gillham Lake, AR............................. . 7 
23. Little River Basin, AR ........................................ 7 
24. Mill Creek, Fort Smith, AR .................................. 7 
25. Millwood Lake, AR...................................... 7 
26. Nimrod Lake, AR .................................... 8 
27. White River Basin (Little Rock District), 
AR & MO ...................... ... ... ....... 
28. White River, Batesville, AR ................. ......... 8 
29. White River, Jacksonport, AR ...................... . 9 
30. Inspection Of Completed Flood 
Control Projects ....................... ...... 9 
31. Other Authorized Flood Control Projects ............. 9 
32. Flood Control Work Under Special 
A uthorization ....................................... ................ 9 
lMultiple-Purpose Projects Including Power .................. 9 
33. Beaver Lake, AR........................................ 9 
34. Bull Shoals Lake, AR ......................................... 10 
35. Dardanelle Lock And Dam (No. 10), AR ........... 11 
36. Greers Ferry Lake, AR......... ............................. 11 
37. Norfork Lake, AR..................... .................. 11 
38. Ozark-Jeta Taylor Lock and 
Dam (No. 12), AR .................................. 12 
39. Table Rock Lake, MO ... ............................... 12 
General Investigations .............................................. 13 
40. Surveys .................................. .1.3.......... 
41. Preconstruction Engineering & Design (PED)... 13 
42. Collection And Study Of Basic Data .................. 13 
43. Nimrod Fisheries Restoration .............11.4............ 
44. Morgan Point Bendway Closure Structure, 
Desha County, AR ..................... 14 
45. Coleman Creek Little Rock, AR ............1.4............ 
46. Spadra Creek, Clarksville, AR......................... 14 
47. Highway 69 Bridge at Black River, 
Jackson County, AR ..................... ....... .... 1 4 
48. Rockaway Beach at Lake Taneycomo Aquatic 
Habitat Restoration, MO............................ 14 
49. Pine Bluff Wetland Restoration................... ..... 15 
50. Beaver Tailwater Restoration ............................. I 
51. Slack Water Harbor, Russellville, AR................. 16 
Table 37-A Cost And Financial Statement............. 16 
Table 37-B Authorizing Legislation ................................ 20 
Table 37-C Other Authorized Navigation 
Projects............ ...... ....... ............... 22 
Table 37-E Other Authorized Flood 
Control Projects ...................................... 23 
Table 37-G Deauthorized Projects....................... 24 
Table 37-H Arkansas River Basin: AR, OK, 
and KS: Navigation ....................... 25 
Table 37-1 Arkansas River Basin: AR, OK, 
and KS: Lakes ......................................... 28 
Table 37-J Little River Basin, AR: Lakes ................ 29 
Table 37-K White River Basin; AR, and 
MO: Lakes ............................................... 29 
37-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Navigation 
1. ARKANSAS RIVER BASIN, AR, OK, 
AND KS 
Location. The headwaters for the Arkansas River 
are in the Rocky Mountains near Leadville, CO. The 
river flows southeastward 1,396 miles through Colorado, 
Kansas, Oklahoma, and Arkansas to join the Mississippi 
River 599 miles above Head of Passes, LA. 
Previous projects. For details see page 1066, Annual 
Report for 1932, and pages 744, 864, and 881, Annual 
Report for 1943. 
Existing project. The MCKARNS provides navigation, 
hydroelectric power, flood control, water supply, 
sediment control, recreation, and fish and wildlife 
propagation improvements in the Arkansas River Basin. 
The MCKARNS provides a navigation channel 9 feet 
deep and 444.8 miles long. The channel begins at the 
mouth of the White River, which enters the Mississippi 
River 599 miles above Head of Passes, LA, thence 9.8 
miles upstream to the mouth of Wild Goose Bayou; 
thence 9.2 miles by a land cut, designated as Arkansas 
Post Canal to mile 42 (1943 survey) on the Arkansas 
River; thence 376.0 miles to the mouth of the Verdigris 
River at navigation mile 395.0; thence 49.8 miles up the 
Verdigris River to the head of navigation at Catoosa, 
OK.
The waterway is canalized throughout its length by 
17 locks and dams with a total lift of 420 feet. Dardanelle, 
Ozark-Jeta Taylor, Robert S. Kerr, and Webbers 
Falls are multiple purpose projects that include hydropower. 
Lock chambers are 110 by 600 feet. A minimum 
channel width of 150 feet is provided for the Verdigris 
River, 225 feet for San Bois Creek, 250 feet for 
the Arkansas River, and 300 feet for Arkansas Post Canal 
and White River Entrance Channel. 
Other coordinated developments consist of 15 lakes, 
of which 13 are in Tulsa District, in the states of Kansas 
and Oklahoma, and two are in the Little Rock District. 
Pertinent data and estimated Federal cost are summarized 
in Tables 37-H and 37-I, Navigation: Arkansas 
River Basin; AR, OK, and KS. 
Local cooperation. For MCKARNS, local interests 
must provide adequate terminal and transfer facilities 
and bear the increased costs of maintenance and operation 
of all altered rail and highway routes, including 
bridges and appurtenances, utilities, and other existing 
improvements, other than federally owned. For lakes 
see requirements for each individual lake. 
Terminal facilities. Public port facilities are in operation 
at Pine Bluff (Jefferson County), Little Rock, 
and Fort Smith, AR, and Muskogee and Catoosa (Tulsa- 
Rogers County), OK. Port authorities have been organized 
to develop public facilities at North Little Rock, 
Dardanelle-Russellville, Morrilton, Clarksville, Ozark, 
and Van Buren, AR, and Sallisaw, OK. Terminal facilities 
are in operation or being built at 35 locations in Arkansas 
and at 25 locations in Oklahoma along the improved 
waterways. 
Operations and results during fiscal year. 
Flood damages prevented by Little Rock District 
projects in the Arkansas River Basin during FY00 are 
estimated at $8,047,800; flood losses prevented through 
FY00 are estimated at $852,210,600. 
Approximately 11.9 million tons of commerce were 
moved on the Arkansas portion of the MCKARNS during 
calendar year 2000. Details of the MCKARNS and 
lakes in Arkansas are shown on the following pages. 
Withdrawals for water supply purposes were the city 
of Plainview, AR, 103 acre-feet from Nimrod Lake. 
Condition at end of fiscal year. (See Tables 37-H 
and 37-1, Navigation: Arkansas River Basin; AR, OK, 
and KS, for status for individual items, navigation projects, 
lakes, and basin plan.) Work continues on the Arkansas 
River project in this District including construction 
of the Montgomery Point Lock & Dam, a meander 
cutoff levee between the Arkansas and White Rivers, 
and land acquisition studies. 
Installation of tow haulage equipment was completed 
at David D. Terry Lock and Dam (No. 6), Lock 
and Dam No. 5, Emmett Sanders Lock and Dam (No. 4), 
and Joe Hardin Lock and Dam (No. 3) in 1994, at Norrell 
Lock (Lock 1) and Lock No. 2 in 1997, and Murray 
Lock (No. 7) in 1998. 
Montgomery Point Lock and Dam: Montgomery 
Point Lock and Dam (MPLD) is being constructed one 
half mile upstream from the Mississippi River, on the 
White River Entrance Channel, the first reach in the 
MCKARNS. Declining water surface elevations on the 
Mississippi River have been observed on the Mississippi 
river for a number of years, resulting in navigation restrictions 
on the White River. Construction of the 
MPLD would allow control of the water level in the entrance 
channel, which would maintain the reliability of 
the navigation system. 
A construction contract for MPLD was awarded to 
the joint venture of J. A. Jones and Guy F. Atkinson 
Construction Companies on 21 July 1997 for $186M. A 
notice-to-proceed was issued on 26 August 1997 and the 
contractor began mobilization on 23 September 1997 
An electric utility service contract completed construction 
in January 1999 of a power line to the project. 
Interim electric rates were signed with C&L Electric 
Cooperative on 24 March 1999, and the power line was 
37-2

LITTLE ROCK, AR DISTRICT 
energized in May 1999. Electric rates have been agreed 
upon only on an interim basis. A motion to request 
scheduling of a hearing before the Arkansas Public 
Service Commission(APSC) was filed on 17 May 2000 
and served upon C&L Electric's counsel; APSC has not 
set the hearing date yet. 
To assist the towing industry, a tow haulage system 
will be installed on the lock. The design has begun and 
is scheduled for completion in FY 2001. 
Additional funds in the range of $18-23 million will 
be needed in FY01 to continue with construction as 
scheduled. 
2. ARTHUR V. ORMOND LOCK & DAM 
(NO.9), AR 
Location, existing project, local cooperation, and 
terminal facilities. (See section 1.) 
Operations and results during fiscal year. Continued 
operation and maintenance. Rockefeller Lake 
(pool 9) has four developed parks that in 
FY00experienced public visitation exceeding 0.7 million 
visitor-hours. 
Condition at end of fiscal year. Construction began 
in April 1965 and the lock and dam was placed in 
operation in July 1969. Construction of Holla Bend closure 
structure (fish and wildlife mitigation) began in 
July 1986 and was completed in September 1987. Construction 
of a non-Federal hydropower project, under the 
authority provided by the Federal Energy Regulatory 
Commission, was completed and placed into operation 
m August 1993. Construction of a widened downstream 
entrance was completed in 1998. Installation of tow 
haulage equipment was complete in 1999. 
3. MCCLELLAN-KERR ARKANSAS 
RIVER NAVIGATION SYSTEM, 
BANK STABILIZATION & CHANNEL 
RECTIFICATION, AR 
Location. Several bank stabilization and channel 
rectification projects are laid out in various reaches extending 
from fixed point to fixed point on the Arkansas 
River from 33.7 to 362 miles above mouth and across 
the Arkansas-White cutoff, a 4- to 5-mile natural channel 
joining the Arkansas and White rivers about 18 and 
12 miles above their respective mouths. 
Existing project. Bank stabilization and channel 
rectification is a part of the MCKARNS. For a complete 
description of reach and location of each bank stabilization 
and channel rectification project, see the FY 81 Anal 
Report. Federal cost is $119,300,184 for the existing 
project in the Little Rock District. 
4. DAVID D. TERRY LOCK AND DAM 
(NO. 6), AR 
Location, existing project, local cooperation, and 
terminal facilities. (See section 1.) 
Condition at end of fiscal year. Construction began 
in January 1965 and the lock and dam project was 
placed in operation in August 1968. Tow haulage 
equipment was added in June 1993. Currently, the project 
has two developed parks which in FY00 experienced 
public visitation exceeding 2.9 million visitor-hours. 
5. EMMETT SANDERS LOCK AND 
DAM, AR 
Location, existing project, local cooperation and 
terminal facilities. (See section 1.) 
Operations and results during fiscal year. Continued 
operation and maintenance. Pool 4 has two developed 
parks, which in FY00 experienced public visitation 
exceeding 0.9 million visitor-hours. 
Condition at end of fiscal year. Construction began 
in May 1964 and the lock and dam project was 
placed in operation in December 1968. Construction of 
a 40-foot wide, 9,600-foot long highway bridge crossing 
the lock and dam was completed in July 1995. The 
Corps of Engineers, as the Federal agency, has jurisdiction 
and custody of the dam (23 U.S.C. 320 [Public Law 
2810]). The project was 100 percent funded by the Arkansas 
State Highway and Transportation Department. 
Tow haulage equipment was placed into operation in 
June 1993. 
6. JAMES W. TRIMBLE LOCK AND 
DAM (NO. 13), AR 
Location, existing project, local cooperation, and 
terminal facilities. (See section 1.) 
Operations and results during fiscal year. Continued 
operation and maintenance. In FY00, the project's 
three developed parks experienced public visitation 
exceeding 1.0 million visitor-hours. 
Condition at end of fiscal year. Construction began 
in October 1965 and the lock and dam were placed 
in operation in April 1969. The bridge across the dam 
was completed in July 1968. Construction of a non- 
Federal hydropower facility at the project was completed 
in November 1988 under the authority provided 
by the Federal Energy Regulatory Commission. The 
contract to install tow haulage equipment was awarded 
in December 1998. 
37-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
7. LOCK NO. 2 AND WILBUR D. MILLS 
(NO. 2), AR 
Location, existing project, local cooperation, and 
terminal facilities. (See section I.) 
Operations and results during fiscal year. Operation 
and maintenance continued. Wilbur D. Mills has 
five developed parks, which in FY00 experienced public 
visitation exceeding 3.0 million visitor-hours. 
Condition at end of fiscal year. Construction began 
in May 1963. The lock was placed in operation in 
March 1968. Emergency repairs to the scour protection 
features and tainter gates at the dam that resulted from a 
barge accident in December 1982 were completed in 
FY85. The barges that clogged the dam gates during the 
December 1982 flood showed that, with a certain set of 
circumstances (higher than normal head combined with 
the clogged gates resulted in high current velocity that 
caused both upstream and downstream scouring), the 
structure could fail. This condition exists primarily because 
the structure was constructed on piling and designed 
for all of the gates to operate in unison. 
A model study by the Waterways Experiment Station 
determined the most feasible solution to this problem is 
to extend the stilling basin downstream. A contract to 
extend the stilling basin was awarded in June 1990 and 
completed in FY94. Project costs are estimated at $21.6 
million. A contract was awarded in September 1995 to 
add tow haulage equipment at Lock No. 2. Construction 
of a non-Federal hydropower project, under the authority 
provided by the Federal Energy Regulatory Commission 
is complete and was placed into operation in December 
1999.. 
8. JOE HARDIN LOCK AND DAM 
(NO. 3), AR 
Location, existing project, local cooperation, and 
terminal facilities. (See section 1.) 
Operations and results during fiscal year. Continued 
operation and maintenance. Pool 3 has three developed 
parks which in FY00 experienced public visitation 
exceeding 0.3 million visitor-hours. 
Condition at end of fiscal year. Construction began 
in May 1963 and the lock and dam were placed in 
operation in December 1968. Tow haulage equipment 
was installed and operational in 1993. 
9. LOCK AND DAM NO. 5, AR 
Location, existing project, local cooperation and 
terminal facilities. (See section 1.) 
Operation and results during fiscal year. Continued 
operation and maintenance. Pool 5 has two developed 
parks which in FY00 experienced public visitation 
exceeding 0.7 million visitor-hours. 
Condition at end of fiscal year. Construction began 
in November 1964 and the lock and dam were 
placed in operation in December 1968. Tow haulage 
equipment was installed in June 1993. 
10. MURRAY LOCK AND DAM (NO. 7), 
AR 
Location, existing project, local cooperation, and 
terminal facilities. (See section 1.) 
Operations and results during fiscal year. Operation 
and maintenance continued. Murray has five developed 
parks, which in FY00 experienced public visitation 
exceeding 3.0 million visitor-hours. 
Condition at end of fiscal year. Construction began 
in November 1964 and the lock and dam was placed 
in operation in October 1969. Construction of a non- 
Federal hydropower facility at the project was completed 
in May 1988 under the authority provided by the 
Federal Energy Regulatory Commission. 
11. NORRELL LOCK AND DAM (NO. 1) 
AND ENTRANCE CHANNEL, AR 
Location, existing project, local cooperation, and 
terminal facilities. (See section 1.) 
Recommended modification. The White River Entrance 
Channel is the first reach in the MCKARNS project. 
This is the only reach in the navigation system 
where the minimum stage is controlled by the stages of 
the Mississippi River and not by a downstream dam. 
Water surface elevations on the Mississippi River have 
been declining for years due to changed hydraulic conditions 
and riverbed elevations, resulting in inadequate 
navigation depths in the White River Entrance Channel. 
Construction of the Montgomery Point Lock and 
Dam would eliminate the navigation restrictions. The 
new lock and dam will include "bottom" operated gates 
and a lock chamber of 600 feet by 110 feet with miter 
gates. The navigation pass over the dam (gates down) 
will be approximately 77 percent of the time for present 
conditions and 64 percent of the time for future conditions. 
Operations and results during fiscal year. Operation 
and maintenance continued. The project currently 
37-4

LITTLE ROCK, AR DISTRICT 
has one developed park which in FY00 experienced 
public visitation exceeding 0.7 million visitor-hours. 
Condition at end of fiscal year. Construction began 
in May 1963, and the lock and dam were placed in 
operation in June 1967. A contract to add tow haulage 
equipment to the lock was completed in 1997. 
12. TOAD SUCK FERRY LOCK AND 
DAM (NO. 8), AR 
Location, existing project, local cooperation, and 
terminal facilities. (See section 1.) 
Operations and results during fiscal year. Continued 
operation and maintenance. In FY00, the project's 
five developed parks experienced public visitation 
exceeding 1.0 million visitor-hours. 
Condition at end of fiscal year. Construction began 
in July 1965 and the lock and dam was placed in 
operation in November 1969. The Conway water supply 
project was completed and transferred to the city for 
operation and maintenance in July 1983. Installation of 
tow haulage equipment was complete in 1999. 
13. MAINTENANCE AND REPAIR 
FLEET AND MARINE TERMINALS, 
AR 
Location, existing project, local cooperation, and 
terminal facilities. (See section 1.) 
Operations and results during fiscal year. Operation 
and maintenance continued. 
Condition at end of fiscal year. Construction of 
Pine Bluff Marine Terminal began March 1968 and was 
placed in operation in April 1969. Construction of the 
Dardanelle Marine Terminal began June 1968 and it was 
placed in operation in November 1969. 
14. OTHER AUTHORIZED 
NAVIGATION PROJECTS 
(See Table 37-C for other authorized navigationl 
projects.) 
15. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Preauthorization studies under the small project continuing 
authorities program, navigation activities, Section 
107, Public Law 86-645, as amended. Expenditures 
for Sec. 107 activities in FY00 totaled $22,410.77. Coordination 
account, $11,826.42 Russellville Harbor, Arkansas 
River, AR; $10,584.35. 
Flood Control 
16. BLACK RIVER, POPLAR BLUFF, MO 
Location. The project is located along the Black 
River, in Poplar Bluff, MO, about 160 miles south of St. 
Louis, MO. 
Existing project. The project consists of a 1,200- 
foot long, 3-foot high, reinforced concrete floodwall and 
stop-log structure. Total project cost was $470,000 with 
the Federal share at $333,900 and the non-federal share 
at $136,100. Construction was authorized under the 
Continuing Authorities Program, Section 205, Flood 
control Act of 1948, as amended. 
Local cooperation. The project cooperation agreement 
was signed December 2, 1996. The local sponsor 
was the city of Poplar Bluff. 
Operations and results during fiscal year. The 
O&M manual was completed and provided to the city. 
The project was financially closed-out in June 2000. 
17. BLUE MOUNTAIN LAKE, AR 
Location. (See Table 37-1: Arkansas River Basin, 
AR, OK, and KS: Lakes.) 
Existing project. Construction cost was approximately 
$5.1 million. For further information see pages 
906 and 907 of the 1962 Annual Report. 
Local cooperation. Section 2, Flood Control Act of 
1938 applies. 
Operations and results during fiscal year. Operation 
and maintenance of project continued. Flood damages 
prevented during FY00 are estimated at $522,700; 
cumulative benefits through September 30, 2000, are 
estimated at $28,183,900. The project's five developed 
parks experienced public visitation exceeding 1.4 million 
visitor-hours. 
Condition at end of fiscal year. Project is complete 
except for additional recreational sanitary facilities. 
Construction of the project began in May 1940 and it 
was placed in operation in March 1947. 
18. CLEARWATER LAKE, MO 
Location. (See Table 37-K: White River Basin, AR 
& MO: Lakes.) 
Existing project. Construction cost, including the 
cost of modifying the project, is estimated at $22.4 million. 
For further information see pages 897 and 898 of 
1962 Annual Report. 
Major rehabilitation. Construction began in November 
1987 on a seepage berm on the upstream face of 
37-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
the dam, a grout curtain on the right abutment, and a 
parapet wall along the dam. 
An additional 9 acres of land was acquired to widen 
the spillway from 190 feet to 370 feet. The widened 
spillway will pass about 90 percent of the probable 
maximum flood with water surface at the top of existing 
dam and parapet wall, preventing waves from overtopping 
the dam. The cost of the modification was 
$11,467,910. Construction was complete in September 
1989. 
Local cooperation. Section 2, Flood Control Act of 
1938 applies. 
Operations and results during fiscal year. Operation 
and maintenance continued. Flood damages prevented 
during FYO0 are estimated at $724,500; cumulative 
benefits through September 2000 are estimated at 
$182,012,200. Project currently has 6 developed parks, 
which in FY00 experienced public visitation exceeding 
4.8 million visitor-hours. 
Condition at end of fiscal year. Project is complete 
except for improvements to the sanitary facilities in the 
recreation areas. Construction of the project began in 
June 1940 and was ready for beneficial use in March 
1948. A new water control plan is being considered that 
better meets the needs of the interests in the basin. Objections 
by the Arkansas Game & Fish Commission 
during the review of the Draft Environmental Assessment 
has delayed progress on implementation of the 
proposed plan. 
19. DEQUEEN LAKE, AR 
Location. On Rolling Fork River, RM 22.8, a 
tributary of the Little River, in Sevier County, about 4 
miles northwest of DeQueen, AR. 
Existing project. An earth-fill dam, 2,360 feet long, 
constructed to 160 feet above streambed. An uncontrolled 
spillway, 200 feet wide, is about 1,400 feet east 
of main embankment. Outlet works consist of a gated 
conduit, 12 feet in diameter. 
The lake controls 169 square miles of drainage area 
and provides a total storage of 136,100 acre-feet 
(101,200 acre-feet for flood control storage, 25,500 
acre-feet for conservation storage, and 9,400 acre-feet 
for sedimentation reserve). Federal cost of the project is 
estimated at $19,623,752. 
Local cooperation. Section 2, Flood Control Act of 
1938, and Section 301, Water Supply Act of 1958, as 
amended, apply. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. Flood damages 
prevented during FY00 are estimated at $239,500; cumulative 
benefits through September, 2000, are estimated 
at $8,985,500. In FY00, the project's six developed 
parks experienced public visitation exceeding 1.4 
million visitor-hours. 
Condition at end of fiscal year. Construction began 
April 1966. Project was placed in useful operation 
in August 1977. 
20. DIERKS LAKE, AR 
Location. On Saline River, RM 56.6, a tributary of 
the Little River, about 5 miles northwest of Dierks, 
Howard County, AR. 
Existing project. An earth-fill dam, 2,760 feet long, 
and about 153 feet above the streambed. An uncontrolled 
spillway 800 feet wide is in a saddle at the west 
end of the dam. Outlet works consisting of a gated 6- by 
9-foot oblong conduit, one 24 -inch low-flow pipe, and 
one 30-inch water supply pipe are provided. The lake 
controls a drainage area of 114 square miles and provides 
for storage of 67,100 acre-feet for flood control 
and 29,700 acre-feet for water supply, conservation, and 
sedimentation reserve, a total of 96,800 acre-feet. The 
Federal cost of the project was $16,002,903. 
Local cooperation. Section 2, Flood Control Act of 
1938, and Water Supply Act of 1958, as amended, apply.
Operations and results during fiscal year. Continued 
operation and maintenance. Flood damages prevented 
during FY00 are estimated at $116,200; cumulative 
benefits through September 2000, are estimated at 
$5,458,300. Currently have three developed parks, 
which in FY00 experienced 0.8 million visitor-hours. 
Condition at end of fiscal year. Construction began 
in June 1968. In May 1975, the embankment closure 
was completed and the project was placed in useful 
operation. 
21. FOURCHE BAYOU BASIN, LITTLE 
ROCK, AR 
Location. On Fourche, Rock and Grassy Flat 
Creeks in the vicinity of Little Rock, Pulaski County, 
AR.
Existing project. The project, authorized by the 
Water Resources Development Act of 1986 (PL99-662), 
consists of widening, clearing and snagging with alteration 
of highway and railroad bridges. This work was 
physically completed February 1996. Authorization 
also included the acquisition of 1,750 acres of bottom- 
Slands and nature appreciation facilities. The ASA(CW) 
declined to include the bottomland acquisition when the 
Sproject was authorized. In 1996, that decision was re- 
37-6

LITTLE ROCK, AR DISTRICT 
versed. A decision document is to be prepared to determine 
whether to budget for including the bottomland 
acquisition. An environmental baseline study was completed 
in FY 98 to delineate between potential HTRW 
sites and clean areas within the bottomlands prior to any 
acquisitions. The estimated project cost is $33,300,000; 
Federal, $22.7 million; non-Federal $10.6 million. 
Local cooperation. The city of Little Rock, the 
project sponsor, signed the local cooperation agreement 
in August 1987. 
Operations and results during the fiscal year.. A 
project study plan for the decision document was prepared 
for SWD approval based on HQ guidance provided 
August 2000 for the acquisition of the 1,750 acres 
of Fourche bottomlands and nature appreciation areas. 
22. GILLHAM LAKE, AR 
Location. Damsite is on the Cossatot River, RM 
49.0, in Howard County, about 5 miles northeast of 
Gillham in Sevier County, AR. 
Existing project. Federal cost of the project was 
$17,827,111. 
Local cooperation. Section 2, Flood Control Act of 
1938, and Section 301, Water Supply Act of 1958, as 
amended, apply. Tri-Lakes Water District furnished a 
resolution of intent to repay costs allocated to water 
supply storage. 
Operations and results during fiscal year. Continued 
operation and maintenance. Flood damages prevented 
during FY00 are estimated at $247,200; total 
cumulative flood damages prevented are estimated at 
$11,946,100. In FY00, the project's four developed 
parks experienced public visitation exceeding 1.4 million 
visitor-hours. 
Condition at end of fiscal year. Construction began 
in June 1968. The embankment closure was completed 
in May 1975, and the project was placed in useful 
operation. 
23. LITTLE RIVER BASIN, AR 
Location. Improvements are on the Little River and 
tributaries in Arkansas. More definite location of individual 
items is shown in Table 37-J. 
Existing project. A six-lake system for flood control 
and other purposes in the Little River Basin. The 
system consists of four lakes in Arkansas: Millwood on 
the main stem, Dierks on the Saline River, DeQueen on 
thRe olling Fork River, and Gillham on the Cossatot 
River; and two lakes in Oklahoma: Broken Bow on the 
Mountain Fork River and Pine Creek on the Little River. 
Under a District boundary change, effective in October 
1980, the four projects in this system in Arkansas were 
reassigned from the Tulsa District to the Little Rock 
District. 
Local cooperation. Section 2, Flood Control Act of 
1938, and Section 301, Water Supply Act of 1958, as 
amended, apply. Tri-Lakes Water District (DeQueen, 
Gillham, and Dierks) furnished a resolution of intent to 
repay costs allocated to water supply storage. The 
Southwest Arkansas Water District is currently repaying 
costs allocated to water supply storage at Millwood 
Lake. 
Operations and results during fiscal year. Operation 
and maintenance of projects continued. See individual 
projects for details. Flood damages prevented by the 
Little River Basin reservoirs during FY00 are estimated 
at $907,500; cumulative benefits through September, 
2000, are estimated at $39,298,400. 
Withdrawals for water supply purposes were: The; 
Tri-Lakes Water District, AR, 1,401 acre-feet from Gillham 
Lake; Tri-Lakes Water District, AR, 390 acre-feet 
from Dierks Lake; Tri-Lakes Water District, AR, 276 
acre-feet from DeQueen Lake, and Southwest Arkansas 
Water District, AR, 80,444 acre-feet from Millwood 
Lake. 
Condition at end of fiscal year. Millwood, De- 
Queen, Gillham, and Dierks Lakes are complete and in 
operation. 
24. MILL CREEK, FORT SMITH, AR 
Location. In southwest Fort Smith, Sebastian 
County, AR. 
Existing project. The project was constructed under 
Section 205 of the Continuing Authority Program. The 
project included improvements on 3.9 miles of the Mill 
Creek channel and modifications on three bridges. Project 
construction was completed in November 1992. The 
estimated project cost is $8,959,300: $4,843,000, Federal 
and $4,116,300, non-Federal. 
Local cooperation. The city of Fort Smith, the local 
sponsor, signed the local cooperation agreement in November 
1988.The city assumed project operation and 
maintenance on 17 June 1993. 
25. MILLWOOD LAKE, AR 
Location. On the Little River, RM 16.0, approximately 
7 miles east of Ashdown, Little River County, 
AR, and about 2 miles northeast of Millwood, Little 
River County, AR. 
Existing project. The Federal cost of the project 
was $46,087,382. 
37-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Local cooperation. Section 2, Flood Control Act of 
1938 applies. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. Flood damages 
prevented during FY00 are estimated at $304,600; cumulative 
benefits through September, 2000, are estimated 
at $12,908,500. Millwood Lake has 12 developed 
parks which in FY00 experienced public visitation 
exceeding 4.2 million visitor-hours. 
Condition at end of fiscal year. Construction began 
in September 1961 and the project was placed in full 
flood control operation in August 1966. 
26. NIMROD LAKE, AR 
Location. 
Existing project. Estimated cost is $4,092,825. For 
further information see pages 908 and 909 of 1962 Annual 
Report. 
Local cooperation. Section 2 of the 1938 Flood 
Control Act applies. 
Operations and results during fiscal year. Operation 
and maintenance of project continued. Addition 
and improvement to existing recreation sanitary facilities 
continued. In FY00, seven parks experienced public 
visitation exceeding 1.9 million visitor-hours. During 
FY00, flood damages prevented are estimated at 
$547,700; cumulative benefits through September, 
2000, are estimated at $19,902,800. 
Condition at end of fiscal year. Project is complete. 
27. WHITE RIVER BASIN (LITTLE 
ROCK DISTRICT), AR & MO 
Location. Improvements are on the White River 
and tributaries, Arkansas and Missouri. More definite 
location of individual items is shown in Table 37-K: 
White River Basin. 
Existing project. A general comprehensive plan for 
flood control and other purposes in the White River Basin. 
The plan includes seven lakes; two are flood control 
only projects and five are multiple-purpose projects. 
Beaver, Table Rock, Bull Shoals, Norfork, Clearwater, 
Greers Ferry and Bell Foley lakes were selected and approved 
for construction by the Chief of Engineers, and 
individual reports on six of these seven lakes are presented 
on subsequent pages. The Bell Foley project, the 
remaining unbuilt authorized project, was reevaluated in 
FY 89; the project continues to have a favorable benefitto-
cost ratio since its formulation in 1968. The lakes in 
the plan are listed in Table 37-K: White River Basin. 
Local cooperation. Section 2, Flood Control Act of 
1938 applies, Water Supply Act of 1958, as amended, 
applies to Beaver, Greers Ferry, and Norfork projects. 
Operations and results during fiscal year. Operation 
and maintenance of projects continued. Flood damages 
prevented by the White River Basin lakes during 
FY00 are estimated at $8,330,000; cumulative benefits 
through September, 2000, are estimated at 
$548,375,600. Flood damages prevented by the White 
River Basin levees during FY00 are estimated at 
$980,400; cumulative benefits through September 2000, 
are estimated at $86,607,000. 
Electric energy delivered to Southwestern Power 
Administration for marketing during FY00 totaled 1.5 
billion kilowatt-hours. 
Water releases for fish hatcheries were: 29,038 acrefeet 
from Norfork Lake for Fish and Wildlife Service 
trout hatchery; 14,519 acre-feet from Table Rock Lake 
for Missouri Conservation Commission trout hatchery; 
and, 14,519 acre-feet from Greers Ferry Lake for U.S. 
Fish and Wildlife Service trout hatchery. 
Withdrawals for water supply purposes were: Beaver 
Water District, AR, 46,154 acre-feet, and Carroll-Boone 
Water District, AR, 8,199 acre-feet, from Beaver Lake; 
Madison County Water District, AR, 2,631 acre-feet, 
and Benton-Washington Counties Water District, AR, 
5,707 ac-ft, from Beaver Lake; Kings River Country 
Club, 35 ac-ft, from Table Rock Lake; Marion County 
Regional Water District, AR, 920 acre-feet from Bull 
Shoals Lake; Water and Sewer Improvement District 
No.3 of Mountain Home, AR, 4,284 acre-feet from Norfork 
Lake; and the city of Clinton, AR, 2,140 acre-feet; 
Community Water System, Inc., AR, 4,271 acre-feet; 
Red Apple Inn, AR, 137 ac-ft; and, Thunderbird Country 
Club, AR, 43 ac-ft, from Greers Ferry Lake. 
Condition at end of fiscal year. Beaver, Table 
Rock, Bull Shoals, Norfork, Clearwater, and Greers 
Ferry lakes are complete and in operation. Progress 0n 
these lakes is shown in individual reports. Water Valley 
and Lone Rock lakes have been deauthorized. A 
new water control plan was approved and implemented 
in December 1998. This plan was developed in close 
coordination with the basins various interests and was 
recommended as their preferred plan of operation. 
28. WHITE RIVER, BATESVILLE, AR 
Location. On the White River, within the city of 
Batesville, Independence County, AR. 
Existing project. The Definite Project Repod 
(DPR), recommending construction of a levee ad 
37-8

LITTLE ROCK, AR DISTRICT 
floodwall to protect the industrial area, under Section 
205 of the 1948 Flood Control Act, was approved in 
June 1988. The project includes 4,855 feet of 
levee/floodwall, 9 stoplog structures, 6 drainage structures, 
a stoplog storage area, 3 sewerline control gates, 
and a two-gage automated warning system.. The 
levee/floodwall construction contract was awarded in 
July 1995 and completed in Dec 1996. The 
levee/floodwall was transferred to the city of Batesville 
for operation and maintenance March 14, 1997. However, 
in Aug. 1999, it was determined that erosion to the 
bank and at two drainage structure culverts required a 
design deficiency correction. Estimated total project 
cost is $3.96 million with a Federal share of 2.97 million.
Local cooperation. The city of Batesville signed a 
local cooperation agreement in January 1994 with the 
U.S. Army Corps of Engineers. The city's project share 
is estimated to be $990,000. 
Operations and results during the fiscal year. The 
erosion correction design was completed and the announcement 
for construction was made in Dec. 2000. 
29. WHITE RIVER, JACKSONPORT, AR 
Location. On the left bank, of the White River at 
RM 256 between Newport and Jacksonport, Jackson 
County, AR. 
Existing project. 300 feet of revetment was added 
to the existing revetment which protected the Massey- 
Alexander Levee (formerly known as Jackson County 
Levee District No. 2) under authority of Section 205 of 
the Flood Control Act of 1948, as amended. The project 
cost was estimated at $123.600 with a Federal share of 
$92.700. The construction started August 1996 and was 
completed December 1996. 
Local cooperation. The Massey-Alexander Levee 
District signed a Project Cooperation Agreement (PCA) 
in September 1995. An additional 535 feet of revetment 
was added, as a betterment, to protect a natural gas 
Pipeline at the local sponsor's expense of $206,000. 
The sponsor assumed operation of the project in No- 
Vember 1997. 
30. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Approved regulations for operation and maintenance 
of flood control works, Part 208 of Title 33, Code of 
Federal Regulations, provide for periodic inspection of 
Completed projects transferred to local interests for operation 
and maintenance. Inspections of local flood 
protection projects were made to determine extent of 
compliance with approved regulations for maintenance 
and operation of these projects. Responsible officials of 
improvement districts concerned were advised of inadequacies 
in maintenance and operation of local flood 
protection works under their jurisdiction where appropriate. 
Costs for FY00 were $100,769.54. Total accumulative 
cost through September, 1999, was 
$2,218,182.08. 
31. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
(See Table 37-E: Other Authorized Flood Control 
Projects.) 
32. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
(1) Emergency bank protection, Section 14, 1946 
Flood Control Act. FY00 costs, Federal $136,689.75; 
Section 14, Coordination Account, $15,363.32; Batesville 
Water Tower, AR, project was completed 24 July 
2000, at a project cost of $513,100 with a Federal share 
of $333,515, FY00 Federal funds $30,905.09; Beaver 
Creek at Slough Hollow, MO, Federal $74,934.29; and 
Highway 69 at Black River, Jackson, Federal 
$15,487.05 
(2) Snagging and clearing, Section 208, 1954 Flood 
Control Act. Fiscal year costs: None. 
(3) Flood control activities, Section 205, 1948 Flood 
Control Act. FY00 costs, $254,989.46: Section 205 Coordination 
Account, $13,514.81; Black River, Poplar 
Bluff, Mo., $6,459.43; White River, Batesville, AR, 
$87,592.95; Brodie Creek, Little Rock, AR, $0.57; 
Spadra Creek, Clarksville, AR, . $48,070.31; Dark Hollow, 
North Little Rock, AR, $9,022.60; Coleman Creek, 
Little Rock, AR, $9,938.68; Crooked Creek, Bryant, 
AR, $1,069.86; Clear Creek, Pierce City, MO, 
$4,696.98; Jam Up Creek, Mountain View, MO, 
$683.07; Mill Creek, AR, $6,963.11; Lone Star Water 
Management Project, $49,078.69; Cypress Creek, Perry, 
AR, $17,898.40. 
Emergency Response Activities 
(1) Public Law 84-99 (Flood Control and Coastal 
Emergency): None 
(2) Emergency Work for Others: None for FY00. 
Multiple-Purpose Projects Including Power 
33. BEAVER LAKE, AR 
Location. (See Table 37-K. White River Basin.) 
17-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Existing project. Estimated cost is $50,797,000. 
For further information see 788 and 789 of 1966 Annual 
Report. (For authorization see Table 37-B. ) 
Major rehabilitation. Since the dam was constructed 
there has been a seepage problem below Dike 
No. 1. Based on detailed investigation, it was determined 
that the limestone fouhdation under Dike 1 and 
200 feet of the north end of the main dam embankment 
is the main problem. The plan of improvement was a 
concrete seepage cutoff in Dike 1 and the north end of 
the main dam. A $16.9-million contract to construct a 
concrete cutoff wall was awarded in June 1989; the notice 
to proceed was issued in October 1989. The contract 
period was estimated to be 760 days. However, the 
contractor ceased productive work due to inability to excavate 
rock and was been placed in default. An $18.8 
reprocurement contract was awarded in April 1992. 
Work began in May 1992 and all work was completed in 
Nov 1995. Project cost is estimated at $26,588,000 million.
The Beaver Dam Safety Assurance study was completed 
with FY 97 expenditures of $1,359.61. 
Water Quality Enhancement. Congress directed 
the Corps to implement best management practices 
(BMP's) in the Beaver Lake watershed and monitor the 
effects of these practices on water quality. A study was 
completed and a project report was approved in July 
1989. The BMP's and water quality monitoring were 
concurrently implemented over a 5-year period which 
began in May 1991 with a project completion date of 
July 1997. 
The BMP's were implemented under the terms of a 
memorandum of agreement between the Corps and the 
Natural Resources Conservation Service (NRCS), formerly 
the Soil Conservation Service, with the assistance 
of the Agricultural Stabilization and Conservation 
Service. The water quality monitoring was implemented 
under terms of a local cost-sharing agreement with the 
Arkansas Soil and Water Conservation Commission. 
Water quality monitoring was performed in consultation 
with the Environmental Protection Agency by a Corps 
administered contract. The water quality-monitoring 
contract was awarded on January 29, 1992. Water quality 
sampling began in May 1992 and was completed on 
July 1, 1996. BMP implementation was completed 
August 31,1995. Cost in FY98 was $67,897.93 Federal, 
and $1,434.58 non-Federal. Total project cost was 
$6,878,775.15 
Environmental Infrastructure Assistance. The 
Water Resources Development Act of 1992 authorized 
the Corps of Engineers to provide design and construction 
assistance to appropriate non-Federal interests for a 
water transmission line from the northern part of Beaver 
Lake, Arkansas, into Benton and Washington Counties. 
This project is part of a $40 million project, which includes 
a water intake, treatment and storage facilities, 
and transmission lines. The project sponsor is the 
Benton/Washington County Water Association, and the 
primary source of funding is the Rural Economic and 
Community Development Service (formerly the Farmers 
Home Administration, U.S. Department of Agriculture). 
The Little Rock District and the project sponsor executed 
a Memorandum of Agreement in June 1997. The 
Little Rock District then transferred $3 million to the 
sponsor for construction of a segment of the water 
transmission line. 
Local cooperation. Section 2 of the 1938 Flood 
Control Act, and the 1958 Water Supply Act, as 
amended, apply. 
Operations and results during fiscal year. Continued 
operation and maintenance. Flood damages prevented 
during FY00 are estimated at $712,900; cumulative 
benefits are estimated at $38,779,300. During the 
year 90,256,100 kilowatt-hours of electrical energy were 
delivered to the Southwestern Power Administration for 
marketing. The project has eleven developed parks, 
which in FY00 experienced public visitation exceeding 
20.2 million visitor-hours. An agreement to provide 
21,972.14 acre-feet of storage at no charge to the Arkansas 
Game and Fish Commission for fish production facilities 
was sent to HQ for approval in July 2000. 
Condition at end of fiscal year. Project is complete. 
Alterations to existing parks to enhance fee collections, 
improve efficiency, and reduce the maintenance 
effort or rehabilitate the 26-year old park operation 
through operation and maintenance and SRUF funds, as 
appropriate. Construction of the project began in October 
1959 and was placed in operation for flood control 
in December 1963, hydroelectric power generation with 
both units in May 1965, and water supply in January 
1966. Work on a dam seepage problem is complete. 
34. BULL SHOALS LAKE, AR 
Location. (See table 37-K: White River Basin, AR & 
MO.) 
Existing project. Cost with eight generating units 
was $88,858,711. For further information see pages 725 
and 726 of 1965 Annual Report. (For authorization see 
table 37-B.) 
Local cooperation. Section 2, Flood Control Act of 
1938 applies. 
Operations and results during fiscal year. Continued 
operation and maintenance. Flood damages prevented 
during FY00 are estimated at $3,247,800; total 
cumulative flood damages prevented are estimated at 
$150,790,000. During the year, more than 301,489,000 
37-10

LITTLE ROCK, AR DISTRICT 
kilowatt-hours of electrical energy were delivered to 
Southwestern Power Administration for marketing. The 
project has eighteen developed parks, which in FY00 
experienced public visitation exceeding 26.1 million 
visitor-hours. 
Condition at end of fiscal year. Project is complete. 
Alterations to existing parks are needed to enhance 
fee collections, to improve efficiency, to reduce 
maintenance effort or to rehabilitate the 37-year-old 
park facilities through operations and maintenance or 
SRUF funds, as appropriate. Low dissolved oxygen 
readings in the downstream area of Bull Shoals Dam in 
October 1990 have resulted in ongoing studies to be undertaken 
to minimize harmful effects on the trout fishing 
of the White River. 
Unguaranteed short-term solutions to the problem, 
consisting of limiting generation, will sustain the existing 
fishery, but long-term guaranteed changes will require 
congressional authorization. Construction of the 
project began in April 1946 and was ready for beneficial 
flood control use in June 1951 and generation of electrical 
energy in September 1952. Units 1 through 8 were 
placed in operation September 1952, December 1952, 
June 1953, January 1962, February 1962, August 1963, 
and September 1963, respectively. 
Major rehabilitation (Powerhouse). A major rehabilitation 
study was initiated in October 1995. The 
study was to investigate a solution to the environmentally 
induced reliability problem (low dissolved oxygen) 
of these units. Potential solutions include new autoventing 
turbines, a down stream weir, turbine venting, or 
forced-air. Following preliminary study results, the turbines 
were modified in 1997 to increase downstream 
aeration. The study has been suspended while the effects 
of these modifications are evaluated. 
35. DARDANELLE LOCK AND DAM 
(NO. 10), AR 
Location. (See Table 37-H. Arkansas River Basin, 
AR, OK, and KS: Navigation.) 
Existing project. Project is a unit of MCKARNS. 
Dam is 2,683 feet long and 68 feet high. It has a spill- 
Way with 20 tainter gates 50 feet long and 39 feet high. 
Navigation lock is 110 by 600 feet with a lift of 54 feet. 
Powerhouse originally contained four 31,000-kilowatt 
generators. Lake has a storage capacity of 486,200 acrefeet. 
Estimated cost was $84,270,124. 
Local cooperation. (See section 1.) 
Operations and results during fiscal year. Continued 
operation and maintenance. Power generation 
Coltined. During FY00, about 480,321,000 kilowatthours 
of electrical energy were delivered to the Southwestern 
Power Administration for marketing. In FY00, 
the project's thirteen developed parks experienced public 
visitation exceeding 7.2 million visitor-hours. 
Condition at end of fiscal year. Project is complete. 
Construction began June 1957. Power units were 
placed on line in April, May, and September 1965, and 
January 1966. The lock became operable in December 
1969. The Visitors Center and resident office were 
completed in May 1985. The contract to install tow 
haulage equipment was awarded in December 1998. 
Major rehabilitation. Major Rehabilitation of the 
power plant was completed in August 2000. Turbines 
were replaced and generators were rewound to increase 
plant capacity by 13 percent. Cost of the Major Rehabilitation 
was $28.8 million. 
36. GREERS FERRY LAKE, AR 
Location. (See Table 37-K.: White River, AR & 
MO. ) 
Existing project. Estimated cost is $55,125,000. 
For further information see page 740 of 1964 Annual 
Report. 
Local cooperation. Section 2, 1938 Flood Control 
Act and 1988 Water Supply Act, as amended, apply. 
Operations and results during fiscal year. Continued 
operation and maintenance. Flood damages prevented 
during FY00 are estimated at $1,010,300; total 
cumulative flood damages prevented are estimated at 
$29,613,900. In FY00, 80,411,000 kilowatt-hours of 
electrical energy were delivered to the Southwestern 
Power Administration for marketing. The project has 
seventeen developed parks, which in FY00 experienced 
public visitation exceeding 29.2 million visitor-hours. 
The project's operational management plan provides 
means by which the natural resources, including water 
quality, aesthetic value, forestry, fish and wildlife are 
managed and protected for future generations. An allvolunteer 
environmental program (annual cleanup) has 
been most successful and serves as a model for the Nation. 
During the past 27 years the program has won 
more than 26 national awards. 
Condition at end of fiscal year. Project is complete. 
Construction of the project began in June 1957 
and was ready for beneficial flood control use in January 
1962. Power units 1 and 2 were operable in March and 
May 1964, and water supply was operable in April 
1971. The Visitors Center was completed in June 1983 
at a cost of $813,000. 
37. NORFORK LAKE, AR 
Location. (See Table 37-K: White River Basin, AR 
& MO.) 
37-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Existing project. The total estimated cost is 
$70,701,629, including highway bridge construction. 
This does not include an estimate for the addition of 
power units 3 and 4, which were authorized, but never 
built. For further information see page 896 of 1962 Annual 
Report. 
Local cooperation. Section 2, Flood Control Act of 
1938 and Water Supply Act of 1958, as amended, applies. 
Operations and results during fiscal year. Continued 
operation and maintenance. Flood damages prevented 
during FY00 are estimated at $897,500; total 
cumulative flood damages prevented through September 
2000, are estimated at $49,409,500. During the year, 
more than 66,345,000 kilowatt-hours of electrical energy 
was delivered to the Southwestern Power Administration 
for marketing. The project's 18 developed 
parks experienced public visitation exceeding 15.4 million 
visitor-hours during FY00. 
Condition at end of fiscal year. Construction of 
project began in October 1940, ready for beneficial 
flood control use in June 1943, and for generation of 
electrical energy with one unit in June 1944. Second 
unit was added in February 1950. Water supply was 
added as a purpose in December 1969. Construction of 
two highway bridges over Norfork Lake to replace ferries 
was completed in November 1982. The bridges 
were transferred to the Arkansas Highway and Transportation 
Department for operation and maintenance in 
July 1984. 
38. OZARK-JETA TAYLOR LOCK AND 
DAM (NO. 12), AR 
Location. (See Table 37-H: Arkansas River Basin, 
AR, OK, and KS: Navigation.) 
Existing project. Project is a unit of MCKARNS. 
The dam is 2,480 feet long and 58 feet above streambed; 
spillway has 15 tainter gates, each 50 feet long and 46 
feet high. Navigation lock is 110 by 600 feet with a lift 
of 34 feet. Powerhouse contains five 20,000 kilowatt 
generators. Lake has a storage capacity of 148,400 acrefeet. 
In addition, one foot of power pondage is provided 
in Pool 13 between elevations 391.0 and 392.0. Cost 
was $85,629,412. (For authorization see table 37-B.) 
Local cooperation. (See section i.) 
Operations and results during fiscal year. Continued 
operation and maintenance. Delivered 
277,240,000 kilowatt-hours of electrical energy to 
Southwestern Power Administration for marketing. 
Ozark Lake has 10 developed parks which in FY00 experienced 
public visitation exceeding 1.3-million visitorhours. 
Condition at end of fiscal year. Construction began 
in December 1964. Project is complete. Lock and 
dam was placed in operation in November 1969. Power 
units were placed on line as follows: unit 1, November 
1972; unit 2, August 1973; unit 3, October 1973; unit 4, 
December 1973; and unit 5, May 1974. 
A major rehabilitation study was initiated in October 
1996. The powerplant has experienced numerous mechanical 
problems and major repair requirements since 
its construction. The study describes the condition of 
the powerplant and reviews alternative solutions. The 
Rehabilitation Study Report was submitted in March 
1999; it was removed from the 2001 budget. Funding is 
being sought for inclusion of the Report in the 2002 
budget 
39. TABLE ROCK LAKE, MO 
Location. (See Table 37-K: White River Basin, AR 
& MO.) 
Existing project. Cost was $119,491.90. For further 
information see page 893 of 1962 Annual Report. 
(For authorization see table 37-B.) 
Dam Safety (Assurance). Table Rock Dam has a 
hydrologic deficiency. The Probable Maximum Flood 
(PMF) would overtop the dam more than 5 feet and 
would breach the earthen embankment portion of the 
dam, causing catastrophic flood conditions. An auxiliary 
gated spillway to safely pass the PMF is currently 
under construction. The project is being built in two 
major phases. The first phase contract was awarded in 
March 1999 and consists of the excavation of the approach 
channel, foundation grouting, and the construction 
of a portion of the earthen embankment. The second 
phase contract will be awarded in June 2000 and 
will consist of the major dam construction (including 
bridge, gates, concrete, etc...) and the excavation of the 
approach channel. The total estimated project cost is 
$60.2 million. 
Local cooperation. Section 2 of the 1938 Flood 
Control Act applies. 
Operations and results during fiscal year. Continued 
operation and maintenance. Flood damages prevented 
during FY00 are estimated at $1,737,000; total 
cumulative flood damages prevented are estimated at 
$97,770,700. During the year, about 232,300,000 kilowatt-
hours of electrical energy were delivered to the 
Southwestern Power Administration for marketing. The 
District and the Waterways Experiment Station are investigating 
the possibilities of improving the quality o0f 
Table Rock releases with a hypolimnetic oxygenation 
37-12

LITTLE ROCK, AR DISTRICT 
system. Table Rock Lake has fifteen developed parks 
which in FY00 experienced public visitation exceeding 
20 million visitor-hours. This project's operational 
management plan provides means by which the natural 
resources, including forestry, fish and wildlife, are managed 
and protected for future generations. 
Condition at end of fiscal year. Project is complete 
except for addition and improvement to existing recreational 
sanitary facilities. Construction of project began 
in October 1954. The project was ready for beneficial 
flood control use in November 1958, and for generation 
of electrical energy with units 1 and 2 in May 1959. 
UniteI a -d, 4 i -Adl d ii Aauil--u d 1961 
L s a wcI rceU c II r111 al 1 
General Investigations 
40. SURVEYS 
Expenditures for surveys 
$1,136,913.64. 
ect is channel modification that will include replacement 
of the tunnel under the Redwood Street area within the 
city limits of North Little Rock. Congress provided 
$250,000 in Federal funds for FY 2000 and $375,000 in 
FY 2001. Contributed funds in FY 2000 were $83,000 
and $125,000 in FY 2001. 
(2) Reservoirs: Pine Mountain Lake, AR, $550.10. 
42. COLLECTION AND STUDY OF 
BASIC DATA. 
Total expenditures in FY00 were $429,986.33. 
(1) Flood Plain Management Services (FPMS): Expenditures 
for FPMS activities in FY00 totaled 
$429,986.33. National Flood Proofing Committee, 
$80,832.57; Flood Plain Management Services, 
$115,052.18; Technical Services, $78,495.80; Quick 
Responses, $10,000; SS - Elkins, AR FW, $67.44; SS - 
in FY00 totaled Hollister, MO, $264.82; SS - Forsyth, MO, $42.54; SS - 
Farmington,AR, $59,980.50; SS - Fayetteville, AR, 
$t1c6 - c4cS W hinctt n Cntn,. AR $'252 78 5fZ. CC 
(1) Flood damage prevention studies, FY00 expenditures, 
$315,254.85: Arkansas River, Fort Smith, AR, 
$16,128.92; May Branch, Ft. Smith, AR, Reconnaissance 
Study, FY00 Federal funds expenditures were 
$19,626.70; May Branch, Ft. Smith, AR, Feasibility 
Study, FY00 Federal funds expenditures were 
$279,499.23 . 
(2) Miscellaneous activities. FY00 expenditures, $ 
55,360.01: Special investigations, $35,398.26; Review 
of FERC Licenses, $3,554.46; Interagency Water Resource 
Development, $14,436.30; North American Waterfowl 
Management Plan, $1,970.99. 
(3) Coordination with Other Agencies and Non-Fed., 
FY00 expenditures, $73,181.30: Cooperation w/other 
Water Agencies, $5,975.74. Planning Assistance to 
States (PAS): Negotiation Funds, $1,518.30; Black and 
Arkansas Rivers, AR $112.23; Monett, MO, Flood Hazard 
Study, $26,991.56; Willow Spring, MO, Flood Hazard 
Study, $4.34; Conway, AR Water Supply Study, 
$16,392.42; and Little Red River, AR Water Supply, 
$22,186.71. 
41. PRECONSTRUCTION 
ENGINEERING & DESIGN (PED). 
Total PED expenditures in FY00 were $175,703.92. 
(1) Local Protection: Arkansas River, Tucker Creek, 
FY00 costs were $807.86. FY00 expenditures for North 
Little Rock, AR, Dark Hollow were $174,345.96. PED 
activities including a Limited Reevaluation Report for 
the Dark Hollow project were initiated in FY 2000. A 
Design Cost-Sharing Agreement was executed on 30 
May 2000 with the City of North Little Rock. The proj- 
4iU'.t7 , L) -V Q311116LUi1 .U U , flL-)N , , .I ;U.I.J,- IBranson, 
MO, $19,960.72; SS-Ozark, MO, $39,845.22. 
The authority for the Flood Plain Management 
Services program is Section 206 of the 1960 Flood 
Control Act, PL 86-645, as amended. Under the authority 
of Section 321 of the Water Resources Development 
Act of 1990, PL 101-640, technical services and planning 
assistance are (1) provided to states and local governments 
without charge and (2) offered to Federal 
agencies and private persons on a cost recovery basis. 
Through these technical services and planning guidance, 
the program encourages comprehensive flood plain 
management planning at all levels to reduce the potential 
for losses to life and property from floods. 
Federal and non-Federal agencies and the private 
sector are assisted with planning and development information 
for flood hazard areas. This assistance is in 
the form of local flood plain regulations, Federal Insurance 
Program requirements, and Executive Order 11988 
guidelines. Such assistance may include factual flood 
information (available or determined) and interpretation 
of flood frequencies, extent of flooding, flood-water 
velocity, duration of flooding and floodway limits. 
(2) Hydrologic Data Collection: During FY00, 115 
stations were operated; 79 cooperatively with USGS and 
36 by the Corps. 
(3) Environmental Restoration (Section 1135): Total 
FY00 expenditures were $279,187.10, including the Coordination 
Account, $18,373.48; Initial Appraisals, 
$19,210.05; Morgan Point Bendway Closure, 
$121,910.51; the Nimrod Fisheries Restoration, 
$28,718.48; Beaver Lake Tailwater Habitat Restoration, 
37-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
$21,859.39; Collins Creek Trout Fishery, $43,227.74; 45. COLEMAN CREEK LITTLE ROCK, 
and Pine Bluff Wetland Restoration, $25,887.74. AR 
(4) Aquatic Ecosystem Restoration (Section 206): 
Total FY00 expenditures were $53,826.71, including the 
Coordination Account, $14,229.63; Preliminary Restoration 
Plans, $17,349.38; and Rockaway Beach, 
$22,247.70. 
43. NIMROD FISHERIES RESTORATION 
Location. Nimrod Lake is located about 9 miles 
southeast of Plainview, Arkansas, in Yell County, on the 
Fourche LaFave River at river mile 62.6. 
Existing Project. The project consisted of revegetating 
the shoreline, adding fish shelters, and manipulating 
the water level management plan. Total project 
costs were $106,800 with the federal share being 
$80,100 and the non-federal share being $26,100. 
Local Cooperation. The Arkansas Game and Fish 
Commission was the local sponsor. . 
Results during the fiscal year. Construction was 
completed in March 2000 and the project was turned 
over to the local sponsor. 
Condition at end of fiscal year. The project was 
financially closed-out. 
44. MORGAN POINT BENDWAY 
CLOSURE STRUCTURE, DESHA 
COUNTY, AR 
Location. This project is located immediately 
downstream of the non-overflow embankment of the 
Wilbur D. Mills Dam of the MCKARNS, in Desha 
County (Southeastern Arkansas). 
Existing project. The project modification report 
was approved in September 1995 under Section 1135(b) 
of the Water Resources Development Act of 1986, as 
amended: Environmental Restoration. The report recommended 
construction of a closure structure at the 
downstream end of the bendway, placement of a water 
intake structure, cypress tree plantings and placement of 
fish shelters. The project is intended to restore about 7 
miles of riverine and wetland habitat damaged by the 
construction and operation of the Wilbur D. Mills Dam. 
Local cooperation. The state of Arkansas is the 
sponsor with a cost share of 75 percent Federal and 25 
percent non-Federal. 
Operations and results during fiscal year. Construction 
on the project was initiated on 2 November 
1998. The construction contract was physically complete 
on 30 September 1999. Fish stocking and tree 
planting project components have been completed. 
The city of Little Rock asked the Corps of Engineers 
to investigate the flooding problems along Coleman 
Creek in west-central Little Rock residential area, under 
the authority of Section 205 of the 1948 Flood Control 
Act. Funds were received and a study initiated in FY99. 
The study effort is ongoing. 
46. SPADRA CREEK, CLARKSVILLE, 
AR 
The mayor of Clarksville asked the Corps of Engineers 
to study flooding problems under authority of 
Section 205 of the 1948 Flood Control Act. A study 
was initiated in FY99 to consider alternative plans for 
extending and/or raising an existing levee. The study is 
ongoing, and a Detailed Project Report (DPR) is expected 
to be completed in FY01. 
47. HIGHWAY 69 BRIDGE AT BLACK 
RIVER, JACKSON COUNTY, AR 
The Arkansas Highway and Transportation Department, 
the sponsor, requested the assistance of the Corps 
of Engineers during FY 99 to investigate riverbank erosion 
along the left bank of the Black River at the Highway 
69 bridge under authority of Section 14 of the 1946 
Flood Control Act. Construction was completed in 
August 2000 with the repair of a county road damaged 
during construction. This bank stabilization project was 
accepted by its sponsor for operation and maintenance in 
Dec. 2000. The project cost was $277,230 with a non- 
Federal share of $97,030. 
48. ROCKAWAY BEACH AT LAKE 
TANEYCOMO AQUATIC HABITAT 
RESTORATION, MISSOURI 
The City of Rockaway Beach, Missouri requested 
the Corps of Engineers under the authority of Section 
206, to investigate the restoration of aquatic habitat in 
Lake Taneycomo adjacent to the City of Rockaway. 
$50,000 in Federal funds were expended in the Planning 
Design and Analysis phase of this project in FY 2000. 
The proposed project includes removal and replacement 
of an existing causeway, excavation around the city 
shoreline and placement of aerators to improve the 
aquatic habitat in the area. 
49. PINE BLUFF WETLAND 
RESTORATION 
Location: The proposed Pine Bluff Wetland Restoration 
Project will be located in Pine Bluffs Regional 
Park on about 130 acres designated for the future Pine 
37-14

LITTLE ROCK, AR DISTRICT 
Bluff Nature Center. Existing Project: The proposed 
modifications consists of constructing a 2-acre wetland, 
creating three food plot areas, and reforesting about 9 
acres. Total project costs is estimated at $366,600 with 
the federal share estimated at $275,000 and the nonfederal 
share estimated at $91,600. 
Local Cooperation: The local sponsor is the city of 
Pine Bluff. 
Results during the Fiscal Year: The current plan 
submitted to SWD in November 2000 was not approved 
due to the high cost per acre. 
Condition at end of fiscal year: The project will be 
terminated. 
50. BEAVER TAILWATER 
RESTORATION 
Location: The project area is located immediately 
below Beaver Dam along the White River in Carroll 
County, Arkansas. 
Existing Project: The proposed modification consists 
of restoring 2 miles of channel and banks of the 
upper White River damaged by high flows from releases 
in Beaver Lake. The modification consists of constructing 
and placing in the river channel 60 in-stream 
habitat structures, three log crib retaining walls, and one 
stone weir deflection structure. The estimated cost of 
the project is $120,000 with the federal sharing being 
$90,000 and the non-federal share being $30,000. 
Local Cooperation: The local sponsor is the Arkansas 
Game & Fish Commission. 
Results during the Fiscal Year: The PCA was executed 
on September 6, 2000. 
Condition at end of Fiscal Year: Contract award 
was scheduled for November 2000. 
51. SLACK WATER HARBOR, 
RUSSELLVILLE, ARKANSAS 
Location: The recommended plan in the DPR consists 
of a slack water harbor located on the left de- 
Scending bank of the Arkansas River at navigation mile 
202.6. 
Existing Project: The total project costs are estimated 
at $3,883,000 with the federal share estimated at 
$3,164,000 and the non-federal share estimated at 
$719,000. 
Local Cooperation: The local sponsor is the city of 
Russellville. 
37-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Table 37-A 
Cost And Financial Statement 
See Total 
Section Cost to 
in Text Project Funding FY97 FY98 FY99 FY00 Sept. 30, 2000 
1.-15. McClellan-Kerr New Work 
Arkansas River Approp. 1,646,147 2,128,000 3,211,000 6,320,000 504,257,619 
Navigation Cost 3,207,682 2,059,266 2,677,586 5,622,282 512,960,406 
Locks & Dams, Maint. 
AR Approp. 18,863,000 18,562,277 21,639,832 19,810,093 481,948,577 2 
Cost 17,216,514 21,055,570 22,011,013 20,013,159 481,835,409 ' 
New Work 
Contrib. - - 5,723,348 
Cost - - 6,312,969 
1. Montgomery New Work 
Point Lock & Dam Approp. 3,338,000 44,483,000 33,314,000 25,294,000 106,429,000 
Cost 3,314,818 30,704,610 39,110,226 28,383,939 101,513,593 
16. Black River New Work 
Poplar Bluff, MO Approp. 
Cost 
New work 
Contrib. 
Cost 
- 333,000 
36,196 305,248 
40,300 0 
- 32,288 
0 
35,018
0 
7,376 
5,400 
6,459
0 
636 
504,000 
500,762 
63,400 
56,688 
17. Blue Mountain New Work 
Lake, AR Approp. - - 5,069,974 
Cost - - 5,069,974 
Maint. 
Approp. 1,025,000 884,662 950,644 1,199,783 22,609,847 2 
Cost 1,011,237 880,107 960,918 1,189,722 22,591,742 2 
18. Cato Springs New Work 
Branch, Approp. -45,000 0 - 235,700 
Fayetteville, AR Cost -5,000 201 - 235,700 
New Work 
Contrib. 1,002 0 0 0 36,900 
Cost 5,000 0 743 35 36,899 
19. Clearwater Lake, New Work 
MO Approp. 10,406,300' 
Cost 10,406,300 ' 
Maint. 
Approp. 2,008,978 2,178,054 2,641,040 2,812,770 47,300,544 
Cost 1,996,594 2,193,323 2,825,092 47,303,585 
Major Rehab. 
Approp. 12,087,910 
Cost 12,087,910 
20. DeQueen Lake New Work 
Little River Approp. 19,629,753 
Basin, AR Cost 19,623,752 
Maint. 
Approp. 996,000 884,906 890,321 1,130,434 17,903,986 2 
Cost 850,893 970,167 956,807 1,130,987 17,813,049 
37-16

LITTLE ROCK, AR DISTRICT 
Table 37-A (Continued) 
Cost And Financial Statement 
See Total 
Section Cost to 
in Text Project Funding FY97 FY98 FY99 FY00 Sept. 30, 2000 
21. Dierks Lake, New Work 
1,027,000 855,167 985,380 1,108,654 
872,216 994,846 1,015,742 1,108,814 
16,002,903 
- 16,002,781 
18,230,352 2 
18,176,463 2 
22. Dry Jordon New Work 
Creek, Approp. -40,000 -36,700 - - 157,500 
Harrison, AR Cost 30,944 10 157,500 
New Work 
Contrib. -- - - 
Cost - - 
23. Fourche Bavou New Work 
Basin, 
Little Rock, AR 
24. Gillham Lake, 
Little River 
Basin, AR 
26. Mill Creek, 
Fort Smith, 
AR 
Millwood Lake, 
Little River 
Basin, AR 
Nimrod Lake, 
AR 
29. White River 
Basin, AR & MO 
(Little Rock 
District) 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
232,000 
192,028 
13,000 
0 
101,934 
0 25,000 20,597,000 
24,882 9,498 20,634,574 
-1,731,678 
1,717,768 
S- - 17,827,111 
- - - 17,827,111 
960,000 662,228 749,468 941,336 16,495,468 2 
651,664 941,833 802,776 940,757 16,519,466 2 
300,000 -18,000 
548 287,836 
- -281,391 
-281,391 
- 4,900,001 2 
- 4,764,419 2 
299,261 
299,261 
- - - 46,087,382 
- - - 46,087,382 
1,781,000 1,488,369 1,557,982 2,019,659 42,984,163 2 
1,770,389 1,562,375 1,643,683 2,019,168 43,132,768 
- - 4,092,826 
4,092,826 
1,276,000 1,317,095 1,296,213 1,696,196 28,468,038 
1,123,501 1,441,733 1,304,019 1,683,745 28,435,533 
342,618,387 
342,439,802 
455,085,012 
454,690,932 
24,184,548 
23790468 
37-17 
Little River 
Basin, AR 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
---~~ 
27. 
28.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Table 37-A (Continued) 
Cost And Financial Statement 
See Total 
Section Cost to 
in Text Project Funding FY97 FY98 FY99 FY00 Sept. 30, 2000 
30. White River, New Work 
Batesville, 
AR 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
160,000 -48,000 60,600 80,000 
454,832 33,232 94,680 87,593 
7,006 
0 
990 
2,828,009 
2,850,309 
184,472 
182,468 
31. White River, New Work 
Jacksonport, Approp. -5,000 -10,000 0 - 92,691 
AR Cost 56,647 1,318 64 - 92,692 
New Work 
Contrib. - -84,473 0 - 233,027 
Cost 177,361 2,418 39 - 233,027 
35. Beaver Lake, New Work 
AR Approp. - - - - 46,183,033 
Cost - - 46,183,033 
Maint. 
Approp. 3,792,400 3,810,120 4,023,097 4,374,228 82,441,557 
Cost 3,632,443 4,108,798 4,105,375 4,376,412 82,664,739 
Major Rehab. 
Approp. -32,147 - - 33,571,573 
Cost 1,360 - - - 27,410,331 
35. Beaver Lake, New Work 
Water Quality Approp. 12,000 0 0 - 4,304,000 
Cost 67,876 0 3 - 4,282,001 
New Work 
Contrib. 1,390 0 - - 557,406 
Cost 1,415 20 - - 540,123 
35. Beaver Lake, New Work 
Infrastructure 
36. Bull Shoals 
Lake, AR 
37. Dardanelle Lock 
& Dam (No. 10) 
AR 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major Rehab. 
Approp. 
Cost 
0 
2,965,847 
0 
3,633 
0 
8,379 
5,076,000 4,402,706 4,233,269 5,212,919 
5,044,334 4,553,436 4,299,353 5,235,347 
- 3,000,000 
- 2,999,957 
- 88,857,611 
88,857,611 
118,934,504 2 
119,142 080 
- - - 84,270,124 
84,261,240 
6,150,500 6,608,568 5,802,930 4,895,415 117,911,505 
6,397,614 7,413,260 5,955,972 4,910,219 118,147,3282 
5,216,000 5,217,000 8,454,000 3,523,000 27,311,000 
5,261,790 5,183,761 8,236,885 3,127,132 26648,488 
37-18 
37-18

LITTLE ROCK, AR DISTRICT 
Table 37-A (Continued) 
Cost And Financial Statement 
See Total 
Section Cost to 
in Text Project Funding FY97 FY98 FY99 FY00 Sept. 30, 2000 
38. Greers Ferry New Work 
Lake, AR Approp. 
Cost 
Maint. 
Approp. 
Cost 
- 48,865,512 
- 48,865,512 
4,487,100 4,474,250 4,402,460 5,222,125 104,937,370 2 
4,391,651 4,631,513 4,526,182 5,280,626 105,181,407 2 
39. Norfork Lake, New Work 
AR Approp. - - 74,578,929 
Cost -- - 70,701,629 
Maint. 
Approp. 3,469,000 3,122,143 3,193,833 3,983,896 85,359,990 2 
Cost 3,347,796 3,144,674 3,303,333 3,979,112 85,366,033 2 
40. Ozark-Jeta New Work 
Taylor Lock & Approp. - - 85,629,412 
Dam (No. 12), Cost - 85,629,412 
AR Maint. 
Approp. 3,991,000 3,381,029 3,921,348 4,337,900 88,263,541 
Cost 3,760,321 3,601,746 4,137,687 4,349,453 88,366,927 
41. Table Rock Lake. New Work 
MO 
45. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Ninrod 
Waterfowl 
Levee 
46. Morgan Point 
Bendway 
Closure 
Structure, 
Arkansas River 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
1,015,000 951,000 3,064,000 7,654,000 79,761,875 
944,116 972,326 2,588,013 7,294,854 78,877,185 
5,351,070 5,180,801 4,782,742 5,553,013 118,966,139 ' 
5,377,651 6,060,460 4,951,928 5,553,096 120,041,647 ' 
26,200 
29,481 
24,100 
20,000 
-100,000 
52,861 
270,700 
0 
1,569
0 
3,152 
0 
891 
0 
57 
0 2,707,000 -128,000 
9,194 2,417,538 121,911 
0 
270,700 
72,200 
72,201 
24,100 
24,100 
2,782,000 
2,742,145 
270,700 
270,700 
1. For more details on project funds, see text for individual projects. 
2. Beginning data shown in Table 37-A includes special recreation use fees. 
3. Includes funds for plans and specifications. 
4. Includes total project cost, including study cost. 
37-19 
1 -I -- I - - - ~- ~- - - 
---- 
- ~I 
45.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Table 37-B Authorizing Legislation 
Date of 
Authorizing Act Project and Work Authorized Documents 
June 28, 1938 
August 18, 1941 
July 24, 1946 
July 24, 1946 
ARKANSAS RIVER BASIN, AR, OK, & KS 
(See Section 1 of text) 
Approved General comprehensive plan: 
Mannford Reservoir, OK 
Oologah Lake, OK 
Canton Lake, OK 
Tenkiller Ferry Lake, OK 
Wister Lake, OK 
Blue Mountain Lake, AR 
Nimrod Lake, AR 
Modified comprehensive plan to include reservoirs in 
Grand (Neosho) River Basin, OK, and Mo, and in 
Verdigris River Basin: 
Markham Ferry Reservoir, OK 
Fort Gibson Lake, OK 
Pensacola Reservoir Lake O' The Cherokees, OK 
Fall River Lake, KS 
Elk City Lake, KS 
Toronto Lake, KS 
Neodosha Lake, KS 
Authorized Chief of Engineers to provide in the Canton 
Lake 69,000 acre-feet of irrigation storage, subject to certain 
conditions. 
Approved multiple-purpose plan: 
Oologah Lake, OK 
Markham Ferry Reservoir, OK 
Fort Gibson Lake, OK 
Blackburn Reservoir, OK 
Mannford Reservoir, OK 
Taft Reservoir, OK 
Bank stabilization 
Dardanelle Lock and Dam, AR 
Eufaula Lake, OK 
Navigation locks and dams 
Ozark Lock and Dam, AR 
Short Mountain Lock and Dam, OK 
Webbers Falls Lock and Dam, OK 
Tenkiller Ferry Lake, OK 
June 30, 1948 Modified Arkansas River navigation comprehensive plan H. Doc 758, 79th Cong., 2d sess. 
to include bank protection works at Bradens Bend, OK. 
37-20 
Flood Control Com. Doc. 1, 75th 
Cong., Ist sess. 
H. Doc. 107 and 440, 76th Con., 1 
sess. 
H. Doc 758, 79th Cong. 2d sess. 
H. Doc 758, 79th Cong. 2d sess.

LITTLE ROCK, AR DISTRICT 
Table 37-B (Continued) Authorizing Legislation 
Date of 
Authorizing Act Project and Work Authorized Documents 
May 17, 1950 
July 14, 1960 
November 17, 1986 
June 10, 1948 
July 24, 1946 
July 3, 1958 
July 24, 1946 
Modified comprehensive plan authorized in 1938 Flood 
Control Act and multiple-purpose plan authorized in River 
and Harbor Act of 1946 to provide for substituting Keystone 
Lake Mannford, Blackburn and Taft Reservoirs. 
Authorized incorporation of River and Harbor and Flood 
Control plans into a single plan of development and made 
all pervious authorizations applicable to combined plan of 
development. 
Fourche Bayou Basin, Little Rock, AR 
(See Section 26 of text.) 
Mill Creek, Fort Smith, AR 
(See Section 30 of text.) 
RED RIVER BELOW DENISON DAM INCLUDING 
LITTLE RIVER BASIN, OK AND AR 
(See Section 26 of text) 
Construct Boswell, Hugo, and Millwood Lakes, and Bank 
Stabilization 
Modified Millwood: Construct Pine Creek, Lukfata, Broken 
Bow, DeQueen, Gillham, Dierks Lakes 
Emergency streambank erosion protection, Red River, 
Little River Co., AR 
Water Resources Development Act 
of 1986, P.L. 99-662, Sec. 401. 
Section 205, P.L. 80-858. Authorized 
by Asst. Sec. of the Army 
(CW), 10/14/88. 
H. Doc. 602, 79'" Cong., 2d sess. 
H. Doc. 170, 85
'h Cong., I" sess. 
Section 14, PL 79-526 
WHITE RIVER BASIN 
(LITTLE ROCK DISTRICT) 
(See Section 34 of text) 
June 28, 1938 
August 18, 1941 
September 3, 1954 
October 23, 1962 
Approved comprehensive plan for White River Basin: 
Lone Rock Lake, AR, Norfork Lake, AR, 
Clearwater Lake, MO, Water Valley Lake, AR, 
Bell Foley Lake, AR, Greers Ferry Lake, AR, 
and White River emergency. 
Modified comprehensive plan to include Bull Shoals Lake, 
AR, and MO, Table Rock Lake, MO, and AR, and Norfork 
Lake, AR, and MO (power). 
Authorized power in Greers Ferry Reservoir and added 
Beaver Lake to the plan. 
Authorizing clearing and straightening of channel for Village 
Creek, Jackson and Lawrence Counties. 
Flood Control Com. Doc 1, 75"' 
Cong., Ist sess. 
H. Doc. 917, 76'h Cong., 3d sess. 
H. Doc. 290, 77'" Cong., 1"t sess. 
H. Doc. 499, 83d Cong., 2d sess. 
H. Doc 352, 87"' Cong., 2d sess. 
37-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Table 37-B (Continued) Authorizing Legislation 
Date of 
Authorizing Act Project and Work Authorized Documents 
March 1, 1974 Authorizing highway bridge construction across Norfork Flood Control Corn. Doc. 1, 75h 
Lake Cong., 1" sess. 
May 11, 1962 Environmental restoration of wetlands and fish and wild- Senate Report 102-344; Energy & 
life resources in the White River Basin. AR and MO. Water Development Appropriations 
(See Section 33 of text.) Act, 1993, PL 102-377 
October 22, 1976 White River Fish Hatchery, Arkansas provides for trout Water Resources Development Act 
production facilities downstream from Beaver Dam. of 1976, P.L. 94-587, Sec. 105. 
June 30, 1948 White River, Batesville, AR. Section 205, P.L. 80-858, construc- 
(See Section 35 of text.) tion be approved by ASA (CW). 
TABLE 37-C Other Authorized Navigation Projects 
For Last Federal Cost thru Sept. 30, 2000 
Full Report 
See Annual Operation and 
Project Report For Construction Maintenance 
Arkansas River, Little Rock Slackwater Harbor, AR 
Black River, AR and MO' 
Current River, AR and MO 2 
Upper White River, AR 4.5 
White River, AR (above Peach Orchard Bluff)2.3 
White River, Jacksonport, AR6 
1988 
1950 
1964 
1952 
1950 
1984 
$736,869 
80,000 
17,0003 
83,197 
$930,324 
132,178 
1,788,374 
785,666 
43,110 
Completed. Authorized by Chief of Engineers under authority of Sec. 107, 1960 R 8 H Act, as amended, (P.L.86-645). 
Channel adequate for existing commerce; completion not contemplated . 
Includes $7,000 for previous project. 
Federal operation and maintenance terminated June 30, 1952, due to lack of commerce. Facilities at Locks and Dams Nos. 1,2, and 3 disposed of in accordance 
with authority in Public Law 996, 84th Congress. 
Completed. 
Responsibility for maintenance of project downstream from Newport, AR; transferred to Memphis District in FY 62. 
37-22

LITTLE ROCK, AR DISTRICT 
TABLE 37-E Other Authorized Flood Control Projects 
For Last Cost to Sept. 30, 2000 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Bell Foley Lake, White River, ARI Inactive 1975 S1,432,116 
Black River, Butler County Road 607, MO Completed 1985 44,500 
Black River, Poplar Bluff, MO, to Knobel, AR Completed 1958 84,315 
Butler County Drainage District 3, MO Completed 1983 42,172 
Carden's Bottom Drainage District No. 2, Completed 1951 919,955 
Arkansas River, AR 
Cato Springs, Fayetteville, AR Completed. 1996 426,000 
Clarksville, AR Completed 1962 271,717 
Conway County Drainage and Levee District Completed 1959 187,440 
District No. 1, Arkansas River, AR 
Conway County Levee Districts Nos. 1, Completed 1952 1,018,840 
2, and 8, Arkansas River, AR 
Conway County Levee District No. 6, Completed 1952 390,952 
Arkansas River, AR 
Crawford County Levee District, AR Completed 1983 53,506 
Crawford County Levee District, Arkansas Completed 1954 2,001,820 
River, AR 
Crooked Creek, Harrison, AR Completed 1995 1,245,000 
Curia Creek Drainage District, Completed 1983 1 17,898 
Independence County, AR 
East Poplar Bluff and Poplar Bluff, MO Completed 1958 304,699 
Faulkner County Levee District No. 1, Completed 1941 99,5 1I 
Arkansas River, AR 
Fort Smith, Arkansas River, AR Completed 1951 1,077,546 
From North Little Rock to Gillett, AR Completed 1954 845,300 
(above Plum Bayou) 
Fourche Creek, Little Rock, AR2 Cancelled 1973 22,890 
Jackson County Levee District 2 Completed 1986 131,699 
White River, AR 
Little Massard Creek, Fort Smith, AR Completed 1983 198,096 
Little Red River District 1, AR Completed 1988 28,968 
Little Red River, White County Road Completed 1983 63,355 
Bridge, Judsonia, AR 
Little Rock Levee, AR, East End Completed 1975 1,901,899 - 
Fourche Bayou, AR 
McLean Bottom Levee District No. 3, Completed 1950 422,549 
Arkansas River, AR 
Near Dardanelle, Arkansas River, AR Completed 1953 198,069 
Newport, White River, AR Completed 1941 314,276 
North Little Rock, Arkansas River, AR Completed 1958 512,001 
Otter Creek and Tributaries Completed 1987 162,204 
Shannon Hills, AR 
Petit Jean River, AR Completed 1966 84,350 - 
Petit Jean River, AR Completed 1991 88,379 
Pine Mountain Lake, AR3 Inactive 1985 1,432,331 - 
Point Remove Levee and Drainage Completed 1983 86,943 - 
District, Conway County, AR 
Red River, 1-30, Little River Co., AR Completed 1992 119,897 - 
Red River, Hwy. 31, Little River Co., AR Completed 1992 144,828 
Roland Drainage District, Arkansas River, AR Completed 1950 269,907 
Rolling Fork River, Sevier County, AR Completed 1983 64,500 - 
37-23 
s~

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 37-E (Cont.) Other Authorized Flood Control Projects 
For Last Cost to Sept. 30, 2000 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Skaggs Ferry, Black River, AR Completed 1941 81,023 
South Bank, Arkansas River (Head Fourche Completed 1964 1,404,852 
Island to Pennington Bayou), AR 
South Bank, Arkansas River, Little Rock to Completed 1961 409,115 - 
Pine Bluff, AR, Tucker Lakes 
Swan Creek Bank Stab., Taney County, MO Completed 1986 76,800 
Van Buren, Arkansas River, AR Completed 1952 438,222 
Village Creek, White River, and Mayberry Completed 1972 1,567,156 
Levee Districts, AR4 
Village Creek, Jackson and Inactive 1977 510,217 
Lawrence Counties, AR5 
West of Morrilton, Arkansas River, AR Completed 1962 1,269,959 
White River, at Hwy 14, mile east Completed 1981 214,308 
of Oil Trough, AR 
White River Bank Stab., Batesville, AR Completed 1986 101,100 
White River, Batesville Water TowerSec 14, AR Completed 1999 473,000 
White River, Jacksonport, AR 6 Completed 1987 293,567 
White River, Newport, AR Completed 1989 93,929 
White River, St. Paul, AR Completed 1990 22,400 
1. Reclassified as inactive in Jun '77; reviewed & deferred in May '85; funded for reevaluation (draft report dated Sep '89). 
2. Construction of project cancelled because local interests failed to provide right-of-way for construction and maintenance. 
3 Reclassified as inactive in Jul '85. 
4. See H Doc 577.87th Cong for description. 
5. Reclassified in Jun '77: local interests unable to meet local cooperation requirements; funded for reevaluation in FY 89; recommended to be placed in the 
inactive status. 
6. Design deficiency correction to be completed 30 December 1996. 
TABLE 37-G Deauthorized Projects 
For Last Funds Expended 
Full Report 
See Annual Date Federal Contributed 
Project Report For Authority Deauthorized Funds Funds 
Crooked Creek Lake 1969 1990 
& Levee, AR 
Lone Rock, Buffalo 1959 1977 $130,653 - 
River, AR 
Prosperity Lake, MO - 1989 864,000 - 
Water Valley, Eleven 1959 1977 414,011 - 
Point River, AR & MO 
37-24

TABLE 37-H ARKANSAS RIVER BASIN; AR, OK, AND KS: NAVIGATION 
(See Section 1 of Text) 
Miles Elevation Sill 
Up- Upper Year 
stream Lock Pool Type of Opened to Tota 
from Miles to Dimension Lift (feet, Upper Lower Character of Kind of Construc- Naviga- Estimal 
Feature Mouth Nearest Town (feet) (feet) MSL) (feet) (feet) Foundation Dam tion tion Cost 
LITTLE ROCK DISTRICT 
Norrell Lock and Damn 
No.1 
Entrance Channel 
Lock No. 2 
Wilbur D. Mills Damn 
(No. 2) 
Joe Hardin Lock and 
SDam No. 3 
Emmett Sanders Lock 
and Dam (No. 4) 
Lock and Dam No. 5 
David D. Terry Lock 
and Dam (No. 6) 
Murray Lock and Dam 
(No. 7) 
Toad Suck Fenrry 
Lock and Dam (No. 8) 
Arthur V. Ormond 
Lock and Dam (No. 9) 
Dardanelle Lock and 
Dam (No. 10) 
8 east of AR 
Post, AR 
First 10.3 miles 
of system 
6 east of AR 
Post, AR 
3 southeast of 
AR Post, AR 
5 north of Grady, 110 by 600 
AR 
7 east of Pine 
Bluff, AR 
4 southeast of 
Redfield, AR 
12 southeast of 
Little Rock, AR 
6 northwest of 
Little Rock, AR 
6 west of 
Conway, AR 
3 southwest of 
Morrilton, AR 
2 northwest of 
Dardanelle, AR 
110by600 30 max 
20 norn 
110 by 600 20 no 
28 max 
142 16 15 1967 $22,472,000 
$ 43,649,000 
162 18 14 1967 $ 70,266,000 
1968 
20 182 18 14 
110 by 600 14 196 
110 by 600 17 213 
110 by 600 18 
110 by 600 18 
231 
249 
110 by 600 16 265 
110 by 600 19 
110 by 600 54 
284 
338 
18 14 
18 14 
18 14 
18 14 
18 14 
18 14 
18 14 
1968 $ 38,040,000 
1968 $ 45,246,000 
1968 $ 31,710,000 
1968 $ 69,086,000 
1969 $ 46,076,000 
1969 $57,831,000 
1969 $37,798,000 
1969 $84,270,124 
Lock and Dam No. 11 Deleted - - 
r
Co-) 
H
CH-) 
ted

TABLE 37-H Cont. ARKANSAS RIVER BASIN; AR, OK, AND KS: NAVIGATION 
(See Section 1 of Text) 
Miles Lock Elevation Depth on Miter Type of Total 
Up- Miles to Dimension Lift Upper Upper Lower Character of Kind of Construc- Year Estimat 
Feature stream Nearest Town (feet) (feet) Pool (feet) (feet) Foundation Dam tion Opened to Cost 
Ozark-Jeta Taylor 
Lock and Dam 
(No. 12) 
James W. Trimble 
Lock and Dam 
(No. 13) 
TULSA DISTRICT 
James W. Trimble 
Lock and Dam 
(No. 13) 
W. D. Mayo Lock 
and Dam (No. 14) 
Robert S. Kerr Lock 
and Dam (No. 15) 
Webbers Falls Lock 
and Dam (No.16) 
Chouteau Lock and 
Dam (No. 17) 
Newt Graham Lock and 
Dam (No. 18) 
1 east of 
Ozark, AR 
7 east of 
Fort Smith, AR 
4 east of 
Redland, OK 
1 north of 
Cowlington, OK 
I northwest of 
Gore, OK 
4 northwest of 
Okay, OK 
8 southwest of 
Inola, OK 
110 by 600 34 372 
110 by 600 20 392 
110 by 600 20 412 
110 by 600 
110 by 600 
48 
30 
110 by 600 21 
110 by 600 21 
460 
490 
511 
532 
18 15 
18 14 
14 15 
18 14 
19 16 
15 14 
15 14 
1969 $85,629,412 
1969 $58,816,000 
1970 $6,858,000 
1970 $32,655,000 
1970 $94,578,237 
1970 $83,738,277 
1970 $31,619,000 
1970 $44,355,000 
ted 
t- 
-.hO 
O 
"TI 
til 
o
rc
trl 
0
1< 
0
o
r 
rH
0
0
t71 
~r 
0
VT1 
ai 
a3 
a) 
--

Little Rock District: 
Bank stabilization and channel rectification, mile 33.7 to 362 and 
Arkansas-White Cutoff, 100 percent complete ............. $119,300,184 
Maintenance and repair fleet and marine terminals, 
complete ................................... ................... 10,247,000 
Total, Little Rock District ............... ............ 814,362,720 
Navigation aids (U.S. Coast Guard) .................. 
Tulsa District 
Bank stabilization and channel rectification, Short Mountain 
to Fort Smith, complete ............... ................... 
Maintenance and repair fleet and marine terminals, 
complete ......... ......................... 
2,268,000 
12,700,038 
Upstream Lakes: 
Oologah, 90.2 miles upstream from mouth, Verdigris River 
complete ............. ... ...................... . $ 
Keystone, 638.8 miles upstream from mouth, Arkansas River, 
complete ........... ...................... 
Eufaula, 27 miles upstream from mouth, Canadian River, 
complete ................................ ............ ......... 
Subtotal ............................... 
Total, Tulsa District ............. ........... 
Total Project Cost 96 percent complete....... ..... $ 1,419,908,121 
2,750,000 
Subtotal ................................... $309,253,552 
1. Navigation mileage from mouth of White River, except Dam No. 2, is 40.5 miles above mouth of Arkansas Rivet. 
2. Details in Tulsa District report. 
-3, 
46,722,329 
123,170,773 
124,130,747 
294,023,849 
603,277,401 
rn 
C-) 
C,) 
H
H 
fTABLE 3 7-H Con t ARKANSAS RIVER BASIN; AR, OK, AND KS: NANIATO 
(See Section 1 of ext) 
Additional features entering into cost of project 
- ---

TABLE 37-I ARKANSAS RIVER BASIN; AR, OK, AND KS: LAKES 
(See Section 1 of Text) 
Miles Drainage Height Reservoir Power Year or 
Above Area of Dam Capacity Development Percent Total Est 
Lake and State River Mouth Nearest Town (sq mi) (feet) Type (acre-feet) (kilowatts) Complete Co. 
Blue Mountain, AR Petit Jean 74.4 Paris, AR 488 115 Earthfill 257,900 --- 1947 $ 5,0 
Canton, OK North Canadian 384.3 Canton, OK 12,483 68 Earthfill 383,300 --- 1948 11,2 
Elk City, KS Elk 8.7 Independence, KS 634 107 Earthfill 284,300 --- 1966 19,0 
(Table Mound) 
Eufaula, OK Canadian 27.0 Eufaula, OK 47,522 114 Earthfill 3,798,000 90,000 1964 123,7 
Fall River, KS Fall 54.2 Fall River, KS 585 94 Earthfill 256,400 --- 1949 10,5 
Fort Gibson, OK Grand (Neosho) 7.7 Fort Gibson, OK 12,492 110 Concrete- 1,284,400 45,000 1953 43,8 
Keystone, OK Arkansas 538.8 Sand Springs, OK 74,506 121 gravity 1,836,500 70,000 1964 123,1 
Markham Ferry, OK Grand (Neosho) 47.4 Pryor, OK 11,533 90 Earthfill 444,500 100,000 1968 6,9 
Neodesha, KS Verdigris 222.8 Neodesha, KS 1,152 74 Earthfill 90,000 --- 0 
Nimrod, AR Fourche La Fave 62.6 Plainview, AR 680 103 Earthfill 336,010 --- 1942 4,0 
* Oologah, OK Verdigris 90.2 Claremore, OK 4,339 137 Concrete- 1,519,000 --- 1974 37,0 
Pensacola.OK Grand (Neosho) 77.0 Disney, OK 10,298 147 gravity 2,197,000 86,400 1940 
Tenkiller Ferry, OK Illinois 12.8 Gore, OK 1,610 197 Earthfill 1,230,800 34,000 1953 25,9 
Toronto, KS Verdigris 271.5 Toronto, KS 730 90 Concrete arch 199,700 --- 1960 13,8 
Wister, OK Poteau 60.9 Wister, OK 993 99 Earthfill 427,900 --- 1949 10,6 
Subtotal, exclusive of Eufaula, Keystone, and Oologah. 151,4 
Arkansas River Basin; AR, OK and KS; Navigation (Table 28-H). 1,419,9 
Total, Arkansas River Basin, 96 percent complete. 1,571,3 
1.Project includes facilities for production of hydroelectric power. 
2.Cost included in navigation project. 
3.Details in Tulsa District report. 
4.Constructed by State of Oklahoma under the name of Robert S. Kerr Dan (Lake ludson). Estimate shown is for Federal participation. 
5.lnactive. Estimate is based on 1954 price levels. 
6.Constructed by State of Oklahoma under the name Grand River Dam (Lake O The Cherokees). Estimate shown is for Federal participation. 
O 
timated z 
st 0
0..i 
)69,974 Z 
:09,834 Cl 
)52,990 a 
95,907 g 
50,873 
21,405 O 
71,173 
08,756 M 
97,910 > 
92,826 
29,928 ' 
52,126 Z 
63,540 2 
96,324 ; 
87,439 
0 
03,997 
08,121 C 
12,118 t
o
0<

TABLE37-J LITTLE RIVER BASIN, AR: LAKES 
(See Section 26 of Text) 
Project River Site Nearest Town 
DeQueen Lake Rolling Fork River 22.8 DeQueen, AR 
Gillham Lake Cossatot River 49 Gillham, AR 
Dierks Lake Saline River 56.6 Dierks, AR 
Millwood Lake Little River 16 Millwood, AR 
1. Project is reported separately herein. 
Co 
-3 
C) 
-3 
>
cu 
I. For details see individual reports. 
2. Inactive - placed in a defened status in May 1985. Estimate based on 1983 price levels. 
w 
TABLE 37-K WHITE RIVER BASIN; AR, AND MO: LAKES 
(See Section 34 of Text) 
Miles Drainage Height Reservoir Power 
Above Area of Dam Capacity Development Total Estimated 
Lake River Mouth Nearest Town (sq mi) (feet) Type (acre-feet) (kilowatts) Cost 
Beaver' White 609 Eureka Springs, AR 1,186 228 Concrete-gravity & earthfill 1,952,000 112,000 $ 52,631,472 
Bell Foley' Strawberry 27.2 Poughkeepsie, AR 519 136 Concrete-gravity & earthfill 518,000 ---- 93,700,000 
Bull Shoals' White 418.6 Mountain Home, AR 6,036 258 Concrete-gravity 5,408,000 340,000 96,356,000 
Clearwater' Black 257.4 Piedmont, MO 898 154 Earthfill 413,000 ---- 22,462,553 
Greers Ferry' Little Red 79.0 Heber Springs, AR 1,146 243 Concrete-gravity 1,844,000 96,000 55,125,000 
Norfork' North Fork 4.8 Norfork, AR 1,806 216 Concrete-gravity 1,983,000 80,550 111,624,000 
Table Rock' White 523.8 Branson, MO 4,020 252 Concrete-gravity & earthfill 3,462,000 200,000 71,233,000 
Total 15,580,000 828,550 503,132,025
TULSA, OKLAHOMA, DISTRICT* 
The civil works boundry of the Tulsa District includes 
an area of approximately 160,000 square miles covering 
Oklahoma and parts of Kansas and Texas within 
the Arkansas and Red River Basins. The District's 
responsibilities within the Arkansas River Basin cover 
southern Kansas, northern Oklahoma, and the Texas 
Panhandle. These areas are included in the drainage 
basin of the Arkansas River and its tributaries above 
the mouth of the Poteau River, extending to the Kansas- 
Colorado State line, exclusive of that portion of the 
South Canadian River Basin and its tributaries west of 
the Texas-New Mexico State line. The District's responsibilities 
within the Red River Basin cover the northern 
portion of Texas, and the southern portion of Oklahoma. 
These areas are embraced in the drainage basin of the 
Red River and its tributaries above Index, Arkansas. 
IMPROVEMENTS 
Navigation Page 
1. McClellan-Kerr Arkansas River 
Navigation System, OK 
2. Other Authorized Navigation Projects 
Flood Control 
3. Arcadia Lake, OK 
4. Arkansas City, KS 
5. Arkansas-Red River Basins Chloride 
Control Projects, KS, OK, and TX 
5a. Area V, Estelline Springs, TX 
5b. Area VIII, TX 
5c. Red River Basin Chloride 
Control, TX & OK 
6. Birch Lake, OK 
7. Bowie County Levee, TX 
8. Candy Lake, OK 
9. Canton Lake, OK 
10. Copan Lake, OK 
11. Council Grove Lake, KS 
12. El Dorado Lake, KS 
13. Elk City Lake, KS 
14. Fall River Lake, KS 
15. Fort Supply Lake, OK 
16. Fry Creeks, Bixby, OK 
17. Great Bend, KS 
18. Great Salt Plains Lake, OK 
19- Halstead, KS 
20. Heyburn Lake and Polecat Creek, OK 
38-2 
38-2 
38-2 
38-3 
38-3 
38-3 
38-3 
38-4 
38-4 
38-4 
38-4 
38-5 
38-5 
38-5 
38-5 
38-6 
38-6 
38-6 
38-6 
38-6 
38-6 
38-7 
38-7 
21. Hugo Lake, OK 
22. Hulah Lake, OK 
23. John Redmond Dam and Reservoir, KS 
24. Kaw Lake, OK 
25. Lake Kemp, TX 
26. Lake Wichita, Holliday Creek, TX 
27. Marion Reservoir, KS 
28. McGrath Creek, Wichita Falls, TX 
29. Mingo Creek, OK 
30. Oologah Lake, OK 
31. Optima Lake, OK 
32. Parker Lake, OK 
33. Pat Mayse Lake, TX 
34. Pearson-Skubitz Big Hill Lake, KS 
35. Pine Creek Lake, TX 
36. Sardis Lake, OK 
37. Skiatook Lake, OK 
38. Toronto Lake, KS 
39. Tulsa & West Tulsa Levees, OK 
40. Waurika Lake, OK 
41. Winfield, KS 
42. Wister Lake, OK 
43. Other Authorized Flood Control Projects 
44. Inspection of Completed Local 
Flood Protection Projects 
45. Scheduling Flood Control 
Reservoir Operations 
46. Emergency Flood Control Activities 
47. Flood Control Work Under 
Special Authorization 
38-1 
38-7 
38-7 
38-7 
38-8 
38-8 
38-8 
38-8 
38-8 
38-9 
38-9 
38-9 
38-9 
38-10 
38-10 
38-10 
38-10 
38-10 
38-11 
38-11 
38-11 
38-11 
38-12 
38-12 
38-12 
38-12 
38-12 
38-12

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Multiple-Purpose Projects Including Power Tables 
48. Broken Bow Lake, OK 
49. Eufaula Lake, OK 
50. Fort Gibson Lake, OK 
51. Keystone Lake, OK 
52. Lake Texoma (Denison Dam), OK & TX 
53. Robert S. Kerr Lock and Dam 
and Reservoir, OK 
54. Tenkiller Ferry Lake, OK 
55. Webbers Falls Lock and Dam, OK 
38-12 
38-13 
38-13 
38-13 
38-13 
38-13 
38-14 
38-14 
General Investigations 
56. Surveys 
57. Collection and Study of Basic Data 
38-14 
38-14 
38-A Cost and Financial Statement 
38-B Authorizing Legislation 
38-C Other Authorized Navigation Projects 
38-D Not Applicable 
38-E Other Authorized Flood Control 
Projects 
38-F Not Applicable 
38-G Deauthorized Projects 
38-H Arkansas River Basin 
Multiple-Purpose Plan 
38-I Inspection of Completed Local 
Flood Protection Projects 
38-J Flood Control Work Under 
Special Authorization 
38-K General Investigations 
Navigation 
1. McCLELLAN-KERR ARKANSAS 
RIVER NAVIGATION SYSTEM 
(Tulsa District Portion), OK. 
Location. The Tulsa District portion of the 
McClellan-Kerr Arkansas River Navigation System 
provides a navigation route up the Arkansas River 
from the Oklahoma-Arkansas State line to the head of 
navigation at Catoosa, OK, near Tulsa, OK. The total 
length of the Tulsa District portion of the system is 
137 navigation miles. Descriptions and costs for the 
entire navigation system can be found in Little Rock 
District's entry in this Annual Report. 
Existing projects.The McClellan-Kerr Arkansas 
River navigation project is a component of the multiple-
purpose plan for the Arkansas River Basin which 
provides for the improvement of the basin through the 
construction of coordinated developments for navigation, 
hydroelectric power, flood control, water supply, 
water quality control, sediment control, recreation, 
and fish and wildlife propagation. The McClellan- 
Kerr project also includes bank stabilization, channel 
straightening, and cutoffs as required. The navigation 
channel has a minimum depth of 9 feet and 
minimum widths of 250 feet on the Arkansas River 
and 150 feet on the Verdigris River. The Tulsa 
District portion of the navigation system consists of 
Arkansas River Bank Stabilization and Channel Rectification, 
Chouteau Lock and Dam, Newt Graham 
Lock and Dam, Robert S. Kerr Lock and Dam and 
Reservoir, Robert S. Kerr Marine Terminal, Sans Bois 
Navigation Channel, W.D. Mayo Lock and Dam, Webbers 
Falls Lock and Dam, and the pool in Oklahoma 
which was created by Lock and Dam 13 in Arkansas. 
The other parts of the multiple-purpose plan 
for the Arkansas River Basin are listed in Table 29- 
R
Local cooperation Fully complied with. 
Terminal facilities. Public port facilities are in 
operation at Muskogee and Catoosa, OK, and at Fort 
Smith, AR. Other private commercial port facilities 
are complete and in operation at eight Oklahoma 
locations. 
Operations and results during fiscal year, 
Routine operation and maintenance continued. 
2. OTHER AUTHORIZED NAVIGATION 
PROJECTS. 
See Table 38-C. 
Flood Control 
3. ARCADIA LAKE, OK. 
Location. On the Deep Fork River, at river mile 
218.3, in the metropolitan area of Oklahoma City and 
Edmond, OK, about 1.5 miles west of Arcadia, in 
Oklahoma County, OK. (See Arcadia, OK, Geologi" 
cal Survey map, scale 1:24,000.) 
Existing project. The plan of improvement provides 
for flood control, water supply, and recreation 
by construction of an earthfill dam approximately 102 
feet high and 5,250 feet long with a high-level unco"' 
38-2 
38-15 
38-24 
38-27 
38-27 
38-28 
38-28 
38-29 
38-30 
38-30 
--

TULSA, OK, DISTRICT 
trolled spillway. Outlet works consist of a gated 
tower and conduit. The lake has a total capacity of 
92,000 acre-feet (27,380 for conservation, 64,430 
for flood control, and 190 for sedimentation reserve), 
and controls a 105-square-mile drainage 
area. Construction began in October 1980, and the 
project became operational for flood control in November 
1986. 
Local cooperation.Fully complied with. 
Operations and results during fiscal yeaRoutine 
operation and maintenance continued. 
4. ARKANSAS CITY, KS. 
Location. Arkansas City is located approximately 
4 miles north of the Kansas-Oklahoma state line at 
the crossroads of U.S. Highway's 77 and 166, in 
Cowley County, KS, immediately northwest of the 
confluence of the Arkansas and Walnut Rivers. 
Existing project. The project consists of raising 
and extending approximately 6 miles of levee along 
the Arkansas and Walnut Rivers, and rechanneling 
approximately 2-1/2 miles of the Walnut River. Structural 
steel gates will be constructed at two railroad/ 
river crossings and stoplog structures will be constructed 
at two U.S. Highway/river crossings. 
Local cooperation.A Project Cooperation Agreement 
was signed on September 4, 1996. The city of 
Arkansas City, the local sponsor, are currently fulfilling 
their requirements. 
Operations and results during fiscal yeaRhase 
II construction is ongoing and on schedule for 
Completion in FY 02. 
5. ARKANSAS-RED RIVER BASINS 
CHLORIDE CONTROL PROJECTS, 
KS, OK, AND TX. 
Location. On certain tributary streams of the 
Arkansas and Red Rivers in the western half of the 
Tulsa District. 
Existing project The project was initiated as a 
result of studies involving the control of water pollution 
caused by 15 natural salt sources identified in 
1957 by the U.S. Public Health Service. The Arkansas 
and Red Rivers are major national and regional 
Water resources which are severely limited due to 
Poor water quality primarily caused by the natural 
pollutant, sodium chloride. The Arkansas River is 
polluted by five naturally occurring salt located sources in northwestern Oklahoma and southwestern 
Kansas. The Red River Basin is polluted by 10 
naturally occurring salt sources located in northwestern 
Texas, and southwestern Oklahoma. Preliminary 
Feasibility Studies included the construction 
and subsequent maintenance of an injection 
well and a ring dike used for data collection. 
Preauthorization studies completed in 1966 and 
1970 recommended construction of project features 
at 13 of the 15 chloride emission areas. For 
a detailed discussion of the chloride control projects, 
see page 19-4 of the Annual Report for 1983. The 
Water Resources Development Act of 1986 (PL 99- 
662) authorized the Red River Basin and the Arkansas 
River Basin as separate projects with separate 
authority under Section 203 of the Flood Control 
Act of 1966. The Arkansas River portion of the 
project was deferred in 1982 (not economically 
justified). 
5a. AREA V, ESTELLINE SPRINGS, TX. 
Location. Chloride Control Area V is located about 
0.5 mile east of Estelline, TX, on the Prairie Dog Town 
Fork of the Red River. 
Existing project. For a description of the completed 
improvement, see the Annual Report for 1987. 
Construction started in 1963, and the structure was 
completed in 1964. 
Local cooperation Descriptive text concerning 
local cooperation requirements is given on page 19-5 
of the Annual Report for 1983. 
Operations and results during fiscal yeaRoutine 
operation and maintenance continued. 
5b. AREA VIII, TX. 
Location. Chloride Control Area VIII is located at 
river mile 74.9, of the South Fork of the Wichita River, 
in King County, TX, about 5 miles east of Guthrie, TX. 
Existing project. The plan of improvement consists 
of a low-flow brine collection dam (the Bateman 
Low-Flow Dam) with attendant pumping station and 
pipeline facilities. The collected brine is pumped to 
the storage reservoir behind the Truscott Brine Dam. 
This brine dam, located at river mile 3.6 on Bluff 
Creek (a tributary of the North Fork of the Wichita 
River) about 3 miles northwest of Truscott, TX, contains 
collected brine from Area VIII and will contain 
brine collected in the future from Area X. Construction 
was initiated at Area VIII and Truscott 
Brine Dam in 1976. The Bateman Low-Flow Dam 
was completed and put into full operation in May 
1987. 
38-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Local cooperation. Descriptive text concerning Existing project. For a description of the comlocal 
cooperation requirements is given on page pleted improvement, see the Annual Report for 1979. 
19-5 of the Annual Report for 1983. Construction began in November 1973, and the project 
was placed in useful operation in March 1977. 
Operations and results during fiscal year. 
Routine operation and maintenance continued. 
5c. RED RIVER BASIN CHLORIDE 
CONTROL, TX & OK. 
Location. The project is located in Cottle, Hall, and 
King Counties, TX, and Harmon County, OK, along 
the Wichita and Red Rivers. Area VI is located on the 
Elm Fork of the Red River in Harmon County, OK; 
Area VII is on the North Fork of the Wichita River, 
Cottle County, TX; Crowell Brine Dam is on Canal 
Creek, a tributary of the Pease River; Area IX is on the 
Middle Pease River, Cottle County, TX; Area X is on 
the Middle Fork of the Wichita River, King County, 
TX; and Areas XIII-XIV are on the Jonah and Salt 
Creeks of Prairie Dog Town Fork of the Red River, 
Hall County, TX. 
Existing project. The plan of improvement consists 
of one deep-well injection system, three brine 
storage reservoirs, four low-flow brine collection dams, 
two well collection facilities, six pumping plants, and 
56.3 miles of pipeline. Construction was completed 
at Estelline Springs, Area VIII (low-flow dam, 
pumpstation and pipeline), Area X (low-flow dam 
and pumpstation) and Truscott Lake. In 1987, Area 
VIII began operation, pumping brines to Truscott 
Lake. 
Local Cooperation. Section 1107 of the Water 
Resources Development Act of 1986 authorized the 
project at full Federal expense. The Red River Authority 
of Texas has signed a 221 Agreement as the 
non-Federal sponsor. 
Operation and results during fiscal yeaEstimated 
total cost of the project is $241,500,000 (October 
1997 price level base). A draft Supplement to the 
Final Environmental Impact Study (SFEIS) was submitted 
for public review in May 1995. Finalization of 
the SFEIS has been put on hold indefinitely and the 
Assistant Secretary of the Army for Civil Works directed 
that a reevaluation of the Wichita River Basin 
be performed with available funding. 
6. BIRCH LAKE, OK. 
Location. On Birch Creek at river mile 0.8, about 
1.5 miles south of Barnsdall, in Osage County, OK. 
(See Barnsdall, OK, Geological Survey map, scale 
1:24,000.) 
Local cooperation.Fully complied with. 
Operations and results during fiscal yeaRoutine 
operation and maintenance continued. 
7. BOWIE COUNTY LEVEE, TX. 
Location. Bowie County is located in northeastern 
Texas, along the Red River, near Texarkana, Texas. 
The Bowie County Levee is situated on the south side 
of the Red River and extends almost 9 miles from the 
Kansas City Southern Railroad embankment westward 
to an area near Wamba, Texas. (See Wamba, 
TX, Gelogical Survey map, scale 1:24,000.) 
Existing project. The project, as authorized 
under the Flood Control Act of 1946, provides for the 
rehabilitation of the existing Bowie County, Texas, 
Levee. The levee was constructed in 1913 by the 
Bowie County Levee District No. 1. The Bowie 
County Levee is part of a levee system which 
includes the Miller County Levee that extends 
downstream approximately 35 miles. The existing 
Bowie County Levee does not meet current design 
standards and has not received proper maintenance. 
Studies completed in 1994 indicated that 
no economically feasible flood control alternative 
was identified and Federal interest in pursuing 
detailed design and project construction was not 
warranted. Legislation passed in FY 01 re-authorized 
the project to include rehabilitation of 
approximately 6 miles of the existing levee and 
construction of approximately 4 miles of new levee. 
This project will be constructed at an estimated 
cost of $10,000,000. 
Local cooperation. Additional legislation is 
required to allow the Government to build the levee 
proposed by the local sponsor. The Government has 
determined that this project will be cost-shared in 
accordance with the Flood Control Act of 1936. The 
Corps of Engineers has determined that cost sharing 
on this project will be in accordance with the 
Flood Control Act of 1936. 
Operations and results during fiscal yes he 
sponsor is pursuing appropriate legislation which 
will allow the project to proceed. 
8. CANDYLAKE, OK. 
Location. On Candy Creek, a tributary of Bird 
Creek in the Verdigris River Basin, at river mile 
38-4

TULSA, OK, DISTRICT 
1.9. The damsite is about 1.5 miles northeast of 
Avant in Osage County, OK. (See Avant, OK, Geological 
Survey map, scale 1:24,000.) 
Existing project. The plan of improvement provides 
for an earthfill dam about 4,200 feet long, 
including an uncontrolled concrete spillway, with a 
maximum height of 103 feet above the streambed. 
Outlet works will consist of a gated intake structure, 
a 10x11.25-foot conduit, and a stilling basin. 
An 18x24-inch low-flow pipe and an 18-inch water 
supply pipe will be provided. The lake will have a 
total capacity of 75,420 acre-feet (44,160 for conservation 
and sediment reserve and 31,260 for 
flood control). The drainage area above the damsite 
is 43 square miles. Candy Lake will be operated as 
a unit of a seven-lake system for flood control in the 
Verdigris River Basin in Oklahoma. Construction 
began in September 1976. 
Local cooperation.Section 2 of the Flood Control 
Act of 1938, the Water Supply Act of 1958, and Section 
221 of the Flood Control Act of 1970, apply. 
Operations and results during fiscal yea.n 
accordance with PL 99-662, 33 U.S.C. 579a 1001 
(b)(2), the Assistant Secretary of the Army for Civil 
Works submitted a list of projects for deauthorization 
to Congress on January 8, 1993. Certain projects from 
this list, including Candy, were deauthorized on 
July 9, 1995. WRDA 99 mandated selling project 
lands back to the former owners or their heirs. 
9. CANTON LAKE, OK. 
Location. On the North Canadian River at river 
mile 394, about 2 miles north of Canton in Blaine 
County, OK. (See Canton, OK, Geological Survey 
map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 590 of the Annual 
Report for 1969. Construction began in December 
1940, and the project was placed in useful operation in 
April 1948. 
Local cooperation.The Canton Lake Committee 
Was established to improve coordination and communication 
between the multi-purpose users of Canton 
Lake. The committee coordinates Oklahoma City's 
Water supply release schedule with interested parties 
to minimize impacts.. 
Operations and results during fiscal yeaRoutine 
operation and maintenance continued. 
10. COPAN LAKE, OK. 
Location. On the Little Caney River, a tributary 
of the Caney River, in the Verdigris River Basin, at 
river mile 7.4, about 2 miles west of Copan in 
Washington County, OK. (See Copan, KS, Geological 
Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-7 of the Annual 
Report for 1983. Copan Lake is operated as a unit of 
a seven-lake system for flood control in the Verdigris 
River Basin in Oklahoma. Construction began 
in November 1972, and the project was placed in 
useful operation in April 1983. 
Local cooperation Fully complied with. 
Operations and results during fiscal yeaRoutine 
operation and maintenance continued. 
11. COUNCIL GROVE LAKE, KS. 
Location. On the Grand (Neosho) River at river 
mile 450, about 1.5 miles northwest of Council Grove, 
in Morris County, KS. (See Council Grove Lake, KS, 
Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 519 of the Annual 
Report for 1969. Construction began in June 1959, 
and the project was placed in useful operation in July 
1964. 
Local cooperation.Fully complied with. 
Operations and results during fiscal yeaRoutine 
operation and maintenance continued. 
12. EL DORADO LAKE, KS. 
Location. On the Walnut River, a tributary of the 
Arkansas River, at river mile 100.2, about 4 miles 
northeast of El Dorado in Butler County, KS. (See El 
Dorado, KS, Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-7 of the Annual 
Report for 1983. El Dorado Lake was authorized as a 
unit of a three-lake system for flood control in the 
Walnut River Basin. Construction began in October 
1973, and impoundment began in June 1981. 
Project is complete. 
Local cooperation. By payment of $8.17 million 
on May 18, 1997, the Kansas Department of Wildlife 
and Parks has fully complied with the Local Cooperation 
Agreement. 
38-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Operations and results during fiscal year. Operations and results during fiscal yeaou. 
WRDA 99 mandated the transfer without consider- tine operation and maintenance continued. 
ation of 51.98 acres of land to the state of Kansas for 
use as Honor Camps. The state of Kansas must pay 16. FRY CREEKS, BIXBY, OK. 
for the administrative costs of the land transfer. 
'M 1. . , .1 . I'.. I 
tRoutine operation and maintenance continued. 
13. ELK CITY LAKE, KS. 
Location. On the Elk River at river mile 8.7, 
about 7 miles northwest of Independence, in Montgomery 
County, KS. (See Table Mound, KS, Geological 
Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 593 of the Annual 
Report for 1969. Construction began in February 
1962, and the project was placed in useful operation in 
March 1966. 
Local cooperation.Fully complied with. 
Operations and results during fiscal yeaRoutine 
operation and maintenance continued. 
14. FALL RIVER LAKE, KS. 
Location. On the Fall River at river mile 54.2, 
about 4 miles northwest of Fall River, in Greenwood 
County, KS. (See Severy, KS, Geological Survey map, 
scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 953 of the Annual 
Report for 1969. Construction began in May 1946, and 
the project was placed in full operation in April 1949. 
Local cooperation.Fully complied with. 
Operations and results during fiscal yeaoutine 
operation and maintenance continued. 
15. FORT SUPPLY LAKE, OK. 
Location. On Wolf Creek, a tributary of the North 
Canadian River, at river mile 5.5, about 12 miles 
northwest of Woodward, in Woodward County, OK. 
(See Fort Supply, OK, Geological Survey Map, scale 
1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 594 of the Annual 
Report for 1969. Construction began in October 1938, 
and the project was placed in full flood control operation 
in May 1942. 
Local cooperation.Fully complied with. 
Location. In the northern part of the city of Bixby, 
in Tulsa County, OK. 
Existing project. The project consists of enlarging 
both Fry Creeks, diverting Fry Creek 1 into Fry 
Creek 2 and then diverting the combined creeks 
into the Arkansas River. The total length of the 
modified channels would total 4.3 miles, with bottom 
widths of 30 to 225 feet and depths of 6 to 12 
feet. Three bridges will be constructed and 20 
acres of land has been acquired for mitigation of 
fish and wildlife losses. 
Local Cooperation. The Project Cooperation 
Agreement was signed with the city of Bixby, OK, in 
January 1995. 
Operations and results during fiscal yeaEstimated 
total cost of the project is $13,540,000. In 
September 1996, construction efforts were initiated 
on this project and were completed in FY 00. 
17. GREAT BEND, KS. 
Location. In Barton County, KS, on the north bank 
of the Arkansas River about 4.5 miles above its confluence 
with Walnut Creek. (See Great Bend, KS, Geological 
Survey map, scale 1:24,000.) 
Existing project. The plan, authorized by the 
Flood Control Act of 1965, provides for 6.2 miles of 
leveed channel to divert Walnut Creek flood flow 
around Great Bend into the Arkansas River upstream 
from the city; a 1.5-mile leveed channel to divert Little 
Walnut Creek flood flow into the Walnut Creek diversion 
levees along the Arkansas River; a tie-back levee 
4.3 miles long on the Arkansas River left bank upstream 
from the junction of the Walnut diversion 
channel; and appurtenant facilities. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. 
Financial closeout on this project was completed dur 
ing FY 97. This project has been fully operational 
since June 1994. Estimated total cost of the project is 
$36,350,000 (October 1994 price level base). 
18. GREAT SALT PLAINS LAKE, OK. 
Location. On the Salt Fork of the Arkansas River 
at river mile 103.3, about 12 miles east of Chero0 
38-6

TULSA, OK, DISTRICT 
kee, in Alfalfa County, OK. (See Jet, OK, Geological 
Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 594 of the Annual 
Report for 1969. Construction of the project began in 
September 1938, and was completed in July 1941. The 
project was placed in full flood control operation in 
May 1941. 
Local cooperation.Fully complied with. 
Operations and results during fiscal yeaRoutine 
operation and maintenance continued. 
19. HALSTEAD, KS. 
Location.In the city of Halstead, in Harvey County, 
KS, along the Arkansas River. (See Halstead, KS, 
Geological Survey Map, scale 1:24,000.) 
Existing project. Provides for channel modification 
and construction of about 4 miles of levee in 
combination with straightening and widening approximately 
3.6 miles of the Little Arkansas River 
channel to a 50-foot-bottom width in the vicinity of 
Halstead. Channel modification will be restricted to 
one side of the channel except in transition areas. 
Tree planting and revegetation will be done and ten 
pool riffle areas will be established to minimize environmental 
impacts. 
Local cooperation.Fully complied with. 
Operations and results during fiscal yeaffhe 
project is fully operational, however, the Corps is 
evaluating a construction contract claim on this project. 
This effort is expected to continue through the end of 
FY 01. 
20. HEYBURN LAKE AND POLECAT 
CREEK, OK. 
Location. On Polecat Creek, a minor tributary of 
the Arkansas River, at river mile 48.6, about 11 miles 
west of Sapulpa, in Creek County, OK. (See Lake 
Heyburn, OK, Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the com- 
Pted improvement, see page 599 of the Annual 
port for 1969. Construction started in March 1948, 
and the project was placed in useful operation in 
October 1950. Channel improvements below the lake 
Were completed in September 1952. 
Local cooperation. The channel improvement 
Project below the lake was never maintained by the 
sPonsor, Joint Drainage District No. 1, Tulsa and 
Creek Counties, OK. For this reason, the channel 
returned to its pre-project condition and does not 
provide flood protection for the affected area. The 
Corps of Engineers discontinued maintenance inspections 
of the channel project in 1982, due to the 
condition of the project and lack of cooperation on 
the part of the sponsor. 
Operations and results during fiscal yeatioutine 
operation and maintenance continued. 
21. HUGO LAKE, OK. 
Location. On the Kiamichi River at river mile 17.6, 
about 7 miles east of Hugo, in Choctaw County, OK. 
(See Hugo Dam, OK, Geological Survey map, scale 
1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-12 of the Annual 
Report for 1977. Construction began in October 1967, 
and the project was placed in useful operation in 
January 1974. 
Local cooperation.Fully complied with. 
Operations and results during fiscal year. 
WRDA 99 mandated the sale, at fair market value, 
of approximately 250 acres of project lands at Hugo 
Lake to the Choctaw County Industrial Authority. 
Routine operation and maintenance continued. 
22. HULAH LAKE, OK. 
Location. On the Caney River at river mile 96.2, 
about 15 miles northwest of Bartlesville, near Hulah, 
in Osage County, OK. (See Bowring, OK, Geological 
Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 595 of the Annual 
Report for 1969. Construction began in May 1946, and 
was completed in June 1950. The project was placed 
in full flood control operation in September 1951. 
Local cooperation.Fully complied with. 
Operations and results during fiscal year. 
Routine operation and maintenance continued. 
23. JOHN REDMOND DAM AND 
RESERVOIR, KS. 
Location. The dam is located on the Grand 
(Neosho) River at river mile 343.7, about 2 miles 
northwest of Burlington, in Coffey County, KS. (See 
38-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
John Redmond Dam, KS, Geological Survey map, 
scale 1:24,000.) 
Existing project For a description of the completed 
improvement, see page 581 of the Annual 
Report for 1970. Construction was initiated in July 
1959, and was completed in December 1965. The 
project was placed in flood control operation in July 
1964. 
Local cooperation.Fully complied with. 
Operations and results during fiscal yeaRoutine 
operation and maintenance continued. 
24. KAW LAKE, OK. 
Location. On the Arkansas River at river mile 
653.7, about 8 miles east of Ponca City, in Kay County, 
OK. (See Charley Creek West, OK, Geological Survey 
map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-13 of the Annual 
Report for 1977. Construction began in June 1966, 
and the project was placed in operation in May 1976. 
Local cooperation.Fully complied with. 
Operations and results during fiscal yeaRoutine 
operation and maintenance continued. 
25. LAKE KEMP, TX. 
Location. On the Wichita River at river mile 126.7, 
about 40 miles southwest of Wichita Falls, TX. (See 
Northeast Lake Kemp, TX, Geological Survey Map, 
scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-14 of the Annual 
Report for 1977. Construction began in May 1970, and 
the project was placed in useful operation in October 
1972. 
Local cooperation. Fully complied with. 
Operations and results during fiscal yeaRoutine 
operation and maintenance continued. 
26. LAKE WICHITA, HOLLIDAY 
CREEK, TX. 
Location. The project is located in Wichita and 
Archer Counties, TX. The Lake Wichita dam and 
the Holliday Creek channel are located in the city 
of Wichita Falls, TX. (See Wichita Falls, TX, Geological 
Survey Map, scale 1:24,000.) Financial 
closeout is ongoing and scheduled to be complete 
during FY 01. 
Existing project.The existing Lake Wichita dam 
was replaced with an earthen dam approximately 
16,000 feet long with a concrete spillway, an auxiliary 
spillway, and low-flow outlet works. Channel improvements 
along Holliday Creek from the new spillway 
to the Wichita River, a distance of 9.3 miles, were 
also constructed. 
Local cooperation.Fully compiled with. 
Operations and results during fiscal yeaEhe 
project was completed October 1, 1996, and is fully 
operational. Estimated total project cost is 
$48,789,000 (October 1995 price level base). 
Financial closeout is ongoing and scheduled to be 
complete during FY 01. 
27. MARION RESERVOIR, KS. 
Location. On the Cottonwood River at river mile 
126.7, about 3 miles northwest of Marion, in Marion 
County, KS. (See Pilson, KS, Geological Survey map, 
scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 597 of the Annual 
Report for 1969. Construction began in June 1964, 
and the project was placed in flood control operation 
in February 1968. 
Local cooperation.Fully complied with. 
Operations and results during fiscal yeAr. 
Routine operation and maintenance continued. 
28. MCGRATH CREEK, WICHITA 
FALLS, TX. 
Location. The project is located in the northern 
central portion of Texas, in the city of Wichita Falls. 
Existing projecthMcGrath Creek is approximately 
3,900 feet long and connects Sikes Lake and the 
recently constructed Holliday Creek project. The 
project involves realigning and concrete lining the 
McGrath Creek Channel, and constructing a neW 
spillway to pass flows through Sikes Lake. 
Local cooperation.The city of Wichita Falls, TX 
is the non-Federal sponsor. The Project Cooperation 
Agreement was executed in November 1994 
38-8

TULSA, OK, DISTRICT 
Operations and results during fiscal year.and was completed in May 1963 for initial develop- 
Project construction is completed. Estimated total ment. Construction for ultimate (second stage) 
project cost is $13,520,000 (October 1996 price development was initiated in July 1967, and was 
level base). Financial closeout occurred this FY. completed in 1974. 
29. MINGO CREEK, OK. 
Location. On the right-bank tributary of Bird 
Creek in the city of Tulsa, in Tulsa County, OK. 
(See Tulsa, OK, Geological Survey Map, scale 
1:24,000.) 
Existing project. The recommended plan will 
consist of 23 detention sites, which would capture 
peak flows and hold them temporarily until downstream 
flows subside. There will be about 9.4 miles of 
channelization in selected locations on the tributaries 
and main stem of Mingo Creek. 
Local cooperation. In accordance with the cost 
sharing and financing concepts reflected in the 
Water Resources Development Act of 1986, the 
non-Federal sponsor must provide lands, easements, 
rights-of-way, and dredged material disposal 
areas; modify or relocate buildings, utilities, 
roads, bridges (except railroad bridges), and other 
facilities where necessary in the construction of 
the project; pay five percent of the costs allocated to 
flood control; and bear all costs of operation, maintenance, 
and replacement of flood control facilities. 
The non-Federal sponsor has also agreed to make 
all required payments concurrently with project 
construction. The local sponsor is the city of Tulsa, 
OK. The city has constructed 4.75 miles of channel 
and placed two excavated detention facilities into 
flood control operation prior to initiation of Federal 
construction in September 1988. The project is 
currently 99% complete. 
Operations and results during fiscal yeaReimbursement 
to date for work completed by the City of 
Tulsa is $19,000,000. Estimated total project cost is 
$119,200,000 (October 1998 price level base). 
Project completion is expected in FY 01. 
80. OOLOGAH LAKE, OK. 
Location On the Verdigris River at river mile 
90.2, about 2 miles southeast of Oologah, in Rogers 
County, OK. (See Oologah, OK, Geological Survey 
map, scale 1:24,000.) 
Xi ting project. For a description of the comted 
improvement, see page 19-15 of the Annual 
Report for 1972. Construction began in July 1950, but 
the project was placed in standby status in October 
1951. Construction resumed in December 1955, 
Local cooperation.Fully complied with. 
Operations and results during fiscal yeaffhe 
first year of a three year water quality study was 
completed in FY 00 with O&M funds of $485,000. 
Routine operation and maintenance continued. 
31. OPTIMA LAKE, OK. 
Location. On the North Canadian River at river 
mile 623.2, about 4.5 miles northeast of Hardesty, in 
Texas County, OK. (See Optima Dam, OK, Geological 
Survey map, scale 1:24,000.) 
Existing project.For a description of the existing 
improvement, see page 19-16 of the Annual Report for 
1979. Construction began in March 1966, and 
impoundment began in October 1978. Construction 
was completed in 1981. 
Local cooperation.Fully complied with. 
Operations and results during fiscal yeaRPutine 
operation and maintenance continued. 
32. PARKER LAKE, OK. 
Location. On Muddy Boggy Creek, a tributary of 
the Red River, about 23 miles east of Ada, in Coal 
County, OK. (See Parker, OK, Geological Survey 
map, scale 1:24,000.) 
Existing project. Parker Lake, if constructed, 
would be a multipurpose element in a plan of improvement 
for the Upper Muddy Boggy Creek Basin, OK. 
The project would consist of an earthfill dam about 
2,200 feet long, a gated outlet works for flood control 
and water supply, and a 100-foot-wide spillway. The 
lake created would have a total storage capacity of 
220,240 acre-feet and would yield 42 million gallons 
per day for municipal and industrial water supply. 
The project was authorized by the Water Resources 
Development Act of 1986. The project has not been 
funded for construction, however, a Limited Project 
Review of the project is scheduled to be completed in 
March 1998. Federal accomplishment of single purpose 
municipal and industrial water supply projects is 
not in accord with current Administration priorities. 
Local cooperation. The Oklahoma Water Resources 
Board, the sponsor, has agreed to cost 
38-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
share in the flood control portion of the project and 
the water supply provided enough interested users 
for the water supply can be identified. 
Operation and results during fiscal yeaEstimated 
total project cost is $71,400,000 (October 1992 
price level base). 
33. PAT MAYSE LAKE, TX. 
Location. On Sanders Creek, a tributary of the 
Red River, at river mile 4.6, about 12 miles north of 
Paris, in Lamar County, TX. (See Grant, TX, Geological 
Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 584 of the Annual 
Report for 1970. Construction began in March 1965, 
and the project was placed in full flood control operation 
in September 1967. 
Local cooperation.Fully complied with. 
Operations and results during fiscal yeakoutine 
operation and maintenance continued. 
34. PEARSON-SKUBITZ BIG HILL 
LAKE, KS. 
Location. On Big Hill Creek at river mile 33.3, 
about 4.5 miles east of Cherryvale, KS. (See Dennis, 
KS, Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-11 of the Annual 
Report for 1983. Construction began in April 1974, 
and impoundment began in March 1981. 
Local cooperation.Fully complied with. 
Operations and results during fiscal yeaRoutine 
operation and maintenance continued. 
35. PINE CREEK LAKE, OK. 
Location. On the Little River at river mile 145.3, 
about 5 miles northwest of Wright City, in McCurtain 
County, OK. (See Wright City, OK, Geological Survey 
map, scale 1:24,000.) 
Existing project For a description of the completed 
improvement, see page 584 of the Annual 
Report for 1970. Construction began in February 
1963, and the project was placed in useful operation in 
June 1969. 
Local cooperation.Fully complied with. 
Operations and results during fiscal yeaRoutine 
operation and maintenance continued. 
36. SARDIS LAKE, OK. 
Location. On Jackfork Creek, a tributary of the 
Kiamichi River, at river mile 2.8, about 2.5 miles 
north of Clayton, in Pushmataha County, OK. (See 
Yanush, OK, Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-11 of the Annual 
Report for 1983. Sardis Lake is operated as a unit of 
a two-lake system for flood control in the Kiamichi 
River Basin. (The other lake in the system is Hugo 
Lake). Construction began in August 1975, and the 
project became operational in January 1983. 
Local cooperation. The Oklahoma Water Resources 
Board (OWRB) failed to make satisfactory 
arrangements to pay for the Sardis Lake water supply 
storage as agreed to in a letter exchange of September 
1997. On July 2, 1998, the state of Oklahoma 
was declared in default under the contract. On July 
14, 1998, the Department of Justice (DOJ) filed suit 
in the Northern District Court of Oklahoma. The 
litigation has not moved forward because of a taxpayer 
"qui tam" suit filed in January 1998 in the 
Western District Court of Oklahoma against the 
OWRB and the United States. The suit between 
OWRB and the United States was postponed until a 
decision was reached on the taxpayer "qui tam" 
suit. On March 4, 1999, the Western District Court 
dismissed OWRB and the United States from the 
suit. The taxpayer group has 30 days to appeal. The 
DOJ will continue legal proceedings when the appeal 
process has lapsed in the "qui tam" suit. 
Operations and results during fiscal year. 
Routine operation and maintenance continued. 
37. SKIATOOK LAKE, OK. 
Location. On Hominy Creek, a tributary of Bird 
Creek in the Verdigris River Basin, at river mile 14.3, 
about 5 miles west of Skiatook, in Osage County, OK. 
(See Avant S.E., OK, Geological Survey map, scale 
1:24,000.) 
Existing project For a description of the completed 
improvement, see Page19-8 of the Annual 
Report for 1987. Construction began in January 
1974, impoundment began in October 1984, and 
the project became operational in November 1984. 
38-10

TULSA, OK, DISTRICT 
Local cooperation.Fully complied with. 
Operations and results during fiscal yearA 
dam safety project to rehabilitate the existing spillway 
was authorized with the approval of the Dam 
Safety Report in FY 97. Construction is scheduled to 
begin in FY 01. The total project cost is estimated to 
be $9,700,000 (October 1999 price levels). A 
waterborne shower/toilet is under construction in 
Twin Points Recreation Area. A wastewater treatment 
system for the facility was completed. Rural 
water will be installed for the area in FY 01. Routine 
operation and maintenance continued. 
88. TORONTO LAKE, KS. 
Location. On the Verdigris River at river mile 
271.5, about 4 miles southeast of Toronto, in Woodson 
County, KS. (See Fredonia, KS, Geological Survey 
map, scale 1:24,000.) 
Existing project.For a description of the completed 
improvement, see page 600 of the Annual Report 
for 1969. Construction began in November 1954, and 
the project was placed in full operation in March 
1960. 
have deteriorated and levee material has eroded 
into the pipes leaving small cavities in the embankment. 
The Tulsa District completed an evaluation 
of the levees in September 1989, which determined 
that rehabilitation would be required for the 
levees to operate as designed. Funds to repair the 
levee were provided in FY 91 and FY 94 by the U.S. 
Congress. 
Local cooperation.The Local Cooperation Agreement 
(LCA) was executed in March 1992, with Tulsa 
County and Levee District No. 12, the non-Federal 
sponsors. Approximately three-quarters of the 
project repairs have been completed to date. In FY 
99, a supplement to the LCA and additional funding 
was provided by the local sponsor to allow construction 
of Phase II. Additional funding is required to 
complete all necessary repairs. 
Operations and results during fiscal yeaPhase 
I contract for repair of 23 of the 48 deficient pipes 
was awarded July 30, 1992, and completed in July 
1993. Phase II construction was initiated in the 
summer of 1999 and was completed in FY 00. 
40. WAURIKA LAKE, OK. 
Local cooperation.Fully complied with. Location. On Beaver Creek, a tributary of the Red 
River, at river mile 27.0, about 6 miles northwest of 
Operations and results during fiscal yearWaurika, in Jefferson County, OK. (See Hastings, 
WRDA 99 mandated the transfer without consider- OK-TX, Geological Survey map, scale 1:24,000.) 
ation of 31.98 acres of project lands to the state of 
ansas, however, Kansas must pay for the administrative 
costs of the transfer. Routine operation 
and maintenance continued. 
89. TULSA AND WEST TULSA 
LEVEES, OK. 
Location On the banks of the Arkansas River near 
Tulsa, OK. On the left bank, the levee extends from 
river mile 531.0 near Sand Springs, OK, downstream 
to river mile 521.4 at Tulsa. On the right bank, the 
levee extends from near river mile 526.7 downstream 
toriver mile 521.3 and is adjacent to the major portion 
Ofthe business and residential districts in West Tulsa, 
Tulsa County, OK. 
Existing project.The Tulsa and West Tulsa Levees 
Were completed by the Tulsa District in 1945. The 
project was turned over to the Tulsa County Drainage 
District No. 12 for operations and maintenance. The 
Project consists of 3 levees with a total length of 
about 20 miles and an average height of 10 feet. 
The levees provide protection from flooding to props"
ty valued at approximately $1 billion dollars. Many 
of the drainage pipes that pass under the levee 
Existing project For a description of the completed 
improvement, see page 19-12 of the Annual 
Report for 1983. Waurika Lake is operated as a unit 
of a coordinated lake system for flood control in the 
Red River Basin. Construction began in July 1971, 
and impoundment began in August 1977. 
Local cooperation.Fully complied with. 
Operations and results during fiscal yeaRoutine 
operations and maintenance continued. 
41. WINFIELD, KS. 
Location. Winfield is located approximately 15 
miles north of the Kansas-Oklahoma state line on 
U.S. Highway 77 in Cowley County, KS. The city is 
located immediately southeast of the confluence of the 
Walnut River and Timber Creek. 
Existing project. The project consists of raising 
and extending approximately 4 miles of levee along 
Timber Creek and the Walnut River. Road ramps 
will be constructed at two locations where city 
streets cross the Walnut River. 
38-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Local cooperation.A Project Cooperation Agreement 
(PCA) was signed on September 4, 1996. The 
city of Winfield, the local sponsor, is currently fulfilling 
its requirements. 
Operations and results during fiscal yearA 
construction contract was awarded in FY 98. Construction 
was completed in FY 99. Financial closeout 
occurred this FY. 
42. WISTER LAKE, OK. 
Location. On the Poteau River at river mile 60.9, 
about 2 miles south of Wister, in LeFlore County, 
OK. (See Wister, OK, Geological Survey map, scale 
1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 601 of the Annual 
Report for 1969. Construction began in April 1946, 
and was completed in May 1949. The project was 
placed in full flood control operation in October 1949. 
The Tulsa District Corps of Engineers is responsible 
for flood control operations at 12 non-Corps 
projects. These include nine Bureau of Reclama. 
tion lakes, two Grand River Dam Authority lakes, 
and one city-county owned lake. All of these projects 
were constructed wholly or in part with Federal 
funds. Routine flood control releases were required 
at several of the projects. Fiscal year costs for 
scheduling flood control reservoir operations totaled 
$727,607. 
46. EMERGENCY FLOOD CONTROL 
ACTIVITIES. 
Fiscal year cost for catastrophic disaster preparedness 
was $32,350; advance preparation was 
$177,671. 
47. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION. 
C!_ ,,FY 99 dit sP-f-oVrO S mall 
:ee l alte 380-i JLr r L Aexpenu ULrOv. 
Local cooperation.Fully complied with. Flood Control Projects Not Specifically Authorized by 
Congress (Section 205); Emergency Streambank and 
Operations and results during fiscal year.Shoreline Projects (Section 14). 
WRDA 99 mandated the transfer of 10-acres of 
project lands to the Summerfield Cemetary Association 
for use as a cemetery. Routine operation Multiple-Purpose Projects Including Power 
and maintenance continued. 
43. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS. 
See Table 38-E. 
44. INSPECTION OF COMPLETED 
LOCAL FLOOD PROTECTION 
PROJECTS. 
Inspections of completed, Federally constructed 
local flood protection projects which are owned, 
operated, and maintained by local interests are 
made to determine the extent of compliance with 
approved regulations for operations and maintenance. 
The inspections assist the Corps of Engineers 
in determining if the project provides the 
flood protection for which it was constructed. See 
Table 38-I for a list of projects inspected in FY 00. 
Fiscal year cost was $156,111. 
45. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS. 
48. BROKEN BOW LAKE, OK. 
Location. On the Mountain Fork River at river 
mile 20.3, about 9 miles northeast of Broken Bow, 
in McCurtain County, OK. (See Broken Bow, OK, 
Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvements, see page 29-17 of the Annual 
Report for 1971. Construction began in November 
1961, and the project was placed in useful operation in 
October 1969. Power units 1 and 2 were placed in 
operation in January and June 1970, respectively. 
Local cooperation. The development of a trout 
fishery in the Mountain Fork River below Broken Bow 
Lake was implemented in 1989, in cooperation with 
the Corps of Engineers (Corps), Southwestern power 
Administration, Oklahoma Department of Wildlife 
Conservation, and the Oklahoma Water Resources 
Board. The operation of the trout stream has been 
cooperatively managed by a Memorandum of Understanding. 
The Water Resources Development 
Act of 1996 (WRDA 96), Sec. 338, modified the 
project to provide for the reallocation of sufficient 
quantity of water supply storage space to support 
38-12

TULSA, OK, DISTRICT 
the Mountain Fork trout fishery at no expense to 
the State of Oklahoma. The District is waiting on 
implementing guidance. 
Operations and results during fiscal yeaiRoutine 
operation and maintenance continued. 
49. EUFAULA LAKE, OK. 
Location. On the Canadian River at river mile 
27.0, about 12 miles east of Eufaula, in McIntosh 
County, OK. (See Porum, OK, Geological Survey 
map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 588 of the Annual 
Report for 1970. Construction began in December 
1956, and the project was placed in full flood control 
operation in February 1964. There are numerous 
areas along the shoreline where private property is 
subject to flooding and erosion as a result of the 
construction and operation. Erosion problems in 
numerous subdivisions bordering the lake were studied 
in 1989 and 1993. At this time, it is estimated that 
there are approximately 22 miles of shoreline in need 
of attention. Estimated costs for repair is approximately 
$15 million. 
Local cooperation.Fully complied with. 
Operations and results during fiscal yeaA 
contract has been awarded to rehabilitate the floating 
tainter gate bulkhead. Routine operation and 
maintenance continued. 
50. FORT GIBSON LAKE, OK. 
Location. On the Grand (Neosho) River at river 
mile 7.7, about 5 miles north of Fort Gibson, in 
Muskogee County, OK. (See Fort Gibson Dam, OK, 
Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 604 of the Annual 
Report for 1969. Construction began in March 1942, 
but was held in abeyance during World War II. Construction 
resumed in May 1946, and was completed in 
June 1950. The fourth generator was installed and 
the project placed in full operation in September 1953. 
Local cooperation.Fully complied with. 
Operations and results during fiscal yeaRoutine 
operation and maintenance continued. 
. KEYSTONE LAKE, OK. 
Location. On the Arkansas River at river mile 
538.8, near Sand Springs, OK, and about 15 miles 
west of Tulsa, OK. (See Keystone Dam, OK, Geological 
Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 589 of the Annual 
Report for 1970. Construction began in January 1957, 
and the project was placed in flood control operation 
in September 1964. 
Local cooperation.Fully complied with. 
Operations and results during fiscal year. 
Routine operation and maintenance continued. 
52. LAKE TEXOMA (DENISON DAM), 
OK AND TX. 
Location. On the Red River at river mile 725.9, 
about 5 miles northwest of Denison, TX. (See 
Denison Dam, OK, Geological Survey map, scale 
1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 603 of the Annual 
Report for 1969. Lake Texoma is operated as a unit of 
a coordinated lake system for flood control in the 
Red River Basin. Construction started in August 
1939, and was completed in February 1944. Commercial 
power generation was started in March 
1945. Authorized work is complete except for installation 
of the third, fourth, and fifth power units. 
Local cooperation.Fully complied with. 
Operations and results during fiscal year. 
WRDA 99 mandated the sale, at fair market value, 
of approximately 1,580 acres of project lands to the 
state of Oklahoma's Department of Tourism. Routine 
operation and maintenance continued. 
53. ROBERT S. KERR LOCK AND DAM 
AND RESERVOIR, OK. 
Location. On the Arkansas River at navigation 
mile 336.2, about 8 miles south of Sallisaw, in LeFlore 
County, OK. (See Robert S. Kerr, OK, Geological 
Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-21 of the Annual 
Report for 1972. The Robert S. Kerr Lock and Dam 
and Reservoir is a unit of the McClellan-Kerr Arkansas 
River Navigation System. Construction 
began in April 1964, and closure was completed in 
38-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
October 1970. The lock and dam became operational 
for navigation in December 1970. Generating 
units 1, 2, 3, and 4 were placed in operation in 
October, July, September, and November 1971, respectively. 
Local cooperation. See section 1 of this report. 
Terminal facilities. Five sites have been developed 
for handling coal, grain, construction aggregates, 
and miscellaneous cargo. The facilities are 
considered adequate for present traffic. 
Operations and results during fiscal yeaRoutine 
operation and maintenance continued. 
54. TENKILLER FERRY LAKE, OK. 
Location. On the Illinois River at river mile 12.8, 
7 miles northeast of Gore, in Sequoyah County, OK. 
(See Gore, OK, Geological Survey map, scale 
1:24,000.) 
Existing project For a description of the completed 
improvement, see page 606 of the Annual 
Report for 1969. Construction began in June 1947, 
and was completed in July 1953. 
Local cooperation.Fully complied with. 
Operations and results during fiscal yeaRoutine 
operation and maintenance continued. A 
project to build an auxiliary spillway and to modify 
the existing spillway was authorized February 22, 
1994, by the Acting Assistant Secretary of the 
Army, under the Dam Safety Assurance Program. 
Phase I was awarded in FY 00. Phase II will be 
awarded in FY 02. 
55. WEBBERS FALLS LOCK AND 
DAM, OK. 
Location. On the Arkansas River at navigation 
mile 366.6, about 5 miles northwest of Webbers Falls, 
in Muskogee County, OK. (See Webbers Falls, OK, 
Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-23 of the Annual 
Report for 1977. The Webbers Falls Lock and Dam is 
a unit of the McClellan-Kerr Arkansas River Navigation 
System. Construction began in January 1965, 
and the project was placed in useful operation in 
November 1970. The lock and dam became operational 
for navigation in December 1970. Generating 
units 1, 2, and 3 were placed in operation in August, 
September, and November 1973, respectively. 
Local cooperation. See section 1 of this report. 
Terminal facilitiesFacilities at the Port of Muskogee 
include: a cargo pier, mooring dolphins, warehouse, 
terminal building, and fuel facility built by the 
Muskogee City-County Port Authority; a liquid cargo 
loading facility and a steel unloading facility built by 
Frontier Steel Company; grain holding facilities built 
by Conagra, Inc.; and a general-purpose private 
dock built by the Fort Howard Paper Company. The 
facilities are considered adequate for present traffic. 
Operations and results during fiscal year. 
Hydropower unit repairs were completed and all 
units are operational. Routine operation and maintenance 
continued. 
General Investigations 
56. SURVEYS. 
Fiscal year cost was $640,071, which included 
two reconnaissance studies; three special studies; 
miscellaneous activities-special investigations, 
intragency water resources development; coordination 
with other Federal agencies, States, and 
non-Federal interests, and seven Planning Assistance 
to States Studies. Table 38-K provides a 
specific list and respective fiscal year expenditures. 
57. COLLECTION AND STUDY OF 
BASIC DATA. 
Fiscal year cost was $391,768, which includes 
floodplain management services. Table 38-K provides 
a specific list and respective fiscal year expenditures. 
38-14

TULSA, OK, DISTRICT 
Table 38-A COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 Sep 30, 2000 
1. McClellan-Kerr Arkansas New Work 
River Navigation System, Approp 
OK, (Tulsa District Portion) Cost 
- 130,936,6382 
- 130,936,6382 
3,919,000 3,771,000 3,871,300 
4,080,296 3,054,371 4,638,166 
3,761,500 173,354,762 
3,727,639 173,517,546 
3. Arcadia Lake, OK New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
4. Arkansas City, KS 
(Contributed Funds) 
5. Arkansas-Red River 
Basins Chloride Control, 
KS, OK, and TX 
Sa. Area V, 
Estelline Springs, TX 
New Work 
Approp 
Cost 
Contrib. 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
5b. Area VIII, TX 
1,270 4,508 
459,700 354,000 331,000 
351,059 479,049 342,408 
444,500 
442,653 
-95,000 1,878,000 276,000 1,226,279 
274,651 1,903,566 295,583 1,354,661 
265,000 
900 
900 
1,200 
1,275 
New Work 
Approp 
Cost 
223,000 
12,437 
2,400 
2,320 
1,200 
1,100 
-10,250 
Maint 
Approp 
Cost 
Red River Basin Chloride 
Control, TX & OK 
New Work 
Approp 
Cost 
1,556,100 1,198,000 1,071,300 
1,518,053 1,297,175 1,080,350 
2,137,000 
4,063,142 
720,000 1,849,000 
1,547,581 1,405,550 
1,311,000 13,334,348 
1,304,043 13,321,369 
1,350,000 30,718,800 
1,561,098 29,818,599 
38-15 
Maint 
Approp 
Cost 
82,965,900 
82,958,217 
4,692,082 
3,880,165 
6,310,279 
6,281,818 
488,000 
12,437 
25,705,208 
25,705,208 
2,316,354 
2,316,354 
300,028 
300,028 
158,657 
158,476 
46,682,242 
46,671,992 
Sc.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Table 38-A COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section Total to 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 Sep 30, 2000 
6. Birch Lake, OK New Work 
Approp 
Cost 
13,549,170 
13,549,170 
553,200 496,000 498,400 
541,678 498,447 526,092 
495,500 13,551,766 
494,938 13,551,204 
7. Bowie County Levee, TX 
8. Candy Lake, OK 
9. Canton Lake, OK New Work 
Approp 
Cost 
11,209,834 
11,209,834 
1,737,000 1,456,500 1,560,400 
1,682,862 1,562,995 1,601,356 
1,938,000 35,414,268 
1,933,114 35,402,774 
10. Copan Lake, OK 
83,800,814 
-1,625 83,799,189 
678,900 733,500 611,800 
640,770 760,094 629,790 
713,700 12,401,479 
718,401 12,400,540 
11. Council Grove Lake, KS 
1,134,800 1,070,000 1,391,950 
1,112,760 1,067,444 1,453,622 
1,939,500 21,902,760 
1,941,271 21,900,286 
12. El Dorado Lake, KS New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
29,369 26 
430,500 337,470 317,400 
419,541 347,380 330,713 
38-16 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
New Work 
Approp 
Cost 
100,000 
487,934 
15,100 
8,116 
45,000 
79,025 
3,500 
10,244 
Maint 
Approp 
Cost 
10,898 
4,300 
4,478 
12,245 
4,300 
4,258 
1,820,000 
1,805,837 
4,927,922 
4,927,922 
221,870 
221,755 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
-30,293 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
11,810,5 0 9 
11,810,509 
92,413,349 
92,413,343 
7,392,050 
7,390,043 
413,000 
410,488

TULSA, OK, DISTRICT 
Table 38-A COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section Total to 
In Text Project Funding FY 97 FY 98 FY 99 FY 00 Sep 30, 2000 
13. Elk City Lake, KS New Work 
Approp 
Cost 
19,052,990 
19,052,990 
622,800 425,000 519,500 
597,575 434,131 538,892 
542,500 16,065,250 
540,154 16,055,785 
14. Fall River Lake, KS 
(Federal) 
(Contrib. Funds) 
15. Fort Supply Lake, OK 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
Contrib. 
Cost 
New Work 
Approp 
Cost 
10,550,873 
10,550,873 
845,500 891,000 1,161,500 1,255,300 19,330,242 
850,016 897,288 1,179,778 1,249,267 19,317,546 
-6120 
6120 
7,723,134 
7,723, 134 
734,300 922,000 764,700 1,043,900 19,532,698 
771,363 798,618 931,152 1,039,928 19,527,068 
16. Fry Creeks, Bixby, OK New Work 
Approp 
Cost 
2,837,000 2,413,000 1,845,000 
2,385,420 2,917,165 1,849,834 
331,000 10,195,568 
299,002 10,035,248 
(Contrib. Funds) 
17. Great Bend, KS 
(Federal) 
(Contrib. Funds) 
Contrib. 275,000 365,000 
Cost 140,854 141,209 
New Work 
Approp 
Cost 
-373,000 
-335,263 
357,937 
50 
Contrib. 178,254 
Cost 371,147 
18. Great Salt Plains Lake, OK New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
298,000 
302,592 
146,500 145,500 
154,372 148,745 
19. Halstead, KS 
(Federal) 
New Work 
Approp 
Cost 
200,000 -100,000 
113,882 7,214 
-37,000 
13,203 
137,000 8,483,000 
106,110 8,428,336 
38-17 
Maint 
Approp 
Cost 
Maint 
Approp 
Cost 
640,000 
640,000 
19,968,400 
19,968,073 
4,259,254 
4,259,254 
4,626,270 
4,626,270 
8,214,347 
8,212,876 
153,000 
152,074

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Table 38-A COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section Total to 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 Sep 30, 2000 
Halstead, KS (Cont'd) 
(Contributed Funds) 
20. Heyburn Lake and 
Polecat Creek, OK 
Contrib. 
Cost 
New Work 
Approp 
Cost 
940,000 
924,537 
2,560,572 
2,560,572 
730,300 568,000 598,050 
643,679 649,285 621,158 
599,000 14,276,536 
597,959 14,270,067 
21. Hugo Lake, OK New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
22. Hulah Lake, OK 
-80 41,211,562 
41,211,562 
1,444,600 1,359,618 1,543,500 1,557,300 32,404,480 
1,452,729 1,338,389 1,604,919 1,572,140 32,397,562 
New Work 
Approp 
Cost 
11,388,150 
11,388,150 
Maint 
Approp 
Cost 
351,700 682,000 527,170 
350,942 366,808 862,271 
379,800 12,336,582 
378,336 12,335,118 
Minor 
Rehabilitation 
Approp 
Cost 
23. John Redmond Dam 
and Reservoir, KS 
135,718 
135,718 
28,151,470 
28,151,470 
New Work 
Approp 
Cost 
Maint 
Approp 2,513,000 654,000 3,031,700 2,250,800 33,331,967 
Cost 2,328,060 1,000,729 3,063,025 2,173,461 33,254,609 
23. Kaw Lake, OK 
(Federal) 
New Work 
Approp 
Cost 
109,430,750 
S 109,430,750 
Maint 
Approp 1,778,100 1,705,000 1,643,420 1,973,000 37,797,195 
Cost 1,812,806 1,730,601 1,635,264 2,004,185 37,782,468 
(Contributed Funds) Contrib. 
Cost 
38-18 
43,934 
43,934 
Maint 
Approp 
Cost

TULSA, OK, DISTRICT 
Table 38-A COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section Total to 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 Sep 30, 2000 
25. Lake Kemp, TX New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
140,100 140,000 196,400 
161,347 139,004 201,101 
26. Lake Wichita, 
Holliday Creek, TX 
(Federal) 
(Contributed Funds) 
27. Marion Reservoir, KS 
New Work 
Approp 
Cost 
Contrib. 
Cost 
New Work 
Approp 
Cost 
227,260 16,510 60,061 
58,212 33,902,212 
1,300 33,845,300 
- 7,835,000 
- 7,835,000 
13,420,818 
13,420,818 
Maint 
Approp 
Cost 
2,372,000 1,953,000 1,456,800 
2,438,030 1,903,431 1,563,173 
1,622,000 26,061,355 
1,608,056 26,047,321 
Minor 
Rehabilitation 
Approp 
Cost 
68,924 
68,924 
28. McGrath Creek, 
Wichita Falls, TX 
(Federal) 
(Contributed Funds) 
29. Mingo Creek, OK 
(Federal) 
(Contributed Funds) 
New Work 
Approp 
Cost 
3,393,000 3,391,000 
3,945,215 3,548,168 
Contrib. 2,315,000 451,100 
Cost 2,376,586 576,922 
New Work 
Approp 
Cost 
4,785,000 9,036,726 4,034,000 
4,534,340 9,271,284 2,068,230 
Contrib. 1,785,000 2,490,000 
Cost 3,184,924 1,734,535 745,211 
93,000 
40,422 
-13,491 
146,578 
- -116,740 
18 -116,666 
8,538,349 
8,538,349 
3,086,860 
3,086,860 
2,790,000 76,904,726 
3,957,236 75,916,986 
- 16,253,400 
255,192 15,871,317 
Qologah Lake, OK 
1,485,000 1,545,600 
1,519,158 1,556,000 
2,500,600 33,050,560 
2,354,285 32,904,154 
38-19 
7,637,702 
7,637,702 
3,563,401 
3,563,381 
132,900 
134,012 
30. New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
1,543,000 
1,596,187 
37,029,9283 
37,029,9283

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Table 38-A COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section Total to 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 Sep 80, 2000 
31. Optima Lake, OK New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
32. Parker Lake, OK 
33. Pat Mayse Lake, TX 
New Work 
Approp 
Cost 
New Work 
Approp 
Cost 
91,000 
97,887 
75,000 
15,326 
50,000 23,544 
52,567 25,930 
55,334 4,313 
Maint 
Approp 
Cost 
34. Pearson-Skubitz 
Big Hill Lake, KS 
878,000 841,000 1,049,060 1,419,000 20,011,266 
857,128 871,487 1,070,088 1,414,598 20,036,855 
New Work 
Approp 
Cost 
16,879,166 
16,879,166 
Maint 
Approp 
Cost 
35. Pine Creek Lake, OK 
929,800 869,000 749,300 1,629,000 15,970,528 
911,511 856,954 779,690 1,621,799 15,955,475 
New Work 
Approp 
Cost 
20,628,049 
20,628,049 
1,074,900 857,000 986,350 1,204,000 21,630,137 
1,024,551 913,376 1,002,949 1,202,771 21,628,316 
36. Sardis Lake, OK New Work 
Approp 
Cost 
- -281,041 
- -105,740 
1,000,100 800,000 759,400 
1,023,550 856,598 786,443 
857,000 14,089,621 
850,120 14,081,974 
37. Skiatook Lake, OK New Work 
Approp 
Cost 
-1,244 465,000 
- 269,564 
1,230,900 947,000 818,500 1,319,000 16,384,438 
1,270,191 1,056,800 841,665 1,316,760 16,379,285 
38-20 
56,500 
56,483 
47,173,438 
47,173,438 
7,514,693 
7,514,638 
585,326 
584,973 
9,310,661 
9,310,661 
Maint 
Approp 
Cost 
Maint 
Approp 
Cost 
68,518,439 
68,518,429 
Maint 
Approp 
Cost 
318,000 
363,350 
107,051,738 
106,901,652

TULSA, OK, DISTRICT 
Table 38-A COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section Total to 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 Sep 30, 2000 
38. Toronto Lake, KS New Work 
Approp 
Cost 
13,896,324 
13,896,324 
39. Tulsa & West Tulsa, OK 
(Federal) 
(Contributed Funds) 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Contrib. 
Cost 
347,700 398,000 519,716 
344,096 402,765 526,993 
17,749 
679 
10,644 
75,000 
31,937 
2,856 
75,000 
49,191 
350,000 8,940,832 
359,068 8,938,953 
457,787 
17,976 
230,433 
Minor 
Rehabilitation 
Approp 
Cost 
40. Waurika Lake, OK New Work 
Approp 
Cost 
-69 
1,425,000 
1,417,886 
492,976 
412,240 
1,118,111 
1,110,444 
69,729,461 
69,729,281 
1,364,500 1,152,000 1,355,000 1,392,000 23,287,862 
1,327,246 1,201,941 1,377,034 1,368,572 23,264,080 
41. Winfield, KS 
(Contributed Funds) 
42. Wister Lake, OK 
New Work 
Approp 
Cost 
Contrib. 
Cost 
New Work 
Approp 
Cost 
-86,000 2,378,000 3,375,000 
248,869 2,330,421 2,802,721 
- 65,000 
Maint 
Approp 
Cost 
1,011,400 501,500 489,500 
919,324 604,693 530, 175 
522,000 15,605,524 
512,889 15,596,027 
Major 
Rehabilitation 
Approp 
Cost 
Broken Bow Lake, OK 
11,131,529 
11,131,529 
41,222,692 
41,222,692 
New Work 
Approp 
Cost 
38-21 
Maint 
Approp 
Cost 
532,000 
1,003,158 
-10,540 
54,460 
8,186,617 
7,971,712 
54,460 
54,460 
10,690,751 
10,687,439 
48.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Table 38-A COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section Total to 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 Sep 30, 2000 
Broken Bow Lake, OK 
(Cont'd) 
49. Eufaula Lake, OK 
Maint 
Approp 
Cost 
1,318,000 1,321,669 1,091,900 1,472,000 33,892,866 
1,251,537 1,294,720 1,215,477 1,471,041 33,887,621 
New Work 
Approp 
Cost 
123,795,907' 
123,795,9074 
Maint 
Approp 3,884,800 4,697,000 4,028,000 5,983,500 88,507,083 
Cost 4,006,071 4,480,746 4,367,219 5,982,694 88,477,453 
(Contributed Funds) 
50. Fort Gibson Lake, OK 
(Contributed Funds) 
51. Keystone Lake, OK 
Contrib. 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
Contrib. 
Cost 
New Work 
Approp 
Cost 
254,780 
254,180 
43,821,405' 
43,821,4056 
3,436,000 3,273,000 3,464,000 4,112,800 73,249,412 
3,486,300 3,203,442 3,647,826 4,084,774 73,180,679 
- 501,000 
487,164 
123,171,1736 
123,171,1736 
3,588,800 3,295,000 3,899,600 4,822,000 70,031,005 
3,660,176 3,304,610 3,945,300 4,814,771 69,997,510 
52. Lake Texoma 
(Denison Dam), 
OK and TX 
New Work 
Approp 
Cost 
68,168,9607 
- 68,157,3907 
Maint 
Approp 5,680,000 5,480,000 5,370,740 7,716,000 
Cost 6,241,324 5,666,505 5,437,475 7,740,970 
Minor 
Rehabilitation 
Approp - - 
Cost . 
53. Robert S. Kerr Lock and 
Dam and Reservoir, OK 
New Work 
Approp 
Cost 
38-22 
Maint 
Approp 
Cost 
127,053,408 
126,998,923 
46,237 
46,237 
94,578,237 
94,578,237 
-11,570

TULSA, OK, DISTRICT 
Table 38-A COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section Total to 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 Sep 30, 2000 
Robert S. Kerr Lock and 
Dam and Reservoir, OK 
(Cont'd) 
54. Tenkiller Ferry Lake, OK 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
55. Webbers Falls 
Lock & Dam, OK 
4,176,000 4,416,000 3,609,200 
4,561,323 4,445,457 3,695,194 
4,022,000 76,113,045 
4,019,578 76,084,834 
411,000 195,000 1,684,000 4,889,000 32,552,720" 
595,704 239,836 809,938 5,439,572 32,213,0508 
3,078,700 2,748,000 2,903,100 4,258,000 66,063,820 
3,076,723 2,848,279 2,947,711 4,209,693 66,015,423 
New Work 
Approp 
Cost 
86,107,967 
86,107,967 
Maint 
Approp 
Cost 
3,484,900 3,590,400 4,376,000 4,803,000 71,344,824 
3,192,062 3,695,492 4,972,118 4,779,826 71,277,987 
1. Includes $2,077,900 expended by the Jobs Act (P.L. 98-8 dated, March 24, 1983) for projects listed in Tables 29-M of the FY 85 
Annual Report. 
2. Includes $12,700,038 for Bank Stabilization and Channel Rectification. 
3. Excludes $81,460 contributed funds and $1,348,816 special funds. 
4. Excludes $299,803 contributed funds and $13,211,728 special funds. 
5. Excludes $134,919 contributed funds. Includes $49,581 Public Works acceleration funds; and $1,058,500 Hydropower. 
6. Excludes $5,366,231 special funds. 
7. Includes $433,549 Emergency Relief funds. Exchange $1,256,068 from special contributed funds. 
8. Excludes $946 contributed funds. Includes $39,999 Public Works acceleration funds. 
9. The cost for Grand Lake 0' the Cherokees has been added to the amount reported in paragraph 45, Scheduling Flood Control 
Reservoir Operations. 
38-23

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 38-B AUTHORIZING LEGISLATION 
See Date of Project 
Section Authorizing and Work 
In Text Act Authorized Documents 
July 24, 1946 
October 22, 1976 
November 17, 1986 
December 31, 1970 
October 22, 1976 
November 17, 1986 
October 23, 1962 
November 7, 1966 
December 31, 1970 
November 17, 1986 
October 23, 1962 
August 26, 1994 
October 23, 1962 
June 28, 1938 
July 24, 1946 
June 30, 1948 
October 23, 1962 
May 17, 1950 
October 27, 1965 
August 18, 1941 
August 18, 1941 
June 22, 1936 
November 17, 1986 
November 17, 1986 
McCLELLAN-KERR ARKANSAS 
RIVER NAVIGATION SYSTEM 
Big and Little Sallisaw Creeks 
Navigation Project 
W.D. Mayo Hydropwer 
ARCADIA LAKE 
Changed water quality to 
water supply 
ARKANSAS CITY 
ARKANSAS-RED RIVER BASINS 
CHLORIDE CONTROL 
Authorized Area V 
(Estelline Springs) 
Authorized Areas VII, VIII, and X 
Authorized Areas I, II-III, VI, 
IX, XIII, XIV, and XV 
Authorized the Red River Basin 
and the Arkansas River Basin as 
separate projects with separate 
authority. 
BIRCH LAKE 
BOWIE COUNTY LEVEE 
CANDY LAKE 
CANTON LAKE 
Approved Irrigation Storage 
Approved Water Supply Storage 
COPAN LAKE 
COUNCIL GROVE LAKE 
EL DORADO LAKE 
ELK CITY LAKE 
FALL RIVER LAKE 
FORT SUPPLY LAKE 
FRY CREEKS 
GREAT BEND 
38-24 
4. 
5. 
5a. 
5b.&5c. 
6. 
7. 
8. 
9. 
10. 
11. 
12. 
13. 
14. 
15. 
16. 
17. 
HD 79-758 
PL 79-525 
PL 94-587 
PL 99-662 
HD 91-299 
PL 94-587 
PL 99-662 
SD 87-107 
PL 89-789 
SD 110 
PL 91-611 
PL 99-662 
HD 87-563 
PL 103-316 
HD 87-564 
HD 75-569 
HD 87-563 
HD 80-442 
HD 89-232 
HD 76-440 
HD 76-440 
HD 74-308 
PL 99-662 
PL 99-662

TULSA, OK, DISTRICT 
TABLE 38-B AUTHORIZING LEGISLATION 
(Continued) 
See Date of Project 
Section Authorizing and Work 
In Text Act Authorized Documents 
18. 
19. 
20. 
21. 
22. 
23. 
24. 
25. 
26. 
27. 
28. 
29. 
30. 
GREAT SALT PLAINS LAKE 
HALSTEAD 
HEYBURN LAKE AND POLECAT CREEK 
HUGO LAKE 
HD 74-308 
PL 99-662 
HD 80-290 
HD 79-602 
June 22, 1936 
November 17, 1986 
July 24, 1946 
July 24, 1946 
June 22, 1936 
May 17, 1950 
February 15, 1958 
October 23, 1962 
October 23, 1962 
November 17, 1986 
May 17, 1950 
March 14, 1990 
November 17, 1988 
November 17, 1986 
June 28, 1938 
June 22, 1936 
November 17, 1986 
October 23, 1962 
October 23, 1962 
November 10, 1978 
July 3, 1958 
October 23, 1962 
December 4, 1981 
October 23, 1962 
August 18, 1941 
August 18, 1941 
38-25 
HULAH LAKE HD 74-308 
JOHN REDMOND DAM AND RESERVOIR HD 80-442 
Authorized name change PL 85-327 
KAW LAKE HD 87-143 
LAKE KEMP HD 87-144 
LAKE WICHITA, HOLLIDAY CREEK PL 99-662 
MARION RESERVOIR HD 80-442 
Authorized name change PL 101-253 
MCGRATH CREEK WICHITA FALLS, TX PL 100-676 
MINGO CREEK PL 99-662 
OOLOGAH LAKE Committee Doc. 
No. 1, 75th 
Cong., 1st Session 
OPTIMA LAKE HD 74-308 
PARKER LAKE PL 99-662 
PAT MAYSE LAKE HD 88-71 
PEARSON-SKUBITZ BIG HILL LAKE HD 87-472 
Authorized name change PL 95-265 
PINE CREEK LAKE HD 85-170 
SARDIS LAKE SD 87-145 
Authorized name change PL 97-88 
SKIATOOK LAKE HD 87-563 
TORONTO LAKE HD 76-440 
PL 77-228 
TULSA & WEST TULSA, OK PL 77-228 
31. 
32. 
33. 
34. 
35. 
36. 
37. 
38. 
39.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 38-B AUTHORIZING LEGISLATION 
(Continued) 
See Date of Project 
Section Authorizing and Work 
In Text Act Authorized Documents 
40. 
41. 
42. 
June 28, 1938 
June 24, 1946 
July 24, 1946 
WAURIKA LAKE 
WINFIELD 
WISTER LAKE 
Changed conservation pool 
elevation 
Increase permanent pool level 
BROKEN BOW LAKE 
Reallocation of water supply storage 
EUFAULA LAKE 
Authorized Piney Creek and 
Muddy Creek bridge replacement 
Authorized cost sharing 
December 30, 1963 
October 27, 1965 
June 28, 1938 
July 30, 1983 
October 12, 1996 
July 3, 1958 
October 23, 1962 
October 12, 1996 
July 24, 1946 
July 16,1984 
November 17, 1986 
August 18, 1941 
July 24, 1946 
November 17, 1986 
May 17, 1950 
June 28, 1938 
October 17, 1940 
Sepember 30, 1944 
August 14, 1953 
November 17, 1986 
July 24, 1946 
July 8, 1963 
TENKILLER FERRY LAKE 
Power 
WEBBERS FALLS LOCK AND DAM 
SD 88-33 
PL 88-253 
PL 89-298 
Committee Doc. 
No. 1, 75th 
Cong., ist Session 
PL 98-63 
PL 104-303 
HD 85-170 
SD 87-137 
PL 104-303 
HD 79-758 
PL 98-360 
PL99-662 
HD 76-107 
PL 76-228 
PL 99-662 
SD 81-07 
HD 75-541 
PL 76-868 
PL 78-454 
PL 83-273 
PL 99-662 
HD 79-758 
PL 88-62 
Committee Doc. 
No. 1, 75th 
Cong., 1st Sess. 
HD 79-758 
HD 79-758 
38-26 
FORT GIBSON LAKE 
Incorporated into the multiple-purpose 
plan for the Arkansas River Basin 
Added hydropower units 5 & 6 
KEYSTONE LAKE 
LAKE TEXOMA (Denison Dam) 
Flood control and power 
Navigation and regulating flows 
Authorized name 
Water supply 
Recreation 
ROBERT S. KERR LOCK AND 
DAM AND RESERVOIR 
Authorized name change 
48. 
49. 
50. 
51. 
52. 
53. 
54. 
55. 
-e

TULSA, OK, DISTRICT 
TABLE 38-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last 
Full Report Cost to September 30, 2000 
See Annual Operation and 
Project Status Report for Construction Maintnenace 
Big and Little Sallisaw Inactive - - 3,163 
Navigation Project 
Poteau River Navigation Project, Complete 1983 536,952 
OK and AR 
Red River from Fulton, AR, Complete 1924 378,574 182,157 
to Mouth of Washita River 
TABLE 38-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last 
Full Report Cost to September 30. 2000 
See Annual Operation and 
Project Report For Construction Maintenance 
Augusta LPP, KS' 2 1938 84,217 
Boswell Lake, OK3 1952 - - 
Cherry and Red Fork Creeks LPP, OK2 1970 261,448 
Crutcho Creek LPP, OK3 1972 213,016 
Dodge City LPP, KS2 
Enid LPP, OK2 1963 743,612 14,599 
Flat Rock and Valley View Creeks LPP, Tulsa, OK2 , 4 1975 1,741,000 - 
Florence LPP, KS2 1965 369,782 - 
Hutchinson LPP, KS2 1956 3,497,718 - 
Iola LPP, KS2 1939 22,290 - 
Jenks LPP, OK 2 1950 344,797 
Joe Creek LPP, OK2 308,041 
Larned LPP, KS2 
Lukfata Lake, OK3 1983 1,424,685 
Marion, KS 1988 5,488,618 
Oklahoma City LPP, OK 2 1960 8,047,512 
Red River Bank Stabilization Below Denison, OK and TX2 1953 222,105 
Red River Emergency Bank Protection - 400,000 
Sand Creek LPP, KS2 1968 545,996 
Sand Lake, OK3 1963 
Shidler Lake, OK3 1983 568,191 - 
Tulsa and West Tulsa LPP, OK 2 1954 3,592,432 - 
Turtle Creek LPP, Yukon, OK3 1975 144,853 
West Branch Chisholm Creek LPP, KS2 1965 364,200 - 
Wichita and Valley Center LPP, KS2 1960 12,247,379 - 
LPP. Local Protection Project. 
1. Completed by Kansas Works Progress Administration 
2. Complete. 
3. Deferred. 
4. Federal cost limited to $1,000,000. 
. Active with no current year expenditures. 
38-27

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 38-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Date Federal Contributed 
See Annual and Funds Funds 
Project Report for Authority Expended Expended 
Big Pine Lake, TX 1984 November 1, 1997 1,701,670 0 
Public Law 99-662 
Candy Lake, OK 1996 July 9, 1995 4,950,000 0 
Public Law 99-662 
Cedar Point Lake, KS 1980 November 17,1986 0 0 
Public Law 99-662 
Cow Creek, Hutchinson, KS 1971 November 17, 1986 363,720 0 
Public Law 99-662 
El Dorado, West Branch, 1977 November 17, 1986 92,319 0 
Walnut River, KS Public Law 99-662 
Neodesha Lake, KS 1952 November 17, 1986 97,910 0 
Public Law 99-662 
Lake Texoma Perimeter Access July, 9, 1995 13,200 0 
Roads, Texas & Oklahoma Public Law 99-662 
Sand Lake, OK April 5, 1999 0 0 
Public Law 99-662 
Shidler Lake, OK May 1, 1997 568,000 0 
Public Law 99-662 
Towanda Lake, KS 1981 November 17, 1986 393,361 0 
Public Law 99-662 
Tuskahoma Lake, OK 1963 July 19, 1992 
Public Law 99-662 
TABLE 38-H ARKANSAS RIVER BASIN MULTIPLE-PUPOSE PLAN 
(See Section 1 of Text) 
River Mild Nearest Town 
LAKES 
Canton 
Elk City 
Eufaula 
Fall River 
Fort Gibson 
Grand Lake 0' the Cherokees 
Keystone 
Lake Hudson (Markham Ferry) 
Neodesha 
Oologah 
Tenkiller Ferry 
Toronto 
Wister 
North Canadian 
Elk River 
Canadian 
Fall River 
Grand (Neosho) 
Grand (Neosho) 
Arkansas 
Grand (Neosho) 
Verdigris 
Verdigris 
Illinois 
Verdigris 
Poteau 
394.3 
8.7 
27.0 
54.2 
7.7 
77.0 
538.8 
47.4 
222.8 
90.2 
12.8 
271.5 
60.9 
Canton, OK 
Elk City, KS 
Eufaula, OK 
Fall River, KS 
Fort Gibson, OK 
Disney, OK 
Sand Springs, OK 
Locust Grove, OK 
Neodesha, KS 
Oologah, OK 
Gore, OK 
Toronto, KS 
Wister, OK 
38-28 
Feature River

TULSA, OK, DISTRICT 
TABLE 38-H ARKANSAS RIVER BASIN MULTIPLE-PUPOSE PLAN 
Continued (See Section 1 of Text) 
Feature River River Mild Nearest Town 
McCLELLAN-KERR ARKANSAS RIVER NAVIGATION SYSTEM, OK 
(Tulsa District Portion) 
Bank Stabilization and Verdigris and N/A2 Fort Smith, AR, 
Channel Rectification Arkansas to Catoosa, OK 
Chouteau Lock and Dam (17), OK Verdigris 401.5 Okay, OK 
Newt Graham Lock and Dam (18), OK Verdigris 421.6 Inola, OK 
Robert S. Kerr Lock and Dam (15), OK Arkansas 339.0 Sallisaw, OK 
Robert S. Kerr Marine Terminal, OK Arkansas 336.2 Cowlington, OK 
Sans Bois Navigation Channel, OK Sans Bois Creek 341.0 Keota, OK 
W.D. Mayo Lock and Dam (14), OK Arkansas 319.6 Redland, OK 
Webbers Falls Lock and Dam (16), OK Arkansas 366.6 Gore, OK 
1. On the McClellan-Kerr Arkansas River Navigation System, these are navigation miles. 
2. As required for a channel 9 feet deep. 
TABLE 38-I INSPECTION OF COMPLETED LOCAL FLOOD 
PROTECTION PROJECTS 
(See Section 44 of Text) 
Projects Inspected in Fiscal Year Inspection Date 
01i- 
Cherry/Red Fork Creeks, OK 
Deep Fork Channel Clearing 
Dodge City, KS 
Enid Diviersion Channel, OK 
Flat Rock/Valley View Creeks, OK 
Florence, KS 
Great Bend, KS 
Haikey Creek, OK 
lialstead, KS 
Hutchinson, KS 
Iola, KS 
Holliday Creek, Wichita Falls, TX 
Jenks, OK 
Joe Creek, OK 
Larned, KS 
Marion, KS 
Mingo Creek, OK 
North Canadian Waste Water Treatment Plant, OK 
Oklahoma City Floodway, OK 
Park City, KS 
South Deer Creek, OK 
Tulsa and West Tulsa Levees, OK 
West Branch Chisholm Creek, KS 
Wichita/Valley Center, KS 
November 1999 
September 1999 
October 1999 
October 1999 
November 1999 
December 1999 
October 1999 
November 1999 
November 2000 
April 2000 
January 2000 
August 2000 
October 2000 
October 2000 
November 1999 
February 2000 
October 2000 
August 2000 
August 2000 
May 2000 
September 1999 
October 2000 
May 2000 
May 2000 
38-29 
- ---

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 38-J FLOOD CONTROL WORK 
UNDER SPECIAL AUTHORIZATION 
(See Section 47 of Text) 
Fiscal Year 
Study Identification/Name Cost 
SMALL FLOOD CONTROL PROJECTS NOT SPECIFICALLY 
AUTHORIZED BY CONGRESS - Section 205 Coordination 
Section 205 Coordination 
Bixby Creek, Bixby, OK 
Lake Carl Blackwell, Stillwater, OK 
Cowskin Creek, Wichita, KS 
Sycamore Creek, Coffeyville, KS 
Whitewater River, Augusta, KS 
Wichita Falls, TX, Plum Creek 
Wolf Creek, Lawton, OK 
TOTAL SMALL FLOOD CONTROL PROJECTS 
EMERGENCY STREAMBANK AND SHORELINE PROTECTION (Section 14) 
Section 14 Coordination 
Mainstreet Bridge, Halstead, KS 
Neosho River Bridge, Neosho County, KS 
Water Supply Dam, Neosho River, Oswego 
Slover Street, Shawnee, OK 
TOTAL EMERGENCY STREAMBANK AND SHORELINE PROTECTION 
PROJECT MODIFICATION TO IMPROVE ENVIRONMENT 
Section 1135 Coordination 
Initial General Appraisals 
Arcadia, OK, Fish Habitat Restoration 
Eastern Avenue Bottomland Hardwoods Restoration, OK 
El Dorado, KS, Fish Habitat Restoration 
Riverine Habitat Restoration, OK 
Sally Jones Lake, Vian, OK 
TOTALMODIFI CATION TO IMMPROVE ENVIRONMENT 
AQUATIC ECOSYSTEM RESTORATION (SECTION 206) 
Section 206 Coordination 
Preliminary Restoration Plans 
Byron Walker Wetlands, Kingman, KS 
Aquatic Ecosystem Restoration, North Canadian River, OK 
TOTAL AQUATIC ECOSYSTEM RESTORATION 
(Section 1135) 
18,792 
162,816 
20,284 
13,591 
13,995 
22,535 
483,822 
64.699 
800,534 
7,346 
238,607 
5,223 
483 
5,881 
257,540 
18,925 
15,853
-8 
103,002 
-11,932 
113,451 
6,849 
246,140 
17,734 
39,131 
2,840 
144.749 
204,454 
38-30

TULSA, OK, DISTRICT 
TABLE 38-K GENERAL INVESTIGATIONS 
(See Sections 56 and 57 of Text)
Fiscal Year 
Study Identification/Name Cost 
SURVEYS 
Flood Damage Prevention Studies 
Reconnaissance Study 
Bois D'Arc Creek, Bonham, TX 
Warr Acres, Bethany, OK 
Special Studies 
Watershed/Ecosystem Reconnaissance Study 
Cimarron River Basin, OK & KS 
Southeast Oklahoma, OK 
Walnut & Whitewater Rivers Watershed, KS 
Miscellaneous Activities 
Special Investigations 
Intragency Water Resources Development 
Coordination with Other Federal Agencies, States, and Non-Federal Interests 
Department of Agriculture, Soil Conservation Service (PL 83-566) 
Coop with Other Water Resource Development Agencies 
Planning Assistance to States 
Planning Assistance to States, Negotiation 
Oklahoma, McClellan Kerr Arkansas River 
Oklahoma, Grand Lake Sewer Study 
Oklahoma, Lake Texoma Regional Sewer 
Oklahoma, Mangum Lake 
Oklahma, Poteau River Phase 
Oklahoma, Tenkiller Water Treatment 
Oklahoma, Arkansas River Channel Capacity 
TOTAL SURVEYS 
COLLECTION AND STUDY OF BASIC DATA 
Flood Plain Management Services 
Guides, Pamphlets and Supporting Studies 
Indian Workshops 
NFPC 
Project Impact 
Quick Responses 
SS-Avant, OK 
SS-Blanchard, OK 
SS-Cache Creek 
SS-Camp Robinson 
SS-Del City, OK 
SS-Florence, KS 
SS-Haysville, KS 
SS-Midwest City, OK 
SS-Ponca Tribe, OK 
SS-Riverine Flood Model 
8S-Skiatook, OK 
SS-Waurika, OK 
SS-Webbers Falls, OK 
SS-Wichita, KS 
SS-Whetstone NJ Tribal FloodCinrgeek 
'Technical Services General 
TOTAL COLLECTION AND STUDY OF BASIC DATA 
38-31 
74,695 
78,372 
90,756 
73,699 
70,913 
30,903 
12,557 
11,965 
6,001 
27,564 
1,476 
26,031 
-8,427 
106,197 
10, 660 
26,709 
640,071 
124,121 
15 
5 
18,492 
1,240 
9,868 
1,806 
36,414
2 
15 
106 
40,539 
13 
6 
14,939 
2,527 
48 
28 
31 
576
9 
15 
140,953 
391,768 -
FORT WORTH, TX, DISTRICT* 
FORT WORTH, TX, DISTRICT 
District includes that portion of Texas south of 
Red River drainage basin exclusive of drainage basin 
of Rio Grande and its tributaries above and including 
Pecos River; exclusive of drainage basins to all short 
streams arising in coastal plain of Texas and flowing 
into the Gulf of Mexico, including entire basins of 
Buffalo Bayou, San Jacinto, San Bernard, Lavaca, 
Navidad, Mission, and Arkansas Rivers; exclusive of 
lower basins of major streams flowing into the gulf as 
follows: Sabine River, Texas and Louisiana, 
downstream from U.S. Highway 190 crossing at Bon 
Wier, Texas; Neches River downstream from Town 
Bluff gaging station; Trinity River downstream from 
Texas State Highway 45 crossing at Riverside, 
Texas; Brazos River downstream from confluence 
with Navasota River; Colorado River downstream 
from gaging station at Austin; Guadalupe River 
downstream from confluence with San Marcos River; 
San Antonio River downstream from confluence with 
Escondido Creek; Nueces River downstream from 
confluence with Frio and Atascosa Rivers; and 
exclusive of Agua Dulce, San Fernando, and Olmos 
Creek basins draining into Baffin Bay; coastal area 
south thereof to Rio Grande and south to the northern 
boundaries of Newton, Jasper, Tyler, Polk, Trinity, 
Walker, Waller, Austin, Fayette, Gonzales, Karnes, 
Live Oak, Jim Hogg, Zapata; the northern and 
western boundaries of McMullan; and the western 
boundaries of Montgomery and Duval Counties, 
Texas. District also includes those portions of the 
Sulphur River and Cypress Creek Watershed located 
in the State of Texas; that portion of western 
Louisiana in Sabine River drainage basin upstream 
from U.S. Highway 190 crossing at Bon Wier, Texas. 
39-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
IMPROVEMENTS 
Navigation .............................3. ............. 
1. TRINITY RIVER PROJECT. TX .................. 3 
Flood Control .................................. 3 
2. AQUILLA LAKE, TX ...............3.................. 
3. BARDWELL LAKE, TX.........................4.... 
4. BEALS CREEK, BIG SPRING, TX ......4...... 
5. BELTON LAKE, TX ...............4................. 
6. BENBROOK LAKE, TX ................ 5 
7. CANYON LAKE, TX .................. 5 
8. FERRELLS BRIDGE DAM LAKE ...........6 
O'THE PINES. TX .........................6 
10. HORDS CREEK LAKE,IX......... .........6........... 
11. JIM CHAPMAN LAKE, TX ...........7.......7 
12. JOE POOL LAKE. TX ..............7................. 
13. LAVON LAKE,T X ................8................. 
14. LAVON LAKE MODIFICATION ......8........ 
AND EAST FORK CHANNEL ... .......8......... 
IMPROVEMENT. TX ..............8.................. 
15. LE WISVILLE DAM,T X .............9................. 
16. NAVARRO MILLS LAKE,T X ........9......... 
17. O.C. FISHER DAM AND ............9................. 
A K E.T X ..............................9................ .. 
18. PROCTOR LAKE. TX ...................... 10 
19. RAY ROBERTS LAKE,T X ..........1.0........ 
20. SAN ANTONIO CHANNEL .........1.1............ 
IM PROVEMENT. TX .... ........I.1. ............. 
21. SAN GABRIEL RIVER. TX ..................... 11 
22. SOMERVILLE LAKE,'TX ...........12............ 
23. STILLHOUSE HOLLOW ...........1.2.......... 
DAM . TX ................................ ..1.2.... 
24. WACO LAKE,T X ................1.3................. 
25. WACO LAKE. 'TX(D AM SAFETY)........ 13 
26. WRIGHT PATMAN DAM AND.............. 13 
LAKE. TX ......................1 3 
27. INSPECTION OF COMPLETED ......1.4...... 
FL.OOD CONTROL PROJECTS ......14..... 
28. SCHEDULING FLOOD CONTROL......... l, 
RESERVOIR OPERATIONS ............... 
29. OTHER AUTHORIZED FLOOD .............. 12 
CONTROL PROJECTS ......................... 
30. WORK UNDER SPECIAL......................... 1 
AUTHORIZATION .............................. 1 
Multi-Purpose Projects Including Power.. 
31. ROBERT DOUGLAS WILLIS ............. 
HYDROPOW ER, TX............................. P 
32. SAM RAYBURN DAM AND.................1! 
RESERVOIR, TX .................................. 
33. SAM RAYBURN DAM AND.................... 1 
RESERVOIR, TX (DAM SAFETY).....1 
34. TOWN BLUFF DAM-B.A ........................ It 
STEINITAGEN LAK E,TX................... It 
35. W HITNEY LAKE. TX.............................. 1 
General Investigations .............................. 1 
36. SURVEYS ........... ............. ........... I 
37. PRECONSTRUCTION .............. 1 
ENGINEERING AND DESIGN...........U1 
38. COLLECTION AND STUDY OF ............ 1 
BASIC DATA ................ .... ...... 
Tables 
Table 30-A COST AND FINANCIAL 
STATEM ENT....................... ....15 
Table 30-B AUTHORIZING LEGISLATION ...... 19 
Table 30-C OTHER AUTHORIZED 
FLOOD CONTROL PROJECTS.......23 
Table 30-D INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS......24 
Table 30-E WORK UNDER SPECIAL 
AUTHORIZATION...............25 
39-2

FORT WORTH, TX, DISTRICT 
Navigation 
1. TRINITY RIVER PROJECT, TX 
The project authorized by the River and Harbor 
Act of 1965 (H. Doc 276,89th Cong., Ist Sess.) 
consists of five major components: Multiple-Purpose 
Channel, Tennessee Colony Lake, Dallas Floodway 
Extension, West Fork Floodway and Water 
Conveyance Facilities. For the last full report on the 
project as authorized, see Annual Report of 1978. 
The project information present herein is based on 
the tentatively selected project plan presented in the 
Draft General Design Memorandum. The plan 
consists of three structural components: Dallas 
Floodway Extension, Tennessee Colony Lake, and 
Channel to Liberty in the lower basin. 
Operations during fiscal year. Channel to 
Liberty and Tennessee Colony Lake have been 
dormant for several years due to lack of local 
support. The Dallas Floodway Extension has 
advanced to the Preconstruction Engineering and 
Design stage and is described in Preconstruction 
Engineering and Design section. 
CHANNEL TO LIBERTY: 
Location. The Charnel to Liberty begins at the 
Houston Ship Channel, crosses the bay area in an 
easterly direction to intersect the existing Double 
Bayou Channel, turns northward along the coastline 
to Wallisville Lake and then continues northward 
through the lake area along the course of the Trinity 
River to River Mile 45 above Liberty, Texas. 
Existing project. See Galveston, Texas 
District Annual Report write-up for existing project. 
Proposed project. The navigation portion of 
the channel will have a width of 200 feet with a depth 
of 12 feet and will extend from the Houston Ship 
Channel in Galveston Bay to the port of Liberty, 
Texas. The flood control portion of the channel will 
have a bottom width of 200 feet with a depth of 30 
feet, and will extend from Wallisville Lake to River 
Mile 45 above Liberty, Texas. 
Local cooperation. Local interests are required 
to: (a) provide, without cost to the Federal 
Government, all lands, easements and rights-of-way 
required for construction, operation and maintenance 
of the project, (b) accomplish, without cost to the 
Federal Government, all relocations and alterations to 
existing improvelnents, other thaln highway bridges 
over new land cuts and railroad bridges required for 
the construction of the project, (c) maintain and 
operate the flood control portion of the channel 
upstream of Liberty, Texas, and (d) reimburse the 
Federal Government for one-half of the separable 
costs allocated to recreation and fish and wildlife 
enhancement. 
TENNESSEE COLONY LAKE: 
Location. The Tennessee Colony dam site is 
located at River Mile 341.7 on the Trinity River 
about 22 miles west of Palestine, Texas. The lake 
would extend into Freestone, Anderson, Henderson, 
and Navarro Counties, and would control a drainage 
area of 12,302 square miles. 
Existing project. The plan of improvement 
provides for the construction of an earthfilled dam 
with a maximum height of 123 feet above the 
streambed and a total embankment length of 42,350 
feet with a gated concrete spillway The lake will have 
a total controlled storage of 3,455,000 acre-feet and a 
water surface area of 114,400 acres at the top of the 
flood control pool and 68,100 acres at the top of the 
conservation pool. The total storage includes 
2,269,500 acre-feet for flood control, 1,040,000 acrefeet 
for conservation, and 145,500 acre-feet for 
sediment reserve. 
Local cooperation. Local interests are required 
to reimburse the Federal Government for costs 
allocated to water supply storage and one-half of the 
separable cost allocated to recreation and fish and 
wildlife enhancement. 
Flood Control 
2. AQUILLA LAKE, TX 
Location. On Aquilla Creek in Hill County, 
Texas, with the dam at River Mile 23.3, about 6.8 
miles southwest of Hillsboro, Texas, and about 24.0 
miles north of Waco, Texas. 
Existing project. For description of completed 
improvements and authorizing acts see Annual 
Report of 1984. Construction was started March 
1977, and project was ready for beneficial use April 
29, 1983. Estimated cost is $46,100,000. 
Local cooperation. The Water Supply Act of 
1958, as amended, and the Federal Water Project 
Recreation Act of 1965 and Section 221, Flood 
39-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Control Act of 1970 apply. A contract with the 
Brazos River Authority for water supply storage was 
approved by the Secretary of the Army, June 29, 
1976. To date, the Authority has paid $175,239 
toward principal and $189,923 to operation and 
maintenance. 
Operations during fiscal year. 
operation and maintenance continued. 
Routine 
Benefits accrued to Aquilla Lake project: 
Accumulated flood damages prevented through FY 
2000 were $19,775,800. 
3. BARDWELL LAKE, TX. 
Location. Dam is on Waxahachie Creek 5- 
river miles upstream from its confluence with 
Chambers Creek, a tributary of the Trinity River, and 
about 5 miles south of Ennis, Ellis County, Texas. 
Existing project For a description of completed 
improvement and authorizing act see Annual Report 
of 1969. Construction of project was started August 
1963 and completed for beneficial use in November 
1965. Estimated cost of project is $12,941,000. 
Local cooperation. Local interests must 
reimburse the Federal Government for costs allocated 
to increased water supply storage under the terms of 
the Water Supply Act of 1958. A contract was 
approved by the Secretary of the Army on June 24, 
1963, and the Trinity River Authority, a State agency, 
agreed to fulfill all requirements of local cooperation. 
To date the authority has paid $1,738,986 toward 
principal and $2,353,082 toward annual cost of 
operation and maintenance of project, including cost 
of operating 10-foot conduit. 
Operations during fiscal year. Routine 
operation and maintenance continued. 
Benefits accrued to Bardwell Lake project: 
Accumulated flood damages prevented through FY 
2000 were $13,220,600. 
4. BEALS CREEK, BIG SPRING, TX 
Location. Beals Creek, Big Spring, Texas is 
located in the city of Big Spring, Howard County, 
Texas, on Beals Creek, a tributary of the Colorado 
River. 
Existing project. The Beals Creek Flood 
Control Project consists of construction of a channel 
to the north of and within a portion of the existing 
Beals Creek channel. The channel extends 
approximately 7,200 feet from a point south of 
Channing Street at Onemile Lake and ends at the 
Benton Street Bridge. The channel is a trapezoidal 
grass-lined channel with an average depth of 11 feet, 
a bottom width of 20 feet, and side slopes of 1 
vertical to 3 horizontal. A grade control structure 
was constructed at the upper limit of the project at 
Onemile Lake to allow the proper drainage gradient 
while preserving the existing wetland environment in 
the Onemile Lake area. Final Federal cost (Oct. 1, 
1997, base price) is $8,240,254; non-Federal cost for 
real estate, relocation of utilities and disposal is 
$3,618,152. 
Local cooperation. The Project Cooperation 
Agreement with the city of Big Spring was signed by 
the Assistant Secretary of the Army (CW) on March 
10, 1994. 
Operations during the fiscal year. The 
project was physically completed in December 1998. 
Financial closeout is in progress. 
5. BELTON LAKE, TX 
Location. Dam is on Leon River about 16.7 
miles above confluence of Leon and Lampasas 
Rivers and about 3 miles north of Belton, Texas. 
Existing project. For a description of 
completed improvement and authorizing acts see 
Annual Report of 1962. Construction started June 
1949 and project was ready for beneficial use in 
March 1954. Raising water supply po01: 
Construction started in July 1970 and the pool raise is 
complete. Estimated cost of project is $18,410,000. 
Local cooperation. Section 2, Flood Control 
Act of 1938, applies. A contract with Brazos River 
Authority, a State agency, for remaining water supply 
storage in reservoir was approved by Secretary of the 
Army on January 15, 1958, at an estimated cost of 
$5,125,003. To date $2,050,922 has been paid. 
Under the contract Brazos River Authority must also 
pay annually 11.2 percent of actual annual cost Of 
operation and maintenance. To date $3,428,541 has 
been paid. An interim contract with BrazoS Rive 
Authority for emergency use of water supply storage 
in project was approved by Secretary of the Arnmy o 
39-4

FORT WORTH, TX, DISTRICT 
January 2,1957. Amount of $433,083 paid by 
authority on March 21, 1957 for use of these facilities 
was credited to interest and principal payable under 
formal water supply contract. 
Operations during fiscal year. Routine 
operation and maintenance continued. 
Benefits accrued to Belton Lake project: 
Accumulated flood damages prevented through FY 
2000 were $141,045,700. 
6. BENBROOK LAKE, TX 
Location. Dam is in Tarrant County, Texas, on 
Clear Fork of Trinity River 15 river miles upstream 
from its confluence with West Fork of Trinity River 
about 10 miles southwest of downtown Fort Worth, 
Texas.
Existing project. For description of completed 
improvement and authorizing acts see Annual Report 
of 1962. Construction of project was started May 
1947 and ready for beneficial use in September 1952. 
Estimated cost of project is $14,544,000. 
Local cooperation. Section 2, Flood Control 
Act of 1938, applies. No water supply storage is 
included in project. In 1956, Congress passed 
legislation enabling the city of Fort Worth to 
purchase conservation storage space in Benbrook 
Lake. Contracts have been negotiated with the city 
of Fort Worth and the Benbrook Water and Sewer 
Authority for the use of portions of the navigation 
storage for water supply purposes until such storage 
is required for Trinity River Navigation. To date, 
$2,346,916 has been paid by the city of Fort Worth 
and $195,504 by Benbrook Water and Sewer 
Authority. A cost-sharing contract with the city of 
Benbrook for Recreation Development was approved 
by the Secretary of the Army May 20, 1977. To date, 
$27,315 has been paid. 
Operations during fiscal year. Routine 
OPeration and maintenance continued. Additional 
Work included paint and repair of both floodgates and 
the single emergence gate. Total cost to complete 
was $223,200. 
Benefits accrued to system consisting of 
Benbrook Lake, Clear Fork and West Fork 
Floodways: Accumulated flood damages prevented 
through FY 2000 are estimnated at $3,470,587,500. 
7. CANYON LAKE, TX 
Location. Dam is on Guadalupe River, 303 
miles above its mouth, and about 12 miles northwest 
of New Braunfels, Comal County, Texas. 
Existing project. For a description of 
completed improvement and authorizing act see 
Annual Report of 1969. Construction started April 
1958 and project completed for beneficial use June 
1964. Estimated cost of project is $21,732,000, 
including $1,400,000 contributed by local interests. 
Hydropower: "The Guadalupe-Blanco River 
Authority (GBRA) was licensed by the Federal 
Energy Regulatory Commission to construct a 6,070- 
kilowatt plant, which is located adjacent to the 
existing outlet channel. The project operates utilizing 
conservation releases, i.e., no change from the 
present operating regiment is anticipated. GBRA has 
an agreement with the Pedernales Electric 
Cooperative for sale of power. Construction of the 
hydropower was completed in 1989 with non-Federal 
funds.
Local cooperation. Local interests (Guadalupe 
Blanco River Authority) will utilize water impounded 
for water supply and streamflow regulation for 
development of electric power. In a formal contract 
approved by Chief of Engineers on October 24, 1957, 
Guadalupe-Blanco River Authority agreed to fulfill 
all requirements of local cooperation. Required 
contribution of $1,400,000 was made in full by 
Guadalupe-Blanco River Authority. The estimated 
cost of the water storage contract is about 
$9,000,000. To date, $3,348,004 has been paid. In 
addition $22,848 was contributed for installation and 
operation of reservoir leakage gages. Under the 
contract the authority must pay 34.8 percent of actual 
annual cost of operation and maintenance. To date, 
$2,725,892 has been paid. 
Operations during fiscal year. Routine 
operation and maintenance continued. Additional 
work included upgrade of recreational facilities in 
Potters Creek Park. Total cost to complete upgrade 
was $125,000. 
Benefits accrued to Canyon Lake project: 
Accumulated flood damages prevented through FY 
2000 were $177,939,800. 
39-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
8. FERRELLS BRIDGE DAM - LAKE 
O'THE PINES, TX 
Location. Dam is on Cypress Creek in Marion, 
Harrison, Upshur, Morris, Camp, and Titus Counties, 
Texas, 8 miles west of Jefferson, Texas. 
Existing project. An earthfill dam 10,600 feet 
long and 77 feet high includes a 200-foot spillway 
with a capacity of 68,200 cubic feet per second. 
Reservoir controls runoff from 850 square miles of 
drainage area, and has a gross storage capacity of 
842,100 acre-feet including 587,200 acre-feet flood 
control storage, 3,800 acre-feet conservation storage, 
and 251,000 acre-feet for municipal and industrial 
water supply. Reservoir extends 28 miles upstream. 
Project affords substantial flood protection of 
Cypress Creek Valley from dam site to confluence 
with Red River and, together with operation of other 
reservoirs proposed in Red River Basin, will provide 
flood protection along main stem of Red River below 
Denison Dam. Construction commenced in January 
1955 and was completed June 1960. Estimated 
Federal cost of project is $17,231,700, including 
$4,349,200 for Code 711 and $399,739 accelerated 
Public Works fund. This project transferred to the 
Fort Worth District as of the end of FY 1979. 
Local cooperation. None required. 
Operations during fiscal year. 
operation and maintenance continued. 
Routine 
Benefits accrued to Ferrells Bridge Dam- 
Lake O'The Pines project: Accumulated flood 
damages prevented through FY 2000 were 
$13,866,000. 
9. GRAPEVINE LAKE, TX 
Location. Dam is in Tarrant County, Texas, on 
Denton Creek, 11.7 river miles upstream from its 
confluence with Elm Fork of Trinity River and about 
20 miles northwest of city of Dallas, Texas. 
Existing project. For description of completed 
improvement and authorizing act, see Annual Report 
of 1962. Construction of project was started 
December 1947 and ready for beneficial use in July 
1952. Estimated cost of project is $18,896,000, 
including $2,040,000 contributed by local interests. 
A contract for modification of Embankment and 
Spillway was awarded September 30, 1983 and 
completed Fiscal Year 1990. The improvements 
provided for spillway modification by construction of 
spillway chute and stilling basin and a berm on the 
downstream side of the main embankment. 
Local cooperation. A contract with Dallas 
County Park Cities Water Control and Improvement 
District No. 2 for 50,000 acre-feet of water supply 
storage was approved by Secretary of the Army on 
March 21, 1955. Park Cities paid the required 
$607,000. A contract with city of Dallas for 85,000 
acre-feet of water supply storage was approved by 
Secretary of the Army on March 17, 1954. Dallas 
paid the required $1,433,026. A contract with city of 
Grapevine, Texas, for 1,250 acre-feet of water supply 
storage was approved by Secretary of the Army on 
September 14, 1953, at an estimated cost of $22,654. 
A contract for Interim Use of Navigation Storage 
with city of Grapevine was approved by Secretary of 
the Army on February 27, 1981, at an estimated cost 
of $684,000, has been paid in full. Above contracts 
include payment of operation and maintenance costs 
as follows: Dallas County Park Cities Water Control 
and Improvement District No. 2, a pro rata part of the 
actual annual cost, which part is to be not less than 
$2,000 nor more than $3,000; Dallas, 9.2 percent of 
actual annual cost; and Grapevine, its pro rata part of 
actual annual cost (estimated at $79.55 annually and 
included in total annual payment). Following 
operation and maintenance payments have been 
made: Park Cities, $142,231; Dallas, $803,787; and 
Grapevine, $428,786. 
Operations during fiscal year. 
operation and maintenance continued. 
Routine 
Benefits accrued to system comprised of 
Grapevine Lake and Dallas Floodway: Accumulated 
flood damages prevented through FY 2000 were 
$4,370,410,200. 
10. HORDS CREEK LAKE, TX 
Location. On Hords Creek, a tributary of 
Pecan Bayou, about 13.5 miles west of Coleman, 
Texas, and about 27.8 miles upstream from mouth of 
Hords Creek. 
Existing project. For description of 
completed improvement and authorizing acts see 
Annual Report of 1962. Construction of project was 
started January 1947 and completed for beneficial use 
in April 1948. Estimated cost of project is 
39-6

FORT WORTH, TX, DISTRICT 
$4,337,000 including $105,000 contributed by local 
interests. 
Local cooperation. Fully complied with. 
Operations during fiscal year. Routine 
operation and maintenance continued. 
Benefits accrued to Hords Creek project: 
Accumulated flood damages prevented through FY 
2000 were $937,000. 
11. JIM CHAPMAN LAKE, TX 
Location. Jim Chapman Lake is located in 
northeast Texas about 4 miles southeast of Cooper, 
13.0 miles north of Sulphur Springs, and is at river 
mile 23.3 on the South Sulphur River. The South 
Sulphur River rises in Fannin County, Texas, and 
flows generally east for about 80 miles to its 
confluence with the North Sulphur River to form the 
Sulphur River. 
Existing project. For description of completed 
improvement and authorizing acts, see Annual Report 
of 1997. Construction of project was started in July 
1958 and completed for beneficial use in May 1994. 
The Energy and Water Development Appropriations 
Act of 1997, Public Law 104-206, H.R. 3816, 104'h 
Congress, H.R. 3816, effective September 30, 1996, 
changed the name of Cooper Lake and Channels, TX, 
to Jim Chapman Lake, TX. Estimated cost of project 
is $143,000,000, including $227,000 non-Federal 
cost for land for the levees. 
Local cooperation. Local interests (North 
Texas Municipal Water District, Sulphur River 
Municipal Water District, city of Irving) will utilize 
water impounded for present and future water supply. 
The total cost allocated to water supply to be 
reimbursed is $54,600,000. North Texas Municipal 
Water District, NTMWD, has contracted for 36.859 
percent of the water supply storage for future use 
with deferred payments for ten years. Under the 
contract NTMWD must pay 13.803 percent of actual 
annual cost of operation and maintenance. Sulphur 
River Municipal Water District, SRMWD, has 
contracted for 6.5 percent of the water supply storage 
for initial use and 19.78 percent for future use for a 
total of 26.282 percent of the water supply storage. 
To date, $231,374 has been paid. Under the contract, 
8RMWD must pay 2.435 percent of actual annual 
operation and maintenance. To date, $69,977 has 
been paid. The city of Irving has contracted for 
16.923 percent of the water supply storage for initial 
use and 19.936 for future use for a total of 36.859 of 
the water supply storage. To date, $665,535 has been 
paid. Under the contract Irving must pay 6.337 
percent of actual annual operation and maintenance. 
To date $201,408 has been paid. 
The Texas Parks and Wildlife Department and 
the Corps of Engineers have entered into or have 
agreed to formal Operation and Maintenance 
contracts for recreation facilities and wildlife 
conservation and management. Under the contracts 
for recreation facilities dated 7 November 1988 and 
11 September 1990, Texas Parks and Wildlife will be 
responsible for 100 percent of the operations and 
maintenance of two state parks that are being 
constructed with Federal funds. Under the contracts 
for wildlife conservation and management the state 
will be responsible for 24.14 percent of the operation, 
maintenance and replacement annual costs for areas 
totaling approximately 35,500 acres. The remaining 
balance will be the responsibility of the Project 
Sponsors and the Government. 
Operations during fiscal year. Routine 
operation and maintenance continued. 
Benefits accrued to Jim Chapman Lake project: 
Accumulated flood damages prevented through FY 
2000 are estimated at $5,022,700. 
12. JOE POOL LAKE, TX 
Location. Damn is located at River Mile 11.2 on 
Mountain Creek, a right bank tributary of the West 
Fork of the Trinity River, and is adjacent to the city 
limits of Grand Prairie, Dallas County, Texas, which 
is one of the rapid growing cities in the Dallas-Fort 
Worth Metropolitan area. 
Existing project. For description of completed 
improvement and authorizing acts see Annual Report 
of 1996. Construction of project was started in 1975 
and completed for beneficial use in September 1994. 
Public Law 97-400, H.R. 7377, 9 7 h Congress, 
effective December 31, 1982, changed the name of 
Lakeview Lake to Joe Pool Lake. Estimated cost of 
project is $215,540,000 including $11,350,000 
contributed by local interests. 
Local cooperation. The Water Supply Act of 
1958 as amended, and the Federal Water Project 
Recreation Act of 1965 apply. Water storage space 
39-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
contract with the Trinity River Authority (TRA) for 
142,900 acre-feet of water supply storage space was 
executed September 29, 1976. Current estimated 
capital cost for water storage space is $66,591,979, 
including Interest During Construction and contractor 
claims. Recreation development contract with the 
TRA Joe Pool Lake was executed August 2, 1976. 
Under this original recreation contract, as amended, 
TRA had difficulty meeting its long-term capital debt 
repayment obligation to the Government. As a result, 
H.R. 4733, Title 1, Section 102(b), 106 th Congress, 
2"d Session, authorized the city of Grand Prairie, TX, 
to pay the Government a total of $4,290,000 in two 
installments in exchange for the local sponsorship of 
the recreation program, relieving TRA of any and all 
obligations. The city of Grand Prairie made its first 
installment in the amount of $2,150,000 on 
December 1, 2000, with the second and final 
installment, in the amount of $2,140,000, due and 
payable no later than December 1, 2003. The city of 
Grand Prairie is currently in the process of making 
the transition to local sponsor of recreation at Joe 
Pool Lake. 
Operations during fiscal year. Routine 
operation and maintenance continued. 
Benefits accrued to Joe Pool Lake project: 
Accumulated flood damages prevented through FY 
2000 were $905,171,300. 
13. LAVON LAKE, TX 
Location. Dam is in Collin County, Texas, on 
East Fork of Trinity River 55.9 miles above its 
confluence with Trinity River and about 22 miles 
northeast of Dallas, Texas. 
Existing project. For description of completed 
improvement and authorizing acts see Annual Report 
of 1962. Construction of project was started January 
1948 and ready for beneficial use in September 1953. 
Project is complete. See following section for Lavon 
Lake Modification and East Fork Channel 
Improvement authorized by Flood Control Act of 
1962. Estimated cost of project is $15,470,000. 
Local cooperation. Section 2, Flood Control 
Act of 1938, applies. A contract with North Texas 
Municipal Water District, NTMWD, for water supply 
storage, including cost of intake structure, was 
approved by Secretary of the Army July 8, 1954, at 
an estimated cost of $1,405,753. Contract was 
revised in 1973 and final revised contract amount is 
$1,445,262. To date, NTMWD has paid $5,780,856. 
Under the contract, NTMWD must pay annually 13.6 
percent of actual annual cost of operation and 
maintenance, and to date has paid $1,690,539. 
Operations during fiscal year. 
operation and maintenance continued. 
Routine 
Benefits accrued to Lavon Lake project: 
Accumulated flood damages prevented through FY 
2000 were $211,575,200. 
14. LAVON LAKE MODIFICATION 
AND EAST FORK CHANNEL 
IMPROVEMENT, TX 
Location. Existing dam is in Collin County 
Texas, on East Fork of Trinity River, 55.9 miles 
above its confluence with Trinity River and about 
22.0 miles northeast of Dallas, Texas. Channel 
improvement of East Fork extends from its mouth to 
River Mile 31.8. 
Existing project. For description of completed 
improvement and authorizing acts see Annual Report 
of 1988. Construction of project was initiated in May 
1970 and ready for beneficial use in December 1975. 
Estimated Federal cost of the modification and 
improvement is $69,750,000 and $220,000 local 
interests, a total of $69,970,000. Project is complete. 
Local cooperation. Local interests must 
reimburse the Federal Government for costs allocated 
to increased water supply storage under the terms of 
the Water Supply Act of 1958. The North Texas 
Municipal Water District, NTMWD, has contracted 
for 43 percent of the water supply (approved 
September 22, 1967, by the Secretary of the Army) 
and to date $985,433 has been paid. NTMWD has 
submitted assurance to contract for 57 percent of 
future water supply. Reimbursement is currently 
estimated at $38,505,578. 
Levee Districts 4 and 5, which comprise the 
lower 10 miles of the East Fork Channel, entered into 
agreements as required by Section 221 of the Flood 
Control Act of 1970 on January 28, 1972 and have 
furnished all necessary construction easements. 
Levee Districts 6, 8, 10, 13, and 15, which 
comprise the upper 15 miles of the East Fork 
Channel, have declined to provide the necessary 
39-8

FORT WORTH, TX, DISTRICT 
assurances. On December 8, 1972, this portion of the 
project was reclassified from "active" to "inactive" 
category. 
Operations during fiscal year. Improvement 
of the lower ten miles of the East Fork Channel and 
Levees and total project is 100 percent complete. 
15. LEWISVILLE DAM, TX 
Location. Dam is in Denton County, Texas, on 
Elm Fork of Trinity River 30 river miles above its 
confluence with Trinity River and about 22 miles 
northwest of city of Dallas, Texas at a site 
downstream from old Garza Dam. 
Existing project. For description of completed 
improvement and authorizing acts see Annual Report 
of 1962. Construction of project was started 
November 1948 and ready for beneficial use in 
November 1954. Estimated cost of project is 
$25,902,000, including $3,677,000 contributed by 
local interests. 
Hydropower: The city of Denton, Texas, 
COD, was licensed by the Federal Energy Regulatory 
Commission to construct a 2,000-kilowatt plant, 
which is located adjacent to the existing outlet 
channel. The project operates utilizing conservation 
releases, i.e., no change from the present operating 
regiment is anticipated. COD Utilities Department 
utilizes this power for its local customers. 
Construction of the hydropower was completed in 
1991 with non-Federal funds. 
Local cooperation. A contract with city of 
Dallas for 415,000 acre-feet of water supply storage 
land rights and interests to Garza Dam and Reservoir 
was approved by the Secretary of the Army on July 
16, 1953. Local contributions have been made in 
full. A contract with city of Denton, Texas, for 
remaining 21,000 acre-feet of water supply storage 
Was approved by the Secretary of the Army on May 
20, 1954, with an estimated cost of $250,064. Local 
contributions have been paid in full. Under above 
contracts, cities of Dallas and Denton must pay 
annually 21.9 and 1 percent, respectively, of actual 
annual cost of operation and maintenance. To date 
Dallas has paid $4,732,763 and Denton $211,741. 
Operations during fiscal year. Routine 
Operation and maintenance continued. 
Benefits accrued to system comprised of 
Lewisville Lake; this includes Ray Roberts Lake and 
Dallas Floodway Systems. Accumulated flood 
damages prevented through FY 2000 were 
$17,293,255,100. 
16. NAVARRO MILLS LAKE, TX 
Location. Dam is in Navarro County, Texas, at 
River Mile 63.9 on Richland Creek, a tributary of 
Trinity River, about 16.0 miles southwest of 
Corsicana, Texas. 
Existing project. For description of completed 
improvement and authorization acts see Annual 
Report of 1965. Construction started December 1959 
and project completed for beneficial use March 1963. 
Estimated cost of project $13,154,000 including 
$300,000 contributed by local interests. 
Local cooperation. The Water Supply Act of 
1958, as amended, applies. A formal contract with 
the Trinity River Authority was approved March 3, 
1966, by the Secretary of the Army at an estimated 
cost of $2,260,800. To date the Authority has paid 
$1,476,565 for water supply and $1,693,026 for 
operation and maintenance. 
Operations during fiscal year. 
operation and maintenance continued. 
Routine 
Benefits accrued to Navarro Mills Lake project: 
Accumulated flood damages prevented through FY 
2000 were $48,311,000. 
17. O.C. FISHER DAM AND 
LAKE, TX 
Location. Dam is on North Concho River, a 
tributary of Concho River, about 6.6 miles above 
mouth of North Concho River near city of San 
Angelo, Texas. 
Existing project. For description of completed 
improvement and authorizing acts see Annual Report 
of 1962. Name was changed from San Angelo Dam 
and Reservoir to O.C. Fisher Dam and Lake January 
3, 1975 by Public Law 93-634. Construction of 
project was started May 1947 and ready for 
beneficial use February 1952. Estimated cost of 
project is $17,111,000. 
39-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Local cooperation. Section 2, Flood Control 
Act of 1938, applies. A water supply contract with 
Upper Colorado River Authority for water supply 
storage in reservoir was approved by Secretary of the 
Army on October 11, 1948. The Authority has 
contributed $860,444 toward cost of project and 
$64,336 toward operation and maintenance for a 50- 
year period. The Authority must pay additional 
contributions of $1 a year for useful life of project, 
beginning January 1, 1965. 
Operations during fiscal year. Routine 
operation and maintenance continued. Additional 
work included refurbish and refinish the downstream 
side of the control gates. Total cost to complete 
repairs was $450,000. 
Benefits accrued to O.C. Fisher Dam and Lake 
project: Accumulated flood damages prevented 
through FY 2000 were $2,376,000. 
18. PROCTOR LAKE, TX 
Location. Dam is at River Mile 238.9 on Leon 
River, a tributary of Brazos River, about 8.0 miles 
northeast of Comanche in Comanche County, Texas. 
Existing project. For description of completed 
improvement and authorization act see Annual 
Report of 1969. Construction of project was started 
July 1960 and completed for beneficial use 1963. 
Estimated cost of project is $16,249,000. 
Local cooperation. The Water Supply Act of 
1958 applies. A formal contract with the Brazos 
River Authority, a State agency, was approved by 
Secretary of the Army, July 1, 1960, and was 
modified and approved May 9, 1966, at an estimated 
cost of $1,707,900. To date the Authority has paid 
$632,667 for water supply and $742,507 for 
operation and maintenance. 
Operations during fiscal year. Routine 
operation and maintenance were continued. 
Benefits accrued to Proctor Lake project: 
Accumulated flood damages prevented through FY 
2000 were $38,810,700. 
19. RAY ROBERTS LAKE, TX 
Location. Dam site is located at River Mile 
60.0 on the Elm Fork of the Trinity River, Denton 
County, between Sanger and Aubrey, Texas and 30 
miles upstream from Lewisville Dam. 
Existing project. The plan of improvement 
provides for construction of an earthfilled dam with a 
maximum height of 141 feet above the streambed, a 
length of 15,250 feet including an uncontrolled 
broadcrested spillway 100 feet long, controlling 682 
square miles of drainage area. The lake will have a 
total controlled storage of 1,064,600 acre-feet, with a 
water surface area of 36,900 acres. The total storage 
includes 260,800 acre-feet for flood control, 749,200 
acre-feet for water supply, and 54,600 acre-feet for 
sediment reserve. The Water Resources 
Development Act of 1990 authorized the Greenbelt 
Corridor between Lewisville and Ray Roberts Lakes. 
Estimated Federal cost of the project is $317,300,000 
(Oct. 1, 1995 base price). Public Law 96-384, 96" 
Congress, H.R. 8094, effective January 4, 1981, 
changed the name of Aubrey Lake to Ray Roberts 
Lake.
Hydropower: At the request of the city of 
Denton and the approval of the Secretary of the Army 
the penstock was added to the embankment as a 
minimum facility for future hydropower. The city of 
Denton, Texas, COD, was licensed by the Federal 
Energy Regulatory Commission to construct a 1,000- 
kilowatt plant, which is located adjacent to the 
existing outlet channel. The project operates utilizing 
conservation releases, i.e., no change from the 
present operating regiment is anticipated. COD 
Utilities Department utilizes this power for its local 
customers. Construction of the hydropower was 
completed in 1991 with non-Federal funds. 
Local cooperation. The Water Supply Act of 
1958, as amended, and the Federal Water Project 
Recreation Act of 1965 and Section 221, Flood 
Control Act of 1970 apply. Contracts with the cities 
of Dallas and Denton, Texas, for water supply 
storage and recreation were approved by the 
Secretary of the Army, September 16, 1980. To date 
the city of Dallas has paid $223,471,352. The city of 
Denton has paid in full their share of the water supply 
storage. Dallas has paid $628,724 and Denton has 
paid $220,897 toward annual cost of operation and 
maintenance. 
Operations during fiscal year. The project 
was physically completed in April 1999. Financial 
closeout of the project is continuing. Routine 
operation and maintenance continued. 
39-10

FORT WORTH, TX, DISTRICT 
Benefits accrued to Ray Roberts Lake project: 
Accumulated flood damage prevented is shown in 
with Lewisville Dam, TX. 
20. SAN ANTONIO CHANNEL 
IMPROVEMENT, TX 
Location. Floodway is in city of San 
Antonio, Bexar County, Texas, on San Antonio River 
and San Pedro, Apache, Alazan, Martinez, and Six 
Mile Creeks. 
Existing project. The project consists of 30.7 
miles of channel and associated improvements on six 
separate streams. Completion of detailed engineering 
and design studies revealed that the least costly 
alternative for the remaining channel improvements 
would consist of two tunnels 120 feet below the 
surface each having an inside diameter of 24 feet and 
vertical intake, outlet and access shafts. The San 
Pedro Creek tunnel is 6,040 feet in length and the San 
Antonio River tunnel is 16,360 feet in length. 
Estimated Federal cost of these modifications is 
$155,250,000 (Oct. 1, 2000, base price), and 
estimated cost to local interests is $66,650,000, 
which includes $4,100,000 cash contributions and 
$62,550,000 for lands, damages, and construction, a 
total of $221,900,000. The existing project was 
authorized by 1954 Flood Control Act. The Water 
Resources Development Act of 1976 added 
authorization to the existing project for construction 
of flood control measures needed to preserve and 
protect the Espada Aqueduct located in the vicinity of 
Six Mile Creek. Construction was started in October 
1957. The Water Resources Development Act of 
1996 added a Section 215 reimbursement limitation. 
The Water Resources Development Act of 2000 
added environmental restoration and recreation as 
project purposes. 
Local cooperation. Local interests must 
furnish lands and rights-of-way for construction, 
including purchase and removal of buildings, 
relocation or reconstruction of bridges (exclusive of 
railway bridges), channel dams where applicable, and 
utility lines; hold the United States free from 
damages; maintain and operate all works after 
Completion; and provide a cash contribution for 
enhancement benefits of 2.65 percent of actual 
Federal construction cost. San Antonio River 
Authority furnished assurances that it will comply 
With all requirements of local cooperation. These 
assurances were accepted by the District Engineer on 
April 15, 1957. To date $3,958,731 has been 
contributed by San Antonio River Authority. In 
addition, $30,000 has been contributed and accepted, 
under the authority of Civil Functions Appropriations 
Act of 1958, for vehicular crossings over the San 
Antonio Channel. 
Operations during fiscal year. During FY 
2000, funds were used to continue flood damage 
repairs, continue flood plain remapping, and plan 
formulation of Unit 8-5-2.. The project is about 99 
percent complete overall and is scheduled for 
completion in September 2002. 
Benefits accrued to San Antonio project: 
Accumulated damages prevented through FY 2000 
were $439,000,000. 
21. SAN GABRIEL RIVER, TX 
Location. Project is a system of three 
reservoirs in Williamson County in the central 
portion of Brazos River Basin, which consists of 
Granger Dam at River Mile 31.9 on San Gabriel 
River, about 7.0 miles east of Granger, Texas; North 
San Gabriel Dam at River Mile 4.3 on North Fork of 
San Gabriel River, about 3.5 miles northwest of 
Georgetown, Texas; and South Fork Dam at River 
Mile 4.7 on South Fork of San Gabriel River, about 
3.0 miles southwest of Georgetown, Texas. 
Existing project. Granger Lake was authorized 
by 1954 Flood Control Act, and North (North San 
Gabriel Dam and Lake Georgetown) and South Fork 
Lakes were authorized by 1962 Flood Control Act. 
Estimated total Federal cost of project is 
$181,400,000 (Oct. 1, 1986, base price) and 
estimated non-Federal cost of $90,600,000 for a 
project total of $272,000,000. Plan of improvement 
provides for the following: Granger: An earthfilled 
dam 16,320 feet long, including spillway with 
maximum height of 115 feet above streambed, which 
controls 709 square miles of drainage area. Reservoir 
provides a total storage capacity of 244,200 acre-feet, 
of which 162,200 acre-feet are for flood control 
37,900 acre-feet for water supply storage, and 44,100 
acre-feet for sediment reserve. Estimated cost of 
project is $62,062,000. North San Gabriel Dam: A 
rockfill dam 6,700 feet long, including spillway with 
maximum height of 164 feet above streambed, which 
controls 246 square miles of drainage area. Reservoir 
provides a total storage capacity of 130,800 acre-feet 
of which 87,600 acre-feet are for flood control, 
39-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
29,200 acre-feet for water supply storage, and 14,000 
acre-feet for sediment reserve. Estimated cost of 
project is $38,765,000. South Fork: A rockfill dam 
5,620 feet long, including spillway with maximum 
height of 152 feet above streambed, which controls 
123 square miles of drainage area. Reservoir 
provides a total storage capacity of 82,600 acre-feet 
(45,700 for flood control, 28,900 for water supply 
storage, and 8,000 for sediment reserve). Estimated 
cost of project is $17J,173,000. Public Law 96-575, 
96th Congress, H.R 4941 effective January 4, 1981, 
changed the name of North Fork Lake to North San 
Gabriel Dam and Lake Georgetown. 
Local cooperation. Construction is subject to 
condition that local interests reimburse the Federal 
Government for costs allocated to water supply at 
Granger, Georgetown, and South Fork Lakes. 
Reimbursement currently estimated at $13,315,000 
for Granger, $6,295,000 for Georgetown, and 
$50,563,000 for South Fork, for a total of 
$70,172,000, exclusive of interest. Brazos River 
Authority, a State agency, is the local interests' 
sponsor of project, and by letter dated April 18, 1966, 
indicated its acceptance of the proposed plan of 
development and its willingness to pay for the costs 
allocated to water supply in each reservoir in the 
ultimate plan. Such water supply assurances for 
Granger and Georgetown Lakes were approved May 
24, 1968 as satisfactory in accordance with 
requirements of the Water Supply Act of 1958, as 
amended. Contract negotiations for South Fork Lake 
will be deferred until the need for water supply 
develops and the reservoir is scheduled for 
construction. 
Operations during fiscal year. Through 1983 
all work has been completed. Deliberate 
impoundment of water commenced at Granger and 
Georgetown Lakes on January 21, 1980 and March 3, 
1980, respectively. In FY 1982, studies on South 
Fork Lake were resumed in preparation of General 
Design Memorandum to provide reaffirmation prior 
to construction. A Draft Reevaluation Report on 
South Fork Lake was submitted to Headquarters in 
October 1986. The report recommended no Federal 
action and that further studies be deferred 
indefinitely. Future water supply needs of the area 
would be addressed by reallocating storage at 
Granger Lake. The South Fork Lake project is 
eligible for deauthorization in FY 2000, as no funds 
were obligated. 
Benefits accrued to project consisting of 
Granger and Georgetown: Accumulated flood 
damages prevented through FY 2000 were 
$37,002,800. 
22. SOMERVILLE LAKE, TX 
Location. Dam is on Yegua Creek 20 miles 
upstream from its confluence with Brazos River and 
about 2 miles south of Somerville, Texas. 
Existing project. For description of completed 
improvements and authorizing act see Annual Report 
of 1969. Construction started in June 1962 and the 
project was ready for beneficial use in January 1967. 
Estimated cost of project is $30,227,000. 
Local cooperation. The Water Supply Act of 
1958, as amended, applies. A contract with the 
Brazos River Authority, a State agency, for water 
supply storage approved May 10, 1962, by the 
Secretary of the Army, has paid $2,575,919 to date. 
Also under the contract, the Authority must pay 
annually 28.655 percent of the actual annual cost of 
operation and maintenance. 
Operations during fiscal year. 
operation and maintenance continued. 
Routine 
Benefits accrued to Somerville Lake project: 
Accumulated flood damages prevented through FY 
2000 were $66,013,400. 
23. STILLHOUSE HOLLOW 
DAM, TX 
Location. Dam is on Lampasas River 16 miles 
upstream from its confluence with Little River, a 
tributary of the Brazos River, and about 5 miles 
southwest of Belton, Texas. 
Existing project. For description of completed 
improvements and authorizing act see Annual Report 
of 1969. Construction was initiated in July 1962 and 
the project was ready for beneficial use in February 
1968. Estimated cost of project is $23,670,000. 
Local cooperation. The Water Supply Act of 
1958 applies. A contract with the Brazos River 
Authority, a State agency, for water supply storage 
was approved April 13, 1962, by the Secretary of the 
Army, at an estimated cost of $6,912,430. To date 
the Authority has paid $3,301,581. Also under the 
39-12

FORT WORTH, TX, DISTRICT 
contract the Authority must pay annually 27.748 
percent of the actual annual cost of operation and 
maintenance. To date the Authority has paid 
$1,865,756. 
Operations during fiscal year. Routine 
operation and maintenance continued. 
Benefits accrued to Stillhouse Hollow Dam 
Project: Accumulated estimate of flood damages 
prevented through FY 2000 is $35,672,400. 
24. WACO LAKE, TX 
Location. Dam is on Bosque River, 4.6 river 
miles above its confluence with Brazos River, at city 
of Waco, McLennan County, Texas. 
Existing project. For description of completed 
improvements and authorizing act see Annual Report 
of 1969. Estimated cost of project is $50,853,000 
including $250,000 contributed by local interests and 
$2,500,000 other non-Federal cost. Construction was 
started in July 1958, and project was ready for 
beneficial use in February 1965. 
Local cooperation. Section G of the Flood 
Control Act of December 1944 applies. A contract 
with the Brazos River Authority, a State agency, for 
water supply storage and the contract with the city of 
Waco transferring the existing Lake Waco to the 
Government for their water storage, was approved by 
the Secretary of the Army on April 15, 1958. To 
date, the Authority for their portion of the water 
supply storage has paid $3,141,920. Also under the 
contract the Authority and the city must pay 14.706 
and 2.087 percent respectively of the actual cost of 
operation and maintenance. To date the Authority 
has paid $1,537,384 and the city has paid $231,860. 
A contract with the Brazos River Authority, for 
additional storage for. municipal and industrial water 
Supply, was approved by the Acting Assistant 
Secretary of the Army, September 28, 1984. 
Operations during fiscal year. Routine 
Operation and maintenance continued. Additional 
Work included repair to butterfly valves, repair 
stilling basin, and add hike and bike trail. Total cost 
to complete repairs and add trail were $1,100,000. 
Benefits accrued to Waco Lake project: 
Accumulated flood damages prevented through FY 
200w0er e $117,580,400. 
25. WACO LAKE, TX (DAM SAFETY) 
Location. For location of completed dam see 
Waco Lake, Texas in this chapter. 
Existing project. The existing rolled earthfill 
embankment's top elevation of 510 feet National 
Geodetic Vertical Datum (NGVD), is hydrologically 
deficient. The original hydrologic design criteria 
used for Waco Dam design has been revised. Current 
hydrologic design criteria indicates the spillway and 
outlet works cannot pass the Probable Maximum 
Flood (PMF) without overtopping the dam by 1.0 
foot, which could lead to failure of the embankment 
and catastrophic release of the reservoir. Adding 
required freeboard, Waco Dam crest height is 
hydrologically deficient by 4.6 feet. The proposed 
modification consists of raising the dam crest 
approximately by 4.6 feet to 514.6 feet NGVD 
utilizing a combination of compacted earthfill and 
reinforced cast-in-place concrete parapet wall for the 
full length of the dam. No major modification to the 
spillway, spillway service bridge, outlet works tower, 
or outlet works tower service bridge will be required. 
However, the spillway hoist mechanisms for the 
tainter gates will be waterproofed. The outlet works 
service bridge will be provided with a removable 
bulkhead to be installed only large flood events but 
would otherwise remain unchanged. Estimated 
Federal cost for raising the dam modification is 
$6,260,000 (Oct. 1, 1998, base price) and $220,000 is 
to be reimbursed by local sponsors. 
Operations during fiscal year. During FY 
2000 funds were used to continue construction. 
Project construction is scheduled to be completed 
March 2001. 
26. WRIGHT PATMAN DAM AND 
LAKE, TX 
Location. Dam is on Sulphur River in Cass 
and Bowie Counties, Texas. Dam is 45 miles above 
mouth of Sulphur River, and about 8 miles southwest 
of Texarkana, Texas. 
Existing project. For description of 
completed improvements and authorizing act see 
Annual Report of 1984. Estimated cost of project is 
$51,945,000, which includes $5,449,100 Code 711, 
$399,939 accelerated public works funds, and 
$13,138,004 to be reimbursed by local interests, over 
39-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
a period not to exceed 50 years, for water supply 
storage, and including $2,092,040 for pro rata share 
of original reservoir cost. Construction was initiated 
in August 1948 and completed in March 1962, except 
real estate activities, construction under Code 711, 
and conversion of 120,000 acre-feet to water supply 
storage after completion of Cooper Reservoir (now 
Jim Chapman Lake). This project transferred to the 
Fort Worth District as of the end of FY 1979. 
Local cooperation. A contract with the city of 
Texarkana, Texas, for reserving water supply storage 
space was approved by the Secretary of the Army 
December 17, 1968. To date, the city has paid 
$858,459. 
Operations during fiscal year. Routine 
operation and maintenance continued. 
Benefits accrued to Wright Patman Dam and 
Lake project: Accumulated flood damages prevented 
through FY 2000 were $13,859,000. 
27. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Inspection of completed local flood protection 
projects is made periodically in compliance with 
Section 208. 10, of Title 33, Code of Federal 
Regulations, which contains regulations for operation 
and maintenance of local flood-protection works 
approved by the Secretary of the Army in accordance 
with authority in Section 3, Flood Control Act of 
1936. See Table 30-D for inspections made this 
fiscal year. 
Inspection costs for FY 2000 from regular funds 
for maintenance were $887,871. Total costs to 
September 30, 2000 were $887,871. 
28. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
In accordance with Flood Control Act of 1944, 
expenditures were made for scheduling flood control 
reservoir operations and preparation of reservoir 
regulation manual for Marshall Ford Dam, on the 
Colorado River, near city of Austin, Texas, and for 
preparation of reservoir regulation manual for Twin 
Buttes Dam, on Middle and South Concho Rivers 
near city of San Angelo, Texas. Marshall Ford Dam 
was authorized by 1937 River and Harbor Act. 
Project was constructed jointly by Bureau of 
Reclamation and Lower Colorado River Authority 
and was completed during FY 1942. Twin Buttes 
Reservoir was authorized for construction by 
Department of Interior by Public Law 152, 85th 
Congress. Construction was initiated in June 1960; 
closure of dam started in June 1962; deliberate 
impoundment was started January 23, 1963. 
Accumulated damages prevented by Marshall 
Ford Reservoir through FY 2000 were $277,892,300 
and by Twin Buttes through FY 2000 were 
$1,118,000. Twin Buttes Reservoir consists of two 
separate pools, one on South Concho River and the 
other on Middle Concho River and Spring Creek. 
Equalizing channel between these two pools is at 
elevation 1925.0. Costs for FY 2000 from regular 
funds for operation of both reservoirs were $48,030. 
29. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
(See Table 30-C.) 
30. WORK UNDER SPECIAL 
AUTHORIZATION 
(See Table 30-E.) 
Flood control activities pursuant to Section 
205, Public Law 585, 80th Congress, as amended 
(preauthorization); Emergency stream bank 
protection under Section 14, Public Law 526, 79th 
Congress, as amended; Snagging and Clearing of 
navigable streams and tributaries in interest of flood 
control Section 208, Public Law 780, 83rd Congress, 
as amended. Emergency flood control, hurricaneflood, 
and shore protection activities, Public Law 99, 
84th Congress, and antecedent legislation, 
Environmental restoration under Section 1135, Public 
Law 662, 99th Congress, as amended; Aquatic 
ecosystem restoration under Section 206, Public Law 
303, 10 4th Congress. 
Fiscal year costs were $104,322 for disaster 
preparedness; no levee repair. 
Multi-Purpose Projects Including power 
31. ROBERT DOUGLAS WILLIS 
HYDROPOWER, TX 
39-14

FORT WORTH, TX, DISTRICT 
Location. For location of completed dam see 
Town Bluff Dam-B.A. Steinhagen Lake, Texas in 
this chapter. 
Existing project. Installation of hydroelectric 
power generating facilities at Town Bluff Dam was 
authorized by the River and Harbor Act of 1945 
(Public Law 79-14), March 2, 1945, but deferred in 
the original construction. Town Bluff Dam was 
completed and placed in operation in 1951. A 
Design Analysis Report completed in April 1982 and 
a Feasibility Report approved September 9, 1983 
indicated that installing hydropower at this project 
was economically feasible. The hydropower 
facilities include a 7,400-kilowatt power plant (two 
units at 3,700 kilowatts each), intake and outlet 
facilities, and necessary switchgear equipment is 
located in the main embankment at the old diversion 
channel. The plant is operated remotely from the 
Sam Rayburn project. The project produces an 
estimated 35,900 megawatt hours of energy per year. 
There is no Federal cost on this project, it is 
completely funded by non-Federal funds. The 
estimated non-Federal cost is $18,643,000. 101st 
Congress House Report 923, effective February 7, 
1989, changed the name of Town Bluff Hydropower 
to Robert Douglas Willis Hydropower. 
Local cooperation. A contract with the Sam 
Rayburn Municipal Power Authority was approved 
by Secretary of the Army, June 28, 1985, relative to 
financing, escrow agreement, and power sales 
agreement. 
Operations during fiscal year. Routine 
operation and maintenance continued. 
32. SAM RAYBURN DAM AND 
RESERVOIR, TX 
Location. Dam is on Angelina River 25.2 
miles upstream from its confluence with Neches 
River and about 10.0 miles northwest of Jasper, 
Texas.
Existing project. For description of completed 
improvements and authorizing act see Annual Report 
of 1969. Construction was started August 1956 and 
Project was ready for beneficial use in March 1965. 
Estimated cost of project is $68,683,000 including 
$3,000,000 contributed by local interests. 
Local cooperation. A contract with the Lower 
Neches Valley Authority, a State agency, to 
contribute $3,000,000 toward the first cost and an 
additional $200,000 annually for 50 years after 
completion of the project was approved by the 
Secretary of the Army on January 22, 1957. 
Contribution of $3,000,000 was made in full and 
annual payments to date of $5,600,000 have been 
made by the Authority. 
A contract with the city of Lufkin for water 
supply storage was approved May 27, 1969, by the 
Secretary of the Army at an estimated cost of 
$525,600. To date, the city has paid $656,341. Also 
under the contract the city of Lufkin must pay 
annually 0.692 percent of the annual cost of operation 
and maintenance. To date, the city has paid 
$226,325. 
Operations during fiscal year. Routine 
operation and maintenance continued. Additional 
work included embankment riprap repair. The total 
repair cost was $1,200,000. 
Benefits accrued to Sam Raybum project: 
Accumulated flood damages prevented through FY 
2000 were $665,018,100. 
33. SAM RAYBURN DAM AND 
RESERVOIR, TX (DAM SAFETY) 
Location. For location of completed dam see 
Sam Rayburn Dam and Reservoir, Texas in this 
chapter. 
Existing project. The original 2200-foot wide 
uncontrolled spillway was constructed through 
erodible loose sand, shaley clay, and sandstone. 
Based on experience of significant erosion at other 
uncontrolled and unlined spillways constructed 
through less erodible material, the spillway at Sam 
Rayburn Dam would have experienced severe 
erosion damage and probably breach during passage 
of floods in excess of the 150-year flood frequency 
(25 percent of Probable Maximum Flood). The 
original spillway was removed in part and replaced 
with a new reinforced concrete weir, stilling basin 
and outfall channel near the existing spillway 
structure. The new weir was completed December 
1996 and has a width of 640 feet, an overall length of 
433 feet, an outfall channel approximately 5,000 feet 
long and a crest elevation of 176.0 feet National 
Geodetic Vertical Datum (NGVD). Estimated 
Federal cost for the spillway modification is 
$40,000,000 (Oct 1, 1997, base price) and $1,000,200 
is to be reimbursed by hydropower sponsors, 
39-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
$101,000 from the city of Lufkin and $330,000 from 
the Lower Neches Valley Authority. 
Operations during fiscal year. During FY 2000, 
funds were used to complete financial closeout of the 
project. The project was physically completed in 
December 1996. 
34. BLUFF DAM - B. A. 
STEINHAGEN LAKE, TX 
Location. Dam is on Neches River about 12.4 
miles below mouth of Angelina River, one-half mile 
north of Town Bluff, Texas, and 93.0 river miles 
north of Beaumont, Texas. 
Existing project. For description of completed 
improvement and authorizing acts see Annual Report 
of 1962. Construction started March 1947 and 
project was ready for beneficial use in April 1951. 
Estimated cost of project is $9,888,000, including 
$2,000,000 contribution by local interests. 
Local cooperation. Completed as required. 
Operations during fiscal year. Routine 
operation and maintenance continued. Additional 
work included downstream channel riprap repair. 
Total cost was $550,000. 
35. WHITNEY LAKE, TX 
Location. Dam is on Brazos River, about 442 
miles above mouth of river, 5.5 miles southwest of 
Whitney, Texas, and about 38 miles upstream from 
city of Waco, Texas. 
Existing project. For description of completed 
improvement and authorizing acts see Annual Report 
of 1962. Construction of project was started May 
1947 and ready for flood control use in December 
1951. First power was placed on the line in June 
1953. Raise power pool is complete. Estimated cost 
of project is $46,306,000. 
Local cooperation. Section 2, Flood Control 
Act of 1938, applies. A contract with the Brazos 
River Authority, a State agency, for water supply 
storage was approved by the Secretary of the Army 
November 3, 1982. To date, the Authority has paid 
$268,414. 
Operations during fiscal year. Continued 
routine operation and maintenance. Additional work 
included hydropower rehabilitation study and 
replacing transformers. Study and repair cost totaled 
$1,100,000. 
Benefits accrued to Whitney Lake project: 
Accumulated flood damages prevented through FY 
2000 were $233,328,100. 
General Investigations 
36. SURVEYS 
Fiscal year costs were $444,376 for flood 
damage prevention studies; $129,211 for 
coordination with other agencies; $19 for review of 
deferred projects; $71,009 for special studies; $0 for 
review of completed projects; $117,211 for Planning 
Assistance to States; $19,998 for Inter-agency Water 
Resource Development; $2,134 for North American 
Waterfowl Management; and $93,140 for 
miscellaneous activities. 
37. PRECONSTRUCTION 
ENGINEERING AND DESIGN 
DALLAS FLOODWAY EXTENSION, TX 
Dallas Floodway Extension is located on the 
Trinity River in the city of Dallas, Damn County, 
Texas. The plan of improvement provides for 
extending the existing Floodway downstream about 9 
miles to the confluence of the Trinity River and Five 
Mile Creek. 
The plan consists of a levied floodway and flood 
conveyance improvement (channel) along the main 
stem, Five Mile Creek and White Rock Creek. 
Maintained free of encroachments, the levees and 
channels would provide Standard Project Flood 
protection for approximately 6,450 acres of urban 
lands currently subject to flooding. The estimated 
planning and engineering estimate is $8,560,000 
Planning and engineering studies were initiated in FY 
1991. Fiscal year costs were $1,687,729. 
GRAHAM, TX (BRAZOS RIVER BASIN) 
Graham is located in Graham, Young Coulty, 
Texas. The plan of improvement provides a buy-oUt 
of 127 structures within the 10-year flood plain in the 
city of Graham, TX; install a flood warning system' 0to 
protect residents above the buy-out zone; create 
39-16

FORT WORTH, TX, DISTRICT 
recreational areas consisting of a trail, picnic sites, 
and park road; and ecosystem restoration of the 
project lands with native vegetation. The ecosystem 
restoration includes replanting of native trees, shrubs, 
and herbaceous vegetation. This feature will restore 
a portion of the bottomland hardwood forest that has 
been adversely impacted by past floodplain 
development. Planning, engineering and design 
estimate is $260,000, and was initiated in FY 1998. 
Fiscal year costs were $84,102. 
JOHNSON CREEK, ARLINGTON, TX 
Johnson Creek lies principally in Tarrant 
County with a small portion lying in Dallas County. 
The plan of improvement includes a buy-out of 140 
structures for flood damage reduction. 155 acres of 
ecosystem restoration, and 2.25 miles of linear 
recreation features. The buy-out would prevent 
damages during a 25-year flood event. Planning 
engineering and design was initiated in FY 1999, and 
planning engineering arid design estimate is 
$210,000. Fiscal year costs were $180,323. 
38. COLLECTION AND STUDY OF 
BASIC DATA 
Work was continued under the Flood Plain 
Management Services on the compilation of 
information on floods and potential flood damages, 
including identification of those areas subject to 
inundation. Fiscal year expenditures for these 
activities totaled $353,063. Fiscal year costs were 
$39,689 for hydrologic studies. 
39-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 39-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY97 FY98 FY99 FY00 Sep. 30,2000 " 
1 Trinity River New Work: 
Project, TX Includes 
Channel to Liberty 
Tennessee Colony 
Lake and Dallas 
Floodway Extension 
Aquilla Lake, TX 
Bardwell Lake, TX 
Beals Creek, 
Big Spring, TX 
Belton, Lake, TX 
Benbrook Lake, TX 
Approp 
Cost: 
New Work: 
Approp 
Cost: 
Maint. 
Approp. 
Cost 
New Work: 
Approp 
Cost: 
Maint. 
Approp. 
Cost 
New Work: 
Approp 
Cost: 
New Work: 
Approp 
Cost: 
Maint. 
Approp. 
Cost 
New Work: 
Approp 
Cost: 
Maint. 
Approp. 
Cost 
0
0 
560,000 
577,909 
0
0 
1,329,000 
1,271,354 
3,81 1,000 
4,136,348 
0
0 
0
0 
534,560 
552,535 
0
0 
1,248,626 
1,355,681 
1,600,000 
1,862,152 
0
0 
0
0 
531,206 
540,153 
0
0 
1,437,881 
1,463,439 
(-) 90,000 
288,379 
0
0 
2,636,000 2,472,745 2,556,481 
2,615,172 2,210,757 2,672,650 
1,656,000 1,637,734 2,091,600 
1,643,236 1.539,518 2,211,506 
39-18 
22,574,865 
22,574,865 
45,506,300 
45,506,300 
8,925,735 
8,924,550 
10,934,505 Is 
10,934,505 
30,133,639 
28,978,280 
7,520,082 
7,355,918
0
0 
16,960,549 
16,960,549 
47,393,788 
47,319,630 
13,130,463 
13,069,991 
39,386,091 
37.991,223 
0
0 
495,402 
494,234 
0
0 
1,381,780 
1,381,570 
82,082 
3,024 
0
0 
2,342,703 
2,341,207 
0
0 
1,881,572 
1,878,634

FORT WORTH, TX, DISTRICT 
TABLE 39-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY97 FY98 FY99 FY00 Sep. 30,2000 " 
7 Canyon Lake, TX 
8 Ferrels Bridge Dam- 
Lake O' The Pines, TX 
9 Grapevine Lake, TX 
Hords Creek Lake, TX 
Jim Chapman Lake, TX 
(contributed funds) 
New Work: 
Approp 
Cost: 
Maint. 
Approp. 
Cost 
New Work: 
Approp 
Cost: 
Maint. 
Approp. 
Cost 
New Work: 
Approp 
Cost: 
Maint. 
Approp. 
Cost 
New Work: 
Approp 
Cost: 
Maint. 
Approp. 
Cost 
New Work: 
Approp 
Cost: 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
2,591,000 2,819,591 2,819,182 
2,546,045 2,837,762 2,908,958 
2,477,208 
2, 1 80.427 
2, 176,269 2,894,350 
2,206,332 3,162,258 
2,078,500 1,887,862 
1,988,540 1,859,271 
0
0 
991,000 
1,017,136 
400,000 
418,497 
O
0 
2,592,000 
979,828 
0
0 
1,087,776 
1,060,055 
1,500,000 
357,103 
0
0 
1,184,429 
1,235,029 
0
0 
2,296,282 
2,464,720 
0
0 
1,251,004 
1,307,156 
0 
115,547 
0
0 
2,710,500 
2,742,629 
2,698,653 
2,693,821 
2,591,674 
2,616,552 
0
0 
2,310,317 
2,312,046 
0
0 
1,121,472 
1,1 19,966 
0 
41,009 
0
0
0
0 
19,088,524 3 
19,088,524 
37,582,125 
37,356,685 18 
14,175,197 4
4 
14,175,197 
51,793,826 
51,793,933 
21,317,790 
21,317,790 
45,682,975 
45,677,923 
2,731,0898 
2,731,089 
22,161,672 
22,095,448 
138,694,887 
168,666,315 
227,000 
227,000 
11,140,329 
9,555,913 
39-19 
10

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 39-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY97 FY98 FY99 FY00 Sep. 30,2000 
12 Joe Pool Lake, TX 
13 Lavon Lake, TX 
14 Lavon Lake 
Modification and 
East Fork Channel 
Improvement, TX 
15 Lewisville Damrn , TX 
16 Navarrro Mills 
Lake, TX 
17 O.C.Fisher Dam 
and Lake, TX 
New Work: 
Approp 
Cost: 
Maint. 
Approp. 
Cost 
New Work: 
Approp 
Cost: 
Maint. 
Approp. 
Cost 
New Work: 
Approp 
Cost: 
New Work: 
Approp 
Cost: 
Maint. 
Approp. 
Cost 
New Work: 
Approp 
Cost: 
Maint. 
Approp. 
Cost 
New Work: 
Approp 
Cost: 
Maint. 
Approp. 
Cost 
0 
(-)8,995 
701,000 
684,504 
0
0 
2,681,000 
2,392,643 
0
0
0
0 
2,533,328 
2,348,636 
0
0 
1,394,000 
1,367,519 
0
0 
0
0 
742,311 
769,060 
0
0 
2,414,617 
2,710,436 
0
0
o
o
0
0 
2,354,593 
2,550,593 
0
0 
1,269,418 
1,300,276 
0
0 
710,632 
729,149 
0
0 
3,558,700 
3,648,220 
0
0
0
0 
3,010,000 
3,290,275 
0
0 
1,385,839 
1,412,125 
0
0 
596,050 
596,139 
0
0 
2,245,796 
2,242,988 
0
0
o
o
0
0 
2,926,881 
2,923,443 
0
0 
1,340,083 
1,340,570 
0
0 
731,000 1,077,238 858,821 755,803 
696,444 1,124,866 879,065 755.398 
188,960,000 
188,873,609 
9,158,726 
9,156,614 
12,864,796 
12,864,796 
18 
53,097,908 
18 
53,205,310 
69,796,862 
69,796,862 
25,333,988 
25,333,988 
is 
65,708,237 
63,142,166 
9,846,759 
9,846,759 
28,905,853 
28,904,464 
16,027,467 
16,027,467 
25,108,81
2 
25.107.194 
39-20

FORT WORTH, TX, DISTRICT 
TABLE 39-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY97 FY98 FY99 FYOO Sep. 30,2000 
18 Proctor Lake, TX 
19 Ray Roberts Lake, TX 
31 Robert Douglas Willis 
Hydropower, TX 
(Contributed Funds) 
32 Sam Rayburn 
Dam and 
Reservoir, TX 
33 Sam Rayburn Dam 
and Reservoir, TX 
(Dam Safety) 
(Federal Funds) 
(Contributed Funds) 
20 San Antonio 
Channel 
Improvement, TX 
(Federal Funds) 
(contributed funds) 
New Work: 
Approp 
Cost.: 
Maint. 
Approp. 
Cost 
New Work: 
Approp 
Cost: 
Maint. 
Approp. 
Cost 
New Work: 
Approp 
Cost: 
New Work: 
Approp 
Cost: 
Maint. 
Approp. 
Cost 
New Work: 
Approp 
Cost: 
Maint. 
Approp. 
Cost 
New Work: 
Approp 
Cost: 
Maint. 
Approp. 
Cost 
0
0 
2,073,000 
2,1 25,556 
1,893,000 
2,130,533 
731,000 
696,961 
0
0
0
0 
4,314,000 
3,740,446 
2,200,000 
2,126,180 
0 
55,933 
3,564,000 
3,832,116 
268,900 
177,600 
0
0 
2, 150,233 
2,1 80,765 
3,000,000 
2,810,234 
931,265 
814,104 
0
0
0
0 
4,018,935 
4,096,596 
2,600,000 
2,628,705 
0 
117,187 
1,503,000 
1,816,452 
43,568 
1,524,905 
0
0 
1,776,500 
1,797,287 
350,000 
1,024,438 
747,070 
945,197 
0
0
0
0 
4,016,033 
4,682,773 
0 
41,563 
0
0 
1,034,000 
977,248 
0 
105,858 
0
0 
1,724,038 
1,722,744 
0 
110,719 
1,001,638 
1,000,619 
0
0
0
0 
4,294,428 
4,293,583 
0 
-201,660 
144,280 
208,540 
992,082 
943,245 
0 
49,385 
14,469,585 
14,469,585 
35,938,060 
35,737,3431 
319,778,700 
319,552,712 
9,412,475 
9,340,184 
18,628,463 
18,628,463 
60,670,957 
60,670,957 
82,165,679 
81,848,979 
40,514,000 
40,169,942 
437,895 
437,895 
152,878,130 
152,675,456 
4,001,268 
5,369,148 
39-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 39-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY97 FY98 FY99 FY00 Sep. 30,2000 " 
21 San Gabril River, TX 
Granger 
Lake Georgetown 
22 Somerville Lake, TX 
23 Stillhouse Hollow 
Dam, TX 
34 Town Bluff Dam- 
B.A. Steinhagen 
Lake,TX 
24 Waco Lake, TX 
New Work: 
Approp 
Cost: 
Maint. 
Approp. 
Cost 
0
0 
1,141,000 
1,436,996 
Approp. 1,484,000 
Cost 1,434,107 
New Work: 
Approp 
Cost: 
Maint. 
Approp. 
Cost 
New Work: 
Approp 
Cost: 
Maint. 
Approp. 
Cost 
New Work: 
Approp 
Cost: 
Maint. 
Approp. 
Cost 
New Work: 
Approp 
Cost: 
Maint, 
Approp. 
Cost 
0
0 
2,309,000 
2,308,393 
0
0 
1,688,000 
1,689,654 
0
0 
1,418,500 
1,412,9 i 7 
0
0 
1,845,672 
1,925,185 
39-22 
0
0 
1,411,484 
1,412,614 
1,510,134 
1,538,068 
0
0 
2,387,292 
2,417,204 
0
0 
1,431,623 
1,419,740 
0
0 
1,427,421 
1,381,961 
0
0 
2,026,823 
2,032,899 
0
0 
1,505,205 
1,522,681 
1,635,000 
1,670,674 
0
0 
2,777,824 
2,798,427 
0
0 
1,769,350 
1,855,012 
0
0 
1,586,53 2 
1,726,525 
0
0 
2,284,498 
2,230,599 
0
0 
1,522,746 
1,522,770 
1,671,861 
1,672,018 
0
0 
2,739,611 
2,741,102 
0
0 
1,957,661 
1,955,653 
0
0 
2,137,690 
2,136,597 
0
0 
3,432,919 
3,415,713 
101,796,100 
101,796,100 
24,181,6361 
22,887,141 
23,458,168 
23,457,100 
27,790,438 
27,790,438
0 
Is 
48,303,115 
Is 
40,218,416 
20,522,084 
20,522,084 
Is 
30,933,131 
30,905,652 
6,602,737 
6,602,737 
s18 
30,018,300 
29,953,460 
49,521,121 
49,521,121 
47,064,305 
46,969,946

FORT WORTH, TX, DISTRICT 
TABLE 39-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY97 FY98 FY99 FY00 Sep. 30,2000 7 
25 Waco Lake, TX New Work: 
(Dam Safety) Approp 284,000 997,000 3,008,000 140,000 4,874,000 
Cost: 225,002 300,366 2,442,170 1,066,326 4,455,422 
35 Whitney Lake, TX New Work: 
Approp 0 0 0 0 42,952,938 
Cost: 0 0 0 0 42,952,938 16 
Maint. 
Is 
Cost 3,540,370 3,622,987 3,940,521 4,916,605 78,148,256 
26 Wright Patman Dam New Work: 
and Lake, TX Approp 0 0 0 0 35,731,626 
Cost: 0 0 0 0 35,73 1,626 
Maint. 
18 
Approp. 2,386,292 2,500,213 2,801,450 2,531,902 50,954,377 
Cost 2,204,934 2,632,788 2,950,788 2,538,921 49,949,028 
A-tu,." ---i-'C-c u-e/s, aV'rj eceipts 1Irom rec--o nleyance o lanu ueuposll eu 9-CIlOPS i0vuv/ex nenue tirom contioute tuns. 
to miscellaneous receipts. 
2Excludes $322,346 receipts from reconveyance of land 
deposited to miscellaneous receipts. 
'Excludes $1,422,848 expended for new work from contributed 
funds, including $22,848 "Contributed Funds Other" for 
installation and operation of gages for leakage study. 
Includes $1,378,486 for Code 711, $52,808 for Code 713,and 
$399,739 accelerated Public Works Act funds. Excludes 
$1,711,200 contributed funds. 
Includes $1,376,322 for code 711, $52,808for code 713, and 
#399 accelerated Public Works Act funds. Excludes $4,137 
reimbursed in Fiscal Year 1973. 
Claim Northeast Texas Municipal Water District $16,546. 
Three payments of $12,410 less real charges of $1,325, making a 
Iotoaf l$2 ,811 reimbursed in Fiscal Year 1972, Fiscal Year 1973, 
and Fiscal Year 1973. 
'Excludes $146,795 receipts from reconveyance of land 
deposited to miscellaneous receipts, and $2,040,026 for new work 
expended from contributed funds. 
9 Excludes receipts from reconveyance of land of $426,606 that 
were deposited to miscellaneous receipts, and $3,676,661 for new 
work expended from contributed funds. 
o Includes $130,000 under appropriation 96X5125. 
" Excludes $300,000 expended fiom contributed funds. 
12 Excludes $3,000,000 expended from contributed lifunds. 
"Includes receipts fi-rdoismp osals and revocation of tiunds 
related hereto. 
14 Excludes $2,000,000 contributed funds expended. 
'5E xcludes $2,750,000 expended tfocro ntributed funds. 
'6Ex cludes $188,282 receipts from reconveyance of lands 
deposited to miscellaneous accounts. 
7 Includes funds provided by the Jobs Act (PL 98-8, dated 
march 24,1983). 
'8Beginning Fiscal Year 1985 data shown on Tables A includes 
Special Recreational Use Fees. Data for previous fiscal years have 
changed to conform to the new procedure. 
39-23

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 39-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
2 Aug. 13, 1968 
3 Mar. 31, 1960 
4 Oct. 12, 1972 
5 Jul. 24, 1946, 
Sep. 3, 1954 
6 Mar. 2, 1945 
7 Mar. 2, 1945 
Sep. 3, 1954 
8 Jul. 24, 1946 
9 Mar. 2, 1945 
AQUILLA LAKE, TX 
Construction of a dam on Aquilla Creek about 6.8 
miles southwest of Hillsboro, Texas and about 24 
miles north of Waco, Texas. 
BARDWELL LAKE, TX 
Construction of a dam on Waxahachie Creek 
about 5 miles south of Ennis, Texas 
BEALS CREEK, BIG SPRINGS TX 
Construction of a channel. 
BELTON LAKE, TX 
Construction of a dam on Leon River, about 
3 miles north of Belton, Texas. 
Modification of the dam to provide for 
generation of hydroelectric power. 
BENBROOK LAKE, TX 
Construction of a dam on the Clear Fork of 
the Trinity River about 10 mile southwest 
of Fort Worth, Texas 
CANYON LAKE, TX 
Construction of a dam on the Guadalupe 
River about 12 miles northwest of New 
Braunfels, Texas. 
FERRELLS BRIDGE DAM-LAKE O' THE 
PINES, TX. 
Provides for construction of an earthfill dam and 
reservoir area. 
GRAPEVINE, TX 
Construction of a dam on Denton Creek, a 
tributary of the Trinity River, about 20 miles 
northwest of Dallas. Texas. 
S. Doc. 52, 90th 
Cong., Ist Sess. 
H.Doc. 424, 82nd 
Cong., 2nd Sess. 
H. Doc. 115, 92nd 
Cong., 2nd Sess. 
H. Doc. 88, 81st 
Cong., Ist Sess. 
H. Doc. 535, 81st 
Cong., 2nd Sess. 
H. Doc.403, 77th 
Cong., 1st Sess. 
H. Doc. 247, 76th 
Cong., Ist Sess. 
H. Doc. 602, 79th 
Cong., 2nd Sess. 
H. Doc. 403, 77th 
Cong., Ist Sess. 
39-24

FORT WORTH, TX, DISTRICT 
TABLE 39-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
10 Aug. 3, 1941 
11 Aug. 3, 1955 
12 Oct. 27, 1965 
13 Mar. 2, 1945 
14 Oct. 23,1962 
15 
HORD'S CREEK LAKE, TX 
Construction of a dam on Hord's Creek, a 
tributary of Pecan Bayou, near the city of 
Coleman, Texas. 
JIM CHAPMAN LAKE, TX 
Construction of an earthfill dam and reservoir 
area. 
JOE POOL LAKE, TX 
Construction of a dam on Mountain Creek, 
adjacent to the city limits of Grand Prairie, 
Texas, about 3 miles above the existing 
Mountain Creek Dam. 
LAVON LAKE, TX 
Construction of a dari on the East Fork of the 
Trinity River, about 22 miles northeast of Dallas, 
Texas 
LAVON LAKE MODIFICATION AND EAST FORK 
CHANNELS IMPROVEMENT, TX 
IagcrL i Dwr ad tatialnnc wpnt andi 
n airIe LaavOnl _am an eallUguemllllu 
realignment of the lower 25 miles of the 
East Fork of the Trinity River, including 
rehabilitation of existing levees. 
Mar. 7, 1974 Improvement of Collin County Road I 15. 
LEWISVILLE DAM, TX 
Mar. 2, 1945 Construction of a dam on the Elm Fork of the 
Trinity River near the city of Lewisville, Texas. 
NAVARRO MILLS LAKE, TX 
16 Sep. 3, 1954 Construction of a dam on Richland Creek, a 
tributary of the Trinity River, about 16 miles 
southwest of Corsican Texas. 
Dec. 31, 1970 Alteration of FM Highway 3164 in Wolf Creek Park. 
H. Doc. 370, 76th 
Cong., Ist Sess. 
H. Doc.488. 83rd 
Cong., 2nd Sess. 
H . Doc. 276, 89th 
Cong., 1st Sess. 
H. Doc. 533, 78th 
Cong., 2nd Sess. 
H. Doc. 554, 87th 
Cong., 2nd Sess. 
H. Doc. 403, 77th 
Cong., 1st Sess. 
H. Doc. 498, 83rd 
Cong., 2nd Sess. 
39-25

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 39-B AUTHORIZING LEGISLATION 
See Date 
Settion Authorizing 
in Text Act Project and Work Authorized Documents 
17 Aug. 18,1941 
18 Sep. 3, 1954 
19 Oct. 27,1965 
32 Mar. 2, 1945 
33 Mar. 2, 1945 
O.C. FISHER DAM AND LAKE, TX. 
Construction of a dam on the North Concho River 
just above San Angelo, Texas. 
PROCTOR LAKE 
Construction of a dam on the Leon River about 8 
miles northeast of Comanche, Texas. 
RAY ROBERTS LAKE, TX 
Construction of a dam on the Elm Fork of the Trinity 
River between Sanger and Aubrey Texas, about 
30 miles upstream from the existing Lewisville 
Darnm. 
SAM RAYBURN DAM AND RESERVOIR 
Construction of a dam on the Angelina River 
about 10 miles northwest of Jasper, Texas. 
SAM RAYBURN SPILLWAY (DAM 
SAFETY ASSURANCE), TX 
Modification of the spillway and embankment 
H. Doc. 315, 76th 
Cong., Ist Sess. 
H. Doc. 535, 81st 
Cong., 2nd Sess. 
H.Doc. 276, 89th 
Cong., Ist Sess. 
S. Doc. 98, 76th 
Cong., I st Sess. 
S. Doc. 98, 76th 
Cong., Ist Sess.. 
SAN ANTONIO CHANNEL IMPROVEMENT, TX 
20 Sep. 3, 1954 Channel improvement of the San Antonio River 
and tributaries in and near the city of San 
Antonio, Texas. 
SAN GABRIEL RIVER PROJECT, TX 
21 Sep. 3, 1954 Construction of: (1) a dam (Granger Dam and Lake) on the San 
Jan. 3, 1975 Gabriel River about 7 miles east of Granger, Texas, (2) a dam 
(North Fork Lake) on the north Fork of the San Gabriel River 
about 3.5 miles northwest of Georgetown, Texas and (3) a 
dam (South Fork Lake) on the South Fork of the San Gabriel 
River about 3 miles southwest of Georgetown, Texas. 
H. Doc. 344, 83rd 
Cong., 2nd Sess. 
H. Doc. 535, 81st 
Cong., 2nd Sess. 
H.Doc. 591, 87th 
Cong., 2nd Sess. 
39-26

FORT WORTH, TX, DISTRICT 
TABLE 39-B 
See Date 
Section Authorizing 
in Text Act 
AUTHORIZING LEGISLATION 
Project and Work Authorized 
23 Sep. 3, 1954 
34 Mar. 2, 1945 
31 Mar. 2, 1945 
1 Oct. 27, 1965 
24 
25 
STILLHOUSE HOLLOW DAM, TX 
Construction of a dam on the Lampasas River 
about 5 miles southwest of Belton, Texas. 
TOWN BLUFF DAM-B.A. STEINHAGEN 
LAKE, TX 
Construction of a dam on the Neches River near 
Jasper, Texas. 
ROBERT DOUGLAS WILLIS 
HYDROPOWER, TX 
Construction of two units at 3,000 kilowatts each 
of hydroelectric power generating facilities 
connected with Town Bluff-B.A. Steinhagen 
Lake, Texas. 
TRINITY RIVER PROJECT, TX 
Construction of Tennessee Colony Dam located at river mile 
339.2 on the Trinity River about 16 miles west of Palestine, 
Texas; a multiple purpose channel from the Houston, 
Texas ship channel to Fort Worth, Texas; a distance of 
approximately 363 miles, an extension of the existing Dallas, 
Texas, Floodway downstream approximately 9.0 miles; a 
realignment and enlargement of the West Fork of the Trinity 
River from the mouth of the West Fork to the existing Texas, 
Floodway, a distance of approximately 31 miles; and water 
conveyance facilities involving construction of about 98 miles 
of pipeline from Tennessee Colony Lake to the existing 
Benbrook Lake. 
WACO LAKE, TX 
Sep. 3, 1954 Construction of a dam on the northwest edge of 
Waco, Texas, below the confluence of the North, 
South and Middle Bosque Rivers 
Sep. 3, 1954 
WACO LAKE, TX (DAM AND SAFETY) 
Modification of raising the dam crest. 
H. Doc. 535, 81st 
Cong., 2nd Sess. 
S. Doc. 98, 76th 
Cong., 1st Sess. 
S. Doc. 98, 76th 
Cong., 1st Sess. 
H. Doc. 276, 89th 
Cong., Ist Sess. 
H. Doc. 364, 90th 
Cong., 2nd Sess. 
H. Doc. 535, 81st, 
Cong., 2nd Sess. 
H. Doc. 535, 81st 
Cong., 2nd Sess. 
39-27 
- -~-- Documents

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 39-B 
See Date 
Section Authorizing 
.A_ 
AUTHORIZING LEGISLATION 
in Text Act Project and Work Authorized Documents 
WHITNEY LAKE, TX 
35 Aug. 18, 1941 Construction of a dam on the Brazos River about H. Doc. 390, 76th 
19 miles southwest of Hillsboro, Texas. Raise Cong., Ist Sess. 
the power pool 13.0 feet. 
WRIGHT PATMAN DAM AND LAKE, TX 
26 Jul.24, 1946 Construction of an earth-filled dam and reservoir. H. Doc. 602, 79th 
Cong. 2nd Sess. 
39-28

FORT WORTH, TX, DISTRICT 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
TABLE 39-C (See Section 29 of Text) 
For Last Full Cost to September 30, 1999 
Report See 
Annual Report Operation and 
Project For Construction Maintenance 
Belton Lake Hydropower Study, TX 5 
Belton Lake Modification, TX' 1988 
Big Fossil Creek, TX' 1969 
Big Sandy Lake, TX 5 1986 
Big Spring, TX' 1979 
Boggy Creek, Austin, TX' 1992 
Brownwood Channel 
Improvement, TX 5 
Calloway Branch Hurst, TX' 1986 
Carl L. Estes Dam and Lake, TX5 1979 
Dam "A" Lake, TX5 1987 
Duck Creek Channel 
Improvements, TX 5 1983 
Elm Fork Floodway, TX 5 1987 
Forth Worth 
Floodway (Clear Fork), TX' 1971 
Forth Worth 
Floodway (West Fork), TX' 1971 
Grand Prairie, TX (Landfill)' 1987 
Grand Prairie, TX (Meyers Road)' 1989 
Greenville, TX ' 1983 
Lake Brown Modification, TX' 1983 
Lake Fork Lake, Sabine River, TX' 
Lake Worth, Tarrant County, TX 4 
Millican, TX4 1988 
Navasota Lake, Navasota River, TX 5 
Roanoak Lake, TX' 1979 
Rockland Lake, TX s 1988 
Rutledge Hollow Creek Channel 
Improvement, Poteet, TX' 1969 
San Gabriel River, South, TX4 
Tarrant County, 
Tony's Marine Creek, TX4 
Zacate Creek Channel, TX' 1983 
Completed Inactive 3Deferred 4Recommended for Deauthorization 'Deauthorized 
39-29

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
INSPECTION OF COMPLETED FLOOD CONTROL PROJECTS 
TABLE 39-D (See Section 27 in Text) 
Location 
Beals Creek 
Bear Creek, Collin County 
Beltline Road Bridge, Richardson 
Big Fossil Creek Floodway, Richland Hills 
Boggy Creek Floodway, Austin 
Calloway Branch Channel, Hurst 
Calloway Branch, Airline Dr. Pk., Richland Hills 
Cat Claw Creek Channel, Abilene 
Dallas Floodway, Dallas 
Delaware Branch, Irving 
Dry Branch, Grand Prairie 
Duck Creek, Garland 
East Fork Floodway, Kaufman County 
Fort Worth Floodway, Tarrant County 
Grand Prairie Landfill, Grand Prairie 
Hutton Branch, Carrollton 
Johnson Creek Channel, Grand Prairie 
Long Branch Channel, Greenville 
Lorean Branch Channel, Hurst 
McCoy Road Bridge, Carrollton 
Meyers Road, Grand Prairie 
Munday Floodway, Mundy 
Park Row Bridge, Arlington 
Pleasanton Floodway, Pleasanton 
Poteet Floodway , Poteet 
Ridglea Country Club Drive Bridge , Fort Worth 
Roaring Springs Road Bridge, Westover Hills 
Rush Creek Channel, Arlington 
San Antonio Floodway, San Antonio 
San Antonio Tunnels, San Antonio 
Singing Hills Creek Channel, Watauga 
Sulphur Branch Channel, Euless 
Ten Mile Creek, Desoto 
Walnut Creek, Seguin 
Wheeler Creek Channel, Gainesville 
Zacate Creek Floodway. Laredo 
Dates of 
Inspection 
Jul. 7, 1999 
Mar. 9, 1999 
Nov. 19, 1999 
Mar. 15, 2000 
Aug. 19, 1999 
Dec. 8, 1999 
Aug. 10, 2000 
Jul. 20, 2000 
Oct. 20, 2000 
Sept. 30, 1999 
Jul. 19, 2000 
Aug. 8, 2000 
Nov. 30, 1994 
Oct. 6, 1999 
Feb. 17, 2000 
Nov. 19, 1999 
Jun. 22, 2000 
Feb. 3, 2000 
Dec, 13, 199 
Nov. 19, 1999 
Feb.17, 2000 
Dec. 13, 1999 
Feb. 16, 2000 
Sept. 23, 2000 
Sept. 23, 2000 
Under Construction 
Feb. 3, 2000 
Feb. 16, 2000 
Sept. 22, 1999 
Aug. 19, 1998 
Mar. 30, 2000 
Dec. 7, 1999 
Jun. 2 3, 1999 
Aug. 25, 2000 
Jun. 21, 2000 
Sept.~ 
39-30 
-- -- ---

FORT WORTH, TX, DISTRICT 
WORK UNDER SPECIAL AUTHORIZATION 
TABLE 39-E (See Section 30 of Text) 
Project Flood Control Activities Section 205 Cost 
Cienegas Creek, Del Rio, TX $ 48,840 
Duck Creek, Garland, TX 464,049 
Farmers Branch, White Settlement, TX 1,038 
Little Fossil Creek, Haltom City, TX 114,901 
San Felipe, Del Rio, TX 65,412 
Section 205 Coordination Acct. 13,826 
Sulphur Branch, Euless, TX 33,924 
Project Aquatic Ecosystem Restoration Section 206 Cost 
Aquatic Ecosystem Restoration $ 40,365 
Miscellaneous 431,063 
Preliminary Restoration Plans 22,190 
Section 206 Coordination Acct. 18,174 
Project Ecosystem Restoration Section 1135 Cost 
Big Cypress Bayou Fish & Wildlife Habitat 
Initial Appraisals 
Joppa Preserve Restoration 
Lewisville Aquatic Wildlife Habitat 
Lewisville Lake Wildlife Habitat 
Old Trinity River Channel Wildlife Restoration 
Proctor Lake Wetland Restoration 
Section 1135 Coordination Acct. 
Proiect S.trpom RInk Protection Section 14 
Bear Creek, Collin County, TX 
Brazos River, Waco Sewerage System 
Colorado River, Smithville Water Supply, TX 
Mary's Creek 
Section 14 Coordination Acct. 
West Fork Trinity River Landfill, Arlington, TX 
West Fork Trinity River Water Plant, TX 
$ 5,737 
31,070 
77,134 
45,662 
21,435 
115,951 
75,209 
18,043 
Cost 
$ 9,609 
71,020 
230,286 
173,784 
836 
20,983 
494,971 
39-31 
""Anim AIr air v~,, Proieet
GALVESTON, TX, DISTRICT* 
GALVESTON, TX, DISTRICT 
Galveston District comprises drainage basins of 
all short streams arising in coastal plain of Texas and 
flowing into the Gulf of Mexico, including the entire 
basin of Buffa!o Bayou, San Jacinto, San Bernard, 
Lavaca, Navidad, Mission, and Aransas Rivers. It 
embraces Agua Dulce, San Fernando, and Olmos 
Creek Basins draining into Baffinm Bay, and coastal 
area south thereof to the Rio Grande and east of 
western Boundary of Starr County, Texas. It includes 
lower basins of major streams flowing into the Gulf 
of Mexico: Sabine River, Texas and Louisiana, 
downstream from U.S. Highway 190 crossing at Bon 
Wier, Texas; Neches River downstream from Town 
Bluff gaging station; Trinity River downstream from 
Texas State Highway 19 crossing at Riverside, 
Texas; Brazos River downstream from confluence 
with Navasota River; Colorado River downstream 
from northern boundary of Fayette County; 
Guadalupe River downstream from confluence with 
San Marcos River; San Antonio River downstream 
from confluence with Escondido Creek; Nueces 
River downstream from confluence with Frio and 
Atascosa River. 
40-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
IMPROVEMENTS 
NAVIGATION................................................... 
1. AQUATIC PLANT CONTROL, TX ............. 3 
2. BRAZOS ISLAND HARBOR, TX .................. 3 
3. CEDAR BAYOU, TX. .................................... 3 
4. CHANNEL TO PORT BOLIVAR, TX...........4 
5. CLEAR CREEK AND CLEAR LAKE, TX....4 
6. CORPUS CHRISTI SHIP CHANNEL, TX ....4 
7. DOUBLE BAYOU, TX...................................5 
8. FREEPORT HARBOR, TX ............................ 5 
9. GALVESTON HARBOR AND CHANNEL, 
TX........................... ................... ...6.... 
10. GULF INTRACOASTAL WATERWAY 
BETWEEN APALACHEE BAY, FL, AND THE 
MEXICAN BORDER .......................................... 7 
11. HOUSTON-GALVESTON NAVIGATION 
CHANNELS, TX................................ ............9 
12. HOUSTON SHIP CHANNEL, TX ............. 10 
13. MATAGORDA SHIP CHANNEL, TX....... 11 
14. NECHES RIVER AND TRIBUTARIES, 
SALT WATER BARIER AT BEAUMONT TX 11 
15. SABINE-NECHES WATERWAY, TX...... 12 
16. TEXAS CITY CHANNEL, TX ................... 12 
17. TRINITY RIVER AND TRIBUTARIES, TX 
... . . .... .. .. *.*............ .. ...... .. ..... *.....1.. 13 
17A. ANAHUAC CHANNEL, TX ................ 13 
17B. CHANNEL TO LIBERTY, TX ................ 13 
17C. WALLISVILLE LAKE, TX ..................... 14 
18. RECONNAISSANCE AND CONDITION 
SURVEYS ................................. ....... 15 
19. NAVIGATION WORK UNDER SPECIAL 
AUTHORIZATION ...................................... 15 
SHORE PROTECTION ....................................... 15 
20. CORPIS CHRISTI BEACH, TX 
(RESTORATION PROJECT) ......................... 15 
FLOOD CONTROL........................................ 15 
21. BUFFALO BAYOU AND TRIBUTARIES, 
TX ..................................... .. ............. 15 
21A. ADDICKS AND BARKER RESERVOIRS, 
TX ................................................................. 16 
21B. BRAYS BAYOU ................................... 16 
21C. GREENS BAYOU................................. 17 
21D. HALLS BAYOU ................................. 17 
21E. HUNTING BAYOU .............................. 17 
21F. LITTLE WHITE OAK BAYOU, TX........18 
21G. CARPENTERS BAYOU, TX ................. 18 
22. BUFFALO BAYOU, TX (LYNCHBURG 
PUM P STATION) .............................................. 18 
23. CLEAR CREEK, TX .................................. 18 
24. CYPRESS CREEK, TX...............................19 
25. LOWER RIO GRANDE BASIN, TX ......... 19 
25A. ARROYO COLORADO, TX ........2.0........ 
25B. SOUTH MAIN CHANNEL, TX ......2.0....... 
25C. RAYMONDVILLE DRAIN, TX..............20 
26. SIMS BAYOU, TX ................2.0................. 
27. INSPECTION OF COMPLETED FLOOD 
CONTROL WORKS ..................2.1.................. 
28. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION ...........2.1........... 
29. EMERGENCY STREAM RANK AND 
SHORELINE EROSION WORK AND 
SNAGGING AND CLEARING ACTIVITIES 
UNDER SPECIAL AUTHORIZATION............21 
ENVIRONMENTAL RESTORATION............22 
30. PROJECT MODIFICATIONS FOR 
IMPROVEMENT OF ENVIRONMENT...........22 
31. AQUATIC ECOSYSTEM RESTORATION 
.........................................2..2.............................. 
32. BENEFICIAL USES OF DREDGED 
M ATERIAL..................... .............2.2....................... 
33. SABINE-NECHES WATERWAY- TEXAS 
POINT NATIONAL WILDLIFE REFUGE, TX22 
GENERAL INVESTIGATIONS........................22 
34. SURVEYS ........................... .2.2.................... 
35. COORDINATION WITH OTHER .....2.2....... 
36. COLLECTION AND STUDY OF BASIC 
D A TA ..................................2 .3.............................. 
37. PRE-CONSTRUCTION ENGINEERING 
AND DESIGN .....................8.23......................... 
TABLE 40-A ................................ .24....... 
COST AND FINANCIAL STATEMENT........24 
TABLE 40-B ...................... ........ ..*.3.0..... 
AUTHORIZING LEGISLATION .......3.0........... 
TABLE 40-C ...................... .........48... 
OTHER AUTHORIZED NAVIGATION 
PROJECTS .................................. 48 
TABLE 40-D ...............................4.9. 4." .49 
OTHER AUTHORIZED FLOOD CONTROL 
PROJECTS .............. .. ................. 49 
TABLE 40-E.................. ........... ...5.0... 
OTHER AUTHORIZED ENVIRONMENTAL 
RESTORATION PROJECTS ..........5.0.......... 
T A BL E 4 0 -F ..................... . . . . . . . . . ....... -- *.*.. 51 
DEAUTHORIZED PROJECTS.....................51 
TA BLE 40-G .......................5.2............................. 
TOTAL COST OF EXISTING PROJECTS ..... 52 
TABLE 40-H ..... .... ..............-. .54 
CHANNEL DIMENSIONS...........-. .. 59 
TA BLE 40-I ......... ..... .......... .......... ....5.9.- 
GULF INTRACOASTAL WATERWAY ...59 
EXISTING PROJECT DIMENSIONS,......59 
TABLE 40-J E...........61 
DREDGING OPERATION=S======.=.=..=.=..=.= ===6 
40-2

GALVESTON, TX, DISTRICT 
Navigation 
1. AQUATIC PLANT CONTROL, TX 
(SOUTHWESTERN DIVISION) 1965 
ACT 
Location. Navigable waters, tributary streams, 
connecting channels, and other allied waters in Texas. 
Previous project. For details see page 699 of 
Annual Report for 1963. 
Existing project. A comprehensive project to 
provide for control and progressive eradication of 
water-hyacinth, alligatorweed, Eurasian watermilfoil, 
hydrilla, and other obnoxious aquatic plant growths, 
from navigable waters, tributary streams, connecting 
channels, and other allied waters in Texas in the 
combined interest of navigation, flood control, drainage, 
agriculture, fish and wildlife conservation, public 
health, and related purposes, including continued 
research for development of the most effective and 
economic control measures. Control of water-hyacinth 
and alligatorweed has been approved for the Nueces 
River Basin, North Coastal Area, Guadalupe River 
Basin, Sabine River Basin, Trinity River Basin, Cypress 
Creek Basin, Neches River Basin, South Coastal Area, 
San Jacinto River Basin, Rio Grande Basin, Colorado 
River Basin and Brazos River Basin. Control of hydrilla 
and watermilfoil is on a site by site basis after analysis 
and issuance of National Environmental Policy Act 
documentation 
Local cooperation. Sec. 302, 1965 River and 
Harbor Act, amended by Water Resources Development 
Act of 1986, applies. 
Operations during fiscal year. The cost-sharing 
program had been funded for $31,000 for FY 98, but 
chemical control work by the State of Texas was 
curtailed through FY00 to await interpretation of 
herbicide labelling instructions by the Environmental 
Rotection Agency. Chemical control work has been 
reinstated by the state for FY01. Only mechanical 
cotrol of waterhyacinth and hydrilla is accomplished 
by the State along segments of the Rio Grande. A new 
oWn-year cost-sharing, cost-reimbursable contract, with 
the options for an additional four years, has been 
negotiated with the State of Texas to maintain Program 
apabilities in the event of future funding. 
Cost incurred for Fiscal Year 2000 was $9,810. 
2. BRAZOS ISLAND HARBOR, TX 
Location. At extreme south end of coast of Texas, 
about 7 miles north of mouth of Rio Grande and about 5 
4ils east of Brownsville, Texas. (See National Ocean 
Srvey Chart 11301.) 
Previous project. For details see page 1017 of 
Annual Report for 1932. 
Existing project. Provides for channel dimensions 
in various sections of the waterway as shown in Table 
40-H. 
Project also provides for dual jetties at the gulf 
entrance, a north jetty 6,330 feet long, a south jetty 
5,092 feet long, and 1,000-foot extension to existing 
north jetty and for maintenance of 3rd fishing harbor 
constructed by local interests. Under ordinary 
conditions, mean tidal range is about 1.5 feet, and 
extreme range is about 2 feet. All depths refer to mean 
low tide. To some extent, height of tides is dependent on 
the wind, and during strong "northers" in winter season, 
water surface in southern end of Laguna Madre may be 
raised 4 feet or more above mean low tide in the gulf. 
Widening Brownsville Channel from Goose Island 
to Brownsville turning basin and deepening southeast 
corner of Brownsville turning basin to 36 feet was 
completed in April 1980. The 1,000-foot extension to 
existing north jetty was deauthorized under Section 
1001 of the Water Resources Development Act of 1986. 
The entrance channel was enlarged from 38 feet by 300 
feet to 44 feet by 300 feet in FY 1992. Construction of 
an environmental mitigation site consisting of the 
creation of a 16 acre tidal wetland which included shoal 
grass and black mangroves, was completed in 1997. 
(See Table 40-G for total cost of existing project to 
September 30, 2000.) 
Local cooperation. Fully complied with. 
Terminal facilities. Numerous terminal facilities 
for bulk and liquid cargo are available. (See Port Series 
No. 26, revised 1991.) Facilities are adequate for 
existing commerce. 
Operations during fiscal year. Maintenance: 
Routine maintenance. (See Table 40-J for dredging 
operations.) 
3. CEDAR BAYOU, TX. 
Location. The bayou is about 30 miles long. It 
flows to the south and empties into northwest corner of 
upper Galveston Bay, about 1.5 miles below mouth of 
San Jacinto River and about 28.5 miles north of 
Galveston, Texas. (See National Ocean Survey Chart 
11326.) 
Previous project. For details see Annual Report 
for 1938. 
Existing project. Project provides for a channel 10 
feet by 100 feet from Houston Ship Channel to Bayou 
Mile 11.0. Channel was completed from Houston Ship 
Channel to first bend in Cedar Bayou above the mouth 
in 1931. Channel from Mile -0.1 to Mile 3.0 was 
completed in March 1975. Channel from 3.0 to Mile 
40-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
11.0 was deauthorized under Sec. 12 of Public Law 93- 
251 and re-authorized in December 2000 under Sec. 349 
(a)(2) of Public Law 106-541, the Water Resources 
Development Act of 2000. Project also includes jetties 
at mouth of bayou provided for under previous project. 
Under ordinary conditions, mean tidal range is 
about 0.6 feet and extreme range 1.2 feet. Height of 
tides is dependent largely on the wind, and during 
strong "northers" in the winter season water surface may 
be depressed 2 feet below mean low tide. (See Table 
40-G for total cost of existing project to September 30, 
2000.) 
Local cooperation. Fully complied with. 
Terminal facilities. U.S. Steel Company has a 
barge dock at bayou mile 2.8, and there are a few small 
wharves, privately owned, for local use at various places 
along Cedar Bayou. Facilities are considered adequate 
for existing commerce. 
Operations during fiscal year. Maintenance: 
Routine maintenance. (See Table 40-J for dredging 
operations.) 
4. CHANNEL TO PORT BOLIVAR, TX 
Location. Port Bolivar is at end of Bolivar 
Peninsula and 4 miles north of city of Galveston. 
Channel connects the port with channel in Galveston 
Harbor. (See National Ocean Survey Chart 11324.) 
Previous project. For details see page 1856 of 
Appendix to Annual Report for 1915. 
Existing project. Existing project dimensions for 
channel are shown in Table 40-H. (Also see Table 40-B 
for authorizing legislation.) 
Under ordinary conditions, mean tidal range is 
about 1.3 feet and extreme range 2 feet. Height of tides 
is dependent largely on the wind, and during strong 
"northers" in the winter season water surface may be 
depressed 2 feet below mean low tide. Enlargement of 
turning basin from 1,000 to 1,600 feet is inactive. A 
channel 14 feet deep, 200 feet wide, and approximately 
950 feet long is maintained across the east end of the 
turning basin to accommodate the Galveston-Port 
Bolivar ferry. Project is complete except for inactive 
portion. Project dimensions have not been maintained 
in the completed part since lesser dimensions are 
adequate for existing commerce. (See Table 40-G for 
total cost of existing project to September 30, 2000.) 
Local cooperation. None required. 
Terminal facilities. Terminals are privately owned 
and consist of 2 slips and 2 piers. The piers, 400 feet 
wide by 1,200 feet long and 210 feet wide by 1,200 feet 
long, are badly deteriorated and not in use. The slips 
are used as anchorage by shallow-draft vessels. A 
highway ferry landing owned by the State of Texas is 
located at south end of turning basin. Facilities are 
considered adequate for existing commerce. 
Operations during fiscal year. Maintenance: 
Routine maintenance. (See Table 40-J for dredging 
operations.) 
5. CLEAR CREEK AND CLEAR LAKE, 
TX 
Location. Clear Creek has its source about 18 
miles south of Houston, Texas, and flows southeast for 
about 25 miles, emptying into west side of upper 
Galveston Bay at a point 24 miles north west of 
Galveston, Texas. (See National Ocean Survey Chart 
11326.) 
Existing project. Project provides for 1.5 miles of 
channel 7 feet by 75 feet from Galveston Bay to mouth 
of Clear Creek; 0.7 miles of channel 7 feet by 60 feet, 
known as North Fork Channel; and 7.7 miles of channel 
7 feet by 60 feet through Clear Creek and Clear Lake. 
The project was completed in June 1950. 
Under ordinary conditions, mean tidal range is 
about 0.8 foot and extreme range 1.4 feet. Height of 
tides is dependent largely on the wind, and during 
strong "northers" in the winter season water surface may 
be depressed 2 feet below mean low tide. 
Local cooperation. Fully complied with. 
Terminal facilities. Consist of small privately 
owned wharves, several ship repair yards and marinas 
which accommodate light commercial vessels and 
pleasure yachts. These are along lake shore and at 
towns of Seabrook and Kemah at mouth of creek. A 
commercial shell loading dock is located near League 
City at the head of NASA-Manned Spacecraft Center 
has a barge dock along lake shore near their property. 
Operations during fiscal year. Maintenance: No 
maintenance required for fiscal year. 
6. CORPUS CHRISTI SHIP CHANNEL, 
TX 
Location. This project, formerly known as Port 
Aransas-Corpus Christi Waterway, Texas, was changed 
to Corpus Christi Ship Channel, Texas, by 1968 River 
and Harbor Act. This is a consolidation of old 
improvements of Port Aransas, Texas, and channel fronm 
Aransas Pass to Corpus Christi, Texas. Aransas Pass is 
on southern portion of Texas Coast, 180 miles 
southwest of Galveston and 132 miles north of mouth of 
Rio Grande. Aransas Pass connects Corpus Christi Bay 
with the gulf. Waterway extends from deep water in the 
gulf through Aransas Pass jettied entrance, thence 
westerly 20.75 miles to and including a turning basin a 
Corpus Christi, thence westerly 1.75 miles through 
Industrial Canal to and including turning basin at Avery 
40-4

GALVESTON, TX, DISTRICT 
Point, thence westerly 4.25 miles to and including a 
turning basin near Tule Lake, thence northwesterly 1.8 
miles to and including a turning basin at Viola, Texas. 
(See National Ocean Survey Charts 11308, 11309, 
11311, and 11314.) 
Previous project. For details see page 1861 of 
Annual Report for 1915. 
Existing project. (See Table 40-H for existing 
project dimensions provided for in various channels and 
basins comprising this waterway.) 
Project also provides for two rubblestone jetties at 
Aransas Pass entrance, extending into the gulf from St. 
Joseph and Mustang Islands, project lengths of which 
are 11,190 and 8,610 feet, respectively. Project further 
provides for a stone dike on St. Joseph Island about 
20,991 feet long, connecting with north jetty and 
extending up this island to prevent a channel being cut 
around jetty. Project also provides for a breakwater at 
the entrance to the harbor area at Port Aransas, and for 
the realignment of the existing 12-foot by 100-foot 
project channel to Port Aransas. The breakwater 
consists of two overlapping sections. The one on the 
east side of the realigned entrance channel has a length 
of 830 feet and the second, located on the west side of 
the entrance channel, has a length of 1,290 feet. The 
channel to Port Aransas was relocated in the 300-foot 
clear distance between the overlapping sections. The 
portion of the channel remaining inside the breakwaters 
was widened to 150 feet. Under ordinary conditions, 
mean tidal range at Aransas Pass is about 1.1 feet and 
extreme range about 2 feet, and at Corpus Christi mean 
range about 1 foot and extreme about 1.5 feet. Heights 
of tides are dependent largely on strength and directions 
of winds, and during strong "northers" in the winter 
season water surface may be depressed as much as 3 
feet below mean low tide. Estimated cost for new work 
is: Federal (Corps) $74,938,515, including $456,515 for 
Port Aransas Breakwaters and exclusive of amount 
expended on previous projects: and non-Federal 
$18,977,431 (includes $768 for Port Aransas 
Breakwaters) including $7,644,435 contributed funds 
and value of useful work performed, $3,320,228 lands, 
$6,027,000 relocations and $1,985,000 other cost. 
(October 1, 1992 base price.) 
The Port Aransas-Corpus Christi 40-foot project 
was completed in 1966. The Jewel Fulton Canal was 
completed in 1963. The Port Aransas Breakwaters were 
completed in July 1973. Deepening deep-draft channels 
to 45 feet from Tule Lake Turning Basin through Viola 
Turning Basin was completed in 1989, and constructing 
a mooring area at Port Ingleside with dolphins has been 
deferred. Entrance and jetty channels have been dredged 
to project depth and width, and dredging of channel 
from Harbor Island to and through the Chemical 
Turning Basin at 45-foot depth has been completed. 
Initial mooring dolphins were completed in May 1979. 
Disposal area levees, Area 1 and Rincon were 
completed in August 1984. First stage disposal area 
levees, South Shore, were completed in September 
1984. Construction contract for mitigation terracing 
was completed in 1997. (See Table 40-G for total cost 
of existing project to September 30, 2000.) 
Local cooperation. Fully complied with. 
Terminal facilities. Terminal facilities on Harbor 
Island at head of Aransas Pass, Ingleside, Corpus 
Christi, La Quinta, Avery Point, and Viola, are 
considered adequate for existing commerce. (See Port 
Series, No. 25, revised 1993, Corps of Engineers.) 
Operations during fiscal year. Maintenance: 
Routine maintenance. (See Table 40-J for dredging 
operations.) 
7. DOUBLE BAYOU, TX 
Location. Enters Trinity Bay on the east side about 
30 miles north of Galveston and about 8.25 miles south of 
Anahuac, Texas. 
Existing Project. Project provides for a channel 7 
feet by 125 feet from the mouth of Double Bayou to the 7- 
foot contour in Trinity Bay, a length of 3.9 miles; and a 
channel, know as West Fork, 7 feet by 100 feet for a length 
of 2.0 miles. The project was completed in 1971. 
Under ordinary conditions mean tidal range is about 
0.5 feet and extreme range is about 1.2 feet. Height of 
tides is dependent largely on winds, and during strong 
north winds in the winter season, water surfaces may be 
depressed 1.5 feet below mean low tide. (See National 
Ocean Survey Chart 11326.) 
Local cooperation. Fully Complied with. 
Terminal facilities. Facilities are privately owned. 
At the mouth of the bayou is a timber wharf for loading oil 
barges. Between miles 1 and 1.5 above the mouth is a 
timber wharf, a boat slip, and a marine railway owned by 
the Brown and Root Corporation. At mile 3 above the 
mouth is a small depot for handling oyster shell. The 
facility consists of a timber bulkhead and hoppers for 
loading trucks. One-half mile above the mouth are several 
fishing vessel docks. 
Operations during fiscal year. Maintenance: 
maintenance required for Fiscal Year 2000. 
No 
8. FREEPORT HARBOR, TX 
Location. Formed by improvement of Brazos 
River, Texas, from mouth to about 6 miles upstream to 
Freeport, Texas. (See National Ocean Survey Charts 
11321 and 11322.) 
Previous projects. For details see page 1860 of 
Annual Report for 1915, and page 872 of Annual Report 
for 1938. 
40-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Existing project. Existing project dimensions for 
various channels and basins are shown in Table 40-H on 
channel dimensions at end of chapter. 
Existing project also provides for dual jetties and a 
diversion canal for the Brazos River, including a dam, a 
lock in the dam and necessary auxiliary equipment. 
Also provides for rehabilitation of southwest jetty and 
the relocation of the northeast jetty (about 640 feet to 
the northeast); realignment of the channel between the 
Jetty Channel and Brazosport Turning Basin; 
realignment of the channel between Brazosport Turning 
Basin and Upper Turning Basin; relocation of Upper 
Turning Basin; and public use facilities adjacent to the 
Freeport Jetties. The 30-foot channel from Upper 
Turning Basin to Stauffer Chemical Plant, including the 
turning basin, was deauthorized by Sec. 12 of PL 93- 
251. Construction of lock in diversion dam at local 
expense is considered inactive. 
The 38-36 foot project was completed in 1962. The 
45-foot channel was completed in 1993 as follows: 
Relocation of the U. S. Coast Guard station was 
completed in May 1990; dredging the channel and 
turning basin to 36-feet and the Upper Turning Basin to 
46-feet was completed in July 1990; dredging the jetty 
channel and the Lower Turning Basin was completed in 
November 1990; Construction of 3,700 feet of the 
North Jetty, was completed in March 1991; dredging 
the entrance channel was completed in April 1992; 
dredging the Main channel, Brazosport turning basin 
and jetty channel was completed in June 1992; 
construction of public use facilities and grading and 
stone protection was completed in August 1992; and 
rehabilitation of the south jetty and addition of 500-feet 
to the north jetty was completed in May 1993. 
Navigation problems were identified by the Local 
Sponsor and pilots, and a contract to make channel 
adjustments to a bend near the project main turning 
basin was completed in 1998 to provide full utilization 
of the 45-foot channel. Project is essentially complete. 
Construction of final recreation area at Quintana by the 
Local Sponsor is the last remaining item. (See Table 40- 
G for total cost of existing project to September 30, 
2000.) 
Under ordinary conditions mean tidal range is about 
1.5 feet and extreme range is about 2.5 feet. Except 
under extreme conditions, rises on river and in diversion 
channel do not cause greater variations in water surface 
than those caused by tidal action. Estimated cost of new 
work is: $63,707,000 Federal (Corps) and $470,000 
Federal (USCG); and $32,313,000 non-Federal, 
including $21,302,000 contributed funds, $300,000 
contributed work, $6,967,000 lands, $3,174,000 levees 
and spillways, and $570,000 relocations. (October 1, 
1997 base price.) 
Local cooperation. Fully complied with except for 
Section 101 of River and Harbor Act of 1970, under 
cost-sharing tenets of the Water Resources 
Development Act of 1986 and the Water Resources 
Development Act of 1996. Local Cooperation 
Agreement, executed June 26, 1986, along with 
Amendments 1, 2, 3, and 4 executed March 19, 1987; 
July 19, 1991; July 19, 1991; and July 15, 1997; 
respectively, require that local interest provide lands, 
easements, rights-of-way, including land for recreation, 
and dredged material disposal areas, presently estimated 
at $10,141,000, modify or relocate utilities, roads, and 
other facilities, except railroad bridges, where necessary 
for construction of the project, presently estimated at 
$570,000, contribute in cash one-half of the separable 
and joint costs allocated to recreation, presently 
estimated at $530,000; and, during construction, pay 25 
percent of the construction costs allocated to deep-draft 
navigation, including disposal facility construction, 
presently estimated at $21,302,000. 
Terminal facilities. Small privately owned 
wharves, two oil docks, one acid dock, two shell 
unloading docks and one caustic dock. Brazos River 
Navigation District has one large dock with four transit 
sheds over rail facilities permitting all-weather work. 
Facilities considered adequate for existing commerce. 
(See Port Series No. 26, revised 1991, for additional 
facilities.) 
Operations during fiscal year. New Work: No 
new work for FY 00. 
Maintenance: Routine maintenance. (See Table 40- 
J for dredging operations.) 
9. GALVESTON HARBOR AND 
CHANNEL, TX 
Location. A consolidation of authorized 
improvements at Galveston, Texas, which includes 
projects formerly identified as Galveston Harbor, Texas; 
Galveston Channel, Texas; and Galveston seawall 
extension. Entrance to Galveston Harbor is on Gulf of 
Mexico on the northern portion of the Texas Coast. 
Galveston Channel extends from a point in Galveston 
Harbor between Bolivar Peninsula and Fort Point to and 
along wharf front Galveston, Texas, and is about 5 
miles long and 1,200 feet wide. (See National Ocean 
Survey Chart 11324/5.) 
Previous projects. For details see page 1854 of 
Annual Report for 1915. 
Existing project. Provides for channel dimensions 
in sections of the waterway shown in Table 40-H. 
Also provided are: two rubble-mound jetties, the 
south one extending from Galveston Island and the 
north one extending from Bolivar Peninsula, for 
distances of 35,900 feet and 25,907 feet, respectively, 
40-6

GALVESTON, TX, DISTRICT 
into the Gulf of Mexico; a concrete seawall from the 
angle at Sixth Street and Broadway, in the city of 
Galveston, to the south jetty, and a 16,300-foot 
extension of the concrete seawall in a southwesterly 
direction from 61st Street; for 11 groins along the gulf 
shore between 12th Street and 61st Street; and for 
maintenance of seawall from the angle at 6th Street and 
Broadway to the south jetty. Under ordinary conditions, 
mean tidal range in Galveston Harbor is 1.6 feet on 
outer bar and 1.4 feet on inner bar with extreme ranges 
of 2.3 and 2.1 feet, respectively. Mean range in 
Galveston channel is about 1.3 feet and extreme range 
about 2 feet under ordinary conditions. Height of tides 
in both Galveston harbor and channel is dependent 
largely on the wind, and during strong "northers" water 
surface may be depressed 2 feet below mean low tide. 
Existing project is complete. Dredging of Galveston 
channel to 36-foot depth was completed in November 
1966. Dredging of the realigned entrance and Outer Bar 
Channel was completed in October 1967. Rehabilitation 
of the Beach Front Groins was completed June 1970. 
Dredging of Galveston channel to 40 feet was 
completed in March 1976. See Section 16. TEXAS 
CITY CHANNEL, TX regarding work authorized by 
Water Resources Development Act of 1986, Section 11, 
HOUSTON-GALVESTON NAVIGATION 
CHANNELS, TX, for work authorized by the Water 
Resources Development Act of 1996. (See Table 40-G 
for total cost of existing project to September 30, 2000.) 
Local cooperation. Complied with. 
Terminal facilities. None on Galveston Harbor, 
which is entrance channel leading to terminal facilities 
on Galveston, Texas City, and Houston Ship Channels. 
Galveston Channel terminal facilities are mostly on 
south side of channel. Principal wharves, owned by the 
city of Galveston, extend from 10th to 41st Street (see 
Port Series No. 23, revised 1996). A container ship 
terminal equipped with a crane capable of stacking 
containers three units high on the deck of any normal 
container ship has been completed and placed into 
operation by the city of Galveston at Piers 10 and 11, on 
the south side of Galveston Channel. The city of 
Galveston has also placed into operation a barge 
terminal equipped with two 35-ton and one 5-ton cranes 
for loading and unloading barges on Lash and Seabee 
ships at Pier 35 and a docking and holding area for Lash 
and Seabee barges on Pelican Island, directly across the 
channel from Piers 35 and 36. Present facilities are 
Considered adequate for existing commerce. 
Operations during fiscal year. New Work: See 
Section 11, HOUSTON-GALVESTON NAVIGATION 
CHANNELS, TX. 
Maintenance: Routine Maintenance. Also see 
Section 11, HOUSTON-GALVESTON NAVIGATION 
CHANNELS, TX. (See Table 40-J for dredging 
operations.) 
10. GULF INTRACOASTAL 
WATERWAY BETWEEN 
APALACHEE BAY, FL, AND THE 
MEXICAN BORDER 
Location. Extends from a point on Sabine River 
about 3 miles below Orange, Texas, to Brownsville, 
Texas, about 421 miles; a navigation channel, about 7 
miles long, in Colorado River, extending from 
Matagorda, Texas, to Gulf of Mexico; a tributary 
channel in San Bernard River, extending from 
Intracoastal Waterway crossing to State highway bridge 
some 30 miles above crossing; a tributary channel in 
Colorado River extending from Intracoastal Waterway 
upstream 15.5 miles; a tributary channel extending 
about 14 miles from Intracoastal Waterway to Palacios, 
Texas; a tributary channel extending about 2 miles from 
Intracoastal Waterway to Rockport, Texas; a tributary 
channel extending about 6 miles from Intracoastal 
Waterway near Port Aransas, Texas, to town of Aransas 
Pass, Texas; a tributary channel about one-fourth mile 
long extending from Intracoastal Waterway near Port 
O'Connor, Texas, into Barroom Bay; a tributary 
channel extending about 38.8 miles from Intracoastal 
Waterway via Seadrift to a point in Guadalupe River 5.5 
miles below Victoria, Texas; a harbor of refuge for 
small craft at Seadrift; a channel extending from gulf to 
Port Mansfield, Texas, about 11 miles; and a tributary 
channel in Arroyo, Colorado extending from 
Intracoastal Waterway to a point near Harlingen, Texas, 
about 31 miles; side channels in vicinity of Port Isabel, 
Texas, and a small boat basin at Port Isabel, Texas, and 
a tributary channel extending from Intracoastal 
Waterway main channel at a point in West Galveston 
Bay into Offatts Bayou about 2.2 miles with a west 
turnout (wye connection) 12 feet deep and 125 feet wide 
between Offatts Bayou Channel and the Gulf 
Intracoastal Waterway. (See National Ocean Survey 
Charts 11302, 11303, 11305, 11306, 11308, 11309, 
11314, 11315, 11317, 11319, 11322, 11326, and 
11331.) 
Previous project. For details see page 1859 of 
Annual Report for 1915. (West Galveston Bay and 
Brazos River Canal, Texas.) 
Existing project. Existing project dimensions 
provided for in main channel of waterway: A channel 
12 feet deep (below mean low tide) and 125 feet wide 
from the Sabine River to Brownsville, Texas. 
Relocation of channel 12 feet deep by 125 feet wide in 
Matagorda Bay, miles 454.3 to 471.3, relocation of 
channel 12 feet deep by 125 feet wide in Corpus Christi 
Bay, miles 539.4 to 549.7 (mileage is west of Harvey 
40-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Lock, Louisiana); and alternate channel, 12 feet deep 
(below mean low tide) and 125 feet wide via Galveston 
Channel and Galveston Bay to the Galveston causeway; 
maintenance of existing channel 12 feet deep by 125 
feet wide through Lydia Ann Channel, between Aransas 
Bay and Aransas Pass; provisions of such passing 
places, widening of bends, locks and guard locks, 
railway bridges over artificial cuts as are necessary, and 
the tributary channels shown in tabulation. The 
authorized channel 16 feet deep and 125 feet wide from 
Sabine River to Houston Ship Channel is inactive. (See 
Table 40-1 on existing project dimensions provided for 
in tributary channels.) 
Removal of the railroad bridge across the canal at 
Mud Bayou was completed and operation and care of 
the facility was discontinued on April 14, 1969. 
Deepening the existing 6 foot by 60 foot side channels 
at Port Isabel to 12 feet was completed February 22, 
1972, Offatts Bayou channel was completed January 
1974. Relocation of main channel across Corpus Christi 
Bay was completed in September 1976. The 14 foot by 
175 foot Channel to Aransas Pass was completed in 
April 1979. Dredging Chocolate Bayou Channel was 
completed in January 1981. Construction of a saltwater 
barrier in Chocolate Bayou was completed in February 
1981. The 12 foot by 125 foot channel relocation route 
in Matagorda Bay has been deauthorized. The Harbor of 
Refuge at Seadrift, Texas, has been placed in the 
inactive category. 
Mouth of Colorado River: Construction of jetties 
at mouth of Colorado River was completed in 1986. 
Construction of a navigation channel from the Gulf to 
the GIWW and an impoundment basin were fiscally 
completed in 1991. Construction of Tiger Island Dam 
and recreation facilities were also completed in 1991. 
Construction of the recreation facilities at Jetty Park was 
completed in 1992. Construction of the diversion dam 
and connecting channel was completed in 1993. 
Construction of the oyster cultch was completed in 
1995. 
Brazos River Floodgates- Major Rehabilitation: 
Major rehabilitation of the East Floodgate Guidewalls 
was completed in 1997. The cost of rehabilitation was 
$2,750,000 Federal (Corps) and $2,750,000 Federal 
(Inland Waterways Trust Fund). 
Sargent Beach: Work authorized by the Water 
Resources Development Act of 1992 for construction of 
a concrete-pile and concrete block revetment structure 
which extends 8 - miles to protect the Gulf Intracoastal 
Waterway was completed in 1998. Construction cost 
was $29,460,000 Federal (Corps) and $29,460,000 
Federal (Inland Waterways Trust Fund). 
Active authorized work remaining consists of the 
following: (1) Work authorized by the Water Resources 
Development Act of 1988 for enlarging the existing 
Channel to Victoria from a depth of 9 feet and width of 
100 feet to a depth of 12 feet and width of 125 feet. 
(2) Aransas National Wildlife Refuge, work authorized 
by the Water Resources Development Act of 1996 for 
construction of bank protection and a spill containment 
system through the critical habitat for the endangered 
whooping crane. (See Table 40-G for total cost of 
existing project to September 30, 2000.) 
Mean tidal variation is 0.5 foot at Orange, 1 foot at 
Port Arthur, 1.3 feet in Galveston Bay, 1.5 feet at 
Freeport, 1 foot in Matagorda Bay, 1 foot in San 
Antonio Bay, 1 foot at Corpus Christi, 1.5 feet at Port 
Isabel, and 1.5 feet at Brownsville. Extreme ranges of 
tide under ordinary conditions are 1 foot at Orange, 1.5 
feet at Port Arthur, 2 feet in Galveston Bay, 2 feet at 
Freeport, 1.5 feet in Matagorda and San Antonio Bays, 
1.5 feet at Corpus Christi, 2 feet at Port Isabel, and 1.5 
feet at Brownsville. Height of tides is dependent largely 
on wind. Strong north winds have depressed water 
surface as much as 2 feet below mean low tide. 
Estimated cost for new work is: 
Channel to Victoria - $28,391,000 Federal 
(Corps), $422,000 Federal (Department of 
Transportation), $62,000 Federal (U.S. Coast Guard), 
and $6,645,000 non-Federal consisting of $3,155,000 
cash, $1,646,000 lands, $190,000 fender system, and 
$1,654,000 levees and other associated costs. (October 
1, 2000 base prices.) 
Aransas National Wildlife Refuge - $15,430,000 
Federal (Corps). (October 1, 2000 base prices.) 
Local cooperation. Fully complied with except for 
provisions of Section 101, 1968 River and Harbor Act 
and Water Resources Development Act of 1988. The 
Project Cooperation Agreement for Channel to Victoria 
was executed November 17, 1994. 
Terminal facilities. There are terminal facilities at 
Aransas Pass, Port Arthur, Galveston, Port Isabel, and 
Brownsville. See Port Series No. 22 (revised 1988), Port 
Series No. 23 (revised 1996), Port Series No. 25 
(revised 1983) and Port Series No. 26 (revised 1991), 
Corps of Engineers. Local interests constructed terminal 
facilities at Port Mansfield and Port Harlingen. There 
are numerous privately owned piers and wharves along 
the waterway. A 330-foot navigation district owned 
general cargo dock, a 770-foot private dock and a 760- 
foot private timber trestle have recently been completed 
at the upper end of the Channel to Victoria. Facilities 
are adequate for existing commerce. 
Operations during fiscal year. 
New Work: - 
Channel to Victoria - The construction contcrat 
for dredging Stations 835+00 to 1300+00, awarded May 
28, 1999, was completed in August 2000 at a cost of 
$3,858,122 (Federal) and $428,680 (contributed funds) 
40-8

GALVESTON, TX, DISTRICT 
A construction contract for dredging Stations 1300+00 
to 1841+21.69 was awarded September 29, 2000. No 
cost was incurred for FY 00. 
Aransas National Wildlife Refuge - The contract 
for erosion protection at Welder Flats, awarded March 
1999 and physically completed in September 1999 was 
financially completed in FY 00 with a final cost of 
$11,090. The final erosion protection and channel 
improvement contract was awarded March 20, 2000 and 
was 97 percent complete at year-end with a cost of 
$4,153,185. Cost incurred for a Dredged Material 
Management Plan was $282,390 for FY 99 and $69,266 
for FY 00. 
Maintenance: - 
Main Channel and Tributaries - Repairs to 
mooring dolphins along the GIWW at a cost of 
$491,665 were made in FY 00. The cost incurred for 
2000 for Dredged Material Management Plans was 
$216,213 for Corpus Christi to Port Isabel. (See Table 
40-J for dredging operations.) 
Aransas National Wildlife Refuge - No 
maintenance cost was incurred for FY 00. 
Brazos River Floodgates - The Brazos River 
Floodgates were operated and maintained at a cost of 
$1,082,296. A construction contract to rehabilitate the 
east and west floodgates was awarded May 17, 2000 
and continued through Fiscal Year 2000 at a cost of 
$400,000. 
Channel to Victoria - A mowing contract was 
awarded in February 2000 at a cost of $28,300. 
A series of archeological services contracts were 
issued during FY 00 for continued cultural resources 
work at Channel to Victoria Barge Canal sites 41CL59, 
41CL76, and 41VT98. Continued artifact analysis and 
processing (FY 00 total of $280,854) was conducted for 
site 41CL59, which was initially excavated under full 
data recovery mitigation in FY 97. Site 41CL59 is an 
extensive prehistoric shell and earth midden with an 
occupation range dating from 400 B.C. to A.D. 1000. 
Archeological site 41CL76 is located just upstream 
from 41CL59. The site was tested for National Register 
of Historic Places eligibility during FY 99 for a total 
cost of $61,233. Post-testing work, including 
preparation, review, and approval of the final report of 
ivestigations, indicates that 41CL76 is eligible for 
National Register- and will require data recovery 
excavations prior to it's eventual demise due to ongoing 
bankline erosion along the Barge Canal. Initial data 
recovery excavations were launched during the last 
quarter of FY 00 for site 41VT98. The site has been 
identified as Archaic Period (ca. 2,500-3,500 B.C.) 
cemetery and occupation site. Data recovery (field 
Work) excavations were issued under a separate delivery 
order for a total of $526,808. Excavations are planned to 
continue through FY 01, followed by post- fieldwork 
artifact analysis and report preparation that will be 
conducted throughout FY 01 and upcoming fiscal years 
02-03. 
Colorado River Locks - The Colorado River 
Locks were operated and maintained at a cost of 
$1,038,173. 
Channel to Port Mansfield - Routine 
Maintenance. (See Table 40-J for dredging operations.) 
Chocolate Bayou -Cost incurred for a Dredged 
Material Management Plan was $34,354. Routine 
maintenance. (See Table 40-J for dredging operations.) 
Mouth of Colorado River - A contract to 
rehabilitate the jetty walkway was awarded August 22, 
2000 and incurred a cost of $50,000 for FY 00. (See 
Table 40-J for dredging operations.) 
11. HOUSTON-GALVESTON 
NAVIGATION CHANNELS, TX 
Location. Houston Ship Channel connects 
Galveston Harbor, at a point opposite Port Bolivar, with 
city of Houston, Texas, extending 50 miles 
northwesterly across Galveston Bay through San Jacinto 
River and Buffalo Bayou to a turning basin at head of 
Long Reach with light-draft channel 5 miles long from 
turning basin to Jensen Drive, Houston. The entrance 
to Galveston Harbor and Channel is on Gulf of Mexico 
on the northern portion of the Texas Coast. Galveston 
Channel extends from a point in Galveston Harbor 
between Bolivar Peninsula and Fort Point to and along 
wharf from Galveston, Texas and is about 5 miles long 
and 1,200 feet wide. (See National Ocean Survey 
Charts 11324/5, 11327, 11328, and 11329.) 
Existing project. See Section 9, GALVESTON 
HARBOR AND CHANNEL, TX and Section 12, 
HOUSTON SHIP CHANNEL, TX for project prior to 
October 1998. New authorized project provides for 
enlarging the Houston Ship Channel to a depth of 45 
feet over a width which varies between 650 and 1,112 
feet, and deepening the Galveston Harbor Channel to 47 
feet (45-feet authorized and 2 feet for dredging 
inaccuracies and wind impact) over its original 800-foot 
width and 10.5 mile length; and extending the channel 
an additional 3.9 miles to the 47-foot bottom contour in 
the Gulf of Mexico along existing alignment. A 
dredged-material disposal plan, which would utilize 
confined or beneficial uses of dredged material in the 
bay and/or offshore disposal and 118 acres of Oyster 
mitigation is also provided in the project. Estimated 
cost for new work is: $379,177,000 Federal (Corps) 
which includes $86,726,000 for deferred environmental 
construction; $3,720,000 Federal (U.S. Coast Guard); 
and $129,803,000 non-Federal consisting of 
$66,273,000 cash, $994,000 lands, and $54,000 
relocations for general navigation features; $8,977,000 
40-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
for berthing areas; and $53,505,000 cash for 
environmental restoration which includes $28,909,000 
for deferred environmental construction. (October 1, 
2000 base price.) 
The dredging plan for construction consists of nine 
reaches as follows: Offshore Entrance Channel 
Extension, Offshore Jetty and Entrance Channel, Lower 
Bay, Mid-Bay, Upper Bay, Lower Bayou, Goat Island, 
Upper Bayou and the Galveston Channel. Other 
construction includes Oyster Reef Mitigation and 
creation of marsh sites at Lower Bay, Mid Bay and 
Upper Bay disposal areas. 
The first construction contract to dredge the 
Entrance Channel Extension, awarded August 7, 1998, 
was completed in 1999. The contract for dredging the 
entrance channel and jetty area was completed in March 
2000. The Oyster Reef Mitigation contract was 
completed in July 2000. Construction continued through 
FY 00 on the Lower Bay and the Upper Bayou 
contracts. Construction was initiated on Upper Bay and 
Lower Bayou in FY 00. 
Local cooperation. Complied with for the 
completed work. For the Houston-Galveston 
Navigation Channels project, authorized by the Water 
Resources Development Act of 1996, the cost-sharing 
and financing concepts reflected in the Water Resources 
Development Act of 1986, as amended, apply. Local 
interests are required to provide lands, easements, 
rights-of-way, roads and other facilities, except railroad 
bridges; pay one-half of the separable and joint costs 
allocated to recreation; and pay 25 percent of the costs 
allocated to deep-draft navigation, during construction 
including in-kind work in connection with construction; 
and pay an additional 10 percent of the costs allocated 
to navigation within a period of 30 years following 
completion if not offset by credit allowed for lands, 
easements, rights-of-way, and relocations. 
The Port of Houston Authority and the City of 
Galveston are the sponsors for the project. A Project 
Cooperation Agreement with the Port of Houston 
Authority was executed on June 10, 1998. The Project 
Cooperation Agreement with the City of Galveston is 
pending. 
Terminal facilities. See Section 9, GALVESTON 
HARBOR AND CHANNEL, TX and Section 12, HOUSTON SHIP 
CHANNII.TX. 
Operations during fiscal year. New Work: The 
construction contract for dredging the remaining 
entrance channel and jetty area, awarded March 19, 
1999, was physically completed in March 2000 and 
incurred a cost of $24,040,274 for FY 00. Construction 
contract for dredging Lower Bay, awarded September 4, 
1998, continued through FY 00 at a cost of 
$32,799,150. The construction contract for dredging 
Upper Bayou, awarded October 26, 1998, continued 
through FY 00 at a cost of $4,912,288 for the year. The 
contract to construct an oyster reef, awarded March 12, 
1999, was physically completed in July 2000 for a FY 
00 cost of $12,420,249. A construction contract for 
dredging Upper Bay was awarded January 19, 2000, and 
continued through FY 00 at a cost of $11,871,049. The 
contract to dredge Lower Bayou was awarded April 21, 
2000 and continued through FY 00 at a cost of 
$5,351,938. 
Maintenance: See Section 9, GALVESTON 
HARBOR AND CHANNEL, TX and Section 12, 
HOUSTON SHIP CHANNEL, TX for maintenance of 
existing channels. (See Table 40-J for dredging 
operations.) 
12. HOUSTON SHIP CHANNEL, TX 
Location. Connects Galveston Harbor, at a point 
opposite Port Bolivar, with city of Houston, Texas, 
extending 50 miles northwesterly across Galveston Bay 
through San Jacinto River and Buffalo Bayou to a 
turning basin at head of Long Reach with light-draft 
channel 5 miles long from turning basin to Jensen 
Drive, Houston. (See National Ocean Survey Charts 
11324/5, 11327, 11328, and 11329.) 
Previous project. For details see page 1856 of 
Annual Report for 1915. 
Existing project. Provides for channel dimensions 
in sections of the waterway shown in Table 40-H. 
Also provides for certain cut-offs, for easing sharp 
bends, an earthen dam across the upper end of Turkey 
Bend, and for off-channel silting basins as deemed 
necessary by the Chief of Engineers. Construction of 
26,000 linear feet of pile dike to protect the channel in 
upper Galveston Bay was deauthorized by Sec. 12 of PL 
93-251. The 40-foot project was completed in March 
1966. Dredging a channel in Greens Bayou to Mile 1.57 
was completed in 1970. Dredging Greens Bayou, Mile 
1.57 to Mile 2.73, has been deauthorized. See Section 
11, HOUSTON-GALVESTON NAVIGATION 
CHANNELS, TX for. work authorized by the Water 
Resources Development Act of 1996. (See Table 40-G 
for total cost of existing project to September 30, 2000.) 
Mean tidal range under ordinary conditions is 0.6 
foot to 1.3 feet in lower part of Galveston Bay; 0.6 foot 
to 1.3 feet in upper bay; and 0.5 to 1 foot in San JacintO 
River and Buffalo Bayou. Extreme ranges under 
ordinary conditions are about 2 feet, 1.2 feet and I foot, 
respectively. Freshets caused rises of over 12 feet in 
Buffalo Bayou; however, this condition has not 
occurred since completion of Addicks and Barker Dans 
for flood control on upper watershed of Buffalo BayoU 
Height of tides is dependent largely on the wind, and 
during strong "northers" in winter season the water 
surface may be depressed 2 feet below mean low tide. 
40-10

GALVESTON, TX, DISTRICT 
Local cooperation. Fully complied with for 
Houston Ship Channel. Local Cooperation Agreement 
for assumption of maintenance on Bayport Ship 
Channel was executed April 6, 1993. Local Cooperation 
Agreements for assumption of maintenance on Barbour 
Terminal Channel and Greens Bayou Channel were 
both executed on February 8, 1994. 
Terminal facilities. City of Houston and Port of 
Houston Authority operate modem terminals which 
supplement privately owned wharves, piers, and docks, 
as described in Port Series No. 24 (revised 1989), Corps 
of Engineers. Facilities are considered adequate for 
existing commerce. 
Operations during fiscal year. New Work: See 
Section 11, HOUSTON-GALVESTON NAVIGATION 
CHANNELS, TX. 
Maintenance: A contract for emergency levee 
relocation of the Rosa Allen Placement Area was 
awarded October 29, 1999, and completed in FY 00 for 
a cost of $2,297,768. (See Table 40-J for dredging 
operations.) See Section 11, HOUSTON-GALVESTON 
NAVIGATION CHANNELS, TX. 
13. MATAGORDA SHIP CHANNEL, TX 
Location. This is a consolidation of shallow draft 
channel improvements of "Channel from Pass Cavallo 
to Port Lavaca, Texas," and deep draft channel 
improvements authorized under "Matagorda Ship 
Channel, Texas." Bar at Pass Cavallo is 125 miles 
southwest of Galveston entrance and 54 miles north of 
Aransas Pass. It connects Matagorda Bay with the gulf. 
Project extends across Matagorda Bay and Lavaca Bay 
to towns of Port Lavaca and Point Comfort. These two 
towns are on opposite sides of Lavaca Bay and both are 
about 26 miles northwest from Pass Cavallo. (See 
National Ocean Survey Chart 11316.) 
Existing project. Existing project dimensions 
provided for in various channels and basins are listed in 
Table 40-H on channel dimensions. 
Project also provides for dual jetties at entrance, 
south jetty extending 6,000 feet to 24-foot depth in the 
gulf and north jetty extending 5,900 feet to 24-foot 
depth. Under ordinary conditions mean tidal range is 
about 1 foot and extreme range about 2 feet. Height of 
tide is dependent largely on the wind, and during strong 
"fnorthers" in winter season the water surface may be 
depressed 2 feet below mean low tide. (See Table 40-G 
for total cost of existing project to September 30, 2000.) 
Local cooperation. Fully complied with. 
Terminal facilities. Privately owned facilities at 
Port Lavaca, municipally owned facilities at mouth of 
Lynn bayou, privately owned and publicly owned 
facilities at Point Comfort, Texas. These facilities are 
considered adequate for present commerce. Facilities at 
Point Comfort consist of a channel, turning basin with 
wharfs, oil dock and loading equipment, all owned by 
Aluminum Company of America; and a wharf built by 
local interest at Point Comfort turning basin. 
Operations during fiscal year. Maintenance: 
Routine maintenance. (See Table 40-J for dredging 
operations.) 
14. NECHES RIVER AND 
TRIBUTARIES, SALT WATER 
BARIER AT BEAUMONT TX 
Location. The project is located just below the 
Big Thicket National Preserve and the confluence of 
Pine Island Bayou and the Neches River at Beaumont, 
Texas, in Jefferson and Orange Counties on the upper 
coast of Texas. (See National Ocean Survey Chart 
11343.) 
Existing project. The project will provide for an 
overflow dam in the Neches River, a gated salt water 
barrier consisting of five 56 feet by 24.5 feet tainter 
gates; a gated navigation bypass channel with a clear 
opening of 56 feet and a depth of 16 feet; an access road 
and levee; and an auxiliary dam across a canal which 
drains an adjacent bayou. Estimated cost for new work 
is $42,384,000 Federal (Corps) and $14,128,000 non- 
Federal consisting of $8,389,000 contributed funds, 
$222,000 for lands, $5,517,000 for relocations. (October 
1, 2000 base price.) 
The project was authorized for construction in the 
Water Resources Development Act of 1976 (Sec. 102, 
PL 94-587). The construction contract was awarded 
September 18, 2000 and work began in October. 
Local cooperation. Local Sponsor for the project is 
the Lower Neches Valley Authority. Report of the 
Chief of Engineers for the Water Resources 
Development Act of 1976 authorization cited a 1974 
Waterways Experiment Station report, which concluded 
that 75 percent of the salinity in the Neches River at 
Beaumont was due to the Federal deep draft navigation 
project to Beaumont and 25 percent was due to 
withdrawals by water users. From 1994 to 1996, the 
Corps reevaluated the project which resulted in a May 
1997 decision by the Assistant Secretary of the Army 
(Civil Works), to direct that the project go forward with 
75 percent Federal / 25 percent non-Federal cost-sharing 
as a navigation mitigation project. In October 1999, the 
Assistant Secretary of the Army (Civil Works) issued a 
decision stating that operations and maintenance will 
also be cost-shared as 75 percent Federal and 25 percent 
non-Federal. A Project Cooperation Agreement was 
executed on May 22, 2000. 
Terminal facilities. None. 
Operations during fiscal year. New Work: The 
architectural, engineering and design contract was 
40-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
completed in FY 00 at a fiscal year cost of $476,221. 
The contract to construct the saltwater barrier and the 
other project features was awarded September 18, 2000. 
No cost was incurred for FY 00. 
15. SABINE-NECHES WATERWAY, TX 
Location. This is a consolidation of old 
improvements of "Harbor at Sabine Pass and Port 
Arthur Canal" and "Sabine-Neches Canal, including 
Sabine River to Orange and Neches River to Beaumont, 
Texas." Sabine Pass is on Gulf of Mexico about 58 
miles east of Galveston and 280 miles west of 
Southwest Pass, Mississippi River. It connects Sabine 
Lake with gulf. Port Arthur canal extends 7 miles from 
near upper end of Sabine Pass to Port Arthur docks at 
mouth of Taylors Bayou. Near its upper end, Sabine- 
Neches canal joins and extends to mouths of Neches 
and Sabine Rivers. Waterway next extends up Neches 
River to Beaumont and up Sabine River to Orange. (See 
National Ocean Survey Charts 11341, 11342, and 
11343.) 
Previous projects. For details see page 1863 of 
Annual Report for 1915, page 985 of Annual Report for 
1916, and page 873 of Annual Report for 1926. 
Existing project. Existing project dimensions 
provided for in various channels and basins are set forth 
in Table 40-H on channel dimensions. Project also 
provides for two stone jetties at Sabine Pass entrance 
from the gulf, western jetty to be 21,905 feet long and 
eastern jetty 25,310 feet long. Project further provides 
for removal of guard lock in Sabine-Neches Canal, 
construction of suitable permanent protective works 
along Sabine Lake frontage owned by city of Port 
Arthur to prevent dredged material from entering Sabine 
Lake and to prevent erosion of material deposited, 
reconstruction of Port Arthur Bridge, and relocation of 
Port Arthur field office. Mean tidal variation at entrance 
is about 1.5 feet, at Port Arthur about 1 foot, and at 
Orange and Beaumont about 0.5 foot. Prolonged north 
winds during winter season have depressed water 
surface as much as 3.4 feet below mean low tide while 
tropical disturbances have caused heights as much as 8 
feet above mean low tide. 
Existing project is complete. Removal of 
obstructive bridge at Port Arthur was completed May 
1969. The high level fixed bridge across Sabine-Neches 
Canal was completed October 1970. Deepening project 
to 40 feet was completed April 1972. (See Table 40-G 
for total cost of existing project to September 30, 2000.) 
Local cooperation. Complied with. 
Terminal facilities. See volume 2, Port Series No. 
22 (revised 1988), Corps of Engineers. Facilities are 
considered adequate for present commerce. 
Operations during fiscal year. Maintenance: 
Routine Maintenance. A construction contract to repair 
the road on Placement Areas No. 8 and No. 11 awarded 
August 31, 1999, was completed in FY 00 at a cost of 
$1,895,864. A contract to repair the spillway pipes on 
the north spill box of Placement Area No. 11 was 
awarded September 29, 2000 and incurred a cost of 
$23,876 for FY 00. A contract for dewatering Placement 
Area No. 8 was awarded September 5, 2000 and a cost 
of $50,000 was expended in FY 00. Mosquito control 
spraying was performed in FY 00 for $58,006. (See 
Table 40-J for dredging operations.) 
16. TEXAS CITY CHANNEL, TX 
Location. Texas City is on the mainland of Texas 
on west side of Galveston Bay, about 10 miles 
northwest of city of Galveston. (See National Ocean 
Survey Charts 11324/5.) 
Previous projects. For details see page 1856 of 
Annual Report for 1915. 
Existing project. Provides for channel 40 feet 
deep, 400 feet wide and about 6.75 miles long, from 
Bolivar Roads to a turning basin at Texas City, 40 feet 
deep, 1,000 feet to 1,200 feet wide and 4,253 feet long; 
and an Industrial Canal, 40 feet deep and 300-400 feet 
wide extending a distance of 1.7 miles southwestward 
from the south end of Texas City Turning Basin, and a 
turning basin, 40 feet deep, 1,000 feet wide and 1,150 
feet long. 
Project also provides for easing the approach to the 
turning basin; a pile dike 28,200 feet long, parallel to 
and north of the channel; and a rubble-mound dike, 
27,600 feet long, along the southerly side of the pile 
dike.
The 40-foot channel was completed in June 1967. 
Widening the Texas City Turning Basin; realigning the 
Texas City Turning Basin to a location 85 feet easterly 
from its present position; and enlargement through 
widening and deepening of the Industrial Canal and 
basins was initiated in July 1980 and completed in June 
1982. The only work remaining is deferred construction 
consisting of widening the Industrial Canal from 250 
feet to 300 feet at 40 foot depth. 
Work authorized by Water Resources Development 
Act of 1986 would modify the project by providing for 
deepening the Texas City Turning Basin to 50 feet, 
enlarging the 6.7-mile long Texas City Channel to 50 
feet by 600 feet, deepening the existing 800-foot wide 
Bolivar Roads Channel and Inner Bar Channel to 50 
feet, deepening the existing 800-foot wide Outer Bar 
and Galveston Entrance Channel to a 52-foot depth for 
4.1 miles at a width of 800 feet and an additional reach 
at a width of 600 feet to the 52 foot contour in the Gulf 
of Mexico. Establishment of 600 acres of wetland and 
development of water-oriented recreational facilities on 
40-12

GALVESTON, TX, DISTRICT 
a 90-acre enlargement of the Texas City Dike are also 
proposed. The project is currently in the "deferred" 
category. (See Table 40-G for total cost of existing 
project to September 30, 2000.) 
Under ordinary conditions mean tidal range is about 
1.3 feet and extreme range is about 2 feet. Height of tide 
is dependent largely on the wind and during strong 
"northers" water surface may be depressed 2 feet below 
mean low tide. Estimated cost for new work is 
$123,300,000 Federal (Corps), excluding expenditures 
on previous projects, and $74,393,700 non-Federal, 
including $62,027,741 contributed funds, $248,000 
work contribution, $427,959 lands, $10,737,000 levees 
and spillways, $6,000 for removal of barge mooring 
facilities from Shoal Point (formerly known as Snake 
Island), $561,000 for berthing areas, and $386,000 
relocations. (October 1, 1988 base price.) 
Local cooperation. Fully complied with for 
completed work. For work authorized by the Water 
Resources Development Act of 1986, as amended, local 
interests are required to provide lands, easements, 
rights-of-way, and disposal areas; relocate utilities, 
roads, and other facilities, except railroad bridges; 
provide berthing areas; pay one-half of the separable 
and joint costs allocated to recreation; and bear all costs 
of operation, maintenance and replacement of recreation 
facilities, and, during construction, pay 25 percent of the 
costs allocated to deep-draft navigation to a depth of 45 
feet plus 50 percent of the costs allocated to deep-draft 
navigation deeper than 45 feet; pay an additional 10 
percent of the costs allocated to deep-draft navigation 
within a period of 30 years following completion if not 
offset by credit allowed for lands, easements, rights-ofway, 
relocations and disposal areas; and pay 50 percent 
of the costs incurred for operation and maintenance 
below the 45-foot depth. 
Terminal facilities. Privately owned terminal 
facilities are on the mainland at inner end of this 
channel and are considered adequate for existing 
commerce. A deep-draft channel and turning basin 
extend about 1.9 miles southwestward from south end 
of Texas City Turning Basin have been constructed by 
local interests. See Port Series No. 23 (revised 1996), 
Corps of Engineers. 
Operations during fiscal year. Maintenance: No 
maintenance was required for the fiscal year. (See 
Table 40-J for dredging operations.) 
17. TRINITY RIVER AND 
TRIBUTARIES, TX 
Location. The main stem of the Trinity River is 
forned at Dallas by the confluence of the West Fork 
and the Elm Fork at river mile 505.5. The mouth of the 
Trinity is about one-half mile west of Anahuac, Texas. 
(See Geological Survey base map, Texas, scale 
1:500,000.) 
Previous project. For details of abandoned locks 
and dam construction see page 986 of Annual Report 
for 1933. 
Existing project. See individual detailed reports on 
Anahuac Channel, Channel to Liberty and Wallisville 
Lake. Project includes the existing Federal project 
designated as "Mouth of Trinity River, Texas," which 
was completed in 1907 at a cost of $80,000 (no cost to 
local interest). Project is not being maintained. (See 
Table 40-G for total cost of existing project to 
September 30, 2000.) 
Local cooperation. See individual detailed reports 
on Channel to Liberty and Wallisville Lake. There is no 
local cooperation required for Anahuac Channel. 
Terminal facilities. Privately owned wharves and 
piers at Anahuac, Moss Bluff, Wallisville, and Liberty, 
Texas, are adequate for existing commerce. 
17A. ANAHUAC CHANNEL, TX 
Location: Extends from 6-foot depth in Galveston 
Bay to Anahuac, Texas, opposite mouth of Trinity River 
38 miles north of Galveston, Texas. (See National 
Ocean Survey Chart 11323.) 
Existing project. No project dimensions authorized 
by 1905 River and Harbor Act. A 6- by 80-foot channel, 
16,000 feet long was dredged in 1905. At present a 6- 
by 100-foot channel is maintained. Under ordinary 
conditions tidal range is 0.6 to 1.2 feet. Height of tide is 
dependent largely on wind. Strong north winds depress 
water surface 1.5 feet below mean sea level. Latest 
published map is in House Document 440, 56th 
Congress, Ist Session. Project was completed in 1911. 
Local cooperation. None required. 
Terminal facilities. Privately owned wharves and 
piers are the only terminal facilities at Anahuac. 
Operations during fiscal year. Maintenance: No 
work was incurred during the fiscal year. 
17B. CHANNEL TO LIBERTY, TX 
Location. Improvement is located in Galveston 
Bay and tidal reach of lower Trinity River. (See 
Geological Survey Maps for Anahuac, Cove, Moss 
Bluff, and Liberty, Texas.) 
Previous projects. For details see page 986 of 
Annual Report for 1932. 
Existing project. Provides for a 6-foot channel 
from Anahuac to Liberty, which was completed in 1925. 
A navigable channel from the Houston Ship Channel 
near Red Fish Bar in Galveston Bay to Liberty, Texas, 
with depth of 9 feet and width of 150 feet, extending 
along the east shore of Trinity Bay to the mouth of the 
40-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Trinity River at Anahuac, thence in the river channel to 
a turning basin at Liberty, Texas, and a protective 
embankment along the west side of the channel in 
Trinity Bay. 
The 6-foot Channel to Liberty was completed in 
1925. The 9-foot Channel to Liberty has been dredged 
from junction with Houston Ship Channel to a point one 
mile below Anahuac, Texas. Work remaining consists 
of dredging a 9- by 150-foot channel from one mile 
below Anahuac, Texas to Liberty, Texas. 
Local cooperation. Fully complied with for portion 
of "Channel to Liberty" between Houston Ship Channel 
and I mile below Anahuac, Texas, as required by 1946 
River and Harbor Act (H. Doc. 634, 79th Cong., 2nd 
Sess.), but not complied with for remaining portion of 
"Channel to Liberty" as required by River and Harbor 
Act of 1945 (H. Doc. 403, 77th Cong., 1st Sess.). 
Terminal facilities. Privately owned wharves and 
docks at Anahuac, Wallisville, Texas Gulf Sulphur 
Co.'s slip, Moss Bluff and Liberty, Texas, are adequate 
for existing commerce. 
Operations during fiscal year. Maintenance: 
Routine maintenance. (See Table 40-J for dredging 
operations.) 
17C. WALLISVILLE LAKE, TX 
Location. Dam is at river mile 3.9, about 4 miles 
northwest of Anahuac, Texas. (See National Ocean 
Survey Chart 11323.) 
Existing project. Provides for construction of a 
dam and overflow spillway approximately 8 miles long 
to prevent salinity intrusion and create a 3,800 acre 
reservoir. The maximum pool elevation will be 2 feet 
above National Geodetic Vertical Datum. (The reservoir 
was reduced from 5600 acres with a maximum pool 
elevation of 4 feet N.G.V.D. by agreement to protect the 
endangered bald eagle.) Project provides for an 84 foot 
by 600-foot navigation lock to facilitate navigation on 
Channel to Liberty. The sill has a depth of minus 16 feet 
below National Geodetic Vertical Datum. Project also 
provides for two recreational areas; and three water 
control structures to control salinity intrusion and 
regulate freshwater flows to the saltwater marsh west of 
the river. Dam controls a drainage area of 1,262 square 
miles below Livingston Dam (non-Federal project at 
channel mile 99.2) and has a storage capacity of 14,000 
acre-feet. Under ordinary conditions mean tidal range in 
bay is from 0.6 foot to 1.2 feet. Height of tide is 
dependent largely on wind. Strong northerly winds 
depress water surface 1.5 feet below mean sea level. 
Total estimated cost of authorized project is 
$81,200,000 Federal (Corps). (October 1, 2000 base 
price.) 
A contract for construction of access road, Big Hog 
intake structure, intake canal and access bridge was 
completed in October 1968. Work started in July 1970 
on construction of the lock and dam, roads, diversion 
channel, and navigation channel. Work was suspended 
in February 1973 because of an injunction halting 
construction. Protective work on the lock and dam was 
permitted and was completed in April 1973. An 
exception to the injunction was granted for plugging oil 
wells which was completed in August 1973. Notice of 
appeal to the Court of Appeals for the Fifth Circuit was 
filed in April 1973. In August 1974, the Court of 
Appeals reversed the judgment and remanded the case 
with directions that a revised or supplemental statement 
be prepared and judged anew. Final supplement to the 
Environmental Impact Statement for the modified 
project authorized in the Supplemental Appropriations 
Act, 1983 (PL 98-63) was submitted to the 
Environmental Protection Agency on September 21, 
1983. 
In March 1986, the Court rendered its 
Memorandum of order continuing the injunction and 
directing the Corps to recommence the administrative 
process at the time when the first departure from 
standard NEPA procedures occurred prior to the 1983 
legislative action. The Corps and Local Sponsors 
perfected an appeal to the U.S. Court of Appeals and on 
May 11, 1987, the Court of Appeals ruled in favor of 
the Corps and dismissed the suit in its entirety. 
The Energy and Water Development Appropriation 
Act of 1991 provided $9,200,000 for the project and 
directive language for continuation of construction. 
In the fall of 1989, a pair of bald eagles were 
discovered nesting at the project site which led to 
additional consultation under the Endangered Species 
Act. Solicitation of the contract for the non-overflow 
dam was postponed to allow for environmental 
coordination. An Environmental Assessment was 
prepared with a Finding of No Significant Impact 
(FONSI) which was signed in September 1991. 
Environmental documents were approved and 
construction was resumed. 
A contract to rehabilitate and complete the 
navigation lock, complete the North and South 
navigation channels, construct a new 
administrative/resident office building, and electrical 
and mechanical equipment controls for the controlled 
spillway structure was awarded in December 1995 and 
completed in FY 99. A dedication ceremony for the 
Wallisville Lake Project was held on November 1, 
1999.
Construction of Control Structure A was completed 
in February 2000 and Cedar Hill Park was completed in 
October 2000. 
40-14

GALVESTON, TX, DISTRICT 
Work remaining consists of repairs to the West 
Non-Overflow Dam and construction of public use 
facilities, remediate abandoned dam and remove 
skimmers, replace timbers and construct a boat ramp 
and dock. 
Local cooperation. Local interest must contribute 
an amount equal to cost allocated to water supply, onehalf 
of cost allocated to salinity control and cost 
allocated to recreation less cost of basic facilities and 
less 15 percent of total project cost. Local interest 
reimbursement is estimated at $12,180,000. 
Operations during fiscal year. New Work: The 
architect/engineering contract, awarded April 4, 1994 to 
prepare plans and specifications and cost estimates for 
lock rehabilitation and construction of new facilities, 
completed the design in 1996 and completed providing 
construction phase services at a cost of $15,646 for FY 
99. The construction contract for lock rehabilitation and 
construction of new facilities, awarded December 22, 
1995, was completed in FY 99 at a cost of $2,428,791. 
A construction contract for Control Structure A, 
awarded January 27, 1999 and physically completed in 
February 2000, incurred a cost of $1,161,033 for FY 99 
and $959,447 in FY 00. A contract to construct Cedar 
Hill Park was awarded February 28, 2000 and 
physically completed in October 2000 for a cost of 
$614,448 for FY 00. Vegetation was removed along the 
access road for a cost of $144,428. The contract was 
awarded April 27, 2000 and completed in 2000. A 
contract for repairs to the west non-overflow dam and 
construction of public use facilities was awarded August 
7, 2000 and continued through FY 00 at a cost of $298, 
416. 
Maintenance: The Wallisville Lake Project was 
turned over for permanent operations at the beginning of 
FY 00. The project was operated and maintained at a 
cost of $878,892. 
18. RECONNAISSANCE AND 
CONDITION SURVEYS 
Reconnaissance and condition surveys were 
conducted in FY 2000 at a total cost of $15,777. The 
surveys were on the following projects: 
Greens Bayou Jan-Jul 00 
Chocolate Bayou Apr-Aug 00 
Barbour Terminal May 00 
Texas City Ship Channel Dec 99- Aug 00 
19. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation activities pursuant to Section 107, 
Public Law 86-645 (preauthorization): 
Initial coordination for Section 107 navigation 
activities was performed in FY 00 at a cost of $3,190. 
Mitigation of shore damages attributable to 
navigation projects pursuant to Section 111, Public Law 
90-483: 
No mitigation of shore damages studies were 
performed in FY 99. 
Shore Protection 
20. CORPUS CHRISTI BEACH, TX 
(RESTORATION PROJECT) 
Location. Corpus Christi Beach, a shore area 
having a length of about 2 miles, is located on the west 
side of Corpus Christi Bay in Nueces County at Corpus 
Christi, Texas. (See National Ocean Survey Charts 
11309 and 11311.) 
Existing project. The plan of improvement 
provided for initial restoration of eroded areas of Corpus 
Christi Beach, over a shore length of 1.4 miles, located 
on the easterly side of Rincon Peninsula, with periodic 
nourishment as required. Construction was completed in 
March 1978. Periodic nourishment and construction of 
sand retention groin was completed in November 1985. 
Local cooperation. Fully complied with. 
Operations during fiscal year. Section 934 of 
Water Resources Development Act of 1986 provides for 
extension of nourishment period to 50 years for beach 
nourishment projects. A study to determine the 
appropriateness of such an extended nourishment period 
for the Federal beach nourishment project was 
completed. The study indicated that there was no 
economic justification for continued Federal 
participation in the program. The responsibility for 
beach monitoring and maintenance was transferred to 
the City of Corpus Christi in July 1990. The project 
was financially closed out in FY 99. 
Flood Control 
21. BUFFALO BAYOU AND 
TRIBUTARIES, TX 
Location. Improvements are on Buffalo Bayou 
watershed, a part of San Jacinto River watershed, in 
Harris County, west and northwest of city of Houston, 
Texas. (See Geological Survey quadrangle sheets for 
Harris County.) 
Existing project. Provides for improvements of 
Buffalo Bayou and its tributaries above turning basin of 
Houston Ship Channel to control floods for protection 
40-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
of city of Houston, and prevent deposition of silt in 
turning basin of ship channel by construction of 
detention reservoirs, enlargement and rectification of 
channels and construction of control works. 
Channel rectification on Brays Bayou with an 
improved channel length 25.4 miles was completed in 
March 1971. Channel rectification on White Oak Bayou 
was completed in 1976. Work remaining consists of 
rectification of approximately 22 miles of main stem of 
Buffalo Bayou. 
See individual detailed reports on Addicks and 
Barker Reservoirs; and Brays, Greens, Halls, Hunting, 
Little White Oak, and Carpenters Bayous. 
Local cooperation. Section 203, 1954 Flood 
Control Act applies. Local interests have accomplished 
all required local cooperation on Brays Bayou and 
White Oak Bayou. On Buffalo Bayou, local interests 
purchased interests that the United States had in 7 miles 
of rectified channel below Barker and Addicks Dams 
for $256,651. Of the remaining required rights-of-way 
on Buffalo Bayou, local interests have acquired about 
40 percent. About 53 percent of required bridge 
relocations and 3 percent of the required bridge 
relocations have been accomplished. Advance of 
$4,400,000 by the Harris County Flood Control District 
was refunded in September 1956. Public Law 86-53 
authorized reimbursement of $38,726 to Galveston, 
Houston and Henderson Railroad Company for bridge 
alterations at Brays Bayou. Non-Federal contributions 
totaled $63,661 for project betterment. Recreation 
development is subject to conditions of non-Federal 
cost-sharing under Federal Water Project Recreation 
Act of 1965. 
See individual detailed reports on Addicks and 
Barker Reservoirs; and Brays, Greens, Halls, Hunting, 
Little White Oak, and Carpenters Bayous. 
21A. ADDICKS AND BARKER 
RESERVOIRS, TX 
Location. Reservoirs are located in and west of the 
City of Houston in Harris and Fort Bend Counties, 
Texas. 
Existing project. Construction of Barker Dam was 
complete in February 1945. Construction of Addicks 
Dam and 7.4 miles of channel rectification downstream 
from Addicks and Barker Dams was completed in 
October 1948. Modification of Barker and Addicks 
Dams consisting of gating the final two uncontrolled 
conduits in each dam, was complete in 1963. Major 
rehabilitation of Addicks and Barker Dams to prevent 
seepage through the embankment was completed in 
1982.
Work under the Dam Safety Assurance program 
was initiated in Fiscal Year 1986. Work accomplished 
included raising approximately 32,400 feet of Addicks 
Dam I to 3 feet and raising approximately 57,600 feet 
of Barker Dam 3 to 5 feet and armor-plating low ends of 
both dams. A contract with the city of Houston for costsharing 
in the construction of recreation facilities was 
entered into in November 1981. The lease for 
approximately 10,534 acres of land and water areas was 
approved in February 1983. 
Local cooperation. None required. 
Operations during fiscal year. Recreation: 
Community Park West (Phase IB) and the velodrome 
were completed in 1986 and remain in use. Community 
Park West (Phase 4) and the development of 
Community Park 2 (soccer fields, ball fields, and 
parking lots) were completed by the City of Houston in 
1992. Harris County Precinct 3 completed building 
additional soccer fields in Community Park 2 in George 
Bush Park. The Fort Bend County YMCA pavilion, 
archery range, and nature trails in Barker Reservoir are 
being heavily used. Maintenance and improvements of 
these recreation areas continue by all agencies. 
Maintenance: A contract to install, maintain and 
repair piezometers at Addicks and Barker was awarded 
and completed in the summer of 2000 for a cost of 
$98,965. 
Construction contracts to rehabilitate and improve 
the parking and storage areas at the project site and to 
repair about 20,000 feet of road on top of Barker Dam 
and about 10,000 feet of road on top of Addicks Dam 
are planned for next fiscal year. 
21B. BRAYS BAYOU 
Location. The project is located in the southcentral 
portion of Buffalo Bayou, Harris County, TX. 
Existing project. The authorized plan of 
improvement consists of 3 miles of stream 
improvements, 3 flood detention basins, and 7 miles of 
stream diversion channels. Aesthetic vegetation is 
included. Recreation facilities include trails, picnic 
facilities, sports fields, comfort stations and parking 
areas. The estimated cost for new work is $266,900,000 
Federal (Corps) and $157,177,000 non-Federal 
consisting of $23,487,000 cash contributions, and 
$133,690,000 for lands and relocations (October 2000 
base price). 
The project was authorized for construction in the 
Water Resources Development Act of 1990 (PL 101- 
640). In 1995, the project was divided into two 
separable elements, a Detention Element (stream 
improvements and detention basins) and a Diversion 
Element. The Local Sponsor was authorized to develop 
the project and design and construct an alternative to the 
diversion component and be reimbursed for the Federal 
share by the Water Resources Development Act of 1996 
40-16

GALVESTON, TX, DISTRICT 
(PL 104-303). Construction funds were received in 
1998.
Location cooperation. Local Sponsor for the 
project is Harris County Flood Control District. Local 
Sponsor is required to provide lands, easements, and 
rights-of-way; modify or relocate buildings, pipelines, 
utilities, roads and other facilities, except for railroad 
bridges; pay five percent of the total costs allocated to 
flood control presently estimated at $23,487,000 and 
bear all costs of operation, maintenance, and 
replacement of flood control and recreation facilities. A 
Project Cooperation Agreement for the detention 
element was executed March 3, 2000. 
Operations during fiscal year. New Work: 
Construction by the Local Sponsor of the Detention 
Element is currently underway. Reimbursement to 
Harris County Flood Control District was made in July 
2000 for the following completed segments of the Sam 
Houston Detention Basin: Discrete Segment #1, 
Compartment 3- $1,916,116; Discrete Segment #3, 
Compartment 1, Phase 1- $1,156,012; and Discrete 
Segment #4, Compartment 1, Phase 2- $1,810,635. 
In accordance with Section 211 of the Water 
Resources Development Act of 1996, the sponsor is 
investigating the Diversion element in an effort to find 
an alternative to the authorized project. 
21C. GREENS BAYOU 
Location. The project is located in the north-central 
portion of Buffalo Bayou, Harris County, TX, and does 
not include the Halls Bayou tributary. 
Existing project. The authorized plan of 
imnprovement consists of 25 miles of stream 
enlargements, 14 miles of stream clearing and 4 flood 
detention basins. Aesthetic vegetation and mitigation is 
included. Recreation facilities include trails, picnic 
facilities, sports fields, launches, ramps, comfort 
stations and parking areas. The estimated cost for new 
work is $160,251,000 Federal (Corps) and $97,307,000 
non-Federal consisting of $15,215,000 cash 
contributions, and $82,092,000 for lands and relocations 
(October 2000 base price). 
The project was authorized for construction in the 
Water Resources Development Act of 1990 (PL 101- 
640).
Local cooperation. Local Sponsor for the project is 
Harris County Flood Control District. Local Sponsor is 
required to provide lands, easements, and rights-of-way; 
modify or relocate buildings, pipelines, utilities, roads 
and other facilities, except for railroad bridges; provide 
a cash contribution presently estimated at $15,215,000 
and bear all costs of operation, maintenance, and 
replacement of flood control and recreation facilities. 
Operations during fiscal year. New Work: See 
Section 37, PRE-CONSTRUCTION ENGINEERING 
AND DESIGN. 
21D. HALLS BAYOU 
Location. Halls Bayou is a major tributary of 
Greens Bayou, located in the north-central portion of 
Buffalo Bayou, Harris County, TX. 
Existing project. The authorized plan of 
improvement consists of 18 miles of stream 
improvements. Recreation facilities include trails, picnic 
facilities, boat ramps, a comfort station and parking 
areas. The estimated cost for new work is $70,908,000 
Federal (Corps) and $52,871,000 non-Federal consisting 
of $7,921,000 cash contributions, and $44,950,000 for 
lands and relocations (October 2000 base price). 
The project was authorized for construction in the 
Water Resources Development Act of 1990 (PL 101- 
640).
Local cooperation. Local Sponsor for the project is 
Harris County Flood Control District. Local Sponsor is 
required to provide lands, easements, and rights-of-way; 
modify or relocate buildings, pipelines, utilities, roads 
and other facilities, except for railroad bridges; provide 
a cash contribution presently estimated at $7,921,000 
and bear all costs of operation, maintenance, and 
replacement of flood control and recreation facilities. 
Operations during fiscal year. New Work: 
Project is awaiting Pre-construction Engineering and 
Design funds. 
21E. HUNTING BAYOU 
Location. Hunting Bayou is located in Houston, 
approximately 4 to 5 miles from the central business 
district. 
Existing project. The authorized plan of 
improvement consists of 14.3 miles of stream 
improvements. Recreation facilities include trails, picnic 
facilities, a comfort station and parking areas. The 
estimated cost for new work is $69,992,000 Federal 
(Corps) and $62,730,000 non-Federal consisting of 
$7,102,000 cash contributions, and $55,628,000 for 
lands and relocations (October 2000 base price). 
The project was authorized for construction in the 
Water Resources Development Act of 1990 (PL 101- 
640). The Local Sponsor was authorized to design and 
construct an alternative to the project and be reimbursed 
for the Federal share by the Water Resources 
Development Act of 1996 (PL 104-303). 
Local cooperation. Local Sponsor for the project is 
Harris County Flood Control District. Local Sponsor is 
required to provide lands, easements, and rights-of-way; 
modify or relocate buildings, pipelines, utilities, roads 
and other facilities, except for railroad bridges; provide 
40-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
a cash contribution presently estimated at $7,102,000 
and bear all costs of operation, maintenance, and 
replacement of flood control and recreation facilities. 
Operations during fiscal year. New Work: See 
Section 37, PRE-CONSTRUCTION ENGINEERING 
AND DESIGN. 
21F. LITTLE WHITE OAK BAYOU, TX 
Location. Little White Oak Bayou is a tributary of 
White Oak Bayou in north-central Houston. 
Existing project. The authorized plan of 
improvement consists of 6.0 miles of stream 
enlargements. Recreation facilities include trails and 
picnic facilities. The estimated cost for new work is 
$17,958,000 Federal (Corps) and $17,957,000 non- 
Federal consisting of $1,996,000 cash contributions, and 
$15,961,000 for lands and relocations (October 1990 
base price). 
The project was authorized for construction in the 
Water Resources Development Act of 1990 (PL 101- 
640).
Local cooperation. Local Sponsor for the project is 
Harris County Flood Control District. Local Sponsor is 
required to provide lands, easements, and rights-of-way; 
modify or relocate buildings, pipelines, utilities, roads 
and other facilities, except for railroad bridges; provide 
a cash contribution presently estimated at $1,996,000 
and bear all costs of operation, maintenance, and 
replacement of flood control and recreation facilities. 
Operations during fiscal year. New Work: 
Project is awaiting Pre-construction Engineering and 
Design funds. 
21G. CARPENTERS BAYOU, TX 
Location. Carpenters Bayou is a tributary of 
Buffalo Bayou in northeastern Houston. 
Existing project. The authorized plan of 
improvement consists of 9.7 miles of stream 
enlargements. Recreation facilities include trails and 
picnic facilities. The estimated cost for new work is 
$3,900,000 Federal (Corps) and $1,950,000 non-Federal 
consisting of $370,000 cash contributions, and 
$2,320,000 for lands and relocations (October 1990 
base price). 
The project was authorized for construction in the 
Water Resources Development Act of 1990 (PL 101- 
640).
Local cooperation. Local Sponsor for the project is 
Harris County Flood Control District. Local Sponsor is 
required to provide lands, easements, and rights-of-way; 
modify or relocate buildings, pipelines, utilities, roads 
and other facilities, except for railroad bridges; provide 
a cash contribution presently estimated at $370,000 and 
bear all costs of operation, maintenance, and 
replacement of flood control and recreation facilities. 
Operations during fiscal year. New Work: 
Project is awaiting Pre-construction Engineering and 
Design funds. 
22. BUFFALO BAYOU, TX 
(LYNCHBURG PUMP STATION) 
Location. The project is located 10 miles east of 
Houston, Texas near the entrance to the Houston Ship 
Channel. 
Existing project. The Lynchburg Pump Station is 
to be protected by a flood barrier encircling the facility. 
A plan consisting of a combination sheet pile wall and 
earth levee is recommended. Total barrier length is 
approximately 2000 feet. The Crosby-Lynchburg Road 
will be rerouted to the top of the levee. 
Local cooperation. The Coastal Water Authority, 
owned by the City of Houston, is the Local Sponsor of 
the project. 
Operation during the fiscal year. The Detailed 
Project Study was completed in September 1996. An 
implementation plan in the amount of $5,985,000 has 
been tentatively agreed upon by the Local Sponsor, 
subject to approval by higher authority of the Corps of 
Engineers. Pending resolution of Project Cooperation 
Agreement issues, construction could be initiated in FY 
2002 if funds are available. 
23. CLEAR CREEK, TX 
Location. The project is located about midway 
between the two metropolitan centers of Houston, 
Texas, on the north and Galveston-Texas City on the 
south in Harris and Galveston Counties above and 
below existing Clear Lake. 
Existing project. The authorized plan of 
improvement consists of an improved channel from 
Mile 3.8 to Mile 34.8 to contain within its banks all 
flood flows up to and including that of a 100-year flood. 
The selected plan provides channel enlargement and 
easing of bends within the existing stream from Mile 3.8 
to Mile 26.05 to contain at least the 10-year frequency 
storm, and additional outlet with gated structure from 
Clear Lake to Galveston Bay, restriction of development 
in the residual 100-year flood plain and measures to 
mitigate environmental effects. In 1986, at the request 
of Brazoria County Drainage District No. 4, that portion 
of the project upstream of the Brazoria/Galveston 
County line, approximate improved Mile 19.1, Was 
placed in the "inactive" category. Estimated cost for 
new work, excluding "inactive" portion, is $80,393,000 
Federal (Corps) and $55,464,000 non-Federal consisting 
of $6,792,000 cash contributions, $22,600,000 for lands 
40-18

GALVESTON, TX, DISTRICT 
and $26,072,000 for relocations (October 1, 2000 base 
price). 
Environmental interest groups and agencies, private 
citizens, and some local communities located near or 
adjacent to Clear Lake expressed opposition to the Clear 
Creek Flood Control Project as currently authorized and 
planned for upstream reaches. In general, the 
opposition to the project has been focused on 
environmental concerns in the upstream reaches and on 
induced flooding concerns downstream in Clear Lake. 
Construction has been delayed at the request of the 
Local Sponsor so that an alternative to the authorized 
project can be developed that will reduce above 
concerns and still provide flood protection to those that 
are critically affected by flood waters in the watershed. 
Local cooperation. Local Sponsors for the project 
are Galveston and Harris counties. The Local 
Cooperation Agreement, executed June 30, 1986, 
requires local interests to provide lands, easements, 
rights-of-way, and material disposal areas; modify or 
relocate building, pipelines, utilities, roads and other 
facilities, except railroad bridges, where necessary in 
the construction of the project; make a cash contribution 
for mitigation measures consistent with the non-Federal 
share of total project costs without mitigation measures; 
pay five percent of the total costs allocated to flood 
control; and bear all costs of operation and maintenance 
of flood control facilities. 
Operations during fiscal year. Preparation of the 
General Reevaluation Report (GRR) continued. The 
Galveston District and the local sponsors for the 
General Reevaluation study (Harris County Flood 
Control District, Galveston County, and Brazoria 
Drainage District No. 4) updated the databases for the 
Clear Creek watershed and prepared for the initial 
public meeting. The database update included state-of - 
the-art aerial photogrammetry, new surveys that 
included elevations of over 3000 homes and structures, 
and new demographic and socioeconomic information. 
Six years of litigation between the Corps of 
Engineers, Harris County and the Southern Pacific 
Transportation Company over a proposed replacement 
bridge came to an end. A final settlement of 
$1,113,855.43 was received to reimburse the initial 
$905,000 placed in the court's escrow account in 1995 
and the interest earned in the amount of $208, 855.43. 
24. CYPRESS CREEK, TX 
Location. The project is located north of Houston, 
Texas in Harris County. 
Existing project. The authorized plan of 
provement consists of enlargement of the lower 29.4 
Tiles of the Cypress Creek Channel, incorporating 
grassed side slopes and channel bottom and appropriate 
erosion control measures; application of floodplain 
management techniques in the residual floodplain; 
construction of project-oriented recreation features, 
including 11.5 miles of hike-and-bike trails and related 
facilities for health, safety, and public access; and 
habitat management measures on 844 acres of Harris 
County Parkway land, creation of wooded and brush 
habitat along 100 acres of the project right-of-way, 
acquisition of 329 acres of wildlife habitat along the 
creek, and creation of 35 acres of ponds and marshes. 
The authorized plan is no longer under consideration. 
The current plan is to buy out or raise houses where 
inhabitants are at or below the five year flood level. 
Estimated cost for the new plan is $4,463,000 Federal 
(Corps) and $1,487,000 non-Federal contribution. 
(October 1, 1999 base price.) 
Local cooperation. Local Sponsor for the project is 
Harris County. The non-Federal share of the cost of 
non-structural flood control measures shall be 25 
percent of the cost of such measures. The non-Federal 
interests for any such measures shall be required to 
provide all lands, easements, rights-of-way, and 
relocations necessary for the project, but shall not be 
required to contribute any amount in cash during 
construction of the project. 
Operations during fiscal year. New work: Work 
during FY 2000: The General Reevaluation Report was 
approved September 27, 1999-just prior to FY 2000. 
The revised project consisted of removing the 35 homes 
from the five year flood level. The sponsor wished to 
implement the project as quickly as possible; therefore, 
the Harris County Flood Control District and the Corps 
of Engineers negotiated a Section 215 Agreement. This 
agreement would provide reimbursement to the sponsor 
for the Federal share of funds expended to implement 
the project once a Project Cooperation Agreement 
(PCA) was executed and funds appropriated for 
construction. The Section 215 Agreement was executed 
January 5, 2000. The sponsor began acquiring homes in 
June 1999 and began demolition of the structures in 
February 2000. Negotiations began on the PCA, and 
continued through the fiscal year 2000. 
25. LOWER RIO GRANDE BASIN, TX 
Location. The project is located in Willacy, 
Hidalgo, and Cameron Counties. The basin is bounded 
on the east by the Gulf of Mexico, on the south by the 
Rio Grande which forms the international boundary 
between the United States and Mexico, on the west by 
Starr County, and on the north by Brooks and Kenedy 
Counties. 
Existing project. See individual detailed reports on 
Arroyo Colorado, South Main Channel, and 
Raymondville Drain. 
40-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Local cooperation. See individual detailed reports 
on Arroyo Colorado, South Main Channel, and 
Raymondville Drain. 
25A. ARROYO COLORADO, TX 
Location. The project is located in Hidalgo and 
Cameron Counties, Texas. 
Existing project. The authorized project will 
provide flood protection along Highway 83 and erosion 
protection for the banks of the Arroyo Colorado in the 
city of Harlingen. The project consists of a gated water 
control structure, 1.4 miles of channel improvements, 
and stone armoring of selected reaches in Harlingen. 
The estimated cost for new work is $5,851,000 Federal 
(Corps) and $1,951,000 non-Federal consisting of 
$1,848,000 cash and $103,000 for lands and relocations 
(October 1, 1993 base prices). 
The project has reached a stalemate as the 
Local Sponsor, the Hidalgo County Drainage District 
#1, can not provide required guarantee to hold and save 
the Government free from all damages arising from the 
construction, operation, maintenance, repair and 
replacement for the project, nor are they able to operate 
and maintain the project when completed. The 
International Boundary and Water Commission has 
complete jurisdiction over the project as it is one of the 
elements of the Rio Grande Floodway System. The 
Commission is interested in the project but only if 
additional funds to do operations and maintenance are 
provided. Legislative approval will be required to alter 
the current status. 
Local cooperation. Local Sponsor, the Hidalgo 
County Drainage District #1, is required to provide 
lands, easements, and rights-of-way; modify or relocate 
buildings, pipelines, utilities, roads and other facilities, 
except for railroad bridges; provide a cash contribution 
presently estimated at $1,848,000 and bear all costs of 
operation, maintenance, and replacement of flood 
control facilities. 
Operations during fiscal year. None. 
25B. SOUTH MAIN CHANNEL, TX 
Location. The project is located in Hidalgo and 
Willacy Counties, Texas. 
Existing project. The authorized project consists of 
channel improvements which will provide flood 
protection to the cities of McAllen, Edinburg, Edcouch, 
La Villa and Lyford, as well as the rural areas of 
Hidalgo and Willacy Counties north of U.S. Highway 
83. The estimated cost for new work is $132,791,000 
Federal (Corps) and $72,386,000 non-Federal consisting 
of $10,259,000 cash and $28,107,000 lands and 
$34,020,000 relocations (October 1, 2000 base prices). 
Local cooperation. Local Sponsors for the project 
are Hidalgo County Drainage District #1 and Willacy 
County Drainage District #1. Local Sponsor is required 
to provide lands, easements, and rights-of-way; modify 
or relocate buildings, pipelines, utilities, roads and other 
facilities, except for railroad bridges; provide a cash 
contribution presently estimated at $10,259,000 and 
bear all costs of operation, maintenance, and 
replacement of flood control facilities. 
Operations during fiscal year. New Work: See 
Section 37, PRE-CONSTRUCTION ENGINEERING 
AND DESIGN. 
25C. RAYMONDVILLE DRAIN, TX 
Location. The project is located in northern 
Hidalgo and Willacy Counties, Texas. 
Existing project. The authorized project will 
provide a drainage outlet to the Laguna Madre for 
northern Hidalgo and Willacy Counties. The project 
consists of 43.8 miles of channel work, including 
enlargement of existing channels and construction of 
new channels, a 3.88-mile long levee, and diversion 
ditches along the west side of Raymondville. The 
estimated cost for new work is $60,822,000 Federal 
(Corps) and $20,274,000 non-Federal consisting of 
$6,374,000 cash and $6,142,000 lands and $7,758,000 
relocations (October 1, 2000 base prices). 
Local cooperation. Local Sponsor for the project is 
Hidalgo County Drainage District #1 and Willacy 
County Drainage District #1. Local Sponsor is required 
to provide lands, easements, and rights-of-way; modify 
or relocate buildings, pipelines, utilities, roads and other 
facilities, except for railroad bridges; provide a cash 
contribution presently estimated at $6,374,000 and bear 
all costs of operation, maintenance, and replacement of 
flood control facilities. 
Operations during fiscal year. New Work: See 
Section 37, PRE-CONSTRUCTION ENGINEERING 
AND DESIGN. 
26. SIMS BAYOU, TX 
Location. The project is located in Harris CountY, 
in the southern portion of Houston, Texas. 
Existing project. The authorized plan of 
improvement provides for enlargement and rectification, 
with appropriate erosion control measures, of 19.3 miles 
of Sims Bayou to provide 25-year flood protection; 
environmental measures and riparian habitat 
improvement along the entire alignment; and 
recreational development to include 27 miles of hikeand-
bike trails connecting to existing public parks, 
together with picnic, playground, and other leisure 
facilities. Estimated cost for new work is $220,230,000 
Federal (Corps) and $108,276,000 non-Federal 
consisting of $19,326,000 cash contributions, 
40-20

GALVESTON, TX, DISTRICT 
$39,988,000 for lands, $48,660,000 for relocations and 
$302,000 for channels (October 1, 2000 base price). 
Local cooperation. Local Sponsor for the project is 
Harris County Flood Control District. In accordance 
with the cost-sharing and financing concepts reflected in 
the Water Resources Development Act of 1986, local 
interests are required to provide lands, easements, and 
rights-of-way; modify or relocate buildings, pipelines, 
utilities, roads, and other facilities, except railroad 
bridges, where necessary for the construction of the 
project; pay one-half of the separable and joint costs 
allocated to recreation; and bear all costs of operation, 
maintenance and replacement of recreation facilities; 
and pay 5 percent of the costs allocated to flood control; 
and bear all costs of operation, maintenance and 
replacement of flood control facilities. The Local 
Cooperation Agreement for flood control was executed 
on October 19, 1990. The recreation Local Cooperation 
Agreement is pending. 
Operations during fiscal year. New Work: 
Construction contract for channel rectification from 
Hemingway Drive to Reveille Park, awarded December 
22, 1994, was physically completed January 1998, but 
remains financially open. The construction contract for 
channel rectification from Swallow to Hemingway, 
awarded July 19, 1996, was physically completed in 
January 1999, but is not financially complete. Surveys 
were performed by contract in connection with plans 
and specifications for the Cullen to State Highway 288 
reach and the State Highway 288 to Union Pacific 
Railroad reach at a cost of $455,316. Construction 
contract for channel rectification from Swallow to 
Mykawa, awarded November 20, 1997, continued 
through FY 00 at a cost of $2,378,650. Construction 
contract for channel rectification from Mykawa to 
Cullen, awarded April 1, 1999, continued through FY 
00 at a cost of $6,588,011. A contract to repair damages 
from Reveille Park to Hemingway, awarded April 19, 
1999, continued through FY 00 at a cost of $1,205,787. 
A construction contract for Channel rectification at 
Mouth to Port Terminal Railroad, Station 9+00 to 
52+52 was awarded June 30, 2000. No cost was 
incurred for FY 00. 
Reimbursement was made to the Local Sponsor, 
Harris County Flood Control District, for their work on 
the reach from Port Terminal Railroad to Interstate 
Highway 45, in the amount of$300,000. 
27. INSPECTION OF COMPLETED 
FLOOD CONTROL WORKS 
Inspections of completed projects operated and 
maintained by local interests were made on the 
following projects. Fiscal year cost was $149,391. 
Proiect 
Brays Bayou, TX 
Buffalo Bayou at Piney Point, TX 
Port Arthur, Hurricane 
Flood Protection, TX 
State Highway I 1 Bridge, TX 
Three Rivers, TX 
Clear Creek, TX - 
Second Outlet 
Galveston Groins, TX 
Date of 
Inspection 
December 1999 
April 2000 
February 2000 
May 2000 
May 2000 
April 2000 
August 2000 
28. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to section 205 of 
1970 Flood Control Act, Public Law 858, 80th 
Congress, as amended: 
No initial coordination for Section 205 Flood 
Control activities were performed in FY 00. 
Construction of the flood protection project for Buffalo 
Bayou, Texas (Lynchburg Pump Station) is discussed in 
Section 22. 
A feasibility report for flood protection at Pin Oak 
Creek at Kirbyville, Texas, initiated in FY 99, 
completed in FY 00 at a fiscal year cost of $6,541. The 
study was terminated in FY 00 at the request of the 
sponsor. 
Emergency flood control - repair, flood fighting, 
and rescue work (Public Law 99, 84th Congress and 
antecedent legislation): 
Disaster Preparedness cost for Fiscal Year 2000 
was $315,081. Catastrophic Disaster Preparedness 
Program fiscal year cost was $55,154. 
29. EMERGENCY STREAM RANK AND 
SHORELINE EROSION WORK AND 
SNAGGING AND CLEARING 
ACTIVITIES UNDER SPECIAL 
AUTHORIZATION 
Stream bank and shoreline erosion activities 
pursuant to Section 14 of the 1946 Flood Control Act, 
Public Law 525, as amended: 
No new studies for stream bank and shoreline 
erosion activities were performed in FY 00. 
Snagging and clearing activities for flood control 
pursuant to Section 208 of the Flood Control Act of 
1954, Public Law 780, as amended: 
No new feasibility studies of snagging and clearing 
activities for flood control improvements were 
performed in Fiscal Year 2000. 
40-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Environmental Restoration 
30. PROJECT MODIFICATIONS FOR 
IMPROVEMENT OF 
ENVIRONMENT 
Project modifications for improvement of 
environment activities pursuant to Section 1135 of the 
Water Resources Development Act of 1986, Public Law 
99-662, as amended: 
No coordination or initial appraisals were 
performed in FY 00. 
31. AQUATIC ECOSYSTEM 
RESTORATION 
Coordination of Aquatic Ecosystem Restoration to 
improve the quality of the environment pursuant to 
section 206 of the Water Resources Development Act of 
1996, Public Law 104-303, as amended: 
Fiscal year costs for coordination were $6,824. 
No initial appraisals were performed in FY 00. 
32. BENEFICIAL USES OF DREDGED 
MATERIAL 
Projects for beneficial uses of dredged material 
pursuant to Section 204 of the Water Resources 
Development Act of 1992, Public Law 102-560 are as 
follows: 
Planning and design analysis and environmental 
assessment for Sabine-Neches Waterway, Texas Point 
National Wildlife Refuge, TX, are discussed in Section 
33. 
33. SABINE-NECHES WATERWAY - 
TEXAS POINT NATIONAL 
WILDLIFE REFUGE, TX 
Location. The project is located on the Texas Gulf 
Coast at the intersection of the Gulf shoreline and the 
West Jetty of the Sabine-Neches Waterway. The 
project is within the Texas Point National Wildlife 
Refuge, managed by the U.S. Fish and Wildlife Service 
in Jefferson County, Texas. 
Existing project. The project consist of pumping 
dredged material from the maintenance dredging of the 
Sabine Pass Channel onto the beach ridges adjacent to 
the West Jetty and within the Texas Point National 
Wildlife Refuge. Material placed in the marsh will fill 
subsided and eroded areas and enhance the restoration 
of the marsh. The material would also be available for 
transport into the marshes by storm-driven tidal surges. 
Once the material is there it would increase marsh 
elevations and provide nutrients for marsh plants. Any 
additional material will be placed in the surf zone 
shoreward of the ridge. This material will further 
stabilize the ridge and will provide increased storm 
protection for the marsh. 
By helping to mitigate the effects of subsidence and 
erosion, the restored wetlands will continue to provide 
feeding, nesting, and nursery habitat for a variety of 
waterfowl, water birds, and mammals that utilize the 
marshes. The protected marsh will continue to 
contribute to the productivity for fish and shellfish by 
providing a feeding and nursery area. 
Estimated cost for new work is $871,134 Federal 
(Corps) and $290,378 non-Federal consisting of lands, 
easements, relocations and rights-of-way in the amount 
of $2,875 and a cash contribution of $287,503. The 
construction costs represent the incremental difference 
between the base navigation condition and the costs 
associated with constructing the marsh restoration 
project. There are no operation, maintenance, repair, 
rehabilitation, and replacement costs associated with the 
project. 
Local cooperation. Fully complied with. The 
Texas General Land Office is the sponsor for the 
project. A Project Cooperation Agreement was 
executed August 11, 2000. 
Operations during fiscal year. New Work: 
Initiated and completed the planning and design 
analysis and environmental assessment. A contract was 
awarded September 25, 2000, but no cost was incurred 
for Fiscal Year 2000. 
General Investigations 
34. SURVEYS 
Fiscal year costs for reconnaissance and feasibility 
studies were $1,364,505 for navigation and $43,372 for 
flood damage prevention. Reconnaissance and 
feasibility studies on watershed and ecosystems projects 
incurred costs of $12,296. A cost of $39,523 was 
incurred for a reconnaissance study for shoreline 
protection in FY 00. Reconnaissance and feasibility 
studies on review of authorized projects incurred costs 
of $2,541,476 for FY 2000. Miscellaneous Activities 
for FY 00 include the following: Special Investigations 
at a cost of $25,361; Interagency Water Resources 
Development at $14,573; National Estuary Program at 
$5,834; and North American Waterfowl Management 
Plan at a cost of $2,208. 
35. COORDINATION WITH OTHER 
AGENCIES 
Cost for Coordination With Other Agencies waS 
$5,087 for FY 2000. 
40-22

GALVESTON, TX, DISTRICT 
36. COLLECTION AND STUDY OF 
BASIC DATA 
Floodplain management, technical services and 
quick responses were performed at a cost of $50,002, 
$50,005, and $4,007, respectively. 
Hydrologic studies cost $7,192. 
37. PRE-CONSTRUCTION 
ENGINEERING AND DESIGN 
Greens Bayou, Texas - The project will provide 
for 25 miles of stream enlargements, 14 miles of stream 
clearing and 4 flood detention basins. Aesthetic 
vegetation and mitigation is included. Recreation 
facilities include trails, picnic facilities, sports fields, 
launches, ramps, comfort stations and parking areas. 
Estimated planning and engineering cost is $6,945,000. 
Planning and engineering studies were initiated in FY 
1990. Fiscal year costs were $696,154. 
South Main Channel, Texas - The authorized 
project consists of channel improvements which will 
provide flood protection to the cities of McAllen, 
Edinburg, Edcouch, La Villa and Lyford, as well as the 
rural areas of Hidalgo and Willacy Counties north of 
U.S. Highway 83. The authorized plan is currently 
being revised to reflect a smaller project and will 
include construction of new channels only in Willacy 
County, and a local protection project for Lyford, 
Texas. Estimated planning and engineering estimate is 
$8,710,000. Planning and engineering studies were 
initiated in FY 1990. Fiscal year costs were $1,053,167. 
Raymondville Drain, Texas - The project consist 
of 43.8 miles of channel work, including enlargement of 
existing channels, and construction of new channels, a 
3.88-mile long levee, and diversion ditches along the 
west side of Raymondville, Texas. Estimated planning 
and engineering estimate is $2,343,000. Planning and 
engineering studies were initiated in FY 1997. Fiscal 
year costs were $113,158. 
Hunting Bayou, Texas - The project was 
authorized for construction in the Water Resources 
Development Act of 1990 ( PL 101-640). The 
authorized project provides for 14.3 miles of stream 
improvements, recreation trails, picnic facilities, a 
comfort station, access and parking areas. The Local 
Sponsor was authorized to design and construct an 
alternative to the project and be reimbursed for the 
Federal share by the Water Resources Development Act 
of 1996 (PL 104-303). The project is currently being 
reformulated and will be identified by the General 
Reevaluation Study. Estimated planning and engineering 
estimate is $2,070,000. Planning and engineering studies 
were initiated in FY 1998. Fiscal year costs were $74,635. 
North Padre Island, Texas - The project was 
authorized for ecosystem restoration and storm damage 
reduction at North Padre Island, Corpus Christi Bay, by the 
Water Resources Development Act of 2000 (PL 106-53). 
The project will consist of a jettied channel from the Gulf 
of Mexico through Padre Island connecting with the Gulf 
Intracoastal Waterway at approximately mile 553; storm 
damage reduction measures on the north side of the area; 
and ecosystem restoration measures at various locations 
adjacent to the project area. Estimated planning and 
engineering estimate is $1,800,000. Planning and 
engineering studies were initiated in FY 2000. Fiscal year 
costs were $1,696,000. 
40-23

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 40-A 
COST AND FINANCIAL STATEMENT 
See 
Section Total Cost To 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 Sep. 30, 2000$ 
1. Aquatic Plant Control 
(Southwestern Division) 
1965 Act 
2. Brazos Island 
Harbor, TX 
3. Cedar Bayou, TX 
4. Channel to Port 
Bolivar, TX 
5. Clear Creek and 
Clear Lake, TX 
6. Corpus Christi Ship 
Channel, TX 
(Regular Funds) 
(Contributed Funds) 
New Work: 
Approp. 
Cost 
New Work: 
Approp 
Cost 
Maint: 
Approp 2 
Cost 2 
Major Rehab: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Major Rehab: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
6,319 
27,305 
,691,260 
,664,921 
31,000 
4,784 2,259 
- (107,300) 
21,221 (71,340) 
2,192,000 3,086,299 
2,153,377 3,153,019 
- 4,533,600' 
9810 4,519,187' 
- 27,871,2022 
- 27,871,2022 
392,940 60,940,4753 
391,064 60,937,8873 
- 2,170,080 
- 2,170,080 
- 681,263' 
681,263' 
(270)
8 
603,430 
- 603,358 
159,600 4,224,576' 
159,604 4,224,500' 
- 133,9256 
- 133,9256 
89,280 
340,542 
(3,957) 
75,970 
12,200 
12,120 
- 12,400 
- 12,360 
12,089 
4,988,000 5,765,099 
3,836,430 6,918,654 
149,887 
138,448 1,381,709' 
138,498 1,381,679' 
S 66,934 
66,934 
(40) 549,599 
549,599 
- 77,474,639' 
- 77,472,463' 
696,300 125,660,990' 
694,812 125,657,5609 
- 3,576,684 
- 3,576,684 
6,279,088 
6,143,152 
40-24

GALVESTON, TX, DISTRICT 
TABLE 40-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost To 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 Sep. 30, 200029 
7. Double Bayou, TX 
(Regular Funds) 
(Contributed Funds) 
8. Freeport Harbor, TX 
Minor Rehab: 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Maint: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Approp. 
Cost 
433,050 
431,188 
154,569 
131,000 
2,564,804 
2,503,579 
4,620,841 
4,587,072 
- 15,774 
134 17,502 
- 226,558 
- 226,558 
-1,860,902 
- 1,860,902 
- (23,569) 
4,052,000 
4,263,253 
40,000 
55,290 
233,325 
233,325 
20,000 64,781,95610 
30,077 64,765,9721 
3,630,000 4,647,783 4,947,000 84,724,039 
2,342,847 5,970,636 4,946,198 84,722,3801" 
-- - 8,935 
-- - 8,935 
9. Galveston Harbor and 
Channel, TX 
10. Gulf Intracoastal 
Waterway between 
Apalachee Bay, FL and 
the Mexican Border 
(Galveston District) 
(Regular Funds) 
(Inland Waterways 
Trust Fund) 
(Regular Funds) 
(Inland Waterways 
Trust Fund) 
(Regular Funds) 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 4,263,430 
Cost 4,246,903 
Major Rehab: 
Approp. 
Cost 
New Work: 
Approp. 12,270,830 
Cost 12,332,656 
New Work: 
Approp 8,558,000 
Cost 8,649,381 
Maint: 
Appr 24,577,401 
Cost 24,582,562 
Major Rehab: 
Approp. 250,000 
Cost 415,369 
Major Rehab: 
Approp. 250,000 
Cost 467,140 
Minor Rehab: 
Approp. 
Cost 
- 29,096,39212 
29,096,39212 
4,333,000 166,376 6,697,753 118,749,04713 
4,319,309 194,590 6,698,589 118,746,51513 
-- - 7,969,329 
7,969,329 
9,978,000 7,204,100 9,506,490 143,553,71714 
8,097,000 8,907,151 9,609,040 143,253,237 '4 
2,941,000 
3,122,015 
- (130,510) 28,634,490 
26,540 384 28,634,490 
27,841,900 28,308,062 28,670,518 489,681,327'" 
26,035,524 30,264,184 28,634,639 489,581,47216 
8,781 
9,338 
(40,300) 
(8,162) 
(40,300) 
(2,525) 
3,390,338 
3,390,338 
2,955,700 
2,955,700 
835,873 
835,873 
40-25

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 40-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost To 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 Sep. 30, 2000' 
11. Houston-Galveston 
Navigation Channels, TX 
(Regular Funds) 
(Contributed Funds) 
12. Houston Ship 
Channel, TX 
(Regular Funds) 
13. Matagorda, Ship 
Channel, TX 
(Regular Funds) 
14. Neches River Saltwater 
Barrier, TX 
(Regular Funds) 
(Contributed Funds) 
15. Sabine-Neches 
Waterway, TX 
(Regular Funds) 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
1,725,000 
1,654,890 
540,853 
20,000,000 44,201,800 38,003,700 121,248,300 
2,753,710 32,002,467 67,341,990 121,054,644 
- 19,960,000 19,100,000 40,080,000 
234,666 9,651,362 26,939,013 37,586,330 
- - - 35,760,382'7 
- - - 35,760,382' 
6,742,478 13,273,600 6,237,105 8,543,922 198,964,433"9 
6,739,949 12,579,485 6,943,371 8,535,868 198,953,768 s 
.--- 18,058,77719 
- - - 18,058,77719 
1,406,029 
1,400,113 
502,000 
481,833 
2,757,000 2,563,618 1,409,404 66,713,02920 
2,030,483 3,298,461 1,395,380 66,696,728" 
1,450,000 2,307,000 1,715,000 7,821,843 
1,455,003 2,322,312 1,452,433 7,558,974 
800,000 
195,260 
11,594,320 
11,587,144 
800,000 
195,260 
- - - 56,136,815 
- 56,136,81521 
8,356,000 7,840,364 11,238,821 246,259,691" 
7,940,843 8,272,907 11,232,884 246,249,24022 
16. Texas City Channel, TX New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Major Rehab: 
Approp. 
Cost 
25,000 
24,922 
(50,596) 
(52,144) 
78 
420,000 3,274,501 
244,100 3,452,538 
- 15,156,97223 
- 15,156,972" 
42,050 32,861,66624 
42,040 32,861,65624 
S 726,158 
S 726,158 
17. Trinity River and 
Tributaries, TX 
(Includes Wallisville) 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
12,000,000 
11,989,713 
739,714 
665,091 
9,200,000 5,500,000 3,989,000 80,612,67625 
8,902,679 4,730,564 4,789,998 80,042,81325 
880,000 928,558 2,473,000 25,505,886~ 
772,311 1,135,125 2,470,717 25,500,5692 
40-26

GALVESTON, TX, DISTRICT 
TABLE 40-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost To 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 Sep. 30, 2000" 
20. Corpus Christi Beach, 
TX (Restoration Project) 
(Contributed Funds) 
21. Buffalo Bayou and 
Tributaries, TX 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Recreation: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
- (28,635) 
1,493,500 
1,481,133 
174 
2,835,440 
2,825,098 
- 2,120,641 
- 2,120,641 
- 2,009,710 
- 2,009,710 
3,420,310 5,796,200 5,520,000 79,587,27127 
1,129,781 1,011,074 5,813,860 72,791,72227 
- - - 377,804 
- - - 377,797 
5,115,500 2,007,741 1,985,927 45,257,223 
4,604,711 2,589,876 1,930,374 45,180,317 
22. Buffalo Bayou at 
Lynchburg,IX 
(Regular Funds) 
(Contributed Funds) 
23. Clear Creek, TX 
(Regular Funds) 
(Contributed Funds) 
24. Cypress Creek, TX 
(Regular Funds) 
(Contributed Funds) 
25. Lower Rio Grande 
Basin, TX 
26. Sims Bayou, TX 
(Regular Funds) 
(Contributed Funds) 
Major Rehab: 
Approp. 
Cost 
Dam Safety: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
12,475,000 
12,475,000 
12,693,700 
12,693,700 
165,000 
96,969 
161 
5,463,502 
5,526,988 
275,000 
523,381 
155,000 
162,349 
170,000 
189,180 
962,000 
973,452 
New Work: 
Approp. 13,026,290 
Cost 12,855,241 
New Work: 
Approp. 885,500 
Cost 1,146,701 
262,800 
279,578 
32,000 
81,139 222 
758,600 
756,702 
273,346 
253,286 
1,004,000 290,873 
928,246 369,459 
(-530) 
220,000 
221,524 
82,935 
788,300 22,976,036 
118,772 22,289,214 
- 1,315,000 
- 1,234,382 
85,000 3,832,000 
86,676 39,350 
6,127,100 
2,334,426 
- 835,000 
65 835,000 
850,600 740,800 1,192,000 8,206,463 
865,066 743,917 1,166,325 8,180,290 
11,409,000 8,846,127 11,410,000 
9,552,099 9,504,001 12,294,414 
755,860 200,000 550,000 
398,575 484,385 510,799 
82,202,417 
81,666,287 
5,291,36028 
4,872,93628 
40-27

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 40-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost To 
in Text Project Funding FY 97 FY 98 FY 99 FY 00 Sep. 30, 2000" 
33. SNWW- Texas Point 
Wildlife Refuge New Work: 
(Regular Funds) Approp.._. 875,000 875,000 
Cost. - - - 121,970 121,970 
(Contributed Funds) New Work: 
Approp. - - 
Cost. - - - 
Excludes $1,637,270 credit for 
contributed work. 
2 Includes $675,855 for previous projects. 
In addition, $10,571,509 expended from contributed 
funds, of which $123,361 was for previous projects. 
Excludes $874,258 expended from contributed funds 
for dock removal for the local sponsor. 
3 In addition, $1,352,092 expended from 
contributed funds and $34,000 expended from 
contributed funds for Port Isabel. In addition 
$621,723 expended from contributed funds from the 
City of South Padre Island for beneficial placement 
of dredged material on the South Padre Island Beach. 
4 Includes $39,087 for previous projects. In 
addition $25,000 expended from contributed funds. 
Includes $69,784 for previous projects. 
6 Includes $48,711 for previous projects. 
Includes $46,101 for previous projects. 
8 Includes $1,372,534 for previous projects. 
Includes $456,515 for Sec. 107 project for Port 
Aransas Breakwaters. In addition $768 expended 
from contributed funds for Port Aransas Breakwaters. 
9 Includes $62,452 for previous projects. In 
addition, $1,071,952 expended from contributed 
funds. 
1 Includes $147,098 for previous projects. 
In addition, $20,811,568 expended from contributed 
funds. ($581,615 on 45-foot project.) 
" In addition, $229,311 expended from 
contributed funds. 
1 Includes $8,421,996 for previous 
projects. In addition, $3,648,932 expended from 
contributed funds. 
1 Includes $86,126 for previous projects. In 
addition, $2,982,425 expended from contributed 
funds. 
1 Includes $706,709 for previous projects. 
Includes Sec. 107 projects for Port Isabel Small Boat 
Basin ($46,559); Port Isabel Side Channel ($8,414); 
Offatts Bayou ($356,466); and Channel to Aransas 
Pass ($658,573). In addition contributed funds 
expended for Port Isabel Small Boat Basin ($46,559); 
Offatts Bayou ($49,665); Channel to Aransas Pass 
($347,950); Chocolate Bayou ($658,310); Mouth of 
Colorado River ($3,397,080); ($1,275,097) Channel 
to Victoria; and ($862,716) expended for the local 
sponsor's levee requirement on Channel to Victoria. 
" Includes $1,526,564 for previous projects. In 
addition $22,672 contributed funds for main channel 
and $336,450 contributed funds for Rollover Pass 
(beginning 1997). Includes following amounts for 
tributary channels separately funded starting in fiscal 
year 1987: Channel to Victoria $16,883,455. Channel to 
Aransas Pass $2,600. Chocolate Bayou Channel 
$4,181,780. Includes following amounts for tributary 
channels separately funded starting in fiscal year 
1989: Channel to Harlingen $8,452,983. Channel to 
Port Mansfield $9,044,003. Also includes 
$13,861,117 for Mouth of Colorado River, separately 
funded beginning in fiscal year 1992 and $28,140 
contributed funds for Channel to Harlingen beginning 
in fiscal year 1998. 
6 Includes $1,526,564 for previous projects. 
In addition $22,672 expended from contributed funds 
for main channel and $244,642 contributed funds for 
Rollover Pass (beginning 1997) for the beneficia 
placement of dredge material at Rollover Pass. 
Includes following amounts for tributary channels 
separately funded starting in fiscal year 1987: 
Channel to Victoria $16,882,704, Channel to Aransas 
Pass $2,600, Chocolate Bayou Channel $4,169,123. 
In addition $1,515,574 was expended from 
contributed funds for Chocolate Bayou Channel. Also 
includes amounts for tributary channels separately 
funded starting in fiscal year 1989: Channel to 
Harlingen $8,449,348. Channel to Port Mansfield 
$9,039,335. Also includes an expended amount of 
$13,860,409 for Mouth of Colorado River, separately 
funded in fiscal year 1992. In addition, includes 
$28,140 contributed funds expended beginning il 
fiscal year 1998. 
40-28

GALVESTON, TX, DISTRICT 
1 Includes $4,105,157 for previous projects. 
In addition, $2,591,939 expended from contributed 
funds, of which $1,209,179 was for previous projects. 
0 Includes $1,213,142 for previous projects. 
In addition, $534,641 expended from contributed 
funds for Houston Ship Channel, of which $200,000 
was for previous projects and $125,000 expended 
from contributed funds for Greens Bayou Channel. 
Includes appropriated funds for tributary channels 
separately funded starting in fiscal year 1992: Greens 
Bayou Channel $640,178. Barbour Terminal Channel 
$2,122,991. Bayport Ship Channel $10,400,665. 
Also, includes $91,942 contributed funds for Bayport 
Ship Channel beginning in FY 1998. Expenditures 
for tributary channels separately funded starting in 
fiscal year 1992: Greens Bayou Channel $637,217. 
Barbour Terminal Channel $2,121,705. Bayport Ship 
Channel $10,399,931. In addition $91,942 expended 
from contributed funds for Bayport Ship Channel 
beginning in FY 1998. 
1 In addition, $12,259,619 expended from 
contributed funds and $182,800 for contributed lands. 
D Starting in fiscal year 1990 includes an 
appropriation of $2,334,990 and expenditures of 
$2,334,990 for Channel to Red Bluff. 
Includes $5,180,832 for previous projects. 
In addition, $2,680,942 expended from contributed 
funds, of which $577,507 was for previous projects. 
1 Includes $2,379,677 for previous projects. 
In addition, $5,938,115 expended from contributed 
funds and $7,944 expended from contributed funds 
for real estate acquisition for the local sponsor. 
11 Includes $366,823 for previous projects. 
In addition, $1,023,819 expended from contributed 
funds, of which $99,000 was for mitigation measures. 
Includes $195,083 for previous projects. 
* Includes $1,966,306 for previous projects. 
In addition, $66,000 expended from contributed 
funds. 
1 Includes $543,662 for previous projects. 
Includes $6,719,813 appropriated (and $6,717,175 
expended) for Wallisville Lake project beginning in 
FY 1983.
1 Includes $4,400,000 of advanced funds 
repaid to Harris County Flood Control District. In 
addition, $63,661 contributed funds expended for 
Brays Bayou and $12,900 Federal funds and $19,104 
contributed funds expended for enlargement of 
Clodine Ditch. 
' Excludes $2,001,295 expended from 
contributed funds for real estate acquisition for the 
local sponsor. 
29 Includes funds ($12,544,400) provided by 
the Jobs Act (P.L. 98-8, dated March 24, 1983) for 
projects listed in Table 15-I of Annual Report for 
1985. 
40-29

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
AQUATIC PLANT CONTROL, TX 
Oct. 27, 1965 Provides for control of progressive eradication of aquatic plant growth 
from the navigable waters and streams in the U.S. 
Nov. 17, 1986 Amended cost sharing requirements to provide for 50 percent Federal 
and 50 percent non-Federal participation in control operations. 
BRAZOS ISLAND HARBOR, TX 
Jun. 3, 1930 Jetties and jetty channel, inside channels and basins. 
May 24, 1934 
(PWA) 
Aug. 30, 1935 
Aug. 26, 1937 
Local cooperation requirement modified to provide contribution of funds 
to cover cost of original dredging of all inside channels and basins. 
Deepen jetty channel to 31 feet and inner channels and Brownsville and 
Port Isabel turning basins to 28 feet. 
Mar. 2, 1945 Enlarge Port Isabel turning basin. 
Mar. 2, 1945 Deepen entrance channel to 35 feet; deepen to 33 feet channel across 
Laguna Madre; deepen to 32 feet channels from Laguna Madre to 
turning basins at Brownsville and Port Isabel; widen turning basins; 
and dredging present shallow-draft channel south of Port Isabel from 
railroad bridge to Laguna Madre and connecting channel to Port 
Isabel turning basin. 
H. Doc. 251, 89h 
Cong., Ist Sess. 
Sec. 103(c), PL 99-662 
Rivers and Harbors 
Committee Doc. 16, 
71st Cong., 2nd Sess. 
Rivers and Harbors 
Committee Doc. 10, 
71st Cong., Ist Sess. 
Rivers and Harbors 
Committee Doc. 32, 
75th Cong., 1st Sess. 
H. Doc. 335, 76th 
Cong., 1st Sess. 
H. Doc. 347, 77th 
Cong., 1st Sess. 
Jul. 24, 1946 Additional connecting channel between Port Isabel and Brownsville H. Doc. 627, 79th 
channels; and transfer shallow-draft channels at Port Isabel to GIWW. Cong., 2nd Sess. 
May 17, 1950 Deepen to 38 feet in outer bar channels and 36 feet in all other authorized 
channels and basins; extend existing turning basins at Brownsville 
and Port Isabel; and construct small-boat basin with a connecting 
channel next to Brownsville ship channel. 
Jul. 14, 1960 Widen Brownsville Channel to 300 feet at a depth of 36 feet from former 
Goose Island passing basin to turning basin extension, thence at a 
width of 500 feet and same depth to turning basin proper, deepen to 
36 feet in area in southeast corner of turning basin, maintain two 
existing basins of fishing harbor, and a connecting channel, and 
construct a third basin, with necessary connecting channel and extend 
Brazos Island Harbor north jetty seaward 1,000 feet.2 7 
Nov. 17, 1986 Enlargement of the entrance channel from deep water in the Gulf of 
Mexico to the Laguna Madre to a depth of 44 feet and a width of 400 
feet; enlargement of the Turning Basin Extension to a point 800 feet 
beyond the grain elevator to a depth of 42 feet at widths varying from 
325 to 400 feet; removal of Brownsville Navigation District Wharves 
5, 6, and 9 to permit widening of the adjacent portion of the Turning 
Basin to 1,200 feet at a depth of 36 feet; construction of asphalt 
walkways with handrails on the crown of the North and South Jetties, 
and construction of park-type public use facilities at the inner end of 
the North Jetty. 
H. Doc. 192, 81st Cong., 
Ist Sess. 
H. Doc. 428, 86th 
Cong., 2nd Sess.' 
Sec. 201, PL 99-662 
40-30 
1. 
2.

TABLE 40-B 
See Date 
Section Authorizing 
GALVESTON, TX, DISTRICT 
AUTHORIZING LEGISLATION 
Feb. 27, 1911 
Mar. 4, 19132 
Sep. 23, 1922 
Jul. 3, 19303 
Jul. 3, 1930 
Dredge roadstead in Harbor Island Basin to 20 feet deep and construct 
10,000 linear feet of stone dike on St. Joseph Island. 
Channel between jetties and Harbor Island Basin to 25 feet deep, extend 
jetties seaward, extend dike on St. Joseph Island 9,100 feet, and 
dredge approach channel 12 feet deep to town of Port Aransas. 
Dredging channel from Aransas Pass to Corpus Christi, 25 feet deep, 200 
feet bottom width. 
Deepen entrance channel from gulf to Harbor Island and provide an inner 
basin at Harbor Island of reduced area but greater depth. 
Channel from Aransas Pass to Corpus Christi Channel with depth 30 
feet. 
Committee Doc. 3, 
59th Cong., 2nd Sess. 
H. Doc. 1094, 61st 
Cong., 3rd Sess. 
H. Doc. 1125, 62nd 
Cong., 3rd Sess. 
H. Doc. 321, 67th 
Cong., 2nd Sess. 
H. Doc. 214, 70th 
Cong., Ist Sess. 
Rivers and Harbors 
Committee Doc. 9, 
71st Cong., 1st Sess. 
40-31 
- 
-i 
in Text Act Project and Work Authorized Documents 
3. CEDAR BAYOU, TX 
Jul. 3, 1930 Channel 10 feet deep and 100 feet wide from Houston Ship Channel to a S. Doc 107, 71st 
point on bayou 11 miles above mouth."9 Cong., 2nd Sess.1 
Dec. 11, 2000 Channel 12 feet deep and 125 feet wide from Houston Ship channel to a S. 349 (a)(2), PL 106- 
point on bayou 11 miles above mouth. 541 
4. CHANNEL TO PORT BOLIVAR, TX 
Jun. 25, 1910 A channel 30 feet deep and 200 feet wide from deep water in Galveston H. Doc. 328, 61st Cong., 
Harbor extending to a turning basin 1,000 feet square and 30 feet 2nd Sess. 
deep. 30 
Mar. 4, 1919 Enlargement, extension and protection of turning basin.30 H. Doc. 1122, 65th 
Cong., 2nd Sess.' 
5. CLEAR CREEK AND CLEAR LAKE, TX 
Jun. 13, 1902 A channel 4 feet deep and 50 feet wide. H. Doc. 449, 56th 
Cong., 1st Sess. 
Aug. 30, 1935 Enlargement of channel to 6 feet deep and 60 feet wide. H. Doc. 264, 73rd 
Cong., 2nd Sess. 
Mar. 2, 1945 Realignment, enlargement, and extension of channel to highway bridge H. Doc. 319, 77th 
near League City. Cong., Ist Sess.' 
6. CORPUS CHRISTI SHIP CHANNEL, TX 
Mar. 3, 1899 Acquisition of old curved portion of north jetty previously constructed Specified in Act. 
by private parties. 
Jun. 13, 1902 Complete north jetty in accordance with builder's plans. Specified in Act. 
Mar. 3, 1905 Complete north jetty in accordance with builder's plans. Specified in Act. 
Mar. 2, 1907 Connect old curve to St. Joseph Island, and construct south jetty. Rivers and Harbors 
ommiucen. :',

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Aug. 30, 19354 
CORPUS CHRISTI SHIP CHANNEL, TX (Continued) 
Enlarge all channels from gulf to western end of basin dredge by Humble 
Oil and Refining Co., at its docks on Harbor Island. 
Committee Docs. 35, 
72nd Cong., 1st Sess., 
and 40, 73rd Cong., 2nd 
Sess. 
Maintain channel and maneuvering basin between breakwater and H. Doc. 130, 72nd 
western shoreline of Corpus Christi Bay. Cong., Ist Sess. 
Maintain 30-foot depth of approach channel, turning basin at Corpus 
Christi, Industrial Canal and turning basin at Avery Point. 
Aug 30, 1935 Maintain and deepen to 32 feet channel from deep water at Port Aransas 
to and including turning basin at Corpus Christi. 
Jun. 20, 1938 Extend main turning basin at Corpus Christi westward 2,500 feet at its 
present width and depth, deepen existing Industrial Canal and turning 
basin to 32 feet and extend this canal at a depth of 32 feet and general 
width of 150 feet, westward along Nueces Bay shore to a turning 
basin 32 feet by 900 feet, and 1,000 feet long near Tule Lake. 
Mar. 2, 1945 Provide depth of 34 feet in all project channels and basins from Port 
Aransas to and including Tule Lake turning basin, for a width of 250 
feet from Port Aransas to breakwater at Corpus Christi, for a width of 
200 feet in Industrial Canal and in channel between Avery Point and 
Tule Lake turning basins, and widen Avery Point turning basin to 
1,000 feet. 
Deepen entrance channel to 38 feet from gulf to outer end of jetty; 38 
feet decreasing to 36 feet thence to station 90 north jetty; and 36 feet 
in all other deep water channels and basins except 2,000-foot 
undredged part of inner basin at Harbor Island, and a width of 400 
feet in channel from Port Aransas to Maneuvering basin at Corpus 
Christi. 
Rivers and Harbors 
Committee Doc. 13, 
74th Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 63, 
74th Cong., Ist Sess. 
H. Doc. 574, 75th 
Cong., 3rd Sess. 
H. Doc. 544, 78th 
Cong., 2nd Sess. 
H. Doc. 560, 80th 
Cong., 2nd Sess. 
Sep. 3, 1954 An anchorage basin 12 feet deep, from 300 to 400 feet wide, and 900 feet H. Doc. 654, 81st 
long in Turtle Cove at Port Aransas, Texas. Cong., 1st Sess. 
Sep. 3, 1954' Branch channel 32 feet by 150 feet, extending northerly from main 
channel in vicinity of Port Ingleside, along north shore of Corpus 
Christi Bay to Reynolds Metals Co. plant and turning basin 32 feet 
deep and 800 feet square near plant in general vicinity of LaQuinta, 
Texas. 
Sep. 3, 1954 An entrance channel 36 by 400 feet on a tangent alignment from 400- 
foot channel in Corpus Christi Bay, near Corpus Christi breakwater to 
flared approach channel to Corpus Christi turning basin. 
Jul. 3, 1958 Deepen and widen LaQuinta Channel to 36 by 200 feet; enlarge 
LaQuinta turning basin to 36 by 800 by 1,000 feet; a flared entrance 
to channel; and widening at curves. 
H. Doc. 89, 83rd 
Cong., Ist Sess. 
H. Doc. 487, 83rd 
Cong., 2nd Sess. 
S. Doc. 33, 85th Cong., 
I st Sess. 
40-32 
Aug. 30, 1935 
Aug. 30, 1935 
Jun. 30, 1948

GALVESTON, TX, DISTRICT 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
CORPUS CHRISTI SHIP CHANNEL, TX (Continued) 
Jul. 3, 1958 Deepen entrance channel to 42 feet from gulf to outer end of jetty; 40 
feet in all other deep-water channels and basins except undredged 
northward extension to inner basin at Harbor Island and branch 
channel to LaQuinta; and widen Industrial Channel to 400 feet with 
flared entrances to Corpus Christi and Avery Point turning basins. 
Jul. 3, 1958 Channel 40 by 200 feet extending 2.2 miles from Tule Lake turning 
basin to a turning basin 40 feet deep, 700 to 900 feet wide, 1,000 feet 
long at Viola, Texas. 
Jul. 3, 1958 Depth of 12 feet and a width of 100 feet in locally dredged Jewel Fulton 
Canal from LaQuinta Channel to a turning basin 12 by 200 by 400 
feet, and assumption of maintenance by United States. 
H. Doc. 361, 85th 
Cong., 2nd Sess. 
H. Doc. 361, 85th 
Cong., 2nd Sess. 
H. Doc. 361, 85th 
Cong., 2nd Sess. 
Jul. 14, 1960 
(As amended by 
Dec. 31, 1970) 
Aug. 13, 1968 
Construction of a breakwater at entrance to harbor area at Port Aransas, 
and realignment of existing 12-foot by 100-foot project channel. 
Provides for a project depth of 45 feet in the existing deep-draft channels 
and basins, for construction of a new deep-draft turning point, for 
construction of a deep draft mooring area and mooring facilities and 
for widening of the channels and basins at certain locations. The Act 
also deauthorized the undredged northward extension of Inner Basin 
at Harbor Island and the undredged west turnout (Wye connection) 
between the LaQuinta Channel and the main channel of the 
waterway. 
Sec. 107, PL-86-645 
S. Doc. 99, 90th Cong., 
2nd Sess.1 
Oct. 22, 1976 Modified local cooperation requirements for 1968 Act. Shifted 
responsibility for cost of disposal areas and confinement works from 
sponsor to joint 75 percent Federal and 25 percent non-Federal 
responsibility. 
Sep. 15, 1994 Assume maintenance of 17 foot by 100 foot Jewel Fulton Canal, after 
construction by local interest. 
Sec. 124, PL 94-587 
Sec. 204, PL 99-662 as 
amended 
DOUBLE BAYOU, TX. 
Mar. 3, 1899 A channel 6-feet deep and 100-feet wide through the bar at mouth of H. Doc. 387, 55th 
Double Bayou. Cong., 2nd Sess. 
Jul. 14, 1960 
(As amended 
Oct. 25, 1965) 
7-foot by 125-foot channel from the 7-foot depth in Trinity Bay to the 
intersection of Double Bayou Channel with the channel to Liberty; 
and thence a 7- by 100-foot channel upstream for 2.0 miles. 
FREEPORT HARBOR, TX 
Mar. 3, 1899 Dredging and other work necessary in judgment of Secretary of War for 
improving harbor; for taking over jetties and privately built works at 
mouth of river. 
Mar. 2, 1907 Examination authorized. Work later confined to maintenance of jetties. 
Sec. 107, PL 86-646 
Specified in Act. 
H. Doc. 1087, 60th 
Cong., 2nd Sess. 
40-33 
7. 
8.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
FREEPORT HARBOR, TX (continued) 
Feb. 27, 1911 Repairs to jetties and dredging. 
Mar. 4, 1913 Construct seagoing hopper dredge. 
Aug. 8, 1917 Purchase of one 15-inch pipeline dredge and equipment, its operation of 
3 years, operation of seagoing dredge one-half time for 3 years, and 
repairs to jetties. 
Mar. 3, 19256 Diversion dam, diversion channel, and necessary auxiliary works. 
Jul. 3, 1930 Maintenance of diversion channel at expense of local interest. 
Aug. 30, 1935 
Aug. 30, 1935 
May 17, 1950 
Deepening channels and basins. 
Maintenance of present project dimensions of channels and basins at 
Federal expense. 
Deepen outer bar channel to 38 feet from gulf to a point within jetties, 
thence 36 feet in authorized channels to and including upper turning 
basin. 
Jul. 3, 1958 Relocate outer bar channel on straight alignment with jetty channel and 
maintain Brazos Harbor entrance channel and turning basin 
(constructed by local interests). 
Oct. 5, 1961 Modification of HD 1469. Revoking certain provisions of local 
cooperation. 
Dec. 31, 1970 
Nov. 17, 1986 
Relocation of entrance channel and deepen to 47 feet; enlargement to a 
depth of 45 feet and relocation of jetty channel and inside main 
channel; deepening to 45 feet of channel to Brazosport; enlargement 
of the widened area of Quintana Point to provide a depth of 45 feet 
with a 750-foot diameter turning area; Brazosport turning basin to 45 
feet deep with a 1,000 foot turning area; a new turning basin with a 
1,200 foot diameter turning area and 45 feet deep; deepening 
Brazosport channel to 36 by 750 feet diameter; flared approaches 
from Brazos Harbor Channel; relocation of north jetty and 
rehabilitation of south jetty. 
Modified local cooperation requirements for the 1970 Act. 
Specified in Act. 
Specified in Act. 
Specified in Act. 
Rivers and Harbors 
Committee Doc. 10, 
68th Cong., 2nd Sess. 
Rivers and Harbors 
Committee Doc. 18, 
70th Cong., Ist Sess. 
Rivers and Harbors 
Committee Doc. 15, 
72nd Cong., Ist Sess. 
Rivers and Harbors 
Committee Docs. 15, 
72nd Cong., 1st Sess., 
and 29, 73rd Cong., 
2nd Sess. 
H. Doc. 195, 81st Cong., 
1st Sess. 
H. Doc. 433, 84th 
Cong., 2nd Sess. 
PL 394, 87th Cong. 
H. Doc. 289, 93rd 
Cong., 2nd Sess.2 
Sec. 101, PL 99-6 62 
40-34

GALVESTON, TX, DISTRICT 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
GALVESTON HARBOR AND CHANNEL, TX 
Construct 2 rubblestone jetties at entrance to Galveston Harbor. H. Doc. 85, 49th 
Cong., Ist Sess., and 
Annual Report, 1886, 
p. 131 1. 
Jun. 13, 1902 A channel 1,200 by 30 feet from Bolivar Roads (outer end of old inner H.Doc. 264, 56th 
bar near Fort Point) at 51st Street.' Cong., 2nd Sess. 
Mar. 3, 1905 Purchase or construct hydraulic pipeline dredge. 
Mar. 2, 1907 Extension of jetties to present project length and construction and 
operation of a dredge. 
Mar. 2, 19079 
Jun. 25, 19109 
Specified in Act. 
H. Doc. 340, 59th 
Cong., 2nd Sess., and 
Rivers and Harbors 
Committee Doc. 11, 
59th Cong., 2nd Sess. 
Extension of Galveston Channel from 51st to 57th Sts., with depth of 30H. Doc. 768, 59th 
feet and width of 700 feet. Cong., 2nd Sess. 
H. Doc. 328, 61st 
Conditional extension of Galveston Channel between 51st and 57th Sts., Cong., 2nd Sess 
30 feet deep and 1,000 feet wide. 
Jul. 27, 1916 Extend seawall at Galveston from angle at 6th St., and Broadway to H. Doc. 1390, 62nd 
vicinity of Fort San Jacinto. Cong., 3rd Sess. 
Jul. 18, 1918 Deepen harbor channel to 35 feet and widen to 800 feet. 
Sep. 22, 1922 Further extension of seawall at Galveston to a junction with south jetty; 
and repairing seawall in front of Fort Crockett reservation. 
Jan. 21, 1927" Deepen Galveston Channel to 32 feet; and maintain Galveston Harbor 
channels to dimensions of 800 feet wide, 35 feet deep on outer bar 
and 34 feet deep in inner bar.' 
Aug. 30, 1935 
Aug. 30, 1935 
Aug. 30, 1935 
H. Doc 758, 65th Cong., 
2nd Sess. 
H. Doc. 693, 66th 
Cong., 2nd Sess. 
H. Doc. 307, 69th 
Cong., Ist Sess. 
Maintain State Highway Ferry Landing Channels to dimensions of 12 by River and Harbors 
100 feet. 
72ndCommittee Doc. 31, 
72nd Cong., 1st Sess. 
Construct 13 groins along gulf shore from 12th to 61st Sts. in city of 
Galveston at a limited cost of $234,000 (10 groins constructed). 
Deepen Galveston Channel to 34 feet (Bolivar Roads to 43rd St.). 
Aug. 30, 1935 Deepen Galveston entrance channel to 36 feet. 
Apr. 4, 1938 Completion of project for construction of 13 groins. 
Jun. 30, 1948 Deepen Galveston Harbor to 38 feet from gulf to a point 2 miles west of 
seaward end of north jetty; thence 36 feet to Bolivar Roads; revoking 
authority for maintenance of ferry channels; and Galveston channel to 
36 feet deep from Bolivar Roads to 43rd Street. 
H. Doc. 400, 73rd 
Cong., 2nd Sess. 
Rivers and Harbors 
Committee Doc. 61, 
74th Cong., Ist Sess. 
Rivers and Harbors 
Committee Doc. 57, 
74th Cong., Ist Sess. 
PL 463, 75th Cong. 
H. Doc. 561, 80th 
Cong., 2nd Sess. 
40-35 
9. 
Aug. 5, 1886

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
May 17, 1950 
GALVESTON HARBOR AND CHANNEL, TX (continued) 
Deepen outer bar channel to 38 feet from gulf to a point within jetties, 
thence 36 feet in authorized channels to and including upper turning 
basin. 
Jul. 3, 1958 Dredge to a depth of 42 feet over the authorized width of 800 feet from 
the Gulf of Mexico to a point 2 miles west of the seawall and of the 
North jetty thence at a depth of 40 feet to the junction of the Houston 
Ship Channel, with widths of 800 feet to Bolivar Roads, thence 
decreasing to 400 feet at the junction with the Houston Ship Channel. 
Jun. 23, 1971 
(House Res.) 
Nov. 18, 1971 
(Senate Res.) 
Deepen Galveston Channel to 40 feet from Bolivar to 43rd Street. 
H. Doc. 195, 81st 
Cong., I st Sess. 
H. Doc. 350, 85th 
Cong., 2nd Sess. 
H. Doc. 121, 9 2
"d 
Cong 
Oct. 12, 1996 Provides for navigation and environmental restoration improvements. Sec. 101 (30) 
The navigation improvements consist of deepening and widening the PL 104-303 
Entrance Channel to 47 feet deep and 800 feet wide; the Houston 
Ship Channel to 45 feet deep and 530 feet wide; and the Galveston 
Channel to 45 feet deep. The environmental restoration portion 
consist of initial construction of marsh habitat and a colonial water 
bird nesting island through the beneficial use of new work dredged 
material, and incremental development (deferred construction) of 
additional marsh over the life of the navigation project through the 
beneficial use of maintenance materials dredged from Galveston Bay. 
The project is referred to as Houston-Galveston Navigation Channels. 
GULF INTRACOASTAL WATERWAY BETWEEN 
APALACHEE BAY, FL AND MEXICAN BORDER 
Mar. 2, 1907 Channel 4 by 100 feet from West Galveston Bay across Chocolate Bay to 
4 feet of water in Chocolate Bay. 
Mar. 3, 1925 Channel 9 by 100 feet, Sabine River to Galveston Bay, and a 20-inch 
pipeline dredge. Such passing places, widening at bends, locks or 
guard locks and railway bridges over artificial cuts as are necessary. 
Jan. 21, 1927 Channel 9 by 100 feet, Galveston Bay to Corpus Christi. 
Aug. 26, 1937 
Jun. 20, 193813 
Jun. 20, 1938 
Maintenance of a flood-discharge channel in Colorado River. 
Channel 9 by 100 feet in San Bernard River, Texas. 
Channel in Colorado River, 9 by 100 feet, with basin. 
H. Doc. 445, 56th 
Cong., 1st Sess. 
H. Doc. 238, 68th 
Cong., 1st Sess. 
H. Doc. 238, 68th 
Cong., 1st Sess. 
S. Committee print, 
75th Cong., Ist Sess. 
H. Doc. 640, 75th 
Cong., 3rd Sess. 
H. Doc. 642, 75th 
Cong., 3rd Sess. 
Jun. 20, 1938 Channel 9 by 100 feet from Palacios through Trepalacios and Matagorda H. Doc. 564, 75th 
Bays. Cong., 3rd Sess. 
Jun. 20, 1938 Channel 9 by 200 feet from main channel to harbor at Rockport and H. Doc. 64 1, 75th 
improve harbor to 9-foot depth. Cong., 3rd Sess. 
40-36 
10.

GALVESTON, TX, DISTRICT 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
GULF INTRACOASTAL WATERWAY (continued) 
Channel 6 by 100 feet from main channel to Aransas Pass, Texas. H. Doc. 643, 75th 
Cong., 3rd Sess. 
Enlarge waterway to depth of 12 feet and a width of 125 feet from H. Doc. 230, 76th 
Sabine River to Corpus Christi. Cong., 1st Sess. 
Jul. 23, 1942 Construct waterway from Corpus Christi to vicinity of Mexican 
border to provide a depth of 12 feet and width of 125 feet throughout. 
PL 675, 77th Cong. 
Mar. 2, 1945 Channel 6 by 60 feet from GIWW to a point in Chocolate Bayou near H. Doc. 337, 76th 
Liverpool. Cong., Ist Sess. 
Mar. 2, 19459 Channel 6 feet deep and 60 feet wide from main channel near Port H. Doc. 428, 76th 
O'Connor, Texas, in Barroom Bay. Cong., Ist Sess. 
Mar. 2, 1945 Enlarge channel from main channel to Aransas Pass, Texas, providing a H. Doc. 383, 77th 
depth of 9 feet and width of 100 feet. Cong., Ist Sess. 
Mar. 2, 1945 Channel 12 by 125 feet from main channel to Red Fish Landing, Texas, S. Doc 248, 78th 
with basin. Cong., 2nd Sess. 
Mar. 2, 1945"14 Channel 12 feet deep and 125 feet wide from main channel to vicinity of H. Doc. 402, 77th 
Harlingen, Texas, via Arroyo Colorado with basin. Cong., 1st Sess. (See PL 
14, 79th Cong.) 
Jul. 24, 1946 Fill a portion of shallow-draft channel adjacent to Port Isabel Turning H. Doc. 627, 79th 
Basin, construct a channel to connect shallow-draft channel with main Cong., 2nd Sess. 
channel near shoreline of Laguna Madre, and enlarge shallow-draft 
channel west of this connection, all to 12-foot depth and bottom width 
of 125 feet. 
Jul. 24, 1946 Reroute main channel to north shore of Red Fish Bay between Aransas H. Doc. 700, 79th 
Bay and Corpus Christi Bay; deepen tributary channel from Port Cong., 2nd Sess. 
Aransas to Aransas Pass, Texas, 12 feet and extended basin at same 
depth. 
May 17, 1950 Deauthorized 6 by 60 foot channel in Chocolate Bayou and reauthorized H. Doc. 768, 80 th Cong., 
the 4 by 100-foot channel. 
May 17, 1950 Alternate channel across South Galveston Bay between Port Bolivar and H. Do. 196, 81st Cong., 
Galveston causeway. 
May 17, 1950 "Red Fish Landing" changed to "Port Mansfield, Texas." PL 516, 81st Cong. 
Jul. 12, 1952 Incorporate as part of Intracoastal Waterway a channel 9 by 100 feet PL 527, 82nd Cong., 
from main channel via Seadrift to point on Guadalupe River 3 miles 2nd Sess. 
above Victoria, Texas, authorized by River and Harbor Act of 1945. 
Sep. 3, 1954"5 Small craft harbor 9 by 200 by 1,000 feet at Seadrift with an entrance H. Doc. 478, 81st 
channel 9 by 100 feet. 
Sep. 3, 1954 Widen tributary channel between Port Aransas and Aransas Pass, Texas, H. Doc. 376, 83rd 
to 125 feet; straighten and widen to 125 feet connecting channel to Cong., 2nd Sess. 
Conn Brown Harbor, and maintain Conn Brown Harbor at Federal 
expense, all to 12 feet deep. 
40-37 
Jun. 20, 1938 
Mar. 23, 1939

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
GULF INTRACOASTAL WATERWAY (continued) 
Sep. 9, 1959 Improve channels and basins comprising channel to Port Mansfield 
constructed in part by Federal Government and in part by local 
interest; constructing turnout curves at Gulf Intracoastal Waterway 
intersection and bend easing at entrance to turning basin; construct 
parallel jetties at gulf entrance; maintenance of locally dredged jetty 
channel 16 by 250 feet; and maintenance of small craft basin. 
Jul. 14, 1960 Entrance channel 7 feet deep by 75 feet wide from main channel to Gulf 
of Mexico to inside shoreline at Port Isabel, Texas, an inner channel 6 
feet deep by 50 feet wide from entrance channel to East Harbor 
Basin, and an irregular-shaped harbor basin 6 feet deep having a 
surface area of about 7 acres. 
Jul. 14, 1960 
(As amended 
Dec. 31, 1970) 
Jul. 14, 1960 
(As amended 
Dec. 31, 1970) 
Jul. 14, 1960 
(As amended 
Dec. 31, 1970) 
Oct. 23, 196216 
Oct. 23, 1962 
Oct. 23, 1962 
Oct. 27, 196517 
S. Doc. 11, 
86th Cong., 
1st Sess. 
Sec. 107, PL 645, 
86th Cong. 
Deepen the existing 6-foot channel at Port Isabel to 12 feet and removing Sec. 107, PL 86-645 
the submerged bars at each end of the island to a depth of -12 feet 
MLT. 
Deepening the existing channel to 12 by 125 feet, and extend Sec. 107, PL 86-645 
southeasterly from the Gulf Intracoastal Waterway main channel in 
West Galveston Bay, into Offatts Bayou, a distance of 2.2 miles, and 
a west turnout 12 by 125 feet between the proposed Offatts Bayou 
Channel and the Gulf Intracoastal Waterway. 
Deepening Aransas Pass tributary channel to 14 feet from mile 0 at Sec. 107, PL 86-645 
Harbor Island to mile 6.1 at the city of Aransas Pass; widening to 175 
feet between miles 3.5 and 4.6; and deepening Conn Brown Harbor, 
turning basin and connecting channel between Conn Brown Harbor 
and turning basin. 
Improve main channel 16 feet deep and 150 feet wide from Sabine River H. Doc. 556, 87th 
to Houston Ship Channel; with two relocations; relocate main channel Cong., 2nd Sess. 
in Matagorda Bay and Corpus Christi Bay; and maintaining existing 
Lydia Ann Channel. 
Deepen and widen channel to Palacios; construct two protective H. Doc. 504, 87th 
breakwaters; maintain and deepen existing basins; and deepen, Cong., 2" Sess. 
enlarge and maintain existing approach channel to basin No. 2. 
Eliminates requirement of local interest to construct bridge at mile 29.2 H. Doc. 288, 87th 
turning basin at Victoria, and maintain turning basins at Victoria and Cong., 2nd Sess. 
Seadrift; provide: Federal construction of vertical-lift railroad bridge 
at Missouri-Pacific Railroad mainline crossing, mile 29.2; 
construction and future maintenance of basin near Victoria, Texas, 
and maintenance of basin constructed by local interests at Seadrift, 
Texas. 
Modify existing Federal navigation project to provide a channel H. Doc. 217, 89th 
extending from Gulf Intracoastal Waterway through Chocolate Bay Cong., 1st Sess. 
and Chocolate Bayou to project channel mile 8.2, thence to a turning 
basin near channel mile 13.2 and for salt water barrier in Chocolate 
Bayou about 3.7 miles upstream from basin (channel mile 16.9). 
40-38

GALVESTON, TX, DISTRICT 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
GULF INTRACOASTAL WATERWAY (continued) 
Entrance channel 15 feet deep and 200 feet wide at the mouth of 
Colorado River Channel protected by an east jetty 3,500 feet long 
extending to 12-foot depth and a west jetty 2,900 feet long extending 
to 5-foot contour; make channel 12 feet by 100 feet from gulf shore to 
Matagorda, including recreation facility, a turning basin 12 feet by 
300 feet wide and 1,450 feet long, and a new diversion channel 250 
feet wide and varying in depth from 20 to 23 feet including a closure 
dam across the present river channel. 
Modified 1968 authorization to provide that diversion features be 
constructed at Federal expense and operation and maintenance be 
shared 75 percent Federal and 25 percent non-Federal. 
Enlarge existing Channel to Victoria from a depth of 9 feet and width of 
100 feet to a depth of 12 feet and width of 125 feet. 
S. Doc. 102, 90th 
Cong., 2nd Sess. 
Sec. 812, PL 99-662 
Sec. 3, PL 100-676 
Oct. 31, 1992 Provide 8 miles of erosion protection for the existing waterway in the Sec. 101 (20), 
vicinity of Sargent, Texas. PL 102-580 
Oct. 12, 1996 Provides for erosion protection along a 31-mile reach of the Gulf 
Intracoastal Waterway, which crosses the critical wintering habitat of 
the endangered whooping crane, including a 13.25 mile reach within 
the boundary of the Aransas National Wildlife Refuge. Also, 
provides for limited oil spill containment features and equipment to 
protect those areas from accidental hazardous spills. 
HOUSTON-GALVESTON NAVIGATION CHANNELS, TX 
Oct. 12, 1996 Provides for navigation and environmental restoration improvements. 
The navigation improvements consist of deepening and widening the 
Entrance Channel to 47 feet deep and 800 feet wide; the Houston 
Ship Channel to 45 feet deep and 530 feet wide; and the Galveston 
Channel to 45 feet deep. The environmental restoration portion 
consist of initial construction of marsh habitat and a colonial water 
bird nesting island through the beneficial use of new work dredged 
material, and incremental development (deferred construction) of 
additional marsh over the life of the navigation project through the 
beneficial use of maintenance materials dredged from Galveston Bay. 
Oct. 27, 2000 Provides for barge lanes immediately adjacent to either side of the 
Houston Ship Channel, from Bolivar roads to Morgan Point, to a 
depth of 12 feet. 
HOUSTON SHIP CHANNEL, TX 
Mar. 5, 1905 Easing or cutting off sharp bends and construction of a pile dike.' s 
Mar. 2, 1919 A channel 30 feet deep, widen bend at Manchester and enlarge turning 
basin. 
Mar. 3, 1925 A light-draft extension of channel to mouth of White Oak Bayou.' 9 
Jul. 3, 1930 Widen channel through Morgan Point and to a point 4,000 feet above 
Baytown and widen certain bends. 
Sec. 101 (29), 
PL 104-303 
Sec. 101 (29) 
PL 104-303 
Appendix B, 
PL 106-377 
Rivers and Harbors 
Committee Doe. 35, 
61st Cong., 2nd Sess. 
H. Doc. 1632, 65th 
Cong., 3rd Sess. 
H. Doc. 93, 67th 
Cong., 1st Sess. 
H. Doc. 13, 71st 
Cong., IstSess. 
40-39 
Aug. 13, 1968 
Nov. 17, 1986 
Nov. 17, 1988 
11. 
12

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
HOUSTON SHIP CHANNEL, TX (continued) 
Aug. 30, 19351" 
Aug. 30, 1935 
Mar. 2, 1945 
Deepen to 32 feet in main channel and turning basin, and a 400-foot 
width through Galveston Bay. 
Deepen to 34 feet in main channel and widen from Morgan Point to 
turning basin 
Branch channel 10 by 60 feet behind Brady Island. 
Mar 2, 1945 Widen channel from Morgan Point to lower end of Fidelity Island with 
turning points at mouth of Hunting Bayou and lower end of Brady 
Island. 
Rivers and Harbors 
Committee Doc. 28, 
72nd Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 58, 
74th Cong., Ist Sess. 
H. Doc. 226, 76th 
Cong., 1st Sess. 
H. Doc. 226, 76th 
Cong., Ist Sess. 
Mar. 2, 1945 Widen channel from lower end of Fidelity Island to Houston turning H. Doc. 737, 79th 
basin and dredge off-channel silting basins. Cong., 2nd Sess. 
Jun. 30, 1948 Deepen to 36 feet from Bolivar Roads to and including main turning 
basin at Houston, Texas, including turning points at Hunting Bayou 
and Brady Island. 
Jul. 3, 195820 Deepen to 40 feet from Bolivar Roads to Brady Island, construct Clinton 
Island turning basin, a channel 8 by 125 feet at Five Mile Cut, and 
improve shallow-draft channel at Turkey Bend. 
Jul. 14, 1960 Barbour Terminal at Morgan Point. 
Oct. 27, 1965H. 
Doc. 257, 89th 
Cong., Ist Sess. 
Nov. 17, 1986 
Restoring existing locally dredged channel from mile 0 to 0.34 to 36 feet 
deep and dredging a 15-12 ft. channel from mile 0.34 to 2.81, in 
Greens Bayou.2' 
Maintenance of Greens Bayou, Barbour Terminal Channel, and Bayport 
Ship Channel to forty-foot depths at Federal expense. 
H. Doc. 561, 80th 
Cong., 2nd Sess. 
H. Doc. 350, 85"t 
Cong., 2nd Sess.I 
Sec. 107, PL 86-645 
H. Doc. 257, 89th 
Cong., 1st Sess. 
Sec. 819, PL 99-662 
Oct. 12, 1996 Provides for navigation and environmental restoration improvements. Sec. 101 (30) 
The navigation improvements consist of deepening and widening the PL 104-303 
Entrance Channel to 47 feet deep and 800 feet wide; the Houston 
Ship Channel to 45 feet deep and 530 feet wide; and the Galveston 
Channel to 45 feet deep. The environmental restoration portion 
consist of initial construction of marsh habitat and a colonial water 
bird nesting island through the beneficial use of new work dredged 
material, and incremental development (deferred construction) of 
additional marsh over the life of the navigation project through the 
beneficial use of maintenance materials dredged from Galveston Bay. 
The project is referred to as Houston-Galveston Navigation Channels. 
MATAGORDA SHIP CHANNEL, TX 
Jun. 25, 1910 Channel to Port Lavaca, Texas 7 feet deep and 89 feet bottom width. 
Aug. 30, 1935 Extend 7-foot channel to shoreline of Lavaca Bay at mouth of Lynns 
Bayou. 
H. Doc. 1082, 60th 
Cong., 2nd Sess. 
Rivers and Harbors 
Committee Doc. 28, 
74th Cong., 1st Sess' 
40-40 
13.

GALVESTON, TX, DISTRICT 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
MATAGORDA SHIP CHANNEL, TX (continued) 
Deepen and widen channel to present project dimensions. Rivers and Harbors 
Committee Doc. 37, 
75th Cong., 1st Sess. 
Mar. 2, 1945 Extend channel 6 by 100 feet from Port Lavaca via Lavaca Bay, Lavaca H. Doc. 314, 76th 
and Navidad Rivers to Red Bluff, a distance of 20 miles. Cong., Ist Sess. 
Mar. 2, 1945 A harbor of refuge 9 feet deep near Port Lavaca and an approach channel H. Doc. 731, 79th 
100 feet wide and equal depth. Cong., 2nd Sess. 
Jul. 3, 1958 Deepen to 12 feet and widen to 125 feet Port Lavaca Channel and 
approach channel to harbor of refuge; deepen to 12 feet Port Lavaca 
turning basin and basins at harbor of refuge. 
Jul. 3, 1958 An entrance channel 38 by 300 feet, a channel 36 by 200 feet, 22 miles 
long across Matagorda and Lavaca Bays to Point Comfort, Texas, a 
turning basin 36 feet deep and 1,000 feet square at Point Comfort, 
and dual jetties at entrance from gulf. 
NECHES RIVER AND TRIBUTARIES, SALT WATER 
BARRIER AT BEAUMONT, TX 
Oct. 22, 1976 Construct gated salt water barrier in Neches River consisting of seven 40 
x 24.5 foot tainter gates; gated navigation by-pass channel with clear 
opening of 56 feet and depth of 16 feet; access road and levee; and 
auxiliary dam across canal which drains adjacent bayou. 
SABINE-NECHES WATERWAY, TX. 
Jul. 25, 1912 Existing project dimensions of jetties, a 26-foot channel through Sabine 
Pass, Port Arthur Canal and Port Arthur turning basin; and a 26-foot 
turning basin at Port Arthur. A depth of 25-feet in Sabine-Neches 
Canal, Neches River to Beaumont and Sabine River to Orange, 
including cutoffs and widening channels. 
H. Doc. 131, 84th 
Cong., Ist Sess. 
H. Doc. 388, 84th 
Cong., 2nd Sess. 
Sec. 102, PL 94-587 
H. Doc. 773, 61st 
Cong., 2nd Sess. 
Sep. 22, 1922 Deepen channels to 30 feet from gulf to Beaumont, with increased H. Doc. 975, 66th 
widths and an anchorage basin in Sabine Pass. Cong., 3rd Sess. 
Sep. 22, 1922 Deepen Port Arthur east and west turning basins and approach channel to 
30 feet. Take over and deepen to 30 feet channel connecting west 
turning basin with Taylors Bayou turning basin. For a 30-foot depth 
in channel from mouth of Neches River to cutoff in Sabine River near 
Orange. 
Mar. 3, 1925 Removal of guard lock in Sabine-Neches Canal. 
Jan. 21, 1927 Widen Sabine Pass and jetty channel, Port Arthur Canal, and Sabine- 
Neches Canal. For dredging 2 passing places in Sabine-Neches Canal, 
easing of bends, removal and reconstructing Port Arthur field office, 
extending Beaumont turning basin upstream 200 feet above new city 
wharves, and an anchorage basin in Sabine Pass. 
S. Doc. 152, 67th 
Cong., 2nd Sess. 
H. Doc. 234, 68th 
Cong., 1st Sess. 
H. Doc 287, 69th 
Cong., 1st Sess. 
Aug. 30, 193511 A depth of 32 feet in channels from gulf to Beaumont turning basin, 
including all turning basins at Port Arthur. 
Rivers and Harbors 
Committee Doc. 27, 
72nd Cong., I st Sess. 
40-41 
Aug. 26, 1937 
14. 
15.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Aug. 30, 1935"11 
Aug. 30, 1935 
Aug. 26, 1937 
Aug. 26, 1937 
Jun. 20, 193822 
Oct. 17, 1940 
SABINE-NECHES WATERWAY, TX (continued) 
Deepen channels to 34 feet with increased widths from gulf to Beaumont 
turning basin. 
Construct suitable permanent protective works along Sabine Lake. 
Maintain Taylors Bayou turning basin. 
Maintain channel from Sabine River to Orange Municipal wharf. 
Dredging 500 feet from eastern end of Harbor Island and abandonment 
of channel south and west of Harbor Island. 
Increased widths of channels from gulf to Beaumont turning basin and 
channel connecting Port Arthur west turning basin and Taylors Bayou 
turning basin, deepen Beaumont turning basin and Beaumont turning 
extension to 34 feet; and dredge a new cutoff from Smith's Bluff 
cutoff to McFadden Bend. 
Abandon Orange turning basin; dredge a channel 25 by 150 feet, suitably 
widened on bends to highway bridge, and dredge a cutoff channel 
opposite Orange. 
Mar. 2, 1945 Extend Beaumont turning basin upstream 300 feet. 
Mar. 2, 1945 Widen Port Arthur west turning basin to 600 feet. 
Rivers and Harbors 
Committee Doc. 12, 
74th Cong., 1st Sess. 
Specified in Act. 
Rivers and Harbors 
Committee Doc. 3, 
75th Cong., Ist Sess. 
Rivers and Harbors 
Committee Doc. 20, 
75th Cong., Ist Sess. 
H. Doc. 581, 75th 
Cong., 3rd Sess. 
S. Doc 14, 77th 
Cong., Ist Sess. 
H. Doc. 685, 76th 
Cong., 3rd Sess. 
S. Doc 60, 77th 
Cong., Ist Sess. 
Mar. 2, 1945 Dredge a channel from Beaumont turning basin to vicinity of S. Doc 158, 77th 
Pennsylvania Shipyard. Cong. 2nd Sess. 
Jul. 24, 194623 Deepen Sabine Pass outer bar channel to 37 feet, Sabine Pass jetty 
channel to 36 feet at inner end, deepen to 36 feet Sabine Pass 
Channel, Port Arthur Canal, Port Arthur east and west turning basins, 
Taylors Bayou turning basin and channel from Port Arthur west 
turning basin to Taylors Bayou turning basin, deepen to 36 feet and 
widen to 400 feet Sabine-Neches Canal from Port Arthur Canal to 
mouth of Neches River except through Port Arthur Bridge; deepen 
Neches River channel from mouth to Beaumont turning basin to 36 
feet widening to 350 feet from Smith's Bluff to Beaumont turning 
basin; deepen junction area on Neches River at Beaumont turning 
basin to 36 feet; and widen Sabine-Neches Canal between Neches and 
Sabine Rivers to 150 feet. 
Jul. 24, 194624 Improve Cow Bayou, Texas, by construction of a channel 100 feet wide 
and 13 feet deep extending from navigation channel in Sabine River 
to a point 0.5 mile above county bridge at Orangefield, Texas, with a 
turning basin. 
Jul. 24, 1946 Improve Adams Bayou, Texas, to provide a channel 12 feet deep and 100 
feet wide extending from 12-foot depth in Sabine River to first county 
highway bridge across bayou. 
H. Doc. 571, 79th 
Cong., 2nd Sess. 
H. Doc. 702, 79th 
Cong., 2nd Sess. 
H. Doc. 626, 79th 
Cong., 2nd Sess. 
40-42

GALVESTON, TX, DISTRICT 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
SABINE-NECHES WATERWAY, TX (continued) 
May 17, 1950 Deepen to 36 feet and widen to 400 feet the Sabine-Neches Canal near 
Port Arthur bridge; reconstruct Port Arthur Bridge and relocate Port 
Arthur field office. 
Rectification of certain reaches of existing Sabine Pass Channel, Sabine- 
Neches Canal, and Neches River and Sabine River Channel; widen to 
350 feet entrance channel to Port Arthur turning basins; widen curve 
at junction of Port Arthur and Sabine-Neches Canals; relocate and 
enlarge Sabine Pass anchorage basin to 34 by 1,500 by 3,000 feet; 
widen to 200 feet Sabine-Neches Canal from mouth of Neches River 
to mouth of Sabine River and Sabine River Channel to upper end of 
existing project at Orange, except for channel around Harbor Island at 
Orange; deepen to 30 feet Sabine River Channel from cutoff near 
Orange municipal slip to upper end of project, except around Harbor 
Island; and enlarge area at entrance to Orange municipal slip to 
provide a maneuvering basin. 
Improve outer bar channel to 42 and 40 feet for all inland channels to 
Port Arthur and Beaumont; width of 500 feet in Port Arthur Canal 
and 400 feet in Neches River Channel to Beaumont with three turning 
points in Neches River; a channel, 12 by 125 feet, extending in 
Sabine River to Echo; and replace an obstructive bridge at Port 
Arthur, Texas. Deauthorization of uncompleted portion of channel 
between Port Arthur west turning basin and Taylors Bayou turning 
basin and enlargement of entrance channel to Port Arthur turning 
basins. 
H. Doc. 174, 81st 
Cong., 1st Sess. 
S. Doc. 80, 83rd 
Cong., 2nd Sess. 
H. Doc. 553, 87th 
Cong., 2nd Sess.' 
TEXAS CITY CHANNEL, TX 
Mar. 4, 1913 A channel 300 by 30 feet and construct a pile dike 28,200 feet long north H. Doc. 1390, 62nd 
to channel. Cong., 3rd Sess. 
Jul. 3, 1930 A harbor 800 by 30 feet at Texas City, and construct a rubblemound H. Doc. 107, 71st 
dike. Cong., Ist Sess. 
Extension of rubblemound dike to shoreline. 
Deepen channel and harbor to 32 feet. 
Aug. 30, 1935 Deepen channel and harbor to 34 feet. 
Aug. 26, 1937 Extend harbor 1,000 feet southward, 800 by 34 feet. 
Jun. 30, 1948 Deepen channel and harbor to 36 feet, widen channel to 400 feet and 
harbor to 1,000 feet and changing name of project to "TEXAS CITY 
CHANNEL, TEXAS." 
Rivers and Harbors 
Committee Doc. 4, 
73rd Cong., Ist Sess. 
Rivers and Harbors 
Committee Doc. 46, 
73rd Cong., 2rd Sess. 
Rivers and Harbors 
Committee Doc. 62, 
74th Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 47, 
75th Cong., Ist Sess. 
H. Doc. 561, 80th 
Cong., 2nd Sess.1 
40-43 
Sep. 3, 195425 
Oct. 23, 196226 
16. 
Aug. 30, 193511 
Aug. 30, 1935

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
TEXAS CITY CHANNEL, TX (continued) 
Jul. 14, 1960 Deepen channel and turning basin to 40 feet and construct 16-foot H. Doc. 427, 86th 
Industrial Barge Canal. Cong., 2nd Sess. 
Oct. 12, 1972 Widen the existing main turning basin to 1,200 feet including relocation 
Senate Res.) of the basin 85 feet to the east; providing a 40-foot deep channel in 
the Industrial Canal at widths of 300-400 feet, with a turning basin at 
Oct. 12, 1972 the head of the canal 40 feet deep, 1,150 feet long, and 1,000 feet 
(House Res.) wide, and easing of the bend at the entrance to the canal, and 
deauthorization of shallow-draft Industrial Barge Canal not 
incorporated in the plan of improvement above. 
Nov. 17, 1986 
17. 
Jun. 18, 1878 
1889 
Deepening the Texas City Turning Basin to 50 feet, enlarging the 6.7 
mile long Texas City Channel to 50 feet by 600 feet; deepening the 
existing 800-foot wide Bolivar Roads Channel and Inner Bar Channel 
to 50 feet; deepening the existing 800-foot wide Outer Bar and 
Galveston Entrance Channels to 52 feet; extending the Galveston 
Entrance Channel to a 52 foot depth for 4.1 miles at a width of 800 
feet and an additional reach at a width of 600 feet to the 52 foot 
contour in the Gulf of Mexico; and establishment of 600 acres of 
wetland and development of water-oriented recreational facilities on a 
90-acre enlargement of the Texas City Dike. 
TRINITY RIVER AND TRIBUTARIES, TX 
Dredging of a channel through the bar at the mouth of the Trinity River. 
Modified to include two parallel jetties 275 feet apart, the westerly one 
of length 7,359 feet and the other of length 300 feet. 
Jun. 13, 1902 Improvement of the Trinity River in the interest of providing navigation 
(As amended from the mouth of the Trinity River to Dallas. The plan provided for 
Mar. 3, 1905, the construction of 37 locks and dams, with auxiliary dredging and 
Mar. 2, 1907, other open-channel work necessary to obtain a 6-foot depth for 
Jun. 25, 1910, continuous navigation (excepting periods of excessive drought). 
Jul. 25, 1912, Each Act also authorized the construction of certain-named locks and 
Mar. 4, 1913, dams. 
and Jul. 27, 1916) 
Mar. 3, 1905 Authorized the Anahuac Channel. No project dimensions were specified 
by the Act, so a 7- by 8-foot channel, 12,238 feet long was dredged in 
1905. 
H. Doc. 199, 92" Cong., 
2nd Sess. 
(Sec. 201, 
PL 89-298) 
Sec. 201, PL 99-662 
H. Doc. 409, 56th 
Cong., 1 Sess. 
Specified in Act. 
Abandon improvements above Liberty and terminate all improvements H. Doc. 989 66" 
by lock and dam, leaving a 6-foot channel from Liberty to mouth. Cong., 3rd Sess 
Mar. 2, 1945 Provides for a navigable channel from the Houston Ship Channel near 
Red Fish Bar in Galveston and Trinity Bays to the mouth of Trinity 
River and 9 feet deep and 150 feet wide in the river section, with a 
turning basin at Liberty. 
Jul. 24, 1946 Modification of the project to provide for a channel 9 feet deep and 150 
feet wide from the Houston Ship Channel near Red Fish Bar in 
Galveston Bay extending along the east shore of Trinity Bay to the 
mouth of the Trinity River at Anahuac, including protective spoil 
embankment on the bay side of the channel in lieu of the 9 by 200- 
foot channel in Galveston and Trinity Bays. 
H. Doc. 403, 77th 
Cong., Ist Sess. 
H. Doc. 634, 79th 
Cong., 2nd Sess. 
40-44 
Sep. 22, 1922

GALVESTON, TX, DISTRICT 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
TRINITY RIVER AND TRIBUTARIES, TX (continued) 
Oct. 23, 1962 Provides for the multiple-purpose Wallisville Reservoir, including a 
navigation lock in the Wallisville Dam at Channel Mile 28.30 and 
advancement of the Channel to Liberty from one mile below Anahuac 
(Mile 23.2) to the Texas Gulf Sulphur Company's slip at Channel 
Mile 35.8, and incorporation into existing project Anahuac Channel 
and mouth of Trinity River projects. 
Oct. 27, 1965 Reevaluation of navigation benefits. 
H. Doc. 215, 87th 
Cong., 1st Sess. 
H. Doc. 276, 89th 
Cong., Ist Sess. 
Jul. 30, 1983 Modified Wallisville Reservoir by reducing the size to 5,600 acres and PL 98-63 
confining the reservoir to east side of Trinity River. 
20. 
Dec. 15, 1970 
(House Res.) 
Dec. 17, 1970 
(Senate Res.) 
CORPUS CHRISTI BEACH, TX (RESTORATION 
PROJECT) 
Restoration and periodic nourishment of 1.4 miles of beach. 
BUFFALO BAYOU AND TRIBUTARIES, TX 
Jun. 20, 1938 Barker and Addicks Reservoirs, Texas. 
H. Doc. 415, 91" 
Cong., 2nd Sess. 
(Sec. 201, 
PL 89-298) 
H. Doc. 456, 75th 
Cong., 2nd Sess. 
Sep. 3, 1954 Clearing, straightening, enlarging and lining of Buffalo, Brays, and H. Doc. 250, 83rd 
White Oak Bayous. Cong., 2nd Sess.' 
Oct. 27, 1965 Extend upper limits of White Oak Bayou upstream about 2.1 miles from 
BRI RR bridge to mouth of Cole Creek. 
Nov. 28, 1990 Flood damage reduction improvements and recreational development for 
the Houston, Texas urban area, divided into six separable elements - 
Brays, Greens, Hunting, Halls, Carpenters and Little White Oak 
Bayous. Flood control improvements consist of 75.3 miles of stream 
enlargement, 14 miles of stream clearing, 7 flood detention basins, 7 
miles of diversion channels and environmental revegetation. 
Recreation features consist of 14.7 miles of trails, 502 picnic 
facilities, 12 group pavilions, 2 boat launching ramps, 10 restrooms, 
playgrounds, exercise stations and parking facilities. 
Oct. 12, 1996 Authorizes non-Federal interests to undertake flood control projects in 
the United States, subject to obtaining any permits required pursuant 
to Federal and State laws in advance of actual construction. For the 
purpose of demonstrating the potential advantages and effectiveness 
of non-Federal implementation of flood control projects, the 
Secretary shall enter into agreements pursuant to this section with 
non-Federal interests for development of the following Buffalo Bayou 
projects: Brays Bayou, Hunting Bayou, and White Oak Bayou. 
H. Doc. 169, 89th 
Cong., Ist Sess. 
Sec. 101, PL 101-640 
Sec. 211, PL 104-303 
40-45 
21.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
BUFFALO BAYOU AND TRIBUTARIES (continued) 
Oct. 12, 1996 The non-Federal interest for the Buffalo Bayou and tributaries authorized Sec 350, PL 104-303 
flood control projects, may be reimbursed by up to $5,000,000 or may 
receive a credit of up to $5,000,000 toward required non-Federal 
project cost-sharing contributions for work performed by the non- 
Federal interest at each of the following locations if such work is 
compatible with 1 or more of the following authorized projects: 
White Oak Bayou, Brays Bayou, Hunting Bayou, Garners Bayou (not 
authorized), and the Upper Reach of Greens Bayou. 
During any evaluation of economic benefits and costs that occurs after 
October 12, 1996, the Secretary shall not consider flood control 
works constructed by non-Federal interests within the drainage area 
of such projects prior to the date of such evaluation in the 
determination of conditions existing prior to construction of the 
following authorized projects: Buffalo Bayou Basin, Buffalo Bayou 
and Tributaries (Brays, Greens, Hunting, Halls, Little White Oak, and 
Carpenters Bayous), and Cypress Creek. 
CLEAR CREEK, TX 
Channel enlargement and rectification from upper end of Clear Lake at 
Mile 3.8 to improved channel Mile 34 .8.28 
Modified local cooperation requirements of the 1968 authorization. 
CYPRESS CREEK, TX 
Enlargement and rectification of lower 29.4 miles of Cypress Creek 
channel and recreational development 
Modified the project to authorize a nonstructural flood control project. 
LOWER RIO GRANDE BASIN, TX 
Channel improvements to provide drainage protection for the area in 
Hidalgo and Willacy Counties north of U.S. Highway 83, and for the 
area between U.S. Highway 83 and the Rio Grande in Hidalgo 
County; and to provide flood protection for the cities of McAllen, 
Edinburg, Raymondville, Edcouch, La Villa, and Lyford. 
Modified the project to authorize a nonstructural flood control project. 
SIMS BAYOU, TX 
Enlargement and rectification, with appropriate erosion control measures 
of 19.31 miles of Sims Bayou; environmental measures and riparian 
habitat along entire alignment, and recreational development. 
Amended the Water Resources and Development Act (WRDA) of 1986 
authorization as project cost estimate had exceeded limit established 
in Section 902 of WRDA 1986. 
Sec. 575, PL 104-303 
H. Doc. 351, 90th 
Cong., 2nd Sess. 
Sec. 1001, PL 99-662 
Sec. 3, PL 100-676 
Sec. 355(a), PL 106-53 
Sec 401, PL 99-662 
Sec. 355(a), PL 106-53 
Sec. 401, PL 99-662 
Sec. 103, PL 101-101 
1 Contains latest published maps. 
2 Extension of north jetty 1,950 feet and south 
jetty 1,265 feet considered inactive. (1975 Deauthorization 
list) 
Dredging 2,000 by 650-foot northerly 
extension of inner basin deauthorized. 
Included in Public Works Administration 
program September 6, 1933 and February 16, 1935. 
40-46 
Oct. 12, 1996 
23. 
24. 
25. 
26. 
Aug. 13, 1968 
Nov. 17, 1986 
Nov. 17, 1988 
Aug. 17, 1999 
Nov 17, 1986 
Aug. 17, 1999 
Nov. 17, 1986 
Sep. 29, 1989 
--

GALVESTON, TX, DISTRICT 
s West leg of Wye junction with main channel 
deauthorized. 
6 Construction of lock in diversion dam at local 
expense considered inactive. 
7 Dredging upper 1.3 mile of channel to vicinity 
of Stauffer Chemical plant was deauthorized under Sec. 12 
of PL 93-251. Included in Public Works Administration 
program September 6, 1933. (1975 Deauthorization list) 
* Dredging 43rd to 51st Streets was deauthorized 
under Sec. 12 of PL 93-251. (1975 Deauthorization list) 
1 Deauthorized under Sec. 12 of PL 93-251. 
(1975 Deauthorization list) 
10 Deepening 43rd to 57th Streets was 
deauthorized under Sec. 12 of PL 93-251. (1975 
Deauthorization list) 
11 Previously authorized September 6, 1933 by 
Public Works Administration. 
12 H. Doc. 230, 76th Cong., Ist Sess. and project 
documents contain latest published maps. 
13 Dredging upper 3.4 miles was deauthorized 
under Sec. 12 of PL 93-251. (1975 Deauthorization list) 
14 Dredging upper 5 miles was deauthorized 
under Sec. 1001 of PL 99-662. 
1 Inactive. 
6 Portion of 16-foot by 150-foot channel from 
Sabine River to Houston Ship Channel is inactive. 
Relocation of channel in Matagorda Bay deauthorized 
under Sec. 12 of PL 93-251. (1986 Deauthorization list) 
" The 9 feet by 100 feet channel from Mile 8.2 
to Mile 13.2 in Chocolate Bayou was deauthorized under 
Sec. 1001 of PL 99-662. 
11 Construction of pile dike was deauthorized 
under Sec. 12 of PL 93-251. (1975 Deauthorization list) 
19 Hill Street Bridge to mouth of White Oak 
Bayou was deauthorized under Sec. 12 of PL 93-251. 
(1975 Deauthorization list) 
20 Deepening channel to 40 feet from Southern 
Pacific Slip (mile 47) to Brady Island was deauthorized 
under Sec. 12 of PL 93-251. (1975 Deauthorization list) 
21 The 12-foot channel from mile 1.65 to mile 
2.81 deauthorized under Sec. 12 of PL 93-251. (1985 
Deauthorization list) 
22 Complete widening of channel between Port 
Arthur west turning basin and Taylors Bayou turning basin 
deauthorized by 1962 R&H Act. 
23 Complete deepening of channel between Port 
Arthur west turning basin and Taylors Bayou turning basin 
deauthorized by 1962 R&H Act. 
24 Channel extension above Cow Bayou turning 
basin near Orangefield was deauthorized under Sec. 12 of 
PL 93-251. (1975 Deauthorization list) 
25 Widening to 350 feet entrance channel to Port 
Arthur turning basin deauthorized by 1962 R&H Act. 
26 The 12-foot channel in Sabine River from 
Orange to Echo, Texas deauthorized under Sec. 12 of PL 
93-251. (1985 Deauthorization list) 
27 Jetty extension was deauthorized under Sec. 
1001 of PL 99-662. 
28 Portion of project upstream of 
Brazoria/Galveston County line, approximately mile 18.5, 
in inactive category. 
29 Cedar Bayou, miles 3 to 11 were deauthorized 
under Sec. 12 of PL 93-251 and were re-authorized under 
Sec. 349(a)(2), PL 106-541. 
30 Channel to Port Bolivar turning basin was 
deauthorized under Sec. 1001 of PL 99-662. 
40-47

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 40-C 
OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Full Cost to September 30, 2000 
Report See 
Annual Report Operation and 
Project For Construction Maintenance 
Aquatic Plant Control (1958 and 1962 River and 
Harbor Acts) 
Bastrop Bayou, TX2 
Corpus Christi, TX, Channel to Navy Seaplane Base 
Encinal Peninsula 
Dickinson Bayou, TX 
East Bay (Hanna Reef), TX3 
Greens Bayou Bridges, TX 
Johnson Bayou, LA4 
Little Bay, TXS 
Oyster Creek, TX 
I Exc~xes $1,672 wck coniLxfion. 
2 Widening from 60 ft to 100 fiet at 4-foat was 
deathriz der Sec. 12 ofPL 93-251. 
Ih3a ficSPglyfora 
1967 
1931 
1968 
1954 
1922 
1993 
1933 
1979 
1922 
38,252 
9,920 
1,194,344 
33,942 
2,476 
450,000 
2,261 
6,942 
27,129 
26,467 
57,553 
847 
54,042 
252,728 
7,556 
4 Channeque af oirexgc nacMe. 
5 ArsanCutyNa4igom Diic RodqxtTX 
crsmucted projt as athorid by 1950 Riverad HaxrAct(R Dc 
114, 81st Cong, 1st Sess) in 1955 under Deprmat ofAnny pen 
40-48

GALVESTON, TX, DISTRICT 
TABLE 40-D 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Full Cost to September 30, 2000 
Report See 
Annual Report Operation and 
Project For Construction Maintenance 
Arroyo Colorado, Rio Hondo, TX' 1986 201,300 
Buffalo Bayou at Piney Point, TX2 1996 473,8009 
Colorado River, Matagorda, TX' 1963 273,757 
Falfurrias, TX' 1995 103,454 
Freeport and Vicinity, Texas, Hurricane-Flood 
Protection2 1984 29,285,0423 
Guadalupe River at Victoria, TX2 1996 532,18710 
Guadalupe River (Remove Log Jams), TX2 1978 505,749 
Highland Bayou, TX'3 1984 12,254,390 
Kirbyville, TX2 1993 1,484,6134 
Lavaca-Navidad River, TX: 
Hallettsville Project 1961 256,043 
Port Arthur and Vicinity Hurricane-Flood 
Protection, TX2 1997 61,400,2921" 
San Diego Creek, Alice, TX2 1963 135,175 
State Highway 111 Bridge, Lake Texana, TX2 1995 214,155' 
Taylors Bayou, TX2 1997 37,413,20912 
Texas City and Vicinity, Texas, Hurricane-Flood 
Protection2 1993 38,882,4007 
Tranquitas Creek, Kingsville, TX' 1956 130,239 
Three Rivers, TXS 6 5,835,927' 
Upper White Oak Bayou, TX2 1989 972,300 
U.S. 190 Bridge, Sabine River, Merryville, LA2 1993 500,0008 
Vince and Little Vince Bayous, TX 2 1993 19,307,100 
In adition, $8,695,438 expended fm contrixuted funds, 
1,126905 e~tined value of comnbuted lan, and $2,726,446 for 
*elocatiomlobcyal intenss. 
' In addition, $1,484,613 expeded fcm conibted fich, 
efa value of $200,096 for conmuited lndS and 202456 for 
*Cad=by localinests* 
3 In addi n, $71370 expmded fm contributed finds. 
6 SeeA na Repart for 1983, Fort Worth District, page 16- 
SIn additin, $14396307 expended fncon uted fids, 
r l vaue of$1,224,2 19 fr conibuted lands, and contnbuted work 
int he maont of $1,070,806 by local iktess. Work perfmne d at 100/o 
Local Spnsor expense was in the amxn of$320347. 
S In addition, $237,792 expa ded fm cntxilted fi~nd. 
9 In addition $92920 epended fm uncibtaed ffund 
o In aMdition $480,888 expended fiom conOlted findc 
" Inadditian,$16,976,675expendedfromoatIxtedfuds 
u In additio$12340,997 fpencdr1efdb fmed fu 
t Canpleted. Lower8.6 milesofadl el recificaion 
on Highnd Bayu wasc x April 5,1999. 
40-49

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 40-E 
OTHER AUTHORIZED ENVIRONMENTAL RESTORATION PROJECTS 
For Last Full Cost to September 30, 2000 
Report See 
Annual Report Operation and 
Project For Construction Maintenance 
Laguna Madre Seagrass Restoration, TX ' 1998 225,4402 
Salt Bayou, McFadden Ranch, TX' 1997 1,754,0003 
' noied 
2 In addit $75,146expde rm contbated fixis 
SIn additin,$57677 exmded fimcaibted 
fiundsd an estid va ofotibued lands in the amout of$8,000. 
40-50

TABLE 40-F 
Project 
Baytown 
Brazos River, TX, Velasco to 
Old Washington 
Corpus Christi Ship Ch - 1913 Act Jetty 
GIWW, Harbor Refuge at Seadrift 
Liberty Local Protection Project, TX 
Mill Creek Brazos River, Austin Co. 
1946 Act 
Navidad & Lavaca Rivers, Jackson 
and Lavaca Counties- General 
Channel Project 
Peyton Creek, TX 
Sabine River and Tributaries, TX 
(Echo to Morgan Bluff) 
1978 
1971 
1952 
1952 
1975 
1971 
DISTRICT 
ZED PROJECTS 
GALVESTON, TX, 
DEAUTHORI 
For Last Full 
Report See 
Annual Report 
For 
1980 
1924 
1W udim$123,676 forpeviospojecs. 
40-51 
Federal 
Funds 
Expended 
245,000 
216,9891 
Contributed 
Funds 
Expended 
223,010 
Date 
And 
Authority 
Sec. 1001 of PL 99-662 
Sec. 1001 of PL 99-662 
17 Nov 1986 
Sec. 1001 of PL 99-662 
19 Jul 1992 
Sec. 1001 of PL 99-662 
19 Jul 1992 
Sec. 1001 of PL 99-662 
17 Nov 1986 
Sec. 1001 of PL 99-662 
1 Jan 1990 
Sec. 1001 of PL 99-662 
1 Jan 1990 
Sec. 1001 of PL 99-662 
17 Nov 1986 
Sec. 1001 of PL 99-662 
17 Nov 1986 
79,041 
98,517 
24,753 
21,086 
66,377 
-- 
- I

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TOTAL COST OF EXISTING PROJECTS 
ee Total Cost 
ection to 
a Text Project Funds New Work Maintenance Rehabilitation Sep. 30, 2000 
2. Brazos Island Harbor, TX 
3. Cedar Bayou, TX 
4. Channel to Port 
Bolivar, TX 
6. Corpus Christi Ship 
Channel, TX 
8 Freeport Harbor, TX 
9. Galveston Harbor and 
Channel, TX 
10. Gulf Intracoastal Waterway 
between Apalachee Bay, FL 
and the Mexican Border 
11. Houston Ship Channel, TX 
15. Sabine-Neches Waterway, TX 
Regular 
Public Works 
Contributed 
Total cost of project 
Regular 
Contributed 
Total cost of project 
Regular 
Total cost of project 
Regular 
Public Works 
Contributed 
Total 
Value of useful work 
performed 
Contributed land 
Total cost of project 
Regular 
Public Works 
Contributed 
Total 
Value of useful work 
performed 
Total cost of project 
Regular 
Channel 
Seawall 
Public Works 
Contributed 
Total cost of project 
Regular 
Public Works 
Inland WW. Trust Fund 
Contributed 
Total 
Value of useful work 
performed 
Contributed land 
Total cost of project 
Regular 
Public Works 
Contributed 
Total cost of project 
Regular 
Public Works 
Contributed 
Total 
Value of useful work 
performed 
Contributed land 
Total cost of project 
TABLE 40-G 
SI 
SI 
IF 
24,346,787 
2,848,560 
10,571,509 
37,766,856 
2,170,080
00 
2,170,080 
642,176
0 
642,176 
85,214 
85,214 
75,775,642 
324,287 
6,143,152 
82,243,849 
1,716,695 
276,720 
84,237,264 
64,502,299 
116,575 
20,811,568 
85,425,873 
360,249 
85,786,122 
11,920,187 
8,754,209
0 
3,648,932 
24,323,328 
142,080,051 
466,477 
28,634,490 
5,774,661 
176.955,679 
395,000 
139,776 
177,490,455 
29,042,93 
2,612,932 
1,382,760 
33,037,985 
49,592,331 
1,363,652 
2,103,435 
53,059,418 
32,000 
116,760 
53,208,178 
60,937,887
0 
1,352,092 
62,289,979 
4,154,716
0 
4,154,716 
1,335,578 
1,335,578 
125,595,108
0 
1,071,952 
126,667,060
00 
126,667,060 
84,722,379
0 
229,311 
84,951,690
0 
84,951,690 
118,135,105 
512,163 
13,121 
2,982,425 
121,642,814 
488,054,908
00 
1,811,028 
489,865,936
0
0 
489,865,936 
182,261,387 
15,479,239 
551,583 
198,292,209 
243,869,563
0 
5,938,114 
249,807,677
0
0 
249,807,677 
0
0
0
0
0 
3,576,684
00 
3,576,684
0
0 
3,576,684 
8,935
00 
8,935
0 
8,935 
7,373,356 
595,973
00 
7,969,329 
3,390,338
0 
2,955,700
0 
6,346,038
00 
6,346,038
0
0
00 
00 
0
0
0
00 
o 
o 
87,454,754 
2,848,560 
11,923,601 
102,226,915 
4,796,892
0 
4,796,892 
1,420,792 
1,420,792 
204,947,434 
324,287 
7,215,104 
212,487,593 
1,716,695 
276,720 
214,481,008 
149,233,613 
116,575 
21,040,879 
170,386,498 
360,249 
170,746,747 
137,428,648 
9,862,345 
13,121 
6,631,357 
153,935,471 
633,525,297 
466,477 
31,590,190 
7,585,689 
673,167,653 
395,000 
139,776 
673,702,429 
211,303,680 
18,092,171 
1,934,343 
231,330,194 
293,461,894 
1,363,652 
8,041,549 
302,867,095 
32,000 
116,760 
303,015,855 
40-52

GALVESTON, TX, DISTRICT 
TABLE 40-G TOTAL COST OF EXISTING PROJECTS 
See Total Cost 
Section to 
In Text Project Funds New Work Maintenance Rehabilitation Sep. 30, 2000 
16. Texas City Channel, TX Regular 14,653,853 32,666,573 726,158 48,046,584 
Public Works 136,296 0 0 136,296 
Contributed 1,023,819 0 0 1,023,819 
Total cost of project 15,813,968 32,666,573 726,158 49,206,699 
17. Trinity River and Regular 78,076,507 24,956,907 0 103,033,414 
Tributaries, TX Contributed 66,000 0 0 66,000 
Total cost of project 78,142,507 24,956,907 0 103,099,414 
40-53

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 40-H CHANNEL DIMENSIONS 
Adopted Project 
Dimensions Improved Project Dimensions 
Depth in Depth in 
Feet Feet 
See (Below Bottom (Below Bottom 
Section Mean Low Width Mean Low Width Length 
In Text Project Section of Waterway Tide) (Feet) Tide) (Feet) Feet Miles 
2. Brazos Island 
Harbor, TX 
Outer Bar and Jetty Channel 
Padre Island to Long Island 
Long Island to Goose Island 
Goose Island to Turning 
Basin Extension 
Turning Basin Extension 
Brownsville Turning Basin 
Port Isabel Channel via East 
Turnout 
West Wye, from Brownsville 
Channel 
Port Isabel Turning Basin 
Fishing Boat Harbor: 
West Basin 
Middle Basin 
East Basin 
Connecting Channel 
Entrance Channel 
3. Cedar Bayou, Houston Ship Channel to Bayou 
TX Mile 3.0 
Bayou Mile 3.0 to Mile I1 .07 
4. Channel to Port Bolivar Channel 
Port Bolivar, TX Turning Basin 
5. Clear Creek and 
Clear Lake, 
TX 
Galveston Bay to Clear Creek 
North Fork Channel 
Channel through Clear Creek and 
Clear Lake 
44 
42 
42 
400 
250 
250 
42 300 
42 325 
36 1,200 
36 200 
36 200 
36 200-1,000 
15 
15 
15 
15 
15 
370-305 
370-305 
370 
270 
100 
10 100 
10 100 
30 200 
30 750' 
75 
60 
60 
44 
42 
42 
42 
42 
36 
36 
400 
250 
250 
300 
375 
660-1,200 
200 
36 200 
36 200-1,000 
15 
15 
15 
15 
15 
10 
30 
14 
370-305 
370-305 
370 
265 
100 
100 
200 
200 
75 
60 
60 
40-54 
2.5 
2.1 
9.6 
3.2 
1.3 
2,670 0.5 
1.4 
0.8 
1,300 0.2 
1,470 
1,200 
1,470 
1,230 
770 
0.3 
0.2 
0.3 
0.2 
0.1 
5.7 
900 0.2 
1.5 
0.7 
7.7

GALVESTON, TX, DISTRICT 
TABLE 40-H CHANNEL DIMENSIONS 
Adopted Project 
Dimensions Improved Project Dimensions 
Depth in Depth in 
Feet Feet 
See (Below Bottom (Below Bottom 
Section Mean Low Width Mean Low Width Length 
In Text Project Section of Waterway Tide) (Feet) Tide) (Feet) Feet Miles 
6. Corpus Christi 
Ship Channel, 
TX 
Aransas Pass Outer Bar 
Channel 
Aransas Pass Jetty Channel 
Inner Basin at Harbor Island 
Channel to Port Aransas 
Port Aransas Turning Basin 
Anchorage Basin at Port 
Aransas 
Inner Basin to Mile 8.5 
Mile 8.5 to LaQuinta 
Junction 
LaQuinta Junction to Corpus 
Christi Turning Basin 
Corpus Christi Turning Basin 
Industrial Canal 
Avery Point Turning Basin 
Channel to Chemical 
Turning Basin 
Chemical Turning Basin 
Tule Lake Channel 
Tule Lake Turning Basin 
Viola Channel 
Viola Turning Basin 
Channel to LaQuinta 
LaQuinta Turning Basin 
Turning Point at LaQuinta 
Channel Junction 
Jewel Fulton Canal 
Jewel Fulton Turning Basin 
Mooring Area at Ingleside: 
Mooring Area (a) 
Mooring Area (b) 
47 
45 
45 
12 
12 
12 
45 
45 
45 
45 
45 
45 
45 
45 
45 
45 
45 
45 
45 
45 
45 
12 
12 
45 
45 
700 
600-730 
730-1,720 
100-150 
200-4001 
300-400 
600-500 
500 
400 
800 
400 
975 
400 
1,2005 
300 
1,200 
300-350 
1,200 
300-400 
1,200 
1,250' 
100 
200 
150 
150 
47 
45 
45 
12 
12 
700 
600 
Irregular 
100 
2002 
12 300-400 
45 600-500 
45 
40-45 
45 
45 
45 
45 
45 
40 
40 
40 
40 
45 
45 
45 
12 
12 
45 
500 
400 
1,000 
400 
1,000 
350 
1,050' 
200 
900 
200-250 
700-900 
300-400 
1,200 
1,250' 
100 
200 
150 
7. Double Double Bayou Channel: 
Bayou, TX Mouth to 7-foot contour ini 
Trinity Bay 
West Fork 
125 
100 
125 - 3.9 
100 - 2.0 
Outer Bar Channel 
Jetty Channel 
Quintana Turning Basin 
Channel to Brazosport 
Turning Basin 
Brazosport Turning Basin 
Channel to Upper Turning 
Basin 
Upper Turning Basin 
Channel to Stauffer Chemical 
Plant 
Stauffer Turning Basin 
Brazos Harbor Channel 
Brazos Harbor Turning 
Basin 
47 
45 
45 
45 
45 
45 
45 
30 
30 
36 
400 
400 
750 
400 
1,0004 
285-375 
1,2004 
200 
500 
200 
36 7504 
47 
45 
300 
200 
45 390 
45 1000 
45 285-375 
45 12004 
30 200 
25 500 
30 200 
30 7504 
40-55 
1.8 
1.0 
0.1 
1,550 
200 
900 0.2 
8.5 
3.6 
8.6 
5,423 1.0 
1.1 
1,5I0 0.2 
1,690 
1,000 
1,000 
800 
0.6 
0.3 
3.1 
0.2 
1.8 
0.2 
5.6 
0.1 
1,250 0.2 
- 0.8 
400 0.1 
- 0.8 
8. Freeport 
Harbor, TX 
- 3.0 
- 0.8 
1.2 
667 0.1 
- 1.4 
800 0.1 
500 
1.1 
0.1 
05 
675 0.1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 40-H CHANNEL DIMENSIONS 
Adopted Project 
Dimensions Improved Project Dimensions 
Depth in Depth in 
Feet Feet 
See (Below Bottom (Below Bottom 
Section Mean Low Width Mean Low Width Length 
In Text Project Section of Waterway Tide) (Feet) Tide) (Feet) Feet Miles 
Entrance Channel 
Outer Bar Channel 
Inner Bar Channel 
Anchorage Basin 
Bolivar Roads Channel 
Bolivar Roads Channel to 
43rd St. 
12. Houston Ship Bolivar Roads to Morgan 
Channel, TX Point 
Morgan Point to Boggy 
Bayou 
Boggy Bayou to Greens 
Bayou 
Greens Bayou to Sims Bayou 
Hunting Bayou Turning 
Point 
Clinton Island Turning 
Basin 
Sims Bayou to Southern 
Pacific Slip 
Southern Pacific Slip to 
Houston Turning Basin 
Houston Turning Basin 
Upper Turning Basin 
Brady Island Channel 
Barbour Terminal Channel 
Turning Basin 
Bayport Ship Channel 
Turning Basin 
Anchorage Area 
Five-Mile Cut Channel 
Light-Draft Channel: 
Upper Turning Basin to 
Jensen Drive 
Turkey Bend Channel 
Greens Bayou Channel: 
Mile 0 to Mile 0.36 
Mile 0.36 to Mile 1.57 
13. Matagorda Ship 
Channel, TX 
Outer Bar and Jetty Channel 
Channel to Point Comfort 
Approach Channel to 
Turning Basin 
Turning Basin 
Channel to Port Lavaca 
Lynn Bayou Turning Basin 
Channel to Harbor of Refuge 
North-South Basin 
East-West Basin 
Channel to Red Bluff 
52 
52 
50 
36 
50 
800 
800 
800 
2,875' 
800 
40 1,125 
40 
40 
40 
40 
40 
400 
400 
300 
300 
900-1,0009 
42 
42 
40 
36 
40 
40 
40 
40 
40 
40 
40 
40 8009 40 
40 300 40 
36 
36 
36 
10 
40 
40 
40 
40 
40
8 
10 
10 
300 
400-1,000 
150 
60 
300 
2,000 
300 
1,600 
150 
125 
60 
60 
40 175 
15 100 
38 300 
36 300-2006 
36 
36 
12 
12 
12 
12 
12 
6 
200-300 
1,000 
125 
27-340 
125 
300 
250 
100 
36 
36 
36 
10 
40 
40 
40 
40 
40 
8
10 
10 
40 
15 
800 
800 
800 
2,875 
800 
1,125 
400 
400 
300 
300 
948-1,0009 
965-1,0709 
300 
300 
400-1,000 
150 
60 
300 
2,000 
300 
1,600 
150 
125 
4.7 
1.7 
3.2 
1.8' 
1.0 
- 3.9 
26.2 
12.8 
- 2.4 
- 5.3 
1,375 
1,592
- 0.6 
2.9 
3,100 0.6 
1,000 0.2 
- 0.9 
- 3.1 
2,000 0.4 
- 3.8 
1,000 0.3 
1.9 
60 - 4.1 
60 0.8 
175 - 0.3 
100 1.3 
38 300 
36 300-2006 
36 200-300 
36 1,000 
12 125 
12 27-340 
12 125 
12 300 
12 250 
6 100 
1,000 
532 
1,682 
1,750 
40-56 
9. Galveston 
Harbor and 
Channel, TX 
3.2 
20.9 
1.1 
0.2 
4.1 
0.1 
1.9 
0.3 
0.3 
20.2

GALVESTON, TX, DISTRICT 
TABLE 40-H CHANNEL DIMENSIONS 
Adopted Project 
Dimensions Improved Project Dimensions 
Depth in Depth in 
Feet Feet 
See (Below Bottom (Below Bottom 
Section Mean Low Width Mean Low Width Length 
In Text Project Section of Waterway Tide) (Feet) Tide) (Feet) Feet Miles 
15. Sabine-Neches 
Waterway, TX 
16. Texas City 
Channel, TX 
42 800 
42 
40 
40 
40 
40 
40 
40 
800 
800-500 
1,500 
500 
500 
275-678 
420 
40 600 
40 200-250 
40 150-1,000 
40 400 
40 9004 
Sabine Bank Channel 
Sabine Pass Outer Bar 
Channel 
Sabine Pass Jetty Channel 
Sabine Pass Anchorage 
Basin 
Sabine Pass Channel 
Port Arthur Canal 
Entrance to Port Arthur 
Turning Basins 
Port Arthur East Turning 
Basin 
Port Arthur West Turning 
Basin 
Channel connecting Port 
Arthur West and Taylors 
Bayou Turning Basins 
Taylors Bayou Turning Basin 
Sabine-Neches Canal, Port 
Arthur Canal to Neches 
River 
Turning Point at Mile 19.5 
Neches River, Mouth to 
Maneuvering Area Beaumont 
Turning Basin 
Turning Point, Mile 31.1 
Turning Point, Mile 36.6 
Turning Point, Mile 40.3 
Channel Extension, Mile 40.3 
Maneuvering Area at 
Beaumont Turning Basin 
Beaumont Turning Basin 
Beaumont Turning Basin 
Extension 
Beaumont Turning Basin 
Extension to End of Project 
Channel Vicinity 
Bethlehem Steel Company 
Sabine-Neches Canal, Neches 
River to Sabine River 
Sabine River Channel, Mouth 
to Foot of Green Ave. 
Orange Turning Basin 
Orange Municipal Slip 
Old Channel Around Harbor 
Island 
Channel to Echo7 
Adams Bayou 
Cow Bayou 
Orangefield Turning Basin 
Texas City Channel 
Turning Basin 
Industrial Barge Canal:'o 
Channel from Texas City 
Turning Basin to Mile 1.7 
Turning Basin 
400 
1,0004 
1,0004 
1,000, 
350 
Irregular 
500 
350 
200 
200 
200 
Irregular 
200 
150-200 
125 
100 
100 
300 
600 
1,000-1,200 
42 
42 
40 
40 
40 
40 
40 
800 
800 
800-500 
1,500 
500 
500 
275-678 
40 370-547 
40 350-550 
- 14.7 
- 3.4 
- 4.1 
3,000
- 5.6 
6.2 
- 0.3 
1,765 0.3 
1,610 0.3 
40 200-250 0.6 
40 90-1,233 3,470 0.7 
40 
40 
40 
40 
40 
40 
36 
40 
34 
34 
30 
30 
30 
30 
30 
25 
12 
13 
13 
40 
40 
400 
9004 
400 
1,000 
1,000 
1,300 
350 
Irregular 
160-535 
300 
200 
200 
200 
Irregular 
150-200 
150-200 
100 
100 
300 
400 
1,000 
- 11.2 
-8 
700 
930 
1,530 
1,265 
1,30 
1,5( 
18.3 
0.2 
)0 0.2 
10 0.3 
- 0.4 
0.7 
- 4.4 
9.5 
1,550 0.3 
2,435 0.5 
2.4 
1.7 
7.0 
500 0.1 
- 6.8 
4,253 .8 
40 300-400 
40 1,000 
40-57 
40 
40 
40 
40 
36 
40 
34 
34 
30 
30 
30 
30 
30 
25 
12 
12 
13 
13 
50 
50

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 40-H CHANNEL DIMENSIONS 
Adopted Project 
Dimensions Improved Project Dimensions 
Depth in Depth in 
Feet Feet 
See (Below Bottom (Below Bottom 
Section Mean Low Width Mean Low Width Length 
In Text Project Section of Waterway Tide) (Feet) Tide) (Feet) Feet Miles 
17.. Trinity River Multiple Purpose Channel 
Channel, TX to Fort Worth" 12 200 - - - 
Channel to Liberty" 9 150 6 100 - 41.4 
Anahuac Channel 6 100 6 100 5.8 
_...Ch.n.neldrdge^3.fet.eeptebey...- 
Average. 
Includes 100-foot channel width. 
Includes 450-foot channel to Corpus Christi. 
Diameter. 
Includes 350-foot channel width. 
300-foot width through Matagorda Peninsula. 
Deauthorized. 
Included in channel length. 
Includes 300-foot channel width. 
1 Channel dredged 34 feet deep by 250-200 tfeet wide 
by 9,908 feet long and basin 34 feet deep by 1,000 feet wide by 
1,150 feet long by local interests. 
I Not constructed. 
'2 9-foot by 150-foot channel completed from Houston 
Ship Channel to a point one mile below Anahuac, a distance of 23 
miles. Upper end not connected to river channel to prevent salt 
intrusion into river. River channel maintained at 6 by 100-foot 
from mouth to Liberty, Texas. 
40-58

GALVESTON, TX, DISTRICT 
TABLE 40-I GULF INTRACOASTAL WATERWAY 
APALACHEE BAY, FL. TO MEXICAN BORDER 
EXISTING PROJECT DIMENSIONS, 
PROVIDED FOR IN TRIBUTARY CHANNELS 
Adopted Project 
Dimensions Improved Project Dimensions 
Depth in Depth in 
Feet Feet 
(Below Bottom (Below Bottom 
Mean Low Width Mean Low Width Length 
Tributary Channel Tide) (Feet) Tide) (Feet) Feet Miles 
Offats Bayou 
Main Channel 
West Wye 
Chocolate Bayou Channel 
12-Foot Channel via 
East Turnout 2 
West Turnout 3 
9-Foot Channel 
Turning Basin 
San Bernard River Channel 
Colorado River Channel 6 
Turning Basin 
Silting Basin 
Mouth of Colorado River 
Navigation Channel, GIWW to Gulf 
Turning Basin at Matagorda 
Channel to Palacios 
Turning Basin No. I 
Turning Basin No. 2 
Connecting Channel 
Channel to Barroom Bay 
Channel to Victoria Main Channel via 
East Turnout 
Turning Basin 
West Turnout Channel 
Channel to Seadrift via South Turnout 
Turning Basin 
North Turnout Channel 
Harbor of Refuge at Seadrift Channel 
Basin 
Channel to Rockport 
Turning Basin 
Channel to Aransas Pass 
Turning Basin 
Channel to Conn Brown Harbor 
Conn Brown Harbor 
Channel to Port Mansfield 0 
Entrance Channel 
Approach Channel to Hopper Dredge 
Turning Basin 
Hopper Dredge Turning Basin 
Channel Across Padre Island and 
Taguna Madre 
Turnout Channels, East Side of Main 
Channel, GIWW 
North Turnout 
South Turnout 
12 
12 
12 
12
9
9
9
9
9
9 
15-12 
12 
12 
12 
12 
12 
12 
12 
12 
12
9
9
9
9
9
9
9 
14 
14 
14 
14 
16 
16 
16 
14 
12 
12 
125 
125 
125 
125 
100 
600 
100 
100 
400 
150 
100-200-300 
350 
125 
200 
300 
150-480 
60 
125 
6
0 0
(AVG) 
125 
100 
250 
100 
100 
200 
200 
475 
175 
300 
125 
300 
250 
100 
300 
100 
100 
100 
12 
12 
12 
12
9
9
9
9 
15-20 
12 
12 
12 
12 
12
9 
12
999 
9
9 
14 
14 
14 
14 
16 
16 
16 
14 
12 
12 
125 
125 
125 
125 
100 
100 
400 
150 
100-200-300 
125 
200 
300 
130-400 
125 
50OOAVG) 
125 
100 
200 
100 
200 
342AvoG) 
125-175 
300 
0.2 
300 
250 
100 
300 
100 
100 
100 
2,200 
2.3 
0.4 
8.2 
0.8 
26.0 
15.5 
0.1 
1.0 
16.1 
0.1 
0.2 
0.1 
34.8 
0.1 
0.8 
2.0 
0.5 
2.1 
0.2 
6.1 
0.4 
0.3 
500 
635 
1,130 
800AVG) 
230 
1,225 
2,212 
125 
1,800
- 0.8 
- 0.4 
300 0.1 
- 7.7 
- 0.6 
- 0.6 
40-59

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 40-I GULF INTRACOASTAL WATERWAY 
APALACHEE BAY, FL. TO MEXICAN BORDER 
EXISTING PROJECT DIMENSIONS , 
PROVIDED FOR IN TRIBUTARY CHANNELS 
Adopted Project 
Dimensions Improved Project Dimensions 
Depth in Depth in 
Feet Feet 
(Below Bottom (Below Bottom 
Mean Low Width Mean Low Width Length 
Tributary Channel Tide) (Feet) Tide) (Feet) Feet Miles 
Channel West Side of Main Channel, 
GIWW, to P.T. of Turnout Channels 
Turnout Channels, West Side of Main 
Channel, GIWW 
North Turnout 
South Turnout 
Channel from P.T. of Turnout Channels to 
ApproachChannel to Main Turning Basin 
Approach Channel to Main Turning Basin 
Main Turning Basin 
Turning Basin Extension 
Small Craft Basin 
Shrimp Basin 
Channel to Harlingen via South Turnout 
from Main Channel, GIWW 
Turning Basin near Rio Hondo 
North Turnout from Main Channel 
Port Isabel Side Channels 
Main Channel 
Main Channel 
South Leg 
Port Isabel Side Channels 
Main Channel 
Main Channel 
South Leg 
Port Isabel Small Boat Harbor 
Entrance Channel 
Harbor Channel 
Boat Basin 
14 
12 
12 
14 
14 
14 
100 
200 
200 
125 
200 
400 
14 1,000 
12 
12 
12 
12 
12 
12 
12 
12 
12 
12
766 
160 
350 
125 
400 
200 
125 
233-60 
125 
125 
233-60 
125 
75 
50 
Variable 
14 
12 
12 
14 
14 
14 
100 
200 
200 
125 
200 
400 1,250 
14 1,000 
8 160 
12 350 
12 1251" 
12 400 
12 200 
12 125-90 
12 233-60 
12 125 
12 125-90 
12 233-60 
12 125 
7 75 
6 50 
6 72-501 
Includes the construction of a salt water barrier at 
Mile 16.9. 
2 Constructed 10 feet deep by 100 feet wide by local 
interests. East turnout channel constructed 150 feet wide. 
3 Constructed by local interests. 
4 Authorized to mile 13.2. Mile 8.2 to Mile 13.2 was 
deauthorized. 
s Authorized to Mile 31 above mouth (channel mile 
29.41). Upper 3.4 miles was deauthorized under Section 12 of PL 
93-251. 
6 Includes a discharge channel from Matagorda, 
Texas, to the gulf, which was dredged by local interests in 1939. 
(Maintenance will be discontinued upon completion of 
improvements authorized by R&H Act of 1968.) 
7 Authorized by R&H Act of 1968. Also provides for 
a dam across the present discharge channel, a new 250-foot wide 
by 20 to 23-feet deep discharge channel into Matagorda Bay, and a 
15-foot by 200-foot wide entrance channel with parallel jetties 
from the gulf shoreline into the Gulf of Mexico. East jetty to be 
3,500 feet long and west jetty 2,900 feet long. 
Includes two protective breakwaters at entrance to 
turning basins. 
9 In the inactive category for maintenance. 
'o Also provides for two stone jetties at the gulf 
entrance about 1,000 feet apart. (North jetty constructed 2,300 fee 
long and south jetty constructed 2,270 feet long.) 
i South turnout is 200 feet wide. 
"Authorized to mile 31. Mile 25.8 to Mile 31 was deauthorized 
40-60 
- 0.6 
- 0.6 
- 0.6 
- 0.6 
- 0.3 
0.2 
0.1 
0.2 
0.3 
25.811 
0.1 
0.7 
0.6 
0.4 
0.2 
0.6 
0.4 
0.2 
1.4 
0.3 
0.2 
580 
860 
1,450 
500 
1,308 
I

GALVESTON, TX, DISTRICT 
TABLE 40-J DREDGING OPERATIONS 


Brazos Island Harbor, TX 
(Maintenance) 

Dredging Brownsville Ship Channel 
Port Isabel Channel and Turning 
Basin 

August 23, 2000 to 
September 30, 2000

0

$50,000

Cedar Bayou, TX 
(Maintenance)

Dredging Cedar . Bayou 

October I, 1999 to 
January 20, 2000 

0

$141,582

Channel to Bolivar 
(Maintenance) 

Dredging GIWW, High Island to 
Bolivar

October 1, 1999 to 
June 30, 2000 

89,544

$138,498

Corpus Christ Ship 
Channel, TX 
(Maintenance) 

Dredging LaQuinta Channel and 
Turning Basin

September 15, 2000 to 
September 30, 2000

0

$50,000 

Freeport Harbor, TX 
(Maintenance) 
 
Dredging Freeport Entrance Channel 

October 1, 1999 to 
December 11, 1999 

1,555,615 

$2,302,702

Dredging Entrance, Jetty and 
Inside Channels and Coast 
Guard Basin 

July 20, 2000 to 
September 21, 2000

1,867,570 

$2,239,960

Galveston Harbor and 
Channel, TX 
(Maintenance) 

Dredging Bolivar Roads to Pier B, 
COE Boat Basin, US Coast Guard 
Docking Facilities 
 
February 28, 2000 to 
September 13, 2000

4,368,841 

$3,370,650

Dredging Jetty & Entrance Channel 
(O&M Galveston Portion) 

October 1, 1999 to 
July 20, 2000 

1,101,252 

$2,973,379

Gulf Intracoastal Waterway, TX 
(New Work)

Dredging Channel to Victoria 
Stations 835+00 to 1300+00 

October 1, 1999 to 
August 20, 2000

1,170,090

$3,858,122

Dredging Channel to Victoria 
Stations 1300+00 to 1841+21

September 29, 2000 to 
September 30, 2000

0

$0 
 
Gulf Intracoastal Waterway, TX 
Main Channel 
(Maintenance) 

Dredging Boggy Bayou to 
Colorado River 
 
October 1, 1999 to 
October 19, 1999

119,392 

$30,000 

Dredging Turnstake Island to 
Rattlesnake Island 

October 1, 1999 to 
October 12, 1999 

910,021

$266,400 

Dredging Colorado River 
to Matagorda Bay 

October 1, 1999 to 
July 21, 2000
 
3,142,085  

$4,989,119

Dredging High Island to 
Port Bolivar 

October 1, 1999 to 
June 30, 2000

972,771

$2,718,876

Dredging Port O'Connor to 
San Antonio Bay

October 14, 1999 to 
June 8, 2000 

823,009

$1,595,934 
 
Dredging GIWW, Main Channel in 
Matagorda Bay 

October 27, 1999 to 
April 6, 2000 

322,363 

$1,533,165 

Dredging Baffin Bay through 
Mud Flats

December 27, 1999 to 
March 20, 2000 

958,217 

$1,120,724

Dredging Port Mansfield to 
Mud Flats

January 14, 2000 to
April 10, 2000 

2,104,117

$1,956,935


40-61 

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 40-J DREDGING OPERATIONS 


Gulf Intracoastal Waterway, TX 
Main Channel Dredging   
(Maintenance)

Galveston Causeway to Bastrop Bayou 

August 16, 2000 to
September 30, 2000 

353,315 

$768,316

Chocolate Bayou 
(Maintenance) 

Dredging Chocolate Bayou  

October 1, 1999 to 
October 12, 1999 

1,053,072 

$832,860

Channel to Harlingen  
(Maintenance)

Dredging Channel to Harlingen
 
May 9, 2000 to September 20, 2000

533,363 

$1,622,750 
 
Channel to Port Mansfield 
(Maintenance) 

Dredging Channel to Port Mansfield 

May 9, 2000 to September 20, 2000 

392,763 

$482,508 

Mouth of Colorado River, TX 
(Maintenance) 

Dredging Boggy Bayou to Colorado River 

October 1, 1999 to October 19, 1999 

114,428 

$235,722 

Dredging Mouth of Colorado River, 
Navigation Channel and 
Impoundment Basin 

March 13, 2000 to 
September 30, 2000

701,967 

$2,027,247

Houston-Galveston 
Navigation Channels, TX 
(New Work) 

Dredging Lower Bay 

October 1, 1999 to 
September 30, 2000 

6,041,007 

$23,713,786 

Dredging Upper Bayou

October 1, 1999 to 
September 30, 2000

1,518,758 

$3,551,584
 
Dredging Jetty and Entrance 
Channel 

October 1, 1999 to 
July 20, 2000

6,345,257 

$17,380,523

Dredging Upper Bay 

February 2, 2000 to 
September 30, 2000 

4,532,096

$8,582,768

Dredging Lower Bayou 

April 28, 2000 to 
September 30, 2000
 
1,234,585

$3,869,451

Houston Ship Channel 
(Maintenance) 

Dredging Lower Bay 
(O&M portion) 

October 1, 1999 to 
September 30, 2000 

414,173

$1,780,947  

Dredging Upper Bayou 
(O&M portion) 

October 1, 1999 to 
September 30, 2000

95,238 

$200,000

Dredging Sims to Greens Bayou 
With Extension to Boggy Bayou 

October 1, 1999 to 
July 27, 2000

723,313 

$1,087,794

Dredging Upper Bay 
(O&M portion) 

February 2, 2000 to 
September 30, 2000

50,000

$106,000

Dredging Lower Bayou 
(O&M portion) 

April 28, 2000 to 
September 30, 2000

96,618

$200,000

Dredging Houston Ship Channel, 
Sims Bayou to Main Turning Basin 
And Light Draft Channel 

July 19, 2000 to 
September 30, 2000

270,250 

$1,000,000 

Bayport Ship Channel 
(Maintenance)

Dredging Upper Bay 
(O&M Bayport portion)

February 2, 2000 to 
September 30, 2000 

476,629

$713,001



40-62 

GALVESTON, TX, DISTRICT 
TABLE 40-J DREDGING OPERATIONS 


Matagorda Ship Channel, TX 
(Maintenance) 

Dredging GIWW, Main Channel 
in Matagorda Bay

October 27, 1999 to April 6, 2000 

122,609 

$220,796 

Dredging Matagorda Ship Channel to 
Port Lavaca and Harbor of Refuge 

January 10, 2000 to 
April 6, 2000 

1,281,498

$631,330 

Sabine-Neches Waterway, TX 
(Maintenance) 

Dredging Port Arthur Canal, 
Junction Area, and Turning 
Basin 

October 1, 1999 to 
December 22, 1999 

1,644,446 

$1,211,376

Dredging Neches River Lower Reach 
in Orange and Jefferson Counties

October 1, 1999 to 
April 28, 2000 

1,912,999 

$2,129,280
 
Dredging Sabine Pass, Outer Bar 
and Bank Channel 

December 15, 1999 to 
May 2, 2000 

4,782,702

$3,913,359

Emergency Dredging Sabine Neches 
Waterway, Neches Canal Sec. B 
And Sabine River Channel

August 25, 2000 to 
September 30, 2000 

98,324

$716,546 

Dredging Sabine Neches Waterway, 
Sabine Pass Jetty Channel 

September 25, 2000 to 
September 30, 2000 

0 

$50,000

Trinity River and 
Tributaries, TX 
(Maintenance) 

Dredging Channel to Anahuac and 
Channel to Trinity 

August 30, 2000 to 
September 30, 2000 

35,100

$1,254,460



40-63 

MISSISSIPPI RIVER COMMISSION* 
The Mississippi River Commission (MRC) was 
created by an act of Congress on Jun. 28, 1879. The 
Flood Control Act of May 15, 1928, authorized the 
Flood Control, Mississippi River and Tributaries 
(MR&T) Project. The Commission consists of three 
officers of the Corps of Engineers, one from the former 
Coast and Geodetic Survey (presently the National 
Oceanic and Atmospheric Administration), and three 
civilians, two of whom must be civil engineers. All 
members are appointed by the President with the advice 
and consent of the Senate. 
During the fiscal year the Commissioners were: 
MG Phillip R. Anderson, President, Nov. 1999; 
Mr. Sam E. Angel, member, Nov. 1999; Mr. R. D. 
James, civil engineer, appointed Dec. 1, 1981; 
Mr. William Clifford Smith, appointed Oct. 22, 1998; 
BG Carl Strock, Commander Northwestern Division, 
member designee; BG Robert H. Griffin, Commander, 
Great Lakes and Ohio River Division, appointed Nov 
1999; RADM Nicholas Prahl, NOAA, member 
designee; and COL William David Brown served as 
Secretary of the Commission, retired Jun. 2000. 
The MRC is charged, under direction of the 
Secretary of the Army and supervision of the Chief of 
Engineers, with prosecution of improvements for flood 
control of the Mississippi River and of its tributaries 
and outlets in its alluvial valley, so far as they are 
affected by Mississippi River backwater, between Head 
of Passes, LA (mile 0), and Cape Girardeau, MO 
(1,006 miles AHP-Lower Mississippi mileage terminates 
at mile 954 AHP), and with prosecution of 
improvements in the interest of navigation between 
Cairo, IL (954 miles AHP), and Baton Rouge, LA 
(234 miles AHP); and for stabilization of the lower 
7 miles of the right bank of the Ohio River, to former 
mouth of Cache River. It also is charged with prosecution 
of certain flood control works on the Mississippi 
River and tributaries, as far as they are affected by 
backwater, between Cape Girardeau, MO, and Rock 
Island, IL (1,437 miles AHP), and with prosecution of 
Unprovements on designated tributaries and outlets 
below Cape Girardeau for flood control, navigation, 
major drainage, and related water uses. Authorized 
Operations of the Commission below Cape Girardeau 
are conducted by District Engineers of New Orleans, 
Vicksburg, and Memphis Districts within the areas 
described below, in accordance with approved 
directives and programs and congressional appropriations 
therefore. 
New Orleans District: Mississippi River project 
levees and river channel stabilization as required from 
Head of Passes, mile 0 to 320 AHP, construction of 
three salinity-control structures for fish and wildlife 
enhancement, two in lower Mississippi River Delta 
region, and one in the Mississippi- Louisiana Estuarine 
Area; Bonnet Carre and Morganza Floodways; maintenance 
and improvements of Mississippi River navigation 
channel from Baton Rouge, LA (mile 234 AHP), 
to mile 320; Baton Rouge Harbor (Devils Swamp); 
navigation improvement of Atchafalaya and Old Rivers 
from Mississippi River to Morgan City; control of Old 
and Atchafalaya Rivers; Atchafalaya Basin Floodways; 
flood control and drainage improvements in Bayou 
Cocodrie and tributaries, in Bayou des Glaises, and in 
Upper Pointe Coupee Loop area; and freshwater distribution 
from Atchafalaya River to Teche-Vermilion 
Basins. 
Vicksburg District: Mississippi River project 
levees and river channel stabilization as required from 
upper limits of New Orleans District (mile 320 AHP) in 
vicinity of Black Hawk, LA, to Coahoma-Bolivar 
County line, MS (mile 620 AHP) on left bank, and to 
vicinity of mouth of White River, AR (mile 599 AHP), 
on right bank including south bank Arkansas River 
levee to vicinity of Pine Bluff, AR, and north bank 
levee to vicinity of Tucker on left bank of Plum Bayou, 
AR; bank stabilization in lower 36.1 miles of Arkansas 
River; maintenance and improvement of Mississippi 
River navigation channel between miles 320 and 
599 AHP; Vicksburg and Greenville Harbors; specific 
fish and wildlife facilities in Tensas, Yazoo, and Big 
Sunflower Basins; a demonstration erosion control 
project in the Yazoo Basin; flood control and drainage 
improvements in Red River backwater area including 
leveed portions east and west of Black River and south 
of Red River; Jonesville, LA, Boeuf and Tensas Rivers, 
Bayou Macon Basins and tributaries, AR and LA, and 
Bayou Lafourche, LA; Yazoo River Basin, MS, 
including backwater area; Big and Little Sunflower 
Rivers, Deer Creek, and Steele Bayou, MS; and Grand 
Authorizing legislation (Tables 41 -D and 41 -E) is listed at the end of this chapter. All other tables are referenced 
Stext and also appear at the end of the chapter. 
41-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Prairie Region and Bayou Meto Basin, AR, including 
provision for agricultural water supply. 
Memphis District: Mississippi River project levees 
and river channel stabilization as required, from upper 
limits of Vicksburg District to north bank of Little 
River diversion channel, MO (1,003 miles AHP), a few 
miles below Cape Girardeau, MO, on right bank, and to 
Cache River diversion channel (967 miles AHP) above 
Cairo, IL, on left bank, including levees and revetment 
on right bank of Ohio River, in Mounds-Mound City 
area, IL; except operations above Cairo, IL, do not 
include channel stabilization on the Mississippi River. 
Maintenance and improvement of Mississippi River 
navigation channel between mile 599 and 954 AHP and 
of Memphis Harbor, TN; specific fish and wildlife 
facilities in St. Francis Basin; levees in White River 
backwater area up to vicinity of Augusta, AR, and a 
pumping plant near mouth of White River; levees and 
pumping plants at De Valls Bluff and Des Arc, AR; 
channel improvements in Cache River Basin, AR; 
channel improvements in Big Creek and tributaries, 
AR; improvement works in St. Francis River Basin, 
MO and AR, including backwater area improvements in 
Belle Fountain Ditch and Drainage District No. 17, AR; 
Little River diversion channel, MO, and L-Anguille 
River, AR; Wolf River Basin, TN; Obion and Forked 
Deer River Basins, TN; Reelfoot Lake area, including 
channel improvement for Bayou du Chien and Lake 
No. 9, TN and KY; West Kentucky tributaries, KY; 
Mud Lake pumping station, TN; and pumping plants 
and outlet structures in the Cairo-Mounds-Mounds City 
area, IL. Channel improvements to Eight Mile Creek, 
Arkansas; Whiteman's Creek Ten Mile and Fifteen Mile 
Bayous in West Memphis, and vicinity Arkansas; Horn 
Lake Creek and Tributaries, Mississippi; and 
Nonconnah Creek, Tennessee and Mississippi. Navigation 
channel and harbor improvements to Helena 
Harbor and vicinity, Arkansas at Mississippi River, 
mile 652 AHP. Channel improvements and pumping 
station for Helena, Phillips County,and vicinity, 
Arkansas and St. Johns Bayou and New Madrid 
Floodway, Missouri. 
Field operations of the commission restricted to 
levee construction under Sec. 6, 1928 Flood Control 
Act (local interests contributing one-third of costs and 
furnishing rights-of-way) are conducted within the 
following limits by two districts reporting directly to 
the Commission on matters within their jurisdiction- 
St. Louis District: Mississippi River (Sec. 6) levees 
from upper limits of Memphis District to Clemens 
Station, MO (1,254 miles AHP), on right bank, and 
Hamburg Bay, IL (1,215 miles AHP), on left bank, and 
Illinois River from its mouth to mile 120 at Havana, IL. 
Rock Island District: Mississippi River (Sec. 6) levees 
from upper limits of St. Louis District to Rock Island, 
IL (1,437 miles AHP). For work accomplished see 
Table 42-N, page 42-50, Annual Report for 1975. 
MISSISSIPPI RIVER AND ALLUVIAL VALLEY 
BELOW CAPE GIRARDEAU, MO 
Location and description. The Mississippi River 
rises in Lake Itasca, MN, and flows generally southerly 
for 2,340 miles through the central portion of United 
States to empty into the Gulf of Mexico 115 miles 
below New Orleans. It is improved for barge navigation 
for 1,832 miles to Minneapolis, MN. The 
Mississippi River and its major tributaries, the 
Missouri, Ohio, St. Francis, White, Arkansas, Yazoo, 
and Red-Old Rivers, drain 1,245,000 square miles in all 
or part of 31 states between the Rocky and Appalachian 
Mountains and part of two Canadian provinces. Below 
Cape Girardeau, MO, 53 miles above Ohio River, river 
bottomlands widen abruptly into an alluvial valley of 
35,460 square miles which was originally subjected to 
flood overflow. A major part of the alluvial valley has 
been protected from floods by levees which confine 
floodflows within a floodplain having an average width 
of 5 miles. (See map of alluvial valley of Mississippi 
River, scale 1:500,000.) Observations made by 
Mississippi River Commission to Sep. 30, 1982, show 
approximate all-time maximum and minimum discharges 
between levees as follows: Cairo to White 
River, 2,000,000 and 70,000 cubic feet per second; 
thence to Red River, 2,150,000 and 90,000 cubic feet 
per second; thence to the Gulf of Mexico, 1,500,000 
and 50,000 cubic feet per second in Mississippi River 
and 660,000 and 11,000 cubic feet per second in 
Atchafalaya River. As the 1927 floodflow was not confined 
between levees, maximum discharges recorded do 
not include entire flow of the 1927 flood, maximum of 
record below White River. High water and flood stages 
usually occur in late winter or early spring, but great 
floods such as that of 1937 occurred as early as 
January. Low water stages generally prevail from 
August to December. Extreme all-time high in stages 
recorded at representative gages (rounded to nearest 
foot) are 60 feet at Cairo, 49 feet at Memphis, 61 feet at 
Red River Landing, and 21 feet at New Orleans 
(Carrollton). The river is nontidal above Red River 
Landing where tidal amplitude rarely exceeds 0.1 foot 
during extreme low water. 
Previous projects. For details see page 1944 
Annual Report for 1932. 
Existing project. The Mississippi River and 
Tributaries Project in the alluvial valley between Head 
of Passes, LA, and Cape Girardeau, MO, provides 
protection from floods by means of levees, floodwalls, 
41-2

MISSISSIPPI RIVER COMMISSION 
floodways, reservoirs (in Yazoo and St. Francis 
Basins), bank stabilization, and channel improvements 
in and along the river and its tributaries and outlets 
insofar as affected by backwater of Mississippi River, 
including levee work on the main stem between Cape 
Girardeau and Rock Island. When completed, 23,621 
square miles will be protected from the Mississippi 
River project flood. The project also provides for a 12- 
by 300-foot navigation channel between Baton Rouge, 
LA, and Cairo, IL; for salinity-control structures; and 
for channel realignment and improvement including 
bank stabilization and dikes to reduce flood heights, 
control natural tendency of river to lengthen by 
meandering, and protect levees from being destroyed by 
caving banks. Locations of major main stem 
Mississippi River improvements are shown in 
Table 41-A and those for off-main stem tributaries are 
shown in Table 41-B. Pertinent data on dams and lakes 
are shown in Table 41-C. Authorizing and incorporating 
legislation are shown in Tables 41-D and 4 1-E. 
Summary of presently estimated Federal cost of 
authorized improvements is shown in Table 41-F. 
Construction of the existing project began in 1928 and 
has continued throughout ensuing years. Through 
Sep. 30, 2000, physical completion of the entire project 
is 87.1 percent. 
Recommended modifications. None. 
Local cooperation. The Flood Control Act of 
1928, as amended, applies. Such requirements have, in 
general, been complied with by local interests. 
Terminal facilities. See Port Series No. 21, 1990, 
for Ports of Baton Rouge and Lake Charles, LA; Port 
Series No. 20, 1990, for Port of New Orleans, LA; also 
folio of Flood Control and Navigation Maps of 
Mississippi River from Cairo, IL, to the Gulf of Mexico 
(59th edition), 1992. 
Project cost. Total allotted for flood control, 
excluding maintenance charges through Aug. 18, 1941, 
chargeable under authorizations to Sep. 30, 2000, was 
$6,908,830,977 (See Table 41-V.) (See also 
Tables 41-U, 41-W, and 41-X for additional financial 
statements. 
The 356th Session was held on Dec. 6, 1999, at the 
Mississippi River Commission in Vicksburg, MS. 
Approximately 15 people were in attendance. The 
Conmmnission considered the final Feasibility Report on 
Reelfoot Lake, Tennessee and Kentucky. 
The 357th Session was held on Apr. 10-14, 2000, 
on board the Motor Vessel Mississippi enroute on the 
Mississippi River from Cairo, IL, to New Orleans, LA. 
Bank protection works, levees and channel conditions 
were observed enroute. Public meetings were held at 
Cape Girardeau, MO; Memphis, TN; Greenville, MS; 
and New Orleans, LA, with approximately 415 people 
in attendance. This session was adjourned in New 
Orleans, LA, Apr. 14, 2000. 
The 358th Session was held Aug. 14-25, 2000, on 
board the Motor Vessel Mississippi. Public meetings 
were held at Wabasha, MN; Burlington, IA; St. Louis, 
MO; Tiptonville, TN; West Memphis, AR; Natchez, 
MS; and Morgan City, LA, with approximately 725 
people in attendance. This session adjourned Aug. 25, 
2000, in Morgan City, LA. 
Records of Proceedings of all sessions of the 
Mississippi River Commission are on file in the office 
of the President. 
Alluvial Valley Mapping 
General. Contoured quadrangles and general 
maps of the alluvial valley are available for departmental 
use and public distribution under prescribed 
regulations. Preparation, revision, and publication of 
quadrangle maps (scale 1:62,500) continued. 
Roadmap-type information brochures of principal 
portions of the overall project were published along 
with pamphlets on the subject of flood control and 
navigation. Maps and supplemental data sheets for 
active works were updated and published as required. 
The 1999, 4th edition of the folio of navigation 
maps (Scale 1:24,000) covering the Atchafalaya River 
system and outlets to the Gulf of Mexico was revised 
and printed in FY 99. 
Approximately 210 flight-line miles of blackand-
white aerial photography (various scales); 
11,028 flight-line miles of color true photography; and 
about 34 hours of oblique photography were flown 
along the Mississippi River and tributaries in the 
New Orleans, Vicksburg, and Memphis Districts. 
Work accomplished in the Districts: 
New Orleans District: The conversion of 1:62,500 scale 
quadrangle maps Southwest Pass, West Delta, East 
Delta, Venice, Breton Island, and Empire from manual 
to digital form were completed in FY 00. 
Memphis District-Series conversion 
U.S. Geological Survey 1:24,000-scale 
1:62,500-scale quads of New Madrid, 
Portageville, MO were published in FY 1999. 
of 
to 
MO; 
41-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Vicksburg District-Series Published 
1:62,500 scale quadrangle maps Lake Providence, LAMS 
and Alsatia, LA-MS was completed in FY 00. 
Revision of Vicksburg, MS, LA is in progress. 
Floods 
Streamflow observations during the fiscal year 
follow: 
Memphis District-Mississippi River crest stage of 
49.4 feet at Cairo gage on Feb. 29, 2000, and maximum 
discharge of 732,000 cubic feet per second occurred at 
Hickman, KY on Feb. 29, 2000, a crest stage of 
21.2 feet at Memphis on Mar. 1-2, 2000, and a 
maximum discharge of 747,000 cubic feet per second at 
Memphis on Mar. 1-2, 2000. 
Vicksburg District-The Mississippi River in the 
Vicksburg District - Peak stages and discharges on the 
Vicksburg District's reach of the Mississippi River were 
as follows: Arkansas City, 23.8 feet on Mar. 4, 2000, 
and maximum discharge of 800,000 cubic feet per 
second; Vicksburg, 29.3 feet on Mar. 6, 2000, and a 
maximum discharge of 825,000 cubic feet per second; 
and Natchez, 35.3 feet on Mar. 6, 2000, and maximum 
discharge of 775,000 cubic feet per second. 
New Orleans District-On the Mississippi River, 
the Red River Landing gage recorded a maximum stage 
of 39.4 feet NGVD on Apr. 18, 2000, and the 
New Orleans gage recorded a maximum stage of 
8.4 feet NGVD on Apr. 20, 2000. On the Atchafalaya 
River, the Simmesport gage recorded a maximum stage 
of 25.6 feet NGVD on Apr. 17, 2000. 
Studies and Investigations 
General investigations. Surveys and reports, 
authorized by laws and by Senate and House committee 
resolutions, were made as required. Collection and 
study of basic data continued. 
A July 1997 resolution of the Committee on 
Transportation and Infrastructure of the U.S. House of 
Representatives authorized a study of flooding and 
other problems in the area west of the Atchafalaya 
Basin Floodway between Alexandria, Louisiana, and 
the Gulf of Mexico. A reconnaissance study was 
initiated in FY 1998 and completed in FY 1999. 
A May 1998 resolution of the Committee on 
Transportation and Infrastructure of the U.S. House of 
Representatives authorized a study of flooding and 
other problems in the area between Bayou Lafourche 
and the Mississippi River from Donaldsonville, 
Louisiana, to the Gulf of Mexico. A reconnaissance 
study was initiated in FY 1999. 
An April 1992 resolution of the Public Works and 
Transportation of the U.S. House of Representatives 
Committee authorized a study of flooding and other 
problems east of the Atchafalaya Basin Floodway 
between Morganza, Louisiana, and the Gulf of Mexico. 
A feasibility study was continued in FY 1999. The 
Energy and Water Development Appropriation Act of 
1995 and the Water Resources Development Act of 
1996 directed an expedited study of a lock the Houma 
Navigation Canal under the authority of the Morganza, 
Louisiana, and the Gulf of Mexico study. An interim 
feasibility study on the lock was completed in FY 1997 
and was approved for preconstruction engineering and 
design in FY 1999. A May 1998 resolution of the 
committee on Transportation and Infrastructure of the 
U.S. House of Representatives authorized a study of 
flooding and other problems in the area between Bayou 
Lafourche and the Mississippi River, from 
Donaldsonville to the Gulf of Mexico. A reconnaissance 
study was initiated in FY 99. 
A June 1998 resolution of the Committee on 
Environment and Public Works of the U.S. Senate 
authorized a study of the multipurpose flood control 
and agricultural water supply problems in the Boeuf- 
Tensas Basin of southeast Arkansas. A feasibility study 
was initiated in FY 2000. 
Mississippi River and Tributaries Levees 
Operations and results during fiscal year. This 
feature consists of construction of new, and 
enlargement of existing, levees to approved grade and 
section; construction and restoration of levee berms; 
and construction, repair, and maintenance of roads on 
levees. Work accomplished is summarized in 
Table 41-N and further broken down as follows: 
New Orleans District-Continued construction of 
levees in the Main Stem System. 
Vicksburg District--Continued construction of 
levees in the Main Stem System. See Table 41-L. 
Memphis District-Continued construction of 
levees in the Main Stem System. See Table 41-M. 
Condition as of Sep. 30. (See Tables 41-K, 41-L, 
41-M, and 41-N.) There are 1,609.8 miles of levees 
authorized for the Mississippi River below Cape 
Girardeau, of which 1,603.0 are in place with 1,3493 
built to approved grade and section. The Main Stem 
Levee System consists of 2,215.7 miles, of which 
41-4

MISSISSIPPI RIVER COMMISSION 
2,196.8 are in place with 1,881.4 miles completed to 
approved grade and section. Included in this system are 
85.4 miles of levees and structures along the south bank 
of Arkansas River miles (all completed); 59.2 along the 
south bank of Red River (all completed); and 
449.2 miles in the Atchafalaya River Basin, with 
449.2 miles in place and 387.5 miles completed to 
grade and section (see Table 41-N). Of the authorized 
677.8 miles of berms and seepage control measures, 
558.3 are complete. Graveled or hard-surfaced roads 
have been constructed on 2,094.8 miles of these levees. 
There are an additional 1,511.0 miles of authorized 
tributary levees in the MR&T Project, of which 
1,265.6 miles, are in place with 1,058.5 to approved 
grade and section. Berms have been completed on 
15.3 miles and 942.9 miles of graveled or hard-surfaced 
roads have been constructed on the levees. 
For summary of levee work Table 41-N. 
Mississippi River and Tributaries--Channel 
Improvements 
Operations and results during fiscal year. 
Dredging: Mississippi River Main Stem-(See 
Table 41-G.) Work included dredging 22,832,500 cubic 
yards for maintenance of channel and harbor improvements. 
Minimum channel depth of 9 feet was 
maintained. Dredging was done with the following 
plant: Vicksburg District, channel maintenance was 
Performed by government-owned dredge Jadwin. 
Memphis District channel maintenance dredging was 
performed by the Government-owned dustpan dredge 
Hurley and leased dust pan dredge Wallace George. 
The MR&T Harbor maintained in Memphis 
District was Memphis Harbor (McKellar Lake), by 
leased cutterhead dredge Pontchartrain. MR&T 
Harbors maintained in Vicksburg District were 
Greenville Harbor and Vicksburg by cutterhead dredge 
Marion. 
Bank revetment and dikes: (See Table 41-H, 41-1, 
and 41-J.) Construction of 2.65 miles of new bank 
revetment and 141,270 squares of concrete mattress, for 
maintenance, along the Mississippi River was completed 
by Government plant and hired labor. Also, 
1.46 miles of new dikes were constructed and required 
maintenance was performed. 
Approximately 1.34 miles of new bank revetment 
Was constructed on the Atchafalaya River. 
Other work performed in the interest of navigation, 
SUpplementing maintenance dredging on Mississippi 
River between Cairo, IL, and Baton Rouge, LA, 
included removal of snags, wrecks, and obstructions; 
issuance of bulletins by the Vicksburg District 
providing information on available high-water velocities 
at selected locations; maintenance of bulletin 
boards showing daily gage readings at regular MRC 
gages; and contact pilot service furnishing navigation 
interests with latest information and advice on channel 
conditions and navigation interests. Cost of this work is 
given in Table 41-U. 
Condition as of Sep. 30. In carrying out 
authorized channel improvement program between 
Baton Rouge and Cairo, 16 cutoffs were developed 
between 1933 and 1942. These, combined with chute 
channel development and alignment improvements, 
decreased channel length between these cities by about 
170 miles. However, current velocities increased the 
attack on the banks and the river began to regain its 
length. As a result, the net shortening between 1933 
and 1962 was 114 miles of the theoretical 170-mile 
cutoff. 
There are now in place 1,034.5 miles of operative 
bank revetment and 302.8 miles of dikes on the lower 
Mississippi River. This amount of channel stabilization 
should prevent the river from regaining much more of 
its length due to meandering. A navigation channel 9 
by 300 feet is being accomplished by revetment and 
dikes and maintained by dredging as required during 
the low-water season. Due to growing effectiveness of 
channel improvement program, average maintenance 
dredging requirements are steadily being reduced, and 
an increase in navigable depth is being obtained. 
Approximately 142.0 miles of foreshore protection 
have been constructed along the lower Mississippi 
River. 
There are 85.1 miles of revetment and 5.9 miles of 
dikes on tributary channels as listed in Tables 41-H, 
41-1, and 41-J. 
New Orleans District 
ATCHAFALAYA BASIN, LA 
Operations and results during fiscal year. New 
work by hired labor: Real estate activities and planning 
for construction were continued. 
Construction of levee enlargements and floodwalls 
continued on the east and west protection levees, and 
levees west of Berwick. 
In FY 00, two contracts were awarded: one for 
levee enlargement W123 E96/99 and one for Erosion 
41-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Protection. Three other levee enlargement contracts 
were completed (Teche Ridge Frankin, E84B & Wax 
Lake West A). 
Maintenance by hired labor: Operation and 
maintenance of Bayou Boeuf, Berwick, and Bayou 
Sorrel Locks, Morganza Control Structure, condition 
and operation studies, and water control management 
activities were continued. 
New Orleans District hired labor personnel, 
repaired and replaced guide walls at Berwick Lock, 
repaired the northwest dolphin at Bayou Boeuf Lock 
and repaired the Bayou Darbone Central Structure. 
Vicksburg District hired labor performed major repair 
on the Courtebleau weirs. Lock operating machinery 
was replaced/ upgraded at Bayou Sorrel Lock. A 
contract was awarded for SW guide wall replcement 
and moaring dolphin construction at Bayou Boeuf 
Lock.
Maintenance dredging was performed, resulting in 
the removal of 1,447,375 cubic yards by two leased 
cutterhead dredges from Berwick Bay Harbor at a total 
cost of $1,769,305. 
Condition as of Sep. 30. Construction was 
initiated Aug. 7, 1929, with commencement of the west 
protection levee from Bordelonville to Hamburg, LA. 
The project is 93 percent complete. The current 
estimated Federal cost is $1,790,000,000 and 
non-Federal cost is $8,000,000. Of the 449.2 miles of 
levees and floodwalls authorized for the Atchafalaya 
system, 387.5 miles are built to grade. See Table 41-K 
for status of levees. 
Construction of the first 2.5 miles of the proposed 
5 miles of channel was initiated in January 1958 and 
completed in July 1959, with 7,458,086 cubic yards 
excavated. 
The remaining 2.5 miles were to be constructed 
when development of the initially constructed portion 
warrants expansion. Project expansion has not been 
necessary. Therfore this feature was deauthorized on 
Nov. 2, 1979, under the provisions of Section 12, 
Public Law 93-251 (WRDA 74), as amended. 
Major items remaining to be completed include 
completion of levees to grade and section, channel 
training works below Morgan City, modification of 
existing structures and construction of two freshwater 
distribution structures. Approximately 53.6 miles of 
bank stabilization have been placed as shown in 
Table 41-H. 
Flood Control 
ATCHAFALAYA BASIN FLOODWAY 
SYSTEM, LA 
Location. The project lies in the lower part of the 
Atchafalaya Basin which is situated in south-central 
Louisiana. It lies in parts of Iberville, Iberia, Point 
Coupee, St. Martin, St. Mary and St. Landry Parishes. 
Further, it is limited to the part of the Atchafalaya River 
Basin that has been confined between protection or 
guide levees that are about 15 miles apart. The northern 
boundary, west of the Atchafalaya River, lies along 
the south right-of-way line for the Union Pacific 
Railroad near the south side of U.S. Highway 190 
between the West Atchafalaya Basin Protection Levee 
(WABPL) and the west limits of the Town of Krotz 
Springs, thence southerly along the west limits of the 
town and easterly along the south limits of the town to 
the Atchafalaya River; east of the Atchafalaya River it 
lies along the southern right-of-way line for the Union 
Pacific Railroad. The eastern and western boundaries 
lie at the floodside toes of the East Atchafalaya Basin 
Protection Levee (EABPL) and WABPL, respectively. 
The area within these limits has been calculated at 
about 595,000 acres. 
Existing Project. This project consists of the 
acquisition of 50,000 acres of fee title, excluding 
minerals, from willing sellers and 338,000 acres of 
easements including: developmental control and 
environmental protection and in some cases flowage 
easements. All acquisition is over privately owned 
land. The state will provide its 150,000 acres of existing 
lands and also about 30,000 acres of land donated 
by the Dow Chemical Company to accomplish the 
project features. Other state and Federal lands in the 
project area include 15,000 acres acquired by the 
Department of Interior for the Atchafalaya National 
Wildlife Refuge and 12,000 acres acquired by the State 
for the Sherburne Wildlife Management Area. Additionally, 
the project includes features to protect and 
improve the environmental resources of the area and to 
provide for improved recreational use. 
To date approximately 36,998 acres of fee and 
143,729 acres of easements have been negotiated. 
Local Cooperation: A Project Cooperation 
Agreement (PCA) is not required for the acquisition of 
flowage, developmental control and environmental 
protection easements nor for acquisition of the public 
access lands (fee). A PCA will be required for the 
unscheduled work, such as the Operations and Maintenance 
and Recreation features. One recreational 
41-6

MISSISSIPPI RIVER COMMISSION 
feature, the Simmesport boat launch and appurtenant 
facilities, has been approved for construction. 
Operations and Results During Fiscal Year 00: 
During FY 00, more restrictive easements were 
acquired over 19,737 acres. Approximately 698 acres 
of addi-tional fee were negotiated in FY 00. 
Project Master Plan was signed Aug. 22, 2000. 
Operational Management Plan is approved and implemented. 
During FY 00, the project operations staff 
expanded providing increased on site Environmental 
Protection and Recreational Assistance, Reforestation 
and Trail Improvement Activities were implemented by 
contract during FY 00. 
Conditions as of Sep 30. In FY 00, approximately 
19,737 acres of easements from 100 ownerships were 
negotiated and approximately 698 acres were purchased 
in fee from willing sellers. 
BAYOU COCODRIE AND TRIBUTARIES, LA 
Operations and results during fiscal year. 
Maintenance by hired labor consisted of water control 
management. 
Condition as of Sep. 30. Construction was 
initiated in June 1946 and is 57 percent complete, based 
on the current estimated Federal cost of $20,400,000 
and non-Federal cost of $323,000. See page 2031, 
Annual Report for 1961, for description of completed 
work.
Work required to complete the project consists of 
enlargement of 13.5 miles of upper Bayou Boeuf, 
channel improvement of 25.3 miles of Bayou Cocodrie, 
enlargement of Bayou Courtableau from Washington, 
LA, to the west protection levee, and additional culverts 
through the west protection levee at 100 percent Federal 
cost in lieu of the previously authorized diversion 
channel from Washington to the Bayou Courtableau 
drainage structure. 
With the termination of the Eastern Rapides and 
South Central Avoyelles project, it has become necessary 
to provide an adequate outlet structure solely for 
the Bayou Cocodrie and Tributaries project. The economic 
effects of this change along with current benefits 
estimates have caused the benefit-cost ratio for the 
project to be less than unity. As a result, the project has 
now been classified as inactive. If economic conditions 
change, the project could be reactivated. 
BONNET CARRE' SPILLWAY, LA 
Operations and results during fiscal year. 
Maintenance by hired labor: Condition and operation 
studies, water control management, and ordinary maintenance 
of the control structure and spillway continued. 
Condition as of Sep. 30. Construction of the 
spillway was initiated in FY 1929. The control structure 
was completed in 1931, levees were completed in 
1932, and utility crossings were completed in 1936. 
The cost of the completed work is $14,212,200. 
It was necessary to operate the structure to reduce 
flood stages in 1937, 1945, 1950, 1973, 1975, 1979, 
1983 and 1997. The structure was operated in 1994 to 
transfer fresh water from the Mississippi River to 
Lake Pontchartrain. The structure was operated for one 
month from March 17-April 17, 1997, to reduce flood 
stages. 
Needle replacement began in FY 96 with the 
purchase of about 625 needles for $80,000. The total 
replacement quantity required is approximately 7,000. 
An additional cable security system has been installed 
through needle eyes to prevent needles from dislodging 
during severe storms. 
Natural Resources and Recreation Project Master 
Plan was approved and implemented. Operational 
Management Plan is under development. 
OLD RIVER, LA 
Operations and results during fiscal year. 
Maintenance by hired labor consisted of operation and 
maintenance of the lock and control structures as 
required, condition and operation studies, water control 
management, maintenance of cleared areas, levee 
shaping, and engineering studies. 
Natural Resources and Recreation Master Plan is 
under development. Operations and Maintenance 
Activity includes development of Old River 
Cooperative Visitor Center. 
Condition as of Sep. 30. Construction began 
September 1955 and is complete at a Federal cost of 
$292,273,000. Principal items completed are as 
follows: Low-sill structure, June 1959; overbank 
structure, October 1959; auxiliary structure, September 
1986; levees and levee enlargements, October 1963; 
inflow and outflow channels for the low-sill structure, 
41-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
February 1961; inflow and outflow channels for the 
auxiliary structure, August 1987; navigation lock 
completed December 1962 and opened to navigation 
March 1963, at which time Old River was closed to 
navigation with a rock and earthfill dam; highway 
approaches and bridge over the lock completed March 
1965. Approximately 9.4 miles of bank protection have 
been constructed at the inflow and outflow channels. 
(See Table 41-H for details of bank protection.) 
LOUISIANA STATE PENITENTIARY LEVEE, 
LOUISIANA 
Location. The project is located near Angola, LA, 
in West Feliciana Parish, approximately 40 miles 
northwest of Baton Rouge, LA, and borders the 
Louisiana State Penitentiary along the Mississippi River 
and State of Mississippi state line. 
Existing Project. The project provides for 
improving about 12 miles of existing levees along the 
Mississippi River which currently afford flood 
protection to the penitentiary on the left descending 
bank below Old River. The existing levees are owned 
and maintained by the State of Louisiana and are 
substandard with regard to Federal specifications. By 
improving the existing levees to Federal standards, the 
project will reduce the risk of flooding with its 
attendant property damage and threat to the lives of up 
to 5,100 inmates and about 1,750 employees and 
residents (527 reside on the penitentiary grounds). 
Funds to initiate preconstruction, engineering and 
design were appropriated in FY 91 and funds to initiate 
construction were appropriated in FY 98. 
Local Cooperation. The limited Reevaluation 
Report was approved on July 2, 1999 and formed the 
basis for execution of the Project Cooperation 
Agreement which was approved on July 30, 1999. The 
local Sponsor, the Louisiana Department of Public 
Safety and Corrections has provided cash in the amount 
of $1,150,000 in addition to furnishing the lands and 
damages necessary to support their share of the project 
cost.
Conditions as of Sep. 30. Construction was 
initiated in FY 99 with the award of three contracts in 
September 1999. Two contracts are for the levee 
upstream of Camp C and the other is for replacement of 
the existing drainage structure. The two levee contracts 
upstream of Camp C are about 85 percent complete and 
the drainage structure contract is also about 85 percent 
complete. 
Salinity Control Structures 
MISSISSIPPI DELTA REGION, LA 
CAERNARVON FRESHWATER 
STRUCTURE, BRAITHWATE, LA 
DIVERSION 
Location. The Caernarvon structure is constructed 
in the Mississippi River Levee on the left descending 
bank at mile 81 AHP, just below the St. Bernard- 
Plaquemines Parish line. 
Existing Project. The Caernarvon Freshwater 
Diversion Feature of the Miss. Delta Region Project is 
capable of diverting up to 8,000 cfs of River water into 
the Breton Sound Estuary for fish and wildlife habitat 
enhancement. River stages and the fresh water needs of 
the estuary, determined by monitoring data, establish 
the actual quantities to be diverted. 
Local Cooperation. The Local Cooperation 
Agreement with the State of Louisiana was signed in 
June 1987. Cost sharing for initial construction and 
ongoing operations and maintenance is 75% Federal 
and 25% non-Federal. The project is operated and 
maintained by Plaquemines Parish, under the direction 
of the LA Department of Natural Resources. 
Condition as of Sep. 30. Construction began in 
1988 and was completed in 1991, at a Federal cost of 
$19,700,000 and a non-Federal cost of $6,500,000. 
Diversions have been ongoing, as needed, since August 
1991. The goal of fish and wildlife habitat improvement 
has been met or exceeded, most notably in the 
areas of seed oyster availability on the public oyster 
grounds, a large variety and volume of recreational 
fishing and duck hunting. 
DAVIS POND FRESHWATER DIVERSION 
STRUCTURE, LA 
Location. The Davis Pond structure is under 
construction in the Mississippi River Levee on the right 
descending bank at mile 118 AHP, in St. Charles 
Parish, two miles Luling, LA. 
Existing Project. The Davis Pond Freshwater 
Diversion Feature of the Miss. Delta Region Project 
will be capable of diverting up to 10,650 cfs of River 
water into the Barataria Bay Estuary for fish and 
wildlife habitat enhancement. Fresh water needs of the 
estuary, determined by monitoring data, will establish 
the actual quantities diverted. 
Local Cooperation. The Project Cooperation 
Agreement was signed in April 1993 with the State of 
Louisiana. Cost sharing for initial construction and 
41-8

MISSISSIPPI RIVER COMMISSION 
ongoing operations and maintenance is 75% Federal 
and 25% non-Federal. The project will be operated and 
maintained by St. Charles Parish, under the direction of 
the LA Department of Natural Resources. 
Condition as of Sep. 30. Of the eight construction 
contracts to be completed before diversions will 
commence, three are complete. Three contracts are 
underway, and should be completed in CY 2000. Two 
minor contracts are scheduled to be advertised, awarded 
and completed in CY 2000. The Davis Pond feature is 
scheduled to be capable of diverting River water in 
CY 2001, if the need exists. Final construction and 
ongoing monitoring under the construction phase of this 
feature will continue into 2004. Estimated total first 
cost is $106,400,000. The estimated Federal share is 
$79,800,000 and the estimated non-Federal share is 
$26,600,000. 
New Orleans District 
MISSISSIPPI - LOUISIANA ESTUARINE AREAS, 
LA/MS 
BONNET CARRE' FRESHWATER DIVERSION 
STRUCTURE, LA 
Location. The Bonnet Carre' structure will be 
constructed in the upstream end of the Bonnet Carre 
Spillway structure, on the left descending bank of the 
Mississippi River at Mile 129 AHP, in St. Charles 
Parish, LA. 
Existing Project. The Bonnet Carre Project will 
be capable of diverting up to 30,000 cfs of River water 
into the Lake Pontchartrain, Lake Borgne/Biloxi Marsh 
Estuarine Area for fish and wildlife habitat enhancement. 
Fresh water needs of the area, determined by 
monitoring data, will establish actual diversion 
quantities. 
Condition as of Sep. 30. Before construction can 
proceed, a Project Cooperation Agreement must be 
signed with the States of Louisiana and Mississippi. 
Louisiana has withdrawn their support of the project 
until agreement between Louisiana and Mississippi can 
be reached on how the project will be operated. Federal 
cost of the Project is estimated to be $74,600,000. The 
construction, operation and maintenance of the Project 
Will be shared as follows: Federal, 75%; La, 20%; MS, 
Vicksburg District 
LOWER ARKANSAS BASIN, AR 
Condition as of Sep. 30. Arkansas River levees. 
A total of 56.2 miles of the 61.5 miles of north bank 
levees and all of the 85.4 miles of south bank levees 
have been completed to approved grade and section. 
These levees above mile 36.1 are protected by 
bank-protection works constructed as a feature of 
project for Arkansas River and tributaries, AR and OK. 
For present status of this work, see report of Little Rock 
District. Below mile 36.1, needed bank protection is 
constructed with project maintenance funds. Little 
Bayou Meto gates and lifting mechanism were replaced 
during FY 88. Big Bayou Meto Gate operating mechanisms 
replaced FY 94, 95, 96. 
LOWER RED RIVER SOUTH BANK RED 
RIVER LEVEES, LA 
Operations and results during fiscal year. New 
work by hired labor consisted of engineering studies. A 
Project Management Plan to address replacement of the 
drainage structure and pumping plant was approved in 
Aug 94. A major maintenance report was prepared and 
approved Sep. 95 recommending replacement of the 
drainage structure. Design of the replacement structure 
is complete. Construction is scheduled for initiation in 
the spring of 2001. 
Maintenance by hired labor consisted of water 
control management and economic studies. 
Condition as of Sep. 30. Construction was 
initiated in FY 92 and is complete. All of the 
59.2 miles of levees authorized are completed to 
approved grade and section. 
TENSAS BASIN, AR AND LA 
(a) Boeuf and Tensas Rivers, and Bayou 
Macon, AR and LA. 
Operations and results during fiscal year. Planning 
and design on project features are complete. The Lake 
Chicot Pumping Plant and related features are complete 
and in operation. No further work on the Tensas River 
Project (Separable Element) will be initiated due to lack 
of commitment from a local sponsor to cost share 
remaining E&D and construction. This project has 
been placed in the "inactive" category. 
Condition as of Sep. 30. Channel improvement 
has been accomplished on 741.7 miles of project 
streams, providing major drainage outlets for the 
tributary areas. Additionally, 61.0 miles of the Tensas 
River has been cleared and snagged. The GDM for the 
Tensas River Project, above mile 61, including Mill 
41-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Bayou-Bayou Vidal is complete. However, no further 
work will be initiated due to lack of a local sponsor. 
(b) Red River backwater area. 
Operations and results during fiscal year. 
Planning and design continued on project features. All 
channel work required to get flows to the Tensas 
Cocodrie Pumping Plant and gravity structure is 
complete. The gravity structure and the pumping plant 
are complete and are being operated and maintained by 
contract. One mitigation item, the construction of two 
water control weirs, was completed in May 1988. 
Contracts for three additional mitigation features are 
complete. Construction of the Durham Prong mitigation 
feature is complete. Tensas-Cocodrie, Item 4-A, 
levee enlargement, 6.3 miles in length, was completed 
in September 1988, and Item 4-B, 2.4 miles of levee 
enlargement, was completed in October 1990. A 
contract for Item 2 was awarded in January 1991 and is 
physically complete. These contracts will complete the 
levee enlargement for all of the levee system, except 
0.8 miles. 
Work on the Below Red River Phase II GDM has 
been reclassified as inactive. Design and construction 
of the Sicily Island Area Levee project is underway. 
Condition as of Sep. 30. Levees in Tensas- 
Cocodrie area are complete except for levee raising of 
0.8 miles. The work comprised 93.1 miles of new 
levee, excluding 2.1 miles of high ground where no 
levees are required, and 86.9 miles of gravel road on 
levees. Construction of 63.4 miles of levee, Larto Lake 
to Jonesville levee system, has been completed. A 
levee grade reevaluation study for all levee systems in 
the Red River Backwater area was completed in 
Mar. 1985. Levee work on Sicily Island area consists 
of 56 miles of new levee, 2 pumping plants, 11 miles of 
channel work, and structural mitigation features. Levee 
items IA, IB, 3A, 4A, 4B, 5A-R, 5B, Bayou Louis weir 
and connecting channel, and the Fool River Pump Plant 
are complete. Construction of Levee Items IE, 2A, 2B 
and 3B, and the Haha Bayou Pump Plant are underway. 
YAZOO BASIN, MS 
Operations and results during fiscal year. 
(a) Big Sunflower River, etc. The Project is 
authorized by the Flood Control Acts of 1944, 1946, 
1950, 1962, and 1965. Construction of channel 
improvements on Steele Bayou, Black Bayou are 
underway. Construction on Steele Bayou Channel in 
the Swan Lake Area is being done in phases. Phase V 
is scheduled for award in July 01. Main Canal is 
complete. A contract to complete Black Bayou Item 3 
was awarded in Sep 2000 and is scheduled for 
completion Dec 2001. 
Mitigation for Upper Steele Projects 
Mitigation for the environmental losses is now 
underway. Approximately 2,740 acres of cleared lands 
have been obtained in the Yazoo Basin to mitigate the 
wildlife losses resulting from construction of the Upper 
Steele Bayou Projects. This land has been reforested 
and will be managed for aquatic, wetlands, and waterfowl. 
A total of 5,250 acres of mitigation will be 
required for this project. 
(b) Flood Control Reservoirs 
(1) Arkabutla Lake. (See Table 41-C.) The dam 
and appurtenant structures were maintained and 
operated. Clearing of tributary streams in the lake area 
was continued. Maximum pool elevation in the lake 
was 220.6 feet NGVD on Jul. 2, 2000, and storage in 
flood control pool was 130,000 acre-feet. Peak 24-hour 
inflow was 7,000 cubic feet per second on Mar. 17, 
2000. On Sep. 30, 2000, the pool elevation was 
218.0 feet NGVD, and storage in the flood control pool 
was 98,900 acre-feet. 
(2) Enid Lake. (See Table 41-C.) The dam and 
appurtenant structures were maintained and operated. 
Rehabilitation of boat channels and snagging and 
clearing of tributary streams in the lake area continued, 
Maximum pool elevation in the lake was 250.1 feet 
NGVD on Jul. 2, 2000, when storage in the flood 
control pool was 271,600 acre-feet. Peak 24-hour 
inflow was 7,750 cubic feet per second on Mar. 20, 
2000. On Sep. 30, 2000, pool elevation was 243.9 feet 
NGVD and storage in the flood control pool was 
183,400 acre-feet. 4,500 ac. ft. of storage in conservation 
pool was reallocated to municipal and industrial 
water supply in June 1998. 
(3) Grenada Lake. (See Table 41-C.) Construction 
of remaining public-use facilities has been 
deferred pending development of cost-sharing agreements 
with local interests for construction and 
non-Federal operation and maintenance, consistent with 
projects for which recreation facilities are being 
constructed under the provisions of the Federal Water 
Project Recreational Act of 1965 (Public Law 89-72), 
as amended. Maximum pool elevation in the lake was 
217.3 feet NGVD on Apr. 19, 2000, when storage inthe 
flood control pool was 635,800 acre-feet. Peak 24-hour 
inflow was 60,200 cubic feet per second on Apr. 4 
2000. On Sep. 30, 2000, the pool elevation Was 
41-10

MISSISSIPPI RIVER COMMISSION 
207.7 feet NGVD and storage in the flood control pool 
was 327,600 acre-feet. 
(4) Sardis Lake (See Table 41-C.) The dam and 
appurtenant structures were maintained and operated. 
Clearing of tributary streams in the lake area continued. 
Maximum pool elevation in the lake was 256.6 feet 
NGVD on Jun. 30, 2000, when storage in the flood 
control pool was 507,500 acre-feet. Peak 24-hour 
inflow was 15,800 cubic feet per second on Apr. 6, 
2000. On Sep. 30, 2000, the pool elevation was 
251.3 feet NGVD and storage in the flood control pool 
was 366,800 acre-feet. A construction contract was 
awarded for the seismic remediation of Sardis Dam 
utilizing driven pre-stressed concrete piling as a result 
of an extensive study and evaluation of the expected 
performance of the dam during a major earthquake in 
the New Madrid earthquake zone of the central United 
States. 
(c) Greenwood, Yazoo City and Belzoni 
protection works. Contract forces continued operation 
and maintenance of levees, drainage facilities, and 
pumping plant. 
(d) Main stem. Contract forces continued operation 
and maintenance of channels, levees, and drainage 
facilities. 
(e) Mississippi Delta, MS. Feasibility studies 
limited solely to flood control problems in the Big 
Sunflower River Basin, are complete. No economically 
feasible projects were identified. A negative feasibility 
report was forwarded to the Mississippi River 
Commission in September 1997. 
(f) Reformulation Study. The uncompleted portions 
of the Yazoo Basin construction program are 
being reformulated. This reformulation study includes 
investigations of the engineering, economic, and 
environmental aspects of the basin and is being 
accomplished in 4 phases. These studies will evaluate 
reasonable arrays of alternatives to the project features 
that remained after construction of items that were 
budgeted and scheduled for award in FY 90. The 
Upper Steele Bayou and Upper Yazoo Project reports 
were approved on May 25, 1993 and Jun. 21, 1994, 
respectively. Concerning the final 2 phases, the Yazoo 
Backwater Reformulation Study began in FY 93 and 
the Tributaries Reformulation study began in FY 95. 
The Backwater Study includes nonstructural, structural, 
and combination plans. Nonstructural features include 
Conservation and water management easements and 
reforesting of cleared agricultural lands. Structural 
features include an array of various capacity pumping 
stations and a levee alternative. A draft report was 
released for public review in Sep 2000. The Yazoo 
Tributaries Reformulation Study is evaluating flood 
control requirements on nine project features. Study 
efforts were suspended in 2000 until construction 
advances in the Upper Yazoo projects. 
(g) Demonstration Erosion Control. 
The Demonstration Erosion Control Project (DEC), 
a joint project with the USDA NRCS was initiated by 
FY 85 appropriations as a continuation on streambank 
erosion control efforts. The purpose of the project is to 
demonstrate the applicability of a systems approach to 
the design of erosion, sedimentation, and flood control 
works by applying this approach to 16 demonstration 
watersheds in the Yazoo Basin hill area. During FY 00, 
work continued in the DEC toward development of the 
systems plans and implementation of a monitoring 
program. Cumulative through FY 00, the District has 
completed the construction of 188 low drop grade control 
structures, 600,000 linear feet of bank stabilization, 
120,000 linear feet of channel improvement, 23 box 
culverts, 9 high drop grade control structures, 
1,119 riser pipe grade control structures, 72 floodwater 
retarding structures, and 100,000 feet of levees. 
(h) Tributaries. Construction: 
(1) Bank Stabilization. Three bank stabilization 
items located on the Tallahatchie and Yalobusha Rivers 
were awarded in FY 94. The work was completed in 
FY 95. 
(2) Channels. Construction of the Alligator- 
Catfish, Round Lake Water Control Structure was 
completed Nov. 28, 1989. Construction on the remaining 
channel work on the Ascalmore-Tippo Project is 
complete. Contract forces continued operation and 
maintenance of channels, levees, and drainage facilities. 
(3) Levees. Levee work associated with the last 
item of work on Ascalmore-Tippo Project is complete. 
Levee work associated with Item 1 and Item 1-A 
Pelucia Creek is complete. Three Pelucia Creek pumping 
stations are complete. Construction of Pelucia 
Creek, Item 2, Item 3, and Item 4 were completed in 
FY 94. Pelucia Creek relocations were completed in 
FY 99. 
(i) Upper Yazoo Projects. The first 11 items of 
channel improvement, approximately 77 miles, and 
nine drainage structures have been completed. This 
work extends from Yazoo City, Mississippi, to about 
10 miles downstream of Greenwood, Mississippi. 
41-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
The Fort Pemberton Flood Control Structure was 
completed on Apr. 29, 1991. 
Roebuck Lake and Fort Loring water control 
structures and Tchula Lake weirs were completed in 
FY 95. 
Item 3A-2 levee was completed in FY 94. Channel 
Item 3A-1 was completed in FY 96. Item 3A-2 channel 
work was completed in FY 97. This item contains the 
first thin layer disposal site. Channel Item 3B-I was 
completed in FY 99. Channel Item 3B-2 was completed 
in FY 00. Channel Item 4A was awarded in FY 
00 and is scheduled for completion in FY 01. Channel 
Item 4B was awarded in FY 01. 
Design efforts for Channel Item 5 are underway. 
Item 5A is scheduled for award in Nov 01 and Item 5B 
for Apr 01. 
The Alligator-Catfish water control structure was 
completed in FY 98. This structure has been renamed 
the J. Tol Thomas Water Control Structure. 
Mitigation for Upper Yazoo Projects. Mitigation 
for the terrestrial impacts is now underway. 
Approximately 8,183 acres of cleared, frequently 
flooded lands have been obtained in the Yazoo Basin 
area of Mississippi to mitigate the wildlife losses 
resulting from construction of the Upper Yazoo 
Projects. This land has been reforested and will be 
managed for aquatic, wetlands, and water fowl. A total 
of 17,000 acres of mitigation will be required for this 
project. 
(j) Yazoo Basin backwater. The Yazoo area 
backwater levees are complete, including the backwater 
levee from the Mississippi River levee to the west levee 
of the lower Auxiliary Channel, the Little Sunflower 
River drainage structure, and the connecting channel 
from the Steele Bayou drainage structure to the Big 
Sunflower River. 
The Satartia area backwater levee is complete. 
Rocky Bayou area levee Items IA and I B have been 
completed. Completed backwater levees will require 
raising to provide the degree of protection intended 
based on the project design flow line developed for the 
Mississippi River following the 1973 flood. 
Four Greentree Reservoirs and pumping stations 
have been constructed to mitigate for the waterfowl 
impacts of the project. 
Mitigation of the terrestrial impacts is now 
underway. Approximately 8,800 acres of cleared, 
frequently flooded, agricultural lands have been 
obtained in the Yazoo Backwater area of Mississippi to 
mitigate the wildlife losses resulting from construction 
and operation of the Yazoo Area and Satartia Area 
levees projects. This land has been reforested and will 
be managed for terrestrial wildlife. 
Condition as of Sep. 30. The first feature of 
Yazoo Basin project was started in 1936, and the total 
project is about 65 percent complete. 
Memphis District 
CACHE BASIN, AR 
Operations and results during fiscal year. No 
contracts were awarded or completed during the fiscal 
year.
Condition as of Sep. 30. Project was initiated 
during 1972 and is 4 percent complete. Construction of 
the authorized project was stopped in 1978 due to 
environmental opposition. Reevaluation studies of the 
authorized plan were initiated in June 1987 to provide a 
more environmentally balanced plan. The reevaluation 
effort was terminated on Dec. 15, 1994, due to a lack of 
local sponsorship. The Memphis District has initiated 
action to turn the acquired mitigation lands 
(7,959 acres) over to the U.S. Department of Interior. 
CONSTRUCTION GENERAL 
FRANCIS BLAND FLOODWAY DITCH (EIGHT 
MILE CREEK), ARKANSAS 
Location. The project is located in the City of 
Paragould, AR. 
Existing Project. The existing project consist of 
12.5 miles of channel improvements. Eight miles of 
channel enlargement will occur in the rural downstrean 
area of Paragould. Three and a half miles of enlargement 
will occur in the City of Paragould along with one 
mile of channel riprap/stabilization. The project will 
provide 100 year flood protection within the City of 
Paragould. 
Local Cooperation. A project Cooperation 
Agreement (PCA) was assigned in June 1996. 
Conditions as of Sep. 30. The contract work on 
the rural eight miles of channel has been completed 
The City of Paragould continues to work to provide 
PCA requirements (lands, relocation, etc.) for the work 
within the city. 
41-12

MISSISSIPPI RIVER COMMISSION 
HELENA AND VICINITY, AR 
Location. The project is located in the City of 
Helena, AR. 
Existing Project. The existing project consists of 
1.41 miles of earthen and concrete channel enlargement 
within the city limits of Helena, AR. The concrete 
channel will be constructed primarily under streets 
while the earthen channel is in an undeveloped section 
of the city. 
Local Cooperation. The Project Cooperation 
Agreement (PCA) was signed in August 1997. 
Conditions as of Sep. 30. The contract for the 
earthen channel improvements has been done. The City 
of Helena is working to meet PCA (lands, relocations, 
etc.) requirement for advertisement of the second 
construction contract, the concrete channel. 
HICKMAN BLUFF, KY 
Operations and results during fiscal year. No 
contracts were awarded or completed during the fiscal 
year.
Location. The Hickman Bluff project is located in 
extreme southwestern Kentucky approximately one 
mile from the Mississippi River. 
Condition as of Sep. 30. Project construction was 
initiated during 1995 and completed in September 
2000. 
HELENA HARBOR, PHILLIPS COUNTY, AR 
Operations and results during fiscal year. 
Condition as of Sep. 30. Project construction was 
initiated during 1989 and completed in December 1994. 
HORN LAKE CREEK AND TRIBUTARIES 
INCLUDING COW PEN CREEK, TENNESSEE 
AND MISSISSIPPI 
Location. Horn Lake Creek is located in north- 
West Desoto County, MS and southwest Shelby County, 
Existing project. The project was approved for 
construction on Nov. 17, 1986, under authority of 
Title IV, Section 401 of the 1986 Water Resources 
velopment Act. The project consists of 3.5 miles of 
drift removal and 2.75 miles of channel clearing on 
Horn Lake Creek; 2.1 miles of channel clearing on 
Rocky Creek and 0.62 miles of channel clearing and 
1.85 miles of channel enlargement on Cow Pen Creek. 
The project will provide 1.1-year flood frequency 
protection on Horn Lake and Rocky Creeks and 25-year 
flood frequency protection on Cow Pen Creek. The 
construction is complete. 
Local Cooperation. A Local Cooperation 
Agreement was executed with the Horn Lake Creek 
Watershed Drainage District on Feb. 26, 1992. 
Condition as of Sep. 30. The final contract for 
work on Cow Pen Creek was awarded in September 
1997 and was completed in Sept. 1998. 
LOWER WHITE RIVER 
Operations and results during fiscal year. 
(a) Augusta to Clarendon Levee. There were no 
contracts awarded or completed during the fiscal year. 
(b) Clarendon Levee. There were no contracts 
awarded or completed during the fiscal year. 
(c) White River Backwater Levee-Hudson's 
Landing to MRL. Gravel surface awarded on Sep. 21, 
1999.
(d) White River Navigation. Cutterhead 
hydraulic pipeline awarded on Jun. 16, 1999. 
Condition as of Sep. 30. 
(a) Augusta to Clarendon Levee. Project was 
initiated during 1946 and is 39 percent complete. There 
were no contracts awarded or completed this fiscal 
year.
(b) Clarendon Levee. There were no contracts 
awarded this year. 
(c) White River Backwater Levee. Levee 
stabilization is complete. 
(d) Des Arc Arkansas. Bank stabilization, 
completed. 
(e) White River Navigation. Cutterhead 
hydraulic pipeline, completed on Oct. 15, 1998. 
NONCONNAH CREEK, MS AND TN 
Operations and results during fiscal year. No 
contracts awarded or completed during this fiscal year. 
41-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
Condition as of Sep. 30. Project construction was 
initiated during 1990 and is 50 percent complete. Item 
1, channel awarded Apr. 27, 2000, 90 percent complete. 
MISSISSIPPI RIVER LEVEES 
Operations and results during fiscal year. 
Minor maintenance on levees is performed by the local 
interests and major maintenance is performed as 
required for slide repairs, road rehabilitation, and other 
similar work by the U.S. Army Corps of Engineers. 
Channel Improvement. Stone Dike construction 
at Dismal Point, AR, and Below Ensley, TN, completed 
in FY 2000. Below Island 9, TN Dike construction 
awarded Jul. 22, 1999, completed in FY 2000. Above 
Loosahatchie, TN Dike construction, awarded Jun. 29, 
1999, completed in FY 2000. Wolf Island, KY Dike 
construction, awarded Jun. 30, 2000, 0 percent 
complete. 
Commerce-Birds Pt. Levee raise awarded May 25, 
1999, 100% complete. Below Commerce, MO relief 
wells, parcel 2, awarded Jul. 30, 1999, 100% complete. 
Stone Dike Construction Mississippi River awarded 
Jun. 30, 1998, and was 62.7 percent complete. 
Montezuma Bar, stone dike construction on Mississippi 
River awarded Jul. 20, 1998, completed Aug. 1999. 
Stewart Towhead, MO dikes awarded Jun. 30, 1999, 
completed Oct. 1999. Below Island 9, TN Dike 
construction awarded Jul. 22, 1999 60% completed. 
Above Loosahatchie, TN Dike construction, awarded 
Jun. 29, 1999 0% complete. 
REELFOOT LAKE - LAKE NO. 9, TN AND KY 
Operations and results during fiscal year. No 
contracts awarded or completed during this fiscal year. 
Condition as of Sep. 30. Project was initiated 
during 1974 and is 95 percent complete. 
ST. FRANCIS BASIN, AR AND MO 
(a) Little River Drainage. 
Operations and results during fiscal year. Real 
estate activities are continuing. 
Condition as of Sep. 30. Project was initiated 
during 1938 and is 95 percent complete. 
(b) Lower St. Francis River. 
Operations and Results During Fiscal Year. 
WG Huxtable Pumping Plant, impeller replacement 
awarded on Jan. 30, 1998. Ditch 56 Culvert 
Replacement awarded on Aug. 25, 1998, and is 15% 
complete. Awarded Ditch 9 Lake City cleanout on Sep. 
14, 1999, is complete. 
(c) Upper St. Francis River. 
Operations and Results During Fiscal Year. 
Ditch I and 6, bridges, Miles 1.21 and 2.95 awarded 
Sep. 7, 1999, is complete. Ditch I and 6, 1-155 Drop 
Structure, awarded Aug. 30, 1999, 95 percent complete. 
Main and ditch 2, Item 2, Channel Enlargement, 
awarded May 30, 2000, 10 percent complete. Ditches 
21A and 21B, culverts, initiated Jul. 31, 2000, 
80 percent complete. Big Lake Floodway Ditch, bridge 
below Highway 18, awarded Sep. 15, 2000, 0 percent 
complete. Highway 90, channel restoration, awarded 
Sep. 12, 2000, 0 percent complete. 
Condition as of Sep. 30. Project initiated 1937. 
Project is 90 percent complete. 
ST. JOHNS BAYOU AND NEW MADRID 
FLOODWAY 
Operations and results during fiscal year. 
Construction of the first item of work (4.3 miles of 
vegetative clearing) was completed in Oct. 97. NEPA 
coordination activities continue for remaining items for 
work. 
Condition as of Sep. 30. Construction on 
remaining items can not be initiated until NEPA 
processing is completed. Remaining construction work 
on the First Phase include approximately 23.3 miles of 
channel improvements and two pumping stations. 
Work scheduled this summer after compliance with 
NEPA and receipt of rights-of-way from locals includes 
initiating a channel enlargement item and work on the 
New Madrid Pumping Station. 
WEST KENTUCKY TRIBUTARIES, KY 
Operations and results during fiscal year. No 
contract awarded or completed during fiscal year. 
Condition as of Sep. 30. Project was initiated 
during 1978 and is 4 percent complete. Project is 
currently inactive due to lack of local support; however, 
locals have formally requested assistance in developing 
an environmentally sensitive plan of improvement. A 
preliminary time and cost estimate for a general 
reevaluation have been prepared. 
41-14

MISSISSIPPI RIVER COMMISSION 
WEST TENNESSEE TRIBUTARIES, TN 
Operations and results during fiscal year. 
(a) Forked Deer River and principal tributaries, 
TN. Forked Deer River channel improvement is 
14 percent complete. 
(b) Obion River and principal tributaries, TN. 
Obion Rivers channel improvement is 68 percent 
complete. 
(c) Riprap Protection at four sites Dyer, 
Crockett, Haywood, and Lauderdale awarded 
Aug. 29, 1996, is complete. 
Riprap protection at 3 sites Dyer, Crockett, and 
Lauderdale counties awarded on Aug. 10, 1998, and 
was completed Aug. 18, 1999. Shutdown plan control 
structures at 3 sites, Dyer and Lauderdale counties 
awarded on Aug. 3, 1998, was completed Sep. 1999. 
Condition as of Sep. 30. West Tennessee 
Tributaries Project is 60 percent complete. 
WHITEMAN'S CREEK, ARKANSAS 
Location. The project is located in the city of 
Jonesboro, AR. 
Existing project. The project was authorized for 
construction by the Water Resources Development Act 
of 1992, on Oct. 31, 1992. The project consists of 
6.1 miles of channel improvements on Whiteman's, 
Turtle, Moore's and Higginbottom Creeks. The 
improvements provide 10-year level of flood protection 
along Whiteman's, Turtle and Moores and 25-year 
protection on Higginbottom. 
Local cooperation. A Project Cooperation 
Agreement (PCA) was executed May 31, 1996. 
Conditions as of Sep. 30. The second and final 
contract for work on Whiteman's and Turtle Creek's 
was advertised in November 1999, and scheduled for 
completion in September 1999. 
41-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 41-A MISSISSIPPI RIVER IMPROVEMENTS 
Mileage 
Above Head 
of Passes Locality Improvement Remarks 
0-957' Head of Passes, LA-Cairo, IL 
10-81 The Jump-New Orleans, LA 
11-25 Baptiste Collette-Bayou 
Ostrica, LA 
118 Davis Pond, LA (formerly 
Myrtle Grove, LA) 
81 Caernarvon, LA 
44-91 Bohemia, LA-New Orleans, 
LA 
81-96 New Orleans, LA 
91-104 New Orleans, LA 
96-279 
104-234 
New Orleans-Morganza, LA 
New Orleans-Baton Rouge, 
LA 
127-129 Bonnet CarreD Floodway, LA 
129 Mississippi-Louisiana 
Estuarine Areas, LA/MS 
(Bonnet CarrelO) 
129-234 Bonnet Carre 0-Baton Rouge, 
LA 
235 Baton Rouge Harbor 
279-287 Morganza Floodway, LA 
287-303 Morganza-Old River, LA 
303-314 Old River, LA control 
314-572 Old River-Cypress Creek, AR 
437 Vicksburg Harbor, MS 
437-721 Vicksburg-Lake View, MS 
Dredging, revetment, and contract 
work 
Main line levee, right bank 
Local levees, left bank 
Salinity control structure, right bank 
Salinity control structure, left 
bank 
Main line levee and floodwall, 
left bank 
Main line levee, right bank 
Main line levee and floodwall, 
left bank 
Main line levee, right bank 
Main line levee, left bank 
Regulating spillway, left bank 
Salinity control structure, 
left bank 
Main line levee, left bank 
Devils Swamp barge channel 
Regulating spillway, right bank 
Main line levee, right bank 
Levee closure and enlargement, 
low and high water spillway 
structures, navigation lock, and 
approach channels, right bank 
Main line levee, right bank 
Harbor extension and industrial fill 
Main line levee, left bank 
Authorized by Public 
Law 89-298 
(HD 308/74/1). 
Included in MS Delta 
Region, LA feature. 
Postauthorization 
change report, 
approved June 1987. 
Authorized by Public 
Law 89-298 
(HD 308/74/1). 
Included in MS Delta 
Region, LA feature. 
Authorized by Public 
Law 81-516. 
Authorized by Public 
Law 81-516. 
Authorized by Public 
Public Law 100-676 
Modified by Public 
Law 87-874. 
Extends up south 
bank of Old River to 
Barbre Landing. 
Authorized by Public 
Law 83-780. 
Joins Arkansas 
River, south bank levee. 
Authorized by Public 
Law 70-391. Modified 
by Public Laws 79526 
and 83-780. 
41-16

MISSISSIPPI RIVER COMMISSION 
TABLE 41-A MISSISSIPPI RIVER IMPROVEMENTS 
(Continued) 
Mileage 
Above Head 
of Passes Locality Improvement Remarks 
490 
537 
646 
605-666 
672-993 
722-725 
721-734 
803-873 
857 
890 
890 
890-954 
902-922 
922 
946 
9571 
957 
Wilson Point, LA 
Greenville Harbor, MS 
Long Lake, Helena, AR 
Henrico-Helena, AR 
St. Francis River-Commerce, 
MO3 
Industrial levee (Ensley 
Bottoms) 
Memphis Harbor, TN 
Tiptonville-Obion River 
Near Mud Lake, TN 
St. Johns Bayou, MO 
New Madrid Floodway, MO 
New Madrid-Birds Point, 
MO 
Slough Bend, Hickman, KY 
Hickman, KY 
Peafield, MO 
Cairo, Cairo drainage 
Cairo, Cairo drainage 
district, Mounds, Mound 
City, and vicinity 
Thebes-Rock Island, IL 
Cape Girardeau, MO, to Rock 
Island, IL 
Unpublished 
Vicksburg District's 
MRC report approved 
Apr. 14, 1966.2 
Authorized by Public 
Law 85-500. 
Authorized by Public 
Law 79-526.2 
Pumping Plant and drainage 
structure, right bank 
Harbor improvements and port 
area 
Culvert and floodgate, right 
bank 
Main line levee and floodwall, 
right bank 
Main line levee, right bank 
Levee and pumping station 
Closure of Tennessee Chute, 
industrial fill, levee, harbor 
channels, etc. 
Main line levee, left bank, levee 
extension, and diversion Obion 
River 
Pumping station and adjacent 
channel improvements 
Drainage floodgate and levee 
closure 
Drainage floodgate and levee 
closure 
Floodway, right bank 
Main line levee, left bank 
Floodwall, left bank 
Drainage floodgate 
Floodwalls and levees 
district 
Floodwalls, levees, and pumping 
plant 
Levees, both banks 
Levees 
41-17 
Authorized by Public 
Law 79-526. 
Modified by Acts of 
Jul. 24, 1946 and 
Dec. 23, 1971. 
Authorized Dec. 15 
and 17, 1970 under 
Sec. 201 of Oct. 27, 
1965 FC Act. 
Modified by Jul. 24, 
1946 Act. 
Modified by Sep. 3, 
1954 Act. 
--
-- 
Authorized by 
Sep. 3, 1954 Act. 
__ 
Intermittent (Sec. 6). 
Intermittent (Sec. 6). 
1. Cairo, IL, is on Ohio River about 3 miles above its mouth (Mississippi River mile 954 AHP). 
2. Also see Table 41-D, "Authorizing Legislation." 
3. Commerce, MO, is on Upper Mississippi River, 39 miles above mouth of Ohio River.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 41-B MISSISSIPPI RIVER TRIBUTARY AND 
OUTLET IMPROVEMENTS 
Mileage 
Below Head of 
Atchafalaya 
River Locality Improvement Remarks 
ATCHAFALAYA BASIN, LA' 
Atchafalaya Basin, Morganza 
and West Atchafalaya 
Floodways 
0-54 West Atchafalaya Floodway 
between Red River and 
Alabama Bayou 
27-54 Morganza Floodway between 
Mississippi River and 
Alabama Bayou 
54-117 Atchafalaya Basin Floodway 
between Alabama Bayou and 
Morgan City 
East protection levee 
(Morganza and Atchafalaya 
Floodways) 
20-27 Lacour-Red Cross 
25-117 Morganza-Morgan City 
27 Bayou Latenache 
0-27 Upper Pointe Coupee Loop 
area 
31-57 Bayou Fordoche-Ramah 
80 Bayou Sorrel' 
53-117 Bayou Sorrel Lock-Morgan 
City 
17 Morgan City 
117-129 Below Morgan City 
117-129 Below Morgan City 
Atchafalaya Basin Floodway 
lower protection levee 
105 Calumet 
105-120 Below Morgan City 
115 Berwick' 
116 Patterson 
West protection levee 
(Atchafalaya Basin and West 
Atchafalaya Floodways) 
5 Simmesport-Hamburg 
Floodway 
Floodway 
Floodway 
Levee, upper Morganza guide 
Levee and Morgan City 
floodwall 
Drainage structure, Pointe 
Coupee, and channel 
enlargement 
Additional drainage facilities 
Drainage channel 
Lock 
Alternate navigation channel. 
Gulf Intracoastal Waterway 
Lock in Bayou Boeuf' 
Channel relocation 
Levee, floodwall 
Floodgate, east 
Levees, floodwall, drainage 
structures, and pumping plants 
Lock 
Water system 
Levee fuse plug 
Including lower Morganza 
Floodway guide levee. 
Through upper Morganza guide 
levee and enlargement of outlet 
channel. 
Enlargement of Bayou 
Latenache. Approved Jun. 4, 
1970. See Table 41-D. 
Levee landside borrow pit. 
Alternate route, Gulf Intracoastal 
Waterway, Port Allen to 
Morgan City. 
Gulf Intracoastal Waterway 
utilizes levee west side borrow 
pit channel. 
Gulf Intracoastal Waterway. 
Bypass route for Gulf 
Intracoastal Waterway. 
East of lower river. 
Bayou Teche-Wax Lake Outlet. 
Inclosed area between Wax Lake 
Lake Outlet and Berwick. 
Lower Atchafalaya River. 
Adjustment to provide fresh 
water. 
West Atchafalaya Floodway. 
41-18

MISSISSIPPI RIVER COMMISSION 
TABLE 41-B MISSISSIPPI RIVER TRIBUTARY AND 
(Continued) OUTLET IMPROVEMENTS 
Mileage 
Below Head of 
Atchafalaya 
River Locality Improvement Remarks 
5-105 
29 
29 
40 
40 
40 
41 
41 
41 
94 
Protection levee 
Levee enlargement and floodgate 
extension 
Railway 
Railway 
Gated drainage structures 
Highway 
Highway 
Gated drainage control 
structures and channels 
Railway 
Railway 
Floodgate and approach 
channels 
Outlet, Charenton drainage 
canal and protection levee 
Floodgate, west 
Drainage canal-railway and 
highway bridges 
Through West Atchafalaya 
protection levee. 
Borrow pit channel to Grand 
Lake through West Atchafalaya 
protection levee. 
Restoration of drainage west of 
West Atchafalaya Basin 
protection levee. 
Bayou Teche and Wax Lake 
Outlet. 
To lower flood heights. 
Mansura to Wax Lake Outlet 
Coulee des Grues 
West Atchafalaya Floodway 
Morganza Floodway 
Bayou Darbonne 
West Atchafalaya Floodway 
Morganza Floodway 
Bayou Courtableau 
West Atchafalaya Floodway 
Morganza Floodway 
Charenton 
Jaws-Lake Fausse Pointe 
Calumet 
Wax Lake Outlet 
Atchafalaya River 
Barbre Landing-Alabama 
Bayou 
Simmesport 
Simmesport-Bayou Garofier 
Melville 
Krotz Springs 
Below Alabama Bayou 
Mississippi River-Morgan City 
TECHE-VERMILION 
BASINS, LA 
Atchafalaya River to Teche- 
Vermilion Basins 
and appurtenant works 
Levee, ring, and drainage 
structure 
West bank, levee 
Levee, ring 
Levee, ring 
Channel enlargement 
12- by 125-foot navigation 
channel 
Pumping station above Krotz 
Springs, conveyance channels, 
Vermilion Basins. 
Increase channel capacities to 
decrease flood heights. 
Through Grand and Six Mile 
Lakes. 
Freshwater distribution from 
Atchafalaya River to Teche- 
41-19 
East bank, levee 
94 
105 
105 
0-54 
5-6 
5-66 
28-30 
40-41 
54-117 
94-106

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 41-B MISSISSIPPI RIVER TRIBUTARY AND 
(Continued) OUTLET IMPROVEMENTS 
Mileage 
Above 
Mouth Locality Improvement Remarks 
0-8 
50-133 
96 
133 
Drainage channel 
Drainage channel 
Courtableau Basin, LA, and 
outlets 
Charenton Canal 
West Atchafalaya protection 
levee borrow pit channel 
Bayou Courtableau spillway 
Bayou des Glaises 
BAYOU COCODRIE AND 
TRIBUTARIES 
Bayou Courtableau 
Bayou Cocodrie 
Bayous Cocodrie-Boeuf 
diversion 
Bayou Boeuf 
Bayous Boeuf-Rapides 
diversion 
Upper Cocodrie 
Bayou Boeuf 
Bayou Lamourie to Kincaid 
Structures 
Lecompte Control Structure 
Bayou Rapides Control 
Structure 
Bayou Lamourie Control 
Structure 
Various 
LAKE PONTCHARTRAIN, LA 
Lake Pontchartrain, Jefferson 
AMITE RIVER, LA 
Amite River, LA 
LOWER RED RIVER, SOUTH 
BANK, RED RIVER 
LEVEES, LA 
Moncla-Hotwells 
Bayou Rapides Pumping 
plant and gravity 
structure 
Red River-Moncla to Lake 
Long 
Flood protection 
Parish, LA 
Bank protection 
Levee, south bank 
Levee, south bank 
Levees 
Outlet to gulf 
Intercepting drainage channel. 
Washington to west protection 
levee. 
(2,3) 
Authorized by Public Law 
81-516. 
Eliminated by Public Law 
89-298. 
Senate Doc. (Public Law 84-99) 
Added to project by 
Public Law 101-514. 
Intermittent (Sec. 6). 
41-20 
Drainage control structure 
Diversion channel 
Enlargement and additional 
culverts 
Enlargement and realinement 
New channel 
New channel 
New channel 
Enlargement, clearing, and 
snagging 
Enlargement, realinement, 
clearing, and snagging 
Fixed elevation weir 
Gated drainage structure 
Gated drainage structure 
Railway, highway, and local road 
bridges, and pipeline crossing 
0-17 
17-40 
40-51 
51-60 
17-42 
87-107 
40 
60 
87 
82-145

MISSISSIPPI RIVER COMMISSION 
TABLE 41-B MISSISSIPPI RIVER TRIBUTARY AND 
(Continued) OUTLET IMPROVEMENTS 
Mileage 
Above 
Mouth Locality Improvement Remarks 
EASTERN RAPIDES AND 
SOUTH-CENTRAL 
AVOYELLES PARISHES, LA 
Eastern Rapides and southcentral 
Avoyelles Parishes, LA 
TENSAS BASIN, AR AND LA 
Red River backwater area 
Tensas-Cocodrie area 
Larto Lake-Jonesville 
Sicily Island area 
Below Red River area 
Black River, LA 
Six Mile Bayou area 
Jonesville, LA 
Ouachita River 
Boeufand Tensas Rivers and 
Bayou Macon, AR and LA 
BoeufRiver, AR and LA 
Below Bayou La Fourche 
Bayou La Fourche 
Boeuf River, AR and LA 
above Bayou La Fourche 
Canal 19 
Canal 19 extension 
Big and Colewa Creeks 
Tributaries of Boeuf River-- 
Canal 19 
Fleschmans Bayou 
Caney Bayou 
Big Bayou 
Canal 18 
Kirsch Lake Canal 
Black Pond Slough 
Bayou Macon, AR and LA 
Bayou Macon 
Canal 43 
Canal 81 
Flood protection and drainage 
improvement 
Levees, drainage channels, 
structures, and pumping plant 
Levees, drainage channels, and 
structures 
Levees, drainage channels, 
structures, and pumping plants 
Levees, drainage channels, 
structures, and pumping plants 
Drainage structure and 
appurtenant channel works 
Levees, floodwall, pumping 
plant, and interior drainage 
Levees, drainage channels, and 
structures 
Clearing 
Channel improvement and 
realinement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Authorized by Public Law 
91-611. 
(4) 
(4) 
(4) 
(4) 
Unpublished VXD-MRC Letter 
Report dated May 31, 1977, 
MR&T authority. 
2 
Portion of levee built under 
Sec. 6. Incorporated in MR&T 
by Public Law 81-516. 2 
Monroe to Sandy Bayou and 
Bawcomville (Sec. 6). 
(5) 
(5) 
Authorized by Public Laws 
78-534 and 79-526.23 
(5) 
(6) 
Authorized by Public Law 
78-534.
3 
(6) 
(6) 
(5) 
(6) 
(6) 
(6) 
See Table 41-E 
(5) 
(5) 
Al .91 
3-56 
3-56 
56 
0-32 
0-56 
151-235 
210-286 
286-296 
0-75 
0-8 
0-7 
0-33 
0-10 
0-9 
0-14 
0-170 
0-34 
0-35

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 41-B MISSISSIPPI RIVER TRIBUTARY AND 
(Continued) OUTLET IMPROVEMENTS 
Mileage 
Above 
Mouth Locality Improvement Remarks 
Lake Chicot 
0-6 
0-165 
0-22 
0-0.2 
To divert flows from 
Lake Chicot 
Authorized by Public Law 
90-483. 
Clearing (6) 
Channel improvement 
Channel improvement 
Filling canal 
Levee, south bank 
Revetment 
Levee, north bank 
Pumping plant and drainage 
structure 
Tributary ofBayou Macon 
Rush Bayou 
Tensas River, AR and LA 
Tensas River 
Tributary of Tensas River 
Mill and Vidal Bayous 
Grant's Canal, LA 
Grant's Canal at Lake 
Providence 
LOWER ARKANSAS RIVER, 
AR 
Yancopin-Pine Bluff 
Fletcher Bend, AR, to 
Pine Bluff 
North Little Rock to Gillett 
(below Plum Bayou) 
GRAND PRAIRIE-BAYOU 
METO, AR 
Grand Prairie Region and 
Bayou Meto Basin, AR 
YAZOO BASIN, MS 
Yazoo Backwater area 
Yazoo River System below 
Arkabutla Lake 
Yazoo River between Yazoo 
City and Prichard 
Yazoo River between Yazoo 
City and Askew 
Will M. Whittington Auxiliary 
Channel 
Yazoo City protection 
Rocky Bayou area 
Belzoni protection 
Greenwood protection 
Arkabutla Lake 
Yalobusha River below 
Grenada Lake 
Grenada Lake 
Tallahatchie River-Little 
Tallahatchie River 
Little Tallahatchie River 
below Sardis Lake 
Floodway channel 
Levee, drainage structure, and 
pumping plant 
Channel clearing and 
enlargement 
Levee and floodwall 
Levees, channel improvement, 
drainage structures, and 
pumping plants 
Flood detention and conservation 
Channel improvement 
Authorized by Public Law 
78-534. 3 
Authorized by Public Law 
89-298. 
Authorized by Public Law 
81-516. 
(5) 
Authorized by Public Law 
81-516. 
Including Tallahatchie and 
Coldwater Rivers. 
Intermittent. 
Intermittent. 
Improvement of 7.8 miles was 
approved Apr. 29, 1970. 
See Table 41 -C. 
Flood detention and conservation See Table 41-C. 
Levees, Panola-Quitman Floodway -- 
Channel improvement 
41-22 
Aquifer protection. 
water supply and environmental 
improvements 
Levees and pumping plants 
Channel improvement 
Levees, right bank 
Levees, left bank 
23-98 
35-98 
48-102 
0-75 
0-381 
75-366 
75-345 
45-109 
75 
127 
185 
381 
0-64 
64 
0-24 
0-26

MISSISSIPPI RIVER COMMISSION 
TABLE 41-B MISSISSIPPI RIVER TRIBUTARY AND 
(Continued) OUTLET IMPROVEMENTS 
Mileage 
Above 
Mouth Locality Improvement Remarks 
26 
0-13 
13 
0-88 
137-260 
75-381 
0-8.3 
0-23 
0-42 
275-290 
0-204 
0-8 
0-28 
0-81 
0-43 
0-4 
0-27 
153-160 
0-68 
Sardis Lake 
Yocono River below Enid Lake 
Enid Lake 
Cassidy Bayou below Old 
Coldwater River 
Upper Yazoo Projects 
Area between main stem and 
hills including Bobo Bayou 
McKinney Bayou 
enlargement of pumping plant. 
Alligator-Catfish Bayous 
Bear Creek 
Whiteoak Bayou 
Tallahatchie River, MS 
Big Sunflower River, etc. 
Big Sunflower River 
Hull Brake-Mill Creek Canal 
Hushpuckena River 
Quiver River 
Gin and Muddy Bayous, MS 
Bogue Phalia 
Ditchlow Bayou 
Little Sunflower River 
Deer Creek 
Steele Bayou 
Muddy Bayou 
LOWER WHITE RIVER AND 
BASIN, AR 
Laconia Circle-Old Town Lake 
Big Creek and tributaries 
structures 
Levee, backwater including 
outlet 
Pumping plant 
Channel improvement and 
Flood detention and conservation 
Channel improvement 
Flood detention and conservation 
Channel improvement 
Floodway channel 
Levees and channel improvement 
Channel improvement and 
Channel improvement 
Channel improvement 
Channel improvement 
Two road crossings of Panola- 
Quitman Floodway, MS, and for 
protection of Sheley Bridge 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Water-control structure 
41-23 
See Table 41-C. 
See Table 41-C. 
Including Moores Bayou, Cutoff 
Bayou, Whiting Lake and 
outlet. 
-- 
Authorized by Public Law 
79-526. 
Authorized by Public Law 
79-526. 
Authorized by Public Law 
89-298. 
As modified in GDM in 1967. 
Authorized by Public Law 
89-298. 
Authorized by Public Law 
89-298. 
Authorized by Public Law 
90-147. 
Authorized by Public Law 
78-534.' 
Authorized by Public Law 
87-874. 
Authorized by Public Law 
78-534. 3 
Authorized by Public Law 
78-534. 3 
Authorized by Public Law 
78-534.3 
Authorized by Public Law 
78-534. 
3 
Authorized by Public Law 
78-534. 3 
Modified in December 1970. 
See Table 41-D. 
Approved Mar. 3, 1970. See 
Table 41-D. 
Mile 605-645 Mississippi River. 
Authorized by Public Law 
89-298. 
13-55 
0-68

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 41-B MISSISSIPPI RIVER TRIBUTARY AND 
(Continued) OUTLET IMPROVEMENTS 
Mileage 
Above 
Mouth Locality Improvement Remarks 
Clarendon levee 
Augusta to Clarendon 
De Valls Bluff 
Des Arc, AR 
CACHE BASIN, AR 
Cache River, AR 
Bayou DeView, AR 
ST. FRANCIS RIVER AND 
BASIN, AR AND MO 
Inter-River Drainage District 
in Missouri 
Mouth of St. Francis River- 
Wappapello Dam 
Wappapello Lake 
Little River Basin 
Marked Tree, AR 
Tyronza River 
Big Slough Ditch 
Mayo Ditch 
Cross County Ditch 
Belle Fountain Ditch 
Drainage District No. 17 
L'ANGUILLE RIVER, AR 
L'Anguille River and 
tributaries, Brushy and First 
Creeks 
WEST TENNESSEE 
TRIBUTARIES 
Wolf River and tributaries, TN 
Obion River and tributaries, 
North, South, Middle, and 
Rutherford Forks 
Forked Deer River and 
tributaries, North, Middle, 
and South Forks 
Mud Lake Pumping Station, 
TN 
99 
108-192 
122 
143 
0-196 
0-90 
41-24 
Levee and outlet structures 
Levees, outlet structures 
Levee, outlet structure, and 
pumping station 
Levee, outlet structure, and 
pumping station 
Channel improvement and 
structures 
Channel improvement and 
structures 
Channel improvement and two 
outlet structures 
Floodway, levees, drainage 
channels, and structures 
Flood detention and conservation 
Floodway, levees, drainage 
channels, and structures 
Marked Tree Siphon 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement and 
pumping station 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Pumping plant 
Authorized by Public Law 
89-298. 
(5) 
(s) 
Authorized by Public Law 
81-516. 
Authorized by Public Law 
81-516. 
Authorized by Public Law 
81-516. 
Authorized Dec. 16, 1975. See 
Table 41-D. 
-- 
See Table 41-C. 
Authorized by Public Law 
90-483. 
-- 
--
-_ 
Authorized by Public Law 
90-483. 
Authorized by Public Law 
80-858. 
(6) 
Authorized by 1948 Flood 
Control Act. 
Authorized by 1948 Flood 
Control Act. 
Authorized by Resolutions 
Dec. 15 and 17, 1970.2 
260 
0-225 
225 
0-105 
86 
0-36 
0-29 
0-17 
0-12 
0-108 
0-25

MISSISSIPPI RIVER COMMISSION 
TABLE 41-B MISSISSIPPI RIVER TRIBUTARY AND 
(Continued) OUTLET IMPROVEMENTS 
Mileage 
Above 
Mouth Locality Improvement Remarks 
Harris Fork Creek, TN 
and KY 
Porter Gap, TN 
REELFOOT LAKE-LAKE 
NO. 9, TN AND KY 
Running Reelfoot Bayou, TN 
Bayou du Chien and Lake 
No. 9, KY and TN 
WEST KENTUCKY 
TRIBUTARIES, KY 
Obion Creek, KY 
LITTLE RIVER DIVERSION 
CHANNEL, MO 
Delta to Ancell, MO 
MISSOURI RIVER, MO 
Mouth to St. Charles, MO 
ILLINOIS RIVER, IL 
Mouth to Havana, IL 
OHIO RIVER, IL AND KY 
Cairo to Mound City and 
Mounds, IL 
Flood control improvements 
Construction to main-stem 
standards, levee and 
appurtenant structures for 
flood control 
Channel improvement 
Channel improvements and 
pumping station 
Channel improvement 
Levees 
Levees 
Levees 
Authorized by Water Resources 
Act of Oct. 22, 1976.2 Section 
102, 1976.2 
Section 183, 1976.2 
Authorized by Public Law 
83-780. 
Authorized in December 1970. 
See Table 41-D. 
Authorized by Public Law 
89-298. 
Mile 49 above Cairo. 
Intermittent (Sec. 6). 
Intermittent (Sec. 6). 
Floodwall, levee, revetment, and 
pumping plant 
1. General data concerning Bayou Boeuf, Bayou Sorrel, and Berwick locks where Atchafalaya Basin protection levees cross 
Gulf Intracoastal Waterway, alternate route to Plaquemine, LA, and lower Atchafalaya River (extension of Bayou Tech 
Waterway), respectively, are in report of New Orleans District. 
2. Also see Table 41-D, "Authorizing Legislation." 
3. Public Law 81-516 modified requirements of local cooperation. 
4. Authorized by Public Law 77-228. Modified by Public Law 89-298. 
5. Authorized or incorporated in MR&T by Public Law 79-526.3 See Table 41 -D. 
6. Authorized by Public Law 85-500. 
41-25 
0-20 
0-15 
0-47 
0-28 
0-120

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 41-C MISSISSIPPI RIVER TRIBUTARY 
DAMS AND LAKES 
Grenada Enid Sardis Arkabutla Wappapello 
Name' Lake Lake Lake Lake Lake 
River Yalobusha Yocona Little Tallahatchie Coldwater St. Francis 
Nearest town to damsite Grenada Enid Sardis Arkabutla Wappapello 
Drainage area, square miles 1,320 560 1,545 1,000 1,310 
Conservation pool: 
Area, thousand acres 10 6 11 5 4 
Volume, thousand acre-feet 86 58 108 31 31 
Elevation, feet, NGVD 193.0 230.0 236.0 209.3 354.7 
Flood control pool: 
Area, thousand acres 65 28 58.5 33 23 
Volume, thousand acre-feet 1.252 602 1,462 494 582 
Runoff, inches 17.8 20.2 17.7 9.3 8.4 
Outlet gates: 
Number 3 2 4 3 3 
Size, feet 7.5 by 14 8 by 16 6 by 12 8.5 by 19 10 by 20 
Capacity, thousand cubic 
feet per second 10.7 9.4 10.0 10.0 18.0 
Spillway: 
Type, uncontrolled Chute Chute Chute Chute Gravity 
Length, feet 200 200 400 300 740 
Elevation, crest, feet, NGVD 231.0 268.0 281.4 238.3 394.7 
Discharge capacity, thousand 
cubic feet per second 52 50 132 89 229 
Surcharge pool: 
Area, thousand acres 106 41 90 63 32 
Volume, thousand acre-feet 1,385 554 1,447 858 521 
Runoff, inches 19.7 18.5 17.6 16.1 7.5 
Elevation, feet, NGVD 247.5 284.0 301.0 256.3 413.7 
Dam: 
Type, earthfill Rolled Rolled Hydraulic Rolled Rolled 
Length, thousand feet 13.9 8.4 15.3 11.5 2.7 
Elevation, crest, feet, NGVD 256.0 293.0 311.4 264.3 419.7 
1. Grenada, Enid, Sardis, and Arkabutla Lakes are in Yazoo River Basin, MS; Wappapello Lake is in St. Francis River 
Basin, MO. 
41-26

MISSISSIPPI RIVER COMMISSION 
TABLE 41-D AUTHORIZING LEGISLATION 
Act or 
Authorization Work Authorized Document 
May 15, 1928 Flood protection in alluvial valley of Mississippi River, revetment 
and contraction works and dredging to provide least channel 
depth of 9 feet and width of 300 feet below Cairo. 
Jun. 19, 1930 Provided for allotment of the balance of emergency rescue funds 
to reimburse levee districts and others for expenditures in floodcontrol 
works during the 1927 and subsequent floods. 
Feb. 15, 1933 Provided for ownership of lands in Bonnet Carre0 Spillway and 
Floodway with proviso for granting rights-of-way, easements, 
and permits, in said lands. 
Apr. 23, 1934 Authorized payment for purchase of, or to reimburse states and 
local levee districts for the cost of, levee rights-of-way for floodcontrol 
work in the Mississippi Valley, and for other purposes. 
Aug. 30, 1935 Improvement of Wolf and Nonconnah Rivers, TN (Nonconnah 
Creek is correct title). 
Improvement of Wolf River (Memphis Harbor), TN. 
Jun. 15, 1936 Modification of the 1928 Act to provide for: 
Construction of a backwater levee at mouth of White River, AR. 
Construction of Eudora floodway in lieu of Boeuf floodway; flood 
control, Yazoo River: construction of Morganza floodway; and an 
outlet to the Gulf of Mexico west of Berwick, LA, including a 
6-year program for the improvement and regularization of the 
Mississippi River between Arkansas and Red Rivers, and 
Atchafalaya River; and construction of roads on levees and 
drainage adjustments incident to floodway levees. 
Aug. 28, 1937 Provided for construction of floodwalls, levees, and revetments 
along Wolf River and Nonconnah Creek for protection of 
Memphis, TN. 
Modify the Yazoo River project to substitute a combined 
reservoir floodway and levee plan. 
Jun. 28, 1938 Construction of Mounds to Mound City levee and control works 
along Cache River, IL. 
Modification of previous act pertaining to floodways and outlets 
and lands therein; including program for the improvement and 
regularization of the Mississippi River, between Cairo and 
Arkansas River, extension of levee road system; strengthening 
of levees. 
Aug. 18, 1941 Enlarge main line levees to offset abandonment of floodways 
between Arkansas and Red Rivers, flood-control works in 
backwater areas of Yazoo and Red Rivers, and in Bayous 
Rapides, Beouf, and Cocodrie, LA. 
H. Doc. 90, 70th Cong., 
I st sess. 
Public Law 395, 71st Cong., 
2d sess. 
Public Law 351, 72d Cong. 
Public Law 171, 73d Cong. 
R&H Comm. Doc. 26, 
72d Cong., Ist sess. 
R&H Comm. Doc. 45, 
74th Cong., Ist sess. 
Unpublished report dated 
Apr. 2, 1925. 
H. Comm. on Flood 
Control, 
Doc. 1, 74th Cong., 
Ist sess. 
Unpublished report on 
record in OCE. 
H. Comm. on Flood 
Control, 
Doc. 1, 75th Cong., 
I st sess. 
H. Comm. on Flood Control, 
Doc. 1, 75th Cong., 
Ist sess. 
H. Doc. 359, 77th Cong., 
i st sess. 
41-27

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 41-D AUTHORIZING LEGISLATION 
(Continued) 
Act or 
Authorization Work Authorized Document 
Dec. 22, 1944 Navigation channel 12 feet deep and 300 feet wide between 
Baton Rouge and Cairo; flood protection of Yazoo River 
Backwater Area in vicinity of Satartia, MS. 
Continue prosecution of channel improvement and stabilization 
program, $200 million. 
Jul. 24, 1946 Flood control on the Big Sunflower, Little Sunflower, 
Hushpuckena, and Quiver Rivers and their tributaries, and on 
Hull Brake-Mill Creek Canal, Bogue Phalia, Ditchlow Bayou, 
Deer Creek, and Steele Bayou, MS.' 
Improve Boeuf and Tensas Rivers and Bayou Macon, AR.' 
Improve Bayou Lafourche, LA. 
Improve Yazoo River tributaries. 
North bank, Arkansas River levees(below Plum Bayou).' 
Levees on White River (Augusta to Clarendon).' 
Bayou des Glaises diversion channel, LA.' 
Modify local cooperation requirements in St. Francis and Yazoo 
Basins. 
Tiptonville-Obion levee and drainage improvements.' 
Improvement of St. Johns Bayou, MO. 
Big Sunflower River, etc.' 
Tennessee Chute (Memphis Harbor), TN. 
Continue prosecution of project for flood control and channel 
improvement, $100 million. 
Jun. 30, 1948 Improve Mississippi River below Cape Girardeau, MO, with 
respect to West Tennessee tributaries. 
Improve L'Anguille River, AR. 
Baton Rouge Harbor (Devils Swamp), LA.' 
May 17, 1950 Flood protection at Des Arc, AR. 
Improve St. Francis River and Basin, AR and MO. 
Improve Cache River and Bayou DeView, AR and MO. 
Improve Grand Prairie Region and Bayou Meto Basin, AR. 
H. Doc. 509, 78th Cong., 
2d sess. 
Public Law 534, 
78th Cong., 2d sess. 
H. Doc. 516, 78th Cong., 
2d sess. 
S. Doc. 151, 78th Cong., 
2d sess. 
S. Doc. 191, 79th Cong., 
2d sess. 
H. Doc. 516, 78th Cong., 
2d sess. 
H. Doc. 308, 74th Cong., 
1st sess. 
H. Doc. 98, 76th Cong., 
Ist sess. 
H. Doc. 602, 79th Cong., 
2d sess. 
Public Law 526, 
79th Cong., 2d sess. 
H. Doc. 757, 79th Cong., 
2d sess. 
H. Doc. 138, 80th Cong., 
ist sess. 
H. Doc. 516,78th Cong., 
2d sess. 
S. Doc. 51, 80th Cong., 
Ist sess. 
Public Law 526, 
79th Cong., 2d sess. 
H. Doc. 627, 
80th Cong., 2d sess. 
H. Doc. 651, 
80th Cong., 2d sess. 
H. Doc. 321, 80th Cong., 
Ist sess. 
H. Doc. 485, 81st Cong., 
2d sess. 
H. Doc., 132, 81st Cong., 
Ist sess. 
S. Doc. 88, 81st Cong., 
Ist sess. 
H. Doc. 255, 81st Cong., 
1st sess. 
41-28

MISSISSIPPI RIVER COMMISSION 
TABLE 41-D AUTHORIZING LEGISLATION 
(Continued) 
Act or 
Authorization Work Authorized Document 
Flood protection, Lake Pontchartrain, Jefferson Parish, LA.' 
Filling Grant's Canal, Lake Providence, LA. 
Additional protection to Red River Backwater Area. 
Extend Federal jurisdiction to cover levees in Orleans Parish, LA. 
Bank protection, Amite River, LA. 
Continue prosecution of project for flood control and channel 
improvement, $200 million. 
Jonesville, LA, levee, retaining wall, and drainage structure.' 
1st sess. 
Oct. 30, 1951 Modify requirements for local cooperation in White River 
Backwater Area, AR. 
Sep. 3, 1954 Navigation improvement of Atchafalaya from Mississippi River 
to Morgan City, LA. 
Modify project for Vicksburg-Yazoo Area (Harbor), MS. 
Improve New Madrid Floodway, MO, including Peafield drainage 
floodgate. 
Control of Old and Atchafalaya Rivers and a lock for navigation. 
Improve Reelfoot Lake area, KY and TN. 
Jul. 3, 1958 Improve Greenville Harbor, MS. 
Extensions to project for Boeuf and Tensas Rivers and Bayou 
Macon in Arkansas. 
White River backwater area pumping plant. 
Wolf River and tributaries for flood protection in Tennessee. 
Jul. 14, 1960 Continue prosecution of project for channel improvement-- 
$50 million. 
Oct. 23, 1962 Modification--Baton Rouge Harbor (Devils Swamp), LA. 
Construct improvements in Gin and Muddy Bayous, Yazoo River 
Basin, MS. 
Replace 2 bridges with adequate floodway over Boeuf River and 
Big Bayou in Boeuf Basin, AR. 
Jun. 18, 1965 Continue prosecution of project for flood control and channel 
improvement, $53 million. 
S. Doc. 139, 81st Cong., 
2d sess. 
Public Law 516, 81st Cong., 
2d sess. 
Public Law 516, 81st Cong., 
2d sess. 
Public Law 516, 81st Cong., 
2d sess. 
Public Law 516, 81st Cong., 
2d sess. 
Public Law 516, 81st Cong., 
2d sess. 
S. Doc. 117, 81st Cong., 
Public Law 237, 82d Cong., 
Ist sess. 
S. Doec. 53, 82d Cong., 
1 st sess. 
H. Doc. 85, 83d Cong., 
Ist sess. 
H. Doc. 183, 83d Cong., 
Ist sess. 
H. Doc. 478, 83d Cong., 
2d sess. 
S. Doc. 160, 83d Cong., 
2d sess. 
S. Doc. 15, 86th Cong., 
Ist sess. 
H. Doc. 108, 85th Cong., 
1st sess. 
S. Doc. 26, 85th Cong., 
Ist sess. 
H. Doc. 76, 85th Cong., 
Ist sess. 
Public Law 86-645. 
Public Law 87-874. 
Public Law 87-874 
Public Law 87-874. 
Public Law 89-42. 
41-29

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 41-D AUTHORIZING LEGISLATION 
(Continued) 
Act or 
Authorization Work Authorized Document 
Oct. 27, 1965 Modify and expand levees and channel improvement features of 
main stem project. 
Modify flood control improvements in following tributary areas 
and basins: Cairo-Mounds-Mounds City, St. Francis, Lower 
White, Boeuf-Tensas-Macon, Red River backwater, Yazoo 
headwater, Grand Prairie, and Bayou Meto. 
Acquire any modified easements required in New Madrid 
Floodway as provided by Sec. 4 of May 15, 1928 act. 
Operate and maintain pumping plant in Red River backwater 
area (Tensas-Cocodrie Pumping Plant). 
Provide improvements in West Kentucky tributaries. 
Provide fish and wildlife facilities in St. Francis and Big 
Sunflower Basins; Yazoo Headwater and Backwater Areas; and 
Mississippi Delta region. 
Deauthorize Amite River, LA, project. 
Modify St. Francis River, MO and AR, project within District 
No. 7, Poinsett County, AR. 
Apr. 14, 19662 Provide pumping plant and drainage structure at Wilson 
Point, LA. 
Nov. 7, 1966 Construction of improvements to supplement freshwater supply 
in Teche-Vermilion Basins in Louisiana. 
Bank revetment for protection of existing industrial facilities 
along Mississippi River below Baton Rouge, LA. 
Modification of West Tennessee tributaries feature to provide 
relocation of gas transmission lines at Federal expense. 
Nov. 20, 1967 
Aug. 13, 1968 
Sep. 10, 19683 
Mar. 3, 19703 
Continue emergency work, $87,135,000, which includes $100,000 
for road crossing of Panola-Quitman Floodway, MS, and $80,000 
for protection of Sheley Bridge, Tallahatchie River, MS. 
Improvements in Boeuf and Tensas Rivers and Bayou Macon 
Basin to divert flows that would otherwise enter Lake Chicot, 
AR. 
Improvements in the Belle Fountain ditch and tributaries, MO, 
and Drainage District No. 17, AR. 
Provide pumping plants and other drainage facilities in Cairo, 
IL, and vicinity. 
Modification of Yazoo Headwater Project to include cleanout 
along David Bayou, MS. 
Modify Yazoo Backwater feature to include a control structure in 
Muddy Bayou, MS. 
H. Doc. 308, 88th Cong., 
2d sess. 
H. Doc. 308, 88th Cong., 
2d sess. 
H. Doc. 308, 88th Cong., 
2d sess. 
H. Doc. 308, 88th Cong., 
2d sess. 
H. Doc., 308, 88th Cong., 
2d sess. 
H. Doc. 308, 88th Cong., 
2d sess. 
H. Doc. 308, 88th Cong., 
2d sess. 
S. Doc. 57, 89th Cong., 
I st sess. 
Unpublished Vicksburg 
District's MRC report. 
Approved Apr. 14, 1966. 
H. Doc. 524, 89th Cong., 
2d sess. 
Public Law 89-789. 
Public Law 89-789. 
Public Law 90-147. 
H. Doc. 168, 90th Cong., 
Ist sess. 
H. Doc. 339, 90th Cong., 
2d sess. 
Public Law 90-483. 
Unpublished MRC report 
dated May 8, 1968. 
Unpublished MRC report 
dated Feb. 2, 1970. 
41-30

MISSISSIPPI RIVER COMMISSION 
TABLE 41-D AUTHORIZING LEGISLATION 
(Continued) 
Act or 
Authorization Work Authorized Document 
Apr. 29, 19703 Modification of Yazoo Headwater Project to include drainage 
structure and channel improvement on Rocky Bayou, MS. 
Jun. 4, 1970' Provide for enlargement of Bayou Latenache from Pointe Coupee 
drainage structure to Alabama Bayou, LA. 
Dec. 31, 1970 Modify and expand project to include flood protection within the 
area of eastern Rapides and south-central Avoyelles Parishes, 
LA, that are drained by Bayou des Glaises diversion channel 
and Lake Long, and their tributaries. 
Modify the project for West Kentucky tributaries (Obion Creek), 
KY, to provide for all relocations, at Federal expense, of all 
transmission lines required by the project. 
Senate and 
House Public 
Works 
Resolutions 
adopted Dec. 17 
and 15, 1970, 
respectively. 4 
River Basin 
Monetary Act 
of Dec. 23, 1971 
Report on Western Tennessee Tributaries, TN and KY, 
authorized: 
a. Modification of Reelfoot Lake feature to provide channel 
improvements on Bayou du Chien and Lake No. 9 in KY and 
TN. 
b. Modification of Mississippi levee feature to include a 
pumping station near Mud Lake floodgate and adjacent 
channel improvements. 
Modification of Big Sunflower Basin feature to provide 
additional improvements in Steele Bayou Basin, MS. 
Continue prosecution of project for the comprehensive 
development of the basin, $97 million. 
Modification of Tiptonville-Obion River levee feature to relieve 
local interests of all responsibility except that of providing 
maintenance. 
Jan. 19, 19732 Modification of the Mississippi levee feature to provide additional 
drainage facilities in Long Lake area, vicinity of Helena, AR. 
TITLE I Water Projects recommended by four completed reports were 
Resources authorized for accomplishment of Phase I design memorandum 
Development of advance engineering and design on: 
Act of 1974. a. Greenville Harbor, Greenville, MS. 
b. East bank of Mississippi River, Warren to Wilkinson 
Counties, MS (Natchez area). 
c. East bank of Mississippi River, Warren to Wilkinson 
Counties, MS (Vicksburg-Yazoo area). 
d. Bushley Bayou Area of Red River Backwater Area, LA. 
Modification of West Tennessee tributaries feature (Obion and 
Forked Deer Rivers), TN, to acquire lands for fish and wildlife, 
recreation, and environmental purposes. 
Unpublished MRC report 
dated Mar. 6, 1970. 
Unpublished MRC report 
dated Sep. 22, 1969. 
S. Doc. 91-113, 2d sess. 
Public Law 91-611. 
H. Doc. 91-414, 2d sess. 
S. Doc. 91-74, 2d sess. 
Sec. 1, Public Law 92-222. 
Sec. 7, Public Law 92-222. 
Unpublished Memphis 
District's MRC report 
dated Oct. 4, 1972. 
Sec. 1, Public Law 93-251, 
Mar. 7, 1974. 
S. Doc. 93-38, 1st sess. 
H. Doc. 93-148, 1 st sess. 
H. Doc. 93-148, Ist sess. 
H. Doc. 93-157, Ist sess. 
Sec. 3, Public Law 93-251. 
41-31

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 41-D AUTHORIZING LEGISLATION 
(Continued) 
Act or 
Authorization Work Authorized Document 
TITLE II River 
Basin 
Monetary 
Authorization 
Act of 1974 
River Basin 
Monetary Act 
of Oct. 2, 1975 
Dec. 16, 19752 
TITLE II Public 
Works for 
Water and 
Power 
Development 
and Energy 
Research 
Appropriation 
Act, 1976. 
Modification of the Yazoo Basin, MS, feature to provide for a 
streambank erosion control demonstration project for the delta 
and hill areas of basin. 
Modification of project to provide that the Secretary of the Army, 
acting through the Chief of Engineers, can substitute authorized 
mitigation lands, not yet acquired and no longer suitable, for 
like acreage in the same or adjacent subbasins of the project 
area. This section provides the authority to substitute authorized 
mitigation lands in: 
a. Tensas Basin, LA and AR, feature (Red River backwater). 
b. St. Francis Basin, AR and MO, feature. 
Modification of Bayou Cocodrie and tributaries, LA, feature, to 
provide for: enlargement of Bayou Courtableau from 
Washington to west protection levee; right-of-way and spoil 
disposal areas at Federal expense; and necessary additional 
culverts through west protection levee. 
Modification of Cache River Basin, AR, feature to provide for: 
acquisition by fee easements of lands for fish and wildlife 
management, recreation, and environmental purposes. 
Continue prosecution of project for the comprehensive 
development of the basin, $211 million. 
Continue prosecution of project for the comprehensive 
development of the basin, $158,000,000. 
Modification of St. Francis Basin, AR and MO, feature to provide 
relief from ponding of interior runoff in the Inter-River 
Drainage District of Missouri. 
Continue prosecution of project for comprehensive development 
during period Jul. I-Sep. 30, 1976, $60,300,000. 
Sec. 32, Public Law 93-251. 
Sec. 42, Public Law 93-251. 
Sec. 87, Public Law 
93-251. 
Sec. 99, Public Law 
93-251. 
Sec. 201, Public 
Law 93-251. 
Mar. 7, 1974. 
Sec. 1, Public Law 
94-101. 
Unpublished Memphis 
District's MRC report 
dated Nov. 11, 1975. 
Public Law 94-180, 
Dec. 26, 1975. 
41-32

MISSISSIPPI RIVER COMMISSION 
TABLE 41-D AUTHORIZING LEGISLATION 
(Continued) 
Act or 
Authorization Work Authorized Document 
TITLE II Public 
Works for 
Water and 
Power 
Development 
and Energy 
Research 
Appropriation 
Act, 1977. 
Water Resources 
Development 
Act of 1976. 
TITLE II Public 
Works for 
Water and 
Power 
Development 
and Energy 
Research 
Appropriation 
Act, 1978. 
Dec. 9, 1977, 5th 
Ind. on VXD 
May 31, 1977, 
Letter Report. 2 
Continue prosecution of project for flood control, rescue work, 
repair, restoration, and control of bank erosion, $231,497,000. 
Sec. 101(a) authorized accomplishment of Phase 1 - Advanced 
Engineering and Design Memoranda-On: 
a. St. Johns Bayou and New Madrid Floodway, MO, project: 
Report of OCE - Sep. 26,1975. 
b. Nonconnah Creek, TN and MS, project: Report of OCE - 
Jun. 23, 1976, and as an independent part of the project: 
Improvements for flood control and allied purposes on Horn 
Lake Creek and tributaries, including Cowpen Creek, TN 
and MS. 
Modification of West Tennessee Tributaries feature (Obion and 
Forked Deer Rivers), TN, to: 
a. (Sec. 102) - Provide project for flood control for Harris Fork 
Creek, TN and KY: (H.D. 94-221) except that highway bridge 
relocations and alterations shall be at Federal expense. 
b. (Sec. 183) - Provide for construction of a levee and 
appurtenant works from mouth of Obion diversion channel to 
vicinity Highway 88 and thence to vicinity of Porter Gap, TN. 
Continue prosecution of project for flood control, rescue work, 
repair, restoration, and control of bank erosion, $253,081,000. 
Modification of the Tensas Basin Project, Red River Backwater 
Area, to include a drainage structure and appurtenant channel 
works in the Six Mile Bayou area of Concordia Parish, LA. 
Public Law 94-355, 
Jul. 12, 1976. 
Public Law 94-587, 
Oct. 22, 1976. 
Public Law 95-96 
Aug. 7, 1977. 
Unpublished Vicksburg 
District report dated 
May 31, 1977, on Cynthia 
and Six Mile Bayous, LA. 
Jun. 28, 1980 The establishment of the Tensas River National Wildlife Refuge 
for the preservation and development of environmental 
resources and in lieu of mitigation acquisitions which 
otherwise would be required for certain water resources 
projects, within designated limits, in the basins of the Tensas, 
Boeuf, and Red Rivers in the State of Louisiana. 
Public Law 96-285, 
Jun. 28, 1980. 
41-33

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 41-D AUTHORIZING LEGISLATION 
(Continued) 
Act or 
Authorization Work Authorized Document 
Energy and 
Water 
Development 
Appropriation 
Act. 1981 
Supplemental 
Appropriations 
Bill for FY 
Ending 
Sep. 30, 1985 
(PL 99-88), and 
the Water 
Resources 
Development 
Act of 1986 
(PL 99-662) 
Water 
Resources 
Development 
Act, 1986 
For expenses necessary for prosecuting work of flood control 
projects, rescue work, repair, restoration or maintenance of 
flood control projects threatened or destroyed by flood, 
$232,519,000: Provided, That not less than $250,000 be 
available for control of bank erosion of streams in the Yazoo 
Basin, including the foothill area. Provided further, That funds 
for the Tensas Basin Red River Backwater Area, be used for 
flood control, etc., for Sicily Island and Below Red River 
including pumping stations. 
Authorizes and directs the Secretary of the Army acting 
through the Chief of Engineers to proceed with planning, 
design, engineering, and construction of 41 water resources 
projects, including Atchafalaya Basin Floodway System. For 
the Atchafalaya Basin Floodway Systems project, cost-sharing 
is only required for the recreation feature of the project. The 
flood control and environmental features are Federal costs. 
Sec. 104(a), Authorization of Projects - Authorization of 
Construction: 
Incorporation of the project for flood control, Louisiana State 
Penitentiary levee, Mississippi River, LA: Report of the Chief 
of Engineers, dated Dec. 10, 1982, at a total cost of $23,400,000, 
with an estimated first Federal cost of $17,600,000 and an 
estimated first non-Federal cost of $5,800,000. No acquisition 
of land for or actual construction of the project may commence 
until appropriate non-Federal interests shall agree to 
undertake measures to minimize the loss of fish and wildlife 
habitat lands in the project area. The work is unscheduled. 
a. Bushley Bayou, LA. Water Resources Development Act of 
1986 authorized the project for flood control, Bushley 
Bayou, LA. 
b. Eight Mile Creek, Paragould, AR. Project entails channel 
improvement along the creek with miniparks and hiking/ 
biking trails. 
c. Helena and Vicinity, AR. The Helena Basin is an urban 
basin containing approximately 3,500 acres which 
frequently and severely floods the city of Helena. A 
pumping station and sump with channel enlargement and a 
gated culvert was recommended. 
d. West Memphis and Vicinity, AR. Channel improvements 
along Ten Mile Bayou and Fifteen Mile Bayou for a total of 
23.86 miles, with limited revegetation of right-of-way to 
maintain environmental stability. 
e. St. Johns Bayou and New Madrid Floodway, MO. Flood 
control for urban and rural land. 
Public Law 96-367, 
Oct. 1, 1980. 
FY 1985 Supplemental 
Appropriations Bill 
(PL 99-88), and Water 
Resources Development 
Act of 1986 (PL 99-662). 
Public Law 99-662, 
Nov. 17, 1986. 
41-34

MISSISSIPPI RIVER COMMISSION 
TABLE 41-D AUTHORIZING LEGISLATION 
(Continued) 
Act or 
Authorization Work Authorized Document 
f. Nonconnah Creek and Johns Creek, TN and MS. Channel 
enlargement, recreation features with channel construction 
and environmental enhancement. 
g. Horn Lake Creek and Tributaries, TN and MS. This is an 
urban flood control project located in extreme northwest 
Mississippi and southwest Tennessee. The plan of 
improvement consists of 3.5 miles of selective drift removal 
on lower Horn Lake Creek and 2.6 miles of vegetative 
clearing on Horn Lake Creek, 2.1 miles on Rocky Creek and 
0.6 miles of vegetative clearing and 1.8 miles of channel 
enlargement on Cow Pen Creek. Hike/bike trails are 
included along Rocky Creek and Cow Pen Creek. 
h. Atchafalaya Basin Floodway System, La. Not mentioned, 
but this Act authorized basic cost sharing principles 
for the project. In particular establishes that the 
fish and wildlife enhancement feature of the project is of 
national significance, and therefore, a 100 percent Federal cost. 
Energy i. Lower Atchafalaya Basin Reevaluation Study. Authority 
and water to, within available funds, investiage conditions at Wax 
Development Lake Outlet, Bayou Black, and other features, and 
Appropriation recommend any modification desirable for flood protection 
Act, 1994 navigation, and environmental program. 
Sec. 601(a) Authorization of Projects. Authorization of 
Construction: 
a. Yazoo Backwater Area, MS. Authorized the project for 
mitigation of fish and wildlife losses at the Yazoo 
Backwater Project, MS. The project shall include 
acquisition of 40,000 acres for mitigation of project-induced 
fish and wildlife losses. 
b. Greenville Harbor, MS. Authorized the project for 
navigation, Greenville Harbor, MS, as contained in the 
reports of Chief of Engineers, Nov. 15, 1977 and 
Feb. 2, 1982, at a total cost of $43,700,000 with an estimated 
first Federal cost of $28,000,000 and an estimated non- 
Federal first cost of $15,700,000. 
c. Vicksburg Harbor, MS. Authorized the project for 
navigation, Vicksburg Harbor, as contained in the report of 
the Chief of Engineers, Aug. 13, 1979, at a total estimated 
first Federal cost of $55,900,000 and an estimated non- 
Federal first cost of $23,300,000. 
d. Helena Harbor, Phillips County, AR. The recommended 
plan consists of dredging a navigation channel to provide 
access to 685 acres of landfill; construction of an overlook 
park; implementing landscaping and erosion control 
measures; and mitigation fish and wildlife losses. The 
project is scheduled to be constructed in two phases. 
41-35

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 41-D AUTHORIZING LEGISLATION 
(Continued) 
Act or 
Authorization Work Authorized Document 
e. White River Navigation to Batesville, AR. The plan of 
improvement recommended in the Feasibility Report 
provides for construction and maintenance to provide a 
200-foot wide, 9-foot deep channel available 95 percent of the 
time from mile 10 (Arkansas Post Canal) to mile 254, two 
scenic overlooks, a primitive camping area, and acquisition 
of about 1,865 acres of woodlands for mitigation. However, 
section 52 of the Water Resources Development Act of 
1988 deauthorized this project. 
f. Obion Creek, KY. To prevent headwater flooding along 
tributary streams and backwater flooding of alluvial lands. 
g. Memphis Harbor, Memphis, TN. This is a navigation 
project in the vicinity of Memphis, TN, which would consist 
of dredging and maintaining a 4.9 mile long, 500-foot 
minimum width, 9-foot deep general navigation channel 
with additional dredging as required and strategic 
placement of dredged material to create and provide 
navigation access to 1,000 acres to be developed as a 
waterfront industrial complex. 
Sec. 806. Reelfoot Lake, KY. This project is modified to 
provide that the Federal share of the cost of operating the 
pumping plant feature of such project shall be 50 percent. 
Sec. 836. Mud Lake, Western Tennessee Tributaries. This 
project is modified to provide that the requirements of local 
cooperation shall be (1) 50 percent of the value of the lands, 
easements, and rights-of-way, (2) to hold and save the United 
States free from damages due to the construction works, and 
(3) to maintain and operate all the works after completion. 
Jun. 4, 1987 Modification of Mississippi Delta Region project to construct 
salinity control structure at Davis Pond (mile 118) rather than 
at Myrtle Grove (mile 59). 
Water 
Resources 
Development 
Act, 1988 
Water 
Resources 
Development 
Act, 1988 
Sec. 3(a), Project Authorizations - Authorization of 
Construction: 
a. Mississippi-Louisiana Estuarine Area, MS and LA. 
Authorized the project for environmental enhancement, 
as contained in the report of Chief of Engineers, dated 
May 19, 1986, at a total cost of $59,300,000. 
Section 4(b) 
West Memphis and Vicinity, AR. Modified the project 
by allowing that non-Federal cooperation may be 
provided by levee districts, drainage districts, or 
any unit of a state, county, or local government. 
Unpublished New Orleans 
District report, 
Nov. 1, 1984. 
Public Law 100-676 
Nov. 17, 1988 
Public Law 100-676, 
Nov. 17, 1988 
41-36

MISSISSIPPI RIVER COMMISSION 
TABLE 41-D AUTHORIZING LEGISLATION 
(Continued) 
Act or 
Authorization Work Authorized Document 
Energy and 
Water 
Development 
Appropriation 
Bill, 1990 
Energy and 
Water 
Development 
Appropriation 
Bill, 1990 
Supplemental 
Appropriations 
Bill for FY 
Ending 
Sep. 30, 1985 
(PL 99-83), and 
the Water 
Resources 
Development 
Act of 1986 
(PL 99-662) 
Water Resources 
Development 
Act, 1992 
Water Resources 
Development 
Act, 1992 
Water Resources 
Development 
Act, 1996 
West Memphis and Vicinity, AR. 
Directed the Corps to develop the most cost-effective 
flood control plan for the City of West Memphis without 
regard to frequency of flooding, drainage area, and the 
amount of runoff. 
Bayou Rapides Drainage Structure and Pumping Plant 
Directed the Secretary of the Army to incorporate 
existing flood control features for the Bayou Rapides 
Drainage Structure and Pumping Plant into the Lower Red 
River, South Bank Levees portion of the MR&T Project. 
Atchafalaya Basin Floodway System, LA. 
Authorizes and directs the Secretary of the Army acting 
through the Chief of Engineers to proceed with planning, 
design, engineering, and construction of 41 water resources 
projects, including Atchafalaya Basin Floodway System. For 
the Atchafalaya Basin Floodway Systems project, cost-sharing 
is only required for the recreation feature of the project. The 
flood control and environmental features are Federal costs. 
This act authorized basic cost sharing principles for the project. 
In particular, establishes that the fish and wildlife enhancement 
feature of this project is of national significance and therefore 
a 100% federal cost. 
Whiteman's Creek, Arkansas. 
Directed the Secretary of the Army to implement flood control 
improvement, which essentially consist of 6.1 miles of channel 
enlargement along streams within the city limits of Jonesboro, 
Arkansas. 
New Madrid Harbor, Missouri 
Directed the Secretary of the Army to assume responsibility for 
maintenance of the New Madrid County Harbor constructed by 
non-Federal interests before that date of the enactment of this Act 
in lieu of maintaining the existing Federal channel. 
Grand Prairie and Bayou Basin, Arkansas 
The project for flood control, Grand Prairie Region and Bayou Meto 
Basin, Arkansas, authorized by section 204 of the Flood Control Act 
of 1950 (64 Stat. 174) and deauthorized pursuant to section 1001(b) 
of the Water Resources Development Act of 1986 (33 U.S.C. 579a(b)), 
is authorized to be carried out ground water protection and conservation, 
agricultural water supply, and waterfowl management if the Secretary 
determines that the change in the scope of the project is technically sound, 
environmentally acceptable, and economic, as applicable. 
Public Law 101-83, 
Jul. 25, 1989 
Public Law 101-514, 
Nov. 5, 1990 
FY 1985 Supplemental 
Appropriations Bill 
(PL 99-88), and Water 
Resoureces Development 
Act of 1986 (PL 99-662). 
Public Law 102-580 
Oct. 31, 1992 
Public Law 102-580 
Oct. 31. 1992 
Public Law 104-303 
Oct. 12, 1996 
41-37

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 41-D AUTHORIZING LEGISLATION 
(Continued) 
Act or 
Authorization Work Authorized Document 
Water Resources 
Development 
Act, 1996 
Water Resources 
Development 
Act, 1999 
Water Resources 
Development 
Water Resources 
Development 
Acts, 1986, 
1990 and 1999 
White River, Arkansas Public Law 104-303 
The project for navigation, White river Navigation to Batesville, Arkansas, Oct 12, 1996 
authorized by section 601(a) of the Water Resources Development Act of 
1986 (100 Stat 4139) and deauthorized by section 52(b) of the Water 
Resources Development Act of 1988 (102 Stat. 4044), is authorized to be 
carried out by the Secretary. 
Memphis Harbor, Memphis, Tennessee Public Law 106-53 
Authorized to be carried out by the Secretary, if the Secretary determines Aug. 17, 1999 
that the project is technically sound, environmentally acceptable, and 
economically justified, as appropriate. 
Tunica Lake Weir, Mississippi Public Law 106-53 
The Secretary shall conduct a study to determine the feasibility of 
constructing an outlet weir at Tunica Lake, Tunica county, Mississippi, 
and Lee County, Arkansas, for the purpose of stabilizing water levels in the 
lake. In carrying out the study, the Secretary shall include as part of the 
economic analysis the benefits derived from recreation uses at Tunica Lake 
and economic benefits associated with restoration of fish and wildlife habitat. 
Louisiana State Penitentiary Levee, Mississippi River, Louisiana Public Law 99-662 
Authorizes and directs the Secretary of the Army, acting through Nov. 17, 1986 
the Chief of Engineers to proceed with planning, design, Public Law 101-646 
engineering, and construction of improvements of 12 miles of Nov. 28, 1990 
existing levee along the Mississippi River which provides flood 
protection to the Louisiana State Penitentiary at Angola, LA. 
This act authorizes basic cost sharing principles, and 
establishes that the cost sharing will be shared on a 75%/25% 
basis with the state of Louisiana for this project. 
Authorizes the Secretary of the Army to consider credit for work Public Law 106-53 
performed by an non-Federal sponsor since project authorization. Aug. 17, 1999 
1. Incorporated into Mississippi River and tributaries project as shown in Table 41-E. 
2. Date minor modification for blocked drainage was approved under delegated authority of the President, Mississippi River 
Commission, and in accordance with Sec. 10(p) of the 1946 Flood Control Act (Public Law 79-526). 
3. Date minor modification was approved under discretionary authority of Chief of Engineers contained in May 15, 1928, 
Flood Control Act, as amended. 
4. Projects approved under the provisions of Sec. 201 of Flood Control Act of Oct. 27, 1965. 
41-38

MISSISSIPPI RIVER COMMISSION 
TABLE 41-E INCORPORATING AND AUTHORIZING 
LEGISLATION 
For Last 
Public Full Report 
Act of Law Authorizing See Annual 
Incorporation No. Act Description Report for 
Tiptonville-Obion levee and drainage 
improvements, TN 
Bayou des Glaises diversion ditch, LA 
From North Little Rock, AR, to Gillett, 
AR, on north bank of Arkansas River 
(portion below Plum Bayou) 
White River levees, Augusta to 
Clarendon and De Valls Bluff, AR 
Boeuf and Tensas Rivers and Bayou 
Macon, LA 
Big Sunflower River, etc. 
Devils Swamp barge channel at Baton 
Rouge, LA (Baton Rouge Harbor) 
Jonesville, LA 
Lake Pontchartrain-Jefferson Parish, LA 
Jul. 24, 1946 
Jul. 24, 1946 
Jul. 24, 1946 
Jul. 24, 1946 
Jul. 24, 1946 
Jul. 24, 1946 
Jun. 30, 1948 
May 17, 1950 
May 17, 1950 
79-526 
79-526 
79-526 
79-526 
79-526 
79-526 
80-858 
81-516 
81-516 
Jun. 22, 1936 
Jun. 22, 1936 
Jun. 22, 1936 
Aug. 18, 1941 
Dec. 22, 1944 
Dec. 22, 1944 
Jul. 24, 1946 
Jun. 22, 1936 
Jul. 24, 1946 
1941, p. 943 
1946, p. 1029 
1946, p. 1053 
1946, p. 1083 
1945, p. 982 
1946, p. 1061 
1948, p. 1059 
1953, p. 773 
1953, p. 737 
41-39

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 41-F SUMMARY OF PRESENTLY ESTIMATED 
FEDERAL FIRST COST OF 
AUTHORIZED IMPROVEMENTS 
Estimated Cost' 
Project Title Fiscal Year 2000 
Completed features2 
Mississippi River levees 
Mud Lake Pumping Station, TN 
Sec. 6 levees, 1928 Flood Control Act 
Channel improvement 
Atchafalaya Basin, LA 
Atchafalaya Basin Floodway System, LA 
Bayou Cocodrie and Tributaries, LA 
Old River, LA 
Lower Red River--South Bank Red River levees, LA 
Eastern Rapides and South-Central Avoyelles Parishes, LA 
Mississippi Delta Region, LA 
Tensas Basin, AR and LA 
Lower Arkansas River, AR 
Grand Prairie-Bayou Meto, AR (Flood Control & Water Supply) 
Yazoo Basin, MS 
Lower White River, AR (All except Big Creek & Tribs.) 
Lower White River (Big Creek & Tribs.) 
Cache Basin, AR 
St. Francis Basin, AR and MO 
Francis Bland Floodway Ditch (Eight Mile Creek), AR 
L'Anguille River, AR 
West Tennessee Tributaries, TN 
Harris Fork Creek, TN and KY 
Reelfoot Lake-Lake No. 9, TN and KY 
Reelfoot Lake, TN and KY (Completed) 
Reelfoot Lake-Lake No. 9, TN and KY 
West Kentucky Tributaries, KY 
Sardis Dam (Dam Safety Assurance), MS 
St. Johns Bayou and New Madrid Floodway, MO 
Nonconnah Creek, TN and MS 
Horn Lake Creek and Tributaries, TN and MS 
Horn Lake Creek Modification, TN & MS 
Wappapello Lake, MO (RAMP) 
Greenville Harbor, MS 
Memphis Harbor (Ensley Berm), TN 
Helena Harbor, Phillips County, AR 
Helena, AR, and Vicinity 
West Memphis, AR, and Vicinity 
Vicksburg Harbor, MS 
Louisiana State Penitentiary Levee, LA 
Hickman Bluff, KY 
Whiteman's Creek, AR 
Reelfoot Lake, KY and TN (Ecosystem Restoration) 
41-40 
$ 339,236,000 
2,106,000,000 
5,270,0003 
4,000,000' 
3,863,000,000 
1,790,000,000 
176,000,000 
20,400,000' 
292,273,000 
23,200,000' 
50,000,000' 
99,800,000 
477,631,000 
29,676,0003 
208,000,000 
1,821,029,000 
16,802,000' 
55,900,000' 
155,000,000 
401,600,000 
9,270,0003 
15,100,000' 
153,300,000 
14,300,0003 
(10,700,000) 3 
440,000 
10,260,0003 
26,100,0003 
29,200,000 
61,400,000 
18,400,0004 
3,120,000 
825,000 
585,000 
31,000,000 
23,100,0004 
32,156,000a 
8,590,00046 
11,600,0006 
63,500,000r 
19,500,000, 
17,510,000 
3,300,000 
18,900,000 
s

MISSISSIPPI RIVER COMMISSION 
TABLE 41-F SUMMARY OF PRESENTLY ESTIMATED 
(Continued) FEDERAL FIRST COST OF 
AUTHORIZED IMPROVEMENTS 
Estimated Cost' 
Project Title Fiscal Year 2000 
Mississippi - Louisiana Estuarine Areas, MS and LA 71,300,0005 
Eastern Arkansas, AR 14,0003 
Jackson and Trenton, AR 9,650,000' 
Mississippi Delta, MS 61,600,0003 
Bushley Bayou, LA 37,000,000 
Bayou Meto, AR 125,000,000 
Clarendon Levee, AR 1,576,000 
Augusta to Clarendon, AR 12,601,000 
Memphis Metro, TN 26,000,000 
Wolf River, TN 6,350,000 
Morganza, LA, to Gulf of Mexico 442,000,000 
Reelfoot Lake, TN and KY 20,152,000 
Memphis Harbor, Memphis, TN 22,500,000 
TOTAL $13,342,116,000 
1. Inflation projected through the construction period. Harbors; Lake Pontchartrain; Wolf River; completed roads. 
2. Includes Bonnet CarrelO, Morganza, and New Madrid Floodways; Memphis, Greenville, and Vicksburg on main stem levees; 
channel construction works; Atchafalaya River and Basin; Wax Lake Outlet; Charenton Canal; Bayou des Glaises diversion 
channel, Boeuf Basin levees; Grant's Canal; De Valls Bluff, Jonesville, and Des Arc protection works; Baton Rouge Harbor; 
and miscellaneous features; Teche-Vermilion Basins, LA. 
3. Incremental (not projected through the construction period). 
4. Authorized by Water Resources Development Act of 1986, Public Law 99-662, Nov. 17, 1986. 
5. Authorized by Water Resources Development Act of 1988, Public Law 100-676, Nov. 18, 1988. 
6. Locals built their own project. 
7. Authorized by Water Resources Development Act of 1999, Public Law 106-53, Aug. 17, 1999. 
8. Authorized by Water Resource Development Act of 1999, Public Law 106-53, Aug. 17, 1999 and Report of the Chief of 
Engineers, Dec. 23, 1999. 
9. Reauthorized by Water Resources Development Act of 1999, Public Law 106-53, Aug. 17, 1999. 
10. Authorized by Water Resources Development Act of 2000, Public Law 106-541, Dec. 11. 2000. 
41-41

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 41-G MISSISSIPPI RIVER MAIN STEM 
CHANNEL IMPROVEMENTS 
Location Operations in 1,000 Cubic Yards 
Mileage Fiscal Year 2000 
Above Head Channel 
District of Passes Construction Maintenance Total 
New Orleans 
Baton Rouge Harbor 
(Devils Swamp) 235 -- 226.7 226.7 
Main stem channel 234-320 -- -- -- 
(Smithland and 
Wilkinson Pt Crossings) 
Atchafalaya Basin 1150.4 1150.4 
Berwick Bay Harbor 324.2 324.2 
Three Rivers 
Old River Lock Forebay 304 153.3 153.3 
and Tailbay 
Vicksburg 
Main stem channel 322-600 -- 1,725.3 1,725.3 
Vicksburg Harbor 437 -- 85.0 85.0 
Greenville Harbor 537 -- 488.9 488.9 
Memphis 
Main stem channel 600-954 -- 18,231.2 18,231.2 
Memphis Harbor, 
McKellar Lake 725 -- 447.5 
TOTAL -- 25,832.5 22,832.5 
41-42

TABLE 41-H BANK REVETMENTS, DIKES, AND FORESHORE PROTECTION: 
NEW ORLEANS DISTRICT (FISCAL YEAR 2000) 
Operations This FY Non- 
Construction Operative 
Above New Work Since Operat 
Head Bank Exten- Reinforcement Prior Thru 
of R sion Lap FY This F 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linea 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)' Feet) Feet) 
MISSISSIPPI RIVER 
Standard Revetment: 
Venice, LA ................................. 12 R -- -- -- -- -- -- -- 49,5 
Olga, LA ................................. 19 L -- -- -- -- -- -- -- 19,05 
Lower Childress-Fort Jackson, LA 22 R -- -- -- -- -- -- -- 15,43 
Neptune, LA ................................. 23 L -- -- -- -- -- -- -- 14,3 
Buras, LA .............................. 25 R -- -- -- -- -- -- -- 17,28 
A Tropical Bend, LA................... 30 R -- -- -- -- -- -- -- 25,01 
Bayou Lamoque, LA .................. 33 L -- -- -- -- -- -- -- 21,50 
Port Sulphur, LA ........................ 39 R -- -- -- -- -- -- -- 36,99 
Nestor, LA ............................... 41 L -- -- -- -- -- -- -- 12.42 
Point Michel, LA ........................ 44 R -- -- -- -- -- -- -- 22,93 
Bohemia, LA .............................. 46 L -- -- -- -- -- -- -- 15,44 
Diamond, LA ........... ........... 49 R -- -- -- -- -- -- -- 11.60 
Gravolet, LA ...................... 51 L -- -- -- -- -- -- -- 23,87 
Junior, LA..................................... 54 R -- -- -- -- -- -- -- 23,59 
Harlem, LA.............................. 56 L -- -- -- -- -- -- -- 15,14 
Myrtle Grove, LA.......................... 59 R -- -- -- -- -- -- -- 17,43 
Monsecour, LA.......................... 61 L -- -- -- -- -- -- -- 13,34 
Alliance, LA ............................ 62 R -- -- -- -- -- -- -- 17,26 
Belair, LA ................................ 65 L -- -- -- -- -- -- -- 26,11 
Jesuit Bend, LA ........................... 68 R -- -- -- -- -- -- -- 24,97 
Linwood, LA ................................. 71 L -- -- -- -- -- -- -- 14,64 
Oak Point, LA................................ 72 R -- -- -- -- -- -- -- 16,42 
Scarsdale, LA ............................ 75 L -- -- -- -- -- -- -- 17,82 
English Turn, LA ........................ 78 R -- -- -- -- -- -- -- 21,84 
Poydras, LA ..................... . 82 L -- -- -- -- -- -- -- 45,86 
Twelve Mile Point, LA............... 84 R -- -- -- -- -- -- -- 9,97 
Cutoff, LA ............................. 88 R -- -- -- -- -- -- -- 23,23 
ive 
,Y 
ir 
52 
3
)9 
32 2 
)5 
5
0
2
0 C 
4 D 
9
8
5
0
5
I
8
3
6
5
5
4
9
4

TABLE 41-H 
(Continued) 
BANK REVETMENTS, DIKES, AND FORESHORE PROTECTION: 
NEW ORLEANS DISTRICT (FISCAL YEAR 2000) 
Operations This FY Non- 
Construction Operative 
Above New Work Since Operative 
Head Bank Exten- Reinforcement Prior Thru 
of R sion Lap FY This FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)' Feet) Feet) 
Standard Revetment: 
Third district reach, LA ........... 
Algiers Point, LA............................ 
Gouldsboro, LA ....................... 
Gretna Bend, LA.......................... 
Greenville Bend, LA...................... 
Carrollton Bend, LA ..................... 
Avondale Bend, LA ...................... 
Kenner, LA .................................... 
Luling, LA .................................... 
Destrehan, LA................................ 
Good Hope, LA ............................. 
Waterford, LA ...................... 
Montz, LA ........................ 
Lucy, L A ........................ .............. 
Reserve, LA .................... 
Willow Bend, LA........................... 
Angelina, LA ................................. 
Vacherie, LA ................................ 
Belmont, LA ............................ 
Rich Bend, LA................. ..... 
Romeville, LA ........................ 
St. Alice, LA.......................... 
Burnside, LA ............................... 
Aben, LA ................... ...... .... 
St. Elmo, LA................ ............. 
Smoke Bend, LA ............ ....... 
Marchand, LA.............................. 
Philadelphia Point, LA ............ 
New River Rend, LA ................. 
93 
95 
96 
97 
100 
104 
109 
114 
119 
102 
126 
128 
132 
136 
138 
141 
145 
148 
152 
157 
161 
165 
170 
172 
174 
177 
180 
183 
185 
L
R
R
R
R
L
R
L
R
L
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L 
1,205
-- ] 
678 
rr 
-- 
-- 
-- 
-- 
-- 
-- 
-- 
-- 
-- 
-- 
-- 
-- 
-- 
515 6,666 
2,625 
�-- 
-- - 
AA
Al 
13,356 --
9,881 
13,760 
.... 
-- 
-- 
-- 
-- 
0
O
r 
C7) 
7d 
0o 
0
t 
c3 
O
n
Erm 
5C~ 
C
C
-] 
, 
28,372 
12,238 
4,960 
10,340 
22,045 
16,262 
28,409 
45,492 
44,893 
5,409 
24,531 
21,264 
17,502 
19,450 
23,234 
13,227 
32,762 
26,025 
25,575 
38,498 
33,986 
31,130 
29,304 
11,700 
12,014 
18,792 
19,603 
5,379 
45,672 
-- 
-- 
-- 
-- 
-- 
-- 
-- 
-- 
-I 
-- 
-
-- 
1,69 
5,26 
.. 
.. 
.. 
-- 
-- 
2,334

TABLE 41-H BANK REVETMENTS, DIKES, AND FORESHORE PROTECTION: 
(Continued) NEW ORLEANS DISTRICT (FISCAL YEAR 2000) 
Operations This FY Non- 
Construction Operative 
Above New Work Since Operati 
Head Bank Exten- Reinforcement Prior Thru 
of R sion Lap FY This F' 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linea 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)' Feet) Feet) 
Standard Revetment: 
White Castle, LA ........................ 193 R -- -- -- -- -- -- -- 45,96 
St. Gabriel, LA ................... 201 L -- -- -- -- -- -- -- 33,29 
Plaquemine Bend, LA.............. 209 R -- -- -- -- -- -- -- 45,01 
Manchac, LA ............................. 215 L -- -- -- -- -- 3,454 -- 38,97 
Missouri Bend, LA ..................... 222 R -- -- -- 1,406 6,204 -- 30,43 
Arlington, LA ............................. 227 L -- -- -- -- -- .. -- 18,05 
Port Allen, LA ............................... 231 R -- -- -- -- -- -- -- 17,62 
Scotlandville, LA..................... 234 L -- -- -- -- -- -- -- 1,62 
SAllendale, LA .............................. 238 R -- -- -- -- -- 6,677 -- 28,69J 
Springfield Bend. LA .................. 244 L -- -- -- .-.-- - -- -- 25,69 
Arboth, LA .................................... 250 R 3,336 538 11,123 -- -- -- -- 2352 
Faulkner Lake, LA.................... 253 L -- -- -- -- -- -- -- 18,80 
Grand Bay, LA .......................... 258 R -- -- -- -- -- 11,759 -- 24,905 
Bayou Sara, LA ........................... 265 L -- -- -- -- -- -- -- 29,722 
Red Store, LA.......................... 269 R -- -- -- -- -- -- -- 18,464 
Arrow Bend, LA........................... 272 L -- -- -- -- -- -- -- 13,600 
Boies Point, LA ............................. 275 R -- -- -- -- -- -- -- 16,094 
Morganza, LA ............................ 279 R -- -- -- -- -- -- -- 20,513 
Iowa Point, LA .......................... 282 L -- -- -- -- -- -- -- 15,477 
Brunette Point, LA................... 285 R -- -- -- -- -- -- -- 14,335 
Greenwood Bend. LA.............. 289 L -- -- -- -- -- -- -- 26,032 
Hog Point, LA ........................ 296 R -- -- -- -- 37,516 
Carr Point, LA ........................ 304 R -- -- --. 20,725 
Above Old River, LA .... ......... 305 R -- -- -- -- -- -- -- 9,958 
Fort Adams, MS ...................... 308 L -- -- -- -- -- -- -- 24,206 
Point Breeze, LA ....................... 313 R -- -- -- -- -- -- -- 13,565 
Coochie, LA .................................. 317 R -- -- -- -- -- 3,087 -- 17,150 
ve 
Y
r
8
2
2 co 
7 4 0
7 
I, 
8 . 3 Cm

TABLE 41-H 
(Continued) 
BANK REVETMENTS, DIKES, AND FORESHORE PROTECTION: 
NEW ORLEANS DISTRICT (FISCAL YEAR 2000) 
Operations This FY Non- 
Construction Operative 
Above New Work Since Operative 
Head Bank Exten- Reinforcement Prior Thru 
of R sion Lap FY This FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)' Feet) Feet) 
Palmetto, MS................................. 
Total Revetment 
New Orleans District, 
Mississippi River..................... 
Dikes: 
Profit Island Chute 
Closure, LA ..................... 
Hog Point, LA ............................... 
Hog Point Chute Closure ............... 
Total Dikes 
New Orleans District, 
Mississippi River ................ 
OLD RIVER CONTROL 
Standard Revetment: 
Inflow channel ........................... 
Inflow channel .................. ........ 
Outflow channel ........................ 
Auxiliary inflow channel .............. 
Auxiliary outflow channel ............. 
Total Standard Revetment, 
Ol\d River ........................... 
322 
252 
299 
300 
315 
315 
315 
312 
312 
L -- 
L
L
R
L
R 
L&R 
L&R 
L&R 
5,219 1,053 20,414 3,954 21,929 50,538 -- 1,905,518 
(.99 Miles) (360.89 Miles) 
- -- -- -- . -- 4,315 
- - .. .. .. -- 6,850 
- -- -- -900 
12,065 
(2.29 Miles) 
-- -- -- -- -- -- 2,415 
-- -- -- -- -- -- -- 4,365 
19,891 - -- -- -- -- - 17,200 
-- -- -- -- -- 5,790 
-- -- -- -- -- 5,790 
ON 
:0 
0
C
z
0
Ct 
t 
0
0 
34,650 
all'

TABLE 41-H BANK REVETMENTS, DIKES, AND FORESHORE PROTECTION: 
(Continued) NEW ORLEANS DISTRICT (FISCAL YEAR 2000) 
Below 
Conflu- Operations This FY Nonence 
ofConstructi Operative 
Red and New Work Since Operat 
Atcha- Bank Exten- Reinforcement Prior Thru 
falaya R sion Lap FY This F 
Rivers or (Linear (Linear (Linear Maintenance (Linear (Linea 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)' Feet) Feet) 
ATCHAFALAYA RIVER 
Standard Revetment: 
Mile One, LA ............................ L -- -- -- -- -- -- -- 4,15 
Coville Bayou, LA.................... 3 R -- -- -- -- -- -- -- 6,55 
Legonier, LA .............................. 4 L -- -- -- -- -- -- -- 8,94 
Simmesport, LA ......................... 6 R -- -- -- -- -- -- -- 12,49 
Kuhlman Bayou, LA................. 7 L -- -- -- -- -- -- -- 5,56 
Odenburg, LA ......................... 9 R -- -- -- -- -- -- -- 5,37 
Jacoby, LA................................ 10 L -- -- -- -- -- -- -- 7,39 
. Cason, LA............. ............ 12 R -- -- -- -- -- -- -- 10,79 
L M cCrea, LA ............................... 13 L -- -- -- -- -- -- -- 6,57 
Woodside, LA ..................... 14 R -- -- -- -- -- -- -- 13.00 
Provosty, LA ............................... 17 L -- - -- -- -- - - -- 9,11 
Crooked Bayou, LA................. 18 R -- -- -- -- -- -- -- 16,244 
Mercier, LA............................ 22 L -- -- -- -- -- 5,342 -- 10,47 
Barberton, LA ........................... 23 R -- -- -- -- -- -- -- 3,59 
Evans Point, LA................... 24 L -- -- -- -- -- -- -- 6,668 
Goudeau, LA .............................. 26 R -- -- -- -- -- -- -- 3,93 
Morris Bayou, LA ...................... 27 L -- -- -- -- -- -- 5,44( 
Goodwood, LA ........................ 28 R -- -- -- -- -- -- -- 8,50 
Red Cross, LA ........................... 29 L -- -- -- -- -- -- -- 8,06 
Melville LA ....................... 30 R -- -- -- -- -- - -- 5,66 
Cross Bayou, LA ........................... 31 L -- -- -- -- -- -- -- 6,065 
Melville South, LA ..................... 33 R -- -- -- -- -- -- -- 13,34( 
Toles, LA...................................... 35 L -- -- -- -- -- -- -- 6,355 
Petite Prairie, LA .......................... 36 R -- -- -- -- -- -- -- 8,381 
Three Mile Bayou, LA................ 37 R -- -- -- -- -- -- -- 6,330
ive 
Y
Lr 
0 4 
0 g 1 (/ 
5
5
0 m 
8
2 5 
2
6
8 O 
22

TABLE 41-H 
(Continued) 
BANK REVETMENTS, DIKES, AND FORESHORE PROTECTION: 
NEW ORLEANS DISTRICT (FISCAL YEAR 2000) 
Below Operations This FY Non- 
C onflu- ence of Construction Operative 
Red and New Work Since Operative 
Atcha- Bank Exten- Reinforcement Prior Thru 
falaya R sion Lap FY This FY 
Rivers or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)' Feet) Feet) 
Standard Revetment: 
Holloway Lake, LA............... 
Bayou Sherman, LA.................... 
Krotz Springs, LA ....................... 
Sherburne, LA ............................. 
Bayou Big Graw, LA ................... 
Courtableau, LA ............................ 
Coswell Bayou, LA ..................... 
Alabama Bayou, LA...................... 
Indian Bauyou ............................ 
Happy Town, LA........................... 
co Otis Landing, LA........................... 
Morgan City, LA ......................... 
37 
38 
40 
43 
46 
49 
48 
50 
52 
53 
54 
115 
L
L
R
R
R
R
LL 
R
L
R
L 
7,098 
-- 
32,287 
Total Standard Revertment 
Atchaalaya River 
Dikes: 
Ten Mile Dikes .............................. 
LOWER RED RIVER 
Standard Revetment: 
Long Lake, LA ............................ 
Naples, LA................... .......... 
Turnbull Island, LA....................... 
10 R 
Below Confluence 
of Old River 
Outflow Channel 
and Red River 
(Miles) 
10
7
9 
R
R
L 
Tota\ Standard Revetment 
7,098 
(1.34 Miles) 
7,085 
5,200 
7,925 
10,960 
8,394 
5,374 
6,490 
9,410 
7,098 
7,285 
5,251 
3,410 
32,287 
0
0C/] n
g
1C< 
0
0
U, 
OI 
n
C
C
o>i 
a
2 
5,342 282,889 
(53.58 Miles) 
2,500 
(.47 Miles) 
6,652 
6, 190 
11,038 
23,880 
(4.52 Miles)

TABLE 41-H BANK REVETMENTS, DIKES, AND FORESHORE PROTECTION: 
(Continued) NEW ORLEANS DISTRICT (FISCAL YEAR 2000) 
Operations This FY Non- 
Construction Operative 
Above New Work Since Operati 
Head Bank Exten- Reinforcement Prior Thru 
of R sion Lap Maintenance FY This F' 
Passes or (Linear (Linear (Tons of (Linear (Tons of (Tons of (Linear (Lineal 
Location (Miles) L Feet) Feet) Stone) Feet) Stone) Stone) Feet) Feet) 
Dikes: 
None 
MISSISSIPPI RIVER 
Foreshore Protection: 
Port Allen ................................ 228.3 R -- -- -- -- -- -- -- 7,50 
Cottage Plantation ...................... 222.6 L -- -- -- -- -- -- -- 2,00 
Upper Plaquemine Point ................... 210.5 L -- -- -- -- -- -- -- 4,35 
Lower Plaquemine Point ............ 207.0 -- -- -- -- -- -- -- 
Point Pleasant ............................. 201.7 R -- -- -- -- -- -- -- 5,22 
Upper Point Clair......................... 196.0 L -- -- -- -- -- -- -- 
Point Clair ............................... 191.0 L -- -- -- -- -- -- -- 10,25 
Belle Grove................................ 189.9 R - - - - - - - 
Eighty-One Mile Point .................. 176.0 L - - -- -- -- 
Donaldsonville ............................ 174.2 R - - - - - - - 
Point Houmas ................................ 168.9 R -- -- -- -- -- -- -- 5,40 
Sunshine ................... ............. . 167.4 L -- -- -- ---- -- -- 90 
Union .......................................... 166.3 L -- -- -- -- -- -- -- 6,50( 
Convent ....................................... 158.3 L -- -- -- -- -- -- -- 11,90 
Oak Alley .................................... 153.4 R -- -- -- -- -- -- -- 7,80 
Lutcher ........................................ 148.6 L -- -- -- -- -- -- -- 8,91( 
Wallace ....................... 145.5 R -- -- -- -- -- -- -- 10,39( 
Garyville.......... ..... ......... 140.4 L -- -- -- -- -- -- -- 
Edgard .......................... 138.2 R 4,710 -- -- -- -- -- -- 12,4 ( 
Reserve ................................... 136.0 L -- -- -- -- -- -- -- 2,20 
Waterford ................................... 129.0 R -- -- -- -- -- -- -- 50( 
26 Mile Point .............................. 122.8 L -- -- -- -- -- -- -- 1,32 
Destrehan ..................... 121.0 L -- -- -- - -- -- -- 
St. Rose ..................................... 120.8 L -- -- -- -- -- -- -- 9,83( 
Lower St. Rose ......................... 116.6 L -- -- -- -- -- -- -- 7,05( 
Ama................................. 115.0 R -- -- -- -- -- -- -- 
ve 
Y
r
o0 
0 2 
0
0
1
0
0 0 
0
3
3
3
3
0

TABLE 41-H BANK REVETMENTS, DIKES, AND FORESHORE PROTECTION: 
(Continued) NEW ORLEANS DISTRICT (FISCAL YEAR 2000) 
Operations This FY Non- 
Construction Operative 
Above New Work Since Operative 
Head Bank Exten- Reinforcement Prior Thru 
of R sion Lap Maintenance FY This FY 
Passes or (Linear (Linear (Tons of (Linear (Tons of (Tons of (Linear (Linear 
Location (Miles) L Feet) Feet) Stone) Feet) Stone) Stone) Feet) Feet) 
Foreshore Protection: 
American Cyanamid ...................... 
Willswood ........... ............ ...... 
A vondale ......................... .... ..... 
Twelve Mile Point......................... 
Avondale ....................................... 
Nine Mile Point ............................. 
Greenville ...................... ......... 
Snowdrift ......... ................ .......... . 
Gretna-Gouldsboro ....................... 
A lgiers ......................... .......... 
Holy Cross................................ 
A rabi ...................... .... ............ 
Quarantine ........................ 
Huntlee ....................... .......... 
Chalmette.......................................... 
Norman ...................... .......... 
B rou......... ........ ..... . .......... 
Auora ..................................... 
B lythe B lvd.................................... 
Upper Stanton ............................ 
Saxonholm-Docville ................ 
Pecan Grove-Story........................ 
Story-Allo ............ ........... 
De lacroix ...................................... 
Twelve Mile Point ............... 
M errit....................... ................. 
Saxonholm-Doeville ...................... 
Naval Depot ......................... 
Caernarvon .............................---.. 
114.8 R 
113.2 R 
109.4 R 
108.9 L 
105.5 R 
105.0 R 
100.0 R 
97.6 R 
96.7 R 
95.4 R 
92.2 L 
91.9 L 
91.5 R 
90.4 R 
90.2 L 
90.0 R 
89.5 L 
89.3 R 
88.6 R 
86.5 R 
86.0 L 
85.8 L 
84.5 L 
84.2 R 
83.5 R 
83.0 L 
82.5 L 
82.5 R 
81.2 L 
4,788 
2,430 
6,500 
4,580 
2,070 
1,760 
6,900 
8,450 
1,683 
1,548 
1,915 
6,130 
3,805 
3,139 
1,260 
2,968 
3,030 
3,700 
4,345 
12,890 
1,060 
1,910 
5,400 
8,220 
1,300 
7,800 
7,700 
3,096 
13,200 
i 
LJ 
Q 
0
0
'Si 
O
O
'1 
0,< 
I.< 
0
r
0
'C 
C' 
aa 
ov 
0
O
,< 
t,J 
0
00 
I, 
I, 
I, 
-- 
I, 
-- 
-- 
,, 
,, 
II- 
-e 
-- 
I- 
-- 
,, 
,, 
,, 
,I 
,, 
,I 
-- 
,, 
,, 
-- 
,, 
,, 
,, 
,, 
,I
c

TABLE 41-H BANK REVETMENTS, DIKES, AND FORESHORE PROTECTION: 
(Continued) NEW ORLEANS DISTRICT (FISCAL YEAR 2000) 
Operations This FY Non- 
Construction Operative 
Above New Work Since Operative 
Head Bank Exten- Reinforcement Prior Thru 
of R sion Lap Maintenance FY This FY 
Passes or (Linear (Linear (Tons of (Linear (Tons of (Tons of (Linear (Linear 
Location (Miles) L Feet) Feet) Stone) Feet) Stone) Stone) Feet) Feet) 
Foreshore Protection: 
English Turn .............................. 79.3 L -- -- -- -- -- -- -- 7,500 
Little Rock.................................... 78.8 R -- -- -- -- -- -- -- 9,268 
St. Claire ...................................... 78.8 L -- -- -- -- -- -- -- 1,025 
Fort St. Leon................... ....... 78.2 R -- -- -- -- -- -- -- 10,700 
Scarsdale........... .......... ....... 75.5 L -- -- -- -- -- -- -- 16.611 
Belle Chase................................ 75.5 R -- -- -- -- -- -- -- 11,500 
Stella-Delcour..................... .. 73.6 L -- -- -- -- -- -- -- 6,405 
Oak Point.................................. 73.3 R -- -- -- -- -- -- -- 13.766 
Promised Land-Woodlawn ............ 70.5 L -- -- -- -- -- -- -- 15,495 
Augusta-Live Oak ..................... 70.5 R -- -- -- -- -- -- -- 13,135 
Jesuit Bend .... ................. 69.2 R -- -- -- -- -- - 16,454 
Fanny-Belair.................... 66.8 L -- -- -- -- -- -- -- 12,400 
Sara-Star ..................... .......... 66.3 R -- -- -- -- -- -- -- 2,100 
Star .......................................... 65.8 R -- -- -- -- -- -- -- 5.470 
Bayhi ........................................ 64.0 R -- -- -- -- -- -- -- 11, 90 
Burbridge............................... 63.2 L -- -- -- -- -- -- -- 12,335 
Beau-Carlisle .................... 62.3 L -- -- -- -- -- -- -- 6,258 
Alliance ................................. 62.0 R -- -- -- -- -- -- -- 4,300 
St. Rosalie ........ ..................... 6614. 4 R....... -- -- -- -- -- -- -- 6,976 
Monsecour-Poverty Point.............. 60.3 L -- -- -- -- -- -- -- 7,380 
Irontown ......................... 60.0 R -- -- -- -- -- -- -- 2,298 
Myrtle Grove-Woodpark ............. 58.8 R -- -- -- -- -- -- -- 8,450 
Harlem .................................. 57.0 L -- -- -- -- -- -- -- 15,550 
Wood Park-Deer Range ................ 56.0 R -- -- -- -- -- -- -- 17,650 
Nero ............................... 54.7 L -- -- -- -- -- -- -- 4,450 
Deer Range ................................. 54. 1 R -- -- -- -- -- -- -- 4,220 
Upper Point-A-La-Hache .............. 53.5 L -- -- -- -- -- -- -- 9,101 
Junior....................... ........... 53.5 R -- -- -- -- -- -- -- 7,811 
Point Celeste............................. 52.2 R -- -- -- -- -- -- -- 3,300 
cr" n 
C
c
2b~n 
Oz

TABLE 41-H BANK REVETMENTS, DIKES, AND FORESHORE PROTECTION: 
(Continued) NEW ORLEANS DISTRICT (FISCAL YEAR 2000) 
Operations This FY Non- 
Construction Operative 
Above New Work Since Operat 
Head Bank Exten- Reinforcement Prior Thru 
of R sion Lap Maintenance FY This F 
Passes or (Linear (Linear (Tons of (Linear (Tons of (Tons of (Linear (Linea 
Location (Miles) L Feet) Feet) Stone) Feet) Stone) Stone) Feet) Feet 
Foreshore Protection: 
Davant ..................................... 51.5 L -- -- -- -- -- -- -- 10,7 
St. Thomas..................... . 50.0 L -- -- -- - -- -- 6,4 
Woodland ...................... 50.0 R -- -- -- -- -- -- -- 14,8 
Point-A-La-Hache ...................... 48.1 L -- -- -- -- -- -- -- 23,0 
Nolan ................... ............. 47.2 R -- -- -- -- -- -- -- 13,4 
Socola....................... .......... 46.5 R -- -- -- -- -- 8,2 
Point Michel ............................... 44.2 R -- -- -- -- - 7,3 
Happy Jack ................................. 43.0 R -- -- -- -- -- 18,7 
Port Sulphur................................. 39.7 R -- -- -- -- -- -- -- 6,4 
Little Texas .............................. 39.0 R -- -- - - - - 3( 
Home Place................................... 37.6 R -- -- -- -- -- -- -- 13,2 
Nairn..................................... 34.5 R -- -- -- -- -- -- -- 5,9 
Sixty Mile Point.......................... 32.1 R -- -- -- -- -- -- -- 
Tropical Bend .............................. 31.2 R -- -- -- -- -- -- -- 5,7 
Bowers......................... 30.8 R -- -- -- -- -- -- -- 3,8 
Empire ................................... .. 29.7 R -- -- -- -- - 2,8( 
Anderson ...................... 29.2 R -- -- -- -- -- -- -- 6,1( 
Fredrick .................................... 27.5 R -- -- -- -- -- -- -- 3,8 
Buras ..................................... 26.0 R - -- -- -- -- -- 13,4 
Lower Buras .................................. 24.0 R -- -- -- -- -- 8,9 
Triumph ......... .............. 22.5 R -- -- -- -- -- -- - 5,22 
Fort Jackson.............................. 21.9 R -- -- -- -- -- -- -- 16,6 
Grand Prairie ............................ 19.2 L -- -- -- -- -- 1,35 
Upper Commander ...................... 18.2 R -- -- -- -- -- -- -- 3, 
Commander ..................... 18.0 R -- -- -- -- -- -- -- 22,23
ive 
'Y 
r 
95 
30 
00 
30 
00 
55 
50 
85 
30 
00 
50 
15 
0 
75 
36 
65 
)0 
20 
95 
D0 
20 
90 
50 
30 
32 
0
C7 
0
cc, , 
O 
ve

TABLE 41-H 
(Continued) 
BANK REVETMENTS, DIKES, AND FORESHORE PROTECTION: 
NEW ORLEANS DISTRICT (FISCAL YEAR 2000) 
Operations This FY Non- 
Construction Operative 
Above New Work Since Operative 
Head Bank Exten- Reinforcement Prior Thru 
of R sion Lap Maintenance FY This FY 
Passes or (Linear (Linear (Tons of (Linear (Tons of (Tons of (Linear (Linear 
Location (Miles) L Feet) Feet) Stone) Feet) Stone) Stone) Feet) Feet) 
Foreshore Protection: 
Boothville-Commander .............. 16.0 R -- -- -- -- -- -- -- 1,824 
Upper Venice............................ 12.0 R -- -- -- -- -- -- -- 14,800 
Total Foreshore Protection 
New Orleans District. 
Mississippi River ..................... 4,710 -- -- -- -- -- -- 749,934 
(.89 Miles) (142.03 Miles) 
I. Gross squares articulated concrete mattress (100 square feet). 
Cr 
CA 
cwoo 
C
CUtt

TABLE 41-I BANK REVETMENTS AND DIKES: VICKSBURG DISTRICT 
(FISCAL YEAR 2000) 
Operations This FY Non- 
Construction Operative 
Above New Work Since Operative 
Head Bank Exten- Reinforcement Prior Thru 
of R sion Lap FY This FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)' Feet) Feet) 
MISSISSIPPI RIVER 
Standard Revetment: 
Bougere Bend, LA.................. 329 R -- -- -- -- -- 26,055 
Dead Mans Bend, MS................... 335 L -- -- -- -- -- -- -- 33,220 
Glasscock Cutoff, MS-LA............. 342 R -- -- -- -- -- -- -- 26,083 
Railroad Landing, MS ................... 346 L -- -- . -- -- -- 16,291 
St. Catherine Bend, LA............ 350 R -- -- -- -- -- 6,845 -- 29,108 
Morville, LA............................ 356 R -- -- -- -- -- -- 16,917 
Natchez Island, MS ................ 357 R -- -- -- -- -- -- 2,180 
Carthage, MS.......................... 361 L -- -- 20,350 
Vidalia Casting Field................. 363 L -- -- -- - - 2,670 
Natchez Front, MS ..................... 364 L -- -- -- -- -- -- -- 6,510 
Giles Cutoff, LA-MS ................ 366 R -- -- -- -- -- -- -- 12,020 
Gibson, LA ................................. 371 R -- -- -- -- -- -- 26,000 
Ashland, LA-MS ........................... 374 L -- -- -- -- -- -- 33,427 
Kempe Bend, LA..................... 383 R 1,802 -- 5,033 -- -- 8,314 -- 30,087 
Browns Field, LA ...................... 389 R -- -- -- -- -- -- -- 9,280 
Goldbottom, MS ......................... 392 L - - - - -- -- 30,250 
Hardscrabble, LA ...................... 398 R -- -- -- -- -- -- -- 22,530 
Grand Gulf, MS .......................... 403 L 1,2007 -- -- -- -- -- -- 57,318 
Point Pleasant, MS-LA ............... 413 R -- -- -- -- -- - -- 32,345 
Togo Island, LA........................... 415 R -- -- -- -- -- 7,080 
Lake Karnac, LA-MS .................... 419 L -- -- -- -- -- -- -- 19,260 
Diamond Point, LA-MS ................ 423 R -- -- -- -- -- -- -- 19,310 
Oakbend, MS............................. 425 L -- -- -- -- -- -- 5,342 
Reid-Bedford, LA....................... 429 R -- -- -- -- -- -- -- 18,392 
Racetrack, MS ........................... 433 L -- -- -- -- -- -- -- 13,935 
Barge Line Terminal, MS.............. 437 L -- -- -- 2,235 7,055 -- -- 3,040 
Vicksburg Harbor, MS ............... 437 L -- -- -- -- -- -- -- 7,350 
Delta Point, LA....................... 437 R -- -- -- -- -- -- -- 7,650 
0 
0
Cr 
O
'Cl 
N,

TABLE 41-I 
(Continued) 
BANK REVETMENTS AND DIKES: VICKSBURG DISTRICT 
(FISCAL YEAR 2000 
Operations This FY Non- 
Construction Operative 
Above New Work Since Operative 
Head Bank Exten- Reinforcement Prior Thru 
of R sion Lap FY This FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)' Feet) Feet) 
Standard Revetment: 
King's Point--Opposite 
Delta Point, LA-MS.................... 
False Point, LA............................. 
Marshall-Brown's Point, 
LA-MS ....................................... 
Milliken Bend, LA........................ 
Belle Island, LA-MS ................... 
Goodrich, LA................................ 
Cottonwood Bar, MS ................... 
Filter-Cottonwood, MS................... 
Hagaman, LA .............................. 
Ben Lomond, MS .......................... 
Baleshed Towhead-Stack 
Island, LA-MS ............................ 
Lake Providence, LA.................... 
Mayersville, MS .......................... 
Sarah Island-Opossum 
Point, LA-MS ........................... 
Carolina, MS ............................... 
Cracraft, AR ................................ 
Worthington, MS-AR .................... 
Walnut Point Kentucky 
Bend, MS .................................... 
American Cutoff, MS-AR ............. 
Sunnyside-Lakeport, AR ............... 
Vancluse, AR............................... 
Island 84, AR-MS............ .......... 
Warfield Point, MS..................... 
Leland-LaGrange, AR-MS ........... 
439 L 
443 R 
446 
453 
460 
467 
470 
474 
481 
486 
488 
489 
497 
501 
507 
511 
514 
519 
526 
530 
534 
535 
537 
538 
-- 912 
L
R
L
R
R
L
R
L
R
R
L
R
L
R
R
L
L
R
R
L
L
L 
46 
C! 
C. 
5,127 18,605 
7,650 
Ct 
Ct 
In 
C
OW 
0
z 
19,330 
12,860 
19,580 
46,140 
24,160 
40,765 
18,580 
42,112 
37,756 
10,235 
53,214 
11,600 
34,992 
26,815 
11,080 
22,210 
8,350 
45,653 
2,980 
33,685 
13,016 
13,475 
4,320 
14,150

TABLE 41-I 
(Continued) 
BANK REVETMENTS AND DIKES: VICKSBURG DISTRICT 
FISCAL YEAR 2000) 
Operations This FY Non- 
Construction Operative 
Above New Work Since Operative 
Head Bank Exten- Reinforcement Prior Thru 
of R sion Lap FY This FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)' Feet) Feet) 
Standard Revetment: 
Spanish Moss, AR .................... 
Tarpley Island, MS ........................ 
Miller Bend, MS ............................ 
Island 82, AR............................... 
Ashbrook Island, MS................... 
Arkansas City-Yellow 
Bend, A R ................................... 
Huntington Point, MS............... 
Pair O'Dice, AR .......................... 
Eutaw-Mounds, MS................. 
Cypress Bend, AR ...................... 
Catfish Point, MS ........................ 
Ozark, AR-MS........................... 
Prentiss, AR-MS............................ 
Rosedale Bend, AR ..................... 
Riverton, MS ......................... 
Klondike, AR................................ 
Victoria Bend-Terrene, MS........... 
Lake Concordia, MS..................... 
Big Island, AR ............................... 
Smith Point, MS ................. ...... 
Dennis, MS .................................... 
Cessions, MS ................................. 
539 
542 
544 
546 
549 
553 
556 
561 
563 
568 
573 
578 
582 
585 
586 
588 
593 
596 
598 
601 
611 
615 
R
R
L
R
R
R
L
R
L
R
L
R
L
L
L
R
L
L
R
L
L
L 
1,823 
,-
-- 
-- 
-- 
-- 
Total Revetment, 
V icksburg District, 
Mbississippi River ..... 
4,825 
(.91 Miles) 
-- 11,931 3,147 12,182 -- 1,504-739 
(284 99 Miles) 
..
I , 
z
0
0
n
C/a 
0
0
z
C
r
C
0
O
r)r 
Cm r 
C
N 
Oo 
�r 
4,580 
2,000 
29,360 
3,080 
3,455 
46,158 
21,205 
9,095 
40,188 
34,405 
20,075 
22,015 
20,315 
4,820 
12,500 
23,400 
29,245 
6,980 
16,515 
18.185 
25,195 
10,910 
41,418

BANK REVETMENTS AND DIKES: VICKSBURG DISTRICT 
(Continued) (FISCAL YEAR 2000) 
Operations This FY Non- 
Construction Operative 
Above New Work Since Opel 
Head Bank Exten- Reinforcement Prior TI 
of R sion Lap FY Thi 
Passes or (Linear (Linear (Linear Maintenance (Linear (Lii 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)' Feet) Fe 
Dikes: (2) 3) 
Jackson Point, MS ...................... 330 L -- -- -- -- -- -- -- 4 
Buck Island, MS ......................... 339 L -- -- -- -- -- -- -- 6 
Opposite Warnicott Ldg., MS........ 352 L -- -- -- -- -- -- -- 10 
Natchez Island, LA-MS ............. 358 R -- -- -- -- -- -- -- 14 
Opposite Rifle Point, MS .............. 369 L -- -- -- -- -- -- -- 3 
Rifle Point, LA ........................... 369 R -- -- -- -- -- -- -- 4 
Waterproof Bar, LA................ 379 R -- -- -- -- -- -- -- 14 
Spithead Towhead, MS .............. 386 L -- -- -- -- -- -- -- 9 
Browns Field, LA ....................... 388 R -- -- -- -- -- -- -- 11 
Cottage Bend, LA-MS................... 389 L -- -- -- -- -- -- -- 14 
Bondurant Towhead, LA ............... 394 R -- -- -- -- -- -- -- 6 
Coffee Point, LA ........................ 405 R -- -- -- -- -- -- -- 11 
Yucatan, MS............................... 410 R -- -- -- -- -- -- -- 9 
Togo Island, LA.......................416 L -- -- -- -- -- -- -- 8 
Newtown Bend, LA................. 420 R -- -- -- -- -- -- -- 6 
Diamond Cutoff, MS ............... . 423 L -- -- -- -- -- -- -- 6 
Below Racetrack, MS .................... 430 L -- -- -- -- -- -- -- 19 
Racetrack Towhead, MS.............. 431 R -- -- -- -- -- -- -- 15 
False Point, LA .......................................... 441 R -- -- -- -- -- -- -- 5 
Marshall Cutoff, LA ................... 448 R -- -- -- -- -- -- -- 5 
Below Grand Gulf, MS.................. 399 L -- -- -- -- -- -- -- 3 
Fritz Island, LA .......................... 338 R -- -- -- -- -- -- -- 4 
Forest Home Towhead, LA ........... 449 L -- -- -- -- -- -- -- 15 
Willow Cutoff, LA ..................... 462 R -- -- -- -- -- -- -- 5. 
Tennessee Bar, MS ..................... 465 L -- -- -- -- -- -- -- 8. 
Arcadia Point, MS ................... 470 L -- -- -- -- -- -- -- 9 
Cottonwood Bar, MS.................. 471 R -- -- -- -- -- -- -- 2, 
Point Lookout, LA ................. 478 R -- -- -- -- -- -- -- 2 
rative 
hru 
s FY 
near 
eet) 
,306 
,334 
),791 
.608 
,214 
,197 
,580 
,681 
,557 
,049 O 
.029 
,925 
,010 
,256 O 
,739 
,711 
,378 
,270 
,675 
,166 
,575 
,160 
,873 
,197 
.166 
,463 
,406 
751 
TABLE 41-1

TABLE 41-I 
(Continued) 
BANK REVETMENTS AND DIKES: VICKSBURG DISTRICT 
(FISCAL YEAR 2000) 
Operations This FY Non- 
Construction Operative 
Above New Work Since Operative 
Head Bank Exten- Reinforcement Prior Thru 
of R sion Lap FY This FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)' Feet) Feet) 
Dikes: 
Ajax Bar, MS..................... 
Ben Lomond, MS .......................... 
Baleshed Ldg., MS ....................... 
Wilson Point, LA........................... 
Corregidor, MS .............................. 
Carolina, AR................... ......... 
Cracraft Lower, AR ....................... 
Cracraft, AR .................... 
Leota, MS .................................. 
Island 86, A R................................ 
Seven Oaks, AR............................ 
Walnut Point, MS .......................... 
Anconia Chute, AR ...................... 
Refuge, MS................................... 
Island 84, AR..................... 
Warfield Point, AR........................ 
Leland Bar, AR-MS....................... 
Leland Neck, AR-MS ................... 
Tarpley Cutoff, MS-AR................. 
Island 82-Miller Bend, 
AR-MS .................. .......... 
Ashbrook-Miller Bend, 
AR-MS ...................... ......... 
Ashbrook Cutoff, MS .................... 
Chicot Ldg., AR ............................ 
Catfish Point, MS ........ ....... 
Below Prentiss, MS ....................... 
Above Ozark, AR-MS .................. 
MaL\one AR .........F....i..e..l.d, 
482 
488 
493 
500 
505 
509 
510 
513 
514 
520 
523 
525 
527 
528 
532 
535 
538 
540 
540 
L
L
L
R
L
L
RR L
R
R
L
R
L
L
L
R
L
R 
544 R&L 
547 
549 
564 
571 
580 
580 
585 
L&R 
L
R
L
L
R
R 
(2) (3) 
.p 
t, 
0o 
0
00 
x
re
O
7C 
0
x
0
O
n
r
0
r)
C
0
.q 
0O
D 
28,152 
24,667 
15,721 
8,423 
6,730 
2,897 
10,329 
3.809 
7,571 
18,477 
5,829 
4,725 
7,159 
19,695 
12,475 
2,020 
15.086 
4,315 
10,478 
13,646 
13,015 
8,728 
22,381 
5,290 
12,413 
5,545 
7,549

TABLE 41-I 
(Continued) 
BANK REVETMENTS AND DIKES: VICKSBURG DISTRICT 
(FISCAL YEAR 2000) 
Operations This FY Non- 
Construction Operative 
Above New Work Since Operative 
Head Bank Exten- Reinforcement Prior Thru 
of R sion Lap FY This FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)' Feet) Feet) 
Dikes: 
Terrene, M S .............................. 
White River Landing, AR.............. 
Montgomery Towhead, AR ........... 
Victoria Bend, AR ....................... 
Smith Point, MS ......................... 
Island 70, MS ............................... 
Total Dikes, 
Vicksburg District, 
Mississippi River ........................ 
(2) 
590 
591 
592 
596 
600 
608 
L -- -- 
R -- -- 
R -- -- 
R -- -- 
L -- 
L -- -- 
(3) 
7,921 
2,201 
6,071 
6,736 
7,617 
26,355 
605,205 
-- (1 14.62 Miles) 
Miles 
Above 
Mouth 
ARKANSAS RIVER4 
Standard Revetment: 
Menard Bend, AR.......................... 
Com o, AR....................... ............. 
Morgan Bend, AR ....................... 
Yancopin, AR ........................... 
Total Standard Revetment, 
Arkansas River ..................... 
Dikes: 
Hopedale Cutoff, AR ................... 
Morgan Bend, AR ....................... 
31 
34 R -- -- 
36 L -- -- 
24 R -- -- 
31.540 
(5.97 Miles) 
(2) (3) 
30 R 
36 L 
t 
.., 
r.. 
Ct 
C? 
'rCn 
C
It 
cr 
C
21 
11,770 
11,720 
5,250 
2,800 
1i,848 
3,658

TABLE 41-I 
(Continued) 
BANK REVETMENTS AND DIKES: VICKSBURG DISTRICT 
(FISCAL YEAR 2000) 
Above Operations This FY Non- 
Conflu- Construction Operative 
ence New Work Since Operative 
with Bank Exten- Reinforcement Prior Thru 
Miss. R sion Lap FY This FY 
River or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)' Feet) Feet) 
Dikes: 
Fletcher Bend, AR ........................ 
Total Dikes, Arkansas 
River ................................. ... 
RED RIVER 4 
Standard Revetment: 
D upre, LA ......................... . ........ 
Bringol, LA ....................... ........ 
Egg Bend, LA ................................ 
Colonel Bend, LA.......................... 
Roxana, LA .............................. 
Ryland, LA ............................... 
Whittington, LA ........................... 
Smith, LA .................................... 
Latanier, LA ............................. 
Hudson, LA ......... ....... ......... 
Robert, LA .......................... ..... 
Alexandria Front, LA .................. 
Callahan, LA .................... ....... 
Cotton, LA..................... 
Rapides, LA .............................. 
Boyce, LA .................... .... 
Total Standard Revetment, 
Red Riv er ............................... 
(2) (3) 
39 R -- 
7,693 
-- -- -- -- -- -- -- (1.46 Miles) 
69 R -- 
73 R -- 
75 R -- 
77 R -- 
83 R -- 
88 R -- 
89 R -- 
91 R -- 
93 R -- 
99 R -- 
102 R -- 
105 R -- 
110 R -- 
116 R -- 
119 R -- 
125 R -- 
1,800 
! 
2,187 
0Cri 
V
0
x
"C 
0
0
r3 
0
Cr 
7
m 
VM 
aa 
Cr 
C
C
C
a
a1 
2,690 
4,000 
2,400 
650 
3,325 
3,925 
2,900 
2,700 
2,460 
1,458 
5,500 
5,280 
4,000 
14,700 
1,030 
4,548 
61,566 
(1 1.66 Miles)

TABLE 41-1 
(Continued) 
BANK REVETMENTS AND DIKES: VICKSBURG DISTRICT 
(FISCAL YEAR 2000) 
Above Operations This FY Non- 
Conflu- Construction Operative 
ence New Work Since Operative 
with Bank Exten- Reinforcement Prior Thru 
Miss. R sion Lap FY This FY 
River or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)' Feet) Feet) 
Dikes: 6 (2) (3) 
Choctaw Bayou Bend, LA............. 71 R -- -- -- -- -- -- -- 2,000 
Bringol (Egg Bend), LA ................ 73 R -- -- -- -- -- -- -- 2.477 
Egg Bend, LA ............................. 75 R -- - -- -- -- -- -- 900 
Cologne Bend, LA..................... 77 R -- -- -- -- -- -- -- 1,850 
Echo, LA ............ .................... 78 R -- -- -- -- -- -- -- 1,900 
Richardson, LA .................... 79 R -- -- -- -- -- -- 2,700 
Alexandria, LA........................... 105 R -- -- - - - - - 
Bertrand, LA....................... 122 R -- -- -- -- -- -- -- 7,630 
Dismal Swamp. LA ....................... 24 L -- -- -- -- -- -- -- 1,411 
Total Dikes, Red River .................. -- -- -- -- -- -- -- 20,868 
(3.95 Miles) 
1. 
2. 
3. 
4. 
5. 
6. 
7. 
Gross squares articulated concrete mattress (100 square feet). 
Linear feet of dike which were raised. 
Linear feet of dike on which repairs were made. 
See report on Arkansas River and tributaries, AR and OK, under Little Rock District. 
Mileages based on 1967 hydrographic survey. 
Includes all types of dikes and retards. 
Stone paving only. 
A 
MCE] 
C
C] 
a" 
CA) 
CA) 
0
2

TABLE 41-J BANK REVETMENTS AND DIKES: MEMPHIS DISTRICT 
(FISCAL YEAR 2000) 
Operations This FY Non- 
Construction Operative 
Above New Work Since Ope 
Head Bank Exten- Reinforcement Prior TI 
of R sion Lap FY Thi 
Passes or (Linear (Linear (Linear Maintenance (Linear (Li 
Location (Miles) L Feet) Feet) (Squares)1 Feet) (Squares)' (Squares)' Feet) F 
MISSISSIPPI RIVER 
Standard Revetment: 
Big Island, AR .... ............ .. 598 R -- -- .. -- -- -- -- 
Scrubgrass Bend, AR..................... 600 R -- -- -- -- ..-- 
Henrico, AR................................... 606 R -- -- -- -- -- 3 
Cessions Towhead, AR............... 615 L -- -- -- -- -- -- -- 1 
Island 67, MS ............................... 621 L -- -- -- -- -- -- -- 9 
Island 68 Bar- 
Knowlton, AR ............................ 622 R -- -- --.. -- - -- 26 
Ludlow, AR.......................... 626 R -- .-.-. .- -- -- 
Rescue Land, AR-MS ............... 629 L -- -- -- -- - 2 
Fair Landing, AR................. 632 R -- -- ---- -- -- 27, 
Burke Landing, MS ....................... 637 L -- -- -... - 19 
Island 62, AR.......................... 638 R -- -- -- -- -- -- -- 
Island 63, MS ......................... 639 L -- -- -- -- -- -- -- 11 
Island 63 Bar, MS.................. 639 L -- -- -- -- -- -- -- 3 
Oldtown Bend, AR ................. 644 R -- -- -- 2,900 11,092 14,229 -- 26 
Horseshoe, MS ....................... 647 L -- -- -- -- -- -- -- 16 
Westover, AR ........ ................... 650 R -- - -- -- -- -- -- 15 
Delta-Friars Point, MS ............. 665 L -- -- -- -- -- -- -- 3 
Helena, AR ........................ 660 R -- -- -- --.. -- -- -- 36 
Helena Towhead, AR ....... ....... 664 R -- -- -- -- -- -- 3 
Trotters Landing, MS ............. 665 L -- -- -- -- -- -- -- 38, 
Flower Lake, MS................. 667 L -- -- -- 1,615 4,933 -- -- 16 
St. Francis, AR ........................ 672 R -- -- -- -- -- -- 24 
Harbert Point, MS ................... 675 L -- -- -- -- -- -- -- 9 
Walnut Bend, AR ..................... 680 R -- -- -- -- -- -- -- 31 
Mhoon Bend, MS ...................... 685 L 3,955 -- 8,762 -- -- -- -- 39 
Peters, AR................................... 692 R -- -- -- -- -- -- -- 33 
Commerce, MS.. 695 L -- -- -- -- -- 29.
rative 
hru 
s FY 
near 
eet) 
,905 
7,315 
3,310 
,465 
),630 
,710 
),390 
7,020 
,5152 
,070 
,030 
,514 
,795 
1,860 
1,385 
,640 
),090 
1,460 
,690 
6852 
,385 
,663 
,065 
,070 
,783 
,760 
,085 
C
0
C25 
C
PC 
c
a
r
C
01 
'C 
ONE 
a
.. 0-3 
C
ta 
0Io

TABLE 41-J BANK REVETMENTS AND DIKES: MEMPHIS DISTRICT 
(Continued) (FISCAL YEAR 2000) 
Operations This FY Non- 
Construction Operative 
Above New Work Since Ope 
Head Bank Exten- Reinforcement Prior TI 
of R sion Lap FY Thi 
Passes or (Linear (Linear (Linear Maintenance (Linear (Li 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)' Feet) F 
Standard Revetment: 
Porter Lake, AR.......................... 700 R -- -- -- -- -- -- -- 34 
Pickett, MS-AR ....................... 703 R -- -- -- -- -- -- -- 1 
Seyppel, AR................................... 709 R -- -- -- -- -- -- -- 4 
Norfolk-Star, MS .................. 711 L -- -- -- -- -- 11,504 -- 39 
Cow Island Bend, AR ................... 714 R -- -- -- -- -- -- -- 2 
Cow Island Bend 
(Upper), TN ............................. 716 R -- -- -- 1,945 6.122 -- -- 8 
Coahoma, TN ........................... 717 L -- -- -- -- -- -- -- 9 
Ensley, TN .......................... 723 L -- -- -- -- -- 7,979 -- 46 
Dismal Point, AR........................ 724 R -- -- -- -- -- -- -- 7 
Bauxippi-Wyanoke, AR ................... 730 R -- -- -- -- -- -- -- 24 
Presidents Island, TN................. 733 L -- -- -- -- -- -- -- 12 
Hopefield Point, AR-TN............... 736 R -- -- -- -- -- -- -- 10 
Loosahatchie-Memphis, TN .......... 737 L -- -- -- -- -- -- -- 31 
Loosahatchie Bar, TN................... 740 R ---- -- -- -- -- -- 2 
St. Clair, AR ............................. 742 R -- -- -- -- -- -- -- 2 
Island 40, TN-AR ........................ 744 R -- -- -- -- -- -- -- 30 
Brandywine, AR-TN ........ ....... 750 R -- -- -- -- -- -- -- 18 
Shelby Forest, TN...................... 753 L -- -- -- -- -- -- -- 9 
Dean Island, AR ............................ 756 R -- -- -- -- -- -- -- 7 
Cedar Point-Densford, TN............ 759 L -- -- -- -- -- -- -- 20 
Chute of Island 35, TN .............. 764 R -- -- -- -- -- -- -- 30 
Richardson Ldg, TN ................... 769 L -- -- -- -- -- -- -- 1 
Lookout Bar, TN ........................ 772 R -- -- -- -- -- -- -- 2 
Lookout, TN............ .......... 774 R -- -- -- -- -- -- -- 5 
Sunrise Towhead, TN .................. 776 R -- -- -- 870 2,831 -- -- 18 
Driver Bar, TN.............................. 780 L -- -- -- -- -- -- -- 4
rative 
hru 
is FY 
near 
eet) 
,155 
2,575 
1,830 
),505 
,274 4 
3,623 
,270 
1.256 
7,200 
,530 
,755 
),360 
,293 6 
,070 
,930 
,750 
,
0 10 
,545 
,555 
, 190 
,930 
,415 
,990 
,005 
,440 
.850

TABLE 41-J 
(Continued) 
BANK REVETMENTS AND DIKES: MEMPHIS DISTRICT 
(FISCAL YEAR 2000) 
Operations This FY Non- 
Construction Operative 
Above New Work Since Operative 
Head Bank Exten- Reinforcement Prior Thru 
of R sion Lap FY This FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)' Feet) Feet) 
Standard Revetment: 
Lower Bullerton, AR .................... 
Kate Aubrey Towhead- 
Island 30, TN .............................. 
Osceola, AR...................... 
Osceola, AR .................................. 
Ashport-Keyes Point, TN .............. 
Kate Aubrey, TN .......................... 
Island 26, TN ................... 
Bend of Island 25, TN ................... 
Barfield, AR ....................... 
Obion-Tamm, TN ....................... 
Huffman-Hickman, AR-TN........... 
Heloise, TN ................. ....... 
Island 18, M O ................................ 
Linwood Bend, TN....................... 
Blaker Towhead, TN ..................... 
Bells Point, MO............................ 
Gayoso-Caruthersville, MO........... 
Island 15, TN .................. .............. 
Hathaway Landing, TN ............... 
Robinson Bayou, MO ................... 
Fritz Landing, TN ........................ 
Lee Towhead, MO......................... 
Bend of Island 14, TN .................. 
Above Lee Towhead, TN ............ 
Little Cypress,MO ......................... 
782 R -- -- 
786 
786 
786 
791 
793 
798 
803 
808 
819 
826 
831 
836 
841 
845 
845 
848 
851 
852 
852 
857 
859 
859 
861 
R
R
R
L
R
R
L
R
L
R
L
R
L
L
R
R
LL 
R
L
L
L
L 
864 R 
A 
6N 
15,602-- 
.-- 
.-- 
-- _ 
1,000 3,402 
--
__ 
-- 
-- 
7d 
0r
C
." 
0
0
rE 
0
Cr 
<-C 
n
Cr 
-C 
28,350 
30,808 
1,3503 
5,823 
44,232 
2,500 
15,690 
32,385 
52,335 
53,831 
29,764 
15,770 
30,490 
14,850 
18,562 
5,420 
25,600 
3,630 
1,000 
22.630 
15.670 
9,640 
15,830 
4,943 
40,140

TABLE 41-J BANK REVETMENTS AND DIKES: MEMPHIS DISTRICT 
(Continued) (FISCAL YEAR 2000) 
Operations This FY Non- 
Construction Operative 
Above New Work Since Operative 
Head Bank Exten- Reinforcement Prior Thru 
of R sion Lap FY This FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)' Feet) Feet) 
Standard Revetment: 
Lower Bullerton, AR ..................... 782 R -- -- -- -- -- -- -- 28,350 
Kate Aubrey Towhead- 
Island 30, TN ......................... 786 R -- -- -- -- -- -- -- 30,808 
Osceola, AR................................ 786 R -- -- -- -- -- -- -- 1,3503 
Osceola, AR............................. 786 R -- -- -- -- -- -- -- 5,823 
Ashport-Keyes Point, TN .............. 791 L -- -- -- -- -- 15,602-- -- 44,232 
Kate Aubrey, TN ........................ 793 R -- -- -- -- -- -- -- 2,500 
Island 26, TN ........ ............ . 798 R -- -- -- -- -- -- -- 15,690 
Bend of Island 25, TN .................. 803 L -- -- -- -- -- -- -- 32,385 
Barfield, AR ............................... 808 R -- -- -- -- -- -- -- 52,335 
Obion-Tamm, TN ....................... 819 L -- -- -- -- -- -- -- 53,831 
Huffman-Hickman, AR-TN........... 826 R -- -- -- 1,000 3,402 -- -- 29,764 
Heloise, TN ................................ 831 L -- -- -- -- -- -- -- 15,770 
Island 18, MO ........................... 836 R -- -- -- -- -- -- -- 30,490 
Linwood Bend, TN ..................... 841 L -- -- -- -- -- -- -- 14.850 
Blaker Towhead, TN .................. 845 L -- -- -- -- -- -- -- 18.562 
Bells Point, MO ................... 845 R -- -- -- -- -- -- -- 5,420 
Gayoso-Caruthersville, MO........... 848 R -- -- -- -- -- -- -- 25,600 
Island 15, TN......................... 851 L -- -- -- -- -- -- -- 3,630 
Hathaway Landing, TN .............. 852 L -- -- -- -- -- -- -- 1,000 
Robinson Bayou, MO.................... 852 R -- -- -- -- -- -- -- 22,630 
Fritz Landing, TN ................... 857 L -- -- -- -- -- -- -- 15,670 
Lee Towhead, MO...................... 859 L -- -- -- -- -- -- -- 9,640 
Bend of Island 14, TN ................ 859 L -- -- -- -- -- -- -- 15,830 
Above Lee Towhead, TN .............. 861 L -- -- -- -- -- -- -- 4,943 
Little Cypress, MO ..................... 864 R -- -- -- -- -- -- -- 40,140 
Ca 
CA 
Orv 
0
Cr 
Cr 
C
Ge

TABLE 41-J BANK REVETMENTS AND DIKES: MEMPHIS DISTRICT 
(Continued) (FISCAL YEAR 2000) 
Operations This FY Non- 
Construction Operative 
Above New Work Since Ope 
Head Bank Exten- Reinforcement Prior TI 
of R sion Lap FY Thi 
Passes or (Linear (Linear (Linear Maintenance (Linear (Li 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' Feet) F 
Standard Revetment: 
Merriwether-Cherokee, 
TN .................. 88.6.9. .... L -- -- -- -- -- -- -- 41 
Linda, MO ................................. 876 R -- -- -- -- -- -- 2 
Below Toney's Towhead, 
TN ........... ...................... ... 879 L -- -- -- -- -- -- - 2 
Toney's Towhead, KY-TN .......... 882 L -- -- -- -- -- -- - 1 
Kentucky Point, KY ..................... 887 L -- -- -- -- . 7 
New Madrid Bar, KY ............... 888 R -- -- -- .. -- -- -- 1 
New Madrid Bend, MO................. 889 R -- -- .... -- -- -- 43 
La Forge, MO .................... 892 R -- -- -- -- - 24 
Slough Landing Neck, 
TN-KY ............................ 899 L -- -- -- -- -- -- -- 3 
Winchester Towhead, MO............. 900 R -- -- -- -- -- -- -- 5 
Island 9, KY-TN........................ 905 L -- -- -- -- -- -- -- 33 
Milton Bell, MO........................ 908 R -- -- .. -- -- -- -- 1 
Chute of Island 8, KY................ 913 L -- -- -- -- -- -- - 12 
Bend of Island 8, MO ................. 914 R -- -- -- -- -- -- - 39 
Island 8, KY ............................... 914 R -- -- -- -- -- -- -- 1 
Hickman-Reelfoot, KY .............. 919 L -- -- -- -- -- -- -- 4 
Beckwith Bend, MO ................... 924 R -- -- -- -- -- -- -- 18 
Williams, KY .............. ............ 927 L -- -- -- -- -- -- -- 1 
W olf Island, KY ............................ 934 R -- -- -- -- -- -- - 22 
Columbus, KY ............................... 937 L -- -- .. -- -- -- -- 7 
Belmont, MO............................. 938 R -- -- -- -- -- -- -- 5 
Island 3 and 4, KY ...................... 940 R -- -- -- -- -- -- -- 19 
Campbell, KY ............................... 943 L -- -- -- -- -- -- -- 6 
Pritchard, MO ........................ ..... 948 R -- -- -- -- -- -- -- 15 
rative 
hru 
s FY 
near 
eet) 
,058 
),000 
),895 
3,640 
,960 
3,825 
,262 
1,930 
,520 
,540 
,585 
,600 
,620 
,945 
,515 
,399 
,203 
),015 
,495 
.,395 
,785 
,970 
,865 
,045 
Cx 
Ccr 
C
1< 
C
O
7d 
0
Cr 
Oc 
[.. 
n
,< 
n 
e3 
7t1

TABLE 41-J 
(Continued) 
BANK REVETMENTS AND DIKES: MEMPHIS DISTRICT 
(FISCAL YEAR 2000) 
Operations This FY Non- 
Construction Operative 
Above New Work Since Operative 
Head Bank Exten- Reinforcement Prior Thru 
of R sion Lap FY This FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares) Feet) Feet) 
Standard Revetment: 
Mayfield Creek, KY .................. 
Wickliffe, KY ........................... 
Cache-Cairo, IL 
(Ohio River) ............................ 
Total Revetment, 
Memphis District, 
Mississippi River ....................... 
Dikes: 
H enrico, A R .................................. 
Below Knowlton, AR ... ......... 
Island 67, MS .......................... 
Below Ludlow, AR........................ 
Sunflower, AR............................... 
Island 64, AR.............................. 
Rescue Landing, MS ................... 
Island 62, AR........................... 
Island 63 Bar, MS................... 
Island 63, M S ........................... 
Kangaroo Point, AR .................... 
Friars Point, MS .............. ......... 
Montezuma Bar, MS .................. 
Montezuma Towhead, AR............. 
Prairie Point, AR ........................... 
Flower Lake, MS ......................... 
Walnut Bend, AR .................... 
St. Francis Towhead, MS .............. 
L
L 
949 
953 
958 
3.955 
(0.75 Miles) 
603 
616 
621 
624 
627 
630 
631 
638 
639 
640 
649 
652 
657 
656 
668 
668 
681 
671 
R
R
L
R
L
R
L 
8,935 
16,150 
29,927 
-- 84,762 8,330 28,380 
(8) 
49,314 
6 
(6) 
300 
1,650 
200 
200 
-- 
2,051,918 
(388.62 Miles) 
9,080 
20,670 
4,320 
5,040 
5,520 
7,330 
2,530 
23,180 
2,600 
5,640 
6,580 
6.870 
17,970 
6,700 
10,391 
11,060 
6,390 
3,380 
I ON 
Cl, 
Cr 
CIr 
n
C
cr 
02

TABLE 41-J BANK REVETMENTS AND DIKES: MEMPHIS DISTRICT 
(Continued) (FISCAL YEAR 2000) 
Operations This FY Non- 
Construction Operative 
Above New Work Since Opei 
Head Bank Exten- Reinforcement Prior T 
of R sion Lap FY Thi 
Passes or (Linear (Linear (Linear Maintenance (Linear (Lii 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)' Feet) Fe 
Dikes: (8) (6) 
Below Walnut Bend, AR ............... 676 R -- -- -- .... -- -- 8 
Bordeaux Point, MS .................. 681 L -- -- --...... -- -- 10 
Peters, AR.................................... 693 R -- -- --.. -- 
Commerce, MS..................... 694 L -- -- --.. -- -- 
Basket Bar, AR..... ............ 696 R -- -- --...... -- -- 5 
Buck Island, MS .................... 700 L -- -- -- -- - 150 -- 4 
Porter Lake, AR..................... 701 R -- -- ...... 23 
Pickett, MS .............. .............. 704 L -- -- -- -- -- 10 
Seyppel, AR ....... ... ............. 706 R -- - - --- 
Cat Island, AR ............................ 710 R -- -- -- -- 
00 Coahoma, TN ............................. 718 L -- -- -.. 4 
Armstrong, AR-TN....................... 720 R -- -- -- -- -- 1 
Below Ensley, TN ............... 721 L 915 -- -- .... -- -- 
Dismal Point, AR..................... 724 R 1,990 -- 1,670 -- -- - 30 
Engineers Bar, AR........................ 734 R -- .... -- -- 4 
Hopefield Point, AR .............. 736 R -- -- -- .... 5 
Memphis Front, TN ................ 736 L -- .... -- -- 6 
Robinson Crusoe, TN ............. 738 R -- -- -- -- -- 21 
Loosahatchie Bar, TN ............ 739 R -- -- .. -- -- 100 -- 3 
Sycamore Chute, AR-TN............... 741 R -- -- --...... -- -- 
Above Loosahatchie, TN 742 L 1,650 -- 2,590 -- -- 150 -- 12 
Redman Point, AR. ............... 743 R .. 
Randolph Point, TN ................ 747 L -- -- .... -- -- 6 
Poker Point, AR...................... 748 R -- -- -- -- -- 200 -- 8 
Shelby Forest, TN ................ ........ 751 L -- -- - -- -- -- 5 
Corona Bar, TN-AR .............. 755 R -- -- -- -- 250 -- 9 
Densford, TN ................................. 757 L -- -- -- -- -- 7 
Cedar Point, TN..................... 759 L -- -- -- -- -- - 2 
Below Richardson 
landing, TN ... 6................7 L5-- -- -- -- 
rative 
hru 
s FY 
near 
yet) 
,840 
),730 
,830 
),745 
,810 
,705 
,115 
),080 
.230 
,590 
,640 
,690 
915 
),950 
,155 
,350 5,300 
,939 
,950 
i,725 
,295 
7,750 
.940 
,060 
,540 
,400 
,780 
.,890 
,950 
-v 
0
0
C
Cr 
C
lEl 
C
tz 
'0 
50 
Cr 
n
cr 
0
"Cl

TABLE 41-J BANK REVETMENTS AND DIKES: MEMPHIS DISTRICT 
(Continued) (FISCAL YEAR 2000) 
Operations This FY Non- 
Construction Operative 
Above New Work Since Operative 
Head Bank Exten- Reinforcement Prior Thru 
of R sion Lap FY This FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)' Feet) Feet) 
Dikes: (8) (6) 
Lookout, TN-AR ......................7.7.1 R -- -- -- -- -- -- -- 12,865 
Plum Point, TN ............................. 784 L -- -- -- -- -- -- -- 10,195 
Lake Neark, AR .......................... 786 R -- -- -- -- -- -- -- 2.545 
Island 30 ........................ 787 R -- -- -- -- -- 150 -- 5,485 
Kate Aubrey, TN ....... .......... 791 R -- -- -- -- -- -- -- 11,270 
Keyes Point, TN ......................... 791 L -- -- -- -- -- 925 -- 29,830 
Ashport-Goldust, TN-AR .............. 795 R -- -- -- -- -- -- -- 17,330 
Forked Deer, TN...... ............ 798 L -- -- -- -- -- -- -- 8.550 
Island 25, AR.............................. 804 R -- -- -- -- -- -- -- 5,450 
Nebraska Point, TN .................... 808 L -- -- -- -- -- -- -- 12,149 
Below Tamm Bend, TN.............. 813 L -- -- -- -- -- -- -- 8,300 
Wrights Point, AR ...................... 820 R -- -- -- -- -- -- -- 34.775 
Island 21, Chute, TN .................. 824 L -- -- -- -- -- -- -- 3,170 
Head of Island 21, TN ................... 828 L -- -- -- -- -- -- -- 15,540 
Island 20, MO-TN ......................... 831 R -- -- -- -- -- 2,800 -- 21,969 
Island 18, TN .............................. 837 L -- -- -- -- -- -- -- 8,670 
Tennemo, TN......................... ... 842 L -- -- -- -- -- -- -- 8,240 
Blaker Towhead, TN ................. 843 L -- -- -- -- -- -- -- 4,080 
Caruthersville-Linwood 
Bend, MO................................ 844 R -- -- -- -- -- -- - 30,590 
Opposite Carthersville. TN............ 846 L -- -- -- -- -- -- -- 3,300 
Sandy Hook, TN ..................... 850 R -- -- -- -- -- -- -- 2,350 
Island 15, TN .............................. 851 L -- -- -- -- -- -- -- 8,830 
Robinson Bayou, MO .................... 853 R -- -- -- -- -- -- -- 10,768 
Hathaway, TN ............................ 854 L -- -- -- -- -- -- -- 27,355 
Island 15 Neck, TN.................. 854 L -- -- -- -- -- -- -- 21.100 
Above Lee Towhead, TN .............. 859 L -- -- -- -- -- -- -- 1,300 
Below Cherokee, TN ................. 866 L -- -- -- -- -- -- -- 6.230 
Stewart Towhead, MO................ 871 R -- -- -- -- -- -- -- 19,440 
Cccl 
Cc 
C
05

TABLE 41-J 
(Continued) 
BANK REVETMENTS AND DIKES: MEMPHIS DISTRICT 
(FISCAL YEAR 2000) 
Operations This FY Non- 
Construction Operative 
Above New Work Since Operative 
Head Bank Exten- Reinforcement Prior Thru 
of R sion Lap FY This FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)' Feet) Feet) 
Dikes: (8) (6) 
Ruddles Point, MO................. 874 R -- -- -- -- -- 450 -- 8,130 
Island 11, MO........................... 882 R -- -- -- - -- -- -- 14,330 
New Madrid Bend, MO.............. 887 R -- -- -- -- - -- -- 1,715 
Kentucky Point, KY ................... 887 L -- -- -- -- -- 15,610 
Morrison Towhead, MO......... .. .890 R -- -- --...... -- -- 1,070 
Hotchkiss Bend, MO ............... 895 R -- -- -- -- -- 300 -- 14,208 
Slough Landing, KY............... 896 L -- -- - -- -- -- -- 5,065 
Below Island 9, TN..................... 901 L 3,130 -- 7,000 -- -- -- - 21,989 
Donaldson Point, MO................ 905 R - -- .. - 3,950 -- 22,975 
Island 9, KY .... ............... 906 L -- -- ......-- -- 7,010 
Island 7 - Island 8, MO-KY ........... 917 R -- -- --.. -- -- 450 -- 14,795 
Below Williams, KY ................. 925 L -- -- -- .... -- -- 3,640 
Moore Island, KY-MO .............. 929 R -- -- -- -- -- 200 -- 7,925 
Above Williams, KY .............. 930 L -- -- - -- -- -- 1,150 
Wolf Island Bar, KY............... 933 L -- -- .... -- 12,260 
Campbell, KY................................ 942 L -- -- -- ....-- -- 2,610 
Pritchard, MO................................ 944 R -- -- .... -- -- -- 9,390 
Island 1, KY ............................. 948 L -- -- -- -- -- -- -- 17,345 
Total Dikes 
Memphis District, 
Mississippi River ................. 7,685 -- 11,260 -- 12,425 -- 981,583 
(1.46 Miles) (I85.90 Miles) 
1. Gross squares articulated concrete mattress (100 square feet). 
2. Changed to correct previous errors. 
3. Lumber mattress revetment. 
4. Rock Groins. 
5. Linear feet of triangular frame retards and pile dikes. 
6. Linear feet of dike on which repairs were made. 
7. Stone paving only. 
8. Linear feet of dike which were raised. 
t 
0
C
tel 
tsl 
1
a 
0
-a 
D
0
r
C
tl 
'I 
C3 
PC

TABLE 41-K PROJECT LEVEES: NEW ORLEANS DISTRICT 
(FISCAL YEAR 2000) 
Levees and Floodwalls 
(Miles) 
Built to Approved Berm' Surfaced Roads on Levees 
Grade and Section (Miles) (Miles) 
Total 
Total Cur- In Com- Cur- In Com- Curin 
Total rently System plete rently System plete rently 
Authorized Place Thru Under When Built Thru Under When Built Thru Under 
for This This This Con- Com- This This Con- Com- This This Con- 
Location System FY FY FY struction pleted FY FY struction pleted FY FY struction 
Main Stem Levees 
Mississippi River Levees 
Fifth Louisiana Levee District .. 
Levees ................ 
Old River structures and 
levees.. ................ 
Atchafalaya Basin Levee 
District ............... 
Levees.. ....... ........ 
Morganza structure and 
levee .................. 
Morganza forebay levee ...... 
Port Allen lock ............ 
Lafourche Basin Levee District 
Levees .................. 
Plaquemines West Levee 
District Levees ........... 
Buras Levee District ........ 
Levees .................. 
Empire lock .............. 
Baton Rouge front levees ...... 
Pontchartrain Levee 
District .... .... ......... 
Levees .................. 
Bonnet Carre guide levees ... 
Bonnet Carre forebay levee 
Bonnet Carre structure 
East Jefferson Levee District 
Levees ..... ............ 
West Jefferson Levee District 
Levees ........... . 
Floodwalls ............... 
Harvey Canal Lock ......... 
(16.8) (16.8) (--) (13.3) (--) (-- (--) (--) (--) (15.5) (--) (15.5) (--) 
15.5 15.5 -- 12.0 -- -- -- -- -- 15.5 -- 15.5 -- 
1.3 1.3 -- 1.3 
(126.3) (126.3) -- (1263) ) (1.0) (--) (1.0) (--) (118.7) (--) (118.7) (--) 
118.7 118.7 -- 118.7 -- 1.0 -- 1.0 -- 118.7 -- 118.7-- 
0.8 
6.7 
0.1 
0.8 
6.7 
0.1 
61.7 61.7 
37.9 
(34.1) 
34.0 
0.1 
2.1 
(124.9) 
110.8 
11.3 
1.3 
1.5 
11.6 
(20.0) 
19. 8 
0.1 
0.1 
37.9 
(34.1) 
34.0 
0.1 
2.1 
(124.9) 
110.8 
11.3 
1.3 
1.5 
11.6 
(20.0) 
19.8 
0.1 
0.1 
0.8 -- -- -- ---- 
6.7 -- -- -- -- -- 
0.1 -- -- 
-- 61.7 
-- 37.92 
-- (27.8) 
-- 27.72 
-- 0.1 
-- 1.9 
-- 0.1 
(--) 
-- 
(--) (117.5) (3.8) 
-- 103.4 3.8 
-- 11.3 -- 
-- 1.3 -- 
-- 1.5 -- 
10.8 
(20.0) 
19.8 
0.1 
0.1 
-- 
(--) 
(--) 
-- 
-- 0.1 
(--) 
-- 
(--) 
-- 
-- 
-- 61.7 
(---)-) 
-- 
-- 
-- 61.7 
37.9 
(34.0) 
34.0 
2.1 
37.9 
(34.0) 
34.0 
2.I 
(--) 
(0.1) (--) (--) (--) (110.8) (-- (110.8) -- ) 
0.1 -- -- -- 110.8 -- 110.8 -- 
(--) (--) 
-- 
(--) 
-- 
(--) 
-- 
-- 
11.6 
(19.9) 
19.8 
0.1 
(--) 
--
-- 
11.6 
(19.9) 
19.8 
0.1 
(--) 
cr2 
C!r 
Cr 
Cr 
Cz 
-I 
(--)

TABLE 41-K 
(Continued) 
PROJECT LEVEES: NEW ORLEANS DISTRICT 
(FISCAL YEAR 2000) 
Levees and Floodwalls 
(Miles) 
Built to Approved Berm' Surfaced Roads on Levees 
Grade and Section (Miles) (Miles) 
Total 
Total Cur- In Com- Cur- In Com- Curin 
Total rently System plete rently System plete rently 
Authorized Place Thru Under When Built Thru Under When Built Thru tinder 
for This This This Con- Com- This This Con- Com- This This Con- 
Location System FY FY FY struction pleted FY FY struction pleted FY FY struction 
Orleans Levee District 
Left descending, east bank 
Levees 
Floodwalls 
IHNC lock 
Right descending, west bank 
Levees 
Algiers Canal lock 
Lake Borgne Basin Levee 
District Levees 
Grand Prairie Levee District 
Levees 
Total Mississippi River 
Other Levees Included in Main Stem 
Louisiana State Pen Levee 
Atchafalaya Basin 
Atchafalaya River and 
Bayou des Glaises 
East Bank Atchafalaya River 
Bayou des Glaises 
West bank Atchafalaya River 
Simmesport Ring 
Melville Ring 
Krotz Springs Ring 
Mansura Hills to Hamburg 
West protection levee, Hamburg 
to Berwick drainage canal via 
Calumet 
Levees west of Berwick, Berwick 
drainage canal to Charenton 
drainage canal 
Morganza upper guide levee 
(27.2) 
(13.3) 
4.6 
8.6 
0.1 
(13.9) 
13.8 
0.1 
11.6 
(27.2) (--) (24.9) (--) 
(13.3) (--) (11.0) (--) 
4.6 -- 2.3 -- 
8.6 -- 8.6 -- 
0.1 -- 0.1 -- 
(13.9) (--) (13.9) (--) 
13.8 -- 13.8 -- 
0.1 -- 0.1 -- 
11.6 -- 11.6 -- 
37.4 37.4 -- 374 -- 
511.6 511.6 -- 491.1 3.8 
12.1 
1.2 -- 11 
-7- -- T-i- 
(--) 
(--) 
(--) 
--. 
(18.4) (--) 
(4.6) (--) 
4.6 -- 
(13.8) (--) 
13.8 -- 
-- _- 
-- 11.6 -- 
-- 37.4 -- 
-- 479.6 -- 
(18.4) (--) 
(4.6) (--) 
4.6 
(13.8) (--) 
13.8 -- 
11.6 -- 
37.4 -- 
479.6 -- 
-- 7.3 
(--) 
--. 
(148.4) (148.4) (--) (143.9) (--) 
52.5 52.5 -- 52.5 -- 
7.9 7.9 -- 7.9 -- 
60.1 60.1 -- 55.6 -- 
1.6 
4.1 
1.7 
20.5 
128.7 
56.5 
8.9 
1.6 -- 
4.1 -- 
1.7 -- 
20.5 -- 
1.6 -- 
4.1 -- 
1.7 -- 
20.5 -- 
128.7 3.5 110.0 0.9 
56.5 8.2 
8.9 -- 
29.0 -- 
8.9 -- 
(148.4) (--) 
52.5 -- 
7.9 -- 
60.1 -- 
1.6 -- 
4.1 -- 
1.7 -- 
20.5 -- 
-- -- -- -- 128.7 -- 
-- -- -- -- 56.5 -- 
-- -- -- -- 8.9 
(148.4) (--) 
52.5 -- 
7.9 -- 
60.1 -- 
1.6 -- 
4.1 -- 
1.7 -- 
20.5 -- 
128.4 -- 
56.5 -- 
8.9 -- 
t. 
0
m
Ir' 
C
0
- 
0
C1 
O
t2 
r 
0
ao 
ID 
C
0a 
(-) -- ) (-

TABLE 41-IC 
(Continued) 
PROJECT LEVEES: NEW ORLEANS DISTRICT 
(FISCAL YEAR 2000) 
Levees and Floodwalls 
(Miles) 
Built to Approved Berm' Surfaced Roads on Levees 
Grade and Section (Miles) (Miles) 
Total 
Total Cur- In Com- Cur- In Com- Curin 
Total rently System plete rently System plete rently 
Authorized Place Thru Under When Built Thru Under When Built Thru Under 
for This This This Con- Com- This This Con- Com- This This Con- 
Location System FY FY FY struction pleted FY FY struction pleted FY FY struction 
East Protection levee, Morganza 
to Cutoff Bayou, including 
19.5 miles of Morganza lower 
guide levee ........... ............. 1061067 106.7 0.8 95.7 -- -- -- -- -- 105.0 -- 86.0 
Total Atchafalaya Basin ............... 449.2 449.2 12 5 387.5 0.9 -- -- -- -- 447 5 -- 428.2 
Total Other Levees Included 
in Main Stem ....................... .... 461.3 449.2 12.5 387.5 82 -- -- -- -- 447.5 -- 428.2 
Total-Main Stem Leaves .............. 972.9 960.8 -- 878.6 1. 2 -- 1.1 -- 927. 1 -- 907.8 
TRIBUTARY LEVEES IN 
MR&T PROJECT 
L ake Pontchartrain, LA .................... (17.4) (17,4) (--) (17.4) (174) (--) (174) (--) 
Item A levees .... ....................... 5.0 5.0 -- 5.0 -- -- -- -- -- 5.0 -- 5.0 -- 
Item B levees........ ... ............. 10.1 10.1 -- 101 -- -- -- -- -- 10.1 -- 101 -- 
Item C levees.......... ................... .. 2.3 23 -- 2.3 - - 2.3 -- 23 
Total Tributary Levees in MR&T 
Project ................. .................... 17.4 17.4 -- 17.4 -- -- -- -- -- 174 -- 174 
GRAND TOTAL ............................... 990.3 978.2 12.5 896.0 -- 1.2 -- 1 -- 944.5 -- 925.2 
1. Landside seepage berms only. 
2. Changed to correct previous error. 
cr 
CI 
Cr 
Cer 
PEN 
r. 
C
O2l

TABLE 41-L PROJECT LEVEES: VICKSBURG DISTRICT 
(FISCAL YEAR 2000) 
Levees and Floodwalls 
(Miles) 
Built to Approved Berm' Surfaced Roads on Levees 
Grade and Section (Miles) (Miles) 
Total 
Total Cur- In Com- Cur- In Com- Curin 
Total rently System plete rently System plete rently 
Authorized Place Thru Under When Built Thru Under When Built Thru Under 
for This This This Con- Com- This This Con- Com- This This Con- 
Location System FY FY FY struction pleted FY FY struction pleted FY FY struction 
MAIN STEM LEVEES 
Mississippi River Levees 
East bank in Mississippi .................. 
Greenville Harbor dikes .................. 
West bank in Arkansas ................... 
West bank in Louisiana 
(above Red River) ..................... 
Total Mississippi River 
L evees .................................... 
Other Levees Included in Main 
Stem 
Lower Red River-South Bank 
Red River levees.................... 
Hotwells to Moncla, LA, 
levees.................... ............... 
Arkansas River, South Bank ....... 
Total Other Levees Included in 
Main Stem ............ ............. 
Total-Main Stem Levees........... 
TRIBUTARY LEVEES IN 
MR&T PROJECT 
Arkansas River, North bank ......... 
Red River Backwater Levees ....... 
178.34 178.3 
7.8 7.8 
75.6 75.6 
-- 109.1 18.1 
-- 7.8 -- 
-- 55.0 -- 
198.7 198.7 10 78.7 12.5 
460.4 460.4 10.6 250.6 30.6 
(59.2) (59.2) (--) (59.2) (--) 
59.2 59.2 -- 59.2 -- 
85.4 85.4 -- 85.4 
144.6 144.6 -- 144.6 -- 
605.0 605.0 10.6 395.2 30.6 
61.55 
263.6 
56.2 -- 56.2 -- 
237.3 12.7 219.7 12.9 
156.9 -- 135.0 -- 
61.3 -- 54.3 -- 
91.0 43 74.9 -- 
309.2 4.3 264.2 -- 
(--) (--) (--) (--) 
24.7 -- 24.7 -- 
24.7 -- 24.7 -- 
333.9 4.3 288.9 -- 
8.3 -- -- -- 8.3 -- -- -- 
1742 -- 
2.7 -- 
75.4 -- 
197.8 -- 
450.1 -- 
(59.2) (-) 
59.2 -- 
84.1 
593.4 -- 
47.4 -- 
249.0 -- 
174.2 -- 
2.7 -- 
75.4 -- 
197.8 
450.1 
(59.2) (--) 
59.2 -- 
81.1 
140.3 
590.4 
47.4 -- 
219.7 12.9 
0
0xCt 
1< 
1
n
0
Ct 
y
x 
7dr 
0
C
0
aa

TABLE 41-L 
(Continued) 
PROJECT LEVEES: VICKSBURG DISTRICT 
(FISCAL YEAR 2000) 
Levees and Floodwalls 
(Miles) 
Built to Approved Berm' Surfaced Roads on Levees 
Grade and Section (Miles) (Miles) 
Total 
Total Cur- In Com- Cur- In Com- Curin 
Total rently System plete rently System plete rently 
Authorized Place Thru Under When Built Thru Under When Built Thru Under 
for This This This Con- Com- This This Con- Com- This This Con- 
Location System FY FY FY struction pleted FY FY struction pleted FY FY struction 
Yazoo River Basin ..................... 624 1) (425.3) (--) (237.6) (--) (--) (--) (--) (--) (624.1) (--) (3389) -- 
Headwater .............................. 527.5 373.7 -- 186.0 -- -- -- -- -- 527.5 -- 299 -- 
Backwater ..................................... 96.6 51.6 -- 51.6 -- -- -- -- -- 96.6 -- 390 -- 
Total Tributary Levees in 
MR&T Project .................... 949.2 718.8 12.7 513.5 12.9 8.3 83 -- 9205 -- 6060 129 
GRAND TOTAL ...................... 1,554.2 1,323.8 23.3 908.7 43.5 342.2 4.3 297.2 -- 1,513.9 -- 1,196.4 12.9 
1. Landside seepage berms only. 
2. Levee that has adequate freeboard based on the refined 1973 MR&T project flood flow line for the Mississippi River. Levees with more than 2 feet of freeboard are considered 
adequate. 
3. Subject to change as planning progresses. Does not include existing berms which need restudy. 
4. Includes 1.4 miles of concrete floodwall and 0.3 mile of levee on Vicksburg city front. 
5. Includes 5.3 miles for Gillett new levee. 
6. Relief wells used in place of berms. 
-4 
cr 
(In 
cr~L 
C
Ct 
'2

TABLE 41-M PROJECT LEVEES: MEMPHIS DISTRICT 
(FISCAL YEAR 2000) 
Levees and Floodwalls 
(Miles) 
Built to Approved Berm5 Surfaced Roads on Levees 
Grade and Section (Miles) (Miles) 
Total 
Total Cur- In Com- Cur- In Com- Curin 
Total rently System plete rently System plete rently 
Authorized Place Thru Under When Built Thru Under When Built Thru Under 
for This This This Con- Com- This This Con- Com- This This Con- 
Location System FY FY FY struction pleted FY FY struction pleted FY FY struction 
MAIN STEM LEVEES 
Mississippi River 
M ounds, IL...................................... 
M ound City, IL......................... 
Cairo Drainage District, IL.............. 
City of Cairo, IL ............................. 
Little River Drainage 
District, M O ............................ 
Levee District No. 2, Scott 
County, MO ....... ........ 
Levee District No. 3, Mississippi 
County, MO ..................... 
St. Johns Levee and Drainage 
District, MO .................. ............... 
St. Francis Levee District 
of M O ................... .................. 
City of Hickman, KY ................... 
Board of Levee Commissioners 
Fulton, County, KY .............. 
Reelfoot Levee District of Lake 
and Obion Counties, TN................ 
Madrid Bend Levee District, 
Lake Co., TN ....................... 
Lake County Levee and Drainage 
District, TN ................................... 
Dyer County Levee and Drainage 
District No. 1, TN ...... .............. 
Tipton-Obion levee extension ......... 
St. Francis Levee District 
o f A R ........................................... 
Helena Improvement District 
No. 1, AR ..... .......................... 
Cotton Belt Levee District 
N o. , ARX............. ........... 
3.9 
2.7 
13.82 
6.2 
3,9 
2.7 
13.8 
6.2 
3.9 
2.7 
7.8 
2.24 
0.5 
2.5 
1.6 
4.4 
19.3 19.3 -- 19.3 -- 9.7 
13.8 13.8 10.0 13.8 4.8 
26.0 26.0 -- 26.0 -- 12.9 
59.03 58.7 
55.7 55.7 
1.4 1.4 
16.7 16.7 
4.5 4.5 
5.2 5.2 
-- 58.2 
-- 48.74 
-- 1.4 
-- 16. 7 
-- 4.5 
-- 5.2 
-- 9.2 
-- 23.0 
0.5 
2.5 
2.0 
-- 4.9 
-- 4.8 
-- 4.9 
3.6 
1.1 
8.5 
4.0 
19.3 
13.8 
26.0 
-- -- -- 46.9 
-- 12.0 -- 55.1 
-- 0.5 
-- 15.1 -- 11.4 -- 16.3 
-- 0.6 
17.0 17.0 -- 17.0 -- 9.6 
21.3 21.3 -- 21.3 
6.5 -- -- -- 
156.7 156.7 
5.3 5.3 
-- 153.2 
-- 5.3 
-- 1.3 
-- 89.2 
0.3 
-- 9.4 
-- 0.4 
4.5 
5.2 
17.0 
-- 21.3 
-- 6.5 
-- 88.4 -- 156.7 
-- 2 4 -- 2.4-- 
23.9 23.9 -- 23.9 -- 19.4 -- 19.4 
4.7 
-- 3.6 -- 
-- 1.1 -- 
-- 8.5 -- 
-- 3.5 -- 
-- 19.3 -- 
-- 13.8 - 
-- 26.0 -- 
-- 46.1 -- 
-- 55.1 -- 
-- 16.3 -- 
-- 4.3 -- 
-- 5.2 -- 
-- 17.0 -- 
-- 21.3 -- 
-- 156.7 -- 
-- 4.2 
23.9 -- 23.9 
O-I!N 
0
m
C
c
0
0
0
cc 
C 
oi 
m1. 
03 
�

TABLE 41-M 
(Continued) 
PROJECT LEVEES: MEMPHIS DISTRICT 
(FISCAL YEAR 2000) 
Levees and Floodwalls 
(Miles) 
Built to Approved Berms Surfaced Roads on Levees 
Grade and Section (Miles) (Miles) 
Total 
Total Cur- In Com- Cur- In Com- Curin 
Total rently System plete rently System plete rently 
Authorized Place Thru Under When Built Thru Under When Built Thru Under 
for This This This Con- Com- This This Con- Com- This This Con- 
Location System FY FY FY struction pleted FY FY struction pleted FY FY struction 
Laconia Drainage and Levee 
District Phillips County. AR.......... 
Laconia Levee District No. I of 
Deshna County, AR................... 
Laconia Circle Special Drainage 
District of Deshna 
County, AR ......................... 
Yazoo-Mississippi Delta Levee 
District, MS ......... ...... 
Madrid Bend L.D., Fulton Co., 
A KY ......... ............. ......... 
--a Birds Point-New Madrid setback 
levee, M O ..... ........................ 
Total Mississippi River ............... 
TOTAL MAIN STEM LEVEES....... 
TRIBUTARY LEVEES IN 
MR&T PROJECT 
St. Francis River ............................... 
E ast bank ......................... ........ 
W est bank ..................................... 
Little River ................................. 
East bank (left) ......................... 
W est bank ....... .......................... 
Elk Chute .......... ........................ 
West Basin and middle valley......... 
Lower White River ..................... 
White River backwater levee........... 
Augusta to Clarendon ................. 
Clarendon levee ........................ 
20.5 20.5 -- 
18.1 18.1 -- 
6.6 6.6 -- 
93.6 93.6 -- 
4.8 4.8 -- 
20.5 -- 
18.1 -- 
6.6 
93.6 
4.8 -- 
35.3 35.3 -- 35.3 - 
637.8 631.0 10.0 607.5 -- 
637.8 631.0 10.0 607.5 -- 
(308.2) (302.9) -- (302.9) -- 
159.5 156.2 -- 156.2 -- 
148.7 146.7 -- 146.7 -- 
(130.1) (130.1) -- (130.1) -- 
40.7 40.7 -- 40.7 -- 
35.1 35.1 -- 35.1 -- 
39.9 39.9 -- 39.9 -- 
14.4 14.4 -- 14.4 -- 
(95.6) (85.9) -- (84.1) -- 
40.2 40.2 -- 40.2 -- 
49.2 39.5 -- 39.5 -- 
6.2 6.2 -- 4.4 -- 
11.5 -- 11.5 
12.6 -- 9.2 
88.6 -- 88.6 
23.8 -- -- 
342.7 -- 272.6 
342.7 -- 272.6 
20.5 -- 
16.5 -- 
93.6 -- 
-- 4.8 -- 
= 35.3 -- 
-- 605.6 -- 
-- 605.6 -- 
(301.0) -- 
156.7 -- 
144.3 -- 
(128.9) -- 
40.7 -- 
35.1 -- 
39.7 -- 
13.4 -- 
(94.0) (--) 
38.8 -- 
49.2 -- 
60 -- 
rC 
Cl 
Cl 
Cr 
Cr 
Cl Cl 
C 
20. 5 
16.5 
93.6 
4.8 
35.3 
596.6 
596.6 
(133.5) 
94.7 
38.8 
(94.5) 
40. 1 
23.7 
17.3 
13.4 
(81.0) 
38.8 
36.2 
60

TABLE 41-M 
(Continued) 
PROJECT LEVEES: MEMPHIS DISTRICT 
(FISCAL YEAR 2000) 
Levees and Floodwalls 
(Miles) 
Built to Approved Berm5 Surfaced Roads on Levees 
Grade and Section (Miles) (Miles) 
Total 
Total Cur- In Com- Cur- In Com- Curin 
Total rently System plete rently System plete rently 
Authorized Place Thru Under When Built Thru Under When Built Thru Under 
for This This This Con- Com- This This Con- Com- This This Con- 
Location System FY FY FY struction pleted FY FY struction pleted FY FY struction 
Memphis Harbor..... ..................... 105 J -- 10.5. 7.0 -- 10.5 10.5 
Total Tributary Levees in 
MR&T Project.................. ... 544.4 529.4 -- 527.6 -- 7.0 -- 7.0 -- 534.4 319.5 
GRAND TOTAL............................... 1,182.2 1,160.4 10.0 1,135.0 -- 349.7 -- 279.6 -- 1,140.0 -- 916.1 -- 
1. Subject to change as planning progresses. 
2. Includes 5.1 miles of Cache River levee. This levee was enlarged to 1928 grades with Federal funds, but since that time has been classified as a secondary levee. 
3. Includes 12.1 miles of Farrenburg levee. This levee was enlarged to 1928 grades with Federal funds, but since that time has been classified as a secondary levee 
4. Deficient in freeboard as a result of 1996 Revised Project Design Flood flowline. 
5. Landside seepage berms only. 
i 6. Changed to correct previous error. --- 
Q
C1 
O
0
r 
a
O
wow 
C
I1 
1< 
O
z
,< 
r
O
,r 
O 'C 
C
1< 
tim 
�
,<

TABLE 41-N RECAPITULATION 
PROJECT LEVEE TABLES 42-K, -L, AND -M 
(FISCAL YEAR 2000) 
Levees and Floodwalls 
(Miles) 
Built to Approved Berm s Surfaced Roads on Levees 
Grade and Section (Miles) (Miles) 
Total 
Total Cur- In Com- Cur- In Com- Curin 
Total rently System plete rently System plete rently 
Authorized Place Thru Under When Built Thru [inder When Built Thru Under 
for This This This Con- Com- This This Con- Com- This This Con- 
Location System FY FY FY struction pleted F' FY struction pleted FY FY struction 
MAIN STEM LEVEES 
Mississippi River 
New Orleans District, 
Table 41-K ................... .... 
Vicksburg District, Table 41-L........ 
Memphis District, Table 41-M ..... 
Total Mississippi River ................. 
Other Levees Included in Main 
Stem 
Atchafalaya Basin Floodway-- 
N O D ..................................... 
Louisiana State Pen Levee-- 
NOD ............................ 
Lower Red River-South Bank-- 
VXD .................... ...... 
Arkansas River-South Bank-- 
VXD ................ ..... ........... 
Total Other Levees Included 
in Main Stem .................... 
Total Main Stem Levees ............. 
TRIBUTARY LEVEES IN 
MR&T PROJECT 
Lake Pontchartrain, LA,--NOD......... 
Yazoo River Basin--VXD ............... 
Arkansas River-North Bank-- 
VXD ......................... 
Red River Backwater-VXD .......... 
St. Francis River-MD ................. 
511.6 511.6 -- 491.2; 3.8 1.2 -- 1.1 
460.4 460.4 10.6 250.6 30.6 309.2 4.3 264.2 
637.8 631.0 10.0 607.5 -- 342.7 -- 272.6 
1,609.8 1,603.0 20.6 1,349.3 34.4 653.1 -- 537.9 
449.2 449.2 12.5 387.5 0.9 
12.1 
479.6 -- 
450.1 -- 
605.6 -- 
1,535.3 -- 
-- -- -- -- 4475 -- 
479. 6 
450.1 
596.6 
1,526.3 
428.2 
-- 7.3 
59.2 59.2 -- 59.2 
85.4 85.4 -- 85.4 
59.2 
24.7 -- 24.7 
605.9 593.8 12.5 532.1 8.2 24.7 -- 24.7 
2,215.7 2,196.8 33.1 1,881.4 42.6 677.8 4.3 562.6 
17.4 17.4 -- 
624.1 425.3 -- 
17.4 
237.6 
61.5 56.2 -- 56.2 -- 
263.6 237.3 12.7 219.7 12.9 
308.2 302.9 -- 302.9 -- 
-- 84.1 -- 
-- 590.8 - 
-- 2,126.1 -- 
S-- -- -- 17.4 
-- -- -- -- -- 624.1 
8.3 8.3 47.4 -- 
249.0 -- 
301.0 -- 
59.2 
81.1 
568.5 
2,094.8 -- 
17.4 
338.9 
47.4 
219.7 
133.5 
12.9 
A 
-4 
cr 
V
'C 
7d 
C
C
,2

TABLE 41-N 
(Continued) 
RECAPITULATION 
PROJECT LEVEE TABLES 42-K, -L, AND -M 
(FISCAL YEAR 2000) 
Levees and Floodwalls 
(Miles) 
Built to Approved Berms Surfaced Roads on Levees 
Grade and Section (Miles) (Miles) 
Total 
Total Cur- In Com- Cur- In Com- Curin 
Total rently System plete rently System plete rently 
Authorized Place Thru Under When Built Thru Under When Built Thru Under 
for This This This Con- Com- This This Con- Com- This This Con- 
Location System FY FY FY struction pleted FY FY struction pleted FY FY struction 
Little River--MD ............................... 130.1 130.1 -- 130.1 -- -- -- -- -- 128.9 -- 94.5 
Lower White River-MD ................ 95.6 85.9 -- 84.1 -- -- -- -- -- 94.0 -- 81.0 -- 
Memphis Harbor--MD .............. 10.5 10.5 -- 10.5 -- 7.0 -- 7.0 -- 10.5 -- 
Total Tributary Levees in 
MR&T Project .......................... 1511.0 .265.6 12.7 1.058.5 12.9 15.3 -- -- 1472.3 942.9 12.9 
Grand Total in Project .................. 3,726.7 3,462.4 45.8 2,939.9 55.5 691.2 4.3 577.9 -- 3,598.4 - 3,0377 12.9 
1. Landside seepage berms only. 
2. Subject to change as planning progresses. 
3. 1996 Revised Project Design Flood flowline identified freeboard deficiences. 
4. Changed to correct previous error. 
5. Relief wells have been used in lieu of seepage berms in some reaches of the Miss. River Levees. 
04 
C
m
x
PC 
Cd 
C
O
-4 
C
0
C
a
Cr 
2
IiI 
aa 
,< 
y
13 
Ct 
C
v

MISSISSIPPI RIVER COMMISSION 
TABLE 41-0 CHANNEL IMPROVEMENTS: 
NEW ORLEANS DISTRICT 
FISCAL YEAR 2000) 
Total 
In Complete 
System Built Thru Currently 
Year When This This Percent Under 
Location Initiated Completed FY FY Complete Construction 
(Miles) 
Bayou des Glaises diversion channel 1938 6.0 -- 6.0 100 -- 
Bayous Rapides, Boeuf, and Cocodrie 1946 92.6 -- 63.4 75 -- 
Charenton drainage and navigation canal 1939 6.3 -- 6.3 100 -- 
Wax Lake Outlet 1938 15.7 -- 15.7 100 -- 
Atchafalaya Basin Floodway 1933 244.2 -- 186.4 76 -- 
Morganza Floodway 1941 3.3 -- 3.3 100 -- 
Old River outflow channel 1956 8.3 -- 8.3 100 -- 
Old River inflow channel 1960 2.3 -- 2.3 100 -- 
Old River lock approach channels 1961 2.2 -- 2.2 100 -- 
Baton Rouge Harbor (Devils Swamp) 1958 2.5 -- 2.5 100 -- 
Teche-Vermilion Water Supply 1977 6.3 -- 6.3 100 -- 
Old River Auxiliary Control Structure 
inflow channel 1986 1.9 -- 1.9 100 -- 
Old River Auxiliary Control Structure 
outflow channel 1988 0.9 -- 0.9 100 -- 
Caemnarvon Freshwater Diversion 
channel 1988 1.7 -- 1.7 100 -- 
41-81

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 41-P CHANNEL IMPROVEMENTS: 
VICKSBURG DISTRICT 
(FISCAL YEAR 2000)
Total 
In Complete 
System Built Thru Currently 
Year When This This Percent Under 
Location Initiated Completed FY FY Complete Construction 
(Miles) 
BIG SUNFLOWER RIVER, 
ETC., MS 
Big Sunflower River................................... 1947 199.1 -- 199.1 100 -- 
Quiver River...................... .............. 1947 69.6 -- 69.6 100 -- 
Deer Creek................................... 1947 7.0 -- 7.0 100 -- 
Steele Bayou ..................................... 1947 54.9 -- 54.9 100 -- 
Steele Bayou'..................... .... ............ 1965 71.2 -- 71.2 100 -- 
Main Canal...... ............... .............. 1959 21.1 -- 21.1 100 -- 
Main Canal 2 .. . . . ... . . .... . ... .. ... . . . ... 1993 26.7 -- 26.7 100 -- 
Black Bayou............................ .......... 1992 36.5 6.2 26.3 72 10.2 
Big Sunflower River tributaries ...................... 1957 227.2 -- 227.2 100 -- 
Quiver River tributaries ........................ ............. 1960 35.4 -- 35.4 100 
YAZOO BACKWATER 
Yazoo Backwater .................... .......... 1960 39.9 -- 39.9 100 
YAZOO BASIN HEADWATER, MS 
Upper Yazoo Project............................. 1976 179.0 3.6 76.2 43 4.3 
Coldwater River .................. ................................ 1941 54.6 -- 54.6 100 
Arkabutla Canal........................... ................ 1948 0.4 -- 0.4 100 
Tallahatchie Canal..... ........... ........... 1940 74.8 -- 73.5 98 "" 
Little Tallahatchie River and 
Panola-Quitman Floodway................................ 1939 48.0 -- 48.0 100 
Greenwood protection works ............................. 1971 2.9 -- 2.9 100 
Yacona River ................................... 1952 1.8 -- 1.8 100 
Bobo Bayou .......... ...... ................ 1944 16.1 -- 16.1 100 
Cassidy Bayou .............................. 1934 69.0 -- 69.0 100 
Cassidy Bayou3 ........... .. ... .... . . . . . . .. ................. . -- 26.0 -- ---- 
Bear Creek Diversion ............. ........... ... -- 4.8 -- -- 
Lake Cormorant ................................ .......... -- 20.9 -- -- 
Hurricane Bayou ....... ............. ........ -- 2.5 -- -- 
Opossum Bayou ....................................... -- 20.8 -- -- 
Abaica Creek...... ................ . -- 7.7 -- -- 
Chicopa Creek........................... .. -- 7.0 -- -- 
Bear Creek ....... ................................. .... -- 23.3 -- -- 
Rocky Bayou.............................. ............ -- 7.8 -- -- 
Whiteoak Bayou............ ............ ... -- 55.9 -- -- 
Miscellaneous ditches ................. ......... -- 12.3 -- -- 
Yalobusha River.... ...................................... 1939 46.0 -- 46.0 100 
Yazoo River ............................ ................ 1940 160.2 -- 160.2 100 
Whittington Auxiliary Channel............................. 1956 30.8 -- 30.8 100 
Tchula Lake ............................ 1964 26.4 -- 26.4 100 
David-Burrell Bayou.......................... .. 1957 40.4 -- 40.4 100 
McKinney Bayou................................ . 1960 3.5 -- 3.5 100 
41-82

MISSISSIPPI RIVER COMMISSION 
TABLE 41-P 
(Continued) 
CHANNEL IMPROVEMENTS: 
VICKSBURG DISTRICT 
FISCAL YEAR 2000)
Total 
In Complete 
System Built Thru Currently 
Year When This This Percent Under 
Location Initiated Completed FY FY Complete Construction 
(Miles) 
YAZOO BASIN HEADWATER, MS 
(Continued) 
Hillside Floodway................................... ... 
Yazoo City protection works......................... 
Ascalmore-Tippo Bayous.................. ..... 
Alligator-Catfish Bayou....................... ... 
Pelucia Creek ........................... ............ .. 
BOEUF & TENSAS RIVERS, 
ETC., LA AND AR 
Bayou Lafourche........ ................. . ... 
Bayou Lafourche47 ..... ... ..... .... .......................... ... 
Big & Colewa Creeks....................................... 
Big & Colewa Creeks5 7... . . . . . . . . . . . . . . . 
Tensas R iver........................................................ 
Tensas River6 .... .................. ... .. .. . . . . . . 
Boeuf River, AR and LA... .............. 
Fleschmans Bayou, AR........................ ...... 
Caney Bayou, AR ........................ . ... 
Canal 18, AR ........................ 
Big Bayou, AR...... 
Black Pond Slough, AR'........................ . ... 
Bayou Macon, AR and LA...................... .... 
Rush Bayou, AR.... .................. 
Canal 19, AR..... ................... 
Canal 43, A R ........................................................ 
Canal 81, A R ........................................................ 
Mill Bayou-Bayou Vidal-Bayou 
Vidal Cutoff ........................ 
Kirsch Lake Canal............. ................ 
Canal 19 Extension ........ .................... 
lake Chicot Pumping Plant ........................... 
Mill Bayou...................................... 
RED RIVER BACKWATER, LA 
Snsas Cocodrie Pumping Plant ...................... 
Mile Bayou, LA ........ .... ................... 
1964 
1953 
1975 
1973 
1975 
1949 
1972 
1947 
1965 
1947 
1968 
1953 
1963 
1964 
1963 
1952 
1962 
1959 
1964 
1957 
1956 
1957 
1964 
1955 
1976 
11.0 
1.6 
30.2 
8.3 
11.7 
45.3 
43.0 
81.4 
86.8 
96.5 
165.0 
103.9 
6.6 
7.4 
10.3 
33.3 
14.3 
150.8 
6.7 
50.2 
34.5 
32.7 
17.1 
9.3 
9.4 
2.5 
4.8 
6.9 
1.5 
0.1 
.2 
11.0 
1.6 
15.1 
8.3 
11.7 
45.3 
4.4 
81.4 
51.5 
96.5 
61.0 
103.9 
6.6 
7.4 
10.3 
33.3 
14.3 
150.8 
6.7 
50.2 
34.5 
32.7 
9.4 
2.5 
4.8 
-- 6.9 
-- 1.5 
1. Includes further work on 54.9 miles and adds 16.3 miles of channel to the project. 2. Includes further work on 21.1 miles and adds 1.1 miles of channel to the project. 
3. Includes further work on 26.0 miles. 
4. Includes further work on 38.6 miles and adds 4.4 miles of channel to the project. 
. cludes further work on 75.3 miles and adds 11.5 miles of channel to the project. 
6. includes further work on 96.5 miles and adds 68.5 additional miles of channel to the project. 
7F. urther Work on these items has been deferred due to local oppositions and withdrawal of sponsorship by the levee district 
41-83 
100 
100 
50 
100 
100 
100 
10 
100 
60 
100 
37 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 41-Q CHANNEL IMPROVEMENTS: 
MEMPHIS DISTRICT 
(FISCAL YEAR 2000)
Total 
In Complete 
System Built Thru Currently 
Year When This This Percent Under 
Location Initiated Completed FY FY Complete Construction 
(Miles) 
BIRDS POINT-NEW MADRID 
FLOODWAY 
Birds Point-New Madrid Intercepting 
Ditch Enlargement, Samos and 
Vicinity, MO ............................. 
ST. FRANCIS BASIN 
Little River Drainage, MO ....................... 
St. Francis River, MO and AR ............................ 
West Memphis Drainage, AR ............................. 
Big Slough and Mayo Ditch, AR ........................ 
Tyronza River, AR .............................. ............. 
L'Anguille River, AR ....................................... 
LOWER WHITE RIVER 
BASIN, AR 
Cache River Basin, AR ..................................... 
Big Creek and tributaries, AR ............................. 
WEST KENTUCKY TRIBUTARIES 
Obion Creek, KY ............... ......... ............. 
WEST TENNESSEE TRIBUTARIES 
MS River, Western TN tributaries 
(Backwater Areas) (1946 Act) .......................... 
Obion River Diversion Channel, 
TN (1946 Act)....................... 
Reelfoot Lake-Lake No. 9, KY and TN................ 
Running Reelfoot Bayou, TN ................................ 
MS River Below Cape Girardeau: West 
TN tributaries (1948 Act) ..................... .......... 
Wolf River and tributaries, TN ........................... 
NONCONNAH CREEK, MS AND TN 
Nonconnah Creek, MS and TN ............................. 
HELENA HARBOR, PHILLIPS 
COUNTY, AR 
Helena Harbor, AR (2) .. ... .... ... .. ......................... 
1952 
1963 
1953 
1951 
1960 
1939 
(1) 
1972 
(I) 
(1) 
1952 
(1') 
1974 
1955 
1961 
1960 
1990 
1989 
9.6 -- 9.6 100 
298.9 
638.5 
19.8 
28.0 
12.7 
95.0 
231.5 
103.8 
41.7 
34.3 
9.3 
15.8 
19.7 
225.0 
24.7 
298.9 
573.8 
19.8 
28.0 
12.7 
100 
90 
100 
100 
100 
-- 7.2 3 
-- 34.3 100 
3.0 
19.7 
3.2 93.0 
-- 24.7 
18.2 1.26 
2.25 -- 
1.26 
2.25 100 
1. Not started. 
2. Data for Stage 1 only. 
41-84 
6.6 
6.6 
-, 
-- 
19 
100 
41 
100

MISSISSIPPI RIVER COMMISSION 
TABLE 41-R PUMPING STATIONS: 
NEW ORLEANS DISTRICT 
(FISCAL YEAR 2000) 
Rehabilitation Status 
(If Applicable) 
Percent Percent 
Complete Year Complete Year 
Authorized Thru Complete Thru Complete 
Size This (Schedule/ Year This (Schedule/ 
Name (CFS) FY Actual) Initiated FY Actual) 
Bayou Yokely 
Bayou Yokely Enlargement 
Centerville 
Ellerslie 
Franklin 
Franklin Enlargement 
Gordy 
Maryland 
North Bend 
Tiger Island 
Wax Lake East 
Wax Lake West 
Teche Vermilion 
Pointe Coupee 
TOTAL 
489 
568 
332 
136 
144 
144 
238 
136 
52 
75 
1,008 
496 
1,300 
6,61500 
6,618 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
1955 
1963 
1964 
1953 
1958 
1978 
1964 
1957 
1962 
1955 
1961 
1965 
1982 
1983 
1990 
1990 
1991 
1992 
1992 
1991 
1990 
1990 
100 
100 
100 
100 
100 
100 
100 
100 
1991(A) 
1991(A) 
1992(A) 
1993(A) 
1993(A) 
1992(A) 
1992(A) 
1992(A) 
41-85

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 41-S PUMPING STATIONS: 
VICKSBURG DISTRICT 
(FISCAL YEAR 2000) 
Rehabilitation Status 
(If Applicable) 
Percent Percent 
Complete Year Complete Year 
Authorized Thru Complete Thru Complete 
Size This (Schedule/ Year This (Schedule 
Name (CFS) FY Actual) Initiated FY Actual) 
Chauvin Bayou, LA 250 100 1994 1991 100 
Bawcomville 270 100 1955 1992 100 1993 
Jonesville 180 100 1952 -- -- 
Natchez Port 100 -- -- -- -- 
Wilson Point 50 -- -- -- -- 
Greenwood - Lee Street 90 100 1953 1952 ---- 
Greenwood - Wilson Street 67 100 1953 1952 -- 
Greenwood -Walker Lake 675 100 1949 1952 ---- 
Yazoo City 540 100 1954 1957 ---- 
Columbia 45 100 1939 -- -- 
Calion 200 100 1959 -- -- 
McKinney Bayou, MS 250 100 1962 1961 -- 
Lake Chicot 6,500 100 1987 -- -- 
Tensas Cocodrie 4,000 100 1986 -- -- 
Yazoo Backwater 10,000 -- -- -- -- 
Natchez Area 300 -- -- --... 
Bushley Bayou 300 -- Indef -- -- 
Bushley Bayou 20 -- Indef -- -- 
Sicily-HAHA Bayou 750 100 2000 -- -- 
Sicily - Fool River 300 100 2000 -- -- 
Pelucia Creek - Rising Sun # 1 10 100 1992 -- 
Pelucia Creek -Rising Sun #2 15 100 1992 -- - 
Pelucia Creek Pump 75 100 1993 ---- 
Below Red River 500 -- Indef -- -- 
Bayou Rapides 222 100 1936 -- -- 
Ouachita Parish, 
River Styx Bayou, LA 500 100 2000 -- -- 
Total 25,709 
'This project has been placed in the inactive category. 
41-86

MISSISSIPPI RIVER COMMISSION 
TABLE 41-T PUMPING STATIONS: 
MEMPHIS DISTRICT 
(FISCAL YEAR 2000) 
Rehabilitation Status 
(If Applicable) 
Percent Percent 
Complete Year Complete Year 
Authorized Thru Complete Thru Complete 
Size This (Schedule/ Year This (Schedule/ 
Name (CFS) FY Actual) Initiated FY Actual) 
Devall's Bluff 215 100 1949 1987 100 1989 
Des Arc, Ark. 30 100 1954 -- -- -- 
Ensley 900 100 1966 -- -- -- 
DD #17, Station # 1 375 100 -- -- -- 
Huxtable Pumping Plant 12,000 100 1977 -- ---- 
Graham Burke 1,500 100 1964 -- -- -- 
Finley Street 100 100 1978 -- -- -- 
Dyersburg 26 100 1961 -- ---- 
Cotton Slough 50 100 1964 -- ---- 
West Hickman 190 100 1976 -- -- -- 
Cypress Creek 3,000 100 1944 -- -- -- 
Fairfax 53.5 100 1950 -- -- -- 
Goose Pond 110 100 1976 -- -- -- 
Marble Bayou 220 100 1952 -- -- -- 
Workhouse Bayou 520 100 1950 -- -- -- 
Nonconnah 1,620 100 1944 -- -- -- 
L&DD #3 Peafield 400 100 -- -- -- 
Treasure Island 150 100 1976 -- -- -- 
Lake No. 9 500 100 1981 -- -- -- 
Cairo 10th Street 65 100 1981 -- -- -- 
Cairo 28th Street 65 100 1981 -- -- -- 
DD #17, Station #2 700 100 1981 -- -- -- 
Drinkwater Sewer 150 100 1979 -- -- -- 
May Street 5 100 1948 -- -- -- 
Cairo 22nd Street 37 100 -- -- -- 
Gayoso Bayou 1,500 100 1915 -- -- -- 
MudLae 200 -- -- -- -- -- 
Madison 25 .... 
Cache River 200 -- -- -- -- -- 
New Madrid 1,500 -- -- -- -- 
St. John's Bayou ,00 -- ---- 
TOTAL 27,406.5 
Unknown constructed by local interest. 
41-87

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 41-U COSTS DURING FISCAL YEAR 2000 
Item Construction Maintenance Other 
FEDERAL FUNDS 
Flood control, Mississippi River and tributaries: 
St. Louis District: 
St. Francis Basin-Wappapello Lake 
Subtotal 
Memphis District: 
Cache Basin, AR 
Channel improvement 
Eastern Arkansas Region (Comp) 
Francis Blank Floodway Ditch 
General investigations 
Helena & Vicinity 
Helena Harbor, Phillips County 
Hickman Bluff, KY 
Horn Lake Creek & Tribs 
Inspection of completed works 
L'Anguille River, AR 
Little R. Drainage 
Mapping 
Memphis Harbor (McKeller Lake) 
Nonconnah Creek, TN & MS 
Mississippi River levees 
St. Francis River & Tributaries, AR 
St. Johns Bayou & New Madrid 
West Tennessee tributaries 
White River Backwater 
Whiteman's Creek, AR 
Subtotal 
Vicksburg District: 
Channel improvement 
General investigations 
Inspection of completed works 
Lower Arkansas River 
Lower Red River--South Bank Red River Levee 
Mapping 
Mississippi River levees 
Tensas Basin 
Yazoo Basin 
Subtotal 
$ 4,737,615 
4,737,615 
5,848 
12,700,826 
4,815,893 
85,366 
1,481,951 
8,609 
-721,795 
14,347 
34,393 
-15,933 
2,385,287 
10,928,822 
4,241,212 
552,896 
191,847 
39,187 
36,748,726 
9,276,350 
22,320,132 
87,865 
729,736 
372,911 
1,194,948 
$ 77,668 
77,668 
-.
== 
2,074,620 
,.o 
o� 
oo 
=� 
,.� 
3,195,406 
9,744,569 
2,913,192 
2,074,620 
647,789 
�� 
40,558,758 
10,910,176 
208,035 
126,432 
339.711 
-- 385,166 
27,538,566 1,537,133 
7,625,204 4,182,243 
35,794,642 31,474,992 
80,234,762 49,877,193 
41-88

MISSISSIPPI RIVER COMMISSION 
TABLE 41-U COSTS DURING FISCAL YEAR 2000 
(Continued) 
Item Construction Maintenance Other 
New Orleans District: 
Atchafalaya Basin 
Atchafalaya Basin Floodway System 
B. R. Harbor Devil Swamp 
Bayou Cocodrie and Tributaries 
Bonnet Carre Spillway 
Channel Improvement 
General Investigations 
Inspection of Completed Works 
Louisiana Penitentiary Levee 
Mapping 
Mississippi & LA Estuarine 
Mississippi Delta Region 
Mississippi River Levees 
Old River 
Subtotal 
Total Federal Funds 
CONTRIBUTED FUNDS 
Memphis District 
Wolf River 
Reelfoot Lake TN & KY 
New Orleans District: 
Atchafalaya Basin 
Louisiana Penitentiary Levee 
Old River 
Mississippi Delta Region 
Morganza, LA to Gulf of Mexico 
Total Contributed Funds 
Grand Total, Federal 
and Contributed Funds 
19,474,693 
7,013,045 
12,759,797 
8,707,427 
-- 
68,377 
9,223,885 
7,697,802 
9,846,437 
957,213 
324,848 
95,976 
2,018,143 
9,056,898 
-- 
254,092 
284,626 
395,227 
1,326,346 
4,241,946 
64,945,025 28,810,190 1,543,457 
181,928,512 123,983,756 4,343,533 
29,615 
-- -- 234,739 
-- 2,000,000 -- 
-- 2,150,000 -- 
-- 83,283 -- 
-- 3,392,875 -- 
-- -- 875,890 
-- 7,626,158 1,084,991 
1.543,457 
-- 
181,928,512 131,609,914 5,428,524 
41-89

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 41-V STATEMENT OF ALLOTMENTS AND 
ACCRUED EXPENDITURES FOR FLOOD 
CONTROL, MISSISSIPPI RIVER AND 
TRIBUTARIES, FROM MAY 15, 1928, 
THROUGH SEP. 30, 2000 
Unexpended 
Accrued Balance 
District or Installation and Class of Work Allotments Expenditures Sep. 30,2000 
ALLOTMENTS AND ACCRUED EXPENDITURES 
CHARGEABLE AGAINST FLOOD CONTROL 
ACT LIMITATIONS: 
COMPLETED WORKS: 
Waterways Experiment Station 
Office, Chief of Engineers 
Rock Island District: 
S. G. & O. prior to Aug. 18, 1941 
St. Louis District: 
S. G. & O. prior to Aug. 18, 1941 
Subtotal 
Memphis District: 
Des Arc, AR 
Contraction works 
DeValls Bluff, AR 
Mapping 
Memphis Harbor 
New Madrid Floodway 
Wolf River and tributaries 
Roads on levees (Mississippi River levees) 
S. G. & O. prior to Aug. 18, 1941 
Subtotal 
Vicksburg District: 
Boeuf Basin levees 
Channel realignment, Arkansas River 
Contraction works 
Eudora Floodway 
Vicksburg Harbor 
Greenville Harbor 
Grants Canal (Mississippi River levees) 
Mapping 
Jonesville, LA 
Tensas National Wildlife Refuge, LA 
Roads on levees 
S. G. & O. prior to Aug. 18, 1941 
Subtotal 57,184,031 57,11 
$ 874,000 
19,158 
14,010 
169,352 
1,076,520 
178,925 
8,692,791 
231,215 
1,450,337 
18,736,432 
6,521,543 
1,723,620 
12,426 
1,998,766 
39,546,054 
$ 874,000 
19,158 
14,010 
169,352 
1,076,520 
178,925 
8,692,791 
231,215 
1,450,337 
18,736,432 
6,521,543 
1,723,620 
12,426 
1,998,766 
39,546,054 
2,764,605 
125,074 
1,972,183 
826,235 
4,664,515 
2,864,516 
7,070 
1,531,021 
172,950 
3,980,000 
105,660 
2,350,201 
'4,605 
15,074 
72,183 
26,235 
54,515 
54,516 
7,070 
31,021 
72,950 
80,000 
)5,660 
50,201 
84,031 
41-90 
.

MISSISSIPPI RIVER COMMISSION 
TABLE 41-V 
(Continued) 
STATEMENT OF ALLOTMENTS AND 
ACCRUED EXPENDITURES FOR FLOOD 
CONTROL, MISSISSIPPI RIVER AND 
TRIBUTARIES, FROM MAY 15, 1928, 
THROUGH SEP. 30, 2000 
Unexpended 
Accrued Balance 
District or Installation and Class of Work Allotments Expenditures Sep. 30, 2000 
New Orleans District: 
Baton Rouge Harbor, LA 
Atchafalaya River and Basin, LA 
Bonnet CarrelE Spillway, LA 
Contraction works 
Mapping 
Roads on levees 
S. G. & O. prior to Aug. 18, 1941 
Wax Lake Outlet and Charenton Canal 
Morganza Floodway and structure 
Lake Pontchartrain 
Teche Vermilion Basin Water Supply 
Old River 
Atchafalaya Basin, rights-of-way and flowage, 
Bayou des Glaises setback 
Subtotal 
All other completed items: 
Surveys under Sec. 10, Flood Control Act of 1928 
Impounded savings 
Plant transferred to revolving fund 
OCE (portion of allotment transferred to 
revolving fund, Washington Dist.) 
Subtotal 
TOTAL COMPLETED WORKS 
UNCOMPLETED WORKS: 
Rock Island District: 
Levees under Sec. 6, Flood Control Act of 1928 
St. Louis District: 
Levees under Sec. 6, Flood Control Act of 1928 
Subtotal 
Memphis District: 
Mississippi River levees 
Mississippi River levees 
New Madrid 
Channel improvement: 
Revetments 
Dredging 
Dikes 
699,185 
3,375,492 
14,212,198 
1,258,916 
1,112,967 
540,838 
2,701,566 
10,098,817 
35,992,117 
5,513,110 
34,506,000 
292,274,000 
387,917 
14,212,198 
1,258,916 
540,838 
2.701,566 
10,098,817 
35,992,117 
5,513,110 
34,506,000 
292,274,000 
387,917 
402,673,123 402,673,123 -- 
4,995,215 4,995,215 -- 
1,593,097 1,593,097 -- 
24,924,578 24,924,578 -- 
19,882 19,882 -- 
31,532,772 31,532,772 -- 
532,012,500 532,012,500 -- 
579,462 579,462 -- 
1,897,980 1,897,980 -- 
2,477,442 2,477,442 -- 
233,496,354 
98,000 
452,392,006 
58,566,439 
240,679,963 
233,359,750 
98,000 
452,344,082 
58,566,439 
240,633,249 
136,604 
47,924 
46,714 
41-91

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 41-V 
(Continued) 
STATEMENT OF ALLOTMENTS AND 
ACCRUED EXPENDITURES FOR FLOOD 
CONTROL, MISSISSIPPI RIVER AND 
TRIBUTARIES, FROM MAY 15, 1928, 
THROUGH SEP. 30, 2000 
Unexpended 
Accrued Balance 
District or Installation and Class of Work Allotments Expenditures Sep.30,2000 
Memphis District: (Continued) 
Reelfoot Lake 
Reelfoot Lake, Lake No. 9, TN-KY 
St. Francis Basin: 
Wappapello Lake 
St. Francis River and tributaries 
Big Slough and Mayo ditch 
Little River drainage 
Lower White River: 
Clarendon Levee 
Augusta to Clarendon, AR 
White River backwater levee, AR 
Horn Lake Creek & Tribs 
Hickman Bluff, KY 
Memphis Harbor Ensley Berm 
Nonconnah Creek Recreation Facility 
Nonconnah Creek Environmental Enhancement 
Nonconnah Creek, TN & MS 
West Memphis and Vicinity 
Whiteman's Creek, Ar 
Levees under Sec. 6, Flood Control Act of 1928 
West Tennessee Tributaries 
Helena Harbor 
Helena & Vicinity, AR 
Cache Basin, AR 
West Kentucky Tributaries 
Mud Lake Pumping Station, TN 
L'Anguille River 
Eight Mile Creek 
St. Johns Bayou & New Madrid Floodway 
Eastern Arkansas Reg (Comp) 
Francis Bland Floodway Ditch 
Subtotal 
Vicksburg District: 
Mississippi River Levees (excludes Grants Canal, 
$7,070, shown under completed works) 
Section 6 Levees 
Lower Arkansas River: 
North Bank 
South Bank 
Tensas Basin: 
Lake Chicot Pumping Plant 
Tensas River 
Red River Backwater: 
Below Red River 
128,228 
695 
439,434 
7,896,000 
9,019,908 
306,090,954 
965,429 
52,485,397 
652,115 
1,788,846 
10,624,501 
2,176,379 
17,080,969 
3,510,000 
10,900 
11,502 
11,093,004 
571,000 
1,878,935 
108,651 
53,949,566 
15,091,679 
2,557,072 
10,849,291 
1,440,000 
100,000 
226,393 
3,895,161 
4,749,451 
7,895,346 
85,336 
439,434 
7,896,000 
9,019,908 
306,219,182 
965,429 
52,486,092 
652,115 
1,788,846 
10,624,501 
2,185,300 
17,509,600 
3,510,000 
10,910 
11,510 
11,097,580 
571,000 
1,894,500 
108,651 
53,962,300 
15,131,000 
2,563,600 
10,850,000 
1,440,000 
100,000 
227,000 
3,896,000 
4,756,300 
7,923,800 
85,200 
1,513,158,520 
295,154,509 
9,000 
7,049,414 
15,676,286 
95,639,986 
41,505,235 
639,400 
8,921 
428,631
10 
8 
4,576 
15,565 
12,734 
39,321 
6,528 
709 
0 
607 
839 
6,849 
28,454 
.136 
913,781 1,512,244,739 
479,624 
294,674,885 
9,000 
7,049,414 
15,676,286 
95,639,945 
41,505,235 
639,400 
41-92

MISSISSIPPI RIVER COMMISSION 
TABLE 41-V 
(Continued) 
STATEMENT OF ALLOTMENTS AND 
ACCRUED EXPENDITURES FOR FLOOD 
CONTROL, MISSISSIPPI RIVER AND 
TRIBUTARIES, FROM MAY 15, 1928, 
THROUGH SEP. 30, 2000 
Unexpended 
Accrued Balance 
District or Installation and Class of Work Allotments Expenditures Sep. 30, 2000 
Red River Backwater Levee, LA 
Tensas Cocodrie Pumping Plant 
Lower Red River South Bank Red River Levees 
Channel improvement: 
Revetments 
Dredging 
Dikes 
Levees under Sec. 6, Flood Control Act of 1928 
Ouachita River Levees 
Yazoo Basin: 
Sardis Lake 
Enid Lake 
Arkabutla Lake 
Grenada Lake 
Greenwood 
Belzoni 
Yazoo City 
Will M. Whittington auxiliary channel 
Big Sunflower, etc. 
Main Stem 
Upper Yazoo Projects 
Yazoo Basin--Tributaries 
Tributaries (Except Ascal-Tippo-Opossum Bayous) 
Tributaries-Bank Stabilization 
Ascalmore-Tippo-Opossum Bayous 
Yazoo Basin Backwater 
Yazoo Backwater 
Rocky Bayou 
Yazoo Backwater Pumping Plant 
Muddy Bayou 
Yazoo Backwater, F&WL Mitigation 
Yazoo Basin Reformulation 
Streambank Erosion Control, Eval. and Demo. 
Demonstration Erosion Control 
Dam Safety Assurances-Sardis Dam 
Subtotal 
New Orleans District: 
Bayou Cocodrie and Tributaries 
Miss. & LA Estuarine 
Channel Improvement: 
Dredging 
Revetments 
Louisiana Penitentiary Levee 
Lower Red River (South Bank Levees) 
126,828.873 
56,071,167 
756,300 
526,548,665 
23,919,516 
177,123,832 
958,175 
400,000 
26,502,400 
21,292,400 
16,000,700 
45,401,494 
11,543,000 
316,656 
2,205,611 
10,950,966 
93,816,352 
34,605,200 
152,272,661 
106,782,345 
612,484 
23,977,200 
56,940,983 
3,401,500 
9,522,860 
5,145,200 
6,382,169 
27,241,096 
14,767,000 
258,510,544 
23,230,763 
667,252 
33 
80,009 
95,342 
.- 
-- 
-- 
93,048 
100 
481,575 
12,021 
-- 
11,517 
-- 
32,990 
9,331 
806,674 
704,556 
4,237 
127,496.125 
56,071,200 
756,300 
526,628,674 
23,919,516 
177,219,174 
958,175 
400,000 
26,502,400 
21,292,400 
16,000,700 
45,401,494 
11,543,000 
316,656 
2,205,611 
10,950,966 
93,909,400 
34,605,300 
152,754,236 
106,794,366 
612,484 
23,977,200 
56,952,500 
3,401,500 
9,555,850 
5,145,200 
6,391,500 
28,047,770 
14,767,000 
259,215,100 
23,235,000 
2,322,700,628 
5,008,008 
4,577,600 
35,945,266 
1,050,382,417 
10,508,000 
18,056,600 
2,319,822,828 
5,008,008 
4,503,088 
35,945,266 
1,050,360,618 
8,707,427 
18,056,600 
2,878,346 
74,512 
21,799 
71,200 
41-93

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 41-V 
(Continued) 
STATEMENT OF ALLOTMENTS AND 
ACCRUED EXPENDITURES FOR FLOOD 
CONTROL, MISSISSIPPI RIVER AND 
TRIBUTARIES, FROM MAY 15, 1928, 
THROUGH SEP. 30, 2000 
Unexpended 
Accrued Balance 
District or Installation and Class of Work Allotments Expenditures Sep. 30,2000 
New Orleans District (Continued): 
Levees Under Sec. 6, Flood Control Act of 1928 
Mississippi River Levees 
Mississippi Delta Region 
Atchafalaya Basin Floodway: 
Atchafalaya Basin 
Atchafalaya River Navigation 
Atchafalaya Basin Floodway System 
Subtotal 
TOTAL UNCOMPLETED WORKS 
ADVANCE ENGINEERING AND DESIGN 
(CONSTRUCTION) 
Memphis District: 
L'Anguille River Basin, AR 
Reelfoot Lake, Lake No. 9 
Cache River 
Big Creek and Tributaries, Lower White River 
Clarendon Levee, Lower White River 
West Kentucky Tributaries 
Mud Lake Pumping Station, TN 
Harris Fork Creek, KY & TN 
Subtotal 
Vicksburg District: 
Yazoo Basin, Big Sunflower River, Steele Bayou 
Tensas - National Wildlife Refuge, LA 
Subtotal 
New Orleans District: 
Mississippi Delta Region (EP 309) 
Teche Vermilion Basin-Water Supply 
East Rapides & S. Central Avoyelles Parishes 
Subtotal 
200,680 
366,868,000 
83,518,920 
868,531,317 
303,463 
79,813,220 
2,523,731,491 
6,362,068,081 
150,000 
30,000 
420,000 
365,000 
65,000 
175,000 
350,000 
540,000 
2,095,000 
29,700 
200,000 
229.700 
69,753 
1,109,000 
965,247 
2,144,000 
200,680 
366,821,755 
82,764,456 
868,108,511 
303,463 
79,787,148 
64,245 
754,464 
422,807 
26,071 
2,522,296,392 1,435,099 
6,356,840,856 5,227,226 
150,000 
30,000 
420,000 
365,000 
65,000 
175,000 
350,000 
540,000 
2,095,000 
29,700 
200,000 
229,700 
69,753 
1,109,000 
965,247 
2,144,000 
TOTAL ADVANCE ENGINEERING 
AND DESIGN 
TOTAL COMPLETED WORKS, UNCOMPLETED 
WORKS AND ADVANCE ENGINEERING 
AND DESIGN 
4,468,700 
6,898,549,282 
4,468,700 
6,893,322,056 
5,227,227 
41-94 
- --- 
-- 
---- 
-

MISSISSIPPI RIVER COMMISSION 
TABLE 41-V 
(Continued) 
STATEMENT OF ALLOTMENTS AND 
ACCRUED EXPENDITURES FOR FLOOD 
CONTROL, MISSISSIPPI RIVER AND 
TRIBUTARIES, FROM MAY 15, 1928, 
THROUGH SEP. 30, 2000 
Unexpended 
Accrued Balance 
District or Installation and Class of Work Allotments Expenditures Sep. 30, 2000 
RECREATION FACILITIES--COMPLETED 
PROJECTS 
Eight-Year Project Funds 
St. Louis District: 
Wappapello Lake, MO 
Wappapello Lake, MO, Rockwood Landing 
Subtotal 
Vicksburg District: 
Sardis Lake 
Enid Lake 
Arkabutla Lake 
Grenada Lake 
Subtotal 
Total Eight-Year Program Funds 
Total chargeable against Flood Control 
Act Limitations excluding flood 
control emergencies 
Total maintenance since Jul. 18, 1941 
Total rehabilitation 
Total flood control emergencies 
Total general investigations 
Total flood control, MR&T appropriations 
Appropriations in addition to flood control, MR&T 
Other appropriations itemized in footnote (1), 
PP. 2068-69, Annual Report for 1953 
Grand total appropriated to Sep. 30, 1999 
2,405,300 
203,286 
2,405,300 
203,286 
2,608,586 2,608,586 -- 
1.584,339 1,584,339 -- 
2,268,209 2,268,209 -- 
2,189,280 2,189,280 -- 
1,631,281 1,631,281 -- 
7,673,109 7,673,109 -- 
10,281,695 10,281,695 -- 
6,908,830,977 6,903,603,751 5,227,227 
3,248,427,563 3,371,666,082 745,237 
31,113,000 31,113,000 -- 
14,900,300 14,900,300 -- 
124,763,114 123,820,750 942,364 
10,452,469,935 10,445,103,882 7,366,053 
32,068,909 32,068,909 -- 
10,484,538,844 10,477,172,791 7,366,053 
41-95 
Note: Preauthorization study costs chargeable to the MR&T authorization have been transferred to completed 
work. Costs not chargeable have been excluded from this report.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 41-W COST AND FINANCIAL STATEMENT 
Total 
Project Funding FY 97 FY 98 FY 99 FY 00 Sep. 30,2000 
Mississippi River 
and tributaries 
(Regular Funds)' 
General investigations: 
Allotted 
Cost 
4,380,000 5,382,000 4,555,533 4,298,200 124,763,114 
4,213,085 5,272,270 5,075,113 4,343,534 123,820,751 
Construction (includes 
advance engineering 
and design): 
Allotted 
Cost 
Maintenance 
Rehabilitations 
Flood control 
emergencies 
(Maintenance): 
Allotted 
Cost 
Allotted 
Cost 
Allotted 
Cost 
(Contributed Funds) New Work: 
Contributed 
Cost 
2,504,278 5,189,334 
3,714,434 6,142,217 
185,028,000 160,418,300 175,048,000 180,682,819 6,728,648,081 
166,435,626 170,984,427 186,439,799 181,928,513 6,723,420,856 
140,966,000 130,411,700 144,033,008 124,434,981 3,372,862,544 
136,931,961 132,269,594 146,145,781 123,983,756 3,371,666,081 
- - -- -- 31,113,000 
-- -- -- -- 31,113,000 
-- 14,885,992 
-- 14,885,992 
34,339,413 
33,270,005 
45,000 3,562,906 
83,283 3,525,506 
1. Appropriations were as follows: 
Appropriations chargeable against Flood Control Act authorizations: 
Flood Control, MR&T except for emergencies (excludes Maintenance 
allotments Aug. 18, 1941, through Sep. 30, 2000): 
Net total allotted for works under Mississippi River Commission: 
Eight-Year Program Funds, Construction General: 
Surveys under Sec. 10, Flood Control Act of 1928 (not under MRC): 
Transferred to revolving fund: 
Impounded savings: 
Flood control emergencies: 
Net total allotted: 
Impounded savings: 
Additional funds not chargeable against Flood Control Act authorizations: 
Appropriations for Flood Control, MR&T, except for flood control emergencies: 
General investigations: 
Maintenance allotments Aug. 18, 1941, through Sep. 30, 2000 
Appropriations in addition to appropriations for Flood Control, MR&T 
(itemized in footnote (1), pp. 2068-69, Annual Report for 1953): 
Budgetary and OCE Reserves: 
Grand total: 
$6,898,129,509 
10,281,695 
4,995,215 
24,944,460 
1,593,097 
14,885,922 
14,378 
124,763,114 
3,372,862,544 
32068,909 
41-96 
Maintenance 
Contributed 
Cost 
250,827 
39,617 
186,720 
382,013 
135,000 
141,739 
$6,939,943,976 
14,900,300 
3,497,625,658 
.884 
- 7 I

MISSISSIPPI RIVER COMMISSION 
TABLE 41-W COST AND FINANCIAL STATEMENT 
(Continued) 
Total 
Project Funding FY 00 Sep. 30, 2000 
Reconciliation of appropriations and allotments: 
Total allotted to Sep. 30, 2000 
Transferred to revolving fund: 
Surveys under Sec. 10, Flood Control Act of 1928 (not under MRC): 
Impounded savings withdrawn by Chief of Engineers: 
10,452,991,693 
24,944,460 
4,995,215 
1,607,475 
Total Appropriations to Sep. 30, 2000: 10.484,538.843 
Appropriations for past four reporting periods were as follows: 
FY 97: $330,374,000 FY 99: $323,636,541 
FY 98: $296,212,000 FY 00: $309,416,000 
2. Totals for General Investigations include four projects transferred from Construction totals per DAEN-CWB-W, Aug. 4, 
1978, teletype. 
41-97

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE 41-X MISSISSIPPI RIVER AND TRIBUTARIES 
ACTIVE GENERAL INVESTIGATIONS 
(96X3112) 
FISCAL YEAR COST 
Item and CWIS Number Federal Non-Federal Total 
SURVEYS (Category 110) 
Flood Damage Prevention (112) 
New Orleans District 
Morganza, LA to the Gulf of Mexico-012875 
Subtotal 
Vicksburg District 
Mississippi Delta, MS-12803 
Southeast Arkansas Feasibility - 12756 
Subtotal 
Memphis District 
Reelfoot Lake, IN - 12394 
Subtotal 
Total (Category 112) 
Flood Damage Prevention-Recon Study (113) 
900 324 
900,324
0 
299 401 
299,401 
12,505 
12,505 
1,212,231 
875,890 
875,890 
29,615 
29,615 
905,505 
1,776,214 
1,776,214
0 
299401 
299,401 
42120 
42,120 
2,117,736 
St. Louis District 
MS River, Alex City, IL - 010462 77668 
New Orleans District 
Alexandria, LA to the Gulf of Mexico - 81308 
Donaldsonville, LA to the Gulf of Mexico - 013510 
Subtotal 
Memphis District 
Wolf River, Memphis, TN - 13157 
Subtotal 
TOTAL (Category 113) 
Special Reconnaissance Study (115) 
Vicksburg District 
Spring Bayou, LA - 081338 
TOTAL (Category 115) 
525 
295,036 29 
295,561 295,561 
40017 179,485 219 
40,017 179,485 219,502 
413,246 179,485 592,731 
114,506 114,506 
114,506114506 
TOTAL (Category 110) 1 10 QOQ Il2A 0 00 ,R 4 9 
1 J.77Ua I .JIVrT.-' 
41-98 
--- 
77668

MISSISSIPPI RIVER COMMISSION 
TABLE 41-X MISSISSIPPI RIVER AND TRIBUTARIES 
(Continued) ACTIVE GENERAL INVESTIGATIONS 
(96X3112) 
FISCAL YEAR COST 
Item and CWIS Number Federal Non-Federal Total 
COLLECTION AND STUDY OF BASIC DATA (Category 120) 
New Orleans District - Surveys, Gages & Observations - 81900 
Vicksburg District - Surveys, Gages & Observations - 81900 
Memphis District - Surveys, Gages & Observations - 81900 
TOTAL (Category 120) 
CONTINUATION OF PLANNING & ENGINEERING (Category 140) 
Flood Control Projects (140) 
Memphis District 
Reelfoot Lake, TN & KY, - 012394 
TOTAL (Category 140) 
PRE-CONSTRUCTION ENGINEERING & DESIGN (Category 160) 
Flood Control Projects (162) 
Memphis District 
Bayou Metro Basin, AR - 81307 
Eastern Arkansas Region (Comp) - 081266 
St. Johns Bayou & New Madrid Fdwy - 077005 
Subtotal 
New Orleans District 
Morganza, LA to Gulf of Mexico - 012875 
Subtotal 
TOTAL (Category 160) 
GRAND TOTAL MR&T GENERAL INVESTIGATIONS 
27,552 
233,882 
100,787 
362,221 
27,552 
233,882 
100,787 
362,221 
29,061 29,061 
1,891,936 
201 
112 
1,892,249 
320,019 
320,019 
1,891,936 
201 
112 
1,892,249 
320,019 
320,019 
2,212,268 2,212,268 
4,343.533 1:084990 5428.523 
41-99

U.S. ARMY ENGINEER RESEARCH AND 
DEVELOPMENT CENTER 
BACKGROUND 
The research and development laboratories of the 
U.S. Army Corps of Engineers have served the Carps, 
the Army, and the Nation with technical accomplishments 
in a variety of engineering and scientific fields 
for 70 years. From beginnings in 1929 as a small 
hydraulics laboratory established to assist in developing 
a comprehensive plan for flood control of the 
Mississippi River to the 1999 establishment of the 
Engineer Research and Development Center (ERDC) 
consolidating the research and development efforts of 
the laboratories under the leadership of a single center, 
Corps' laboratories have been solving civil engineering 
and environmental quality challenges. ERDC offers a 
centrally managed center of eight laboratories that is the 
largest and most diverse civil and environmental 
research and development organization in the world. 
During FY00, ERDC had 2,031 employees of 
whom 1,064 were highly trained engineers and 
scientists. The professional staff encompassed 
298 Ph.D.'s and 467 Masters' degrees. 
ERDC executed a Civil Works program totaling 
$136.1 million; of this total, $44.2 million was executed 
in direct allotted R&D Programs. The remaining $91.9 
million was executed in support of USACE District and 
Division offices and non-Corps customers. 
LABORATORIES 
The diverse civil engineering and environmental 
quality research and development center consists eight of centrally managed laboratories located at 
Alexandria, VA; Champaign-Urbana, IL; Hanover, NH; 
and Vicksburg, MS. With world-renowned expertise 
and facilities, each laboratory adds a unique perspective 
and set of capabilities to the overall ERDC team. 
Coastal and Hydraulics Laboratory 
The Coastal and Hydraulics Laboratory is the Nation's center for engineering and scientific research 
and development in the coastal, hydraulic, and hydro- logic engineering and sciences. Nationally and interdaionally 
recognized experts in the fields of rip-rap 
dsgn, navigation engineering, pump station design, 
fisheries engineering, sediment transport, estuarine 
engineering, dredging equipment, hydrodynamics, 
groundwater modeling, coastal storm protection, harbor 
design and modification, coastal and hydraulic structures, 
physical processes associated with water 
resources environmental problems, military logisticsover-
the-shore, wave climatology, hydroinformatics, 
and watershed modeling perform research and sitespecific 
investigations. 
Cold Regions Research and Engineering Laboratory 
The Cold Regions Research and Engineering 
Laboratory (CRREL) maintains the finest research and 
engineering staff and facilities in the world for the 
study of cold regions science and technology. 
CRREL's experience spans nearly 60 years, starting 
with the Boston District's Soils Laboratory work on 
frozen soils in the early 1940s. The creation of CRREL 
began in 1961 with the merger of the Arctic 
Construction and Frost Effects Laboratory and the 
Snow, Ice, and Permafrost Research Establishment. 
This merger put DoD's principal cold regions expertise 
in one place. 
The 1971 beginning of a long-term program by the 
Corps of Engineers to investigate ways of extending 
navigation on the Great Lakes-St. Lawrence Seaway 
throughout the winter also marked the beginning of 
Civil Works research at CRREL. As part of the Great 
Lakes-St. Lawrence Seaway Winter Navigation 
Demonstration Program, CRREL researchers investigated 
ice booms to impede the flow of ice into 
navigation channels. CRREL later developed various 
methods of keeping waterway locks ice-free, including 
the use of chemical coatings, saws for cutting ice from 
lock walls, and bubblers for preventing ice formation. 
Construction Engineering Research Laboratory 
The Construction Engineering Research Laboratory 
was chartered over 30 years ago to provide 
construction research that would address the entire 
spectrum of issues within military construction. This 
research is in support of sustainable military installations 
and encompasses construction, operations, and 
maintenance as well as environmental and safety concerns. 
These technologies have universal application 
42-1

ENGINEER RESEARCH AND DEVELOPMENT CENTER 
and are of extreme value in the Civil Works arena as 
well. Civil Works efforts historically have been in the 
areas of corrosion control, high performance protective 
coatings (including overcoating of lead-based paint), 
management tools for Operation and Maintenance 
optimization, and environmental sustainment. 
Environmental Laboratory 
The Environmental Laboratory is the acknowledged 
leader for conducting environmental quality 
research and problem solution involving the consequences 
of water resources development, navigation, 
regulation of wetlands and inland and oceanic water 
quality, management of natural and cultural resources, 
and cleanup of contaminated groundwater sediments 
and soils. For over 25 years, an interdisciplinary staff 
of peer-recognized professionals, augmented with the 
finest network of academic and private scientists and 
engineers in the country, have provided the 
environmental quality technology necessary to further 
the Corps' missions. 
Notable examples of recent accomplishments 
include wetlands research in support of Section 404 of 
the Clean Water Act; natural resource management to 
guide Corps stewardship at projects; research to 
accelerate growth of desirable, non-problem vegetation; 
distribution of the first-ever expert system/information 
manual on using biological control agents to manage 
nuisance aquatic plants; and providing guidance to the 
field on controlling zebra mussel infestations using 
anti-foulant coatings (paints, thermal metal sprays, 
etc.), and continuous backwash filter systems for 
intakes that supply irrigation systems, water supply, and 
other low-flow requirements. 
Geotechnical Laboratory 
The 1928 flood control research and development 
work of the Hydraulics Laboratory led almost 
immediately to the need for soils research and prediction 
of the behavior of structures built on and/or with 
soil materials. Therefore, the Geotechnical Laboratory 
was established in 1931. 
The thrust of geotechnical engineering involves 
investigation, design, construction, operation, and 
maintenance of structures with, on, or in earth 
materials. Research addresses problems in areas such 
as soil and rock mechanics, foundation behavior, 
tunneling and trenchless technology, engineering 
geology, engineering seismology, engineering 
geophysics, earthquake engineering, pavement 
technology, mobility analysis and modeling, and 
trafficability studies. 
Information Technology Laboratory 
The Information Technology Laboratory (ITL) was 
established in 1986 to provide research, development, 
testing, evaluation, and services for the Corps in 
information technology, computer-aided engineering, 
and computer science areas. ITL provides ERDC, the 
Corps, Army, and DoD with a variety of advanced 
information technology capabilities and expertise. 
ITL manages the first High Performance 
Computing Major Shared Resource Center to be formed 
under the auspices of the DoD High Performance 
Computing Modernization Program; the Tri-Service 
CADD/GIS Technology Center; one of two CEEIS 
Processing Centers providing 60 percent of the Corps' 
MIS data processing, along with the Project 
Management over site of both Centers; one of the 
largest high-bandwidth, high-speed data communication 
networks in the world; the largest library in the 
Corps which is also one of the finest civil engineering 
libraries in the Federal Government; and the largest 
publishing and visual information facility in the Corps. 
ITL has recognized expertise in the areas of highperformance 
computing; application of CADD and GIS 
technologies to Army Civil Works projects and for 
installation facility management; computer-aided interdisciplinary 
engineering and analysis; computer science 
applications; software engineering; large relational 
database systems; high-speed communications; and 
scientific visualization. This expertise is applied to 
address problems in design, analysis, and management 
of projects and facilities to support the various missions 
of the Corps. 
Sensors and electronics are a major agent for 
change in the Corps' Civil Works program. ITL's 
Instrumentation Systems Development Division and 
CRREL's Engineering Resources Division provide 
support to research and development and application 
efforts requiring sensors, sensor-integrating software, 
electronics, and feedback-control systems. 
Structures Laboratory 
The Corps' Concrete Laboratory was transferred 
from Mt. Vernon, NY, to the Corps' Waterays 
Experiment Station (WES) in 1946. In 1983, WES 
combined the Concrete Laboratory and the Weapons 
Effects Laboratory into the current Structures 
Laboratory. 
Sole Federal responsibility for sampline 
inspecting, and acceptance testing of Portland cetien 
and pozzolan rest with the Structures Laboratory. It is 
42-2

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY00 
world leader in research on concrete materials and 
construction techniques, and the evaluation, maintenance, 
and rehabilitation of civil works concrete 
structures. Other areas of expertise include phenomenology 
and effects of explosions, dynamic properties 
of soil and rock masses, and response of structures to a 
wide assortment of loading conditions, including 
seismic, penetration, and blast effects. 
Topographic Engineering Center 
The Topographic Engineering Center (TEC) 
provides new topographic capabilities in geospatial 
science to the Civil Work's community to ensure 
superior implementation of the nation's civil and 
environmental initiatives through research, development, 
and application of remote sensing, geographic 
information, global positioning, topographic, and 
information technologies. TEC scientists and engineers 
have developed faster, more accurate, and cost-effective 
ways to use remote sensing technologies to describe, 
characterize, and analyze the surface of the earth. 
Remote sensing technologies form an essential part of a 
new national approach to infrastructure engineering and 
environmental management. 
Remote sensing tools can accurately characterize 
different surface conditions, including certain types and 
conditions of vegetation, soils, and surface water, and 
with further development, will provide support in an 
effort to monitor change in the biosphere. These tools 
Provide indicators for the location of point and nonpoint 
pollution sources as well as advise of impending 
negative or positive trends. The extensive development 
of remote sensing technologies for use in construction, 
environmental rehabilitation, and resource management 
offer operational tools needed to increase capabilities to 
accomplish tasks otherwise not feasible, while at the 
soae time performing existing tasks rapidly, accurately, 
and at the lowest possible cost. 
ARMY CIVIL WORKS R&D 
PROGRAMS 
efforAts rcmoyv erC viviritlu alWlyo trhkes enrteisree arscphe ctraunmd odf etveeclhonpomloegnyt 
andproblem areas in the Army's Civil Works arena. 
aterials and Structural Engineering Research 
Area
The focus of the Materials and Structural 
lcgineering research area is to provide new or 
eanced technologies to extend the life and reduce 
ccle costs of Corps' Civil Works facilities in an 
environmentally friendly and sustainable manner. 
These technologies are produced by aggressively 
developing high-performance materials and systems, 
with major emphasis in reducing rehabilitation and 
maintenance costs; refining material characterization; 
and improving analytical procedures to assess the 
adequacy of aging facilities and design/analyze 
rehabilitation measures. The research will furnish the 
Corps with improved analysis technologies to ensure a 
continued high level of safety and reliability, 
technologies to more economically design and construct 
required remedial and rehabilitation improvements, and 
technologies to conduct this work with minimum 
ecological impact, positive environmental support, and 
using sustainable methods and materials. The results of 
R&D efforts are posted on the web to assist rapid 
dissemination and updating as progress is made. 
High-Performance Materials and Systems 
Research Program. This program is developing new 
and improved materials and technologies that will 
enable the Corps to significantly reduce project delivery 
times and operations, maintenance, and rehabilitation 
costs. Procedures for materials selection and mixture 
proportioning for a family of low-cost, highperformance 
concrete have been developed. Field 
placement and mix design for grout enriched rollercompacted 
concrete construction has been advanced to 
improve the water-tightness and visual attractiveness of 
exposed surfaces for this low-cost, rapid construction 
method. A current practice report on controlled 
permeability formwork for concrete structures was 
completed. A range of concrete repair scenarios was 
established for Corps structures and analytical studies 
were initiated to evaluate the relative importance of 
those interrelated material properties that affect the 
dimensional compatibility of concrete repairs. The 
performance of commercial coatings applied to damp 
metal surfaces was evaluated, and guidance was 
developed on containment structures for use at Corps 
hydraulic structures during painting. Methods to assess 
the condition of aged, lead-based paints were 
developed, and the variables affecting the over-coating 
of these aged, lead-based paint systems were 
determined. A survey of commercially available, 
environmentally acceptable lubricants was completed 
and their potential for Corps of Engineers use was 
determined. Candidate sheet pile designs were 
developed which take advantage of the unique 
properties of fiber-reinforced polymer composites. 
Geotechnical Engineering Research Program. 
This program is driven by needs for less costly, more 
timely flood protection, navigation, and storm damage 
reduction. Erosion of spillway channels was identified 
42-3

ENGINEER RESEARCH AND DEVELOPMENT CENTER 
as a major concern; this has led to high priority research 
to accurately predict erosion and develop methods for 
reducing this costly storm damage phenomenon. The 
need to reduce real estate acquisition costs and provide 
timely flood control structures has created the need for 
guidance for design of innovative structures built with 
man-made materials or embankments with reinforcements 
so that steeper embankments can be built on 
marginal foundation materials in less time. Development 
of applications guidance for trenchless technology 
is being driven by the need to reduce interruption of 
service and impact in environmentally sensitive or 
highly urbanized areas, reduce operations and maintenance 
costs, and provide services to partners. This 
family of technologies can provide non-disruptive 
solutions for seepage control, drainage, and raw water 
intake pipelines for municipalities that partner on Corps 
reservoir projects. The Geotechnical Engineering 
Research Program has vigorously pursued an initiative 
to develop risk and reliability based methods for 
analysis of levee and earth dam safety. This effort is 
aiding decision-makers in rationalizing expenditures of 
scarce resources to upgrade or rehabilitate older structures. 
The Analytical Model Development efforts are 
providing designers with greater confidence in developing 
measures to ensure the safe performance of 
structures subjected to large deformations and severe 
loading conditions. 
Program accomplishments include a new empirical 
procedure for quantifying spillway erosion potential; 
preliminary guidance for allowing microtunneling 
beneath and through structures such as levees; advancement 
of soil material modeling techniques to three 
dimensions; development of "block cutting" software 
essential for numerical modeling of rock masses with 
appropriate, representative joint spacing, orientation, 
persistence, and fracture properties. A probabilistic 
procedure for liquefaction evaluation was developed 
and preliminary risk charts were developed for all 
40 embankment dams prioritized as to their dam 
safety deficiencies. A procedure was developed and 
implemented to prioritize the 40 embankment dams on 
the dam safety deficiency list for seismic safety studies. 
This prioritized list is being used to make funding 
decisions for dam studies. The innovative flood 
fighting work has evolved into the basis for a new 
direct allotted program including not only geotechnical 
levee issues but also emergency management issues. A 
study investigating clay shale foundations is addressing 
an immediate deformation problem at Oahe Dam, and 
has already provided better quantitative information for 
assessment of deformations in such foundations. These 
clay shale foundations led to the failure of Ft. Peck 
Dam during construction as well as the downstream 
slide in Waco Dam during first filling. 
Concrete and Structural Engineering Research 
Program. This program emphasizes the development 
of efficient concrete and structural engineering 
technology to significantly reduce construction and 
rehabilitation costs and to improve the durability, 
service life, and safety of the Corps hydraulic structures. 
This is the only Civil Works program that 
directly addresses R&D needs for steel structures. This 
program provides the advances to update the Computer 
Aided Structural Evaluation system used nationally and 
internationally for policy compliant design in district 
offices and by private industry for contract Corps work. 
New guidance has been developed in the field 
procedures for repairing steel structures by welding. 
New technologies are being developed in the areas of 
computer-aided analysis of welds and equipment and 
procedures for the testing and evaluation of concrete. 
Research on welds has provided designers with new 
guidance on both fabrication and repair welding of 
hydraulic steel structures. This new guidance will 
extend the life and eliminate maintenance welds that 
have resulted in fatigue and fracture of the Corps' 
existing steel hydraulic structures. Cost-effective 
advancements in concrete technology are developed to 
improve the overall performance and increase their 
durability, thus reducing life-cycle costs of the Corps 
concrete structures. Actual field exposure studies have 
been in progress for over two decades and continue 
under this program to assess the durability of concrete 
when exposed to natural extreme weathering. New 
computer-aided analysis tools were developed for the 
design of pile foundations, nonlinear incremental 
structural analyses of concrete structures, design of 
steel members in tainter gates, and layout of concrete 
arch dams. 
Risk Analysis for Dam Safety Research 
Program. This program was a major new initiative in 
FY99 to aid in allocating investments to improve the 
safety of Corps' dams. All Federal and state agencies 
responsible for the design, construction, operation, or 
regulation of water resource projects have recognized 
the need for making sound investment decisions 
regarding dam safety. The USACE is responsible for 
managing risks for its 569 dams and protecting the 
public against the devastation caused by such 
catastrophes. While many of the USACE civil works 
projects have not been subjected to their maximum 
design conditions, 65 of the Corps' dams have been 
identified as being hydrologically or seismically defticient. 
The cost associated with correcting these defi 
ciencies may be as high as $6.5 billion. There is an 
increasing emphasis within the Executive Branch and 
Congress on having all Federal agencies present their 
annual programs and budgets using a riskbased 
approach. The development and implementationofrisk 
42-4

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY00 
analysis methods will enable the Corps to: prioritize 
dams requiring initial investigations and subsequent 
analyses; prioritize funding for critical repairs, 
rehabilitation, or modifications; select and justify the 
optimal plan to protect human life, reduce property 
damage, and mitigate environmental damage; minimize 
the disruptions of service; and maximize effectiveness 
of infrastructure investments. A multi-agency, multinational 
workshop was held to evaluate the current use 
of risk analysis for dam safety and provide an 
assessment of the USACE planned research program to 
ensure it will meet USACE's future needs. Several 
demonstration projects were conducted to document the 
development and fine-tuning of risk analysis procedures 
for a single dam site and for a regional portfolio of 
dams. This process also develops a cadre of Corps 
personnel experienced in execution of these engineering 
risk studies. 
Earthquake Engineering Research Program. In 
spite of major advances over the last 35 years, serious 
gaps in our knowledge base still exist in the areas of 
earthquake hazard predictions; site characterization for 
seismically sensitive parameters; constitutive behavior 
and material properties of rock, soils, and composite 
(reinforced) materials under seismic loads; and the 
stress and deformation responses of sites and facilities 
to seismic loading. Economical remediation and 
defensive design techniques are needed in addition to 
careful calibration of fast advancing numerical methods 
to actual field performance. In order to address these 
issues, this program is producing design tools and 
criteria that incorporate innovative measures for 
increasing the seismic safety of Corps and other public 
facilities. 
A potentially significant breakthrough in liquefaction 
analysis of soils was observed in this program. 
In centrifuge experiments it was observed that 
liquefaction, defined as dynamically induced pore water 
pressure increase equal to the vertical effective stress, 
cannot occur at confining stresses greater than 3 atm. 
This finding significantly reduces the extent and cost of 
remedial construction needed to assure seismic safety 
for embankment dams. A concentrated effort is in 
progress to engage the professional community in 
review and cooperative work on this breakthrough. 
Post-earthquake reconnaissance trips to Japan, Mexico, 
Turkey, India, and Taiwan provided outstanding new 
informnation about liquefaction of silty soils, and 
Performance and failure of embankment and concrete 
dams. Another earthquake hazard that is often ignored 
was observed, namely fires fueled by escaping 
flammable gases from natural deposits (such as 
Samps). Expulsion of gases from man-made deposits 
(such as landfills) was reported during the Northridge 
earthquake in CA, but no fires were observed at the 
time. In addition, guidelines were improved on the 
application of numerical and constitutive models for 
seismic analysis. Computer tools were developed to 
enable transfer of state-of-the-art procedures to District 
Offices. 
Navigation Systems Area 
The Corps of Engineers' navigation mission is to 
provide safe, reliable, efficient, effective, and environmentally 
responsible waterborne transportation systems 
(channels, harbors, and waterways) for movement of 
commerce, national security needs, and recreation. The 
U.S. Marine Transportation System (MTS) consists of 
over 300 ports, 1,000 harbor channels, and 25,000 miles 
of navigation channels, and is an integral part of both 
the U.S. economy and national security system. The 
MTS contributes more than $700 billion per year to the 
gross domestic product, produces $150 billion per year 
in federal taxes, and employs more than 13 million 
people. It supports rapid deployment of military forces 
and movement of equipment and supplies from strategic 
ports. Despite its importance, the MTS is under 
serious strain. The Congressionally-mandated interagency 
MTS task force and maritime industry report 
that commercial navigation will double by 2020; yet the 
MTS is already operating at near-full capacity in many 
areas and is being challenged by new vessel designs 
and traffic loads which exceed its channel, harbor, and 
lock capacities. Eighty-three Corps' locks are older 
than their 50-year design life, and 11 of them are over 
80 years old. 
In light of these pressing national needs, this 
research and development area provides tools and 
technology for the Corps of Engineers to improve the 
navigation system's functional performance, preserve 
and enhance environmental quality of our waterways, 
reduce unit costs, and improve safety. Specific objectives 
of this research thrust area are to develop 
engineering technologies that increase the effectiveness 
and reduce the per project costs of harbor and channel 
projects that provide deep-draft and shallow-draft 
navigation for domestic and international commerce. 
Engineering tools, computer models, and design 
guidance are developed for defining and managing 
water levels and currents that affect navigation and 
sedimentation, waves that impact coastal structures and 
drive sedimentation processes, sediment that settles in 
navigation channels and harbors, and vessel transits 
within navigation channels and structures. Engineering 
tools, computer models, and design guidance are 
developed to enable rapid and economical navigation 
facility design, construction, repair, and rehabilitation. 
The program balances efforts on critical present-day 
42-5

ENGINEER RESEARCH AND DEVELOPMENT CENTER 
problems facing the Corps of Engineers with those that 
prepare the Corps to meet U.S. navigation system needs 
of the future. 
During FY00, the programs in this research area 
produced many accomplishments, several of which are 
highlighted here. Bendway weir training structure 
design guidance was developed. These structures have 
resulted in millions of dollars of savings from reduction 
in dredging requirements, improved navigation efficiencies, 
improvement in navigation safety, reductions in 
traffic delays, and numerous environmental benefits. 
Bendway weirs' effects on navigation were evaluated 
for various design parameters, including spacing, 
height, length, and angle. 
Guidance for design of navigation channels used 
by mixed fleets of shallow- and deep-draft vessels was 
developed. With increasing vessel drafts and continued 
improvements in bulk carrier and intermodal transportation 
efficiencies, more accurate channel design 
guidance will enable greater capacity in existing 
navigation channels. 
Generalized design guidance on the layout of 
approach conditions to locks that will reduce delays and 
increase capacity was produced. Improvements to lock 
approaches have a high potential for reducing traffic 
delays on the inland waterway system and increasing 
the capacity of existing locks. 
Wave and littoral transport models were improved, 
with more realistic physics incorporated and a standard 
graphical user interface adapted for their use. Extensive 
field data sets were used to improve the models' 
formulations and prove their reliability. The coastal 
Sediment Budget Analysis System was fielded and a 
Diagnostic Modeling System for coastal channel 
sedimentation problems was put into trial use on several 
projects. These tools will collectively provide the 
Corps with more effective management of coastal 
navigation projects with less impact on adjacent 
shorelines. 
Innovations for Navigation Projects (INP) 
Research Program. The program was established to 
aid districts in their efforts to provide innovative 
approaches to construct navigation projects. The 
objectives of this multi-laboratory, multi-discipline 
program are to identify and develop technologies and 
methods to reduce construction time and cost and 
minimize disturbance to navigation and the environment 
during construction. The focus is on technologies 
for Lift-in, Float-in, and In-the-Wet construction. This 
will include designs for new filling and emptying 
systems for locks, the use of alternative construction 
methods, underwater construction with pre-cast 
concrete elements, underwater concrete placement techniques, 
construction of foundations under water, 
quality-assurance/quality-control techniques, design of 
innovative lock walls for a barge gate impact load, 
innovations for lock gate operating equipment, and 
contracting procedures for innovative designs and 
construction methods. Criteria will be provided for 
enhanced construction materials such as controlled, 
low-strength materials for backfill, underwater concrete 
for foundations and filling pre-cast modules, lightweight 
concrete for Float-in construction, and connections 
and seals for joining pre-cast elements and 
modules under water. 
During FY00 guidance and technologies were 
developed for design, construction, and repair, 
including final guidance for the design and use of 
precast, thin-wall panel components for navigation 
structures. Soil-structure interaction studies were performed 
on flexible retaining walls with multiple rows of 
anchors. Interim guidance was developed for the 
design and construction of connections and seals for 
large precast concrete modules. Interim guidance was 
developed for selection of methods and techniques to 
position and stabilize equipment/modules to allow 
positioning and placement of large float-in and lift-in 
precast sections within allowable tolerances. Concrete 
mixtures were evaluated using water quality rating 
procedures, and a report documented performance 
requirements, materials selection, proportioning, and 
water quality. Installation of float-in units for construction 
of dams was evaluated in field applications. 
Investigations were completed that are needed for 
updating design criteria for use on the construction of 
lock floor slabs and culverts underwater. Individual 
components of the in-chamber longitudinal culvert 
design for lock filling and emptying systems were 
evaluated to find ways to improve the efficiency of the 
system through modification of these components. 
Flood and Coastal Protection Area 
The Corps of Engineers' flood and coastal storm 
damage reduction mission is to provide safe and 
reliable projects for reducing the damages to property 
and the vulnerability of loss of life for both inland and 
coastal flooding. The Corps maintains over 8,500 miles 
of levees and operates 383 major lakes and reservoirs to 
reduce flood damages. In spite of the completed 
projects and in-place infrastructure there remains over 
$4 billion in flood damages annually. The overall 
objectives of the research in this area is to develop neW 
flood and coastal storm damage reduction technolaies 
to enhance the effectiveness of projects, innovative 
techniques to reduce flood and coastal storm 
42-6

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY00 
and allow the integration of analysis tools to accelerate 
the study and design process. Engineering tools, 
computer models, and design guidance are developed 
for riverine flood analysis, channel restoration 
evaluations, improvements in ice engineering, and 
evaluation and improvement of multi-dimensional 
hydrodynamic modeling. 
During FY00, the programs in this research area 
produced many accomplishments, several of which are 
highlighted here. The capabilities of hydrologic and 
hydraulic models (HEC-HMS, HEC-RAS, HEC-RES, 
and HEC-FIA) were expanded. Improvements to these 
software packages have improved the analysis 
techniques for flood damage projects and initiated the 
integration of GIS technology into the design and 
analysis process. 
Guidance was developed in draft form for 
restoration of channels using vegetation. This has a 
high potential for incorporation into urban flood 
damage reduction projects throughout the U.S. 
The Corps Water Management System (CWMS) 
was fielded in beta version to selected sites. The 
CWMS integrates the hydraulic and hydrologic 
software in a manner that allows flood forecasting and 
decision support for flood damage areas. 
Evaluation and analysis of grade control structures 
was initiated. Channel degradation is a common 
problem in urban and rural streams throughout the U.S. 
and guidance is needed by the design engineers to 
implement the most appropriate type structures for the inposed problem. 
Cold Regions Engineering Program. The Cold 
Regions Engineering Program focuses on alleviating 
problems from winter weather that impact Corps 
avigation and flood damage reduction projects. Ice 
formation and breakup in rivers and lakes impedes 
navigation, causes flooding, and adversely affects 
navigation, flood control, water supply operations, and 
ilictures. Winter conditions also impact the hydrologic 
cycle, fisheries, and aquatic habitats. The program 
addresses the impact of ice on inland navigation 
project operation and maintenance, severe ice jams and 
related floods, ice hydraulics and damage to shorelines 
and structures, and hydrology and water resources in 
Cold regions. In FY00 the Ice Jam Database, now 
containing more than 12,000 entries was enhanced for 
use by Corps districts in response to emergency situwions 
through a new on-line search and submittal 
aPability available via the Internet. Ice jam emergency 
Perations and mitigation were also addressed through 
Volvement in the design and implementation of 
National Weather Service Web-based ice jam 
monitoring systems at the Northeast River Forecast 
Center, and Glasgow and Missoula, MT. The Ice 
motion detection system was monitored and tested at 
remote installations, utilizing solar power and cell 
phones. A remote system to monitor pressure 
distributions at an ice jam toe was developed. An 
automated method to combine open-water and iceaffected 
stage-frequency curves for use in risk and 
uncertainty analyses was developed and applied. 
Guidance on engineering considerations for dam 
removal in ice-affected rivers was prepared. The 
discrete particle computer simulation program developed 
to model ice transport in rivers and in lock 
approaches has been enhanced for continued application 
in the design of river ice management and 
control methods. Guidance on flow control to manage 
river ice was prepared. A literature review of deicing 
techniques, including low-adhesion paints, coatings, 
and materials at locks and dams, was completed and 
compiled in a technical report. The river ice-forecasting 
model was applied to, and verified against, 
actual winter conditions. 
Environmental Quality Research Area 
The Corps operates and maintains 25,000 miles of 
inland and coastal waterways, 235 navigation locks, 
114 major ports, 442 lakes and reservoirs, 73 hydropower 
projects, 879 flood control projects and annually 
manages the dredging and disposal of 350,000 cubic 
yards of dredged material as part of its water resource 
mission. Wide-ranging environmental stewardship is 
an integral part of Corps water resource management. 
Moreover, recent U.S. figures have estimated 
$16 billion per year in damages caused by non-pointsource 
pollution and up to I billion tons per year of 
eroded soils that are deposited in the Nation's 
waterways severely impacting multiple project uses and 
impeding navigation. A critical part of this mission is 
to ensure that project planning, construction, operation, 
and maintenance, while economically viable, incorporates 
environmental stewardship and restoration. The 
Environmental Quality Research Area addresses the 
highest priority technical problems with state of 
science, cost-effective technologies for managing 
natural resources at Corps projects including identifying, 
assessing, and managing contaminated dredged 
material; wetlands restoration; managing the Nations' 
threatened and endangered resources; and assessing and 
managing project-related water quality and quantity 
problems. This program will provide demonstrated 
economical solutions to the Corps' highest priority 
environmental problems, will reduce unnecessary regulatory 
burdens, and provide a very high return on 
taxpayer investment. 
42-7

ENGINEER RESEARCH AND DEVELOPMENT CENTER 
Water Quality Research Program (WQRP). 
The WQRP conducts research on water quality 
problems for all Corps inland reservoir and waterway 
projects, providing cost-effective methods, applications, 
and guidance for problems related to managing project 
water quality. The direct application of technologies 
developed through research in the WQRP have resulted 
in improved water quality at Corps projects, reduced 
costs of required monitoring, and new and better 
predictive capabilities. In FY00, the WQRP developed 
guidance for improved understanding of environmental 
processes resulting in heterogeneous ecological and 
water quality responses, improved methods for water 
quality monitoring data collection, and techniques for 
collecting water quality information for incorporation in 
geographical assessments or as model input. An 
expanded Corps watershed modeling system developed 
by the WQRP was verified. This technology enables 
selective assessment of land use effects on water quality 
in Corps projects on a larger, more "real-world" scale 
than before. 
Long Term Effects of Dredging Operations 
(LEDO) Program. The LEDO Program provides new 
or improved technology to predict long-term 
environmental impacts and to identify, assess, and 
manage contaminated sediments. The technology 
allows the Corps to meet its dredging constraints and 
environmental compliance in a manner that is 
technically sound while reducing or eliminating 
unneeded constraints. The program research supports a 
risk-based approach in managing contaminated 
sediments. 
LEDO provides technology for identifying, 
assessing, and managing contaminated sediments in 
support of cost-effective navigation and restoration. 
Specific LEDO research thrust areas are: development 
of testing, evaluation, and modeling procedures for 
volatile contaminant losses; application of population 
dynamics models for toxicity interpretation; 
consequences of bioaccumulation of toxic substances; 
application of a marine chronic/sublethal assay; and 
organic matter effect on toxics' bioavailability. Future 
work will include screening tests for contaminant 
bioavailability, biodegradation of polycyclic aromatic 
hydrocarbons, development of genetic screening tools, 
and toxicity of endocrine disrupting compounds. 
LEDO implementation tools and techniques 
include the technical assistance program (DOTS), the 
dredged material management and assessment training 
effort of the DOTS Program; technical notes and lecture 
material suitable for training; EPA/Corps regulatory 
manuals; detailed guidance documents; and an 
interactive World Wide Web site. The program continues 
to upgrade and support a national bioaccumu. 
lation database to make certain that contaminated 
sediment information is available to a broad audience. 
As designed, the program continues to have direct 
programmatic input to the development of the 
EPA/Corps Testing Manuals for dredged material. 
Ecosystem Management and Restoration 
Research Program (EMRRP). The goal of the 
EMRRP is to provide state-of-the-art science and 
engineering technologies and guidance for the Corps to 
use to predict, evaluate, and reduce environmental 
impacts resulting from Corps water resources projects. 
The EMRRP also provides tools to design, manage, and 
maintain restoration and development projects on 
streams and riparian ecosystems. The EMRRP 
investigates: a) rapid/cost effective quantification and 
assessment methods, b) design and construction 
specifications for wetlands/streams/riparian restoration 
activities, c) capabilities to predict ecosystem impacts, 
d) habitat restoration techniques for species of concern, 
e) ecosystem management and decision support 
systems, and f) basic ecosystem processes. 
Products in FY00 include the completion of a 
Special Technical Note Series on Stream and Riparian 
Restoration and Management. These documents provide 
clear, concise guidelines for engineers and 
planners involved in stream and riparian restoration and 
management projects. They also ensure compliance 
with legislative and policy requirements, while 
providing direction on the best management practices 
for restoration projects. 
Guidance has also been provided on contract 
specifications and performance standards for wetland 
restoration and creation projects. A "how-to" document 
was prepared that provides guidelines for developing 
wetlands erosion protection structures in coastal 
systems. Work is near completion in the development 
of national and regional guidance documents to 
improve the Corps' ability to assess functions of 
wetlands in the context of regulatory, planning, ad 
mitigation requirements. The wetland types being 
addressed include depressions, fringes, flats, and slopes. 
This procedure has multi-agency acceptance and 
cooperative funding. 
Reports were completed on a variety of manage 
ment practices, e.g., moist-soil management, ripatan 
zone management, bottomland hardwood managemidl 
and special management practices for Neotropcais 
birds, bats, reptiles, and amphibians. Much of this 
work has been incorporated into Corps training courses 
42-8

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY00 
An on-line website was established with life histories 
and potential impacts to selected sensitive species and 
thehiabri tats by Corps reservoir operations. 
Efforts are near completion in the development of a 
computer-based decision support I information retrieval 
system, Ecosystem Management and Restoration 
Information System (EMRIS), that will allow rapid 
access to tools and information on a variety of environmental 
analyses and ecosystem management strategies. 
The topics to be addressed include: a) engineering 
aspects of environmental compatibility, b) threatened 
and endangered species, c) invasive species issues, d) 
legal ramifications of environmental projects, and e) the 
analysis of various ecosystem functions and values. 
Geospatial Technology Area 
The Geospatial Technology Area comprises Survey 
and Mapping, Remote Sensing, and Geographic 
Information Systems (GIS). Activities within this area 
focus on collection, management, analysis, and exploitation 
techniques for information tied to the earth's 
surface and subsurface (geospatial data). Typical data 
types include bathymetric and topographic survey, 
digital elevation models, dredge cuts, placement sites, 
sub-bottom compositions, soil types, wetlands, land 
cover, endangered species and their habitat, stream and 
tide gages, cross sections, training structures, levees, 
dam deformation, HTRW sites, permits, piezometers, 
archeological sites, snow water content, Corps projects, 
relief wells, etc. Data may be collected for and 
analyzed for projects at specific sites as part of systems: 
from sub-basins to large river systems, from individual 
beaches to large coastal segments. Other objectives of 
this area include automated presentation capability, 
lproved QA/QC, improved data retention and longer 
data life, reduced recollection costs, increased data 
sharing, and improved, more defensible decision 
aking. These efforts support decision makers in all 
Corps business program areas: navigation, flood 
control, hydropower, regulatory, environmental, 
emergency management, recreation, water supply, and 
work for others. Accurate and reliable geospatial data 
Srqeu ired by each business program for the effective 
planning, design, construction, operation, maintenance, 
and rehabilitation of projects. Annual expenditures for 
these data average $200M, thus significant savings 
from more effective and efficient data collection and 
management technologies, data analysis, and data 
exploitation will be realized. 
Survey and Mapping Program. Initial calibraionPr 
ocedures for digital cameras used in mapping 
Ppications were developed. Initial software and 
Procedures to intelligently thin very large data sets with 
minimal loss of model accuracy were developed and 
tested. Finally, software and procedures to produce 3-D 
levee design elements plus plans and profiles automatically 
from survey data were developed. 
Remote Sensing Program. Software and hardware 
techniques to integrate remotely sensed data (fi-om 
numerous satellite and aircraft systems) into Corps 
hydrologic, environmental, and economic models were 
developed and tested. Methods to map snow water 
content from remote sensors for operational use were 
developed for the Sierra Nevada in California and the 
Great Plains snowpacks in the Missouri River Basin. 
This integrated snow cover monitoring system uses 
AV HRR imagery and consists of algorithms for 
preparing gridded input data, i.e., temperature and snow 
water equivalence, a distributed snow process model 
(DSPM), and export visualization routines for Corps 
View. Statistical methods for the application and 
classification of remotely sensed data were produced in 
FY00. Preliminary automated software for these 
statistical methods was developed and applied to COE 
water resources projects for demonstration and analysis. 
These methods will greatly reduce digitization costs 
and maintain high reliability standards for geospatial 
analysis. Improved methods have been developed for 
serving geospatial data over an Intranet for emergency 
managers, the first successful implementation of 
Internet Map Serving software within the Corps of 
Engineers. The Eagle Vision II satellite-receiving 
system has been tested and methods developed for the 
rapid acquisition and dissemination of satellite imagery 
to the Corps' emergency management community. 
New display methods have been developed for easier 
access to geospatial data, a potential second-generation 
interface for the ENGLink Interactive Geospatial 
software developed, and an expanded and improved set 
of nonproprietary data developed. Very large image 
data sets have been acquired and processed. An 
indexing approach has been developed for these data, 
and documentation is being completed. Evaluation of 
the EMERGE digital airborne sensor is being finalized. 
Geographic Information Systems (GIS) 
Program. Improved flood damage analysis software 
with integrated commercial GIS capability and users' 
manual were completed and distributed. Following 
completion of the cataloging of Corps models, the 
"model advisor" software assisting users to select the 
best simulation models for problem-driven applications 
was demonstrated and provided on-line. The Level II 
GIS interface standard for Corps simulation models was 
developed, demonstrated, and documented. Development 
of the Level III and IV protocols was initiated. 
Guidelines were established for the Corps-wide 
integration of CADD and GIS data. A report on links 
42-9

ENGINEER RESEARCH AND DEVELOPMENT CENTER 
between two of the Corps' nongeospatial legacy 
databases that use geospatial data, including strategies 
to maximize their use and information content through 
GIS-enabled map display, query, and analytical 
capability, was completed. Development of geospatial 
ties to the Real Estate Management Information System 
(REMIS) was started. A report on methods for the 
integration of multiple data set types in on-line 
applications was completed, presented, and published 
on the Internet. Work on enterprise approaches to 
warehousing and use of geospatial data within the 
Corps was completed. 
Remote Sensing and Geographic Information 
Systems Center (RS/GISC) Program. The RS/GISC 
is the principal catalyst for the evolution and 
application of emerging remote sensing and geographic 
information systems technologies in execution of the 
Corps' civil works planning, engineering, operations, 
and maintenance activities in all business program 
areas. The RS/GISC manages the Corps' geospatial 
research and development program area, remote 
sensing and GIS research and development programs, 
emergency management RS/GIS support, RS/GIS 
activities in the Corps' Water Control Data System 
(WCDS) Software Modernization Program, GIS 
support for the national management of Formerly Used 
Defense Sites (FUDS) cleanup, hosting and teaching 
the Corps' PROSPECT training in GIS, and GIS and 
remote sensing assistance in the delineation and 
mapping of wetlands. The RS/GISC also acts as the 
principal technology assistance hub for new applications 
of RS/GIS technologies for the Corps district 
offices across the nation. 
Based in the RS/GISC, our Remote Sensing (RS) 
and Geographic Information Systems (GIS) research 
programs support the Army's civil works mission by 
improving methods for acquisition, image processing, 
and development, management, and analysis of geospatial 
data. An enterprise approach to corporate geospatial 
data and the integration of all geospatial data 
(data from GIS, RS, survey and mapping, and CADD), 
and the development of applications meeting the needs 
of Corps civil works business programs are critical 
focus areas. Accomplishments in FY00 include: 
serving as the technology point of contact for the Corps 
of Engineers for civil works remote sensing and GIS; 
ongoing technology transfer through training courses 
(more than 145 students in six classes), briefings, 
technical papers and technical demonstrations; working 
with North Atlantic Division and districts to develop a 
prototype for regional corporate GIS; providing technical 
support to Corps' district offices for the 
development of implementation plans for geospatial 
data management; supporting one stop service requests 
from Corps' districts and divisions; serving on the 
Tri-Service Computer Aided Design and Drafting 
Technical Center's Executive Work Group; working 
with the Federal Geographic Data Committee (FGDC) 
in the New England region for the implementation of 
the FGDC standards; participating in the development 
of a strategic approach to civil works research and 
development; sponsoring and participating in the 
development of national and international remote 
sensing and GIS conferences; and developing and 
transferring improved techniques for inclusion of 
snowmelt in water control decision support. 
Aquatic Plant Control Research Program 
(APCRP). APCRP is the Nation's leader in aquatic 
plant research and technology for managing problem 
aquatic plant infestations of major economic significance 
in public and navigable waters. APCRP provides 
environmentally compatible, cost-effective methods for 
identifying, assessing, and managing aquatic plants. 
Through direct application of APCRP-developed 
technology, researchers have successfully reduced the 
levels of two problem emergent species (alligatorweed 
and water hyacinth) to maintenance levels throughout 
the United States. Currently, major research efforts are 
focused on technology to manage two problem 
submersed aquatic plant species (hydrilla and Eurasian 
watermilfoil) that infest waters in 43 states. 
In FY00, the APCRP updated a computer-based 
Aquatic Plant Information System (APIS) that guides 
users in selecting control options and formulating costeffective 
management plans for site-specific plant 
problems. Improved techniques to deliver aquatic 
herbicides to the target plant were developed. These 
improved delivery systems will allow operational 
personnel to maximize efficacy on submersed vegetation, 
with a minimum of herbicide and application 
costs. Ecological associations were developed between 
plant complexity and fish distribution and abundance. 
Managers can use this to predict the type of fishery in 
specific plant habitats and understand implications Of 
plant control and restoration on changes in abundance, 
diversity, and distribution of fish species. The development 
on new formulations of pathogens for the 
control of hydrilla and Eurasian watermil continued. 
Dredging Operations and Environmental 
Research Program (DOER). DOER was established 
to effectively reduce operational costs and enhance 
environmental compliance in response to numerous 
Corps field requests with support from groups with 
interests in ports, navigation, and environmenal isetal 
The program focuses on operational and environnio 
dredging issues of national economic and environ 
mental significance that involve both the physical 
42-10

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY00 
processes of sediment and water dynamics, as well as 
the environmental concerns of contaminants, habitat, 
and ecological risk. A primary task in DOER is an 
aggressive technology transfer effort to assure rapid 
transition and acceptance of cost-effective and environmentally 
sensitive technology to field users. 
Significant accomplishments during FY00 were 
(a)d eveloped risk-assessment methods for evaluating 
dredged material placement in upland and nearshore 
sites; (b) developed design guidance for placement of 
contaminated sediments in Confined Disposal 
Facilities; (c) demonstrated innovative equipment for 
in-channel sediment relocation; (d) completed guidance 
on using Tons Dry Solids (TDS) for determining actual 
loads dredged by hopper dredges; (e) completed 
guidance on application of the Silent Inspector (SI) 
technology for hopper dredges and pipeline dredges; (f) 
accomplished major advances in the state-of-the-art for 
predicting erosion rate of fine-grained sediments; 
(g)developed a beta version of the Dredged Material 
Spatial Management Analysis Resolution Tool 
(DMSMART), a geographic information system (GIS) 
customized for dredged material management and (h) 
publication of applied research results, where the 
studies supported development of the methods, tests, 
and models listed above. In addition, DOER research 
results were integrated into the DOTS Online Institute, 
where three dredging-related courses are offered: 
Dredging Regulations, Dredged Material Management, 
and Basic Benthic Testing. 
Issues addressed this year include approaches for 
low-cost dredged material treatment options, guidelines 
and specifications for an automated system for monitoring 
of location, status, and capacity for dredged 
material dump scow, continued investigation of finegrained 
sediments properties to improve predictions of 
dredged material disposal mound erosion, complete a 
mixed sediment, layered bed version of the Long Term 
Fate of Dredged Material (MDFATE) that predicts 
erosion of dredged material mounds, and initiate steps 
to provide tools that will allow Districts low cost 
placement of mixed sediments nearshore to keep sand 
I the littoral system. A significant accomplishment 
has been the cooperation and collaboration of agencies 
and organizations sharing the Corps' interest. 
Coastal Inlets Research Program (CIRP). The 
CIRP is an effort to increase the capabilities to cost 
effectively design and maintain the more than 100 inlet 
navigation projects that comprise the bulk of Corps 
astaolp erations and maintenance (O&M) expenditles. 
According to Corps estimates, expenditures will 
esd $8 billion at coastal inlets over the next 
25 years for dredging, structure installation, structure 
maintenance and rehabilitation, and mitigation for 
damages caused by federal projects. The CIRP is 
furthering fundamental knowledge of complex inlet 
processes as well as developing new and improved 
capabilities for conducting O&M activities. It also 
addresses local and regional impacts of navigation 
projects on adjacent shores. Transfer of technology to 
Districts and Divisions is a CIRP priority, including 
annual workshops and innovative use of the worldwide 
web http://cirp.wes.army.mil/cirp/cirp.html. 
During FY00 a physical-processes based automated 
sediment budget system for management of 
inlets and adjacent beaches was developed and verified 
and released Corps wide and to consulting companies 
and academia. A numerical model to predict scour for 
regions characterized by local flow curvature, flow 
separation, entrainment, and flow interaction with inlet 
structures was also developed and verified. This model 
has been released to the public through the worldwide 
web. A web-based tutorial and handbook on coastal 
inlets called "Inlets Online" that addresses needs from 
the professional engineering and science level to 
college and high school education was produced. 
Major laboratory experiments and theoretical studies on 
wave diffraction at inlets was conducted to upgrade the 
Corps' numerical wave model to test the diffraction 
algorithm. Planning began for transition of R&D 
products on deep-draft navigation channels for 
reduction of O&M dredging and cost of doing business. 
A technology-transfer workshop was conducted in 
Florida for 60 Corps, consulting companies, and 
university staff members. 
Recreation Management Support Program. The 
RMSP conducts research and provides related technical 
assistance in support of the Civil Works Recreation 
Business Area. The program is divided into three major 
elements: management studies, management assistance, 
and information exchange. In FY00, research was 
completed that assesses the regional economic impacts 
of the Corps recreation program and provides managers 
with a tool to monitor economic impacts of the 
program. FY00 research continued to identify the 
benefits of the recreation program. Using recently 
released data from the 2000 Census, demographic 
trends were identified affecting the recreation program 
and associated recreation facility modernization 
initiatives. Best practices were identified and refined to 
address the recreation needs of ethnic minority visitors 
using Corps projects. Customer satisfaction monitoring 
tools continued to be developed and distributed to field 
staff. Technical assistance addressing recreation use 
estimation issues was provided to field managers. 
42-11

ENGINEER RESEARCH AND DEVELOPMENT CENTER 
Zebra Mussel Research Program (ZMRP). The 
ZMRP is the only Federally authorized R&D program 
for the development of technology for zebra mussel 
control. The focus is to develop environmentally sound 
control methods for use in and around public facilities. 
The zebra mussel has spread throughout the eastern half 
of the United States and threatens the rivers and water 
supply systems of western states. More than 
$100 million is spent annually to prevent catastrophic 
shutdown of public facilities in the east and central 
United States, and this cost will substantially increase 
over the next few years as zebra mussels continue their 
westward expansion. More cost-effective and environmentally 
sensitive methods are required to control this 
problem. 
The ZMRP is coordinated with the research 
programs of other Federal, regional, and state agencies, 
and private industry through the Zebra Mussel 
Coordination Committee, established under the 
Nonindigenous Aquatic Nuisance Prevention and 
Control Act. 
Research has determined that zebra mussels are 
adapting to the high temperature of southern waters. 
This allows them to increase their range, which will 
increase the cost of control significantly in areas where 
zebra mussels were originally thought to be of little or 
no concern. Additional research has also determined 
that zebra mussels increase the rate of corrosion on 
metal structures threefold. This means that structures 
must be maintained on a 3- to 5-year schedule, rather 
than the normal 10- to 15-year schedule, increasing 
maintenance costs and interrupting navigation and 
power generation nationally. 
Successes include completion of a 5-year evaluation 
of coatings and materials to prevent zebra mussel 
attachment. Published results present significant 
savings to power plants, the boating industry, and Corps 
facilities. In addition, the most widely used means of 
non-chemical control (thermal shock, desiccation, and 
freezing) were directly derived from the ZMRP 
research efforts on physiological factors affecting the 
control of zebra mussels. The ZMRP is transferring 
this technology through a CD-ROM information system 
(updated yearly) and an engineering handbook for 
facility managers and operators of locks and dams, 
water supply and treatment facilities, power plants, and 
vessels. The CD-ROM (over 7,000 distributed to date) 
and handbook help managers and operators determine 
the vulnerability of their facility and outline control 
options. 
As the zebra mussel continues to expand its range 
in the United States, the audiences for ZMRP 
technology transfer products, such as technical notes 
and technical reports increases. To ensure rapid 
transfer of this information to the field, the ZMRP has 
established a Web site that allows interested parties to 
review the information on the site and to also download 
hard copies of the technical notes and reports. 
Water Operations Technical Support (WOTS) 
Program. The WOTS Program provides comprehensive 
and interdisciplinary technology transfer and 
technology application to all Corps water resource 
projects. WOTS is managed to maximize costeffectiveness 
and ensure broad dissemination and 
implementation of technology and information. The 
program provides effective environmental and water 
quality engineering technology to address a wide range 
of water resource management problems at Corps 
reservoir and waterway projects, and in the river 
systems affected by project operations nationwide. In 
addition, WOTS provides technology to address 
problems occurring from the presence of zebra mussels 
and other non-indigenous aquatic species, tail-water 
fisheries at pump-back hydropower projects, water 
quality impacts of shoreline erosion control and 
reservoir sedimentation, and other project operations 
related to environmental and water quality issues. 
Since its inception, WOTS has provided environmental 
and water quality technological solutions to over 
1,100 problems identified at projects from every Corps 
district. The program annually publishes numerous 
copies of manuals, bulletins, notes, and reports. WOTS 
annually conducts specialty workshops, training 
personnel on the latest environmental and water quality 
management techniques. In FY00, the WOTS Progran 
conducted five technology demonstration efforttos 
verify management strategies and techniques, four 
training workshops on environmental and water quality 
management techniques, and prepared nine technical 
publications for distribution to the field. 
WOTS continually endeavors to coordinate with 
water quality elements of other Federal agencies such 
as the Environmental Protection Agency, Tennessee 
Valley Authority, Bureau of Reclamation, Fish and 
Wildlife Service, and the Bonneville Power Admin" 
stration. These efforts have involved watershed 
management activities, problems on the spread o zebra 
mussels, the impacts of hydropower facilities, and cd 
water releases 
Dredging Operations Technical Supt 
(DOTS) Program. The DOTS Program provider/cor 
prehensive and interdisciplinary technology trans 
technology application to all Corps navigation dredg 
projects. DOTS is managed from a centralized pro0gr 
42-12

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY00 
to maximize cost-effectiveness and implement National 
policies and laws on a consistent basis. The program 
provides direct technical support to all Corps elements 
involved in maintaining navigation projects. DOTS 
focuses on applying technology and research results to 
field problems. Emerging scientific approaches to 
testing dredged material and constant changes in 
regulation of these programs cause uncertainty in 
administering the Corps' dredging program. 
Major features of the DOTS Program include 
training Corps staff on the latest environmental 
and engineering techniques associated with dredging 
and dredged material disposal and with water quality 
and related aquatic environmental issues; technology 
transfer of new and emerging techniques used to 
determine compliance with environmental protection 
statutes regarding the management of dredged material; 
transfer of technology developed by others that deal 
with the treatment and decontamination of 
highly contaminated sediments; and applying and 
transferring innovative risk-based technologies 
that identify, assess, and manage sediments contaminated 
with high-profile chemicals such as dioxin, 
polyaromatic hydrocarbons, and polychlorinated 
biphenols. Technology is presented in the form of 
field-ready decision support systems, technical notes, 
manuals, and an extensive World Wide Web site 
(<http://www.wes.army.mil/el/dots>). 
Since inception, DOTS has satisfied over 
4,130 requests for direct technical assistance. Ongoing 
dredged material technology application tasks include 
guidance in using the implementation manuals for the 
Clean Water Act and the Marine Protection, Research, 
and Sanctuaries Act. Guidance for applying techniques 
and methodologies to the management of contaminated 
dredged material, including risk management, equipment 
selection, confined disposal facility management, 
and quality assurance/control, were implemented and 
published. The program also reported ocean-dumping 
activities to the EPA and the International Maritime 
Organization as required by the London Convention. 
Since sediment management seminars were initiated in 
1991, over 4,000 personnel from Federal, state, and 
local agencies have been trained at 12 seminars on the 
latest techniques in regulating, testing, and managing 
dredged materials. The program publishes and makes 
electronically available on the Web site all manuals, 
bulletins, technical reports, technical notes, data, and 
Policy guidance documents on dredging and dredged 
aterial management activities. 
Mabnagement Tools for Operation and Maintedlec 
(O&M) Program. Due to increasing CW O&M 
d constraints and the need for a performancebased 
CW O&M budget, the Management Tools for 
O&M Program was established in FY00. This research 
program is developing a performance-based benefits 
analysis model/procedure for prioritization/ranking of 
the maintenance activities of the annual CW O&M 
budget, including a best practices component to assist 
in cost-efficient execution of the O&M budget. The 
resulting product will provide an objective, consistent, 
and reproducible procedure to be used for O&M budget 
prioritization, for quantifying the impact of deferred 
maintenance on maintenance and/or operations 
expenditures, and for identifying the optimum (lowest) 
level of O&M funding required to maintain established 
levels of customer service. Component level condition 
indices (Cl's) and QUADRANT are two tools which 
are being utilized in the development of the 
performance-based benefit analysis model. The Cl's 
are objectively based, reproducible numerical indicators 
of the condition of structures and equipment. 
QUADRANT provides economic (net benefit value) 
information for prioritizing annual non-routine 
maintenance. A summary index (SI) procedure, based 
on CI's, is being developed as an indicator for the 
overall condition of a project or site. Additionally, an 
Internet accessible O&M Cost Reduction Handbook 
will provide brief descriptions of research activities that 
have been successfully utilized in the field but not 
widely implemented. 
In FY00, the beta version of the O&M Cost 
Reduction Handbook was completed and field 
evaluation initiated. Reports and training were completed 
on the Embankment Dam and Non-Rubble 
Breakwaters & Jetties CI procedures. Decision points 
were reached on what other Cl's will be developed, and 
how CI inspection procedures will be simplified. 
Procedures for developing composite Cl's that are 
applicable to maintenance work items in the annual 
O&M budget were proposed for field review. A review 
of existing methods of benefits analysis for work item 
prioritization was completed and integrated into 
ongoing field efforts directed at O&M budget 
prioritization.
CUSTOMER SUPPORT 
Increasingly, ERDC expertise and products 
developed in R&D programs are being requested to 
solve challenges in critical areas of concern. 
Ice Control Structure for Cazenovia Creek. 
The physical and numerical model study of the low cost 
ice control structure for Cazenovia Creek, near West 
Seneca, NY, was completed. Final report and design 
recommendations were forwarded to Buffalo District. 
Construction costs of this ice control structure have 
42-13

ENGINEER RESEARCH AND DEVELOPMENT CENTER 
been estimated at $1,000,000 as opposed to the $3M 
construction costs of a traditional dam structure as was 
proposed in the 1980's. The reduction in costs is a 
direct result of the engineering research and development 
performed earlier under this program to develop 
and test low cost ice control methods. 
Ice Management. ERDC assisted a number of 
districts with ice problems. The final report of the 
physical model study of ice management at the Soo 
Locks was presented to Detroit District. The report 
recommended size, location, and orientation of high 
flow bubblers needed to divert ice from the Poe Lock 
approach for passage through the MacArthur Lock. Ice 
management techniques were suggested for the 
upstream and downstream miter gates of the Poe Lock 
to facilitate operation during the early navigation 
season. Work completed for the Omaha District 
included the impact of downstream ice jamming on 
operation of Oahe Dam on the Missouri River and 
recommended maximum water releases as a function of 
existing downstream ice conditions to avoid ice jam 
flooding of the cities of Pierre and Fort Pierre. Iceaffected 
risk and uncertainty methods were developed 
for use in a study by St. Paul District of the complex 
flood control protection at Wahpeton, ND. A newly 
developed scour probe was used to obtain in-situ field 
measurements of ice induced and other bed scour in the 
Illinois River. 
Web Cameras. At the request of various districts, 
a number of Web cameras were installed to monitor ice 
conditions near locks and dams and other river 
structures or in remote, difficult to reach areas. Images 
from the digital cameras are regularly transmitted to 
ERDC where they are displayed on web pages so that 
evolution of ice conditions at critical sites can be 
monitored. 
Corps-wide Geospatial Data. Working with 
Mississippi Valley Division, Rock Island District, and 
HQUSACE, requirements were developed and 
acquisition initiated for a common Corps-wide set of 
geospatial data. This data will provide all Corps 
districts, divisions, laboratories, centers, and programs 
with common base data that can serve as a framework 
for Corps projects. 
Emergency Management. Emergency management 
support activities were significant in FY00, 
starting with a series of meetings with the Federal 
Emergency Management Agency (FEMA) to be better 
prepared for the hurricane season. Support was provided 
for a small, but important, hurricane season. 
Models were regularly run and, for the first time, 
provided every six hours prior to expected landfall. 
The Internet was used to post the results of the model 
runs as part of enabling Corps' mission managers to 
better scope expected missions for the provision of 
potable water, ice, temporary roofing, and debris 
removal. Training was provided to FEMA for their 
managers to improve coordination and the passing of 
information between the agencies. 
Possible overestimation of damages by the 
hurricane wind damage model is being examined in a 
validation effort. Online handbooks were developed for 
hurricanes and floods, illustrating modeling tools, 
imagery, and GIS approaches and products available to 
emergency managers. Limitations and caveats concerning 
use are also addressed. Maps were developed for a 
flood and earthquake disaster workshop sponsored by 
Lakes and River Division and South Pacific Division. 
ERDC members also assisted numerous districts 
with ice jam flooding and mitigation. Ice jam flood 
mitigation efforts included site visits and training 
sessions for state and local agencies. Coordination with 
the National Weather Service has resulted in the 
development of ice monitoring networks that facilitate 
rapid, effective response. 
Satellite and Airborne Remote Sensing, 
Numerous requests for assistance in commercial and 
developing sensors were received from Corps' districts. 
This includes sensors working in the visible and near 
infrared, infrared, and microwave portions of the 
spectrum. Information was provided about sensors 
meeting specific requirements, how to obtain imagery, 
and appropriate image processing techniques. 
Model Linkage. To assist with the evaluation of 
the consequences of alternative land use and project 
alternatives, work continued on the development of a 
framework of protocols and standards to handle data 
flow between concurrently running models and RSGIS 
tools in standardized ways. Linkage of models wilble 
easier and less costly due to the selection of a limited 
number of standardized approaches. For the first time, 
it will be possible to link the models necessary to 
adequately analyze the complex natural and huma 
influenced landscape processes necessary for proposed 
and existing projects. A catalog advisor listing Corps 
developed models and providing tools to assist in the 
determination of best models for specific applicat oi 
has been completed and is available on-line, Lrotl 
requirements have been evaluated and the Lever 
protocol has been developed and tested. wo thd 
proceeding on Level III and IV protocols. IliS of 
results in savings through reduction in the numethe 
models that will be developed and by eliminatin 
42-14

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY00 
need for separate interfaces to be developed for each 
model. 
Automated Vectorization. Algorithms were 
evaluated and methods to integrate raster data into 
vector GIS were distributed to Corps districts and 
divisions. These methods greatly accelerate the ability 
to include data sources such as planning information, 
scanned maps, orthographic photographs, and as-built 
drawings into GIS databases. Improved data integration 
supports better decision-making and results in 
more cost-effective project development, selection, 
operation, and maintenance. Positive feed back has 
been received on the utility of the software. 
Geographic Information Systems. Queries come 
to RS/GIS Center staff from districts concerning choice 
of GIS software, implementation issues, enterprise 
approaches, and development of applications. Center 
staff visited all North Atlantic Division districts to 
assist with the development of a prototype enterprise 
GIS that would meet district and division requirements. 
A prototype providing access to stream gage, reservoir, 
project, and disaster-related data was completed and online 
access provided for evaluation and feedback. 
Provisions were made for an orthophotographic base 
for the geospatial data. 
Paint Technology Center. The ERDC Paint 
Technology Center provides Corps Districts with 
failure analysis, paint testing, and field consultation 
services. Since contractor compliance with Corps 
specification is critical to infrastructure safety and 
reliability and to the reduction of maintenance costs, 
Corps district consulted ERDC for guidance on the 
paint specification portion of their bridge restoration 
project. A district was provided failure analysis on a 
metalizing project, for which ERDC determined the 
cause of the problem, and made recommendations that 
Would prevent reoccurrence upon recoating. Technology The Paint Center's paint testing capability has helped 
over 20 Corps district offices avoid construction delays. 
A test report is provided for each sample, which 
Provides testing results and final recommendation for the approval or refusal of the sample. In all, over 200 
paintcoating samples were tested. 
Corrosion Design Studies. ERDC is assisting 
New England District in the design of a corrosion 
protection system, which includes coating and cathodic 
protection (CP) of a sheet pile structure for the 
contaminated disposal facility located in New Bedford 
Harbor. ERDC recommended that the sheet pile be 
Coated and cathodically protected with a replaceable 
Sacrificial aluminum anode system. The CP is a unique 
design that incorporates a replaceable anode system 
every 20 years. The total cost of the CP system is 
estimated at $600K. ERDC also participated in a 
corrosion design project for Wyckoff/Eagle Harbor and 
provided assistance on the design of corrosion 
protection for a sheet pile retainment wall as part of a 
remediation effort for a Superfund site on Bainbridge 
Island. 
Seismic Vulnerability of Equipment. The Corps 
of Engineers' Northwestern Division is evaluating the 
seismic vulnerability of its civil works facilities and has 
conducted walk-down inspections. The resulting 
reports identify equipment and provide limited 
recommendations for protecting equipment through 
anchorage, bracing, and flexible utility connections. 
ERDC organized the walk-down inspection information 
into a single database in order to define the scope of 
known vulnerabilities and mitigation recommendations. 
ERDC also identified potential internal vulnerabilities 
based on work done by others and engineering 
judgment. Future actions will be recommended to 
define vulnerabilities through analytical studies or 
experimental testing. 
Energy Supply Optimization for Innovative 
Combined Sewer Overflow (CSO) Control. Chicago 
District is responsible for the construction and 
development of a 20,000 acre-feet reservoir as part of a 
massive multi-billion dollar CSO and off-line flood 
control program. Chicago District asked ERDC to 
model/demonstrate/evaluate the phenomena that are 
expected to occur. A large-scale physical model will be 
developed using an available excess digester at a local 
wastewater treatment plant and retrofitting it with a 
battery of computer controls and various probes. 
Experimentation will determine the effectiveness of a 
variety of mixing systems and oxygen transfer 
mechanisms on combined sanitary and storm wastewater 
to evaluate sediment mixing and changes in water 
quality. This research will enable the appropriate 
design and equipment selection to meet the project 
requirements in the most cost-effective manner. 
Cooperative Research with the U.S. Environmental 
Protection Agency. The ERDC continued a 
three-year cooperative research program with the EPA 
National Exposure Research Laboratory in Athens, 
Georgia. The program focuses on the South Fork of the 
Broad River in Georgia. ERDC personnel provided 
technical assistance in establishing a network of data 
collection sites within the Broad river basin. A 
CASC2D finite difference distributed hydrology model 
of the basin was set up and run with estimates of initial 
values. In addition, a WASH123D finite element 
distributed hydrology model was constructed. The 
CASC2D code is capable of performing long-term 
42-15

ENGINEER RESEARCH AND DEVELOPMENT CENTER 
simulations of rainfall runoff and soil erosion events. 
In FYO1, the model will be calibrated to available field 
data. Ultimately, the model will be used to assist in 
establishing Total Maximum Daily Load (TMDL) 
criteria for the basin. The CASC2D code is being 
enhanced to model in-channel sediment transport and to 
evaluate water quality and pathogen transport. The 
CASC2D/WASH 1I23D modeling effort is being 
expanded to include the Cowan Bayou area in South 
Mississippi. 
Dredged Material Fate Modeling. A study was 
performed for Wilmington District to support designation 
of a new Ocean Dredged Material Disposal Site 
(ODMDS) for the Wilmington Harbor navigation 
project. The ERDC effort was to predict the geometry 
of dredged material mounds placed in the proposed 
ODMDS, followed by predicting the long term fate of 
those mounds when exposed to both tropical storms and 
a year of "normal waves" using the MDFATE model 
to simulate mound geometry and LTFATE to simulate 
mound stability. Based on discussions with Wilmington 
District, the fate of two types of dredged material 
was simulated. LTFATE simulations of mound 
stability were conducted on the two mound configurations 
developed using MDFATE. Four erosion 
potential scenarios were simulated for each mound 
configuration and event. The LTFATE simulations 
indicated that there is a high probability of significant 
erosion and transport of sediment from either 
mound during both modest and severe storm conditions. 
Results from both sets of simulations were also used 
to make site management and monitoring 
recommendations. 
Wave Protection and the "Maalaea Pipeline", 
Maalaea Harbor, Maui. ERDC conducted a study 
directed at the need for navigation improvements at 
Maalaea Harbor to reduce wave energy within the 
harbor basin and entrance channel and the resultant 
damage to vessels; reduce navigation hazards in the 
entrance channel; and provide opportunity for the 
addition of berthing spaces and attendant harbor 
facilities. A 1:50 scale physical model was used to 
evaluate various structural alternatives for providing 
wave protection. A critical test condition was to verify 
alternative impacts on the surfing waves that compose 
the "Maalaea Pipeline". A total of 9 improvement 
plans were studied, all of which had no adverse impact 
on the surfing waves. The alternative which provided 
the most improvement in navigation and reduction in 
harbor wave heights included a 466-ft-long extension to 
the existing south breakwater; addition of a triangular 
shaped mole on the seaward side of the existing south 
breakwater; a 150-ft wide by 600-ft-long entrance 
channel; and a 1.7 acre, 12-ft-deep turning basin. 
Support of EPA Superfund Projects. ERDC is 
actively involved in hydrodynamic and sediment 
transport studies in support of several EPA superfund 
projects. ERDC models were used to study 
contaminant (PCB, Dioxin, and other toxic chemicals) 
mobility at sites in Virginia and North and South 
Carolina. 
Delong Mountain Terminal, Alaska. ERDC is 
providing support to the Alaska District in the study of 
a proposed channel and turning basin at the Delong 
Mountain Terminal (DMT), an open water port in the 
Chukchi Sea, north of the Bering Strait, used for 
shipping zinc and lead concentrates. A deep-water 
channel has been proposed to allow ocean-going ships 
to call directly at DMT, eliminating the present barging 
operation and increasing the terminal's capacity and 
throughput. ERDC researchers are using field 
measurements and numerical models to simulate wind, 
wave, and current conditions at the site that will be used 
in several elements of the design. 
Apra Harbor, Guam. The only access road for 
Guam's commercial port lies adjacent to an exposed 
ocean coast, protected from the sea by a relatively low, 
recurved concrete seawall fronted by a rubble-strewn 
beach. During severe typhoons, waves run up the 
beach, overtop the seawall, and cause disruption and 
damage to the road and port facilities. ERDC is 
supporting the Honolulu district in developing a project 
design to reduce vulnerability of the road and container 
yard to overtopping and flooding. A combination of 
numerical modeling tools was used to estimate typhoon 
flooding with both existing and planned beach 
configurations. The proposed project was shown to 
have a major impact on reducing overtopping rates. 
Northwest Fisheries Engineering Program 
ERDC has been involved in the development and 
evaluation of various programs aimed at structural 
modifications and/or operational guidance in diverting 
or passing juvenile salmon around or through dais n 
the Columbia and Snake Rivers. These studies 5 
being conducted to re-establish fish runs without losing 
use of the Columbia-Snake river system, which playsa 
vital role in the economic well being of the region 
There are numerous studies involving field effos 
numerical modeling, and physical modeling to address 
major issues concerned with fish bypass sYt 
These include Fish Guidance Efficiency systems ~rfcE 
located in the entrance to the powerhouse, .uven l 
collectors, outfall siting locations for the j 
salmon after they have been collected utilizilg a 
and/or surface collector, flow deflectors on 
spillway, water quality issues, and po eo fol 
turbines. These efforts have been grouped intO 
42-16

REPORT OF THE SECRETARY OF TilE ARMY ON CIVIL WORKS ACTIVITIES FOR FY00 
major areas of interest: FGE systems, Surface Bypass 
Collectors, Gas Abatement, and Turbine Modeling. 
These studies have developed new approaches or 
innovative designs to ensure safe and efficient passage 
of fish through dams and to improve water quality 
conditions. The pioneering research has saved millions 
of dollars through improved design and scheduling 
without trial-and-error iteration. These to restore 
salmon runs serve as a model for similar studies in 
other regions of the U.S. and the world. 
42-17

INSTITUTE FOR WATER RESOURCES 
The Institute for Water Resources (IWR) is a field 
operating activity under the staff supervision of the 
Director for Civil Works, Headquarters, U.S. Army 
Corps of Engineers (HQUSACE). The Institute consists 
of the Hydrologic Engineering Center, the Navigation 
Data Center, the Decision Methodologies Division, the 
Navigation and Water Resources Applications 
Division, the Planning and Policy Studies Division, the 
Program Analysis Division, and support elements. It is 
located at the Humphreys Engineer Center, Alexandria, 
Virginia, with satellite elements at other locations, 
including the Hydrologic Engineering Center in Davis, 
California; and the Waterborne Commerce Statistics 
Center, part of the Navigation Data Center, in New 
Orleans, Louisiana. 
The accomplishments of IWR during FY00 are listed 
by division. 
HYDROLOGIC ENGINEERING CENTER (HEC) 
Top priorities for FY 2000 were our Corps Water 
Management System modernization software 
development and integration project, NexGen software 
research and development project, watershed and water 
resource system analysis, and comprehensive system 
studies. Progress was substantial in all these areas. 
Customer demand for HEC services and products 
continues to be high. Our reimbursable projects 
program continues strong, resulting in another fiscal 
high at year-end. Many of the senior professional staff 
are reaching retirement age and retirements have 
commenced. The pace will quicken in FY 2001 on 
through 2002. Restocking of staff has commenced in 
earnest. 
The project to modernize the Water Control Data 
System (WCDS) software began in FY97. Because the 
modernized system will be much more than a data 
system, it was renamed to the Corps Water 
Management System (CWMS). CWMS is the decision 
Support Automated Information Systems (AIS) that 
supports the Corps water management mission. It 
embodies data acquisition, validation, transformation 
and management; forecasting, simulation and decision 
support analysis; and information dissemination. 
Modernizing and deploying the corporate CWMS software for is a six-year, $7.6 million centrally PRIP 
funded, Corps AIS improvement project managed 
Under the Corps Life Cycle Management of 
Information Systems (LCMIS) process. The 
management structure and design teams form a unique 
arrangement for providing oversight and field 
articipation in the enterprise-wide development and 
ntegraion project. The significant accomplishment in 
Feld 2000 as installation of Test Version 2.0 at four 
field sites. This is the second planned interim test 
installations prior to Test 3.0/CWMS Version 1.0, 
which will complete the system. CWMS is scheduled 
to be deployed Corps-wide in 2001/2002. The project 
is on schedule and within budget. Project documents 
are available on the project Internet Web site: 
(http://cw71 .cw-wc.usace.army.mil/cwcinfo/cwc.html). 
The NexGen software research and development 
project continues to roll out products for Corps field 
offices. There are now Arc/Info and ArcView version 
of HEC-GeoRAS, providing GIS utility support for 
HEC-RAS, the widely popular river hydraulics 
software package. HEC-HMS (Version 2.0) was also 
released. This new version of the Corps standard 
watershed model includes a moisture accounting loss 
algorithm. Work is now underway on the next version 
that will add dam safety and planning analysis 
capabilities. A pre-release of the unsteady flow version 
of HEC-RAS (Version 3.0) was released for testing. 
Public release is expected early next fiscal year. A GIS 
utility package (HEC-GeoHMS) was released in the 
summer. This utility provides substantial capability to 
effectively use national terrain data sets to rapidly 
develop HEC-HMS models. Building models for the 
tributaries to the Central Valley of California was the 
shakedown application of GeoHMS. The major flood 
damage and risk analysis software package, HEC FDA, 
continues to be improved. The two new NexGen 
software programs that are components of CWMS were 
improved and are included in CWMS Test Version 2.0. 
They are a new simulation/real-time reservoir 
operations model, and a flood impact analysis model. 
These programs will continue to be improved and will 
likely be released within the Corps in stand-alone form 
late in FY 2001. 
43-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS FOR FY00 
One aspect of our activities in the risk-based 
analysis and flood frequency analysis areas was 
completed this past year. The panel of The National 
Academy of Sciences, National Research Council 
(NRC) that reviewed the Corps use of risk-based 
analysis delivered its final report this year. HEC 
represented the Corps attending meetings, making 
presentations, and exchanging information on this 
topic. The report focused substantially on the HECFDA 
program that provides the analytical tool for 
implementing risk analysis in the field. In general, the 
NRC report commends the Corps for their risk analysis 
initiative, and encourages continued development of 
the methodology. Suggestions for improvements are 
made in several areas. We began a research project to 
address hydrologic risk and uncertainty and 
environment restoration performance. This is an area 
of inquiry that is expected to grow. The re-study of 
flood frequency on the upper Mississippi River in light 
of the flood of 1993 continues to close in on the final 
phase. A report documenting the flow frequency 
analysis methods and preliminary results was 
completed. A case example application of extreme 
flood magnitude and frequency estimates was initiated 
as part of the new Dam Safety R&D. Preliminary 
results are expected in FY 2001. 
Six PROSPECT courses were conducted for a total 
of six weeks of training. The courses covered several 
hydrologic engineering and planning analysis topics 
including HEC-RAS, HEC-HMS, GIS applications, 
and two new watershed/river and wetlands restoration 
courses. Attendance averaged about 25 students per 
course. Five on-site workshops were also held totaling 
four weeks of sessions for 150 students. While this 
continued the recent trend of reduced PROSPECT signups 
and increased requests for on-site workshops, FY 
2001 looks to reverse the trend with up to ten 
PROSPECT courses likely to be presented. Topics 
presented in the workshops included HEC-RAS, HECHMS, 
and hydrologic engineering in planning. 
Reimbursable project work was undertaken for 14 
Corps field offices as well as HQUSACE, the Federal 
Emergency Management Agency, University of 
California, and the National Institute for Building 
Sciences. Projects include watershed and reservoir 
system modeling, water quality, risk analysis, river 
hydraulics, wetlands hydrology, water control 
management, regional statistical analysis, flood damage 
analysis, GIS applications in hydrology and hydraulics, 
and groundwater modeling. In the upper Mississippi, 
HEC is managing the project to update the model 
geometry for the Mississippi Basin Model System 
(MBMS) to reflect more recent mapping and to 
develop an inundation mapping component based on 
the new mapping was re-activated this year. Map 
products from the contractors continue to lag resulting 
in a one-for-one lag in the project, with late delivery of 
up to eighteen months likely. Remaining work 
includes cutting the new river section geometry, 
integrating these new digital map-based geometry 
sections into the UNET models, re-calibrate the 
models, and prepare final reports. It is clear that the 
Corps will not receive contractor map products in time 
to complete the project in fiscal year 2000. Work will 
need to continue through FY 2001 before completion 
can be declared. The reimbursable project to assist in 
modeling the Sacramento and San Joaquin river basins 
for flood control operations is moving toward the 
documentation phase. This is part of a comprehensive 
study by Sacramento District to review the flood 
damage reduction system for the Central Valley of 
California. Preliminary models were completed in 
Phase I, and improved models are now near completion 
under Phase II. The models (separate models for the 
Sacramento Valley and San Joaquin Valley) are: HEC- 
5 for flood control operations; HEC-FCLP, system 
flood control operation optimization; HEC-FIA, flood 
economic/damage impact analysis model, and HECHMS 
(flood runoff model). Data compilation, and 
some of model development will later serve as the base 
for modernized CWMS implementation for these areas. 
We began an interesting project that is developing a 
flood forecast system for an area of the Susquehanla 
basin that has as its final outputs, forecast flood 
inundation map with associated flood damage- a first 
Work will continue through this year into spring FY 
2001. The total reimbursable project program was over 
$2.0 million with individual projects ranging froma 
few thousand dollars to near a million. 
The HEC program for FY 2001 will continue FY 
2000 efforts at the brisk pace reflected at the end ofthe 
year. We will continue fielding new versions ofthe 
NexGen software packages HEC-RAS, HEC-IS asd 
HEC-FDA, and companion GIS utility softare. 
emerging will be the first public release of the neW 
reservoir simulation program HEC-ResSim, and initi 
unsteady flow capability of HEC-RAS (Version 3.0). 
43-2

INSTITUTE FOR WATER RESOURCES 
Test Version 3.0 of the modernized CWMS will be 
installed and tested in five Corps offices, LCMIS 
Milestone Decision III secured, and Corps-wide 
deployment commence. PROSPECT training will 
increase to about ten courses and the number of field 
workshops will likely continue at about the same rate. 
Research and Development funding is expected to 
continue to decline - not a good trend, software 
maintenance and support and WCDS modernization 
funding will remain at about FY 2000 levels, and 
reimbursable technical assistance and special projects 
will likely level off. On balance, the result is expected 
to be a stable to slight increase in funding over that of 
FY 2000. The reorganization of HQUSACE, is 
complete, with HEC reassigned as a Center within the 
Institute for Water Resources. We expect increased 
synergy with other IWR elements, and anticipate no 
adverse affect on services to our customers. 
DECISION METHODOLOGIES DIVISION 
The Decision Methodologies Division (DMD) 
develops procedures, analytical techniques and 
methods to aid in water resources investment and 
management decisions. It provides technical assistance 
to the field and conducts special studies and projects 
assigned by the Office of the Chief of Engineers. The 
division also conducts several training courses for field 
personnel. 
Division engineers and scientists apply specialized 
knowledge in economics, environmental science, 
geography, risk analysis and engineering to develop 
practical and effective planning and decision support 
tools. These tools are applied by district employees to 
water resources activities throughout the Corp of 
Engineers. The division provides management for the 
Decision Support Technologies and Risk Analysis for 
Water Resources Investments research programs. 
Within these programs, the division is currently 
developing tools to facilitate watershed-planning 
approaches, such as collaborative problem solving, 
multi-objective planning, and tradeoff analysis. In the 
risk analysis program, tools and decision methods are 
being developed for applications to environmental 
restoration and deep draft navigation projects. addition In to work supporting analysis in these areas, the division developed and tested methods for assessing 
uncertainty in project cost and for combining uncertain costs and benefits. New research was initiated to 
Provide analytical methods and decision support tools 
for the Risk Analysis for the Dam Safety Research 
D~n . The decision support tools developed by DM Serve as the standard used for evaluating Corps 
ineers water resources projects. 
The DMD provides technical assistance to Corps 
field divisions and districts. During FY00, the DMD 
performed analyses and provided technical assistance 
to Corps districts on ecosystem restoration, formulation 
and evaluation, risk analysis, inland navigation, deep 
draft navigation, cost effectiveness and incremental 
cost analysis, and budget formulation and analysis. 
The division provided technical assistance to 
Jacksonville District on their Storm Damage Model and 
to the Wilmington District on their shore protection 
model. Also, assistance was provided to the Galveston 
District for navigation improvements to the Gulf Intercoastal 
Waterway, the Corpus Christi Ship Channel, 
and on the Green's Bayou flood damage reduction 
relocation study. The Mobile District was provided 
assistance for their study of improvements to the Black 
Warrior-Tombigbee Waterway. Assistance was 
provided to the New Orleans District for their study of 
recreation in the Lower Atchafalaya River. The 
division provided technical assistance in conducting 
cost effectiveness/incremental cost analysis to New 
York, Baltimore, Norfolk, Sacramento and Mobile 
districts. Technical assistance to the Ft. Worth District 
on dam safety portfolio risk assessment was initiated in 
FY00. 
The division supports the preparation and analysis 
of the O&M budget by providing technical support for 
the Automated Budget System (ABS). All Districts, 
Divisions and Headquarters use the ABS to create work 
packages, rank their importance and analyze the 
impacts of different budget scenarios on each 
organization. A new module, ABSMCDM, was added 
to the ABS in FY00 to allow for the ranking of work 
packages based on multiple criteria. This module adds 
to professional judgment as another means to rank 
work packages. 
43-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS FOR FY00 
The division manages the collection, management 
and analysis of the Corps' flood damage data collection 
program. Flood damage data from recent flood events 
has been collected and through analysis, will help 
develop more accurate assessments of flood damages. 
Using this data, the division developed and HQUSACE 
distributed the first Corps-wide depth- damage 
relationships. This program will reduce the time and 
cost of developing acceptable projects to reduce the 
costs flooding. 
The division conducted several training courses 
during FY00. The division provided technical and 
management support for more than 6 Regulatory 
Training courses and or seminars, including the 
Executive Seminar for commanders and senior 
executives involved in making regulatory decisions. 
The division also conducted several PROSPECT 
training courses; Ecosystem Restoration, Planning and 
Evaluation and Conflict Management and Dispute 
Resolution (two sessions of each), Risk Analysis for 
Water Resources Planning and Management and a 
course on Public Involvement Techniques. The 
division provided on-site training to the North Atlantic, 
South Atlantic and South Pacific Divisions on cost 
effectiveness/incremental cost analysis and planning. 
PLANNING, POLICY AND SPECIAL STUDIES DIVISION 
The Planning, Policy and Special Studies Division 
carries out its mission in support of the Director of 
Civil Works by conducting policy analysis, planning 
and studies of national and regional scope. 
Since 1976, the program has contributed to the 
development of numerous policies and programmatic 
initiatives within the Civil Works Directorate as well as 
several important national and regional studies. 
The program continues to serve the Corps by 
assessing and evaluating changing national and 
regional water resources issues; natural resources uses 
and management; and related public works 
infrastructure management needs as they affect Corps 
Civil Works missions, policies, practices, legislative 
mandates, and executive directives. During FY00, the 
division conducted 21 policy studies in direct support 
of the HQ Policy Division. In addition to the policy 
studies program, special studies of national and 
regional scope were undertaken that built on the policy 
directives and research tools which were developed at 
IWR. 
Among the noteworthy national and regional 
special studies undertaken in FY00 were: 
* Nationwide Permit Programmatic EIS 
* Regulatory Cost Analysis of Nationwide Permit 26 
Changes 
* Florida Wetlands Mitigation Banking Permit 
Evaluation 
* Development of Corps Environmental Database 
. Ohio River Basin El Nifio Forecast System 
* Newport News Water Supply Permit 
* Upper Mississippi River Flow Frequency Study 
Among the specific policy studies conducted during 
FY00, the following subjects and issues were included 
to support the development of legislation, policies, 
directives and guidelines for various activities within 
the Corps Civil Works (CW) program: 
a
U
U
U
U
U
a
U
U 
*m 
*m 
*m 
*m 
WRDA 2000 Formulation 
Formulation of Civil Works Strategic Plan 
Draft ER for Ability to Pay 
Revise, update Civil Works Programs Brochure 
Revisions to CW Planning Guidance Notebook 
Watershed Planning Guidance Development 
Environmental Benefits Analysis 
Regulatory Approaches to Watershed Planning 
National Drought Policy Commission support 
Hydropower Credit in Water Supply Reallocations 
Comprehensive Water Supply regulations 
NAS/NRC Mitigation Banking Study 
Hurricane Fran Assessment Report 
CW Flood Damage Reduction Brochure 
During the year, permanent staff personnel were 
joined by visiting scholars from leading universi 
43-4

INSTITUTE FOR WATER RESOURCES 
the country. Visiting scholars work full time in the 
division offices or visit from time to time during their 
appointments. They contribute to a large number of 
policy and special studies and upon their return to 
teaching, their academic programs are enriched by 
exposure to information they learn while working for 
the Corps. Overall, the division staff and visiting 
scholars have a significant influence on the state of 
current knowledge, from papers presented at various 
workshops and conferences, as well as publications in 
peer-reviewed journals. 
NAVIGATION AND WATER RESOURCES APPLICATIONS DIVISION 
The Navigation and Water Resources Applications 
Division provides support for HQUSACE and field 
divisions and districts for project-specific and system 
studies of navigation improvements and other water 
resources issues. In this regard, it also performs 
recurring national-level analyses such as the update of 
vessel operating costs for inland and deep draft 
waterways, development of coastal harbor and inland 
segment commodity, traffic and fleet forecasts, and 
analysis of the recovery of navigation costs. The 
division also provides program management support 
for the Inland Waterways Users Board (IWUB), 
manages the U.S. Section of the International 
Navigation Association (PIANC), supports overall 
Corps coordination with the Transportation Research 
Board (TRB) of the National Academy of Sciences, 
and performs national and special studies as directed by 
HQUSACE. 
Major activities include the following projects and 
studies: 
Continuing Support Activities. The foundation for 
evaluation of navigation projects, both inland waterway 
and deep draft harbors, is the comparison of 
transportation costs with and without proposed 
unprovements. As part of the USACE Transportation 
Systems Program, the division maintains and verifies 
current data on ocean and inland water vessel operating 
costs, the dimensions of these vessels, the distribution 
of ocean vessel sizes in the world fleet, and the 
Configuration of barge tows on inland waterways. This 
information is transmitted by HQUSACE to all Corps 
districts as CW planning guidance. 
Coordination of Navigation Studies. The IWUB, 
created 1986, by the Water Resources Development Act of is charged with advising Congress on priorities 
for improving inland waterways. To provide technical 
information desired by the IWUB and the Army, the 
division performs ongoing analysis of construction and 
funding schedules for navigation projects on the fueltaxed 
inland waterways system. This analysis 
incorporates the USACE and IWUB priority 
evaluations of inland navigation projects in accordance 
with the budget constraints imposed by the Trust Fund. 
Ongoing Studies: 
* National Dredging Needs Study (Section 402 of 
the WRDA of 1992) 
* Transportation Systems Program, which includes: 
- Update and distribution to field of 
transportation cost models for barges, rail 
and trucks 
- Update of both ocean and inland vessel 
operating and replacement costs 
- Development of a software package for 
customizing deep draft vessel operating 
costs 
- Development of national and regional 
commodity and fleet forecasts for use in 
planning studies 
- Update of the Grain Transportation 
Model 
* Implementation Support on Components of the 
Operations and Maintenance Program Plan of 
Improvement 
* Program Management Support on Activities of the 
IWUB 
* Analysis of Inland Navigation Project Schedules 
and Financial Status of Inland Waterways Trust 
Fund 
* Analysis of Inland Navigation Benefit Categories, 
including Quality of Life and Regional Economic 
Benefits 
* R&D Coastal Navigation Work Unit on the 
Impacts of Navigation Trends on Channel Usage 
and Design 
* Economic Evaluation of North Carolina Beaches 
after Hurricane Fran 
43-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS FOR FY00 
* Analysis of USACE Dredging Quantities and 
Costs 
* Regional Economic Impact Analysis for the Upper 
Mississippi River and Illinois Waterway 
Navigation Study and Inner Harbor Navigational 
Lock Replacement Study 
* Development of Risk-Based Methods to Apply to 
the Evaluation of Deep Draft Navigation Projects 
* Analysis of the recovery of waterway and harbor 
navigation costs, including development of a 
possible Harbor Services User Fee to replace the 
existing Harbor Maintenance Tax 
* Assist in the development of the Navigation 
Information Sharing website for inland waterway 
commodity movements by volume and value 
between states 
Recent Products: 
* Historical Economic Perspective of Ports, National 
Dredging Needs Study 
* Background and Information Papers, National 
Dredging Needs Study 
* Evaluation of Economic Benefits of Cruise Ships 
* Navigation Components of CW Information 
Brochures for U.S. states 
* Annual Report to Congress on the Status of the 
Harbor Maintenance Trust Fund for FY99 
* Shallow Draft Navigation Analysis for the Lower 
Snake River Juvenile Salmon Migration Study 
* Financing Practices for International Dredging of 
Port and Harbors 
* Information Brochure: Inland Navigation Value to 
the Nation 
* Projected and Actual Traffic on Inland Waterways 
PROGRAM ANALYSIS DIVISION 
The Program Analysis Division develops and 
carries out assigned program analysis and evaluation 
studies to assist HQUSACE in Civil Works program 
development, defense and execution. The Division 
also provides analytical support to HQUSACE, and 
Corps field offices to describe, evaluate and improve 
the performance of the Civil Works program. 
Major activities undertaken in FY 00 include the 
following: 
* Civil Works Strategic Plan. The division 
managed the formulation and development of the 
draft Civil Works program development strategic 
plan. This effort has been one of the highest 
priorities of Civil Works. Division staff performed 
extensive background research, and prepared a 
white paper distilling national water resources 
issues. Based on this analysis, division staff 
prepared the draft strategic plan that uses the 
information on water resources challenges to lay 
out an investment plan, and program development 
priorities for the Corps response to the nation's 
water resources needs. Division staff also 
prepared and presented briefings on the national 
water resources challenges to the DCGCW, DCG, 
CG, ASA(CW), and prepared briefing materials 
for presentation to the House and Senate 
Appropriations committees. In addition, division 
staff prepared budget testimony for the Chief 
presenting the water resources challenges, and 
prepared speeches focused on national water 
resources needs for presentation at ICWP, TRB, 
NAFSMA, Arkansas Governor's Council, and 
Association of American Geographers 
conferences. 
* National "Join the Dialogue" initiative 
supporting the CW program development strategic 
plan. The strategic plan development effort had a 
major public outreach component consisting ofa 
public brochure and fact sheets summarizing 
national water resources challenges, a public web 
site, and fourteen regional and two national 
"listening session" public meetings. Program 
Analysis Division staff led the team that 
successfully planned and executed this ambitious 
public involvement strategy in a highly volaile 
environment. Over 25,000 brochures were 
distributed to interested stakeholders and agencies. 
Some 1,400 persons representing a diverset of 
interest groups attended the listening sesSiOn 
meetings. Our public web site had over 8,000 
"hits" during the period Mar - Sep. Listening 
43-6

INSTITUTE FOR WATER RESOURCES 
sessions were well regarded by the large majority 
of those attending as providing an open and 
unbiased forum to voice concerns about water 
resources issues. Some 536 water resources issues 
were put forward by listening session attendees. 
These have been grouped into 18 discreet water 
resources challenge areas that will be used for 
updating the CW strategic plan. 
* Civil Works Planners Training and 
Development Task Force. Program Analysis 
Division provided primary analytic support of this 
high priority Civil Works effort to improve 
planner capability. Division staff put together the 
overall concept and charter for the task force 
effort, and co-chaired the task force effort. The 
task force completed interviews with planning 
chiefs to help define problems and needs; 
successfully initiated a web-based survey for field 
planners; and created a basic plan formulation 
"short course" which will be fielded in FY 01. 
* Value to the Nation Brochures. Program 
Analysis Division staff managed the development 
of the "Value to the Nation" brochure on 
recreation. This brochure describes the value to the 
nation received from the investment in recreation 
at Corps projects. Over 50,000 copies of this 
brochure have been reproduced for distribution at 
Corps project sites. 
THE NAVIGATION DATA CENTER (NDC) 
The Navigation Data Center's (NDC) primary 
mission is to collect and supply navigation data and 
information for the purpose of enhancing productivity 
of both the U.S Army Corps of Engineers and the 
nation by providing quality and timely information for 
water transportation - related analysis and decision 
making. NDC directly supports the USACE navigation, 
regulatory, emergency and readiness functions as well 
as those of other Federal, state and local agencies with 
roles or interests in water transportation. The Office of 
Management and Budget has designated the USACE, 
acting through NDC, as the Federal Central Collection 
Agency for waterborne commerce and vessel activities 
and waterway infrastructure data and statistics. As the 
Federal central source, NDC continued its intra- and 
interagency coordination during FY00. To insure 
Corps interoperability and minimize data entry, NDC 
continued the program to link NDC data as well as data 
from other O&M business areas with the Corps 
financial data system to produce quality, timely, 
Performance measures, such as cost per ton-mile of 
commerce moved. This project, called the Operation 
and Maintenance Business Information Link (OMBIL), 
assists the Corps transition to business oriented 
management. Benefits realized in FY00 abilities were the to link and layer navigation information to 
gain a more comprehensive understanding of 
navigation issues. NDC supports data users by 
supplying information in both standard and custom 
products. NDC maximizes the use of electronic 
distribution of information via the internet, the Corps 
intranet and by combining public data and reports on 
one annual CD-ROM. 
Waterborne Commerce and Vessel Statistics 
NDC continued to provide annual preliminary and 
final U.S. foreign and domestic vessel, vessel activity 
and commercial traffic products, plus monthly tonnage 
estimates, on the internet in order to furnish both the 
government and the public more accessible and more 
timely information concerning waterborne commerce 
statistics. During FY00, the system for automated 
collection of foreign vessel movements data continued 
to expand to additional Customs ports. This system, a 
partnership between Customs and the Corps, now 
generates over 95% of the vessel movement records in 
automated form. The dock-specific data is edited at the 
data input site offering more accurate, more complete, 
and more timely data at a reduced cost. NDC 
performed a data quality comparison between vessel 
manifest-based import/export cargo data versus tradebased 
import/export data. As a result, NDC will use 
the manifest-based data as the primary source for our 
calendar year 2000 official statistics because of its 
better geographic accuracy, completeness and container 
information. The trade-based dataset that NDC has 
supplied in the past will continue to be produced, in 
43-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WUKK IURK YUU 
partnership with the Maritime Administration; so that 
data users will still have access to the cargo value and 
commodity specificity strengths of this dataset. 
Ports and Waterways Infrastructure 
Supporting the Corps Federal Central Collection 
Agency responsibility for documenting the nation's 
port infrastructure which is supported by Federal 
channels, NDC completed the revision of five of the 56 
volume Port Series. These five were completed, 
distributed, and are available for sale in FY 2000: Port 
Series (PS) Report No. 10 - Port of Baltimore, 
Maryland; PS No. 14 - The Ports of Savannah and 
Brunswick, Georgia; PS No. 43 - The Port of 
Cleveland, Ohio; PS No. 44 - The Port of Toledo, 
Ohio; PS No. 49 - The Ports of Duluth, MN; Superior, 
WI; Taconite Harbor, Silver Bay, and Two Harbors, 
MN; and Ashland, WI. In addition to the completed 
reports, field surveys were conducted and data entered 
into the Ports and Waterways Information Management 
System (PWIMS) for the following: The Lake Charles 
section of PS No. 21 - The Ports of Baton Rouge and 
Lake Charles, LA; PS No. 22 - The Ports of Port 
Arthur, Beaumont, and Orange, TX; PS No. 30 - The 
Ports of San Francisco, Redwood City, and Humboldt 
Bay, CA; PS No.31 - The Ports of Oakland, Alameda, 
Richmond, and Ports on Carquinez Strait, CA; PS No. 
41 -The Ports of Buffalo, Rochester, Oswego, and 
Ogdensburg, NY; PS No. 42 - U.S. Ports on Lake Erie 
(Erie, PA; and Conneaut, Ashtabula, Fairport Harbor, 
Lorain, Huron, and Sandusky, OH); and PS No. 68 - 
Ports on the Missouri, Arkansas, Verdigris, White, 
Ouachita and Red Rivers. The Red River facilities are 
new additions to the database. 
In addition to the printed reports, data for the 9,280 
individual docks were made available in summary form 
and as data files on the Internet and Public CD. These 
data are updated as each port area is re-surveyed and 
verified as current. 
Lock Performance and Characteristics 
The lock performance database was migrated to an 
ORACLE relational database system. Most lock 
operators now enter data via a standard web browser 
directly into the central database residing on a Corps 
processing center computer. This has provided a near 
real time capability and a more rapid flow of 
information to the user. Data reports and files are 
available to Corps personnel via intranet read-only 
access to the database reports page. Other lock 
information, summaries and reports are available to the 
public on the Navigation Data Center's homepage. 
Custom reports and summaries are available upon 
request. Lock characteristics, the physical descriptions 
of all the Corps owned/operated locks, data are also 
available on the web to all users. These lock databases 
are feeder systems to the Operations and Maintenance 
Business Information Link (OMBIL) decision suporl 
system. 
Dredging Statistics 
This web-based ORACLE database is successful in 
supplying information on all Corps performed and 
contracted dredging to the Corps, industry and private 
users. Data entry and report generation is 
accomplished via the Corps Intranet and enables all 
Corps members access to the information in the central 
system. The database continues to meet user needs 
with bi-weekly updates of Corps and contract dredging 
information made available on the public Internet site. 
In addition to the standard reports and summaries, 
custom queries and reports are quickly generated to 
meet user requests. The extensive use of the data by 
the Corps and industry has resulted in improved 
bidding competition and a more efficient utilization of 
dredging equipment. The dredging database is a feeer 
system to the Operations and Maintenance Business 
Information Link (OMBIL) decision support system. 
43-8

INSTITUTE FOR WATER RESOURCES 
INTERNATIONAL NAVIGATION ASSOCIATION 
(PIANC) 
The International Navigation Congresses (PIANC) 
is an organization consisting of approximately 42 
national members. From its headquarters in Brussels, 
Belgium, it acts as a clearinghouse of technology and 
experiences relating to ocean and inland navigation 
improvements which are exchanged among engineers, 
scientists, port operators, and marina and vessel 
owners, to name a few. Its objective, broadly stated, is 
to promote the worldwide progress of inland and 
maritime navigation through the exchange of technical 
information on port and waterway development. The 
objective of the Association is met by holding 
International Congresses and by publishing technical 
bulletins and special reports. Special reports are 
published describing the results of the work of 
international research teams, or working groups, 
composed of those national members interested in the 
Particular subject under study. Examples include 
methods of treatment and disposal of dredged material, 
flexible revetments in the marine environment, an 
international survey of dry dock facilities and their 
characteristics, the wildlife habitat and port 
management, standards for recreation navigation 
waterways, and various other topics relating to port and 
waterway development. The organization also serves 
as an excellent source of identifying individual and 
corporate expertise throughout the world on PIANCrelated 
subjects. Personal interchange of ideas and 
information also is promulgated by members attending 
the International Congresses held once every four 
years, and technical working group meetings held 
several times each year. 
The business affairs of the Association are 
managed by the Permanent International Commission 
(PIC), which in 2000 was renamed the Annual General 
Assembly (AGA). It is composed represent of delegates who each member government. The number of 
delegates is determined by the size of the national 
Ulebership, but may not exceed 11 per country. 
The United States (U.S.), which has been a 
member of PIANC since 1902, provides an annual 
aPpropriation for the support and maintenance of the organization This includes an annual subvention to 
PIANC International and payment of a portion of the 
travel expenses of officially appointed national 
delegates (Commissioners) of the United States to 
meetings of the AGA and Congresses. Total annual 
appropriation for the U.S. Section, PIANC is currently 
$45,000, including the annual subvention of 
approximately $11,000. 
The U.S. Section is administered by law, under the 
auspices of the Department of the Army (Corps of 
Engineers). It is located in the Institute for Water 
Resources (IWR), Casey Building, Humphreys 
Engineer Center. The U.S. Section is composed of 
both individual and corporate members who pay 
membership dues. Membership of the U.S. Section on 
September 30, 2000, totaled 337, consisting of 270 
individual members, 66 corporate members and I 
student member. 
United States National Commission 
The United States National Commission 
constitutes the governing body of the National Section. 
At the beginning of FY00 the ex-officio offices of the 
U.S. National Commission were: Chairman, (Dr. 
Joseph W. Westphal, Assistant Secretary of the Army 
(CW)); President, (MG Hans A. Van Winkle, Director 
of Civil Works); and Secretary, (Mr. Thomas M. 
Ballentine) an employee of IWR. 
At the beginning of FY00 U. S. National 
Commissioners were: Mr. Robert D. Nichol, President, 
Moffatt and Nichol Engineers; Mr. Kurt J. Nagle, 
President, American Association of Port Authorities; 
Mr. Charles C. Calhoun, Vice President representing 
the Central Region of the U. S. Section and consultant; 
Dr. Anatoly B. Hochstein, Director, National Ports and 
Waterways Institute, University of New Orleans; Mr. 
Joseph H. Pyne, President, Kirby Corporation; Ms. 
Doris J. Bautch, Chief Division of Ports, Maritime 
Administration, U.S. Department of Transportation; 
Mr. Walter D. Ritchie, Vice President representing the 
Western Region of the U. S. Section and Vice 
President, KPFF, Inc.; and Mr. Thomas H. Wakeman, 
Ill, Vice President representing the Eastern Region of 
44-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS FOR FY00 
the U. S. Section and General Manager, Waterways 
Development Division, Port Commerce Department, 
Port Authority of New York and New Jersey. 
The Treasurer is Captain James R. Carman, 
(retired,) who formerly served as Chief, Division of 
Port and Intermodal Planning, Office of Port and 
Domestic Shipping in the Maritime Administration. 
Conferences 
The Port of Oakland served as the host 
organization for the 2000 annual meeting of the U. S. 
Section. The theme of the conference, which was held 
May 3-5, 2000, was Navigation: Meeting Customer 
Needs for the New Millennium. A specialty workshop 
on Innovation Sediment Decontamination and 
Treatment Technologies was held on May 2" in 
conjunction with the conference. 
Two former Commissioners, both Californians, 
were named to the position of Commissioner Emeritus 
during the conference. The Honorable Joseph W. 
Westphal, Chairman, U. S. Section, recognized and 
presented plaques to Colonel Charles R. Roberts, USA 
(Ret.) who served as a Commissioner from 1986-1993 
and to Mr. Charles F. Connors, a member of the 
Commission from 1989-1997. 
The U. S. Section also participated in 
conferences which were sponsored by American 
Association of Port Authorities (AAPA) and the 
National Waterways Conference, Inc. (NWC). 
On March 20, 2000, the U. S. Section 
sponsored a breakfast at the Spring meeting in 
Washington, D. C. of the AAPA. Dr. James F. 
Johnson, Chief, Planning and Policy Divisions, 
HQUSACE, was the principal speaker. The theme 
of Dr. Johnson's remarks was the responsibility of 
the Corps of Engineers to bring national water 
resource needs to the attention of national 
decision-makers. 
The Association continued the long tradition of 
holding a PIANC breakfast at the annual meeting of the 
National Waterways Conference, Inc. Three speakers 
addressed the subject of Lock Automation and Remote 
Control of Locks. The speakers, all of whom are with 
the U. S. Army Corps of Engineers were: Dr. Ashok 
Kumar, Project Leader, Engineer Research and 
Development Center, Construction Engineering 
Research Laboratory (CERL); Mr. Gary M. Jones, 
Chief, Mechanical/Electrical Section, U. S. Army 
Engineer District, St. Louis; and Mr. Michael L. 
Sommars, Electrical Engineer, U. S. Army Engineer 
District, St. Louis. The speakers addressed recent 
developments in lock automation in European 
countries, activities to automate locks in the St. Louis 
District and plans to improve the Panama Canal. Mr. 
Charles C. Calhoun, Vice President, Central Region, 
represented the U. S. Section of PIANC and served as 
chairman of the session. 
On October 22, 1999, a group of 25 members 
of the U. S. Section who reside in the New York City 
metropolitan area attended a luncheon sponsored by the 
Section. The gathering was held at One World Trade 
Center in the offices of the Port Authority of New York 
and New Jersey. Ms. Lillian C. Borrone, Director, Port 
Commerce Department, made welcoming remarks. Dr. 
John E. Ricklefs, Director of Planning, Moffatt and 
Nichol Engineers International, spoke on international 
port planning in the 21' century. Arrangements forthe 
meeting were made by Mr. Thomas H. Wakeman, I11, 
Dredging Program Manager, the Port Authority of 
New York and New Jersey, and a Vice President of the 
U. S. Section of PIANC. 
Committees and Commissions 
The Annual General Assembly (AGA) ofPIANC 
took action at its meeting on May 17, 2000, to rename 
the international committees and commissions. The 
new names followed by the former names which are 
enclosed by brackets are: 
Inland Navigation Commission (InCom) 
I Permanent Technical Committee I]; Maritime 
Navigation Commission (MarCom) ( Permanent 
Technical Committee IIl; Recreational 
Navigation Commission (RecCom) [Pennanent 
Commission for Sport and Recreational 
Navigation]; Environmental Commission 
(EnviCom) [Permanent Environmental 
Commission]; International Coopersiof 
Commission (CoCom) I Permanent Committee 
for Cooperation and Development]. The names0f 
the Finance Commission, Editing Commissio, 
Commission for Communication and the 
Executive Committee were not changed 
Representatives to Committees and Commissions 
The U.S. Section representatives to the InCoT, 
MarCom, RecCom, EnviCom and CoComn were as 
follows: 
44-2

INSTITUTE FOR WATER RESOURCES 
Environmental Commission -- Mr. Ronald G. 
Vann, Chief, Waterways and Ports Branch, U. S. Army 
Engineer District, Norfolk. 
International Cooperation Commission-- 
Dr. Anatoly B. Hochstein, National Ports and 
Waterways Institute, University of New Orleans. 
Inland Navigation Commission -- Dr. Sandra K. 
Knight, P.E., USAGE. Engineer Research and 
Development Center, Waterways Experiment Station, 
Co-Principal, Tim Parker, Parker Towing Company. 
Maritime Navigation Commission -- Mr. 
Thomas H. Wakeman, III, General Manager, 
Waterways Development Division, Port Commerce 
Department, Port Authority of New York and New 
Jersey, Co-Principal, 
E Dan Allen, Moffatt & Nichol Engineers. 
Recreational Navigation Commission -- Mr. 
John M. Nichol (Retired) and Mr. Richard B. 
Dornhelm, Vice-President, Moffatt and Nichol 
Engineers, Co-Principal, Jack C. Cox, PBS&J. 
Commission for Communications -- Mr. Barry 
W. Holliday, Chief, Dredging and Navigation Branch, 
Operations, Construction, Readiness Division, Office 
of the Chief of Engineers 
Active Technical Working Groups and Reports 
Published During the Year 
During the year two reports were published: 
MarCom WG 35, Dangerous Goods in Ports, and 
EnviCom WG 3, Glossary of Environmental Terms 
and Terminology as Related to PIANC Activities. 
No new working groups (WG) were approved. The 
titles of active working groups and the names of the U. 
S. Representatives are: 
InCom WG 19, Problems of Collisions Due to 
the Presence of Bridges, Organized September 1994, 
Mr. Michael A. Knott, P.E., Moffatt and Nichol 
Engineers. 
InCom WG 21, Economic Studies of Inland 
Waterways. Organized February 1996. Mr. David 
Grier, USACE, Institute for Water Resources. 
InCom WG 22, Safety in Inland Navigation. 
Organized November 1996. RADM William T. 
MCMullen, Texas A&M, Galveston, Texas. 
InCom WG 23, Technical and Economic 
Problems of Channel Icing. Organized December 
1997. Mr. Claude Strauser, USACE District, St. Louis. 
InCom WG 24, Vessel Traffic Management in 
the Inland Waterways. Organized March 1998. Mr. 
J. Michael Sollosi, U. S. Coast Guard. 
InCom WG 25, Maintenance and Renovation of 
Navigation Infrastructure. Organized July 1999. Mr. 
James McDonald, USACE, WES and Captain James 
Blanchar, USACE District, Rock Island. 
MarCom WG 33, Fenders. Organized January 
1996. Mr. Mark T. Faeth, Han-Padron Associates. 
MarCom WG 34, The Effect of Earthquakes on 
Port Structures. Organized June 1996. Mr. Bradley 
P. Erickson, VZM TranSystem Corporation; Valery M. 
Buslov, Ph.D., Han-Padron Associates; and Stephen E. 
Dickenson,, Ph.D., Oregon State University. 
MarCom WG 35, Dangerous Goods in Ports 
(Handling, Storage and Transportation). Organized 
October 1996. 
MarCom WG 36, Catalogue of Precast 
Elements. Organized October 1996. Dr. Billy L. 
Edge, Texas- A&M University. 
MarCom WG 37, Advances in Maritime 
Intermodal Freight Transportation. Organized 
September 1997. Mr. M. John Vickerman, VZM 
TranSystems Corporation. 
MarCom WG 38, Polar Navigation. Organized 
December 1997. Orson P. Smith, Ph.D., University of 
Alaska, Anchorage. 
MarCom WG 39, Monitoring of Breakwaters. 
Organized January 1998. Mr. James D. Prehn, RLS, 
W.F. Baird & Assoc. Ltd. 
MarCom WG 40, Guidelines for the Designing 
of Berm Breakwaters. Organized January 1998. Mr. 
Jeffrey F. Gilman, P.E., Vice President, Peratrovich, 
Nottingham & Drage, Inc. 
MarCom WG 41, High-Speed Ferries at Sea 
and Port Approaches. Organized July 1999. LT.Alan 
L. Blume, U.S. Coast Guard. 
44-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS FOR FY00 
RecCom WG 9, Regeneration of Harbour Areas 
for Sport and Pleasure Navigation Use. Organized 
July 1995. Mr. Jack C. Cox, PBS&J Consultants. 
RecCom WG 10, Provision for Low Cost 
Moorings for Seasonal Use. Organized July 1995. 
RecCom WG 11, Waterway Planning for 
Marinas and Resorts. Organized February 1997. Mr. 
Ron Stone, National Marine Manufactures Association. 
RecCom 12, Recreational Navigation and 
Nature. Organized February 1998. Mr. Scott Jackson 
USACE Waterways Experiment Station and Mr. Paul 
E. Donheffner, Oregon State Marine Board. 
RecCom WG 13, Dredging of Marinas. 
Organized July 1999. Mr. R. W. Lofgren, Lofgren 
Imagineering & Construction Company. 
EnviCom WG 2, Wildlife Habitat and Port 
Management. Organized March 1995. 
EnviCom WG 4, Environmental Management 
System for Ports. Organized January 1996. 
EnviCom WG 5, Environmental Guidelines for 
Marine, Nearshore and Inland Confined Disposal 
Facilities for Contaminated Dredged Material 
Organized January 1998. Michael C. Palermo, Ph.D., 
USACE Waterways Experiment Station and Mr. John 
C. Roberge, Ocean and Coastal Consultants, Inc. 
EnviCom WG 6, Ecological and Engineering 
Guidelines for Sustainable Development of Inland 
Navigation as Related to Navigation Infrastructure, 
Organized July 1999. Craig Fischenich, Ph.D., 
USACE 
Waterways Experiment Station. 
EnviCom WG 7, Ecological and Engineering 
Guidelines for Wetlands Restroration in Relation to 
the Development, Operation and Maintenance of 
Navigation Infrastructure. Organized July 1999. 
Russell Theriot, Ph.D., USACE, Waterways 
Experiment 
Station. 
44-4

INTERNATIONAL BOUNDARY WATERS BOARDS 
In order to carry out United States obligations 
under international agreements, the Office of the Chief of 
Engineers and several Corps divisions and districts with 
jurisdiction over areas bordering Canada have 
representation on numerotus international boards, 
committees, and other groups. The majority of these 
boards were established by the International Joint 
Commission (IJC) as empowered in accordance with the 
provisions of the Boundary Waters Treaty of 1909 
between the United States and Great Britain (for Canada). 
IJC boards fall into two broad categories: boards of 
control, which are more or less permanent and supervise 
compliance over an IJC order; and engineering, technical. 
or study boards, which are usually dissolved after 
completing and reporting on an investigation assignment. 
In addition to boards created by the Commission, 
other international boards and committees are created by 
treaties or other arrangement in matters concerned with 
the water resources of joint interest, and the members 
report directly to the Governments or establishing agency. 
International boundary waters boards and committees 
having Corps of Engineers memberships during the fiscal 
year are listed in Table 45-1. For an explanation of the 
constitution of the various boards and committees, see the 
annual reports, Volume II for fiscal years 1977 and 1980. 
"TABLE 45-1 
International Boundary Waters Boards Having Corps of Engineers Members 
BOARD NAME 
YEAR 
ESTABLIISIEI) 
UNITED STATES 
REPRESENTATION 
i. Int. Lake Superior 
2. Int. St. Croix River 
3. Int. Lake Memphremagog 
4. nt. Lake of the Woods Control Board 
5. Int. Lake Champlain 
6. Int. Kootenay Lake 
7. Int. Rainy Lake Board of Control 
8. Int. Osoyoos Lake 
9. Int. Souris-Red Rivers Engineer Board 
10. Int. Niagara 
11. Int. St Lawrence River 
12. Coordinating Committee on Great Lakes 
Basic Hydraulic and Hydrologic Data 
13. Int. Niagara Committee 
1914 
1915 
1920 
1925 
1937 
1938 
1941 
1943 
1948 
1953 
1953 
1953 
1955 
* Division Engineer, Great Lakes and Ohio River 
Division 
*District Engineer, New England District 
*District Engineer, New York 
*District Engineer St. Paul - Chairman 
*District Engineer, New York 
* 1. District Engineer, Seattle 
2. Dept. of Interior, USGS, Boise, ID 
*District Engineer, St. Paul -- Chairman 
1. District Engineer, Seattle 
2. *Dept. of Interior, USGS, Tacoma, WA 
3. Washington State Parks & Recreation 
Commission, Olympia, WA 
1. District Engineer, St. Paul - Board Member 
2. *Dept. of Interior, BOR, Wash., D.C. 
3. Dept. of Interior, USGS, Reston, VA 
1. *Division Engineer, Great Lakes and Ohio River 
Division 
2. Dept. of Energy, FERC, Wash., D.C. 
I. *Division Engineer, Great Lakes and Ohio River 
Division 
2. Civil Engineer, Retired 
3. New York Power Authority 
4. Rochester Institute of Technology 
5. Cornell University 
1. Division Engineer -- Great Lakes and Ohio River 
Division 
2. Dept. of Commerce, Ann Arbor, MI 
*Division Engineer, Great Lakes and Ohio River 
Division 
45-1

BOARD NAME 
YEAR 
ESTABLISHED 
UNITED STATES 
REPRESENTATION 
14. Int. Souris River Board of Control 
15. Columbia River Treaty Entities 
16. Columbia River Treaty 
17. Int. Champlain-Richelieu 
1959 
1964 
1964 
1975 
18. Study Team 1999 
1. District Engineer, St. Paul - Board Member 
2. *ND State Engr., Bismark, ND 
3. Dept. of Interior, USGS, Bismarck, ND 
1. Division Engineer, Northwestern Division 
2. *Bonneville Power Admin., Portland, OR 
1. *HQUSACE, CECW-ZB, Wash., D.C. 
2. Department of Energy, Tucson, AZ 
1. *New York Dept. Environmental Conservation 
2. District Engineer, New York 
3. Vermont Environmental Conservation. Agency 
4. New England River Basins Commission, Staff 
Associate 
5. Dept. of Interior F&WS, Boston, MA 
1. *Deputy Conmmander, Great Lakes Regional 
Office, Great Lakes and Ohio River 
Division 
2. Bureau of Reclamation 
3. Great Lakes Commission. 
4. Council of Great Lakes Governors 
5. U.S. Geological Survey 
6. Western Sates Water Council 
* Signifies U.S. Section Chairman 
Protection of the Waters of the Great Lakes Under the February 10, 1999, Reference 
A final report, "Protection of the Waters of the 
Great Lakes" was submitted to the U.S. and Canadian 
Governments on February 22, 2000 by the 12-member 
Study Team. The Study Team was co-chaired by the 
Deputy Commander of the Great Lakes Regional Office, 
Great Lakes and Ohio River Division 
Because there is uncertainty about the 
availability of Great Lakes water to meet all ecosystem 
needs, including human needs, over the long term, the 
report concludes that water should be managed with 
caution to protect the resource for the future. It also 
concludes that international trade law obligations, 
including the provisions of the North American Free 
Trade Agreement (NAFTA) and the General Agreement 
on Tariffs and Trade (GATT), do not prevent Canada and 
the United States from taking measures to protect their 
water resources and preserving the integrity of the Great 
Lakes basin ecosystem so long as there is no 
discrimination against individuals from other countries in 
the application of those measures. 
The report recommends that federal, state and provincial 
governments should not authorize or permit any new 
removals, and should exercise caution with respect to 
major new or increased consumptive use, until these 
standards have been promulgated or until 24 months have 
passed, whichever comes first. States and provinces 
should also build on the Great Lakes Charter by 
developing a broader range of consultation procedures 
than currently exist. 
The Final Report responds to the request made by the 
governments of Canada and the United States in their 
February 10, 1999 Water Uses Reference for 
recommendations for the protection of the Great Lakes. 
The IJC previously issued an Interim Report under this 
Reference on August 18, 1999. Since issuing its Interim 
Report, the IJC has obtained additional information frolm 
a variety of sources, including 12 public hearings. 
45-2

INVESTIGATION OF PROJECTS UNDER FEDERAL POWER ACT 
- This page intentionally left blank - 
46-1

REGULATORY, SUNKEN VESSEL REMOVAL AND 
NATIONAL EMERGENCY PREPAREDNESS ACTIVITIES 
1. Regulatory Activities 
Authorities. The following authorities 
charge the Corps of Engineers with the 
regulation of various construction related 
activities in U. S. waters and wetlands: Sections 
9 and 10 of the Rivers and Harbors Act of 1899 
(structures in waterways and the alteration of 
waterways); Section 103 of the Marine, 
Protection, Research, and Sanctuaries Act of 
1972 (Ocean Dumping); and Section 404 of the 
Clean Water Act (discharge of dredged or fill 
material). 
Work Completed. During FY 2000, the 
Corps reviewed and authorized approximately 
88,500 permit activities, 90 percent of which 
were approved within 60 days. About 6400 
projects were issued individual permits, and 
another 82,000 activities were reviewed and 
approved under regional or nationwide general 
permits. General permits are issued to the public 
at large and define types of minor activities with 
no more than minimal adverse effects on the 
aquatic environment, which do not usually 
require the extensive review necessary for 
projects authorized by individual permits. Use 
of general permits provides significant relief to 
the regulated public by avoiding red tape for 
small projects with minimal environmental 
impacts. The Corps denied only about 200 
Permits during FY 2000 since most projects 
which might otherwise have been denied a 
Permit were either modified or conditioned to 
meet Corps requirements, scaled down to qualify 
for approval under general permits, or 
withdrawn. About 3,300 permit applications 
were either withdrawn or canceled. Under regulatory the program, the Corps made over 60,000 
Jurisdiction determinations in FY 2000, many of 
which were made in response to requests from 
landowners who were not applying for permits 
The Corps investigated approximately 6,000 
alleged illegal activities, most of which were 
violations of Section 404 of the Clean Water 
Act. Under the permit program in FY 2000, the 
Corps authorized the filling of approximately 
18,900 acres of wetlands but required the 
restoration, enhancement, or creation of 
approximately 44,800 wetland acres. 
During FY 2000, the Corps initiated an 
Administrative Appeals process for applicant's 
who have had their permit denied, or believe that 
the conditions of an issued permit are so onerous 
that the applicant considers the conditions as a 
denial of their application. Appeals of 
jurisdiction determinations are also included. 
In March 2000, the Corps issued new 
Nationwide Permits. These were intended to 
increase the protection of the Nation's aquatic 
resources, with particular attention to protection 
of the Nation's 100 year floodplains. 
47-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE A 
GENERAL REGULATORY FUNCTIONS 
Obligations 
Unobligated Balance - 30 Sep 99 
Allotments 
Total Funds Available 
Obligations 
Unobligated Balance- 30 Sep 00 
Expenditures 
Unexpended Balance - 30 Sep 99 
Allotment 
Total Funds Available 
Expenditures 
Unexpended Balance - 30 Sep 00 
Investigation and Removal of Sunken Vessels 
Under the authority of Sections 19 and 20 of 
the River and Harbor Act of 1988, the Corps of 
Engineers investigated sunken vessels in navigable 
$ 4,457,336 
$ 117,000,000 
$ 121,457,336 
$ 111,037,788 
$ 10,419,548 
$ 6,837,237 
$ 117,000,000 
$ 123,837,237 
$ 111,336,717 
12,500,521 
waters and removed those obstructing navigation 
For obligation expenditures, see Table B. 
47-2

REGULATORY, SUNKEN VESSEL REMOVAL AND NATIONAL EMERGENCY PREPAREDNESS ACTIVITIES 
TABLE B 
REMOVAL OF SUNKEN VESSELS 
($000) 
Obligations 
Unobligated Balance - 30 Sep 99 
Allotment 
Total Funds Available 
Obligations 
Unobligated Balance - 30 Sep 00 
Expenditures 
Unexpended Balance - 30 Sep 99 
Allotment 
$ 3,258 
500 
503,258 
1,061 
$ 502,197 
$ 3,258 
500 
$ 503,258 
1,061 
$ 502,197 
Total Funds Available 
Expenditures 
Unexpended Balance - 30 Sep 00 
3. National Emergency Preparedness 
Activities 
Authority. Executive Order 12656, as amended, 
assigns responsibilities to executive departments and 
agencies in order to undertake the national 
emergency planning and preparedness activities 
necessary to develop an effective national capability 
to meet essential civilian and national security needs 
during major domestic crises (including catastrophic 
disasters) and national security emergencies. 
Status. During FY 2000, the Corps of Engineers 
continued its effort to improve the command's 
readiness posture and its ability to respond to various 
national emergencies. Emphasis on those activities 
to prepare for catastrophic natural and technological 
disasters and to improve Continuity of Government 
(COG) programs was continued. The primary focus 
during FY 2000 was to provide support to two major 
national level civil planning areas: (a) "support to the nation" ability to mobilize national assets to meet 
natinal/regional level emergencies to continuity of government and ancdo n(tbi)n usiutyp port of 
Operations during national emergencies. Lessons 
learned from Midwest Floods of 1993, as well as 
those gleaned from events such as Hurricanes Hugo, 
Andrew and Iniki, Loma Prieta and Northridge 
Earthquakes and the evolving New Madrid 
Earthquake scenario, clearly indicate that, while the 
Federal Response Plan is a solid response system, it 
does not provide for response to disasters with 
national implications in a way that is sufficiently 
timely or comprehensive. To alleviate this situation, 
the Corps is developing scenario specific plans for 
catastrophic disasters with the intent to exercise these 
plans. Such exercises, which will involve federal, 
state and local officials, should lead to a more timely 
and effective execution of Corps responsibilities 
during disasters that have national impacts. One of 
the more significant exercises being planned involves 
a Los Angeles Earthquake scenario, that is scheduled 
for December 2000. The purpose of this exercise will 
be to bring together federal, state, regional, and local 
government officials for candid, solution-focused 
exchanges on intergovernmental preparedness for a 
catastrophic earthquake event in Southern California. 
Emphasis will be on intergovernmental collaboration 
and exchange of ideas. Other activities include a 
continuation of the planning for and maintenance of 
emergency facilities needed to support continuity of 
operations. For National Emergency Preparedness 
fiscal year obligations and expenditures, see Table C. 
47-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 2000 
TABLE C 
NATIONAL EMERGENCY PREPAREDNESS 
Obligations 
Unobligated Balance - 30 Sep 99 
Appropriations FY 00 
774,381 
5,000,000 
$ 5,774,381 
Total Funds Available 4,749,974 
Obligations 
Unobligated Balance - 30 Sep 00 
Expenditures 
Unexpended Balance - 30 Sep 99 
Appropriations FY 00 
Total Funds Available 
Expenditures 
692,572 
$ 1,147,124 
5,000,000 
$ 6,147,124 
4,498,054 
Unexpended Balance - 30 Sep 00 $ 1,649,070 
47-4

CIVIL EMERGENCY MANAGEMENT ACTIVITIES 
Authority. Public Law 84-99 (33 U.S.C. 70 n) 
(69 Stat. 186) provides the authority for the U. S. 
Army Corps of Engineers to provide a full 
spectrum of emergency management/disaster 
mistance activities using the Flood Control and 
Coaal Emergencies (FCCE) appropriation. 
Under PL 84-99, the Chief of Engineers, acting 
for the Secretary of the Army, is authorized to 
undertake activities including disaster 
preparedness for all natural disasters, Advance 
Measures (preventive measures when faced with 
a imminent threat of unusual flooding), 
emergency operations (Flood Response and Post 
Flood Response), rehabilitation of flood control 
works damaged by flood or coastal storm, 
protection or repair of federally authorized shore 
potective works threatened or damaged by 
coastal storm, and provision of emergency water 
due to drought or contaminated water source. 
Under The Robert T. Stafford Disaster Relief 
md Emergency Assistance Act (42 U.S.C. 5121 
et seq.) (88 Stat. 143) (The Stafford Act), the 
Federal Emergency Management Agency 
(FEMA) may direct USACE to use its resources 
to provide assistance in the event of a major 
disaster or emergency declaration by the 
Pridt. Under The Stafford Act and its 
implementing Federal Response Plan, USACE 
has a standing mission to provide assistance in 
the area of Public Works and Engineering, 
Emergency Support Function #3, for response to 
a mjor disaster or catastrophic event. 
Activities. Overall, the Civil 
Emergency Management Program ensures 
taiely, effective, and efficient disaster 
epardness, response, recovery, and mitigation 
Projects and services on a nationwide basis to 
rduce loss of life and property damage under 
DOD, USACE, FEMA, and other agencies' 
adhorities. Major disaster preparedness 
activities included: the review and updating of d preparedness and response plans to 
sue viability; training personnel to ensure 
tir capability to respond to disasters; 
Pocurement and propositioning of critical 
Quipment and supplies which would likely not 
beavaiable during initial stages of a response; 
PeiOdic xercises to test and evaluate plans, 
Peoel and training; and the inspection of 
P040 1 and non-Federal flood control projects to 
ensure their viability to provide flood protection. 
For each specific event, as needed, Headquarters 
augments its staff and the staffs of the victim 
division/district(s) to manage the event, 
addressing areas such as resource allocations 
(dollars and people), funding emergency 
contracts, purchasing needed materials, 
providing technical and direct assistance, the 
logistics of moving people and materials, and 
coordinating with tribal/Federal/state/local 
agencies involved in the event. These 
augmentation activities include overtime for 
Headquarters and field staff, emergency 
contracts, travel to the event area, purchasing 
materials and supplies, increased staffing to 
include Individual Mobilization Augmentees 
(IMA), and providing Remote Sensing/ 
Geographic Information System (RS/GIS) 
services. 
Significant Events. In 2000, the Corps 
responded to/provided recovery assistance for 
over two dozen national emergencies and 
disasters, including the Cerro Grande fire in Los 
Alamos, NM; a number of hurricanes, including 
Hurricane Floyd that hit the East Coast in 
September of 1999 killing 75 people, causing 
$6.0 billion in damages, and necessitating a half 
dozen levee rehabilitations, including the historic 
town of Princeville, NC;. a drought affecting the 
Kickapoo Tribe in Kansas; ice jam flooding in 
Pennsylvania; and flood events in San Antonio, 
TX, Tillamook, OR, the Central Valley of 
California, and other locations. During 2000, the 
Corps responded to requirements for flood 
fighting, debris removal, drought assistance, 
emergency power, the supply of ice and water, 
temporary housing, and direct and technical 
assistance. In FY2000, approximately $50M of 
Corps funds were expended on disaster response 
and recovery operations under PL 84-99 
authorities, and another $100M in funds were 
expended to execute FEMA missions. 
48-1

APPENDIX A 
Flood Control Reservoirs Operable September 30, 2000 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project eight 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) 
ALASKA 
Chena River Lakes 
ARIZONA 
Adobe 
Alamo 
Cave Buttes 
Dreamy Draw 
New River 
Painted Rock 
Tat Momolikot 
Whitlow Ranch 
ARKANSAS 
Blakely Mountain 
Blue Mountain 
DeGray 
DeQueen 
Dierks 
Gillham 
Yukon 
Kuskokwim 
Gila 
Colorado 
Gila 
Gila 
Gila 
Gila 
Gila 
Gila 
Ouachita Damn 
Arkansas 
Ouachita 
Red 
Red 
Red 
Chena River 
Skunk Creek 
Bill Wms. 
River 
Cave Creek 
Dreamy Draw 
New River 
Gila River 
Santa Rosa 
Wash 
Queen Creek 
Ouachita 
Petit Jean River 
Caddo 
Rolling Fork 
River 
Saline River 
Cossatot River 
Fairbanks 
Phoenix 
Wenden 
Phoenix 
Phoenix 
Phoenix 
Gila Bend 
Casa Grande 
Superior 
Hot Springs 
Paris 
Arkadelphia 
DeQueen 
Dierks 
Gillham 
1979 
1982 
1968 
1979 
1973 
1985 
1959 
1974 
960 
1955 
1947 
1971 
1977 
1975 
1975 
2,000 
18,350 
1,045,300 
46,600 
320 
43,520 
2,476,340 
198,550 
34,500 
2,768,500 
257,900 
881,900 
136,100 
96,800 
221,800 
NPP 
NPP 
560 
NPP 
NPP 
NPP 
NPP 
NPP 
NPP 
20,900 
2,910 
6,400 
1,680 
1,360 
1,370 
FR Earth 
FR Earth 
FRSWX Earth 
FRX 
FRX 
F 
FR 
GWX 
Earth 
Earth 
Earth 
Earth 
Earth 
F Earth 
FP 
FRWX 
FPRSQN 
FSQRW 
Earth 
Earth 
Earth 
Earth 
FSRAW Earth 
&
Rock 
FSQW Earth 
&
Rock 
50 40,200 
109 
283 
109 
50 
104 
181 
75.5 
2,275 
975 
2,275 
448 
2,320 
4,780 
12,500 
25 978 
235 
115 
243 
160 
153 
160 
1,100 
2,800 
3,400 
2,360 
2,500 
1,750 
A-1 
Length 
(Feet)

APPENDIX A 
Flood Control Reservoirs Operable September 30, 2000 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) 
Millwood 
Narrows Danm 
Nimrnod 
CALIFORNIA 
Black Butte 
Brea 
Buchanan Damn 
H.V. Eastman Lake 
Carbon Canyon 
Coyote Valley 
Dry Creek 
(Warm Springs) 
Lake and Channel 
Farmington 
Fullerton 
Hansen 
Harry L. Englebright 
Hidden Darn- Hensley 
Lake 
Isabella 
Red 
Ouachita 
Arkansas 
Sacramento 
Santa Ana 
San Joaquin 
Santa Ana 
Russian 
Russian 
San Joaquin 
Santa Ana 
Los Angeles 
Sacramento 
San Joaquin 
San Joaquin 
Little River 
Little Missouri 
Fourche LaFve 
River 
Stony Creek 
Brea Creek 
Chowchilla 
River 
Carbon Canyon 
River 
East Fork 
Russian River 
Dry Creek 
Littlejohn 
Creek 
East Fullerton 
Crk 
Big Tujunga 
Wash 
Yuba River 
Fresno River 
Kern River 
Ashdown 
Murfreesboro 
Plainview 
Orland 
Fullerton 
Chowchilla 
Brea 
Ukiah 
Healdsburg 
Farmington 
Fullerton 
Los Angeles 
Marysville 
Madera 
Bakersfield 
1966 
1949 
1942 
1963 
1942 
1975 
1961 
1959 
1983 
1952 
1941 
1940 
1941 
1975 
1953 
1,854,930 
407,900 
336,010 
160,000 
4,009 
150,000 
6,614 
122,500 
381,000 
52,000 
764 
51,000 
69,000 
90,000 
570,000 
29,200 
2,500 
3,550 
770 
NPP 
470 
NPP 
1,700 
500 
NPP 
NPP 
120 
400 
5,000 
1,850 
FSW 
FP 
FSWX 
FIRX 
FR 
FIRW 
FR 
FRXS 
FRSW 
F 
FR 
FRX 
DR 
FIRW 
FIRW 
Earth 
Concrete 
Concrete 
Earth 
Earth 
Earth 
&
Rock 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Concrete 
Earth 
Earth 
88 
175 
97 
156 
87 
205.5 
99 
160 
319 
60 
46 
97 
280 
163 
185 
Length 
(Feet) 
17,554 
941 
1,012 
2,970 
1,765 
1,800 
2,150 
3,500 
3,000 
7,800 
575 
10,475 
1,142 
5,730 
4,952 
A-2

APPENDIX A 
Flood Control Reservoirs Operable September 30, 2000 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) 
Lopez 
Martis Creek 
Merced County 
Stream Group 
Bear 
Burns 
Mariposa 
Owens 
Mojave River 
New Hogan 
North Fork, American 
River 
Pine Flat 
Prado 
Redbank and Fancher 
Creeks 
San Antonio 
Santa Fe 
Sepulveda 
Success 
Terminus 
Los Angeles 
Sacramento 
San Joaquin 
San Joaquin 
San Joaquin 
San Joaquin 
Mojave 
San Joaquin 
Sacramento 
Pacoima Wash 
Martis Creek 
Bear Creek 
Burns Creek 
Mariposa Creek 
Owens Creek 
Mojave River 
Calaveras River 
American River 
San Joaquin Kings River 
Santa Ana 
San Joaquin 
Santa Ana 
River 
Fancher Creek 
Santa Ana San Antonio 
Creek 
San Gabriel San Gabriel 
River 
Los Angeles Los Angeles 
River 
San Joaquin Tule River 
San Joaquin Kaweah River 
San Fernando 
Reno 
Merced 
Merced 
Merced 
Merced 
Victorville 
Valley Springs 
Auburn 
Piedra 
Corona 
Fresno 
Upland 
Duarte 
Van Nuys 
Porterville 
Visalia 
1954 
1971 
1954 
1950 
1948 
1949 
1971 
1963 
1939 
1954 
1941 
1993 
1956 
1949 
1941 
1960 
1961 
440 
20,400 
7,700 
7,000 
15,000 
3,600 
89,669 
325,000 
14,700 
1,000,000 
196,235 
9,712 
7,703 
32,109 
17,425 
85,000 
150,000 
NPP 
71 
NPP 
NP 
NPP 
NPP 
NPP 
715 
280 
NPP 
NPP 
NPP 
NPP 
NPP 
NPP 
400 
345 
F Earth 
FSR Earth 
F
F
F
F 
FR 
FIRX 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
&
Rock 
DR Coincrete 
FIRX Concrete 
FRWX Earth 
F Earth 
FX Earth 
FRX Earth 
FR Earth 
FIRX Earth 
FIRX Earth 
50 
113 
92 
55 
88 
75 
106 
210 
1,333 
2,670 
1,830 
4,075 
1,330 
790 
1,250 
1,960 
155 620 
429 
106 
1,820 
2,280 
44 16,135 
160 3,850 
92 23,800 
57 15,444 
142 
250 
3,490 
2,375 
A-3 
Length 
(Feet)

APPENDIX A 
Flood Control Reservoirs Operable September 30, 2000 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) 
Whittier Narrows San Gabriel San Gabriel El Monte 1957 49,143 NPP FRX Earth 56 
River and Rio 
Hondo 
COLORADO 
Bear Creek 
Chatfield 
Cherry Creek 
John Martin 
Trinidad 
CONNECTICUT 
Black Rock 
Colebrook River 
Hancock Brook 
Hop Brook 
Mansfield Hollow 
Northfield Brook 
Thomaston 
West Thompson 
Missouri 
Missouri 
Missouri 
Arkansas 
Arkansas 
Bear Creek 
South Platte 
River 
Cherry Creek 
Arkansas River 
Purgatoire 
River 
Housatonic Branch Brook 
Connecticut West Branch, 
Farmington 
River 
Housatonic Hancock Brook 
Housatonic Hop Brook 
Thames Natchaug River 
Thames Northfield 
Brook 
Housatonic Naugatuck 
River 
Thames Quinebaug 
River 
Denver 
Denver 
Denver 
Lamar 
Trinidad 
Thomaston 
Riverton 
Plymouth 
Middlebury 
Willimantic 
Thomaston 
Thomaston 
Thompson 
1978 
1974 
1950 
1943 
1977 
1970 
1969 
1960 
1968 
1952 
1965 
1960 
1965 
30,810 
231,429 
93,920 
605,115 
124,463 
8,700 
97,700 
4,030 
6,970 
52,000 
2,430 
42,000 
26,800 
109 
1,412 
852 
1,844 
563 
20 
760 
40 
21 
450 
8 
NPP 
200 
FRX Earth 
FRX Earth 
FRX Earth 
FIR Concrete 
& 
Earth 
FIRX Earth 
FR Earth 
FRSX Earth 
FRW 
FR 
FRW 
FRW 
Earth 
Earth 
Earth 
Earth 
F Earth 
FRW Earth 
180 
148 
141 
106 
200 
154 
223 
57 
97 
68 
118 
142 
5,300 
12,400 
14,300 
13,962 
6,610 
933 
1,300 
630 
520 
12,420 
810 
2,000 
70 2,550 
A-4 
Length 
(Feet) 
16,960

APPENDIX A 
Flood Control Reservoirs Operable September 30, 2000 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project eight 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool(NPP) Functions Type (Feet) 
IDAHO 
Lucky Peak 
ILLINOIS 
Carlyle 
Farmdale 
Fondulac 
Shelbyville 
Rend Lake 
INDIANA 
Brookville 
Cagles Mill 
Cecil M. Harden 
J. Edward Roush 
Mississinewa 
Monroe 
Patoka 
Salamonie 
Columbia 
Upper 
Mississippi 
Upper 
Mississippi 
Upper 
Mississippi 
Upper 
Mississippi 
Upper 
Mississippi 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Boise River Boise 
Kaskaskia 
River 
Farm Creek 
Fondulac Creek 
Kaskaskia 
River 
Big Muddy 
River 
East Fork of 
Whitewater 
River 
Mill Creek 
Raccoon Creek 
Wabash River 
Mississinewa 
Salt Creek 
Patoka River 
Salamon ie 
Carlyle 
East Peoria 
East Peoria 
Shelbyville 
Benton 
Brookville 
Tere Haute 
Rockville 
Huntington 
Peru 
Harrodsburg 
Ellsworth 
Wabash 
1955 
1967 
1951 
1951 
1970 
1970 
1974 
1952 
1960 
1969 
1967 
1964 
1978 
1966 
306,000 
983,000 
15,500 
3,780 
684,000 
294,000 
359,600 
228,120 
132,800 
153,100 
368,400 
441,000 
301,600 
263,600 
2,820 
26,000 
NPP 
NPP 
11,100 
18,900 
2,250 
1,400 
1,100 
500 
1,100 
3,280 
2,010 
976 
FIR Earth 
FSNRWA Earth 
F Earth 
F Earth 
FSNRW Earth 
FQRSW Earth 
FRSW Earth& 
Rock 
FRX Earth 
FRX Earth 
FRW Earth 
FRW Earth 
FARS Earth 
FRSQW Earth 
&
Rock 
FRW Earth 
340 2,340 
67 6,570 
80 1,275 
67 1,000 
108 3,000 
54 10,600 
182 3,000 
150 
117 
91 
137 
93 
84 
950 
1,790 
5,332 
8,100 
1,400 
1,550 
133 6,100 
A-5 
Length 
(Feet)

APPENDIX A 
Flood Control Reservoirs Operable September 30, 2000 
Characteristics of Damn 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) 
IOWA 
Coralville 
Red Rock 
Rathbun 
Saylorville 
KANSAS 
Clinton 
Council Grove 
El Dorado 
Elk City 
Fall River 
Hillsdale 
John Redmond 
Kanopolis 
Marion 
Melvern 
Milford 
Upper 
Mississippi 
Upper 
Mississippi 
Missouri 
Upper 
Mississippi 
Missouri 
Arkansas 
Arkansas 
Arkansas 
Arkansas 
Missouri 
Arkansas 
Missouri 
Arkansas 
Missouri 
Missouri 
Iowa River 
Des Moines 
River 
Chariton River 
Des Moines 
River 
Wakarusa River 
Grand 
(Neosho) 
Walnut River 
Elk River 
Fall River 
Big Bull Creek 
Grand 
(Neosho) 
Smoky Hill 
River 
Cottonwood 
River 
Marais des 
Cygnes 
Republican 
River 
Iowa City 
Des Moines 
Centerville 
Des Moines 
Lawrence 
Council Grove 
El Dorado 
Independence 
Fall River 
Hillsdale 
Burlington 
Marquette 
Marion 
Melvern 
Junction City 
1958 
1969 
1969 
1975 
1977 
1964 
1981 
1966 
1949 
1981 
1964 
1948 
1968 
1972 
1965 
475,000 
1,717,235 
552,000 
585,000 
397,200 
112,882 
246,882 
287,200 
254,900 
160,000 
626,000 
450,000 
141,890 
363,000 
5,430 
19,000 
FARWQ Earth 
FARWQ Earth 
11,000 FNRWXQS Earth 
5,950 FARWQS Earth 
7,000 
3,259 
8,400 
4,440 
2,330 
4,580 
9671 
3,815 
6,210 
6,930 
FSWXRQ Earth 
&
Rock 
FSQR Earth 
FSQRW 
FSQWR 
FSWQR 
FSQRWX 
FSQRW 
Earth 
Earth 
Earth 
Earth 
Earth 
FRWXS Earth 
FRQS Earth 
FRQWXS Earth 
1,160,000 15,600 FRSXWN Earth 
Rock 
100 
110 
86 
105 
1,400 
5,676 
10,600 
6,750 
114 9,250 
96 6,500 
99 
107 
94 
75 
86.5 
131 
20,930 
4,840 
6,015 
11,600 
21,790 
15,360 
67 8,795 
98 9.700 
126 6,300 
Length 
(Feet)

APPENDIX A 
Flood Control Reservoirs Operable September 30, 2000 
Characteristics of Damn 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) 
Pearson Skubitz Big 
Hill 
Perry 
Pomona 
Toronto 
Tuttle Creek 
Wilson 
KENTUCKY 
Barren River 
Buckhorn 
Carr Creek 
Cave Run 
Dewey 
Fishtrap 
Arkansas 
Missouri 
Missouri 
Arkansas 
Missouri 
Missouri 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Big Hill Creek 
Deleware River 
110 Mile Creek 
Verdigris River 
Big Blue River 
Saline River 
Barren River 
Middle Fork of 
Kentucky River 
Carr Fork 
Licking River 
Johns Creek 
Levisa Fork, 
Big Sandy 
River 
Length 
(Feet) 
Cherryvale 
Perry 
Pomona 
Toronto 
Manhattan 
Wilson 
Glasgow 
Buckhorn 
Hazard 
Farmers 
Paintsville 
Pikeville 
1981 
1969 
1963 
1960 
1962 
1964 
1964 
1960 
1976 
1974 
1949 
1968 
39,540 
770,000 
230,000 
200,800 
2,346,000 
776,000 
815,200 
168,000 
47,700 
614,100 
93,000 
164,360 
1,190 
12,500 
4,000 
2,660 
15,800 
9,000 
4,340 
550 
530 
6,790 
1,100 
569 
FSRW 
FRSXWN 
FRSWXQ 
FSQWR 
FRWXQNS 
FIRWXN 
FARS 
FQRW 
FQRW 
FQRW 
FARW 
FARW 
Earth 
Earth 
&
Rock 
Earth 
&
Rock 
Earth 
Earth 
&
Rock 
Earth 
Earth 
Earth 
Earth 
&
Rock 
Earth 
&
Rock 
Earth 
Rock 
83 
96 
85 
90 
157 
160 
146 
162 
130 
148 
118 
195 
3,902 
7,750 
7,750 
4,712 
7,500 
5,600 
3,970 
1,020 
720 
2,740 
913 
1,100 
A-7

APPENDIX A 
Flood Control Reservoirs Operable September 30, 2000 
Characteristics of Darn 
Name 
Grayson 
Green River 
Martins Fork 
Paintsville 
Nolin 
Rough River 
Taylorsville 
Yatesville 
LOUISIANA 
Bayou Bodcau 
Caddo Lake 
River Basin 
Ohio 
Ohio 
Cumberland 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Red 
Red 
Stream 
Little Sandy 
Green River 
Martins Fork 
Paint Creek 
Nolin River 
Rough River 
Salt River 
Blaine Creek 
Bayou Bodcau 
Cypress Bayou 
Community 
in Vicinity 
Grayson 
Campbellsville 
Harlan 
Paintsville 
Kyrock 
Leitchfield 
Taylorsville 
Yatesville 
Shreveport 
Shreveport 
Cal. Year 
Placed in 
Useful OP 
1967 
1969 
1978 
1983 
1963 
1958 
1983 
1988 
1949 
1971 
Total 
Storage 
(Acre-Ft.) 
118,990 
723,200 
21,00 
73,500 
609,400 
334,400 
291,670 
86,951 
357,300 
175,000 
Permanent 
Pool 
(Acreage) 
or No 
Pool (NPP) 
1,050 
5,070 
578 
261 
2,890 
2,180 
1,625 
3,921 
NPP 
F 
32,700 
Project 
unctions Type 
FQRW Earth 
&
Rock 
FRSQW Earth 
&
Rock 
FQ Concrete 
FQRW Earth 
&
Rock 
FAR Earth 
&
Rock 
FRX Earth 
&
Rock 
FQRW Earth 
&
Rock 
FQRW Earth 
&
Rock 
FRW Earth 
Height 
(Feet) 
120 
142 
97 
160 
174 
124 
164 
105 
Length 
(Feet) 
1,460 
2,350 
574 
1,600 
990 
1,530 
1,280 
760 
70 12,850 
NFRS Concrete 
& 
Earth 
3,700 
A-8 
... ... .. m ....._ F Chaactritic ofDa

APPENDIX A 
Flood Control Reservoirs Operable September 30, 2000 
Characteristics of Dam 
Name 
Wallace Lake 
MARYLAND 
Jennings Randolph 
Lake 
MASSACHUSETTS 
Barre Falls 
Birch Hill 
Buffumville 
Charles River Natural 
Valley Storage 
Conant Brook 
East Brimfield 
Hodges Village 
River Basin 
Red 
Potomac 
Connecticut 
Connecticut 
Thames 
Charles 
Connecticut 
Connecticut 
Connecticut 
Stream 
Cypress Bayou 
North Branch 
Potomac River 
Ware River 
Millers River 
little River 
Charles River 
Conant Brook 
Quinebaug 
River 
French River 
Community 
in Vicinity 
Shreveport 
Barnum 
Barre 
So. Roylaston 
Charlton 
Millis 
Monson 
Fiskdale 
Oxford 
Cal. Year 
Placed in 
Useful OP 
1946 
1981 
1958 
1941 
1958 
1983 
1966 
1960 
1959 
Total 
Storage 
(Acre-Ft.) 
96,100 
130,900 
24,000 
49,900 
12,700 
35,000 
3,740 
30,000 
12,800 
Permanent 
Pool 
(Acreage) 
or No 
Pool (NPP) 
2,300 
952 
NPP 
NPP 
200 
NPP 
NPP 
360 
NPP 
Project 
Functions 
FQRS 
FQRSW 
FRW 
FRW 
FRW 
F
F 
FRW 
FRW 
Height 
(Feet) 
30 
296 
62 
56 
66 
85 
55 
55 
Type 
Earth 
Earth 
&
Rock 
Earth 
&
Rock 
Earth 
&
Rock 
Earth 
&
Rock 
Nonstructural 
Earth 
&
Rock 
Earth 
&
Rock 
Earth 
&
Rock 
Length 
(Feet) 
4,994 
2,130 
885 
1,400 
3,255 
1,050 
520 
2,140 
A-9 
CfDh aarateritics 
W . .. .. . am"m ..

APPENDIX A 
Flood Control Reservoirs Operable September 30, 2000 
Name 
Knightville 
Littleville 
Tully 
West Hill 
Westville 
MINNESOTA 
Big Stone Lake- 
Whetstone River 
(HWY 75) 
Lac Qui Parle 
Chippewa River 
LacQui Parle 
Marsh Lake 
Orwell 
Red Lake 
River Basin 
Connecticut 
Connecticut 
Connnecticut 
Blackstone 
Thames 
Upper 
Mississippi 
Upper 
Mississippi 
Upper 
Mississippi 
Upper 
Mississippi 
Red River 
Red River 
Stream 
Westfield River 
Middle Branch, 
Westfield River 
Tully River 
West River 
Qu inebaug 
River 
Minnesota 
River 
Chippewa 
River 
Minnesota 
River 
Minnesota 
River 
Otter Tail River 
of the North 
Red Lake River 
of the North 
Community 
in Vicinity 
Huntington 
Chester 
Fryville 
Uxbridge 
Sturbridge 
Odessa 
Watson 
Montevideo 
Montevideo 
Fergus Falls 
Red Lake 
Cal. Year 
Placed in 
Useful OP 
1941 
1965 
1949 
1960 
1961 
1974 
1950 
1950 
1953 
1953 
1951 
Total 
Storage 
(Acre-Ft.) 
49,000 
32,400 
22,000 
12,350 
11,100 
45,000 
(1) 
158,700 
35,900 
14,100 
3,270,000 
Characteristics of Darn 
Permanent 
Pool 
(Acreage) 
or No 
Pool (NPP) 
NPP 
275 
300 
NPP 
23 
12,700 
NPP 
7,750 
8,100 
790 
288,800 
Project 
Functions 
FRW 
FRWS 
FRW 
FRW 
FRW 
FRW 
FRWX 
FRWX 
FARS 
FARS 
FARSX 
Type 
Earth 
Rock 
Earth 
Rock 
Earth 
Rock 
Earth 
&
Rock 
Earth 
Rock 
Earth 
Rolled 
Earth 
Rolled 
Earth 
ERaorltlhed 
Rolled 
Earth 
Earth 
Rock 
Height 
(Feet) 
160 
1,164 
62 
51 
78 
25 
23.3 
25 
19. 5 
47 
15.5 
A-10 
Length 
(Feet) 
1,200 
1,360 
1,570 
2,400 
560 
13,700 
17,975 
4,100 
11,800 
1,355 
36,500 
Characotfe rDisatnicas . ..... 
..0 
.m

APPENDIX A 
Flood Control Reservoirs Operable September 30, 2000 
Characteristics of Dam 
Name 
MISSISSIPPI 
Arkabutla Lake 
Enid Lake 
Grenada Lake 
Okatibbee 
Sardis Lake 
MISSOURI 
Clearwater 
Long Branch 
Little Blue River 
Lakes
Blue Springs 
Longview 
River Basin 
Lower 
Mississippi 
Lower 
Mississippi 
Lower 
Mississippi 
Pascagoula 
Lower 
Mississippi 
White 
Grand Chariton 
Missouri 
Missouri 
Stream 
Coldwater 
River 
Yocona River 
Mississippi 
Yalobusha 
River 
Okatibbee 
Creek 
Little 
Tallahatchie 
Rivere 
Black River 
Little Charlton 
Little Blue 
River 
Little Blue 
River 
Community 
in Vicinity 
Arkabutla 
Enid 
Grenada 
Meridian 
Sardis 
Piedmont 
Macon 
Kansas City 
Kansas City 
Cal. Year 
Placed in 
Useful OP 
1945 
1952 
1954 
1969 
1940 
1948 
1980 
1988 
1986 
Total 
Storage 
(Acre-Ft.) 
525,300 
660,000 
1,337,400 
142,400 
1,570,000 
413,700 
65,000 
26,600 
46,900 
Permanent 
Pool 
(Acreage) 
or No Project 
Pool (NPP) Project 
P(NooPl P) Functions 
5,100 F 
6,100 F 
9,800 F 
1,280 FQSR 
10,700 F 
1,630 
2,430 
560 
930 
FRWX 
FRSQW 
FRW 
FRWQ 
A-11 
Type 
Earth 
&
Rock 
Earth 
&
Rock 
Earth 
&
Rock 
Earth 
Eanh 
&
Rock 
Earth 
&
Rock 
Earth 
Earth 
&
Rock 
Earth 
Ileight 
(Feet) 
81 
99 
102 
67 
117 
154 
71 
78 
120 
Length 
(Feet) 
11,500 
8,400 
13,900 
6,543 
15,300 
4,225 
3,800 
2,500 
1,900 
Doafm Characteristics 
mmmmlpw ww

APPENDIX A 
Flood Control Reservoirs Operable September 30, 2000 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height Lel 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Tye (Feet) (F 
Pomme de Terre Missouri Pomme de Hermitage 1961 650,000 7,820 FRWXA Earth 155 4, 
Smithville 
Wappapello 
NEBRASKA 
Harlan County 
Papillion Creek and 
Tributaries 
Glenn Cunningham 
(Site 11) 
Standing Bear (Site 
16) 
Ed Zorinsky (Site 18) 
Wehrspann (Site 20) 
Salt Creek & 
Tributaries Olive 
Creek (Site 2) 
Blue Stem (Site 4) 
Wagon Train (Site 8) 
Stagecoach Site (9) 
Yankee Hill (Site 10) 
Missouri 
Lower 
Mississippi 
Missouri 
Missouri 
Missouri 
Missouri 
Missouri 
Missouri 
Missouri 
Missouri 
Missouri 
Missouri 
Terre River 
Little Platte 
River 
St. Francis 
River 
Republican Riv 
Knight Creek 
Trib of Big 
Papillion Creek 
Boxelder Creek 
S. Papillion 
Creek 
S. Trib. Olive 
Br. Creek 
N. Trib Olive 
Br. Creek 
N. Trib. 
Hickman Creek 
S. Trib. 
Hickman Creek 
Cardwell Creek 
Smithville 
Wappapello 
Republican 
City 
Omaha 
Omaha 
Omaha 
Omaha 
Kramer 
Sprague 
Holland 
Hickman 
Denton 
1982 
1941 
1952 
1975 
1973 
1991 
1991 
1964 
1963 
1963 
1964 
1966 
A-1 2 
246,500 
613,200 
850,000 
17910 
5,220 
6,910 
1,990 
5,470 
10,260 
9,280 
6,640 
7,560 
7,190 
4,100 
13,600 
391 
137 
418 
203 
174 
316 
303 
196 
208 
FSQRW 
FR 
FIRWXA 
FQEX 
FRX 
FR 
FR 
FR 
FR 
FR 
FB 
&
Rock 
Earth 
Earth 
&
Rock 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
FR Earth 
95 
109 
107 
67 
70 
64 
59 
45 
57 
52 
48 
ngth 
eet) 
630 
4,200 
2,700 
11,827 
1,940 
1,460 
11,400 
11,810 
3,020 
2,760 
1,650 
2,250 
52 3,100

APPENDIX A 
Flood Control Reservoirs Operable September 30, 2000 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height Le 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) (F
ngth 
eet) 
Conestoga (Site 12) 
Town Lake (Site 13) 
Pawnee (Site 14) 
Holmes Park Lake 
(Site 17) 
Branched Oak (Site 
18) 
NEW HAMPSHIRE 
Blackwater 
Edward MacDowell 
Franklin Falls 
Hopkinton-Everett 
Otter Brook 
Surry Mountain 
NEVADA 
Mathews Canyon 
Pine Canyon 
NEW MEXICO 
Abiquiu 
Missouri 
Missouri 
Missouri 
Missouri 
Missouri 
Merrimack 
Merrimack 
Merrimack 
Merrimack 
Merrimack 
Connecticut 
Connecticut 
Colorado 
Colorado 
Holmes Creek 
Middle Creek 
N. Middle 
Creek 
Antelope Creek 
Oak Creek 
Blackwater 
River 
Nubanusit 
Brook 
Pemigewasset 
River 
Contoocook 
River 
Piscataquog 
River 
Otter Brook 
Ashuelot River 
Mathews 
Canyon 
Pine Canyon 
Denton 
Pleasantdale 
Emerald 
Lincoln 
Raymond 
Webster 
West 
Peterborough 
Franklin 
West 
Hopkinton 
East Weare 
Keene 
Keene 
Caliente 
Caliente 
Rio Grande Rio Charma Abiquiu 
1964 
1966 
1965 
1963 
1968 
1941 
1950 
1943 
1962 
1962 
1958 
1941 
1957 
1957 
10,640 
8,080 
29,520 
6,510 
97,560 
46,000 
12,800 
154,000 
71,500 
87,500 
18,300 
32,500 
6,271 
7,747 
1963 1,192,800 
230 
255 
728 
100 
1,780 
NPP 
NPP 
NPP 
200 
120 
85 
265 
NPP 
NPP 
NPP 
FR 
FR 
FR 
FR 
FR 
FRW 
FRW 
FRW 
FRW 
FRW 
FRW 
FRW 
FX 
FX 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
FXS Earth 
A-13 
63 
65 
55 
70 
75 
67 
140 
76 
115 
133 
86 
71 
92 
325 
3,000 
5,000 
7,700 
5,200 
1,150 
1,030 
1,740 
790 
2,000 
1,288 
1,670 
800 
884 
1,540

APPENDIX A 
Flood Control Reservoirs Operable September 30, 2000 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height Le 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) (F 
Cochiti Rio Grande Rio Grande Pena Blanca 1975 582,019 1,200 FRWX Earth 241 28
ngth 
eet) 
,300 
Conchas 
Galisteo 
Jemez Canyon 
Santa Rosa 
Two Rivers: 
Diamond "A" Dam 
Rocky Dam 
NEW YORK 
Almond 
Arkport 
East Sidney 
Mount Morris 
Whitney Point 
NORTH 
CAROLINA 
B. Everett Jordan 
Falls 
W. Kerr Scott 
Arkansas 
Rio Grrande 
Rio Grande 
Pecos 
Pecos 
Pecos 
Susquehanna 
Susquehanna 
Susquehanna 
Genesee 
Susquehanna 
Cape Fear 
Neuse 
Yadkin Pee 
Dee 
Canadian River 
Galisteo Creek 
Jemez River 
Pecos 
Rio Hondo 
Rocky Arroyoo 
Canacadea Crk 
Canisteo Crk 
Tucumcari 
Santa Fe 
Bernailillo 
Santa Rosa 
Roswell 
Hornell 
Arkport 
Ouleout Crk Franklin 
Genesee River 
Otselic River 
New Hope 
Neuse 
Yadkin 
Mount Morris 
Whitney Point 
Durham 
Raleigh 
Wilkesboro 
1939 
1970 
1953 
1979 
1963 
1949 
1940 
1950 
1952 
1942 
1982 
1983 
1963 
513,900 
89,468 
97,425 
438,364 
163,775 
14,005 
7,900 
33,550 
337,000 
86,440 
753,500 
335,620 
153,000 
2,694 
NPP 
NPP 
NPP 
NPP 
162 
NPP 
210 
170 
1,200 
14,300 
11,300 
1,470 
FI Concrete 
& 
Earth 
FX Earth 
FX Earth 
FIX Earth 
FX Earth 
FRW Earth 
F Earth 
FRW Concrete 
& 
Earth 
FR Concrete 
FRW Earth 
FQRSWX 
FQRSWX 
FARSX 
Earth 
Earth 
Earth 
200 
156 
146.6 
212 
998 
118 
90 
113 
19,400 
2,820 
780 
1,950 
4,885 
2,940 
1,260 
1,200 
130 2,010 
210 1,028 
95 4,900 
112 
92 
148 
1,330 
1,915 
1,740 
A-14

APPENDIX A 
Flood Control Reservoirs Operable September 30, 2000 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Height L 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) ( 
n gth 
'eet) 
NORTH DAKOTA 
Baldhill 
Bowman-Haley 
Homme 
Pipestem 
OHIO 
Alum Creek 
Berlin 
Caesar Creek 
Clarence J. Brown 
Deer Creek 
Delaware 
Dillon 
Michael J. Kirwan 
Mosquito Creek 
Red River of 
the North 
Missouri 
Red River of 
the North 
James River 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Sheyenne River 
North Fork, 
Grand River 
South Branch 
of Park River 
Pipestem Creek 
Alum Creek 
Mahoning 
Creek 
Caesar Creek 
Buck Creek 
Deer Creek 
Olen Tangy 
River 
Licking River 
West Branch, 
Mahoning 
River 
Mosquito Creek 
Valley City 
Haley 
Park River 
Jamestown 
Africa 
Deerfield 
Wilmington 
Springfield 
New Holland 
Deleware 
Zanesville 
Newton Falls 
Cortland 
101,365 
92,980 
6,700 
146,880 
134,800 
91,200 
242,200 
63,700 
102,500 
273,000 
273,000 
78,700 
104,100 
1951 
1967 
1953 
1974 
1975 
1943 
1978 
1974 
1968 
1961 
1961 
1966 
1944 
A-15 
5,430 
1,750 
194 
885 
348 
240 
13,300 
1,010, 
727 
1,325 
1,325 
580 
700 
FARS 
FSRWK 
FARS 
FRWX 
FRSW 
FARSWQ 
FRSQW 
FQRW 
FRW 
FRWX 
FRWX 
FAQRSW 
FARSWQ 
Earth 
Earth 
Earth 
Earth 
Concrete 
& 
Earth 
Concrete 
& 
Earth 
Earth 
&
Rock 
Earth 
&
Rock 
Earth 
Earth 
Earth 
Earth 
Earth 
61 
79 
67 
108 
93 
96 
165 
72 
93 
118 
118 
83 
47 
1,650 
5,730 
865 
4,000 
10,000 
5,750 
2,750 
6,620 
3,880 
1,400 
1,400 
9,900 
5,650

APPENDIX A 
Flood Control Reservoirs Operable September 30, 2000 
Characteristics of Dan 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height L 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) ( 
ength 
Feet) 
Muskingum River 
Reservoirs: 
Atwood 
Beach City 
Bolivar 
Charles Mill 
Clendening 
Dover 
Leesville 
Mohawk 
Mohicanville 
Piedmont 
Pleasant Hill 
Senecaville 
Tappan 
Wills Creek 
North Branch, 
Kokosing River Lake 
Paint Creek 
Tom Jenkins 
West Fork Mill Creek 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Indian Fork 
Sugar Creek 
Sandy Creek 
Black Fork 
Brushy Fork 
Tuscarawas 
River 
McGuire Creek 
Walhondoing 
Riv 
Lake Fork 
Stillwater 
Creek 
Clear Fork 
Seneca Fork 
Little Stillwater 
Crk 
Wills Creek 
North Branch 
of Kokosing 
River 
Paint Creek 
East Branch, 
Sunday Creek 
Mill Creek 
New 
Cumberland 
Beach City 
Bolivar 
Mifflin 
Tippecanoe 
Dover 
Leesville 
Nellie 
Mohicanville 
Piedmont 
Perrysville 
Senecaville 
Tappan 
Conesville 
Fredericktown 
New 
Petersburg 
Gloucester 
Mt Healthy 
1937 
1937 
1938 
1936 
1937 
1938 
1937 
1937 
1936 
1937 
1938 
1937 
1936 
1937 
1973 
1972 
1951 
1952 
49,700 
71,700 
149,600 
88,000 
54,000 
203,000 
37,400 
285,000 
102,000 
65,000 
87,700 
88,500 
61,60-0 
196,000 
14,900 
145,000 
26,900 
11,380 
1,540 
420 
NPP 
1,350 
1,800 
350 
1,000 
NPP 
NPP 
2,270 
850 
3,550 
2,350 
900 
98 
710 
394 
200 
FRX Earth 
FIRC Earth 
FR Earth 
FRX Earth 
FRX Earth 
FRX Concrete 
FRX Earth 
FR Earth 
FR Earth 
FRX Earth 
FRX 
FRSX 
FRX 
Earth 
Earth 
Earth 
FRX Earth 
FRW Earth 
FRSQW Earth 
&
Rock 
FRSWX Concrete 
FRX Earth 
65 3,700 
64 
87 
48 
64 
83 
74 
111 
46 
56 
113 
45 
52 
87 
71 
5,600 
6,300 
1,390 
950 
824 
1,694 
2,330 
1,220 
1,750 
775 
2,350 
1,550 
1,950 
1,400 
118 700 
84 944 
100 1,100 
A- 6

APPENDIX A 
Flood Control Reservoirs Operable September 30, 2000 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or NoHeight L 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) ( 
William H. Harsha Ohio Little Miami Williamsburg 1978 284,500 18,760 FRSQW Earth 200 1 
River 
ength 
Feet) 
,450 
OKLAHOMA 
Arcadia 
Birch 
Canton 
Copan 
Fort Supply 
Great Salt Plains 
Heyburn 
Hugo 
Hulah 
Kaw 
Oologah 
Optima 
Pine Creek 
Sardis 
Skiatook 
Waurika 
Wister 
Arkansas 
Arkansas 
Arkansas 
Arkansas 
Arkansas 
Arkansas 
Arkansas 
Red 
Arkansas 
Arkansas 
Arkansas 
Arkansas 
Red 
Red 
Arkansas 
Red 
Arkansas 
Deep Fork 
River 
Birch Creek 
North Canadian 
River 
Little Caney 
River 
Wolf Creek 
Salt Fork of the 
Arkansas River 
Polecat Creek 
Kiamichi River 
Caney River 
Arkansas River 
Verdigris River 
North Canadian 
River 
Little River 
Jackfork Creek 
Hominy Creek 
Beaver Creek 
Poteau River 
Edmond 
Barnsdall 
Canton 
Copan 
Fort Supply 
Cherokee 
Sapulpa 
Hugo 
Bartlesville 
Ponca City 
Oologah 
Hardesty 
Wright City 
Clayton 
Skiatook 
Waurika 
Wister 
1986 
1977 
1948 
1983 
1942 
1941 
1950 
1974 
1951 
1976 
1963 
1978 
1969 
1982 
1984 
1977 
1949 
92,010 
59,030 
383,800 
227,700 
100,700 
271,400 
55,395 
955,200 
289,000 
1,327,160 
1,559,270 
229,500 
465,780 
396,900 
500,700 
325,680 
427,480 
1,820 
1,145 
3,800 
4,850 
1,820 
8,690 
880 
13,140 
3,570 
16,750 
31,040 
5,340 
3,750 
13,610 
10,190 
10,100 
7,386 
FSR Earth 
FSQRW Earth 
FSIRW Earth 
FSQRWN Earth 
FSX Earth 
FRWX Earth 
FRWXS 
FSQRW 
FSQRNW 
FSQRWN 
FSNRW 
FSRW 
FSQWR 
FSRW 
FSQRW 
FISQWR 
FSAXWR 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
102 5,250 
97 
68 
3,190 
15,140 
73 7,730 
85 
68 
89 
101 
94 
125 
137 
120 
124 
101 
143 
106 
99 
11,865 
6,010 
2,920 
10,200 
5,200 
9,466 
4,000 
15,200 
7,712 
14,138 
3,590 
16,637 
5,700 
A-17

APPENDIX A 
Flood Control Reservoirs Operable September 30, 2000 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Height L 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP Functions Type (Feet) ( 
ength 
Feet) 
OREGON 
Applegate 
Blue River 
Cottage Grove 
Dorena 
Fall Creek 
Fern Ridge 
Willow Creek 
PENNSYLVANIA 
Alvin R. Bush 
Rogue 
Columbia 
Columbia 
Columbia 
Columbia 
Columbia 
Columbia 
Susquehanna 
Applegate 
River 
Blue River 
Coast Fork, 
Willamette 
River 
Row River 
Middle Fork, 
Willamette 
River 
Long Tom 
River 
Willow Creek 
Kettle Creek 
Medford 
Blue River 
Cottage Grv 
Cottage Grv 
Eugene 
Eugene 
Heppner 
Renovo 
1981 
1968 
1942 
1949 
1965 
1941 
1983 
1962 
82,000 
85,000 
30,060 
70,500 
115,000 
110,000 
13,250 
75,000 
988 
975 
1,155 
1,885 
1,865 
10,305 
96 
160 
AFIQRSW Gravel 
Embankment 
FINR Earth 
FINR Concrete 
& 
Earth 
FINR Concrete 
& 
Earth 
FINR Rockfill 
& 
Concrete 
FINR Rockfill 
& 
Concrete 
FRN Roller 
Compacted 
Concrete 
FRWQ Earth 
& Rock 
242 
319 
114 
1,300 
1,329 
2,110 
145 3,352 
193 5,100 
49 6,624 
160 1,780 
165 1,350 
A-I 8

APPENDIX A 
Flood Control Reservoirs Operable September 30, 2000 
Characteristics of Damn 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height L 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) ( 
Aylesworth Creek Susquehanna Aylesworth Archbald 1970 1,700 64 FRQ Earth 90 1 
Creek & 
Beltzville 
Blue Marsh 
Conemaugh 
Cowanesque 
Crooked Creek 
Curwensville 
East Branch, Clarion 
River 
Foster Joseph Sayers 
Francis E. Walter 
(Bear Creek) 
Gen. Edgar Jadwin 
Hammond Lake 
Pohopoco 
Creek 
Tulpehocken 
Creek 
Conemaugh 
River 
Cowanesque 
River 
Crooked Creek 
West Branch, 
Susquehanna 
River 
East Branch, 
Clarion River 
Bald Eagle 
Creek 
Lehigh River 
Dyberry Creek 
Crooked Creek 
Lehighton 
Reading 
Saltsburg 
Lawrenceville 
Ford City 
Curwensville 
Wilcox 
Blanchard 
White Haven 
Honesdale 
Tioga 
1971 
1978 
1952 
1980 
1940 
1965 
1952 
1969 
1961 
1960 
1978 
68,250 
50,010 
262,700 
89,000 
93,900 
124,200 
84,300 
99,000 
109,610 
24,500 
63.000 
947 
960 
800 
1085 
350 
790 
90 
1,730 
80 
NPP 
680 
Rock 
FQRSWA Earth 
&
Rock 
FAQRSW Earth 
FW 
&
Rock 
Concrete 
&
Earth 
FRSQW Earth 
&
Rock 
FRW Earth 
FRS Earth 
FARQW Earth 
FRWQ Earth 
FRW Earth 
& Rock 
F Earth 
FRQW Earth 
&
Rock 
170 
ength 
Feet) 
1,270 
4,560 
98 1,775 
137 1,265 
151 3,100 
143 
131 
1,480 
2,850 
184 1,725 
100 6,835 
234 
109 
122 
3,000 
1,255 
6,450 
A-19 
Delaware 
Delaware 
Ohio 
Susquehanna 
Ohio 
Susquehanna 
Ohio 
Susquehanna 
Delaware 
Delaware 
Susquehanna

APPENDIX A 
Flood Control Reservoirs Operable September 30, 2000 
Characteristics of Dam 
Pennanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height L 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) ( 
Functions Type (Feet) (] 
Indian Rock Susquehanna Codorus Creek York 1942 28,000 NPP F Earth 83 1 
& 
Loyalhanna 
Mahoning Creek 
Prompton 
Raystown 
Shenango 
Stillwater 
Tioga Lake 
Tionesta 
Union City 
Woodcock Creek 
Youghiogheny River 
Allegheny 
River 
Loyalhanna 
Creek 
Mahoning Crk 
West Branch, 
Lackawaxen 
River 
Raystown 
Branch, Juniata 
River 
Shenango River 
Lackawanna 
River 
Tioga River 
Tionesta Creek 
French Creek 
French Creek 
Youghiogheny 
River 
Warren 
Saltsburg 
New 
Bethlehem 
Honesdale 
Huntingdon 
Sharpsville 
Uniondale 
Tioga 
Tionesta 
Union City 
Meadville 
Confluence 
1965 
1942 
1941 
1960 
1973 
1966 
1960 
1978 
1940 
1970 
1973 
1943 
1,180,000 
95,300 
74,200 
52,000 
762,000 
191,400 
12,000 
62,000 
133,400 
47,640 
20,000 
254,000 
1,900 
210 
170 
290 
8,300 
1,910 
85 
470 
480 
NPP 
118 
450 
Rock 
PFAQRW Concrete 
& 
Earth 
FRW Concrete 
& 
Earth 
FRW Concrete 
FRW Earth 
FRWPQ Earth 
&
Rock 
FAQRW Concrete 
FS Earth 
FRQW Earth 
& Rock 
FRW Earth 
F Earth 
FQRA Earth 
FARWQ Earth 
1'77 
ength 
Feet) 
,000 
1,877 
114 960 
162 926 
140 
225 
1,200 
1,700 
68 720 
77 1,700 
140 
154 
88 
90 
184 
2,710 
1,050 
1,420 
4,650 
1,610 
A-20 
Kinzua Ohio 
Ohio 
Ohio 
Delaware 
Susquehanna 
Ohio 
Susquehanna 
Susquehanna 
Ohio 
Ohio 
Ohio 
Ohio

APPENDIX A 
Flood Control Reservoirs Operable September 30, 2000 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Height L 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP Functions Type (Feet) (
ength 
Feet) 
SOUTH DAKOTA 
Cold Brook 
Cottonwood Springs 
Lake Traverse: 
Reservation Damn 
White Rock 
TEXAS 
Addicks 
Aquilla 
Barker 
Belton 
Benbrook 
Canyon 
Ferrells Bridge Dam- 
Lake O' the Pines 
Granger Damn and 
Lake 
Grapevine 
Hords Creek 
Joe Pool 
Jim Chapman Lake 
Missouri 
Missouri 
Red River of 
the North 
Red River of 
the North 
San Jacinto 
Brazos 
San Jacinto 
Brazos 
Trinity 
Guadalupe 
Red 
Brazos 
Trinity 
Colorado 
Trrinity 
Red 
Cold Brook 
Cottonwood 
Springs Creek 
Bois de Sioux 
River 
Bois de Sioux 
River 
South Mayde 
Crk 
Aquilla Creek 
Buffalo Bayou 
Leon River 
Clear Fork, 
Trinity River 
Guadalupe 
River 
Cypress Creek 
San Gabriel 
River 
Denton Creek 
Hords Creek 
Mountain 
Creek 
Sulphur River 
Hot Springs 
Hot Springs 
Wheaton 
Wheaton 
Addicks 
Hillsboro 
Barker 
Belton 
Fort Worth 
New 
Braunfels 
Jefferson 
Granger 
Grapevine 
Coleman 
Grand Prairie 
Cooper 
1953 
1970 
1941 
1941 
1948 
7,200 
8,385 
177,000 
96,000 
204,500 
1983 146,000 
1945 207,000 
1954 1,097,600 
1952 
1964 
1959 
1980 
1952 
1948 
1986 
1991 
258,600 
36 
41 
FRWX Earth 
FRWX Earth 
10,925 FRX 
3,850 FRX 
NPP 
3,280 
NPP 
12,300 
3,770 
366,400 346,400 
842,100 
244,200 
425,500 
25,310 
304,000 
441,200 
18,700 
4,400 
7,280 
510 
7,470 
19,305 
Rolled 
Earth 
Rolled 
Earth 
FX Earth 
FSX 
FX 
FIRSX 
Earth 
Earth 
Earth 
FNRXA Earth 
FRSX Earth 
FRS Earth 
FRSWX Earth 
FNRSXA 
FARSX 
FRSX 
Earth 
Earth 
Earth 
FRSWX Earth 
127 
123 
925 
1,190 
14 9,100 
16 14,400 
49 61,166 
104.5 
27 
192 
11,890 
72,844 
5,524 
130 9,130 
224 4,410 
97 10,600 
115 
137 
91 
109 
16,320 
12,850 
6,800 
22,360 
79 28,070 
A-21

APPENDIX A 
Flood Control Reservoirs Operable September 30, 2000 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Proect Height L 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) ( 
Lavon Trinity East Fork, Fort Worth 1953 748,200 21,400 FRSW Earth 81 1 
Lewisville 
Navanrro Mills 
North San Gabriel 
Dam, Lake 
Georgetown 
O.C. Fisher 
Pat Mayse 
Proctor 
Ray Roberts 
Somerville 
Stillhouse Hollow 
Waco 
Wright Patman 
UTAH 
Little Dell Lake 
Elm Fork, 
Trinity River 
Richland Creek 
North Fork, 
San Gabriel 
River 
North Concho 
River 
Sanders Creek 
Leon River 
Elm Fork 
Yegua Creek 
Lampasas River 
Bosque River 
Sulphur River 
Jordan River Dell Creek 
Trinity River 
Lewisville 
Corsicana 
Georgetown 
San Angelo 
Arthur City 
Comanche 
Denton 
Somerville 
Belton 
Waco 
Texarkana 
Salt Lake City 
1954 
1962 
1980 
1952 
1967 
1963 
1987 
1967 
1968 
1965 
989,700 
212,200 
130,800 
396,400 
182,940 
374,200 
1,064,600 
507,500 
630,400 
726,400 
23,280 
5,070 
1,310 
5,440 
5,940 
4,610 
29,350 
11,460 
6,430 
7,270 
1957 2,654,300 20,300 
1993 20,500 1,000 
FRSX Earth 
FRSX Earth 
FRSWX Rock 
FRSX Earth 
FRSW Earth 
FRSX Earth 
FRSX Earth 
FRSX Earth 
FRSX Earth 
FRSX Concrete 
& 
Earth 
FRSX Earth 
FS Earth 
ength 
Feet) 
9,483 
125 32,888 
82 
164 
6,700 
6,700 
128 40,885 
96 
86 
109 
80 
200 
145 
100 
224 
7,080 
13,460 
14,965 
26,175 
15,624 
24,618 
18,500 
1,700 
VERMONT 
Ball Mountain Connecticut West River Jamaica 1961 54,600 75 FRW Concrete 
&
Earth 
A-22 
Trinity 
Trinity 
Brazos 
Colorado 
Red 
Brazos 
Trinity 
Brazos 
Brazos 
Brazos 
Red 
265 915

APPENDIX A 
Flood Control Reservoirs Operable September 30, 2000 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height L 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) 
North Hartland Connecticut Ottauguechee North 1960 71,420 220 FRW Con- 185 1 
River Hartland crete 
North Springfield 
Townshend 
Union Village 
VIRGINIA 
John W. Flannagan 
Gathright Darn & 
Lake Moomaw 
North Fork of Pound 
River 
WASHINGTON 
Howard A. Hanson 
Mill Creek 
Mud Mountain 
Connecticut Black River Springfield 
Connecticut West River 
Connecticut Ompompanoosuc 
River 
Townshend 
Union Village 
Pound River Haysi 
Jackson 
North Fork of 
Pound 
Green River 
Mill Creek 
White River 
Alleghany 
Pound 
Kanaskat 
Walla Walla 
Enumclaw 
1960 
1961 
1950 
1963 
1979 
1968 
1961 
1942 
1953 
51,067 
33,700 
38,000 
145,700 
123,739 
11,300 
106,000 
8,300 
106,000 
290 
100 
NPP 
310 
2,532 
349 
1,600 
225 
NPP 
&
Earth 
FRW Concrete 
&
Earth 
FRW Concrete 
&
Earth 
FRW Concrete 
&
Earth 
FAWR Concrete 
& 
Earth 
FQR Earth 
& Rock 
FRSW Earth 
&
Rock 
FAS Rock 
FR Earth 
FR Rock 
120 
133 
170 
250 
257 
ength 
Feet) 
1,520 
2,940 
1,700 
1,100 
960 
1,172 
122 600 
235 
125 
427 
500 
3,200 
810 
A-23 
Ohio 
James 
Ohio 
Green 
Columbia 
Puyallup

APPENDIX A 
Flood Control Reservoirs Operable September 30, 2000 
Characteristics of Damn 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height L 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) (
ength 
Feet) 
WEST VIRGINIA 
Beech Fork 
Bluestone 
Burnsville 
East Lynn 
R. D. Bailey 
Stonewall Jackson 
Lake 
Summersville Lake 
Sutton 
Tygart River 
WISCONISIN 
Eau Galle 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Chippewa 
Beech Fork Lavalette 
New River Hinton 
Little Kanawha 
Twelvepole 
Creek 
Guyandotte 
River 
West Fork 
Gauley River 
Elk River 
Burnsville 
East Lynn 
Justice 
Weston 
Summersville 
Sutton 
Tygart River Grafton 
Eau Galle Spring Valley 
1977 
1952 
1977 
1970 
1979 
1988 
1965 
1960 
1938 
1969 
37,540 
631,000 
65,400 
82,500 
203,700 
74,650 
413,800 
265,300 
287,700 
43,600 
450 
1,800 
550 
823 
440 
360 
407 
270 
620 
153 
FRW Earth 
FRWX Concrete 
FQRW Earth 
&
Rock 
FQRW Earth 
&
Rock 
FQRW Earth 
&
Rock 
FAQAS Concrete 
FANR Rock 
FNAR Concrete 
FNAR Concrete 
FR Earth 
86 
180 
1,080 
2,048 
89 1,400 
122 650 
310 1,397 
95 620 
390 
220 
230 
2,280 
1,921 
1,921 
122 1,800 
Q - Water Quality Control 
R - Public Recreation (Annual Attendance exceeding 5,000) 
S - Water Supply 
W - Fish and Wildlife (Federal or State) 
A-24 
KEY FOR PROJECT FUNCTIONS: 
A - Low Flow Augmentation 
D - Debris Control 
F - Flood Control 
I - Irrigation

N - Navigation 
P - Power 
APPENDIX A 
Flood Control Reservoirs Operable September 30, 2000 
X - Water Conservation and Sedimentation 
A-25

APPENDIX A 
Flood Control Reservoirs Constructed or Contributed to by Corps of Engineers 
But Operated by Others September 30, 2000 
Name 
CCAALLIIFFOORRNNIIAA 
Big Dry Creek 
Camanche 
Cherry Valley 
Del Valle 
Eaton Wash 
New Bullards Bar 
New Don Pedro 
New Exchequer 
Oroville 
Tahchevah Creek 
COLORADO 
Pinon Canyon 
River Basin Stream 
San Joaquin Big Dry 
Creek 
San Joaquin Mokelumne 
River 
Tuolumne Cherry Creek 
Alameda 
Rio Hondo 
Sacramento 
San Joaquin 
San Joaquin 
Sacramento 
Whitewater 
Colorado 
Arroyo Del 
Valle 
Eaton Wash 
Yuba River 
Tuolumne 
River 
Merced River 
Feather River 
Tahchevah 
Creek 
Pinon 
Canyon 
Arroyo 
Community 
in Vicinity 
Fresno 
Clements 
Sonora' 
Livermore 
Pasadena 
Marysville 
Modesto 
Merced 
Oroville 
Palm 
Springs 
Trinidad 
Cal. Year 
Placed in 
Useful 
OP 
1948 
Total 
Storage 
(Acre-Ft.) 
16,250 
1963 431,500 
1956 268,000 
1968 
1937 
1968 
1970 
1966 
1964 
1965 
1954 
77,000 
960 
960,000 
2,030,000 
1,026,000 
3,539,000 
960 
4,350 
Permanent 
Pool 
(Acreage) 
or No 
Pool (NPP) 
NPP 
NPP 
475 
200 
NPP 
1,910 
3,520 
1,900 
5,838 
NPP 
NPP 
Project 
Functions 
Heigh 
Type t 
(Feet) 
F Earth 
FRS Earth & 
Rock 
FS Earth & 
Rock 
FRS Earth 
F 
FIRPW 
FISP 
FIR 
FIRSW 
F 
Earth 
Concrete 
Earth & 
Rock 
Rock 
Earth 
Earth 
Length 
(Feet) 
40 20,038 
171 2,450 
315 
223 
82 
645 
565 
2,500 
880 
1,795 
2,323 
1,920 
480 1,200 
770 6,850 
42 3,610 
FW Earth 
CONNECTICUT 
East Branch 
Hall Meadow 
Brook 
Housatonic East Branch, 
Naugatuck 
River 
Housatonic Hall Meadow 
Brook 
Torrington 
Torrington 
1964 
1962 
4,350 
8,620 
NPP 
NPP 
FR Earth 
F Earth & 
Rock 
A-26 
- -- -- -- --

APPENDIX A 
Flood Control Reservoirs Constructed or Contributed to by Corps of Engineers 
But Operated by Others September 30, 2000 
Heigh 
Type t 
(Feet) 
Mad River 
Sucker Brook 
HAWAII 
Kaneohe-Kailua 
Connecticut 
Connecticut 
Kaneohe 
Mad River 
Sucker Brook 
Kaneohe 
Stream 
Winchester 
Winchester 
Kaneohe 
1963 
1970 
1981 
9,700 
1,480 
3,800 
10 
NPP 
26 
FR 
F 
Earth 
Earth 
FR Earth 
IDAHO 
Ririe 
MARYLAND 
Savage River 
MISSOURI 
Bear Creek 
NEW MEXICO 
Cuchillo Negro 
NEW YORK 
Onondaga 
Upper Snake 
Potomac 
Upper 
Mississippi 
Rio Grande 
Oswego 
Willow Creek 
Savage 
Idaho Falls 
Westernport 
Bear Creek Hannibal 
Cuchillo 
Creek 
Onondaga 
Creek 
Truth or 
Consequence 
Syracuse 
1975 100,500 
1952 
1962 
1991 
1949 
20,000 
8,700 
13,500 
18,200 
364 
360 
NPP 
NPP 
NPP 
FIR Earth 
FRSW Earth & 
Rock 
F Earth 
F Roller 
Compacted 
Concrete 
F Earth 
A-27 
Name River Basin Stream 
Community 
in Vicinity 
Cal. Year 
Placed in 
Useful 
OP 
Permanent 
Pool 
(Acreage) 
or No 
Pool (NPP) 
Total 
Storage 
(Acre-Ft.) 
Project 
Functions 
Length 
(Feet) 
r

APPENDIX A 
Flood Control Reservoirs Constructed or Contributed to by Corps of Engineers 
But Operated by Others September 30, 2000 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Placed in Storage or No 
I c~ifuil (A rr-t Ft) Pool (NPP) 
111 V icinity u _J 1 
OP 
Project 
Functions 
Heigh 
Type t 
(Feet) 
OKLAHOMA 
Altus 
Grand Lake 0' the 
Cherokees 
Lake Hudson 
TEXAS 
Lake Kemp 
Red 
Arkansas 
Arkansas 
Red 
North Fork of 
the Red River 
Grand 
(Neosho) 
River 
Grand 
(Neosho) 
River 
Wichita 
River 
Altus 
Disney 
Locust 
Grove 
Wichita 
Falls 
1948 152,430 6,260 
1941 2,197,000 46,5006 
1964 444,600 10,9006 
1972 502,900 15,590 
FIS Concrete 
FRP Concrete 
FRP Concrete 
& 
Earth 
FIS Earth 
90 1,104 
147 6,565 
90 4,494 
115 8,890 
UTAH 
Big Wash 
VERMONT 
East Barre 
Waterbury 
Wrightsville 
WASHINGTON 
Wynoochee 
Beaver 
Winooski 
Winooski 
Winooski 
Chehalis 
Big Wash Milford 
Jail Branch 
Waterbury 
North Branch 
Wynoochee 
River 
East Barre 
Waterbury 
Wrightsville 
Montesano 
1961 
1938 
1938 
1938 
1972 
1,200 
12,050 
64,700 
20,300 
70,000 
NPP 
NPP 
890 
570 
1,150 
F Earth 
F Earth 
FRP Earth 
FR Earth 
FSARI Concrete 
& 
Earth 
34 2,814 
65 
158 
115 
177 
1,460 
1,800 
1,525 
1,700 
A-28 
Name River Basin Stream 
Community 
rt try yr 1- 
Length 
(Feet) 
w 
ks ,.Li c-1= t./

APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 2000 
Fiscal Year 
Fiscal Year Placed in Completed or 
Started Useful Scheduled for 
Project Operation Completion Nature of Project 
Aberdeen & Vicinity, SD (Sec 205) 
Aitkin County, CSAH 10, MN 
Alenaio Streamn, Hawaii, HI 
Alii Drive, Hawaii, HI (Sec 14) 
Aloha-Rigolette Area, LA 
Alton to Gale Levee System, Mississippi River, IL and MO 
American River, Common Features, CA 
American River, Folsom Modification, CA 
American River, Natomas, CA 
Aquashicola Creek (Borough of Palmerton) 
Arecibo River, PR 
Arkansas River at Riverfront Park, North Little Rock, AR 
Arizona Flood Warning, AZ (Sec 205) 
Aroostook River, Fort Fairfield, ME (Sec 205) 
Ascalmore-Tippo Items, MS 
Ashland Road Bridge, Four Mile Creek, NE (Sec 14) 
Atchafalaya Basin, LA 
Atchafalaya Basin Floodway System, CA 
B. Everett Jordan Dam and Lake, NC 
Badger Creek near Browning, Glacier County, MT (Sec 14) 
Batesville Sewage Lagoon 
Batesville Water Tower, Batesville, AR (Sec 14) 
Battle Mountain, NV (Sec 205) 
1995 
1999 
1995 
1999 
1996 
1983 
2000 
2000 
2000 
1998 
2000 
1998 
1998 
1999 
1984 
1996 
1928 
1985 
1967 
1993 
1990 
1998 
1998 
1997 
2000 
1999 
1998 
(2) 
1982 
1994 
1990 
1999 
2002 
2001 
1997 
2000 
1999 
Indefinite 
2004 
2006 
2001 
1999 
2004 
1999 
2001 
2001 
1987 
1996 
2021 
TBD 
1999 
1994 
1990 
1999 
2001 
Local Protection 
Streambank Protection 
Local Protection 
Shoreline Protection 
Interior Drainage 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Streambank Protection 
Floodway and Levees 
FC, Rec, and Public Access 
Reservoir 
Streambank Protection 
Streambank Protection 
Streambank Protection 
Local Protection 
B-1

APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 2000 
Fiscal Year 
Started 
i Project 
Bayou Des Glaises, LA 
Beals Creek, Big Spring, TX 
Beaver Creek at Slough Hollow Road, MO (Sec 14) 
Beech Fork, Bardstown, KY (Sec 205) 
Bethel Bank Stabilization, AK 
Big Sioux River & Skunk Creek, Sioux Falls, SD 
Big Wood River, Deer Creek, Bridge, ID (Sec 14) 
Black Warrior River, Northport Levee, AL 
Blue River Channel, Kansas City, MO 
Brays Bayou (Houston), TX 
Broad Top Region, PA (Wood-Broad Top-Wells) 
Brush Creek, Jeanette, PA (Sec 14) 
Buffalo Bayou and Tributaries, TX 
Buffalo Creek, Freeport, PA (Sec 14) 
Buford Trenton Inigation District, ND 
Cache Creek Settling Basin, CA 
Cache La Poudre, CO (Sec 14) 
Cape Girardeau-Jackson, MO 
Cato Spring, Fayetteville, AR (Sec 205) 
Cedar Falls, IA (Sec 205) 
Cedar Point Seawall Bay St. Louis, MO 
Cedar River, Renton, WA (Sec 205) 
Chaska, MN 
Cheat River Basin, WV FWS 
Chicago Shoreline, IL 
Placed in 
Useful 
Operation 
1939 
1998 
2001 
1996 
2000 
Fiscal Year 
Completed or 
Scheduled for 
Completion 
1939 
1998 
2000 
2001 
1997 
2006 
2001 
1999 
2005 
2013 
2000 
1998 
Indefinite 
1998 
2009 
1995 
2001 
2002 
1996 
2000 
2000 
2001 
1998 
1998 
2005 
Nature of Project 
Interior Drainage 
Local Protection 
Streambank Protection 
Local Protection 
Emergency Bank Stabilization 
Local Protection 
Local Protection 
Local Protection Levee 
Local Protection 
Local Protection 
Water Supply 
Streambank Protection 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Shoreline Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
B-2 
... 
a 
1938 
1993 
1998 
1998 
1992 
2000 
1998 
1998 
1984 
1998 
1997 
1994 
1956 
1994 
1998 
1990 
2000 
1992 
1996 
1998 
1998 
1998 
1988 
1997 
1997

APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 2000 
Fiscal Year 
Fiscal Year Placed in Completed or 
Started Useful Scheduled for 
!1 -.- ' . 
m m l oir% Project operation kofllll Lu ll 
Choctawhatchee/Pea Rivers, Alabama and Florida 
Choctawhatchee/Pea Rivers, Elba/Geneva Levees, AL 
Chubb Runn, Franklin, PA (Sec 14) 
Cibola County Rd 7, Cubero, NM (Sec 14) 
City Ditch, Brevoort, IN (Sec 205) 
City of Folsom Willow & Humbug Creeks, CA (Sec 205) 
Clear Creek, TX 
Clifton, AZ 
Clinton Wastewater Treatment Plant, Clinton, NC (Sec 205) 
Colorado River at Grand Junction, CO (Sec 205) 
Comite River Diversion, LA 
Conneaut Lake, PA (Sec 14) 
Connellsville, PA (Sec 205) 
Connoquenessing Creek, Marion Twp, PA (Sec 205) 
Connoquenessing Creek, N. Swickley Twp, PA (Sec 205) 
Cooper Creek, Cheny Valley, TN (Sec 14) 
Cooper Creek, WA 
Corte Madera Creek, CA 
Coulson Park, CO (Sec 14) 
County Road 62, Santa Fe, NM (Sec 14) 
Coyote and Berressa Creeks, CA 
Crooked Creek, Harrison, AR 
Crookston, MN 
Cypress Creek, TX 
Dade County, FL 
1995 
1998 
1995 
2000 
1998 
1999 
1988 
1994 
1999 
1994 
1999 
1996 
1996 
1996 
1997 
2000 
1999 
1966 
2000 
1994 
1994 
1994 
2000 
2000 
1975 
1997 
2000 
1995 
1994 
1996 
1999 
1998 
2001 
2001 
Unscheduled 
2011 
2001 
2000 
1997 
2010 
1998 
1998 
1998 
1998 
2000 
2004 
Indefinite 
2001 
1995 
Indefinite 
1996 
2003 
2001 
2038 
Nature of Project 
Flood Warning 
Local Protection Levees 
Streambank Protection 
Streambank Protection 
Interior Drainage 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Stream Protection 
Local Protection 
Local Protection 
Streambank Protection 
Streambank Protection 
Local Protection 
Local Protection, channel improvement 
Local Protection 
Local Protection, non-structural 
Shore Protection 
B-3 
mm 
..

APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 2000 
Fiscal Year 
Fiscal Year Placed in Completed or 
Started Useful Scheduled for 
Project StedUefO iopne rat~oono mmp uleitoonn NNaatturereo foPf rPorjoejcect t 
Dearbort River near Wolf Creek Lewis & Clark County, MT 
(Sec 14) 
Delaware River, Water Intake, Kickapoo Reservation, KS (Sec 14) 
Delaware River Vicinity of Port Jervis, NY 
Demonstration Erosion Control, MS 
Deshee River, Brevoort, IN (Sec 205) 
Des Moines Recreational River and Greenbelt, IA 
Dry Creek (Warm Springs) Lake & Channel, CA 
Dry Fork of Little Fork, Willard, KY (Sec 205) 
East Nishnabotna River, Page County Bridge, IA (Sec 14) 
East St. Louis and Vicinity, IL - Rehabilitation 
El Paso, TX 
Elk Creek Lake, OR 
Emmonak Shoreline Erosion, AK (Sec 14) 
Escanaba Delta County, MI (Sec 14) 
Fairfield Vicinity Streams, CA 
Falls Lake, NC 
Fallon, NV (Sec 205) 
Flatrock River, Rushville, IN (Sec 205) 
Fort Wayne and Vicinity, IN 
Four Rivers Basin, FL 
Fourche Bayou, Vicinity of Little Rock, AR 
Francis Bland Floodway Ditch, AR 
French Creek, Wattsburg, PA (Sec 14) 
Gallatin River, (1-90), Gallatin County, MT 
1994 
1996 
1995 
1985 
1998 
1989 
1967 
2000 
1992 
1988 
1971 
1971 
1998 
1999 
1985 
1973 
1998 
1998 
1994 
1966 
1987 
1986 
1996 
1991 
1994 1994 
1983 
1993 
1973 
1999 
1993 
1983 
1986 
1996 
1992 
Streambank Protection 
Streambank Protection 
Local Protection (Ice Diversion) 
Local Protection 
Interior Drainage 
Recreation 
Reservoir 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Reservoir 
Shoreline Protection 
Streambank Protection 
Local Protection 
Reservoir 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Streambank Protection 
Streambank Protection 
2001 
1996 
Indefinite 
2001 
Indefinite 
1996 
2001 
1994 
2002 
2002 
Indefinite 
1999 
2001 
1993 
2000 
Unscheduled 
2001 
2001 
1996 
2002 
2003 
1998 
1992 
.....

m 
APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 2000 
Fiscal Year 
Fiscal Year Placed in Completed or 
Started Useful Scheduled for 
!1, 
f m ~ ldtn7 
_i Project Operation 
Grank Forks, ND-East Grand Forks, MN 
Grand Prairie Region and Bayou Meto Basin, AR 
Grand River, Chariton County, MO (Sec 14) 
Gray's Creek, TN (Sec 14) 
Great Bend,KS 
Great Miami River, Fairfield, OH (Sec 14) 
Greenbrier River, WV, Flood Waming System 
Greenwood Bendway, Site 3, MS 
Greenwood Bendway, Site 4, MS 
Greenwood Bendway, Site 5, MS 
Guadalupe River, CA 
Guntersville Lake, Guntersville, AL 
Gulf of Mexico, Highway 193, Mobile Co., AL 
Gulfside Seawall, Waveland, MS 
Halstead,KS 
Hamilton County Streambank Stabilization, TN 
Hargus Creek, Circleville, OH (Sec 205) 
Hatchie River, Alcora & Tippah Co, MS 
Helena & Vicinity, AR 
Highway 119, Deny, LA (Sec 14) 
Highway 218, Grand Chenier, LA (Sec 14) 
Highway 495, Natchitoches,Parish, LA (Sec 14) 
Highway 69 at Black River, AR (Sec 14) 
Hodges Village Dam, MA 
Holes Creek, OH 
1999 
1999 
1998 
1998 
1988 
1999 
1998 
1986 
1987 
1987 
1992 
1988 
2000 
2000 
1991 
1999 
1996 
1997 
1997 
1994 
1995 
1994 
1999 
1997 
1998 
2006 
20099 
2000 
1998 
1994 
2001 
1999 
1988 
1988 
1988 
2008 
1989 
2001 
2001 
1995 
2001 
1997 
1999 
2002 
1994 
1996 
1994 
1999 
2000 
2001 
Nature of Project 
Local Protection 
Water Supply 
Streambank Protection 
Streambank Protection 
Local Protection 
Streambank Protection 
Local Protection 
Riverbank Protection 
Riverbank Protection 
Riverbank Protection 
Local Protection 
Streambank Protection 
Shoreline Protection 
Shoreline Protection 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Streambank Protection; Complete 
Bank Stabilization 
Streambank Protection; Complete 
Streambank Protection 
Major Rehabilitation of Reservoir 
Local Protection 
B-5 
1998 
1999 
1997 
1998 
1994 
1996 
1994 
1999 
2000

APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 2000 
6 
Fiscal Year 
Fiscal Year Placed in Completed or 
Started Useful Scheduled for 
Project Operation t.ompleion Nature ofProject 
Homme Lake and Dam, ND 
Hom Lake Creek, MS 
Houston, MN (Sec 205) 
Huntington Sewer Main, WV (Sec 14) 
Jackson County Hwy 2318, MN 
Jacksonport, White River, AR 
Jackson Twp, Butler Co, PA (Sec 205) 
James R. Olin Flood Control Project, VA 
James River Road (CR213), SD (Sec 14) 
Jim Chapman Lake, TX 
Joe Pool Lake, TX 
Kahawainui Stream, Oahu, HI (Sec 205) 
Kahoma Stream, Maui, HI 
Kanawha Ave, So Charleston, WV (Sec 14) 
Kanawha River, So. Charleston, Sewer Main, WV (Sec 14) 
Kawainui Marsh, Oahu HI (Sec 205) 
Kaweah River, CA 
Keizer, OR (Sec 205) 
Klamath River, Klamath Glen Levee, CA 1996 
Lake Ashtabula-Baldhill Dam, ND 
Lake Pontchartmain, LA 
Lake Wichita, Holliday Creek, TX 
Larose to Golden Meadow, LA 
Las Cruces, NM 
Lesueur River, CSAH 28, Blue Earth County, MN 
1999 
1999 
1996 
1996 
1991 
1986 
1990 
1990 
1999 
1997 
2001 
1997 
2002 
1999 
2000 
1999 
1996 
1997 
1998 
1998 
2000 
1994 
1994 
1990 
1990 
1999 
2001 
1997 
2003 
2001 
1997 
2000 
2013 
1995 
2007 
2001 
2000 
Dam Safety Assurances 
Local Protection 
Local Protection 
Streambank Protection 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Emergency Streambank Protection 
Reservoir, channel improvement 
Reservoir 
Local Protection 
Local Protection 
Streambank Protection 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Dam Safety/Major Rehabilitation 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Streambank Protection 
B-6 
r 
1995 
1993 
1995 
1999 
1994 
1995 
1997 
1994 
1999 
1958 
1975 
1989 
1986 
1999 
2000 
1995 
1999 
2000 
1996 
1994 
1967 
1987 
1972 
2000 
1999

APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 2000 
Fiscal Year 
Fiscal Year Placed in Completed or 
Started Useful Scheduled for 
Operation uompietion Nature of Project 
1981 Indefinite Local Protection 
Project 
Levisa & Tug Forks of the Big Sandy River & Cumberland River, 
KY, WV & VA 
Little Calumet River, IN 
Little Dell Lake, UT 
Little Missouri River, E. River Road, Medora, ND (Sec 14) 
Little Puerco River, Gallup, NM (Sec 205) 
Liverpool, IL (Sec 205) 
Logan Creek, Pender, NE (Sec 205) 
Long Branch Lake, MO 
Long Road, Chehali River, WA (Sec 205) 
Loosahatchie, Memphis, TN (Sec 14) 
Los Angeles County Drainage Area (LACDA), CA 
Louisiana State Penitentiary Levee, LA 
Loves Park, IL 
Lower Columbia River, Barlow Point 
Lower San Joaquin River, CA (Snagging and Clearing) 
Madrid Fire Station, Madrid, MO (Sec 14) 
Magpie Creek & Don Julio, CA (Sec 205) 
Magpie Creek City of Sacramento, CA (Sec 205) 
Mahoning River, Struthers, OH (Sec 205) 
Mahoning River, Warren, OH (Sec 14) 
Maple Creek E. Fork, Howells, NE (Sec 205) 
Marshall, MN 
1993 
1999 
2000 
1980 
1998 
2004 
1996 
1996 
1996 
2008 
1996 
1999 
2001 
2000 
1999 
Indefinite 
2001 
1999 
2002 
2002 
2004 
2001 
Indefinite 
1997 
2001 
2006 
1998 
1998 
1996 
2001 
Local Protection 
Reservoirs 
Emergency Streambank Protection 
Streambank Protection 
Local Protection 
Local Protection 
Reservoir 
Local Protection 
Streambank Protection 
Local Protection 
Flood Control 
Local Protection 
Streambank Protection 
Snagging and Clearing 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
B-7 
1990 
1985 
1999 
2000 
1997 
1996 
1973 
2000 
1998 
1995 
1999 
1991 
2000 
1985 
1995 
1997 
1997 
1997 
1995 
1994 
1996

m Project 
Marysville/Yuba City Levee Reconstruction, CA 
Masefau Bay, Tutuila Island, American Samoa (Sec 14) 
Mayfield Creek, KY (Sec 205) 
Mazon River Twp Road, IL 
McCreadys Point Road, MD (Sec 14) 
Meramec River Basin (Valley Park Levee), MO 
Merced County Streams, CA 
Metropolitan Louisville, Pond Creek, KY 
Metropolitan Region of Cincinnati Duck Creek, OH 
Middle Rio Grande Flood Protection, 
Bemalillo to Belen, NM 
Mid-Valley Area Levee Reconstruction, CA 
Milk River, Malta, MT (Sec 205) 
Mill Creek, Fort Smith, AR (Sec 205) 
Mill Creek, OH 
Mill Creek, WA 
Mingo Creek, OK 
Mississippi River Channel Improvements 
(IA, IL, KY, LA, MI, MO & TN) 
Mississippi River Levees 
Missouri National Rec River, NE & SD 
Missouri River Levee System, IA, NE, KS and MO 
Missouri River, Richland County Rd 152, MT (Sec 14) 
Molly Ann's Brook, NJ 
Mon River, Sewage Treatment Plant, Point Marion, PA 
1992 
1993 
1995 
1994 
1994 
1997 
1992 
1993 
1989 
1992 
1994 
1993 
1991 
1985 
2000 
1999 
1996 
1993 
1994 
1990 
1970 
1999 
1988 
1928 
1928 
1985 
1948 
1998 
1995 
1997 
p~l,c1 u - - rLLatur rc x.I e 
_., -L-x- t 1_ C1 _ 
2000 
1992 
1998 
1996 
1994 
2004 
Indefinite 
2004 
2005 
2008 
2001 
1998 
19995 
Indefinte 
2002 
1998 
2020 
2031 
2008 
Unscheduled 
1999 
2000 
1999 
APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 2000 
Fiscal Year 
Fiscal Year Placed in Completed or 
Started Useful Scheduled for 
Oratin Completion T,,. f. P, t 
Local rrotection 
Shoreline Protection 
Local Protection 
Streambank Protection 
Shoreline Protection 
Local Protection 
Reservoirs 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Channel Improvements 
Main Line Levees 
Local Protection 
Local Protection 
Emergency Streambank Protection 
Local Protection 
Streambank Protection 
B-8 
NONE" 
1999

APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 2000 
Fiscal Year 
Fiscal Year Placed in Completed or 
Started Useful Scheduled for 
Project Operation Completion Nature of Project 
Mon River, Water St. Point Marion, PA 
Mt. St. Helens Sediment Control, WA 
Muddy Creek Cascade, Vaughn, MT (Sec 14) 
Muddy Creek, Gruney Co, MO 
Mudline to Pineville, MS 
Mud Mountain Dam, WA (Dam Safety Assurance) 
Muscatine Island, IA 
Muskingham River Lakes, OH 
Muskingum River Lakes, OH (Dam Safety Assurance) 
Napa River, CA 
New Orleans to Venice, LA 
Nickleplate Road, French Creek, Fairfield, PA 
Nishnabotna River, Hamburg, IA (Sec 205) 
Nogales Wash, AZ 
Nonconnanh Creek, TN & MS 
North Branch Chicago River 
North Ellenville, NY 
North Fork, KY Rivers, Jackson, KY (Sec 205) 
North Nashua River, Lancaster, MA (Sec 14) 
Oates Creek, GA 
Oelwin, Fayette County, IA (Sec 205) 
O'Hare Reservoir, IL 
Ohio River, Chester, WV (Sec 14) 
Ohio River Flood Protection, IN 
1998 
1986 
1992 
1997 
1984 
1986 
1995 
1976 
1982 
1999 
1969 
1998 
1996 
1994 
1990 
1970 
1995 
1997 
2000 
1990 
1993 
1990 
1994 
1999 
1990 
1999 
1985 
1995 
2000 
2000 
1993 
1999 
Tobe 
determined 
1994 
1999 
1985 
2002 
2000 
1988 
Indefinite 
2006 
2017 
2001 
2000 
Indefinite 
Indefinite3 
Indefinite 
1997 
2000 
2000 
1992 
1997 
2001 
1998 
2002 
Streambank Protection 
Local Protection 
Streambank Protection 
Streambank Protection 
Streambank Protection 
Modernization of Dam 
Local Protection 
Major Rehabilitation 
Modernization of Dams 
Local Protection 
Local Protection 
Streambank Protection 
Local Protection 
Flood Waming System 
Local Protection 
Snagging and Clearing 
Local Protection 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Reservoir 
Streambank Protection 
Local Protection 
B-9

.,. 
Project 1pera uoniIatu Ps0.r iuject u 
Ohio River, Moundsville, WV (Sec 14) 
Otter Creek, Shannon Hills, AR (Sec 205) 
Ouachita River Levees, LA 
Pajaro River, CA 
Panola-Quitman Item C, MS 
Papillion Creek and Tributaries Lake, NE 
Passaic River Preservation of National Storage Areas, NJ 
Pebble Creek, Scribner, NE (Sec 205) 
Pelucia Creek, Item 1, MS 
Pelucia Creek, Item 1A, MS 
Pelucia Creek, Item 2, MS 
Pelucia Creek, Item 3, MS 
Pelucia Creek, Item 4, MS 
Peninsula Drainage District #1, OR (Sec 205) 
Perry County L & D Nos. 1, 2, 3, MO 
Peny Creek, IA 
Petaluma River, Petaluma, CA (Sec 205) 
Pine River Dam, MN 
Pigeon Creek, Monongahela, PA (Sec 205) 
Pinopolis Dam, SC (Sec 14) 
Pool 8, Pilot Drawdown, WI 
Portage, WI 
Portugues and Bucana Rivers, PR 
Pt. Leflore, MS 
Raccoon River, IA 
1984 
1989 
1974 
1994 
1986 
1987 
1993 
1993 
1993 
1999 
1985 
1995 
1986 
2000 
1998 
1986 
Indefinite7 
1989 
1993 
1995 
2004 
1995 
1987 
1987 
1993 
1994 
1994 
2000 
1985 
2003 
2003 
2001 
1999 
1995 
2001 
1999 
2007 
1986 
2000 
Streambar PtectL;IIon 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Reservoirs 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Dam Safety 
Local Protection 
Streambank Protection 
Ecosystem Restoration 
Local Protection 
Local Protection 
Streambank Protection 
Local Protection 
B-10 
APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 2000 
Fiscal Year 
Fiscal Year Placed in Completed or 
Started Useful Scheduled for 
tli Completion f,..,...r 
.. 
1996 
1984 
1990 
1987 
1984 
1972 
1997 
1993 
1985 
1987 
1990 
1990 
1993 
1997 
1977 
1995 
1997 
1995 
1998 
1995 
2000 
1997 
1975 
1985 
1994

APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 2000 
Fiscal Year 
Started 
m 
Placed in 
Useful 
Operation 
1995 
1965 
Project 
Ramapo River at Oakland, NJ 
Raritan Bay and Sandy Hook Bay, NJ, Matawan and Union 
Beach Sections 
Raritan River Basin, Greenbrook Sub-basin, NJ 
Ray Roberts Lake, TX 
Redbank & Fancher Creeks, CA 
Red River Basin Chloride Control (Area X) OK and TX 
Red River Below Denison Dam 
Red River of the North Fargo Public Facilities, ND (Sec 14) 
Rend Lake, IL 
Reno Flood Warning System, NV (Sec 205) 
Richmond, VA 
Rillito River, AZ 
Rio de LaPlata, PR 
Rio Puerto Neuvo, PR 
Roanoke River, Upper Basin, VA 
Roughan's Point, Revere, MA 
Running Slough Ditch 
Sacramento River Bank Protection, CA 
Sacramento River, Chico Landing to Red Bluff, CA 
Sacramento River Flood Control, CA 
Sacramento Urban Area Levee Reconstruction, CA 
Salinas River, San Ardo, CA 
Salyersville, KY 
San Antonio Channel Improvement, TX 
1987 
1993 
1970 
1995 
1999 
1990 
1997 
Fiscal Year 
Completed or 
Scheduled for 
Completion 
2002 
Indefinite 
2011 
1999 
1994 
Indefinite 
1995 
2002 
1999 
2001 
1995 
Indefinite 
2007 
2014 
2008 
2001 
1990 
Indefinite 
Indefinite 
Indefinite 
1997 
1993 
2000 
2002 
B-11 
- 
Nature of Project 
Local Protection 
Local Protection 
Local Protection 
Reservoir 
Reservoir 
Chloride Control 
Levee & Streambank Protection 
Streambank Protection 
Deficiency Correction 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
1998 
1975 
1987 
1991 
1948 
2000 
1996 
1998 
1986 
1994 
1995 
1994 
1990 
1997 
1990 
1963 
1963 
1918 
1990 
1993 
1991 
1957

APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 2000 
Project 
San Isidro Rd, Santa Fe, NM (Sec 14) 
San Luis Rey River, CA 
San Lorenzo River, CA 
San Pedrocreek, Pacifica, CA (Sec 205) 
Santa Ana River Mainstem, CA 
Santa Paula Creek, CA 
Santree Dam, SC (Sec 14) 
Sardis, Monroe Co, OH (Sec 14) 
Savan Gut, VI (Sec 205) 
Saylorville Lake, IA 
Seitz Run, Allegheny Co., PA (Sec 205) 
Sheyenne River, ND 
Sicily Island, LA, Levee 
Sidney, NE (Sec 205) 
Sims Bayou, TX 
Skyrocket Creek, Quray, Co (Sec 14) 
Sodus Point Lighthouse, NY (Sec 14) 
Souris River Basin, ND 
Southeast Louisiana 
Southeast Ottawa, IL (Sec 205) 
Springbrook Creek, PA 
Steele Bayou, MS 
Ste. Genevieve, MO 
St. Francis Basin 
Stillwater, MN 
Fiscal Year 
Fiscal Year Placed in Completed or 
Stated Useful Scheduled for 
Operation Scompledonn Nature of Project 
2000 
1988 
1999 
1998 
1990 
1973 
1995 
2000 
1987 
1965 
1998 
1990 
1983 
1993 
1990 
1998 
2000 
1985 
1997 
1998 
1989 
1966 
1995 
1938 
1996 
B-1 2 
1995 
2000 
1989 
1977 
1994 
2000 
1990 
2001 
Indefinite 
2003 
2003 
Indefinite 
Indefinite 
1995 
2000 
2001 
1996 
1999 
2003 
2003 
1995 
2010 
1999 
2001 
1998 
2007 
2000 
1990 
2003 
2002 
2007 
Unscheduled 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Streambank Protection 
Streambank Protection 
Local Protection 
Reservoir 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Streambank Protection 
Streambank Protection 
Reservoir 
Urban Flood Control 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Tributary Levees & Channels 
Local Protection

m 
APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 2000 
Fiscal Year 
Fiscal Year Placed in Completed or 
Started Useful Scheduled for 
Project Operation ompieuon 
St. Johns Bayou- New Madrid Floodway, MO 
Sugar Creek, Bellbrook, OH (Sec 205) 
Swan Creek, Taney County, MO (Sec 14) 
Ted Rhodes Golf Course, Nashville, TN 
Tehama, CA (Sec 205) 
Tensas Cocodrie Pumping Plant, LA 
Tensas Cocodrie, LA, Levee () 
Teton River near Choteau, Teton County, MT (Sec 14) 
Texas Flat Road, Kiln, MS 
Thurman to Hamburg, IA 
Tombigbee River Tributaries, AL and MS 
Tongue River, State Park, Ranchester, WY (Sec 14) 
Town Brook, Quincy, MA 
Tropicana and Flamingo Washes, NV 
Tulsa and West Tulsa, OK 
Turtle Creek, PA 
Tygart Lake, WV 
Upper Gordon Creek, Hattiesburg, MS 
Upper Jordan River, UT 
Upper Scioto River, Marion County, OH (Sec 205) 
Upper Yazoo Projects, MS 
Van Bibber Creek, CO (Sec 205) 
Village Creek, AL 
Walnut Canyon, CA (Sec 14) 
Walnut Creek, CA 
1997 
1996 
1984 
1995 
1999 
1983 
1974 
1992 
2000 
1996 
1965 
1993 
1992 
1995 
1943 
1995 
1996 
1993 
1994 
1986 
1976 
1995 
1989 
1994 
1964 
2007 
2001 
1986 
1995 
Unscheduled 
1996 
Indefinite) 
1993 
2001 
1997 
1997 
1994 
2001 
2005 
1993 
1997 
2001 
1995 
Unscheduled 
1987 
2011 
2003 
1996 
1998 
1997 
Nature of Project 
Rural Urban Flood Control 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection; Complete 
Streambank Protection 
Shoreline Protection 
Local Protection 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Rehabilitation of Levee System 
Local Protection 
Dam Safety Assurance 
Channel Improvement 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
B-13 
ww 
1997 
1986 
1995 
1987 
1993 
1990 
1994 
1945 
1995

APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 2000 
Project 
Westbank and Vicinity, New Orleans, LA 
West Columbus, OH 
West Creek, Topeka (Sec 14) 
West DesMoines-DesMoines, IA 
West Fork, Grand River, Rte H (Sec 14) 
West Fork, Grand River, Rte W (Sec 14) 
West Ray, Marshall, PA (Sec 14) 
West Tennessee Tributaries 
Westwego to Harvey, LA 
Wheeler Creek, Gainesville, TX (Sec 205) 
White River, Indianapolis Central, Waterfront, IN 
White River, Batesville, AR (Sec 205) 
White River, Jacksonport, AR (Sec 205) 
Whiteman's Creek, AR 
Wildcat and San Pablo Creeks, CA 
Willapa River, Raymond, WA (Sec 14) 
Wood River, NE 
Wyoming Valley Levee Raising 
Yalobusha River Mile 7.5, MS 
Yellowstone River, Livingston, MT (Sec 14) 
Yonkers (Nepera Park), NY 
Fiscal Year Placed in 
Started Useful 
Operation 
1991 
1993 
1997 
1994 
1997 
1998 
1990 
1960 
1991 
1983 
1995 
1005 
1996 
1994 
1980 
2000 
1996 
1996 
1993 
1992 
1994 
2000 
1990 
1994 
1996 
1996 
1999 
2000 
1993 
1993 
Fiscal Year 
Completed or 
Scheduled for 
Completion 
2014 
2003 
2000 
2000 
2000 
2000 
1990 
Indefinite' 
2011 
1984 
2002 
1999 
1998 
1999 
1996 
2000 
2003 
2002 
1993 
1993 
1995 
Nature of Project 
Local Protection 
Local Protection 
Streambank Protection 
Local Protection 
Streambank Protection 
Streambank Protection 
Streambank Protection 
Drainage and Flood Control 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Streambank Protection 
Streambank Protection 
Local Protection 
B-14 
. . 
Fiscal YePalar ced in 
Started OUpesreaftuioln

APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 2000 
Construction of further channel improvement was halted in 1987 due to the denial of water quality certification. 
2 Project was in useful operation before Corps started working on it. Work consists primarily of improvements to existing 
channels, levees, pumping stations and other flood control structures. 
3 Environmental and Recreational separable elements unprogrammed. 
4 Levee enlargement remains to be accomplished for 0.8 miles. 
Awaiting financial completion. Requires a correction in the financial management system. 
6 Completion of project depended upon the receipt of adequate funding. 
Landscaping remains to be accomplished. 
8 Recreation contract award is unscheduled. 
9 This completion schedule is for the Grand Prairie Region separable element only. 
B-15

APPENDIX B 
Beach Erosion Control Projects Under Construction 
During Fiscal Year 2000 
Project 
Atlantic Coast of Maryland 
Brevard County, FL 
Brigantine Inlet to Great Egg Harbor Inlet (Absecon Island, NJ) 
Broward County, FL 
Delaware Coast Protection, DE 
Cape May Inlet to Lower Twp, NJ 
Carlsbab Seawall, CA (Sec 103) 
Carolina Beach and Vicinity, NC - Area South 
Carolina Beach and Vicinity, NC - Carolina Beach Portion 
Casino Beach, IL 
Castle Pinckney, SC 
Dade County, FL 
Delaware Coast from Cape Henlopen to Fedwick Island, DE 
(Dewey/Rehoboth Beach, DE) 
Duval County, FL 
East Rockaway to Rockaway Inlet and Jamaica Bay, NY 
Emeryville, Alameda, CA (Sec 103) 
Fire Island to Jones Inlet, NY 
Fire Island Inlet to Montauk Point, NY 
Great Egg Harbor Inlet & Peck Beach, NJ 
Hunting Island, SC 
Lummi Shore Road, WA (Sec 103) 
Martin County, FL 
Myrtle Beach, SC 
Panama City Beaches, FL 
Fiscal Year 
Fiscal Placed in Useful Completed or 
Year Operation Scheduled for 
ina Completion 
Started 
1990 1994 2043 
2000 
2000 
1965 
1989 
1990 
1996 
1996 
1965 
1995 
1999 
1975 
2000 
1976 
1979 
1993 
1988 
1963 
1991 
1999 
1998 
1994 
1995 
1997 
1990 
1991 
1997 
1998 
1982 
1993 
1992 
1999 
1999 
2003 
TBD 
2011 
2028 
2042 
1997 
2047 
2014 
Indefinite 
2000 
2038 
TBD 
2028 
2006 
1993 
2039 
2027 
2043 
1999 
1999 
2046 
2047 
2000 
B- 16 
i

APPENDIX B 
Beach Erosion Control Projects Under Construction 
During Fiscal Year 2000 
Project 
Pinellas County, FL (Long Key) 
Presque Isle Peninsula, PA (Permanent) 
Rockaway Inlet to Norton Point (Coney Island), NY 
Sandy Hook to Barnegat Inlet, Sec I 
Sarasota County, FL 
Shore Drive, Singleton Swash, SC 
Turkey Creek, Sumter County, SC 
Tybee Island, GA 
Virginia Beach, VA (Reimbursement) 
Virginia Beach, VA 
Woodmont Beach, Milford, CT (Sec 103) 
Wrightsville Beach, NC 
Fiscal 
Year 
Started 
1969 
1990 
1994 
1994 
1994 
1999 
1999 
1975 
1962 
1996 
1993 
1965 
Placed in Useful 
Operation 
1993 
1995 
Incremental 
1999 
1999 
1976 
1962 
1994 
1966 
Fiscal Year 
Completed or 
Scheduled for 
Completion 
2043 
2042' 
2049 
2049 
2047 
1999 
2000 
2024 
2012' 
2051 
20004 
Indefinite 
B-17 
- -- -- 
--

APPENDIX B 
Beach Erosion Control Projects Under Construction 
During Fiscal Year 2000 
Emergency Repairs due to Hurricane Andrew as per FY 92 Dire Emergency Act authorization. 
Original authorized project completed in 1991. 
2 IAW Section 355 of WRDA 1996, the project will be extended until the earlier part of year 2012 or completion of the beach erosion 
control and hurricane Protection project at Virginia Beach, Virginia. 
3 Fiscal year 1997 was the fifth year of 50 years of nourishment. 
4 Periodic beach nourishment. 
B-18

APPENDIX B 
Environmental Restoration Projects Under Construction 
During Fiscal Year 2000 
Fiscal Year 
Fiscal Placed in Completed or 
Year Useful Scheduled for 
Project Started Operation Completion Nature of Project 
Amazon Creek Wetlands Restoration, OR (Sec 1135) 
Anacostia River & Tributaries, MD & DC 
Barataria Bay Marsh Creation, LA (CWPPRA) 
Battery Island Bird Habitat Preservation, NC (Sec 204) 
Cape Fear L&D No. 1 Fish Ladder, NC (Sec 1135) 
Central and Southern, FL 
Chesapeake Bay Oyster Recovery, MD 
Clatskanie River, OR 
Columbia River Fish Mitigation, OR & WA 
Dead Lake, AL 
Everglades & South Florida Ecosystem 
Falls of Ohio, Wetlands & Fishery, IN (Sec 1135) 
Fern Ridge Lake Marsh Restoration, OR (Sec 1135) 
Goldsborough Creek, WA (Sec 206) 
Gunderson Pond Restoration, CA (Sec 1135) 
Hidden Lake Restoration, NE 
Howell Evansville Wetland, IN Sec (1135) 
Kissimmee River, FL 
Ladd Marsh, OR 
Lake Seminole Habitat, FL 
Lake Washington Ship Canal, WA (Sec 1135) 
Little Falls Dam, MD (Sec 1135) 
Lower Snake Fish & Wildlife Comp 
Miller Comer, SC 
Milton Freewater, OR 
1999 
1999 
1996 
1999 
1996 
1950 
1997 
2000 
1988 
1998 
1998 
2000 
1999 
2000 
2000 
1996 
1999 
1989 
1999 
1998 
2000 
1999 
1979 
1999 
1999 
1996 
2000 
1997 
2000 
2001 
2001 
2000 
2000 
2001 
Indefinite 
2000 
2001 
Undetermined 
1998 
2005 
2001 
2001 
2002 
2001 
2002 
2000 
2010 
2001 
1999 
2000 
2000 
Undetermined 
2000 
2001 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Aquatic Ecosystem Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
B-19 
r

APPENDIX B 
Environmental Restoration Projects Under Construction 
During Fiscal Year 2000 
a Project 
Missouri River Bank Stabilization & Navigation Project, NE 
Monroe Lake Wetland, IN (Sec 1135) 
Morgan Point Bendway Closure Structure, AR (Sec 1135) 
MRGO Back Dike Marsh Protection, LA (CWPPRA) 
Murphy's Slough, CA (Sec 1135) 
Naugatuck River, Torrington, CT (Sec 1135) 
Nimrod Fisheries Restoration, AR (Sec 1135) 
North Fork Feather River, Chester, CA (Sec 1135) 
Numana Dam, CA (Sec 1135) 
Pine Flat Bypass, CA (Sec 1135) 
Poplar Island, MD 
Putah Creek, South Fork, CA 
Sagamore Marsh, Cape Cod Canal, MA (Sec 1135) 
Salmon River, Challis, ID 
Simmons Fieldcontrol Structure, AR (Sec 1135) 
So. WV (Gilbert, WV) Sewage Treatment Plant 
So. WV (Mercer Co) Water Distribution System 
South Fork, Putah Creek, CA (Sec 1135) 
Tucson (Ajo) Detention Basin Wetlands, AZ (Sec 1135) 
Turning Basin #3, Seattle WA (Sec 1135) 
Upper Grande Ronde, OR 
Vic Fazio Yolo Wildlife Area, CA (Sec 1135) 
Walla Walla River, OR 
Wehrspann Lake Aquatic Habitat Control, NE 
Fiscal 
Year 
Started 
1992 
1999 
1995 
1999 
1998 
2000 
1999 
1994 
1998 
1998 
1998 
1999 
2000 
1999 
1998 
1998 
1998 
1998 
2000 
1999 
1997 
1992 
1994 
1999 
Placed in 
Useful 
Operation 
1995 
1999 
1999 
2000 
1999 
1995 
1999 
-ddmw 
B-20 
--- 
Fiscal Year 
Completed or 
Scheduled for 
Completion 
2000 
2000 
1999 
1999 
2001 
2000 
1999 
2000 
1999 
Unscheduled 
2022 
Unscheduled 
2001 
2003 
1999 
1999 
2000 
2001 
2002 
2004 
2002 
1999 
2001 
2004 
Nature of Project 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Fish Habitat Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration

APPENDIX C 
Navigation Locks and Dams Operable September 30, 2000 
River/ River Chamber Depth on Sills Dam Year Chann 
Lock Mile Community Width Length Lift Upper Lower Type Length Open Length Dept 
AIWW Between Norfolk, VA & St. Johns River, FL 
Deep Creek 10.6 Chesapeake, VA 52 300 12 12 12 Miter 1940 22.0 
Great Bridge 11.5 Chesapeake, VA 75 540 3 16 16 Miter 1932 6.0 
South Mills 33.2 South Mills, NC 52 300 12 12 12 Miter 1941 22.0 
Alabama-Coosa Rivers 
Claiborne 117.5 Claiborne, AL 84 600 30 16 13 Moveable 1603.0 1969 61.0 
Millers Ferry 178.0 Camden, AL 84 600 45 16 13 Moveable 9900.0 1969 103.0 
Robert F. Henry 281.2 Benton, AL 84 600 45 16 13 Moveable 1496.0 1972 88.0 
Allegheny 
2 6.7 Aspinwall, PA 56 360 11 11 12 Miter 1393.0 1934 8.0 
3 14.5 Cheswick, PA 56 360 14 12 11 Miter 1436.0 1934 10.0 
4 24.2 Natrona, PA 56 360 11 9 10 Miter 876.0 1927 6.0 
5 30.4 Freeport, PA 56 360 12 10 11 Miter 780.0 1927 6.0 
6 36.3 Clinton, PA 56 360 12 11 11 Miter 1140.0 1928 9.0 
7 45.7 Kittanning, PA 56 360 13 11 10 Miter 916.0 1930 7.0 
8 52.6 Templeton, PA 56 360 18 14 10 Miter 984.0 1931 10.0 
9 62.2 Rimer, PA 56 360 22 11 11 Miter 950.0 1938 10.0 
Apalachicola, Chattahoochee, And Flint Rivers 
George W. Andrews 46.7 Columbia, GA 82 450 25 19 13 Moveable 620.0 1962 29.0 
Walter F. George 75.1 Fort Gaines, GA 82 450 88 18 13 Moveable 1337.0 1963 85.0 
Jim Woodruff 106.3 Chattahoochee, FL 82 450 33 14 14 Moveable 5924.0 1954 47.0 
Bayou Teche, LA 
Keystone 72.0 New Iberia, LA 36 160 8 9 8 Miter 175.0 1913 35.0 
Bayou Teche, LA (FCMR&T) 
Berwick 1.5 Berwick, LA 45 300 14 9 9 Sector 1950 125.0 
East & West Calumet 4.0 Berwick, LA 45 90 0 0 0 Sector 1950 80.0 
Charenton 35.7 Charenton, LA 45 0 0 0 0 Sector 1949 80.0 
Black Rock Channel & Tonawanda Harbor 
Black Rock 4.0 Buffalo, NY 70 625 5 22 22 Replaced 1914 6.0 2
el 
th Width 
50 50 
12 200 
6 50 
9 200 
9 200 
9 200 
9 200 
9 200 
9 200 
9 200 
9 200 
9 200 
9 200 
9 200 
9 100 
9 100 
6 100 
6 80 
8 80 
8 80 
8 80 
1 200 
C-1

APPENDIX C 
Navigation Locks and Dams Operable September 30, 2000 
River/ River Chamber Depth on Sills Dam Year Chan 
Lock Mile Community Width Length Lift Upper Lower Type Length Open Length De 
Black Warrior & Tombigbee Rivers, AL 
Coffeeville 116.6 Coffeeville, AL 110 600 34 13 13 Moveable 1185.0 1960 97.0 
Demopolis 213.2 Demopolis, AL 110 600 40 13 13 Moveable 1485.0 1954 48.0 
Armistead I. Seldon 262.0 Eutaw, AL 110 600 22 13 13 Moveable 1832.0 1957 77.0 
William Bacon Oliver 337.6 Tuscaloosa, WA 110 600 28 18 18 Moveable 800.0 1991 43.0 
Holt 347.0 Holt, AL 110 600 64 19 13 Moveable 1138.0 1966 18.0 
John Hollis Bankhead 366.0 Adger, AL 110 600 68 13 13 Moveable 1170.0 1975 43.0 
Calcasieu River And Pass, LA 
Calcasieu Barrier 38.9 West Lake, LA 56 575 0 0 0 Sector 450 1968 15.0 
Canaveral Harbor 
Canaveral 3.0 Cape Canaveral, FL 90 600 3 13 13 Sector 0.0 1965 6.0 
Cape Fear River 
1 39.0 Kings Bluff, NC 40 200 11 9 9 Miter 275.0 1915 32.0 
2 71.0 Browns Landing, NC 40 200 9 12 12 Miter 229.0 1917 24.0 
William O. Huske 95.0 Tolars Landing, NC 40 300 9 9 9 Miter 220.0 1935 20.0 
Chicago Harbor 
Chicago 327.2 Chicago, IL 80 600 4 27 23 Sector 2100 1939 1.0 
Colorado River 
Colorado River East 441.1 Matagorda, TX 125 1180 12 15 15 Sector 520 1944 3,700.0 
Colorado River West 441.8 Matagorda, TX 125 1180 12 15 15 Replaced 520 1944 3,700.0 
Columbia River 
Bonneville 145.3 Cascade Locks, OR 86 650 65 19 24 Miter 2680.0 1993 1,080.0 
The Dalles 191.7 The Dalles, OR 86 650 88 15 15 Vertical 8735.0 1957 1,000.0 
John Day 216.5 Rufus, OR 86 650 110 15 15 Vertical 5900.0 1968 1,600.0 
Nary 292.0 Plymouth, WA 86 650 83 15 20 Miter 7365.0 1953 64.0 
nel 
pth Width 
9 200 
9 200 
9 200 
9 200 
9 200 
9 200 
13 56 
12 100 
8 100 
8 100 
8 100 
21 470 
12 125 
12 125 
14 300 
14 250 
14 250 
14 250 
C-2

APPENDIX C 
Navigation Locks and Dams Operable September 30, 2000 
River/ River Chamber Depth on Sills Dam Year Chann 
Lock Mile Community Width Length Lift Upper Lower Type Length Open Length Dep 
Cumberland River, TN & KY 
Barkley 30.6 Grand Rivers, KY 110 800 57 24 13 Miter 9959.0 1964 118.0 
Cheatham 148.7 Ashland City, TN 110 798 26 14 12 Miter 801.0 1952 68.0 
Old Hickory 216.2 Old Hickory, TN 84 397 60 14 13 Miter 3605.0 1954 97.0 
Cordell Hull 313.5 Carthage, TN 84 400 59 14 13 Miter 1138.0 1973 72.0 
Freshwater Bayou, LA 
Freshwater Bayou 1.2 Intracoastal Cit, LA 84 590 4 16 16 Sector 401.0 1968 250.0 
GIWW Between Apalachee Bay, FL & Mexican Border 
Algiers 0.0 Algiers, LA 75 760 18 13 13 Sector 1956 384.0 
Harvey 0.0 Harvey, LA 75 415 20 12 12 Miter 1935 384.0 
Inner Harbor Nvg Chnl 5.6 New Orleans, LA 75 626 17 31 31 Miter 1923 384.0 
Bayou Sorrel 37.5 Plaquemine, LA 56 790 21 14 14 Sector 1952 64.0 1 
Port Allen 64.1 Port Allen, LA 84 1188 45 13 14 Miter 1961 64.0 1 
Bayou Boeuf 93.3 Morgan City, LA 75 1148 11 13 13 Sector 0.0 1954 384.0 
Leland Bowman 162.7 Abbeville, LA 110 1190 5 11 11 Sector 1985 384.0 
Calcasieu 238.5 Lake Charles, LA 75 1194 4 13 13 Sector 0.0 1950 384.0 
Brazos East 400.4 Freeport, TX 75 260 0 15 15 Sector 520 1943 3,700.0 1 
Brazos West 400.9 Freeport, TX 75 260 0 15 15 Sector 520 1943 3,700.0 1 
Green And Barren Rivers,KY 
1 9.1 Spottsville, KY 84 600 8 12 15 Miter 482.0 1956 54.0 
2 63.1 Calhoun, KY 84 600 14 12 12 Miter 519.0 1956 45.0 
Hudson River 
Troy 153.8 Troy, NY 45 493 17 16 13 Fixed 1.0 1916 2.0 1
el 
th Width 
9 300 
9 200 
9 150 
9 150 
12 120 
16 150 
12 120 
12 150 
12 120 
12 120 
16 150 
16 200 
16 200 
12 125 
12 125 
9 150 
9 150 
4 200 
C-3

APPENDIX C 
Navigation Locks and Dams Operable September 30, 2000 
River/ River Chamber Depth on Sills Dam Year Chann 
Lock Mile Community Width Length Lift Upper Lower Type Length Open Length Dep 
Illinois Waterway 
Lagrange 80.2 Beardstown, IL 110 600 10 16 13 Miter 1066 1939 78.0 
Peoria 157.7 Creve Coeur, IL 110 600 11 15 12 Miter 3446 1938 73.0 
Starved Rock 231.0 Uitca,IL 110 600 19 17 14 Miter 1280 1933 14.0 
Marseilles 244.6 Marseilles, IL 110 600 24 19 14 Miter 778.5 1933 27.0 
Dresden Island 271.5 Morris, IL 110 600 22 17 12 Miter 1615.5 1933 15.0 
Brandon Road 286.0 Joliet,IL 110 600 34 18 14 Miter 2373 1933 5.0 
Lockport 291.1 Lockport, IL 110 600 40 20 15 Miter 500 1933 35.0 
Thomas J. O'Brien 326.5 Chicago, IL 110 1000 4 18 18 Sector 256.75 1960 7.0 
Kanawha Lock & Dam, Washington 
Winfield 31.1 Winfield,WV 110 800 28 18 18 Miter 700.0 1997 37.0 
31.1 Winfield, WV 56 360 28 18 12 Miter 700.0 1937 37.0 
31.1 Winfield, WV 56 360 28 18 12 Miter 700.0 1937 37.0 
Marmet 67.7 Marmet, WV 56 360 24 18 12 Miter 557.0 1934 16.0 
67.7 Marmet, WV 56 360 24 18 12 Miter 557.0 1934 16.0 
London 82.8 London, WV 56 360 24 18 12 Miter 557.0 1934 8.0 
82.8 London, WV 56 360 24 18 12 Miter 557.0 1933 8.0 
Kaskaskia River 
Kaskaskia 0.8 Modoc, IL 84 600 29 19 11 Miter 120.0 1973 35.0 
el 
th Width 
9 300 
9 300 
9 300 
9 300 
9 300 
9 160 
9 300 
9 300 
9 300 
9 300 
9 300 
9 150 
9 150 
9 150 
9 150 
9 225 
C-4

APPENDIX C 
Navigation Locks and Dams Operable September 30, 2000 
River/ River Chamber Depth on Sills Dam Year Chann 
Lock Mile Community Width Length Lift Upper Lower Type Length Open Length Dept 
Kentucky River, KY 
1 4.0 Carrollton, KY 38 145 8 8 15 Miter 424.0 1839 27.0 
2 31.0 Lockport, KY 38 145 14 8 6 Fixed 400.0 1839 11.0 
3 42.0 Gest, KY 38 145 13 9 6 Miter 465.0 1844 23.0 
4 65.0 Frankfort, KY 38 145 13 6 7 Fixed 534.0 1844 17.0 
5 82.2 Tyrone, KY 38 145 15 10 6 Fixed 556.0 1844 14.0 
6 96.2 High Bridge, KY 52 147 14 9 6 Fixed 413.0 1891 21.0 
7 117.0 High Bridge, KY 52 147 15 9 7 Fixed 350.0 1897 23.0 
8 139.9 Camp Nelson, KY 52 146 19 11 6 Fixed 257.0 1900 18.0 
9 157.5 Valley View, KY 52 148 17 11 7 Fixed 362.0 1907 19.0 
10 176.4 Ford, KY 52 148 17 9 6 Fixed 472.0 1907 25.0 
11 201.0 Irvine, KY 52 148 18 10 6 Fixed 208.0 1906 20.0 
12 220.9 Ravenna, KY 52 148 17 10 6 Fixed 240.0 1973 19.0 
13 239.9 Willow, KY 52 148 18 10 6 Fixed 248.0 1915 9.0 
14 249.0 Heidelberg, KY 52 148 17 9 6 Fixed 248.0 1917 26.0 
Lake Washington Ship Canal 
Hiram M. Chittenden 1.3 Seattle, WA 28 123 26 16 16 Miter 235.0 1916 0.0 3 
1.3 Seattle, WA 80 760 26 36 29 Miter 235.0 1916 8.0 3
el 
th Width 
6 150 
6 150 
6 150 
6 150 
6 100 
6 100 
6 100 
6 100 
6 100 
6 100 
6 100 
6 100 
6 100 
6 100 
10 0 
10 100 
C-5

APPENDIX C 
Navigation Locks and Dams Operable September 30, 2000 
River/ River Chamber Depth on Sills Dam Year Chann 
Lock Mile Community Width Length Lift Upper Lower Type Length Open Length Dept 
McClellan-Kerr Arkansas River Navigation System 
Norrell 10.3 Arkansas Post, AR 110 600 30 16 15 Fixed 277.0 1967 3.0 
2 13.3 ArkansasPost,AR 110 600 20 18 14 Tainter 6300.0 1967 37.0 
Joe Hardin 50.2 Grady, AR 110 600 20 18 14 Tainter 2240.0 1968 16.0 
Emmett Sanders 66.0 Pine Bluff, AR 110 600 14 18 14 Tainter 5.0 1968 20.0 
5 86.3 Redfield, AR 110 600 17 18 14 Tainter 7455.0 1968 22.0 
David D. Terry 108.1 Little Rock, AR 110 600 18 18 14 Tainter 4040.0 1968 17.0 
Murray 125.4 Little Rock, AR 110 600 18 18 14 Tainter 3530.0 1969 31.0 
Toad Suck Ferry 155.9 Conway, AR 110 600 16 18 14 Tainter 1200.0 1969 21.0 
Arthur V. Ormond 176.9 Morrilton, AR 110 600 19 18 14 Tainter 1797.0 969 29.0 
Dardanelle 205.5 Russellville, AR 110 600 55 18 14 Tainter 1210.0 1969 51.0 
Ozark - Jeta Taylor 256.8 Ozark, AR 110 600 34 18 15 Tainter 900.0 1969 36.0 
James W. Trimble 292.8 Fort Smith, AR 110 600 20 18 14 Tainter 4260.0 1969 27.0 
W.D. Mayo 319.6 Spiro,OK 110 600 21 14 14 Moveable 7400.0 1970 17.0 
Robert S. Kerr 336.2 Salisaw, OK 110 600 48 16 14 Moveable 7230.0 1970 30.0 
Webbers Falls 366.6 Webber Falls, OK 110 600 30 16 14 Moveable 4370.0 1970 35.0 
Chouteau 401.4 Muskogee, OK 110 600 21 15 14 Moveable 11690. 1970 20.0 
Newt Graham Lock 421.6 Inola, OK 110 600 21 15 14 Moveable 1630.0 1970 23.0 
Mermentau River, LA 
Schooner Bayou 3.4 Abbeville, LA 75 525 0 0 0 Sector 1950 11.0 
Catfish Point 25.0 Creole, LA 56 500 0 0 0 Sector 1951 5.0 
el 
th Width 
9 300 
9 300 
9 250 
9 250 
9 250 
9 250 
9 250 
9 250 
9 250 
9 250 
9 250 
9 250 
9 250 
9 250 
9 250 
9 150 
9 150 
6 60 
15 200 
C

APPENDIX C 
Navigation Locks and Dams Operable September 30, 2000 
River Chamber Depth on Sills Dam Year Channel 
Mile Community Width Length Lift Upper Lower Type Length Open Length Depth Width 
Mississippi R Betwn Missouri R & Minneapolis, MN 
Melvin Price 200.8 East Alton, IL 
200.8 East Alton, IL 
25 241.4 Winfield, MO 
24 273.4 Clarksville, MO 
22 301.2 Saverton, MO 
21 324.9 Quincy, IL 
20 343.2 Canton, MO 
19 364.2 Keokuk, IA 
18 410.5 Gladstone, IL 
17 437.1 New Boston, IL 
16 457.2 Muscatine, IL 
15 482.9 Rock Island, IL 
482.9 Rock Island, IL 
14 493.0 Leclaire, IA 
493.0 Leclaire, IA 
13 523.0 Clinton, IL 
12 556.0 Bellevue, IA 
11 583.0 Dubuque, IA 
10 615.0 Guttenburg, IA 
9 647.0 Lynxville, WI 
8 679.0 Genoa, WI 
7 702.0 Dresbach, MN 
6 714.0 Trempealeau, WI 
5A 728.5 Winona,Mn, MN 
5 738.1 Minneiska, MN 
4 752.8 Alma, WI 
3 796.9 Red Wing, MN 
2 815.0 Hastings, MN 
1 847.6 Minn. St. Paul, MN 
847.6 Minn. St. Paul, MN 
Lower Saint Anthony Falls 853.3 Minneapolis, MN 
Upper Saint Anthony Falls 853.9 Minneapolis, MN 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
80 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
56 
56 
56 
56 
1200 24 
600 24 
600 15 
600 15 
600 10 
600 10 
600 10 
1200 38 
600 10 
600 8 
600 9 
360 16 
600 16 
600 11 
320 11 
600 11 
600 9 
600 11 
600 8 
600 9 
600 11 
600 8 
600 6 
600 5 
600 9 
600 7 
600 8 
500 12 
400 38 
400 38 
400 25 
400 49 
23 
42 
19 
19 
18 
17 
15 
15 
17 
16 
17 
27 
27 
18 
21 
19 
17 
19 
15 
16 
22 
18 
17 
18 
18 
17 
17 
22 
13 
13 
14 
16 
18 Vertical 
18 Miter 
12 Miter 
12 Miter 
14 Miter 
12 Moveable 
12 Moveable 
13 Fixed 
14 Moveable 
13 Moveable 
12 Moveable 
11 Moveable 
11 Moveable 
11 Moveable 
14 Moveable 
13 Moveable 
13 Moveable 
13 Moveable 
12 Miter 
13 Miter 
14 Miter 
12 Miter 
13 Miter 
13 Miter 
12 Miter 
13 Miter 
14 Miter 
13 Miter 
10 Miter 
8 Miter 
10 Miter 
14 Miter 
990.0 1990 
990.0 1994 
1140.0 1939 
1200.0 1940 
3084.0 1938 
2955.0 1938 
2144.0 1936 
8809.0 1957 
6960 1937 
3196 1939 
3555.0 1937 
1203.0 1934 
1203.0 1934 
2703.0 1939 
2703.0 1922 
14075 1938 
8369 1938 
4784 1937 
763.0 1936 
811.0 1938 
935.0 1937 
940.0 1937 
893.0 1936 
682.0 1936 
1.0 1935 
1.0 1935 
365.0 1938 
822.0 1930 
574.0 1932 
574.0 1930 
188.0 1959 
3.0 1963 
C-7 
River/ 
Lock 
40.0 
40.0 
32.0 
27.0 
24.0 
18.0 
21.0 
46.0 
27.0 
20.0 
26.0 
0.0 
10.0 
29.0 
29.0 
34.0 
26.0 
32.0 
33.0 
31.0 
23.0 
12.0 
14.0 
10.0 
15.0 
44.0 
18.0 
32.0 
6.0 
6.0 
1.0 
4.0 
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
200 
100 
---~ 
I ~-

APPENDIX C 
Navigation Locks and Dams Operable September 30, 2000 
River/ River Chamber Depth on Sills Dam Year Channe 
Lock Mile Community Width Length Lift Upper Lower Type Length Open Length Dept 
Mississippi R Betwn Ohio And Missouri Rivers 
27 185.5 Granite City, IL 110 600 21 15 15 Miter 3000.0 1953 15.0 
185.5 Granite City, lL 110 1200 21 15 15 Vertical 3000.0 1953 15.0 
Monongahela River 
2 11.2 Braddock, PA 56 360 9 15 16 Miter 748.0 1905 13.0 
11.2 Braddock,PA 110 720 9 15 16 Miter 748.0 1905 13.0 
3 23.8 Elizabeth, PA 56 720 8 11 11 Miter 670.0 1907 18.0 
23.8 Elizabeth, PA 56 360 8 11 11 Miter 670.0 1907 18.0 
4 41.5 Monessen, PA 56 720 17 20 10 Miter 535.0 1932 20.0 
41.5 Monessen, PA 56 360 17 20 10 Miter 535.0 1932 20.0 
Maxwell 61.2 Maxwell, PA 84 720 20 20 14 Miter 460.0 1963 24.0 
61.2 Maxwell, PA 84 720 20 20 14 Miter 460.0 1963 24.0 
Grays Landing 82.0 Grays Landing, PA 84 720 15 27 18 Miter 576.0 1993 21.0 
Pt. Marion 90.8 Point Marion, PA 84 720 19 16 35 Miter 682.0 1994 11.0 
Morgantown 102.0 Morgantown, WV 84 600 17 17 14 Miter 410.0 1950 6.0 
Hildebrand 108.0 Morgantown, WV 84 600 21 14 15 Miter 530.0 1959 7.0 
Opekiska 115.4 Opekiska, WV 84 600 22 18 14 Miter 366.0 1964 7.0 
el 
h Width 
9 350 
9 350 
9 300 
9 300 
9 300 
9 300 
9 300 
9 300 
9 300 
9 300 
9 300 
9 300 
9 300 
9 300 
9 300 
c-a

APPENDIX C 
Navigation Locks and Dams Operable September 30, 2000 
River/ River Chamber Depth on Sills Dam Year Channel 
Lock Mile Community Width Length Lift Upper Lower Type Length Open Length Depth 
Ohio River 
Emsworth 
Dashields 
Montgomery 
New Cumberland 
Pike Island 
Hannibal 
Willow Island 
Belleville 
Racine 
Robert C. Byrd 
Greenup 
Captain Anthony Meldahl 
Markland 
Mcalpine 
Cannelton 
Newburgh 
John T. Myers 
Smithland 
6.2 Emsworth, PA 
6.2 Emsworth, PA 
13.3 Glenwillard, PA 
13.3 Glenwillard, PA 
31.7 Monaca, PA 
31.7 Monaca, PA 
54.4 Stratton, OH 
54.4 Stratton, OH 
84.2 Warwood, WV 
84.2 Warwood, WV 
126.4 Hannibal, OH 
126.4 Hannibal, OH 
161.7 Newport, OH 
161.7 Newport, OH 
203.9 Reedsville, OH 
203.9 Reedsville, OH 
237.5 Letart, WV 
237.5 Letart, WV 
279.2 Hogsett, WV 
279.2 Hogsett, WV 
341.0 Greenup, KY 
341.0 Greenup, KY 
436.2 Chilo, OH 
436.2 Chilo, OH 
531.5 Markldand, KY 
531.5 Warsaw, KY 
606.8 Louisville, KY 
606.8 Louisville, KY 
720.7 Cannelton, IN 
720.7 Cannelton, IN 
776.1 Newburgh, IN 
776.1 Newburgh, IN 
846.0 Mount Vernon, IN 
846.0 Mount Vernon, IN 
918.5 Hamletsburg, IL 
918.5 Hamletsburg, IL 
56 360 18 
110 600 18 
110 600 10 
56 360 10 
110 600 18 
56 360 18 
110 1200 21 
110 600 21 
110 1200 18 
110 600 18 
110 600 21 
110 1200 21 
110 600 20 
110 1200 20 
110 600 22 
110 1200 22 
110 600 22 
110 1200 22 
110 1200 23 
110 600 23 
110 1200 30 
110 600 30 
110 1200 30 
110 600 30 
110 600 35 
110 1200 35 
110 600 37 
110 1200 37 
110 1200 25 
110 600 25 
110 1200 16 
110 600 16 
110 600 18 
110 1200 18 
110 1200 22 
110 1200 22 
16 
17 
13 
13 
16 
16 
17 
17 
17 
17 
38 
38 
35 
35 
37 
37 
37 
37 
41 
41 
45 
45 
45 
45 
50 
50 
19 
49 
40 
40 
31 
31 
34 
34 
34 
34 
13 Miter 
13 Miter 
18 Miter 
18 Miter 
15 Miter 
15 Miter 
15 Miter 
15 Miter 
18 Miter 
18 Miter 
17 Miter 
17 Miter 
15 Miter 
15 Miter 
15 Miter 
15 Miter 
15 Miter 
15 Miter 
18 Miter 
18 Miter 
15 Miter 
15 Miter 
15 Miter 
15 Miter 
15 Miter 
15 Miter 
11 Miter 
12 Miter 
15 Miter 
15 Miter 
15 Miter 
15 Miter 
16 Miter 
16 Miter 
12 Miter 
12 Miter 
1717.0 1921 
1717.0 1921 
1585.0 1929 
1585.0 1929 
1379.0 1936 
1379.0 1936 
1315.0 1959 
1315.0 1959 
1315.0 1965 
1315.0 1965 
1098.0 1973 
1098.0 1973 
1128.0 1972 
1128.0 1972 
1206.0 1969 
1206.0 1969 
1173.0 1969 
1173.0 1969 
1132.0 1993 
1132.0 1993 
1287.0 1959 
1287.0 1959 
1756.0 1962 
1756.0 1962 
1395.0 1959 
1395.0 1959 
8725 1961 
8725 1961 
2054.0 1971 
2054.0 1971 
2275.6 1975 
2275.6 1975 
3504.0 1975 
3504.0 1975 
2962.0 1980 
2962.0 1980 
C-9 
6.0 
6.0 
7.0 
7.0 
18.0 
18.0 
23.0 
23.0 
30.0 
30.0 
36.0 
36.0 
35.0 
35.0 
36.0 
36.0 
34.0 
34.0 
42.0 
42.0 
62.0 
62.0 
95.0 
95.0 
75.0 
95.0 
75.0 
75.0 
114.0 
114.0 
55.0 
55.0 
70.0 
70.0 
73.0 
73.0 
Width 
99
99999999999
9999999999
9999999999
999 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
- 300

APPENDIX C 
Navigation Locks and Dams Operable September 30, 2000 
River/ River Chamber Depth on Sills Dam Year Chann 
Lock Mile Community Width Length Lift Upper Lower Type Length Open Length Dept 
52 938.9 Brookport, IL 110 600 12 15 11 Miter 2978.0 1928 20.0 
938.9 Brookport, IL 110 1200 12 15 11 Miter 2998.0 1969 20.0 
53 962.6 Mound City, IL 110 1200 12 15 10 Miter 3560.0 1980 24.0 
962.6 Mound City, IL 110 600 12 15 10 Miter 3560.0 1929 24.0 
Okeechobee Waterway, FL 
St. Lucie 15.3 Stuart, FL 50 225 13 14 12 Sector 170.0 1941 15.0 
Port Mayaca 38.5 PortMayaca, FL 56 400 2 14 14 Sector 116.0 1977 5.0 
Moore Haven 78.0 Moore Haven, FL 50 250 2 10 11 Sector 89.8 1953 16.0 
Ortona 93.6 Labelle,FL 50 225 11 12 11 Sector 104.0 1937 16.0 
W. P. Franklin 122.0 Fort Myers, FL 56 400 3 13 13 Sector 1150.0 1965 8.0 
Old River, LA (MR&T) 
Old River 304.0 Simmesport, LA 75 1190 35 11 11 Miter 1100 193 7.0 
Ouachita And Black Rivers Below Camden, AR 
Jonesville 25.0 Jonesville, LA 84 600 30 18 15 Moveable 450.0 1972 92.0 
Columbia 117.2 Columbia, LA 84 600 18 18 18 Moveable 400.0 1972 109.0 
Felsenthal 226.8 Felsenthal, LA 84 600 18 18 13 Moveable 350.0 1984 55.0 
H. K. Thatcher 281.7 Calion, LA 84 600 12 18 13 Moveable 350.0 1984 50.0 
Pearl River Lateral Canal 
1 29.7 Pearl River, LA 65 274 27 10 10 Moveable 0.0 1949 11.0 
2 40.8 Bush, LA 65 274 15 10 10 Moveable 1950 3.0 
3 43.9 Sun, LA 65 274 11 10 10 Moveable 1950 5.0 
Red River Ww-Mississippi R To Shreveport, LA 
Lindy Claiborne Boggs 44.0 Larto, LA 84 685 36 22 13 Moveable 630.0 1984 30.0 
John H.Overton 74.0 Ruby, LA 84 685 24 23 23 Moveable 348.0 1987 42.0 
3 116.4 Colfax, LA 84 685 31 25 18 Moveable 1992 40.0 
4 169.0 Coushatta, LA 84 685 25 25 18 Miter 690.0 1994 31.0 
Joe D. Waggonner 200.0 Caspiana, LA 84 685 25 22 23 Miter 663.0 1994 28.0 
Savannah River 
New Savannah Bluff 187.2 Augusta, SC 56 360 15 14 12 Miter 360.0 1937 16.0 
C.-1o 
el 
:h Width 
9 300 
9 300 
9 300 
9 300 
8 80 
8 100 
8 90 
8 90 
8 90 
12 120 
9 100 
9 100 
9 100 
7 100 
7 80 
7 80 
7 80 
9 200 
9 200 
9 100 
9 200 
9 200 
9 90

APPENDIX C 
Navigation Locks and Dams Operable September 30, 2000 
River/ River Chamber Depth on Sills Dam Year Channe 
Lock Mile Community Width Length Lift Upper Lower Type Length Open Length Dept 
Snake River 
Ice Harbor 9.7 Pasco, WA 86 650 103 14 15 Vertical 2790.0 1962 32.0 1 
Lower Monumental 41.6 Kahlotus, WA 86 650 103 19 15 Vertical 3800.0 1969 29.0 1 
Little Goose 70.3 Starbuck, WA 86 650 101 20 15 Miter 2655.0 1970 37.0 1 
Lower Granite 107.5 Pomeroy, WA 86 650 105 20 15 Miter 3200.0 1975 38.0 1 
St. Marys River, MI 
Davis 47.0 Sault Ste. Marie, MI 80 1320 22 24 23 Leaf 1914 0.0 
Macarthur 47.0 Sault Ste. Marie, MI 80 780 22 31 31 Leaf 1300.0 1943 0.0 2 
New Poe 47.0 Sault Ste. Marie, MI 110 1200 22 32 32 Leaf 1300.0 1963 0.0 
Tennessee River, TN, AL, And KY 
Pickwick Landing 206.7 Pickwick Dam, Tn, TN 110 600 55 16 17 Fixed 7385.0 1937 53.0 9 
Guntersville 349.0 Guntersville, AL 60 360 39 17 18 Tainter 3837.0 1937 76.0 9 
Tennessee River, TN, AL, And KY 
Kentucky 22.4 Grand Rivers, KY 110 600 57 24 13 Miter 7976.0 1942 184.0 9 
Melton Hill 23.1 Kingston, TN 75 400 58 13 13 Tainter 1072.0 1963 38.0 9 
Pickwick Landing 206.7 Pickwick Dam, Tn, TN 110 1000 55 19 17 Fixed 7385.0 1984 53.0 9 
Wilson 259.4 Florence, AL 110 600 94 11 11 Fixed 3728.0 1959 16.0 9 
259.4 Florence, AL 60 300 49 13 13 Miter 3728.0 1927 16.0 9 
259.4 Florence, AL 60 300 45 11 11 Fixed 3728.0 1927 16.0 9 
General Joseph Wheeler 274.9 Rogersville, AL 60 400 48 15 13 Fixed 5738.0 1934 74.0 9 
274.9 Rogersville, AL 110 600 48 15 13 Fixed 5738.0 1963 74.0 9 
Guntersville 349.0 Guntersville, AL 110 600 39 17 18 Miter 3837.0 1965 76.0 9 
Nickajack 424.7 Jasper, TN 110 600 39 13 11 Miter 3763.0 1967 46.0 9 
Chickamauga 471.0 Chattanooga, TN 60 360 49 10 14 Miter 5654.0 1937 59.0 9 
Watts Bar 529.9 Breendenton, TN 60 360 58 12 12 Tainter 2646.0 1941 720 9 
Ft. Loudon 602.3 Lenoir City, TN 60 360 72 12 12 Tainter 3687.0 1943 50.0 9
I
h Width 
4 250 
4 250 
4 250 
4 250 
0 300 
7 300 
0 300 
S 300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
C-11

APPENDIX C 
Navigation Locks and Dams Operable September 30, 2000 
River/ River Chamber Depth on Sills Dam Year Chann 
Lock Mile Community Width Length Lift Upper Lower Type Length Open Length Dep 
Tennessee-Tombigbee Waterway AL, MS 
Howell Heflin 266.1 Gainesville, AL 110 600 36 15 15 Moveable 1546.0 1978 49.0 
Tom Bevill 306.8 Aliceville, AL 110 600 27 15 15 Moveable 1479.0 1979 41.0 
John C. Stennis 334.7 Columbus, MS 110 600 27 15 15 Moveable 1004.0 1980 28.0 
Aberdeen 357.5 Aberdeen, MS 110 600 27 15 15 Moveable 1064.0 1985 23.0 
Amory 371.1 Amory, MS 110 600 30 15 15 Moveable 0.0 1985 14.0 
Glover Wilkins 376.3 Smith.Sville, AL 110 600 25 18 18 Moveable 0.0 1985 15.0 
Fulton 391.0 Fulton, MS 110 600 25 18 18 Moveable 0.0 1985 7.0 
John E. Rankin 398.4 Fulton, MS 110 600 30 18 18 Moveable 0.0 1985 8.0 
G.V. "Sonny" Montgomery 406.7 Belmont, MS 110 600 30 18 18 Moveable 0.0 1985 5.0 
Jamie Whitten 411.9 Tupelo, MS 110 600 84 18 18 Moveable 1064.0 1985 65.0 
Willamette River At Willamette Falls 
Willamette Falls Locks 26.0 West Linn, OR 40 198 20 6 8 Leaf 0.0 1873 0.0 
Williamette Falls Guard Lock 26.4 West Linn, OR 40 198 10 6 8 Leaf 0.0 1873 24.0 
el 
th Width 
9 300 
9 300 
9 300 
9 300 
9 300 
9 300 
9 300 
9 300 
9 300 
9 300 
6 150 
6 150 
C- 12

APPENDIX D 
Navigation Projects Under Construction During Fiscal Year 2000 
Fiscal Year 
Fiscal Placed in Completed or 
Year Useful Scheduled for 
Project Started Operation Completion Nature of Project 
Agat Small Boat Harbor, Guam (Sec 107) 
AIWW Replacement of Federal Hwy Bridges in NC 
Aquadilla Harbor, PR (Sec 107) 
Blair Waterway, Tacoma, WA (Sec 107) 
Bonneville Navigation Lock, OR & WA 
Boston Harbor, MA 
Burns Harbor, IN 
Chain of Rocks Canal, IL 
Canaveral Harbor Deepening, FL 
Canaveral Harbor, FL 
Cape Cod Canal, MA 
Channel to Newport News, VA (1965 Mod.) 
Channel to Newport News, VA (1986 Mod.) 
Channel to Victoria, TX 
Charleston Harbor (Deeping/Widening), SC 
Chicago Harbor (Lock), IL 
Chicago Harbor (Lock), IL 
Cook Inlet Navigation Improvement, AK 
Crescent City Harbor, CA 
Delaware River Mainstem Channel & Deepening, NJ, PA, 
& DE 
Fort Pierce Harbor, FL 
1987 
1974 
1993 
1999 
1985 
1998 
1995 
1999 
1993 
1994 
2000 
1967 
1987 
1993 
1998 
1995 
1996 
1998 
1998 
1999 
1995 
1989 
1986 ' 
1993 
2000 
1953 
1968 
1989 
1989 
2001 
1995 
2001 
2001 
2001 
1999 
2004 
1994 
2044 
2003 
Indefinite 
Indefinite 
2002 
2003 
1997 
1997 
2001 
2000 
2006 
1996 
Dredging and breakwater 
Replacement of existing bridges 
Breakwater 
Deepen Channel and Turning Basin 
New larger lock 
Channel deepening 
Breakwater Rehabilitation 
Deficiency Correction 
Navigation Channels 
Jetty extension and sand tightening 
Major Rehabilitation of Railroad Bridge 
Deferred anchorage construction 
Dredge 50 ft. Channel. Deepen to 55 feet 
Enlarging and deepening channel to 12 foot 
depth 
Deepen Entrance Channel to 47 feet and inner 
channels to 45 feet depth. 
Lock Bulkhead Fabrication 
Construct Slots to Dewater Lock Gate Bays 
Channel Dredging 
Deepen Channel 
Deepen Channel 
Enlarge entrance channel 
D-1

APPENDIX D 
Navigation Projects Under Construction During Fiscal Year 2000 
Fiscal Year 
Project 
Four Locks, Illinois Waterway, IL 
Freeport Harbor, TX 
Grays Harbor, WA 
Grays Landing Lock & Dam (Lock & Dam 7) 
Monongahela River, PA 
Gulf Intracoastal Waterway, Aransas National Wildlife 
Refuge, TX (Sec 216) 
Gulfport Harbor, MS 
Helena Harbor, Phillips County, AR 
Hempstead Harbor, NY 
Houston-Galveston Navigation Channels, TX 
Humboldt Harbor and Bay Deepening, CA 
Illinois Waterway Four Locks 
Inner Harbor Navigation Canal Lock 
Jacksonville Harbor, FL 
Kake Harbor, AK 
Kawaihae Small Boat Harbor, Hawaii, HI 
Kentucky Lock Addition, KY 
Kill Van Kull - Newark Bay, NJ and NY (Stage 1) 
Kill Van Kull - Newark Bay, NJ and NY (Stage II) 
Laupahoehoe Harbor, Hawaii, HI 
Fiscal 
Year 
Started 
1993 
1987 
1990 
1986 
1998 
1991 
1989 
1992 
1998 
1997 
1993 
1999 
1999 
1997 
1996 
1998 
1986 
1999 
1988 
Placed in 
Useful 
Operation 
1991 
1997 
2001 
1994 
1995 
1998 
1988 
Completed or 
Scheduled for 
Completion 
1996 
1998 
2001 
2001 
2001 
(6) 
1995 
1995 
2005 
2000 
1996 
2011 
2003 
2000 
1998 
2010 
1995 
2005 
1988 
Nature of Project 
Major rehabilitation of lock and dam 
Dredging, jetty construction, and recreation 
Navigation channel widening and deepening 
Construct new lock & dam to replace existing 
lock & dam 7 
Bank Protection to protect Gulf Intracoastal 
Waterway and the critical habitat of 
endangered whooping crane 
Deepen Channel 
New Slackwater Harbor 
Removal of derelect barges 
Deepen and Widen Houston Ship Channel and 
Galveston Harbor and Channel 
Deepening and Widen channel 
Major rehabilitation of locks and dams 
Lock Replacement 
Dredging material disposal facilities 
Breakwater and Navigation Channel 
Breakwater 
Lock Addition (1200 feet) 
Deepdraft channel - widening and deepening 
to 40 ft 
Deepdraft channel - widening and deepening 
to 45 ft 
Breakwater 
1-2 
w Fiscal.Year

APPENDIX D 
Navigation Projects Under Construction During Fiscal Year 2000 
Project 
Lock and Dams 2, 3 and 4, Monongahela, PA and WV 
Lock and Dam 3, MN 
Lock and Dams 3, 5A, 6,7,8 and 9, MN, WI and IA 
Lock and Dam 13, IL 
Lock and Dam 14, IL 
Lock and Dam 15, IL 
Lock and Dam 24, MO 
Lock and Dam 25, MO 
London Locks and Dam, Kanawha River, WV 
Los Angeles Harbor, CA 
McAlpine Lock and Dam 
McClellan-Kerr Arkansas River Navigation System, AR 
Manatee Harbor, FL 
Marmet Locks & Dam, WV 
Melvin Price Lock and Dam, IL and MO 
Miami Harbor Channel, FL 
Mississippi River between Ohio and Missouri Rivers 
IL and MO 
Mississippi River, Ship Channel, Gulf to 
Baton Rouge, LA 
Fiscal 
Year 
Started 
1992 
1998 
1989 
1993 
1996 
1993 
1996 
1994 
1999 
1996 
1996 
1963 
1995 
1998 
1974 
1993 
1910 
1987 
Placed in 
Useful 
Operation 
Fiscal Year 
Completed or 
Scheduled for 
Completion 
2008 
2004 
2004 
1938 
1939 
1934 
1940 
1939 
1970 
1990 
1987 ' 
1997 
2001 
1997 
2007 
2001 
2003 
2001 
2008 
2000 
2002 
2009 
2005 
2002 
2014 
Indefinite 
Nature of Project 
Major rehabilitation of locks and dams, 
removal of Lock and Dam 3 
Major rehabilitation/embankments 
Major rehabilitation of electrical/mechanical 
systems 
Major rehabilitation of lock and dam 
Major rehabilitation of lock and dam 
Major rehabilitation of lock and dam 
Major rehabilitation of lock and dam 
Major rehabilitation of lock and dam 
Major rehabilitation of lock and dam 
Channel Deepening 
Lock Replacement (1200 feet) 
Locks and dams 
Enlarge turning basin, construct wideners, 
mitigation 
Construction of new lock 
Replacement 
Navigation Channels & Turning Basin 
Regulating works 
Dredging 55-foot channel 
D-3 
- -- -- ---- --- I 
mqmfimmmmmmm .... M, Ill

APPENDIX D 
Navigation Projects Under Construction During Fiscal Year 2000 
Fiscal Year 
Project 
Missouri River Fish and Wildlife Mitigation, IA, NE, KS 
and MO 
Montgomery Point Lock and Dam, AR 
Mouth of Colorado River, TX (Gulf Intracoastal 
Waterway) 
Nawiliwili Harbor, Kauai, HI 
Neal Sound, MD 
Neches River Saltwater Barrier 
New Madrid County Harbor 
New York Harbor and Adjacent Channels, Port Jersey 
Channel, NJ 
New York Harbor, NY and NJ 
Norfolk Harbor Channel, VA (1965 Mod.) 
Norfolk Harbor Channel, VA (1986 Mod) 
Norfolk Harbor, Thimble Shoal Channel, VA 
North Pass-Pass Manchac, LA (107) 
Oakland Harbor, CA 
Olmsted Locks and Dam, IL & KY 
Fiscal 
Year 
Started 
1992 
1997 
1984 
1985 
1999 
2000 
2000 
1998 
1976 
1966 
1987 
1987 
1995 
1987 
Placed in 
Useful 
Operation 
1994 
1987 
2000 
2000 
Incremental 
1967 
1989 
1989 
1995 
1992 
Completed or 
Scheduled for 
Completion 
2006 
2002 
1995 
1987 
2000 
2005 
2000 
2010 
Indefinite 
Indefinite 
Indefinite 
Indefinite 
1996 
2000 
2011 
Nature of Project 
Mitigation of fish and wildlife losses from 
construction and operation of Missouri 
River Bank Stabilization and Navigation 
Project 
Lock and Dam 
Breakwaters, dredging, and recreation 
Breakwater repair 
1650 ft stone jetty 
Construction of a tainter-gated saltwater 
barrier structure, sector-gated navigation 
bypass channel, access road and levee 
Slackwater Harbor Expansion 
Deepening channel to 45 ft. providing a 
turning basin and bulkheading portions of the 
turning basin. 
Removal of drift sources 
Deferred anchorage const. 
Dredge 50 ft. channel and deepen to 55 feet 
Dredge outbound element and deepen to 55 
feet 
9ft.x 130ft. barge channel 
Channel deepening and widening turning 
basin 
Navigation 
D-4 
r __ FYisecaarl 

APPENDIX D 
Navigation Projects Under Construction During Fiscal Year 2000 
Fiscal 
Year 
Project Started 
Ouachita and Black River, AR and LA 1964 
Palm Valley Bridge, FL 
Pascagoula Harbor, MS 
Point Marion, Lock & Dam 8, Monongahela River, PA 
Port of Florence, AL 
Port of Long Beach (Deepening), CA 
Red River WW, Mississippi River to Shreveport, LA 
Richmond Harbor, CA 
Robert C. Byrd Locks and Dam, Ohio River 
Rudee Inlet, VA 
Sacramento River Deep Water Ship Channel, CA 
Salem River, NJ 
San Francisco Bay to Stockton, CA (John F. Baldwin and 
Stockton Ship Channels) 
San Juan Harbor, PR 
Santa Monica Breakwater, CA 
Saugus River, Saugus, MA (Sec 107) 
Sonoma Baylands Wetlands Demonstration Project, CA 
Savannah Harbor Deepening, GA 
Savannah Harbor Widening, GA 
1998 
1994 
1986 
1994 
1998 
1974 
1985 
1985 
1990 
1986 
1995 
1971 
1998 
1998 
2000 
1993 
1993 
1990 
Placed in 
Useful 
Operation 
1984 
1995 
1984 
1992 
Fiscal Year 
Completed or 
Scheduled for 
Completion 
Indefinite 
2002 
2000 
1997 
1995 
2002 
Indefinite' 
2000 
2003 
t991 1991 
Being Determined 
1996 1996 
Being Determined 
2002 
2002 
2002 
1997 
1994 
1992 
Nature of Project 
Replacement of six locks and dams, channel 
deepening to 9 feet and realignment 
Bridge Replacement 
Channel dredging and construction of a new 
turning basin 
Replaces existing 56x360' lock chamber with 
new 84'x720' chamber 
Channel Dredging 
Channel Deepening 
Lock and dam construction. Channel 
improvement and realignment 
Channel deepening and turning basin 
Replacement of existing locks and major 
rehabilitation of the dam 
Dredge 7 foot channel 
Deep draft channel, widening and deepening 
Channel deepening 
Deep draft channel, widening, deepening and 
dredging 
Deepening & widening for channel 
Repair Breakwater 
Dredge entrance channel and two anchorages 
Restoration of Tidal Wetlands on a 348 acre 
site 
Channel deepening 
Widening channel 
D-5 
I - - - - - - ---- -- - -- -- ..... mil 
mmm

APPENDIX D 
Navigation Projects Under Construction During Fiscal Year 2000 
Project 
Seattle Harbor, East Waterway, WA' 
Shallow Creek Spur Channel, MD 
Shinnecock Inlet, NY 
St. George Channel Extension, AK 
St. Paul Harbor Improvements, AK 
Taconite Harbor, MN 
Tampa Harbor, FL (Main Channel) 
Tampa Harbor (Port Sutton), FL 
Tampa Harbor (Ybor Channel), FL 
Taylor Point Cut, LA (107) 
Tenn River, Port of Florence 
Wallisville Lake, TX 
Wilmington Harbor, NC 
Winfield Locks and Dam, Kanawha River, WV 
Fiscal 
Year 
Started 
1999 
1999 
1990 
1994 
1999 
2000 
1976 
1991 
1999 
1999 
1994 
1967 
1999 
1990 
Placed in 
Useful 
Operation 
2000 
1999 
1999 
1997 
Fiscal Year 
Completed or 
Scheduled for 
Completion 
2003 
2001 
1995 
1996 
2004 
2001 
1987 
2002 
2001 
1999 
1995 
2002 
2005 
2002 
Nature of Project 
Dredge East Waterway to 51 ft. 
Spur Channel 
Dredging and repair of jetties 
Dredging 
Breakwater Improvements and Dredging 
Harbor of refuge construction 
Dredging 
Deepen Channel 
Enlarge turning basin 
Navigation cut from Charenton LK to Grand 
Isle 
Channel Improvements 
Multipurpose lake (navigation, salinity 
control, water supply, fish & wildlife, & 
recreational) 
Dredging to Deepen 
Construction of new lock 
0-6 
... . 
m wmlmmpom IFEMM

APPENDIX D 
Navigation Projects Under Construction During Fiscal Year 2000 
' Walter Jones, Joseph P. Knapp, Core Creek, and Gene A. Potter Memorial Bridge are complete. Fairfield bridge is under 
construction. 
2 Phase I, forty-five foot channel to New Orleans, LA. Forty-five foot channel to Mile 181 (Donaldsonville, LA) placed in useful 
operation in 1988. Phase II, forty-five foot channel from mile 181 to Baton Rouge placed in useful operation in 1994. 
Awaiting further PCA's to go deeper than 45 feet. 
4 Lock and Dam No. I placed in useful operation in 1984. Lock and Dam No. 2 in 1987. Lock and Dam No. 3 in 1992. Lock and 
Dam No. 4 and 5 in 1994. 
Schedule for completion of entire project is indefinite. However, the project opened to 9-foot navigation on 31 December 1994. 
6 Thin-layer monitoring program is continuing. 
O0& M funded.

APPENDIX E 
Multiple-Purpose Projects Including Power 
Operable September 30, 2000 
Flood Control 
Total and/or Nay. 
Storage Feature Placed Initial Existing Ultimate 
Community in Capability in Useful Power in Installation Installation Project Heigh 
Project River Vicinity (acre-feet)' Operation CY FY (KW) (KW) Functions Type2 (feet) 
Albeni Falls, ID 
Allatoona Lake,GA 
Barkley Dam & Lake 
Barkley, KY & TN 
Beaver Lake, AR 
Big Bend Dam (Lake 
Sharpel), SD 
Blakely Mountain 
Dam-Lake Ouachita 
Bonneville L&D Lake 
Bonneville, OR & WA 
Broken Bow Lake, OK 
Buford Dam, Lanier, 
GA 
Bull Shoals Lake AR 
& MO 
Clarence Cannon Dam 
Carters Dam, GA 
Center Hill Lake, TN 
Cleatham L&D, TN 
Chief Joseph Danm, 
(Rufus Woods Lake), 
WA 
Cooper River, 
Charleston Harbor, SC 
Cordell Hull L&D, TN 
Cougar Lake, OR 
Pend Oreille 
Etowah 
Cumberland 
White 
Missouri 
Ouachita 
Columbia 
Mountain Fork 
Chattahoochee 
White 
Salt 
Coosawatte 
Caney Fork 
Cumberland 
Columbia 
Santee 
Cumberland 
S.Fork 
McKenzie 
Newport,WA 
Cartersville,GA 
Frand Rivers, 
KY 
Eureka Springs, 
Chamberlain,S 
D
Mt. Pine, AR 
Bonneville,OR 
Broken Bow, 
OK 
Buford, GA 
Mountain 
Home 
Perry, MO 
Carters, GA 
Lancaster,TN 
Ashland City, 
TN 
Bridgeport, WA 
St. Stephen, SC 
Carthage, TN 
Blue River, OR 
1,153,000 
670,000 
2,082,000 
1,952,000 
1,883,000 
2,768,000 
537,000 
1,368,230 
2,554,000 
5,408,000 
1,428,000 
472,756 
2,092,000 
104,000 
593,000 
2,560,000 
310,900 
219,000 
1952 
1950 
1964 
1963 
1964 
1953 
1938 
1968 
1956 
1952 
1983 
1975 
1948 
1952 
1955 
N/A 
1973 
1963 
1955 
1950 
1966 
1965 
1965 
1956 
42,600 
74,000 
130,000 
1.12,000 
468,000 
75,000 
42,600 
74,000 
130,000 
112,000 
468,000 
75,000 
1938 1,145,700 1,145,700 
1970 
1957 
100,000 
86,000 
NFPR 
FPRW 
NPFR 
FPSR 
FPRIW 
FPRW 
NPR 
CC 
CE 
CE 
E
E 235 1,100 
C 122 2,690 
100,000 FPWSR E 225 
86,000 
1953 340,000 340,000 
1985 
1975 
1951 
1958 
58,000 
500,000 
135,000 
36,000 
58,000 
500,000 
135,000 
36,000 
1956 2,457,384 2,457,384 
1985 
1974 
1964 
84,000 84,000 
100,000 100,000 
25,000 64,600 
NFPW E 
FPR C 
FNPRSW CE 
FPRW ER 
FPR CE 
NPR C 
PIR C 
NPW CE 
NPR CE 
NFPRI ER 
86 876 
E-1 
t Length 
(feet) 
90 
190 
157 
228 
95 
1,055 
1,250 
9,959 
2,575 
10,570 
192 
258 
138 
450 
250 
75 
230 
2,750 
5,400 
2,256 
1,700 
1,950 
2,160 
801 
5,998 
93 
445 
1,306 
1,738 
i

APPENDIX E 
Multiple-Purpose Projects Including Power 
Operable September 30, 2000 
Flood Control 
Total and/or Nav. 
Storage Feature Placed Initial Existing Ultimate 
Community in Capability in Useful Power in Installation Installation Project Heigh 
Project River Vicinity (acre-feet)' Operation CY FY (KW) (KW) Functions Type2 (feet 
it Length 
) (feet) 
Dale Hollow Lake, TN 
& KY 
Dardanelle L&D, AR 
DeGray Lake, AR 
Denison Damn (Lake 
Texoma), TX & OK 
Detroit Lake, OR, 
including Big Cliff 
Lake, OR 
Dworshak Dam & 
Reservoir, ID 
Eufaula Lake, OK 
Fort Gibson Lake, OK 
Fort Peck Lake, MT 
Fort Randal Darn Lake 
Francis (Case), SD 
Garrison Dan ( Lake 
Sakakawea), ND 
Gavins Point Dam 
(Lewis & Clark Lake), 
SD & NE 
Green Peter Lake,OR, 
including Foster Lake, 
OR 
Greers Ferry Lake, AR 
Harry S. Truman Damn 
& Res. 
Ilartwell Dan & Lake, 
GA & SC H ills Creek Lake, OR 
Obey 
Arkansas 
Caddo 
Red 
North Santiamn 
N. Fork, 
Clearwater 
Canadian 
Grand 
(Neosho) 
Missouri 
Missouri 
Missouri 
Missouri 
Middle 
Santiam 
Little Red 
Osage 
Savannah 
Middle Fork 
W ilanette 
Celina, TN 
Dardanelle, AR 
Arkadelphia, 
AR 
Denison, TX 
Mill City, OR 
Orofino, ID 
Eufaula, OK 
Ft. Gibson, OK 
Glasglow, MT 
Lake Andes, 
SD 
Riverdale, ND 
Yankton, SD 
Sweet Home, 
OR 
Heber Spings 
Warsaw, MO 
Hartwell, GA 
Oakridge, OR 
1,706,000 
486,200 
831,900 
5,194,163 
461,000 
3,468,000 
3,825,400 
1,284,400 
18,909,000 
5,574,000 
24,137,000 
504,000 
491,000 
2,844,000 
5,202,000 
2,842,700 
356,000 
1943 
1969 
1969 
1944 
1953 
1972 
1964 
1949 
1938 
1953 
1954 
1956 
1967 
1962 
19793 
1961 
1961 
1949 
1965 
1972 
1945 
1954 
1973 
1964 
1953 
1944 
1954 
1956 
1957 
54,000 
124,000 
68,000 
70,000 
118,000 
400,000 
90,000 
45,000 
185,250 
320,000 
430,000 
100,000 
1967 100,000 
1964 
1982 
1962 
1962 
96,000 
160,000 
422,000 
30,000 
E-2 
C
C
E
E
C 
CG
EE 
EE 
E
E 
200 
68 
243 
165 
382 
717 
114 
110 
251 
165 
210 
74 
54,000 
124,000 
108,000 
199,000 
118,000 
1,060,000 7 
90,000 
67,500 
185,250 
320,000 
430,000 
100,000 
100,000 
96,000 
160,000 
422,000 
30,000 
FPR 
NPR 
FNPRS 
FPRSNW 
NFPRI 
PNFR 
FNPSRWX 
FPNW 
NFPRIW 
NFPRIW 
NFPRIW 
NFPRIW 
PFNIR 
FPRS 
FPRWS 
FPRSW 
NFPRI 
1,717 
2,683 
3,400 
17,200 
1,528 
3,287 
3,200 
2,990 
21,026 
10,700 
11,300 
8,700 
1,380 
1,704 
5,000 
17,880 
2,150 
C 340 
C 
CE 
CE 
GE 
243 
96 
204 
304

APPENDIX E 
Multiple-Purpose Projects Including Power 
Operable September 30, 2000 
Flood Control 
Total and/or Nay. 
Storage Feature Placed Initial Existing Ultimate 
Community in Capability in Useful Power in Installation Installation Project Height 
Project River Vicinity (acre-feet)' Operation CY FY (KW) (KW) Functions Type2 (feet) 
Ice Harbor L&D (Lake Snake Pasco, WA 417,000 1961 1961 603,000 603,000 NPRI CG 130 
Sacajawea), WA 
J. Percy Priest Dam & 
Reservoir, TN 
J. Strom Thurmond 
Dam & Lake GA & 
SC6 
Jim Woodruff Dam 
(Lake Seminole), FL, 
GA & AL 
John Day L&D (Lake 
Umatilla), OR & WA 
John H. Kerr Damn & 
Reservoir, NC& VA 
Keystone Lake, OK 
Lake Greeson, AR 
Laurel River, KY 
Libby Dam, Lake 
Koocanusa, MT 
Little Goose L&D 
(Lake Bryan), WA 
Lookout Point Lake 
including Dexter Lake, 
OR 
Lost Creek Lake, OR 
Lower Granite L&D, 
WA 
Lower Monumental 
L&D (Lake Herbert G. 
West), WA 
Stones 
Savannah 
Appalachicola 
Columbia 
Roanoke 
Arkansas 
Little Missouri 
Laurel 
Kootenai 
Snake 
Middle Fork 
Rogue 
Snake 
Snake 
Nashville, TN 
Augusta, GA 
Chattahoochee, 
FL 
Rufus, OR 
Boydton, VA 
Tulsa, OK 
Murfreesboro, 
AR 
London, KY 
Libby, MT 
Starbuck, WA 
Lowell, OR 
Trail, OR 
Pomeroy, WA 
Kahlotus, WA 
652,000 
2,900,000 
367,300 
2,500,000 
2,750,300 
1,672,613 
407,900 
435,600 
5,809,000 
565,200 
483,000 
465,000 
483,800 
376,000 
1967 
1952 
1957 
1968 
1952 
1964 
1950 
1973 
1972 
1970 
1954 
1977 
1975 
1969 
1970 
1953 
1957 
1969 
1953 
1968 
1950 
1978 
1975 
1970 
1955 
1977 
1975 
1969 
28,000 
282,000 
30,000 
2,160,000 
204,000 
70,000 
25,500 
61,000 
525,000 
810,000 
135,000 
49,000 
810,000 
810,000 
28,000 
282,000 
30,000 
2,700,000 
204,000 
70,000 
25,500 
61,000 
840,000 
810,000 
135,000 
49,000 
810,000 
810,000 
FPRW 
FPRSW 
CE 
CE 
147 
200 
Length 
(feet) 
2,822 
2,716 
5,680 
NPRW CE 67 6.150 
NPRFI 
FPRW 
FNPWSR 
FPRW 
FPRW 
FPR 
NPRI 
NFPRI 
DFPISWR 
NPRIF 
NPRI 
CE 
CE 
E
C
R
C 
CG 
CE 
CE 
CG 
CG 
161 
144 
121 
183.5 
282 
420 
165 
243 
345 
146' 
135 
5,900 
22,285 
4,600 
941 
1,420 
3,055 
2,655 
3,381 
3,600 
3,200 
3,791 
E-3

an
Project 
McNary L&D OR & 
WA 
Millers Ferry L&D, 
AL 
Mississippi Delta 
Region, LA 
(Caernarvon 
Freshwater Diversion) 
Nanpil River 
Hydropower, Pohnpei, 
FSM 
New Melones Lake, 
CA4 
Norfork Lake, AR & 
MO 
Oahe Dam (Lake 
Oahe), SD & ND 
Old Hickory L&D, TN 
Ozark-Jeta Taylor 
L&D, AR 
Philpott Lake, VA 
Richard B. Russell 
Dam & Lake, GA & 
SC 
Robert F. Henry L&D, 
AL 
Robert S. Kerr L&D 
and Reservoir, OK 
Sam Rayburn Dam& 
Reservoir, TX 
St. Mary's Riv, MI 
Communit 
Vicinity 
Umatilla, O 
Camden, A] 
Braithwaite 
River 
Columbia 
Alabama 
Mississippi 
Nanpil River 
Stanislaus 
North Fork 
Missouri 
Cumberland 
Arkansas 
Roanoke 
Savannah 
Alabama 
Arkansas 
Angelina 
APPENDIX E 
Multiple-Purpose Projects Including Power 
Operable September 30, 2000 
Flood Control 
Total and/or Nay. 
Storage Feature Placed Initial Existing U 
y in Capability in Useful Power in Installation Ins/ 
y (acre-feet)' Operation CY FY (KW) 
R 1,350,000 1953 1954 980,000 91 
L 331,8090 1969 1979 75,000 7 
SLA 1991 
2,400,000 
1,983,000 
23,337,000 
545,000 
148,400 
318,500 
1,026,244 
234,200 
525,700 
3,997,600 
Great Lakes Sault Ste. Marie 
1987 
1978 
1943 
1959 
1954 
1969 
1951 
1984 
1972 
1970 
1965 
1855 
1988 
1979 
1944 
1962 
1957 
1973 
1954 
1984 
1975 
1971 
1966 
1952 
2,000 
300,000 
80,550 
595,000 
100,000 
100,000 
14,000 
300,000 
68,000 
110,000 
52,000 
18,400 
ltimate 
tallation 
(KW) 
80,000 
5,000 
2,000 
300,000 
163,000 
595,000 
100,000 
100,000 
14,000 
600,000 
68,000 
110,000 
52,000 
18,400 
Project 
Functions 
NPRI 
NPRW 
W 
Type- 
CG 
CE 
CE 
Height Length 
(feet) (feet) 
183 7,365 
90 11,380 
38.5 371 
P C 17 70 
FIPRW 
FPRS 
NFPRIW 
NPR 
NPR 
FPR 
PRFSW 
NPRW 
NPRW 
FPWR 
ER 
C
E 
CE 
C
CE 
CE 
CE 
E 
CE 
NP 
625 
216 
245 
98 
58 
220 
200 
101 
75 
120 
Control 
Gate 
1,560 
2,624 
9,300 
3,605 
2,480 
892 
5,616 
14,962 
7,230 
19,430 
E-4 
- 
_.....,. ..... _ 
Pohnpei, FSM 
Oakdale, CA 
Norfolk, AR 
Pierre, SD 
Hendersonville, 
TN 
Ozark, AR 
Bassett, VA 
Augusta, GA 
Benton, AL 
Sallisaw, OK 
Jasper, TX 
,7 -- -

APPENDIX E 
Multiple-Purpose Projects Including Power 
Operable September 30, 2000 
Project River 
Snettisham, AK' Speel 
Stockton Lake, MO Sac 
Table Rock Lake, AR White 
& MO 
Tenkiller Lake, OK Illinois 
The Dalles L&D (Lake Columbia 
Celilo), WA & OR 
Walter F. George Chattahoo 
L&D, GA & FL 
Webbers Falls L&D, Arkansas 
OK 
West Point Lake, AL Chattahoo 
& GA 
Whitney Lake, TX Brazos 
Wolf Creek Dam Cumberla 
(Lake Cumberland), 
KY 
Community in 
Vicinity 
Juneau, AK 
Stockton, MO 
Branson, MO 
Gore, OK 
The Dalles, OR 
che Fort Gaines, 
ache 
GA 
Wevbbers Falls, 
OK 
West Point, GA 
Whitney, TX 
nd Jamestown, KY 
Total 
Storage 
Capability 
(acre-feet)' 
352,400 
1,674,000 
3,462,000 
1,230,800 
53,000 
934,000 
170,100 
604,500 
1,999,500 
6,089,000 
Flood Control 
and/or Nav. 
Feature Placed 
in Useful 
Operation CY 
1969 
1958 
1952 
1957 
1963 
1970 
1975 
1953 
1950 
Initial 
Power in 
FY 
1973 
1973 
1959 
Existing 
Installation 
(KW) 
73,700 
45,200 
200,000 
Ultimate 
Installation 
(KW) 
73,700 
45,200 
200,000 
1953 39,100 39,100 
1957 1,806,800 1,806,800 
1963 
1973 
1975 
1954 
1952 
130,000 
60,000 
73,375 
130,000 
60,000 
108,375 
30,000 30,000 
270,000 270,000 
Project Height Length 
Functions Type2 (feet) (feet) 
P C6 18 338 
FPRWSQ CEG 128 5,100 
FPR CE 252 6,423 
FPSWRN E 197 3,000 
NPR CR 300 8,875 
NPRW CE 114 13,585 
NPRW E 84 4,370 
FPRW CE 97 7,250 
FPR 
FPR 
CE 
CE 
159 
258 
17,695 
5,736 
E-5 
I 
m .umm"m .o.mmom .. . ....

APPENDIX E 
Multiple-Purpose Projects Including Power 
Operable September 30, 2000 
NOMENCLATURE FOR PROJECT FUNCTIONS 
D - Debris Control P - Power 
F - Flood Control R - Public Recreation Annual Attendance exceeding 5,000 
I - Irrigation S - Water Supply 
N - Navigation W - Fish & Wildlife (Federal Or State) 
Total of all storage functions, including inactive and dead storage to normal full pool 
G: gravel; R: rock; C: concrete; E: earth 
All six units have successfully generated power; however, repairs and modifications have been required on all units. Units 2, 3, 4, 5 and 6 
fully repaired and operational. Repairs to remaining unit No. 1 will be completed in FY 99. 
Being operated for the Department of Interior by the Bureau of Reclamation 
Being operated by the Alaska Power Administration 
Formerly Clarks Hill Lake 
Units 5 and 6 were deauthorized in 1990. 
E-6

APPENDIX F 
Multiple-Purpose Projects Including Power 
Under Construction September 30, 2000 
Nameplate Capacity 
Project Fiscal Scheduled Scheduled Scheduled Ultimate Installation 
Year For For Functions Installation 
Started Operation Completion 
Cooper River, Charleston Hbr, SC 1977 1985 2000 NWDP 84,000 84,000 
Garrison Dam & Powerplant, ND (Maj 1997 2005 2005 P/F/N/I 109,950 98,000 
Rehab) 
Mississippi Delta Region, LA (Davis Pond 1996 2000 2003 2003 W 
Freshwater Diversion) 
New Melones Lake, CA ' 1966 1979 Indefinite DFIPRW 300,000 300,000 
PieiTre, SD 1999 2006 1006 F N/A N/A 
Richard B. Russell Dam and Lake, Savannah 1975 1985 2004 FRPW 600,000 600,000 
River, GA and SC 
KEY 
- Redevelopment 
- Power 
F - Flood Control 
R - Recreation 
I
S 
- Irrigation 
- Water Supply 
N
W 
- Navigation 
- Fish & Wildlife 
F-1 
D
P

APPENDIX F 
Multiple-Purpose Projects Including Power 
Under Construction September 30, 2000 
New Melones Lake was turned over to the Bureau of Reclamation for operation on November 20, 1979. Corps retains responsibility 
for facilities along the lower Stanisalaus River. Remaining construction consists of unscheduled recreation facilities and minor feature 
closeouts. 
F-2

Appendix G 
ANNUAL FLOOD DAMAGE REPORT 
Page Number 
G-3 
G-4 
G-5 
G-6 
G-7 
G-8 
* FIGURES 
Figure 1 -- Damages Reduction 
Figure 2 -- Potential Flood Damages 
Figure 3 -- Flood Related Lives Lost 
Figure 4 -- Continental U.S. River Basins (For Use With Table 6) 
Figure 5 -- Benefits and Accumulated Expenditures 
Figure 6 - Atlantic Tropical Storms 
* TABLES 
Table 1 -- Flood Damages Prevented, By State in Fiscal Year 2000 
Table 2 -- Total Damages Suffered, By State in Fiscal Year 2000 
Table 3 -- Flood Damages Prevented, Fiscal Years 1991-2000 
Table 4 -- Total Damages Suffered By State, Fiscal Years 1991-2000 
Table 5 -- Total Lives Lost, By State in Fiscal Years 1991-2000 
Table 6 -- Regional Distribution, Flood Damages Prevented 
Table 7 - Atlantic Ocean Tropical Cyclones and their Effects 
G-10 
G-12 
G-14 
G-16 
G-18 
G-20 
G-22

FIGURES 
G-2

Flood Damage Reduction 
50. 
45. 
40. 
35. 
30. 
25- 
20. 
15. 
10- 
Co 
Flood Damages Prevented in the U.S.A. by the U.S. Army Corps of Engineers 
G-3 
0O0 
0
0
o
a
8 m

Figure 2 
Potential Flood Damages 
N CM) 
0) 0) 
0) 0) 
ur 
0) 
0) 
o
O
0)- 
Flood Damages Suffered ] Flood Damages Prevented 
G,4 
60. 
50- 
40. 
30. 
UL) 
a
0
0 
m 10.

FigOfe 3 
Flood Related Lives Lost 
(V) U) ) 
00 00 00 00 00 0) 
a) () 0) a) 0) 0) 
TM r r 
* Average for the previous 10-years. 
Fiscal Year 
G-5 
250 
200 
-q 
150 
100 
50 
0 
-J
I 
-J

Figure 4 
CONTINENTAL U.S. RIVER BASINS 
Missouri ;i er 
Great Basin 
I 
Ohio 
Lower 
,Miss.0 
For use with Table 6 
G-6 
Rio 
Grande

FigiPe 5 
Benefits of Federal Projects (Damages Prevented) 
Accumulative Corps Expenditures (Principle plus O&M) 
Adjusted to 2000 using Construction Cost Index EM 1110-2-1304 
$800 
$700 
$600 
$500 
$400 
$300 
$200 
$100 
$0 
L
,- 
O
O 
m 
Flood Damage Reduction 
BENEFITS TO COST 
$6.08 in Benefits 
for every 
$1.00 Invested 
Accumulative Expenditures 
Annual Benefits 
N C t U) o c0 (0 It it 00 0O 00 01 0 
0) Q) 0) 01) 0 0) ) 0M 0) CD 0 0) 0 0 M 0) 0) 0) O 
- - V- - N 
Fiscal Year 
G-7 
Accumulative Benefits

Figure 6 
Atlantic Tropical Cyclones 
20 
c 15 
0
U 10. 
ci *- 
ILC
0) 
0) 
C
0) 
0) 
a Hurricanes (winds > 74 mph) 0 Tropical Storms (winds > 39 mph) 
G-8 
O
L
a) 
E
zz3

TABLES 
G-9

TABLE - 1 
FLOOD DAMAGE REDUCTION 
BY STATE (THOUSANDS OF DOLLARS) During Fiscal Year 2000 
Reduction by Reduction by Damages Prevented Total Flood Average *Comparision of 
Location Corps Supported Corps by Corps Supported Damages Reduction Damage 2000 to the 
Reservoirs Levees Emergency by the Corps Reduction Ten-Year Avg 
Operations of Engineers FY 1991-2000 FY 1991-2000 
ALABAMA 0 0 0 0 0 Low 
ALASKA 200 0 0 200 3,580 Low 
ARIZONA 0 0 0 0 28,502 Low 
ARKANSAS 25,771 7,958 0 33,729 1,114,372 Low 
CALIFORNIA 274,262 64,875 0 339,137 918,674 Low 
COLORADO 0 0 0 0 6,204 Low 
CONNECTICUT 0 375 0 375 25,630 Low 
DELAWARE 0 0 0 0 0 Low 
FLORIDA 14,388 37,714 0 52,102 44,936 Medium 
GEORGIA 0 0 0 0 13,687 Low 
GUAM & Am. Samoa 0 0 0 0 16 Low 
HAWAII 0 0 0 0 2,447 Low 
IDAHO 30,620 3,096 0 33,716 84,681 Low 
ILLONOIS 6,048 26,583 0 32,631 686,703 Low 
INDIANA 9,378 12,319 0 21,697 119,447 Low 
IOWA 1,886 3,594 0 5,480 184,455 Low 
KANSAS 18,797 149 1 18,947 767,168 Low 
KENTUCKY 10,732 3,806 0 14,538 146,705 Low 
LOUISIANA 1,292 0 0 1,292 7,378,160 Low 
MAINE 0 0 0 0 7 Low 
MARYLAND & DC 1,230 354 0 1,584 38,092 Low 
MASSACHUSETTS 5,441 305 0 5,746 21,053 Low 
MICHIGAN 0 2,160 0 2,160 5,024 Low 
MINNISOTA 10 9,048 0 9,058 36,727 Low 
MISSISSIPPI 4,420 0 0 4,420 627,492 Low 
MISSOURI 10,446 1,164 10 11,620 3,195,667 Low 
MONTANA 2,329 0 0 2,329 23,517 Low 
G-1O

TABLE - 1 
FLOOD DAMAGE REDUCTION 
BY STATE (THOUSANDS OF DOLLARS) During Fiscal Year 2000 
Reduction by Reduction by Damages Prevented Total Flood Average *Comparision of 
Location Corps Supported Corps by Corps Supported Damages Reduction Damage 2000 to the 
Reservoirs Levees Emergency by the Corps Reduction Ten-Year Avg 
Operations of Engineers FY 1991-2000 FY 1991-2000 
NEBRASKA 2,088 781 0 2,869 124,187 Low 
NEVADA 1,400 0 0 1,400 94,460 Low 
NEW HAMPSHIRE 0 0 0 0 708 Low 
NEW JERSEY 2,720 0 0 2,720 12,115 Low 
NEW MEXICO 0 2,999 47,078 50,076 64,945 Medium 
NEW YORK 22,881 48,668 0 71,549 138,706 Medium 
N. CAROLINA 556 0 0 556 103,479 Low 
N. DAKOTA 8,172 3,967 0 12,139 75,528 Low 
OHIO 82,457 11,215 0 93,672 245,955 Low 
OKLAHOMA 72,130 0 0 72,130 130,034 Medium 
OREGON 804,394 141,040 0 945,434 925,262 Medium 
PENNSYLVANIA 47,299 3,417 0 50,716 409,278 Low 
PUERTO RICO & VI 0 0 0 0 46,916 Low 
RHODE ISLAND 0 0 0 0 1,355 Low 
S. CAROLINA 0 0 0 0 882 Low 
S. DAKOTA 0 457 0 457 8,318 Low 
TENNESSEE 0 0 0 0 63,532 Low 
TEXAS 556,830 802 0 557,632 2,317,258 Low 
UTAH 0 0 0 0 5,956 Low 
VERMONT 6,828 3,089 0 9,917 3,599 High 
VIRGINIA 19 7,817 0 7,836 36,201 Low 
WASHINGTON 7,772 202,919 1,750 212,441 325,265 Medium 
W. VIRGINA 70,205 9,143 0 79,348 226,375 Low 
WISCONSON 0 17 0 17 1,711 Low 
WYOMING 569 0 0 569 12,228 Low 
TOTALS 2,103,560 609,830 48,839 2,762,239 20,847,197 Low 
FY 2000 Damages Prevented in the U.S. = 13% of the 10-year (1991-2000) Average 
* LEGEND: LOW = Less than 1/2 average. HIGH = Twice to five times average. 
MED= 1/2 to twice average. VERY HIGH = More than five times average. 
G-11

TABLE - 2 
TOTAL DAMAGES SUFFERED IN FY 2000, 
BY STATE (THOUSANDS OF DOLLARS) 
Damages Damage Potential Percent Average Lives Lives 
LOCATION Suffered Reduction Damages Damages Damages Lost Lost FY 
FY 2000 FY 2000 FY 2000 Reduced Suffered FY2000 1991-2000 
FY 2000 1991-2000 
ALABAMA 3,087 0 3,087 0 50,776 0 17 
ALASKA 110 200 310 0 9,302 0 0 
ARIZONA 90 0 90 0 25,632 0 24 
ARKANSAS 2773 33,729 36,502 92 3,729 0 4 
CALIFORNIA 9238 339,137 348,375 97 450,453 0 59 
COLORADO 297 0 297 0 44,047 1 10 
CONNECTICUT 6010 375 6,385 6 2,100 0 1 
DELAWARE 0 0 0 104 0 0 
FLORIDA 499080 52,102 551,182 9 144,334 2 6 
GEORGIA 2101 0 2,101 0 60,346 0 38 
GUAM 650 0 650 0 478 0 0 
HAWAII 400 0 400 0 4,192 0 8 
IDAHO 85 33,716 33,801 100 18,174 0 1 
ILLONOIS 3113 32,631 35,744 91 284,105 4 13 
INDIANA 819 21,697 22,516 96 31,485 1 19 
IOWA 14,877 5,480 20,357 27 646,227 3 13 
KANSAS 250 18,947 19,197 99 66,630 0 10 
KENTUCKY 17,631 14,538 32,169 45 60,812 1 37 
LOUISIANA 153 1,292 1,445 89 335,631 0 11 
MAINE 2,814 0 2,814 0 6,703 0 5 
MARYLAND & DC 2,452 1,584 4,036 39 10,971 0 3 
MASSACHUSETTS 206 5,746 5,952 97 10,171 0 1 
MICHIGAN 25,430 2,160 27,590 8 8,818 0 4 
MINNISOTA 43,112 9,058 52,170 17 176,249 1 7 
MISSISSIPPI 408 4,420 4,828 92 35,994 0 3 
MISSOURI 109,760 11,620 121,380 10 365,533 0 72 
MONTANA 30 2,329 2,359 99 3,110 0 8 
Damage values of less than $50 thousand dollars are shown as zeros. 
G-12

TABLE - 2 
TOTAL DAMAGES SUFFERED IN FY 2000, 
BY STATE (THOUSANDS OF DOLLARS) 
Damages Damage Potential Percent Average Lives Lives 
LOCATION Suffered Reduction Damages Damages Damages Lost Lost FY 
FY 2000 FY 2000 FY 2000 Reduced Suffered FY2000 1991-2000 
FY 2000 1991-2000 
NEBRASKA 23,456 2,869 26,325 11 45,185 0 7 
NEVADA 221 1,400 1,621 86 68,076 0 6 
NEW HAMPSHIRE 515 0 515 0 1,728 0 1 
NEW JERSEY 179,100 2,720 181,820 1 107,529 1 9 
NEW MEXICO 160 50,076 50,236 100 4,351 0 9 
NEW YORK 18,498 71,549 90,047 79 45,590 0 26 
N. CAROLINA 7,605 556 8,161 7 324,666 0 51 
N. DAKOTA 191,177 12,139 203,316 6 421,918 2 8 
OHIO 8,839 93,672 102,511 91 45,007 4 30 
OKLAHOMA 11,691 72,130 83,821 86 8,081 0 20 
OREGON 5,734 945,434 951,168 99 340,667 0 10 
PENNSYLVANIA 27,476 50,716 78,192 65 59,139 0 31 
PUERTO RICO & 1,341 0 1,341 0 13,003 0 53 
RHODE ISLAND 0 0 0 19 0 0 
S. CAROLINA 2,885 0 2,885 0 7,297 0 13 
S. DAKOTA 457 457 100 90,401 0 5 
TENNESSEE 230 0 230 0 12,312 0 25 
TEXAS 25,130 557,632 582,762 96 187,659 4 146 
UTAH 679 0 679 0 2,458 0 1 
VERMONT 1,845 9,917 11,762 84 4,620 0 4 
VIRGINIA 1,368 7,836 9,204 85 50,451 1 18 
WASHINGTON 488 212,441 212,929 100 66,101 0 6 
W. VIRGINA 11,003 79,348 90,351 88 31,075 3 31 
WISCONSON 74,298 17 74,315 0 147,367 1 6 
WYOMING 20 569 589 97 258 0 2 
TOTALS 1,338,735 2,762,239 4,100,974 4,941,062 29 892 
AVERAGE 67 89 
Damage values of less than $50 thousand dollars are shown as zeros. 
G-13

TABLE - 3 
FLOOD DAMAGE REDUCTION 
FISCAL YEARS 1991 - 2000 (IN THOUSANDS OF DOLLARS) 
LOCATION FY 91 FY 92 FY 93 FY94 FY 95 FY96 FY97 FY98 FY99 FY2000 10 Yr. Avg 
ALABAMA 0 0 0 0 0 0 0 0 0 0.0 0 
ALASKA 8,100 10,000 0 8,750 8,750 0 0 0 0 200.0 3,580 
ARIZONA 0 3,945 113,000 0 140,456 5,202 13,219 4,180 5,018 0.0 28,502 
ARKANSAS 478,008 65,947 161,070 861,023 1,350,558 1,066,854 5,733,106 712,907 680,519 33,729.0 1,114,372 
CALIFORNIA 64,022 406,036 750,435 138 1,484,202 389,649 3,042,730 2,623,156 87,235 339,137.0 918,674 
COLORADO 482 9,367 928 509 3,071 0 2,782 0 44,904 0.0 6,204 
CONNECTICUT 100 4,228 56,339 25,746 305 74,414 11,518 55,971 27,303 375.0 25,630 
DELAWARE 0 0 0 0 0 0 0 0 0 0.0 0 
FLORIDA 1,305 17,591 19,155 5,342 104,072 66,655 13,486 103,780 65,873 52,102.0 44,936 
GEORGIA 1,689 1,474 6,549 3,771 3,889 50,305 6,952 31,263 30,979 0.0 13,687 
GUAM 0 0 44 45 68 0 0.0 16 
HAWAII 5,457 194 10 6,728 5,126 4,608 2,349 0 0 0.0 2,447 
IDAHO 23,018 253 85,743 9,844 54,948 190,618 272,955 77,578 98,136 33,716.0 84,681 
ILLONOIS 64,996 10,369 2,483,431 94,914 2,664,865 553,925 557,829 361,233 42,836 32,631.0 686,703 
INDIANA 149,239 27,288 106,604 128,040 24,661 152,440 273,661 180,836 130,000 21,697.0 119,447 
IOWA 77,099 14,662 624,071 41,110 75,133 97,882 653,984 144,879 110,252 5,479.5 184,455 
KANSAS 30,816 298,933 5,760,259 32,293 849,044 65,443 87,605 16,614 511,726 18,947.0 767,168 
KENTUCKY 159,089 35,464 31,614 178,350 79,609 216,292 675,177 62,976 13,938 14,538.0 146,705 
LOUISIANA 13,670,272 1,005,357 7,452,058 7,903,263 9,683,360 5,311,449 12,264,278 5,271,162 11,219,104 1,292.0 7,378,160 
MAINE 0 0 0 0 70 0 0 0 0 0.0 7 
MARYLAND & DC 14 93,074 71,225 0 2 214,782 220 14 3 1,584.0 38,092 
MASSACHUSETTS 9,472 574 33,956 26,276 135 57,870 19,238 55,218 2,043 5,746.0 21,053 
MICHIGAN 0 412 0 0 867 344 23,345 20,690 2,419 2,160.0 5,024 
MINNISOTA 5,400 2,929 133,273 10,980 8,978 19,949 167,250 3,208 6,248 9,057.6 36,727 
MISSISSIPPI 1,196,409 155,364 105,666 121,003 1,059,468 628,384 1,380,714 843,968 779,525 4,420.0 627,492 
MISSOURI 200,669 299,878 9,793,809 769,333 5,740,837 2,240,713 7,903,399 227,701 4,768,711 11,620.0 3,195,667 
MONTANA 15,408 4,483 20,070 6,542 13,004 49,674 101,164 11,947 10,552 2,329.0 23,517 
G-14

TABLE - 3 
G-15 
FLOOD DAMAGE REDUCTION 
FISCAL YEARS 1991 - 2000 (IN THOUSANDS OF DOLLARS) 
LOCATION FY 91 FY 92 FY 93 FY94 FY 95 FY96 FY97 FY98 FY99 FY2000 10 Yr. Avg 
NEBRASKA 58,559 7,351 226,589 36,715 80,795 96,985 635,868 16,050 80,088 2,869.0 124,r87 
NEVADA 0 0 0 0 63,611 19,974 852,687 3,149 3,780 1,400.0 94,460 
NEW HAMPSHIRE 0 0 3,549 250 0 1,250 943 916 171 0.0 708 
NEW JERSEY 1,247 445 5,836 8,355 13,017 10,008 27,172 6,097 46,248 2,720 12,115 
NEW MEXICO 91,189 27,619 109,486 164,439 29,195 116,598 52,598 453 7,799 50,076 64,945 
NEW YORK 17,566 6,120 157,744 56,334 31,201 568,026 234,297 62,932 181,293 71,549 138,706 
N. CAROLINA 23,231 8,474 24,023 54,536 26,823 558,461 65,769 114,667 158,248 556 103,479 
N. DAKOTA 1,591 942 109,062 35,802 32,848 76,344 342,323 47,222 97,009 12,139 75,528 
OHIO 250,242 6,601 107,340 312,590 47,934 828,586 397,145 318,700 96,744 93,672 245,955 
OKLAHOMA 19,116 52,838 556,345 87,545 196,801 12,739 65,815 76,439 160,575 72,130 130,034 
OREGON 42,633 47,243 87,844 83,039 1,342 2,755,876 4,203,503 419,550 666,153 945,434 925,262 
PENNSYLVANIA 40,498 3,046 189,825 46,304 3,954 3,497,659 141,559 66,007 53,213 50,716 409,278 
PUERTO RICO & VI 0 4,665 4,400 0 12,242 107,500 0 340,356 0 0 46,916 
RHODE ISLAND 1,620 0 2,145 0 0 0 114 9,672 0 0 1,355 
S. CAROLINA 2,849 625 300 2,268 943 955 149 735 0 0 882 
5. DAKOTA 572 4,140 1,978 651 7,992 1,152 62,073 915 3,248 457 8,318 
TENNESSEE 310,926 496 768 35,528 39,500 31,000 193,158 5,876 18,067 0 63,532 
TEXAS 13,860 5,197,449 2,631,802 5,707,236 2,672,764 4,736 5,113,947 646,713 626,444 557,632 2,317,258 
UTAH 1,500 700 34,326 4,553 0 0 8,120 0 10,361 0 5,956 
VERMONT 2,525 2,275 1,892 3,006 3,304 4,200 3,355 3,752 1,760 9,917 3,599 
VIRGINIA 1,686 124,553 18,683 3,621 5,736 135,894 5,598 41,446 16,956 7,836 36,201 
WASHINGTON 357,877 54,343 67,028 65,935 6,228 732,293 1,120,921 353,805 281,780 212,441 325,265 
W. VIRGINA 76,882 40,152 98,580 103,464 129,065 1,272,486 395,426 62,851 5,491 79,348 226,375 
WISCONSON 0 0 13,914 65 31 473 2,296 210 103 17 1,711 
WYOMING 4,424 1,373 22,095 3,750 19,548 23,480 29,217 9,020 8,805 569 12,228 
TOTALS 17,481,657 8,059,272 32,284,819 17,049,941 26,780,284 22,314,171 47,161,059 13,416,882 21,161,659 2,762,229 20,847,197

TABLE 4 
TOTAL FLOOD DAMAGES SUFFERED, BY STATE 
FISCAL YEARS 1991-2000 (IN THOUSANDS OF DOLLARS) 
LOCATION FY 91 FY 92 FY 93 FY 94 FY 95 FY 96 FY 97 FY 98 FY 99 FY 2000 10 Yr. Avg. 
ALABAMA 15,055 320 0 112,696 0 1,649 1,354 368,938 4,663 3,087 50,776 
ALASKA 0 7,302 0 74,000 10,025 0 1,271 314 0 110 9,302 
ARIZONA 258 5,189 228,900 1,616 6,618 701 85 66 12796 90 25,632 
ARKANSAS 12,006 909 2,680 2,024 0 205 12,874 2045 1777 2773 3,729 
CALIFORNIA 3,376 93,152 165,920 1,792 1,495,960 13,205 2,086,125 621588 14176 9238 450,453 
COLORADO 2,820 1,602 100 1,242 18,240 4,058 358,890 2550 50675 297 44,047 
CONNECTICUT 16 10,366 0 1,316 0 2,092 52 40 1112 6010 2,100 
DELAWARE 0 2 0 741 0 300 0 0 0 104 
FLORIDA 0 41,938 2,080 182,605 18,536 158,001 49,707 431311 60080 499080 144,334 
GEORGIA 106,158 1,156 7,340 300,000 8,845 2,581 464 166291 8520 2101 60,346 
GUAM 0 0 0 0 0 0 0 3725 400 650 478 
HAWAII 23,715 9,260 2,910 3,700 0 1,935 0 0 0 400 4,192 
IDAHO 2,574 224 0 0 2,096 49,400 125,060 1005 1297 85 18,174 
ILLINOIS 19,834 189 2,640,140 32,606 27,240 107,585 4,295 2380 3666 3113 284,105 
INDIANA 89,504 45,424 9,550 2,852 6,789 21,575 68,598 19611 50124 819 31,485 
IOWA 195,703 50,800 5,740,000 9,124 3,498 165,265 3,680 168,101 111,221 14,877 646,227 
KANSAS 16,551 10,127 551,070 10,437 8,874 3,969 102 4,888 60,030 250 66,630 
KENTUCKY 9,034 46,870 4,980 2,544 17,673 21,323 470,915 16,639 506 17,631 60,812 
LOUISIANA 221,720 4,191 4,020 675 3,097,250 121 4,359 17,845 5,979 153 335,631 
MAINE 16,336 2,179 3,040 9,323 0 4,916 26,845 0 1,580 2,814 6,703 
MARYLAND & DC 48 339 0 4,524 1,620 90,481 198 334 9,715 2,452 10,971 
MASSACHUSETTS 9,716 176 160 0 0 2,663 75,024 13,510 250 206 10,171 
MICHIGAN 6,133 355 1,600 6,236 2,900 26,690 325 18,190 325 25,430 8,818 
MINNISOTA 1,280 1,760 964,050 1,867 3,750 460 743,218 2,529 466 43;112 176,249 
MISSISSIPPI 313,359 1,010 4,480 1,352 1,092 200 32,774 3,498 1,769 408 35,994 
MISSOURI 1,960 2,044 3,429,630 37,864 25,415 871 692 10,227 36,862 109,760 365,533 
MONTANA 10,743 1,403 6,720 3,392 510 2,243 2,874 3,001 184 30 3,110 
Damage values of less than $50 thousand dollars are shown as zeroes. 
G-16

TABLE 4 
TOTAL FLOOD DAMAGES SUFFERED, BY STATE 
FISCAL YEARS 1991-2000 (IN THOUSANDS OF DOLLARS 
LOCATION FY 91 FY 92 FY 93 FY 94 FY 95 FY 96 FY 97 FY 98 FY 99 FY 2000 Yr. Avg 
NEBRASKA 53,615 6,683 294,500 2,710 5,129 31,233 10,273 1,483 22,765 23,456 45,185 
NEVADA 2 1,621 0 160 11,970 370 640,110 1,300 25,009 221 68,076 
NEW HAMPSHIRE 0 0 0 0 110 4,000 10,952 700 1,002 515 1,728 
NEW JERSEY 16,002 500 0 3,520 0 36,720 38,700 750 800,000 179,100 107,529 
NEW MEXICO 1,567 32,264 210 2,000 954 1,285 380 713 3,980 160 4,351 
NEW YORK 19,603 1,862 55,480 25,707 1,485 220,011 55,909 38,627 18,715 18,498 45,590 
N. CAROLINA 2,694 12,927 1,400 2,032 26,596 42,119 17,994 16,135 3,117,160 7,605 324,666 
N. DAKOTA 32 0 413,600 58,552 44,366 220 3,408,298 2,583 100,355 191,177 421,918 
OHIO 55,165 20,078 25,800 39,913 28,511 22,721 66,666 181,409 963 8,839 45,007 
OKLAHOMA 90 10,871 44,720 166 3,275 0 155 262 9,578 11,691 8,081 
OREGON 9,010 32 1,760 0 11,320 3,203,500 173,200 10 2,100 5,734 340,667 
PENNSYLVANIA 8,342 1,805 440 16,194 10,385 494,862 3,136 1,103 27,642 27,476 59,139 
PUERTO RICO & VI 16 90,127 5,300 160 115 131 157 28,190 4,488 1,341 13,003 
RHODE ISLAND 174 16 0 0 0 0 0 0 19 
S. CAROLINA 11,871 0 17,920 6,228 28,169 668 1,105 4,044 75 2,885 7,297 
S. DAKOTA 2,934 3,460 763,380 20,399 12,270 360 100,541 50 619 90,401 
TENNESSEE 13,109 204 5,070 51,039 1,264 2,740 23,479 25,427 554 230 12,312 
TEXAS 188,766 199,356 56,990 1,721 85,050 407,066 136,472 163,407 612,634 25,130 187,659 
UTAH 6,005 24 160 0 1,500 312 10,100 4,485 1,314 679 2,458 
VERMONT 19 2 7,550 1,502 5,150 5,123 170 23,805 1,036 1,845 4,620 
VIRGINIA 984 7,371 0 16,169 66,759 153,516 898 2,381 255,062 1,368 50,451 
WASHINGTON 227,634 176 2,080 160 250 370,060 54,675 3,120 2,371 488 66,101 
W. VIRGINA 908 5,791 620 5,397 8,595 224,172 18,391 35,506 363 11,003 31,075 
WISCONSON 180 29,305 903,660 62,052 675 218,025 93,346 82,825 9,305 74,298 147,367 
WYOMING 2,160 0 0 0 0 181 192 22 0 20 258 
TOTALS 1,698,781 762,762 16,370,010 1,120,309 5,110,829 6,121,884 8,935,080 2,496,963 5,455,263 1,338,735 4,941,062 
Damage values of less than $50 thousand dollars are shown as zeroes. 
G-17

TABLE - 5 
TOTAL LIVES LOST, BY STATE 
FISCAL YEARS 1991-2000 
LOCATION FY 1991 FY 1992 FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999 FY2000 10-Yr Total 
ALABAMA 1 2 0 2 0 2 0 9 1 0 17 
ALASKA 0 0 0 0 0 0 0 0 0 0 0 
ARIZONA 1 3 3 0 1 0 12 4 0 0 24 
ARKANSAS 1 0 2 0 0 0 0 1 0 0 4 
CALIFORNIA 2 2 17 2 8 2 7 16 3 0 59 
COLORADO 0 0 0 0 0 3 6 0 0 1 10 
CONNECTICUT 0 1 0 0 0 0 0 0 0 0 
DELAWARE 0 0 0 0 0 0 0 0 0 0 0 
FLORIDA 0 2 0 0 0 2 0 0 0 2 6 
GEORGIA 4 1 3 29 0 0 0 1 0 0 38 
GUAM 0 0 0 0 0 0 0 0 0 0 0 
HAWAII 1 6 0 1 0 0 0 0 0 0 8 
IDAHO 0 0 0 0 0 1 0 0 0 0 1 
ILLINOIS 1 0 1 2 1 2 1 1 0 4 13 
INDIANA 3 1 1 1 3 2 1 2 4 1 19 
IOWA 3 0 5 0 0 0 1 0 1 3 13 
KANSAS 0 1 3 1 0 2 0 0 3 0 10 
KENTUCKY 2 8 2 0 2 2 16 2 2 1 37 
LOUISIANA 2 1 0 0 6 0 1 1 0 0 11 
MAINE 4 0 0 0 0 0 1 0 0 0 5 
MARYLAND & DC 0 0 0 0 0 3 0 0 0 0 3 
MASSACHUSETTS 1 0 0 0 0 0 0 0 0 0 1 
MICHIGAN 0 0 0 0 0 2 0 0 2 0 4 
MINNISOTA 0 0 4 0 0 0 0 2 0 1 7 
MISSISSIPPI 2 0 0 1 0 0 0 0 0 0 3 
MISSOURI 0 0 29 11 3 7 4 4 14 0 72 
MONTANA 1 3 0 0 0 4 0 0 0 0 8 
NEBRASKA 2 0 5 0 0 0 0 0 0 0 7 
NEVADA 0 1 0 1 0 3 0 1 0 6 
G-18

TABLE - 5 
TOTAL LIVES LOST, BY STATE 
FISCAL YEARS 1991-2000 
LOCATION FY 1991 FY 1992 FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999 FY2000 10-Yr Total 
NEW HAMPSHIRE 0 0 0 0 0 0 0 1 0 0 1 
NEW JERSEY 0 0 0 2 0 1 0 0 5 1 9 
NEW MEXICO 4 0 0 0 0 4 1 0 0 0 9 
NEW YORK 2 0 7 3 0 10 0 3 1 0 26 
N. CAROLINA 3 2 1 0 9 1 3 0 32 0 51 
N. DAKOTA 0 0 1 0 0 0 2 2 1 2 8 
OHIO 0 2 0 1 5 3 5 8 2 4 30 
OKLAHOMA 0 2 5 0 4 0 3 4 2 0 20 
OREGON 1 0 0 0 0 6 1 2 0 0 10 
PENNSYLVANIA 1 0 0 1 4 25 0 0 0 0 31 
PUERTO RICO & VI 1 25 3 0 1 19 0 1 3 0 53 
RHODE ISLAND 0 0 0 0 0 0 0 0 0 0 0 
S. CAROLINA 5 0 2 0 3 1 0 2 0 0 13 
S. DAKOTA 0 0 5 0 0 0 0 0 0 0 5 
TENNESSEE 0 2 0 3 0 3 4 13 0 0 25 
TEXAS 3 19 6 0 48 0 19 19 28 4 146 
UTAH 0 0 0 0 0 0 0 1 0 0 1 
VERMONT 0 0 0 1 1 2 0 0 0 0 4 
VIRGINIA 2 1 1 2 2 9 0 0 0 1 18 
WASHINGTON 4 0 0 0 0 1 1 0 0 0 6 
W. VIRGINA 1 3 0 5 0 12 5 2 0 3 31 
WISCONSON 0 0 1 2 0 0 1 1 0 1 6 
WYOMING 0 0 1 0 1 0 0 0 0 0 2 
TOTALS 58 87 109 70 103 131 98 102 105 29 892 
G-19

TABLE - 6 
REGIONAL DISTRIBUTION 
FLOOD DAMAGES PREVENTED BY THE U.S. ARMY CORPS OF ENGINEERS 
FISCAL YEARS 1980-2000 (IN THOUSANDS OF DOLLARS) 
REGION FY80 FY81 FY82 FY83 FY84 FY85 FY86 FY87 FY88 FY89 FY90 
NEW ENGLAND 75,911 53,661 239,970 9,496 839,029 625 665 463,321 0 250 63,094 
MID-ADLANTIC 16,740 24,171 10,419 25,703 2,486,292 18,823 357,665 30,340 26,450 24,802 16,607 
GULF & S. ATLANTIC 28,086 2,499 24,398 49,384 27,756 21,301 41,774 219,938 11,438 30,014 57,057 
OHIO 289,655 231,431 188,802 207,363 556,603 268,796 633,658 172,866 63,538 285,510 248,699 
TENNESSEE 0 0 0 0 0 45 570 4,376 0 16,176 3,082 
GREAT LAKES 9,594 9,842 27,836 5,856 24,953 30,107 28,071 51,245 9,587 24,982 16,849 
UPPER MISSISSIPPI 0 11,622 96,150 251,594 66,209 57,941 113,777 430,592 1,576 6,761 516,506 
SOURIS-RED-RAINY 0 0 0 2,700 1,314 1,721 18,966 52,015 411 68,814 7,156 
MISSOURI 2,243 89,862 370,993 435,296 1,077,828 32,555 860,513 1,504,538 2,669 176,066 250,873 
ARKANSAS-RED-WHITE 108,025 11,617 55,960 161,010 88,788 168,558 174,737 996,615 161,923 186,727 456,041 
LOWER MISSISSIPPI 4,087,675 3,067 552,850 20,386,036 10,294,428 9,820,704 9,336,140 666,758 1,453,371 5,970,206 10,820,837 
RIO GRANDE 46,260 889 2,526 29,918 98,419 127,698 87,139 113,621 21,528 2,755 42,531 
TEXAS AND GULF 14,910 83,436 441,874 17,537 8,513 28,840 208,168 190,914 6,026 535,689 4,105,103 
COLORADO 117,761 0 0 13,000 90,630 14,300 0 0 00 0 
GREAT BASIN 0 0 8,000 15,015 18,600 2,200 16,300 0 0 500 500 
CALIFORNIA 1,981,428 680 307,013 1,075,869 102,360 72,800 13,910,920 154,858 98 4,770 9,500 
COLUMBIA N PACIFIC 514,257 633,016 1,939,909 547,510 979,308 94,350 1,521,659 125,995 296,159 918,874 962,433 
ALASKA 2,117 4,473 4,741 4,885 5,055 6,846 6,828 17,000 0 8,000 0 
HAWAII & GUAM 4,254 220 800 624 0 0 220 220 8,540 82 1,085 
TOTALS 7,298,916 1,160,486 4,272,241 23,238,796 16,766,085 10,768,210 27,317,770 5,195,212 2,063,314 8,260,978 17,577,953 
G-20

TABLE - 6 
REGIONAL DISTRIBUTION 
FLOOD DAMAGES PREVENTED BY THE U.S. ARMY CORPS OF ENGINEERS 
FISCAL YEARS 1980-2000 (IN THOUSANDS OF DOLLARS) 
REGION FY91 FY92 FY93 FY94 FY95 FY96 FY97 FY98 FY99 FY2000 1991-2000 Avq 
NEW ENGLAND 11,010 4,528 95,580 51,906 375 132,805 31,243 121,825 29,147 680 47,910 
MID-ADLANTIC 8,993 97,947 277,641 34,455 33,530 1,881,703 224,560 79,819 250,493 97,647 298,679 
GULF & S. ATLANTIC 31,003 150,717 70,326 68,517 149,705 830,955 88,877 598,430 257,000 52,668 229,820 
OHIO 655,077 102,832 369,414 714,206 248,096 4,809,346 1,706,408 726,721 281,676 253,742 986,752 
TENNESSEE 334,809 18,920 13,304 52,909 12,480 2,305 131,135 8,326 5,017 0 57,921 
GREAT LAKES 19,100 5,702 124,935 50,981 24,810 141,824 112,230 25,977 19,190 13,979 53,873 
UPPER MISSISSIPPI 27,200 19,043 1,303,564 14,979 7,147 22,160 570,094 390,463 99,151 45,675 249,948 
SOURIS-RED-RAINY 4,700 517 91,473 6,875 28,686 67,053 154,001 36,316 76,877 8,153 47,465 
MISSOURI 272,237 609,640 11,573,040 206,912 4,466,330 2,199,478 7,207,086 177,769 5,111,491 21,228 3,184,521 
ARKANSAS-RED-WHITE 43,396 87,792 949,112 206,387 469,242 60,386 187,332 183,987 688,697 122,313 299,864 
LOWER MISSISSIPPI 15,457,393 1,213,731 13,538,946 9,589,003 16,904,365 7,925,144 22,033,170 6,933,597 12,507,805 6,217 10,610,937 
RIO GRANDE 91,189 39,619 109,486 164,439 29,195 116,598 52,598 453 52,570 50,076 70,622 
TEXAS AND GULF 13,717 5,184,633 2,621,230 5,705,933 2,632,986 4,425 5,113,613 646,241 626,317 557,532 2,310,663 
COLORADO 0 3,945 147,326 0 204,067 25,176 31,616 7,329 8,931 1,400 42,979 
GREAT BASIN 1,500 700 0 4,553 0 0 842,730 0 10,361 0 85,984 
CALIFORNIA 64,022 406,036 750,435 138 1,484,202 389,649 3,042,730 2,623,156 87,235 339,137 918,674 
COLUMBIA N PACIFIC 432,754 102,776 248,997 162,270 71,192 3,700,512 5,629,242 856,406 1,049,702 1,191,591 1,344,544 
ALASKA 8,100 10,000 0 8,750 8,750 0 0 0 0 200 3,580 
HAWAII & GUAM 5,457 194 10 6,728 5,126 4,652 2,394 68 0 0 2,463 
TOTALS 17,481,657 8,059,272 32,284,819 17,049,941 26,780,284 22,314,171 47,161,059 13,416,883 21,161,659 2,762,239 20,847,198 
G-21

TABLE 7 
2000 ATLANTIC OCEAN TROPICAL CYCLONES 
AND THEIR EFFECTS 
NAME Category CLASS DATES Max Min Damages Lives 
Wind Pressure In U.S.A. Lost in 
(Kt.) (MB) ($ Million) U.S.A. 
ALBERTO 3 Hurricane 04-23 AUG 80 950 
BERYL -- Tropical Storm 13-15 AUG 45 1007 1 
CHRIS -- Tropical Storm 18-19 AUG 35 1005 
DEBBY 1 Hurricane 19-24 AUG 65 991 ** 1* 
ERNESTO -- Tropical Storm 02-03 SEP 35 1005 
FLORENCE 1 Hurricane 11-17 SEP 70 985 3 
GORDON 1 Hurricane 14-18 SEP 65 981 10.8 24 
HELENE -- Tropical Storm 15-22 SEP 55 996 1 
ISAAC 4 Hurricane 21 SEP-01 OCT 120 943 1 
JOYCE 1 Hurricane 25 SEP-02 OCT 80 976 
KEITH 4 Tropical Storm 28 SEP-06 OCT 115 942 24 
LESLIE -- Tropical Storm 05-07 OCT 35 1006 
MICHAEL 2 Hurricane 17-20 OCT 85 965 
NADINE -- Tropical Storm 19-22 OCT 50 
* Indirect death -- man fell from roof preparing for storm. 
** Data not available Saffin-Simpson Scale for Wind Speed 
Tropical Storm: 34-39 kt. (39 to 73mph) 
Hurricane: 64 kt. (74 mph) or highter 
G-22

A 
Aberdeen and Vicinity, SD (NWO) 26-3, 26-19, 
26-26 
Abiquiu Dam, NM (SPA) 36-5, 36-14, 36-18 
Acequias Irrigation System, NM (SPA) 36-1, 
36-13, 36-16 
Active Investigations (SAC) 7-10, 7-25 
Addicks and Barker Reservoirs, TX (SWG) 
40-16 
Addison, NY (NAB) 4-15, 4-29 
Adkin Branch, Kinston, NC (SAW) 6-9, 6-22 
Advance Engineering and Design 
Alaska District (POA) 32-7 
Albuquerque District (SPA) 36-12 
Baltimore District (NAB) 4-26 
Detroit District (LRE) 21-52 
Fort Worth District (SWF) 39-16 
Galveston District (SWG) 40-23 
Honolulu District (POH) 31-4 
Jacksonville District (SAJ) 9-36 
Little Rock District (SWL) 36-13 
Los Angeles District (SPL) 33-12 
Louisville District (LRL) 24-15, 24-41 
Mobile District (SAM) 10-26 
Nashville District (LRN) 23-9 
New England Division (NAE) 1-30 
Philadelphia District (NAP) 3-19 
Pittsburgh District (LRP) 18-14 
Portland District (NWP) 28-28 
Rock Island District (MVR) 15-8 
Sacramento District (SPK) 35-32 
San Francisco District (SPN) 34-11 
Savannah District (SAS) 8-9 
Seattle District (NWS) 29-14 
St. Paul 16-14 
Walla Walla District (NWW) 30-12 
Wilmington District (SAW) 6-20 
Aitkin County, CSAH 10, MN (MVP) 16-3, 16- 
15, 16-19 
Alabama-Coosa Rivers, AL & GA (SAM) 10-3, 
10-27, 10-47 
Alamo Dam, AZ (SPL) 33-6, 33-14, 33-22 
Alamogordo, NM (SPA) 36-2, 36-13, 36-16 
Alamosa, CO (SPA) 36-2, 36-13, 36-16 
Albeni Falls Dam, ID (NWS) 29-10, 29-19, 
29-26 
Algoma Harbor, WI (LRE) 21-2, 21-54, 21-73 
Alil Drive Shoreline Protection, Hawaii, Hawaii 
(POH) 31-3, 31-5 
Allatoona Dam - Coosa River Basin, GA (SAM) 
10-21, 10-31, 10-41 
Allegheny River, PA (LRP) 18-2, 18-15, 18-19, 
18-29, 18-34 
Allendale Dam, North Provide LRE, RI (NAE) 
1-15, 1-35, 1-49 
Almond Lake, NY (NAB) 4-15, 4-30 
Aloha Rigolette, LA (MVK) 12-3, 12-9, 12-11 
Alpena Harbor, MI (LRE) 21-3, 21-54, 21-73 
Alton to Gale Organized Levee Districts, IL & 
MO (MVS) 14-3, 14-9, 14-12 
Alum Creek Lake, OH (LRH) 25-3, 25-15, 
25-22 
Alvin R. Bush Dam, PA (NAB) 4-20 
American River (Natonas) (SPK) 35-6, 35-39 
American River Watershed, CA (SPK) 35-6, 35- 
38, 35-48 
Amite River and Tribs, LA, East Baton Rouge 
Watershed (MVN) 11-4, 11-22, 11-25 
Anacostia River and Tributaries, MD & DC 
(NAB) 4-22, 4-33, 4-40 
Anahuac Channel, TX (SWG) 40-13 
Anchorage Harbor, AK (POA) 32-2, 32-9, 
32-13 
Andrews River (NAE) 1-3, 1-31, 1-42, 1-72 
Apalachicola Bay, FL (SAM) 10-4, 10-27, 
10-33 
Apalachicola, Chattahoochee, and Flint 
Rivers, AL, FL & GA (SAM) 10-4, 10-27, 
10-48 
Applegate Lake, Rogue River Basin, OR (NWP) 
28-12, 28-32, 28-42 
Appomattox River, VA (NAO) 5-2 
Aquatic Ecosystem Restoration 
Baltimore District (NAB) 4-25 
Galveston District (SWG) 40-22 
Mobile District (SAM) 10-25 
Philadelphia District ((NAP) 3-18 
Pittsburgh, District (LRP) 18-14 
Savannah District (SAS) 8-7 
Aquatic Plant Control 
Charleston District (SAC) 7-1, 7-11, 7-15, 
7-21 
Galveston District (SWG) 40-3, 40-24, 
40-30, 40-48 
Jacksonville District (SAJ) 9-3, 9-40, 
9-53 
Mobile District (SAM) 10-6 
New York District (NAN) 2-3, 2-25, 2-18, 
2-33 
I-1

Philadelphia District (NAP) 3-18 
Wilmington District (SAW) 6-2, 6-21, 
6-30 
Aquilla Lake, TX (SWF) 39-3, 39-18, 39-24 
Arcadia Harbor, MI (LRE) 21-3, 21-54, 21-73 
Arcadia Lake, OK (SWT) 38-2, 38-15, 38-24 
Area V, Estelline Springs, TX (SWT) 38-3, 
38-15, 38-24 
Area VIII, TX (SWT) 38-3, 38-15, 38-24 
Arecibo Harbor, FL (SAJ) 9-3, 9-40, 9-53 
Arkansas City, KS (SWT) 38-3, 38-15, 38-24 
Arkansas-Red River Basins Chloride Control 
Projects, KS, OK and TX (SWT) 38-3, 
38-15, 38-24 
Arkansas River Basin, AR, OK and KS (SWL) 
37-2, 37-20, 37-25, 37-28 
Arkport Dam, NY (NAB) 4-15, 4-30 
Aroostock River, Fort Fairfield, ME (NAE) 1-16, 
1-35, 1-49 
Arroyo Colorado, TX (SWG) 40-20 
Arthur V. Ormond Lock and Dam (No. 9), AR 
(SWL) 37-3, 37-25 
Ashland Harbor, WI (LRE) 21-4, 21-54, 21-73 
Ashtabula Harbor, OH (LRB) 20-2, 20-14, 
20-21 
Assateague Island (NAB) 4-10, 4-29, 4-37 
Atlantic Coast of Maryland (NAB) 4-10, 4-29, 
4-37 
Atlantic Coast of Long Island, Jones Inlet to 
East Rockaway Inlet; Long Beach 
Island, NY (NAN) 2-14, 2-26, 2-32 
Atlantic Intracoastal Bridge at Great Bridge, 
VA (NAO) 5-4 
Atlantic Intracoastal Waterway at Deep Creek, 
VA (NAO) 5-3 
Atlantic Intracoastal Waterway Between 
Norfolk, VA and St. Johns River, FL 
(NAO) 5-2 (SAW) 6-2, 6-21, 6-27, (SAC) 
7-2, 7-9, 7-12 (SAS) 8-2, 8-11, 8-14 
(SAJ) 9-3, 9-40, 9-53 
Aunt Lydia's Cove, Chatham, MA (NAE) 1-3, 
1-31, 1-42 
AuSable Harbor, MI (LRE) 21-4, 21-54, 21-73 
Authorized Alteration of Bridges (LRN) 23-4 
Authorized Beach Erosion Control Projects 
(LRE) 21-39 
Avoca, NY (NAB) 4-16, 4-30 
Aylesworth Creek Lake, PA (NAB) 4-12, 4-29, 
4-38 
B 
B. Everett Jordan Dam and Lake, NC (SAW) 
6-10, 6-22 
Back River, Poquoson, VA (NAO) 5-4 
Bakers Haulover Inlet, FL (SAJ) 9-4, 9-40, 
9-54 
Ball Mountain Lake, VT (NAE) 1-18, 1-36 
Baltimore Harbor and Channels, MD and VA 
(NAB) 4-3, 4-27, 4-34 
Baltimore Harbor, MD Collection and Removal 
of Drift (NAB) 4-4, 4-27, 4-35 
Barcelona Harbor, OH (LRB) 20-2, 20-14 
Bardwell Lake, TX (SWF) 39-4, 39-18, 39-24 
Barnegat Inlet, NJ (NAP) 3-2, 3-20, 3-25 
Barre Falls Dam, MA (NAE) 1-18, 1-36 
Barren River Lake, KY (LRL) 24-6, 24-17 
Bassett Creek, MN (MVP) 16-3, 16-15, 16-19 
Battery Island Bird Habitat Preservation, NC 
(CAP Section 204) (SAW) 6-20, 6-24 
Bay Port Harbor, MI (LRE) 21-4, 21-54, 21-73 
Bayou Coden, AL (SAM) 10-6, 10-27, 10-33 
Bayou La Batre, AL (SAM) 10-7, 10-27, 10-33 
Beach Erosion Control Work Under Special 
Authorization 
Chicago District (LRC) 22-11 
Detroit District (LRE) 21-40 
Honolulu District (POH) 31-3 
Jacksonville District (SAJ) 9-30 
New York District (NAN) 2-19 
San Francisco District (SPN) 34-7 
Beals Creek, Big Spring, TX (SWF) 39-4, 39- 
18, 39-24, 39-30 
Bear Creek Lake, CO (NWO) 26-3, 26-19, 26- 
26 
Beaver Lake, AR (SWL) 37-10, 37-18, 37-29 
Beaver Tail Water Restoration (SWL) 37-15 
Beech Fork Lake, WV (LRH) 25-3, 25-15, 
25-22 
Belhaven Harbor, NC (SAW) 6-5, 6-22 
Bellingham Harbor, WA (NWS) 29-2, 29-16, 
29-23 
Belton Lake, TX (SWF) 39-4, 39-18, 39-24 
Beltzville Lake, PA (NAP) 3-13, 3-23, 3-31 
Benbrook Lake, TX (SWF) 39-5, 39-18, 39-24 
Beneficial Uses of Dredged Material Galveston 
(SWG) 40-22 
Bennett's Creek, VA (NAO) 5-4 
Berlin Lake, Ohio River Basin, OH (LRP) 18-7, 
18-16, 18-21 
I-2

Bethel Bank Stabilization, AK (POA) 32-5, 
32-11, 32-15 
Big Bend Dam-Lake Sharpe, Missouri River 
Basin, SD (NWO) 26-14, 26-24, 26-30 
Big Sioux River & Skunk Creek, Sioux Falls, 
SD (NWO) 26-4, 26-19, 26-26 
Big South Fork National River and Recreation 
Area, KY and TN (LRN) 23-5, 23-10 
Big Suamico River, WI (LRE) 21-5, 21-55, 21- 
74 
Biloxi Harbor, MS (SAM) 10-7, 10-27, 10-33 
Binghamton, NY (NAB) 4-16, 4-31 
Birch Hill Dam, MA (NAE) 1-18, 1-36 
Birch Lake, OK (SWT) 38-4, 38-16, 38-24 
Black Fox, Murfree and Oaklands Springs, TN 
(LRN) 23-5, 23-10 
Black River (Port Huron), MI (LRE) 21-5, 
21-55, 21-74 
Black River Harbor (U.P.) MI, (LRE) 21-6, 21- 
55, 21-74, 21-92 
Black River Poplar Bluff, MO (SWL) 37-5, 37- 
16, 37-23 
Black Rock Channel and Tonawanda Harbor, 
NY (LRB) 20-2, 20-21, 20-40 
Black Rock Lake, CT (NAE) 1-21, 1-38 
Black Warrior and Tombigbee Rivers, AL 
(SAM) 10-8, 10-28, 10-34, 10-49 
Black Warrior River, Northport Levee, AL 
(SAM) 10-17, 10-30, 10-40 
Blackstone River Basin, MA and RI (NAE) 1- 
16, 1-56, 1-66 
Blackwater Dam, NH (NAE) 1-23, 1-38 
Blair Waterway, Tacoma, WA (NWS) 29-2, 29- 
16, 29-23 
Blue Marsh Lake, PA (NAP) 3-13, 3-23, 3-31 
Blue Mountain Lake, AR (SWL) 37-5, 37-16, 
37-28 
Blue River Basin, Kansas City, MO (NWK) 27- 
2, 27-12, 27-16 
Blue River Channel, Kansas City, MO (NWK) 
27-3, 27-12, 27-16 
Blue River Lake, OR (NWP) 28-13, 28-32, 28- 
42 
Bluestone Lake, Ohio River Basin, WV (LRH) 
25-3, 25-15, 25-22 
Bon Secour River, AL (SAM) 10-10, 10-28, 
10-35 
Bonneville Lock and Dam - Lake Bonneville, 
OR and WA (NWP) 28-19, 28-34, 28-43, 
28-58 
Bonneville Navigation Lock, Bonneville Dam, 
OR and WA (NWP) 28-2, 28-30, 28-37 
Boston Harbor, MA (NAE) 1-3, 1-31, 1-42, 1- 
60, 1-72 
Bowie County Levee, TX (SWT) 38-4, 38-16, 
38-24 
Bowman-Haley Lake, ND (NWO) 26-4, 26-19, 
26-26 
Boyer Chute, NE (NWO) 26-11, 26-23, 26-29, 
26-47 
Brays Bayou, TX (SWG) 40-16 
Brazos Island Harbor, (SWG) 40-3, 40-24, 
40-30, 40-51, 40-54, 40-61 
Brevard County, FL (SAJ) 9-22, 9-47, 9-72 
Bridgeport Harbor, CT (NAE) 1-4, 1-31, 1-43, 
1-60 
Brigantine Inlet to Great Egg Harbor Inlet, NJ 
(Absecon Island, NJ) (NAP) 3-11, 3-22, 
3-30 
Broad Top Region, PA (NAB) 4-10, 4-29, 4-38 
Broken Bow Lake, OK (SWT) 38-12, 38-22, 
38-26 
Brookville Lake, KY (LRL) 24-7, 24-17 
Broward County, FL Beach Erosion Control 
and Hillsboro Inlet, FL Navigation 
Project (SAJ) 9-22, 9-47, 9-72 
Brunswick County Beaches N.C. (Cape Fear to 
North Carolina-South Carolina State 
Line) (SAW) 6-10, 6-23 
Brunswick Harbor, GA (SAS) 8-3, 8-11, 8-15 
Brush Creek, Kansas City, MO (NWK) 27-3, 
27-12, 27-16 
Buchanan Dam-H.V. Eastman Lake, 
Chowchilla River, CA (SPK) 35-5, 35-39 
Buckhorn Lake, KY (LRL) 24-7, 24-17 
Buffalo Bayou, TX (Lynchburg Pump Station) 
(SWG) 40-18, 40-27 
Buffalo Bayou and Tributaries, TX (SWG) 
40-15, 40-27, 40-45 
Buffalo Harbor, NY (LRB) 20-3, 20-14, 20-22 
Buffalo Harbor Environmental Dredging (LRB) 
20-3, 20-14, 20-24 
Buffumville Lake, MA (NAE) 1-26, 1-39 
Buford Dam, Lake Sidney Lanier, GA (SAM) 
10-22, 10-31, 10-42 
Buford Trenton Irrigation District, ND (NWO) 
26-4, 26-19, 26-26 
Bull Shoals Lake, AR (SWL) 37-10, 37-18, 30- 
29 
I-3

Burns Waterway Harbor, IN (LRC) 22-4, 
22-17, 22-26 
Burns Waterway SBH, IN (LRC) 22-3, 22-17, 
22-21, 22-26 
Burns Waterway Harbor (Maj. Rehab), IN 
(LRC) 22-3, 22-17, 22-21, 22-26 
Burnsville Lake, Ohio River Basin, WV (LRH) 
25-4, 25-16, 25-22 
Buttermilk Channel, NY (NAN) 2-3, 2-25, 2- 
28, 2-36 
C 
Cache Creek Basin, (Cache Creek Settling 
Basin), CA (SPK) 35-6, 35-39 
Caesar Creek Lake, OH (LRL) 24-7, 24-18 
Cagles Mill Lake, IN (LRL) 24-7, 24-18 
Calabash Creek, Brunswick County SC (SAC) 
7-7, 7-13, 7-19 
Calaveras River and Littlejohn Creek and 
Tributaries, including New Hogan Lake 
and Farmington Dam, CA (SPK) 35-7, 
35-39 
California Bend, NE (NWO) 26-11, 26-23, 26- 
29, 26-47 
Calumet Harbor and River, IL and IN (LRC) 
22-4, 22-17, 22-21, 22-26 
Canaveral Harbor, FL (SAJ) 9-4, 9-40, 9-54, 9- 
87 
Candy Lake, OK (SWT) 38-4, 38-16, 38-24, 
38-28 
Canisteo, NY (NAB) 4-16, 4-31 
Canton Lake, OK (SWT) 38-5, 38-16, 38-24, 
38-28 
Canyon Lake, TX (SWF) 39-5, 39-19, 39-24 
Cape Cod Canal, MA (NAE) 1-4, 1-31, 1-43 
Cape Fear River, Above Wilmington, NC (SAW) 
6-4, 6-21 
Cape Fear River Basin, NC (SAW) 6-9 
Cape Fear River I&D No. 1 Fish Ladder, N.C. 
(CAP Section 1135) (SAW) 6-18, 6-24 
Cape Girardeau-Jackson, MO (MVS) 14-4, 
14-9, 14-12 
Cape Marsh Management Area, Santee 
Coastal Reserve, Charleston, SC (SAC) 
7-9, 7-14, 7-20 
Cape May Inlet to Lower Twp., NJ (NAP) 3-11, 
3-22, 3-30 
Carolina Beach and Vicinity, NC (SAW) 6-11, 
6-23 
Carpenters Bayou, TX (SWG) 40-18 
Carr Creek Lake, KY (LRL) 24-8, 24-18 
Carrabelle Harbor, FL (SAM) 10-10, 10-28, 10- 
35 
Carters Dam and Reservoir, GA (SAM) 10-22, 
10-31, 10-47 
Caseville Harbor, MI (LRE) 21-6, 21-55, 21-74 
Casino Beach, IL (LRC) 22-9, 22-18, 22-24 
Castle Pinkney, Charleston, SC (SAC) 7-8, 7- 
14, 7-20 
Catastrophic Disaster Preparedness Program 
(MVN) 11-9 (MVK) 12-9 (MVS) 14-6 
(MVR) 15-8 (NWK) 27-10 (SAS) 8-10 
Cattaraugus Harbor, NY (LRB) 20-4, 20-15, 
20-24 
Cave Run Lake, KY (LRL) 24-8, 24-18 
Cecil M. Harden Lake, IN (LRL) 24-9, 24-18 
Cedar Bayou, TX (SWG) 40-2, 40-24, 40-31, 
40-52, 40-54 
Cedar Point Seawall Bay, St. Louis, MS (SAM) 
10-17, 10-30, 10-40 
Cedar River Harbor, MI (LRE) 21-7, 21-55, 21- 
74 
Cedar River, Renton, WA (NWS) 29-8, 29-18, 
29-25, 29-30 
Center Hill Lake, Ohio River Basin, TN (LRN) 
23-7, 23-10 
Central and Southern Florida (SAJ) 9-30, 
9-50, 9-76, 9-84, 9-90, 9-91, 9-93 
Channel from Naples to Big Marco Pass, FL 
(SAJ) 9-5, 9-41, 9-54 
Channel Islands Harbor, CA (SPL) 33-2, 
33-13, 33-17, 33-32 
Channel to Bolivar, TX (SWG) 40-4, 40-24 40- 
31, 40-52, 40-54, 40-61 
Channel to Liberty, TX (SWG) 40-13 
Channel to Newport News, VA (NAO) 5-5 
Charles River (Natural Valley Storage Areas), 
MA (NAE) 1-16, 1-36 
Charleston Harbor Rediversion (Fish Lift), SC 
(SAC) 7-3, 7-11, 7-17 
Charleston Harbor, SC (SAC) 7-2, 7-11, 7-16, 
7-23 
Charlevoix Harbor, MI (LRE) 21-7, 21-56, 
21-74 
Charlotte Harbor, FL (SAJ) 9-5, 9-41, 9-54, 9- 
86 
Chaska, MN (MVP) 16-4, 16-15, 16-19, 16-30 
Chatfield Lake, CO (NWO) 26-5, 26-19, 26-26 
I-4

Chatham (Stage) Harbor, MA (NAE) 1-5, 1-32, 
1-44, 1-72 
Chena River Lakes, AK (POA) 32-5, 32-11, 32- 
15 
Cherry Creek Lake, CO (NWO) 26-5, 26-20, 
26-26 
Chesapeake and Delaware Canal, St. Georges 
Bridge Replacement, DE, (NAP) 3-2, 
3-20, 3-25 
Chesapeake Bay Environmental Prog., MD 
(NAB) 4-23, 4-33, 4-40 
Chesapeake Bay Oyster Recovery, MD (NAB) 
4-23, 4-33, 4-40 
Chesapeake Bay Shoreline, VA (NAO) 5-5 
Chetco River, OR (NWP) 28-2, 28-30, 28-37 
Cheyenne River Sioux Tribe (NOW) 26-12, 26- 
23, 26-29, 26-47 
Chicago Harbor, IL (LRC) 22-5, 22-17, 22-22, 
22-26 
Chicago River, IL (LRC) 22-5, 22-18, 22-22, 
22-26 
Chicago River, IL (North Branch) (LRC) 22-11, 
22-19 
Chicago Shoreline, IL (LRC) 22-9, 22-19 
Chief Joseph Dam - Rufus Woods Lake, WA 
(NWS) 29-1', 29-19, 29-26 
Chignik Harbor, AK (POA) 32-2, 32-9, 32-13 
Chincoteague Inlet, VA (NAO) 5-6 
Choctawhatchee and Pea Rivers, FL and AL 
(SAM) 10-18, 10-30, 10-40 
Choctawhatchee and Pea Rivers Elba and 
Geneva Levees, Al (SAM) 10-18, 10-30, 
10-40 
Claiborne Lock and Dam, AL (SAM) 10-3, 
10-27, 10-47 
Clarence J. Brown Dam and Reservoir, OH 
(LRL) 24-9, 24-18 
Clear Creek (SWG) 40-18, 40-27, 40-46 
Clear Creek and Clear Lake (SWG) 40-4, 40- 
24, 40-31, 40-52, 40-54 
Clearwater Lake, MO (SWL) 37-6, 37-17, 37- 
29 
Cleveland Harbor, OH (LRB) 20-4, 20-15, 
20-24 
Clifton, San Francisco River, AZ (SPL) 33-6, 
33-14, 33-22 
Clinton Harbor, CT (NAE) 1-5, 10-32, 10-44, 
1-60 
Clinton Lake, Wakarusa River, KS (NWK) 
27-3, 27-12, 27-16 
Clinton River, MI (LRE) 21-8, 21-56, 21-74 
Clinton River Spillway, MI (LRE) 21-42, 21-70, 
21-86 
Clinton Wastewater Treatment & Plant, 
Clinton, NC (SAW) 6-12, 6-23 
Coastal Wetlands Planning, Protection, and 
Restoration Act (MVN) 11-10 
Cocheco River, NH (NAE) 1-6, 1-32, 1-44 
Cochiti Lake, NM (SPA) 36-5, 36-14, 36-18 
Cohassett Harbor, MA (NAE) 1-6, 1-32, 1-44, 
1-60, 1-72 
Cold Spring Inlet, NJ (NAP) 3-3, 3-20, 3-25 
Colebrook River Lake, CT (NAE) 1-18, 1-36 
Coleman Creek, Little Rock, AR (SWL) 37-14 
Collection and Study of Basic Data 
Alaska District (POA) 32-6 
Albuquerque District (SPA) 36-12 
Baltimore District (NAB) 4-26 
Chicago District (LRC) 22-16 
Detroit District (LRE) 21-52 
Fort Worth District (SWF) 39-17 
Galveston District (SWG) 40-23 
Honolulu District (POH) 31-3 
Jacksonville District (SAJ) 9-36 
Little Rock District (SWL) 37-13 
Los Angeles District (SPL) 33-12 
Louisville District (LRL) 24-15, 24-42 
Memphis District (MVM) 13-3 
Mobile District (SAM) 10-36 
Nashville District (LRN) 23-9 
New England Division (NAE) 1-30 
New York District (NAN) 2-24 
Norfolk District (NAO) 5-15 
Philadelphia District (NAP) 3-19 
Pittsburgh District (LRP) 18-14 
Portland District (NWP) 28-28 
Rock Island District (MVR) 15-8 
Sacramento District (SPK) 35-32 
San Francisco District (SPN) 34-11 
Savannah District (SAS) 8-9 
Seattle District (NWS) 29-14 
St. Paul District (MVP) 16-14 
Tulsa District (SWT) 38-14, 38-31 
Walla Walla District (NWW) 30-12 
Wilmington District (SAW) 6-20 
Colorado River at Grand Junction, CO (SPK) 
35-8, 35-39 
Columbia and Lower Willamette Rivers below 
Vancouver, WA and Portland, OR (NWP) 
28-3, 28-30, 28-37 
I-5

Columbia River at Baker Bay, WA (NWP) 28-4, 
28-30, 28-38 
Columbia River at the Mouth, OR and WA 
(NWP) 28-5, 28-30, 28-38 
Columbia River Basin, Local Flood Protection 
Projects (NWW) 30-2, 30-16 
Columbia River between Chinook, WA and 
Head of Sand Island (NWP) 28-4, 28-30, 
28-38 
Columbia River between Vancouver, WA and 
The Dalles, OR (NWP) 28-5, 28-30, 
28-38 
Columbia River Fish Mitigation Program (The 
Dalles, Project), OR and WA (NWP) 
28-25, 28-35, 28-46 
Columbia River Juvenile Fish Mitigation 
Program (Walla Walla District) (NWW) 
30-4, 30-13, 30-17 
Columbia River, Seafarers Memorial, 
Hammond, OR (NWP) 28-6, 28-30, 
28-39 
Columbia River Treaty Fishing Sites, OR and 
WA (NWP) 28-20, 28-34, 28-44 
Comite River, LA (Diversion) (MVN) 11-5, 11- 
13, 11-17, 11-27 
Conant Brook Dam, MA (NAE) 1-19, 1-36 
Conchas Lake, NM (SPA) 36-2, 36-13 
Conemaugh River Lake, Ohio River Basin, PA 
(LRP) 18-7, 18-16, 18-21 
Conneaut Harbor, OH (LRB) 20-5, 20-15, 
20-27, 20-40 
Connecticut River Basin, VT, NH, MA and CT 
(NAE) 1-17 
Construction of Locks and Dams, Ohio River 
(LRL) 24-2, 24-16 
Construction of Locks and Dams on Ohio 
River (LRH) 25-2 
Construction of Locks and Dams on Ohio 
River (OR) 19-1, 19-5, 19-6, 19-7, 19-8 
Construction of Locks and Dams, Ohio River 
(LRP) 18-2 
Continuing Authorities Program (NWK) 27-9 
Continuation of Planning and Engineering 
Jacksonville District (SAJ) 9-36 
Cook Inlet, AK (POA) 32-2, 32-9, 32-13 
Cooper Creek, Cherry Valley, AR (MVM) 13-1, 
13-4 
Cooper River, Charleston Harbor, SC (SAC) 
7-3, 7-11, 7-17 
Coordination with other Agencies (LRL) 24-15, 
24-42 (SWG) 40-22 (MVM) 13-3 (SAS) 
8-9 
Coos Bay, OR (NWP) 28-6, 28-31, 28-39 
Coosa River, Montgomery to Gadsden, AL 
(SAM) 10-4, 10-27 
Copan Lake, OK (SWT) 38-5, 38-16, 38-24 
Coquille River, OR (NWP) 28-7, 28-31, 28-40 
Coralville Lake, IA (MVR) 15-4, 15 9, 15-13 
Coming, NY (NAB) 4-17, 4-31 
Cornucopia Harbor, WI (LRE) 21-9, 21-56, 
21-75 
Corpus Christi Beach, TX (SWG) 40-15, 
40-27, 40-45 
Corpus Christi Ship Channel, TX (SWG) 40-4, 
40-24, 40-31, 40-51, 40-52, 40-55, 40- 
61 
Corte Madera Creek, CA (SPK) 35-9, 35-46, 
35-49 (SPN) 34-7, 34-23 
Cottage Grove Lake, OR (NWP) 28-13, 28-32, 
28-42 
Cougar Lake, OR (NWP) 28-20, 28-34, 28-44 
Council Grove Lake, KS (SWT) 38-5, 38-16, 
38-24 
Cowanesque Lake, PA (NAB) 4-19, 4-32 
Coyote and Berryessa Creeks, CA (SPK) 35-9, 
35-40, 35-48, 35-53 
Crescent City Harbor, CA (SPN) 34-1, 34-15, 
34-21 
Crisfield Harbor, MD (NAB) 4-5, 4-27, 4-35 
Crooked Creek Lake, Ohio River Basin, PA 
(LRP) 18-8, 18-16, 18-21 
Cross Florida Barge Canal, (SAJ) 9-5, 9-41, 
9-55, 9-87 
Crookston, MN (MVP) 16-4, 16-15, 16-19, 16- 
34 
Cumberland, MD and Ridgeley, WV (NAB) 
4-11, 4-29, 4-38 
Cumberland River, TN and KY (LRN) 23-2, 
23-10, 23-12, 23-16 
Curwensville Lake, PA (NAB) 4-20, 4-32 
Cuttyhunk Harbor, MA (NAE) 1-6, 1-32, 1-44 
Cypress Creek, TX (SWG) 40-19, 40-27, 40-46 
D 
Dade County, FL (SAJ) 9-32, 9-50 
Dade County, North of Haulover Beach, FL 
(SAJ) 9-33, 9-50 
1-6

Dale Hollow Lake, Ohio River Basin, TN and 
KY (LRN) 23-7, 23-10 
Dardanelle Lock and Dam (No. 10), AR (SWL) 
37-11, 37-18, 37-25 
Dauphin Island, AL (SAM) 10-10, 10-28, 10- 
35 
David D. Terry Lock and Dam (No. 6), AR 
(SWL) 37-3, 37-25 
Deauthorization Projects 
New York District (NAN) 2-24, Mobile 
District (SAM) 10-17, 10-45 
Deep Water Slough, WA (NWS) 29-12, 29-20, 
29-27 
Deer Creek Lake, Ohio River Basin, OH (LRH) 
25-4, 25-16, 25-22 
Delaware Coast Cape Henlopen to Fenwick 
Island DE (Dewey/Rehoboth, DE) 3-12, 
3-22, 3-30 
Delaware Coast Protection, DE (NAP) 3-12, 3- 
23, 3-31 
Delaware Lake, Ohio River Basin, OH (LRH) 
25-4, 25-16, 25-22 
Delaware River between Philadelphia, PA and 
Trenton, NJ (NAP) 3-3, 3-20, 3-25 
Delaware River, PA, NJ and DE Philadelphia 
to the Sea (NAP) 3-4, 3-20, 3-26 
Delaware River Mainstem Channel & 
Deepening (NAP) 3-4, 3-20, 3-26 
Depoe Bay, OR (NWP) 28-7, 28-31, 28-40 
DeQueen Lake, AR (SWL) 37-6, 37-16, 37-29 
Des Moines Recreational River and Greenbelt, 
IA (MVR) 15-5, 15-9, 15-13 
Des Plaines River (LRC) 22-12, 22-19, 22-25 
Detroit Lake - Big Cliff, OR (NWP) 28-21, 
28-34, 28-44 
Detroit River, MI (LRE) 21-9, 21-56, 21-75, 
21-91, 21-95 
Dewey Lake, Ohio River Basin, KY (LRH) 25-5, 
25-16, 25-22 
Dickson City (Olyphant) PA (NAB) 4-13, 4-30, 
4-38 
Dierks Lake, AR (SWL) 37-6, 37-17, 37-29 
Dillingham Emergency Bank Stabilization, AK 
(POA) 32-6, 32-12, 32-15 
Dillingham Harbor, AK (POA) 32-2, 32-9, 
32-13 
Dillon Lake, Ohio River Basin, OH (LRH) 25-5, 
25-17, 25-23 
Dog and Fowl Rivers, AL (SAM) 10-11, 10-28, 
10-36 
Dorena Lake, OR (NWP) 28-13, 28-32, 28-42 
Double Bayou, TX (SWG) 40-5, 40-25, 40-33, 
40-55 
Douglas Harbor, AK (POA) 32-3, 32-9, 32-13 
Duck Creek, OH (LRL) 24-3, 24-16, 24-24 
Duluth-Superior Harbor, MN and WI (LRE) 21- 
10, 21-56, 21-76, 21-92 
Dunkirk Harbor, NY (LRB) 20-5, 20-15, 20-27, 
20-40 
Duval County, FL (SAJ) 9-23, 9-48, 9-73 
Dworshak Units 5 and 6, ID (NWW) 30-5, 30- 
13, 30-17, 30-22, 30-24 
E 
East Branch, Clarion River Lake, Ohio River 
Basin, (LRP) 18-8, 18-16, 18-21 
East Brimfield Lake, MA (NAE) 1-27, 1-40 
East Lynn Lake, Ohio River Basin, WV (LRH) 
25-6, 25-17, 25-23 
East Pass Channel from Gulf of Mexico into 
Choctawhatchee Bay, FL (SAM) 10-11, 
10-28, 10-36 
East Rockaway Inlet, NY (NAN) 2-3, 2-28, 
2-33, 2-36 
East Rockaway Inlet to Rockaway Inlet and 
Jamaica Bay, NY (NAN) 2-14, 2-26, 2- 
32, 2-41 
East Sidney, NY (NAB) 4-17, 4-31 
East St. Louis and Vicinity, IL (MVS) 14-4, 
14-9, 14-13 
Eau Gallie Harbor, FL (SAJ) 9-6, 9-41, 9-55 
Ecosystem Restoration Work Under Special 
Authorization (MVS) 14-6, (MVK) 12-8, 
(SAC) 7-9, (MVR) 15-7 
Edward MacDowell Lake, NH (NAE) 1-23, 1-38 
El Dorado Lake, KS (SWT) 38-5, 38-16, 38-24 
El Paso, TX (SPA) 36-3, 36-13, 36-16 
Elk City Lake, KS (SWT) 38-6, 38-17, 38-24, 
38-28 
Elk Creek Lake, Rogue River Basin, OR (NWP) 
28-14, 28-32, 28-42 
Elkins, WV (LRP) 18-4, 18-15, 18-20 
Elmira, NY (NAB) 4-17, 4-31 
Emergency Bank Protection (NAP) 3-14 
Emergency Flood Control Activities 
Norfolk District (NAO) 5-15, Tulsa 
District (SWF) 38-12 
I-7

Emergency Response Activities (NWK) 27-10, 
Memphis District (MVM) 13-3, Los 
Angeles District (SPL) 33-11, (SAC) 7-10 
Emergency Shore Protection (LRE) 21-39 
Emergency Streambank and Shoreline 
Protection Under Special Authorization 
Galveston District (SWG) 40-21 
Savannah District (SAS) 8-7 
Emmett Sanders Lock and Dam (No. 4) (SWL) 
37-3, 37-25 
Enforcement (SAJ) 9-37 
Environmental Activities Under Special 
Authorization (NWP) 28-26 
Environmental Data Studies (SPA) 36-12 
Environmental Improvement Work Under 
Special Authorization (NAP) 3-18 
Erie Harbor, PA (LRB) 20-6, 20-16, 20-28, 20- 
40 
Eufaula Lake, OK (SWT) 38-13, 38-22, 38-26, 
38-28 
Everett Harbor and Snohomish River, WA 
(NWS) 29-2, 29-16, 29-23, 29-34 
Everglades South Florida Ecosystem 
Restoration (SAJ) 9-38, 9-52, 9-80 
F 
Fairfield Vicinity Streams, CA (SPK) 35-10, 
35-40 
Fairport Harbor, OH (LRB) 20-6, 20-16, 20-29, 
20-40 
Fall Creek Lake, OR (NWP) 28-15, 28-32, 28- 
43 
Fall River Basin, SD (NWO) 26-5, 26-20, 26-27 
Fall River Lake, KS (SWT) 38-6, 38-17, 38-24, 
38-28 
Falls Lake, NC (SAW) 6-13, 6-23 
Faulkner Island, CT (NAE) 1-21, 1-37, 1-49 
Fern Ridge Lake, OR (NWP) 28-15, 28-32, 
28-43 
Fernandina Harbor, FL (SAJ) 9-6, 9-41, 9-56 
Ferrells Bridge Dam-Lake O'The Pines, TX 
(SWF) 39-6, 39-19, 39-24 
Fire Island Inlet to Montauk Point, NY (NAN) 
2-14, 2-25, 2-28, 2-33 
Fire Island to Jones Inlet, NY (NAN) 2-15, 2- 
26, 2-32 
Fishtrap Lake, Ohio River Basin, KY (LRH) 
25-6, 25-17, 25-23 
Fivemile River, CT (NAE) 1-7, 1-32, 1-45, 1-61 
Flood Control and Coastal Emergencies 
Mobile District (SAM) 10-25 
Omaha District (NWO) 26-18 
Portland District (NWP) 28-28 
Savannah District (SAS) 8-10 
St. Paul District (MVP) 16-13 
Flood Control Reservoir Operations (NAE) 1-29 
Flood Control Work Under Special 
Authorization 
Alaska District (POA) 32-6 
Albuquerque District (SPA) 36-11 
Baltimore District (NAB) 4-22 
Charleston District (SAC) 7-8, 7-22 
Chicago District (LRC) 22-16 
Detroit District (LRE) 21-45 
Galveston District (SWG) 40-21 
Honolulu District (POH) 31-3 
Huntington District (LRH) 25-13 
Jacksonville District (SAJ) 9-36 
Little Rock District (SWL) 37-9 
Los Angeles District (SPL) 33-11 
Louisville District (LRL) 24-14, 24-39 
Mobile District (SAM) 10-17, 10-21, 10- 
46 
Nashville District (LRN) 23-7, 23-19 
New England Division (NAE) 1-29 
New Orleans District (MVN) 11-9, 11-29 
New York District (NAN) 2-23 
Omaha District (NWO) 26-10 
Philadelphia District (NAP) 3-19 
Pittsburgh District (LRP) 18-13 
Portland District (NWP) 28-18 
Rock Island District (MVR) 15-8, 15-21 
Sacramento District (SPK) 35-30 
San Francisco District (SPN) 34-10 
Savannah District (SAS) 8-7 
St. Louis District (MVS) 14-6, 14-21 
Tulsa District (SWT) 38-12, 38-30 
Vicksburg District (MVK) 12-8 
Wilmington District (SAW) 6-15, 6-32 
Fly Creek, Fairhope, AL (SAM) 10-11, 10-28, 
10-36 
Folly River, SC (SAC) 7-4, 7-11, 7-17 
Formerly Utilized Sites Remedial Action 
Program (FUSRAP) (MVS) 14-7, 14-10 
Fort Gibson Lake, OK (SWT) 38-13, 38-22, 
38-26, 38-28 
Fort Myers Beach, FL (SAJ) 9-7, 9-42, 9-56 9 
86 
I-8

Fort Peck Lake, MT (NWO) 26-14, 26-24, 
26-30 
Fort Pierce Beach, FL (SAJ) 9-24, 9-48, 9-73 
Fort Pierce Harbor, FL (SAJ) 9-7, 9-42, 9-57 
Fort Randall Dam-Lake Francis Case, 
Missouri River Basin, SD (NWO) 26-15, 
26-24, 26-30 
Fort Supply Lake, OK (SWT) 38-6, 38-17, 38- 
24 
Fort Wayne Metro Area, IN (LRE) 21-42, 
21-70, 21-86 
Foster Joseph Sayers Dam, PA (NAB) 4-21, 
4-32 
Four River Basins, FL (SAJ) 9-33, 9-50, 9-78, 
9-84, 9-95, 9-96 
Fourche Bayou Basin, Little Rock, AR (SWL) 
37-6, 37-17 
Fox River, WI (LRE) 21-11, 21-57, 21-76, 21- 
96 
Francis E. Walter Dam, PA (NAP) 3-14, 3-23, 
3-31 
Frankfort Harbor, MI (LRE) 21-12, 21-57, 
21-77 
Franklin Falls Dam, NH (NAE) 1-24, 1-38 
Freeport Harbor, TX (SWG) 40-5, 4-25, 40-33, 
40-52, 40-55, 40-61 
Friday Harbor, WA (NWS) 29-3, 29-16, 29-23 
Fry Creeks, Bixby, OK (SWT) 38-6, 38-17, 
38-24 
G 
Galilee Salt Marsh, RI (NAE) 1-21, 1-37, 1-49 
Galisteo Dam, NM (SPA) 36-6, 36-14, 36-18 
Galveston Harbor and Channel, TX (SWG) 
40-6, 40-25, 40-35, 4-52, 40-56, 40-61 
Garrison Dam-Lake Sakakawea, Missouri 
River Basin, ND (NWO) 26-15, 26-25, 
26-30 
Garrison Dam Major Rehabilitation, Lake 
Sakakawea, ND (NWO) 26-15 
Gathright Dam and Lake Moomaw, VA (NAO) 
5-15 
Gavins Point Dam-Lewis and Clark Lake, 
Missouri River Basin, NE and SD 
(NWO) 26-16, 26-25, 26-30, 26-35 
General Investigations (NWK) 27-10, (NWO) 
26-18, (NPO) 5-12 (NAO) 5-15 
General Regulatory Functions (NWO) 26-18, 
(NWS) 29-15, (MVR) 15-7, (MVK) 12-8, 
(MVM)1 3-3, (MVS) 14-6, (MVN) 11-11, 
(SAC) 7-10, (SAS) 8-10 
General Edgar Jadwin Dam and Reservoir, PA 
(NAP) 3-14, 3-23, 3-31 
George W. Andrews Lock and Dam, AL & GA 
(SAM) 10-5, 10-27 
Georgetown Harbor, SC (SAC) 7-4, 7-12, 7-17 
Gillham Lake, AR (SWL) 37-7, 37-17, 37-29 
Glen Cove, NY (NAN) 2-5, 2-25, 2-28 
Gloucester Harbor and Annisquam River, MA 
(NAE) 1-7, 1-32, 1-45 
Goldsborough Creek, WA (NWS) 29-12, 29-20, 
29-27, 29-35 
Grafton Park River, ND (MVP) 16-5, 16-15, 16- 
19, 16-34 
Grand Forks, ND - East Grand Forks, MN 16- 
5, 16-15, 16-19 
Grand Haven Harbor, MI (LRE) 21-12, 21-57, 
21-77, 21-92 
Grand Isle and Vicinity, LA (MVN) 11-5, 
11-13, 11-17 
Grand Traverse Bay Harobor, MI (LRE) 21-13, 
21-58, 21-77 
Grays Harbor and Chehalis River, WA (NWS) 
29-3, 29-16, 29-23, 29-34 
Grays Harbor, Point Chehalis, WA (NWS) 29- 
14, 29-17, 29-23 
Grayson Lake, KY (LRH) 25-6, 25-17, 25-23 
Great Bend, KS (SWT) 38-6, 38-17, 38-24, 38- 
29 
Great Egg Harbor Inlet and Peck Beach, NJ 
(NAP) 3-13, 3-23, 3-31 
Great Salt Plains Lake, OK (SWT) 38-6, 38-17, 
38-25 
Great Salt Pond, Black Island, RI (NAE) 1-7, 1- 
33,1-45 
Great Sodus Bay Harbor, NY (LRB) 20-6, 20- 
16, 20-29, 20-40 
Green and Barren Rivers, KY (LRL) 24-2, 
24-16, 24-22, 24-31, 24-35 
Green Bay Harbor, WI (LRE) 21-14, 21-58, 
21-77 
Green Harbor, MA (NAE) 1-8, 1-33, 1-45, 1-61 
Green Peter-Foster Lakes, OR (NWP) 28-21, 
28-34, 28-44 
Green River Lake, KY (LRL) 24-9, 24-19 
Greens Bayou, TX (SWG) 40-17 
Greers Ferry Lake, AR (SWL) 37-11, 37-19, 
37-29 
Greiliekville Harbor, MI (LRE) 21-15, 21-58, 
21-78 
I-9

Guadalupe River, CA (SPK) 35-11, 35-40 
Guilford Creek, VA (NAO) 5-6 
Gulf Intracoastal Waterway between 
Apalachee Bay, FL & Mexican Border 
(SAM) 10-12, 10-29, 10-36 (MVN) 11-13 
(SWG) 40-7, 40-25, 40-36, 40-52, 40- 
61 
Gulf of Mexico, Highway 193 Mobile County, 
AL (SAM) 10-18, 10-30, 10-40 
Gulfport Harbor, MS (SAM) 10-12, 10-29, 
10-37 
Gulfside Seawall, Waveland, MS (SAM) 10-18, 
10-30, 10-40 
H 
Hackensack Meadowlands, NJ (NAN) 2-19, 2- 
27, 2-34 
Halls Bayou, TX (SWG) 40-17 
Halstead, KS (SWT) 38-7, 38-17, 38-25, 38-29 
Hamilton County, TN (LRN) 23-5, 23-10 
Hampton Roads, VA (Collection and Removal 
of Drift) (NAO) 5-6 
Hancock Brook Lake, CT (NAE) 1-22, 1-38 
Hansen Dam, CA (SPL) 33-6, 33-14, 33-22 
Harbor Beach Harbor, MI (LRE) 21-15, 21-58, 
21-78 
Harbor of Refuge, Block Island, RI (NAE) 1-8, 
1-33, 1-46 
Harlan County Lake, Republican River, NE 
(NWK) 27-3, 27-13, 27-16, 27-30 
Harrisville Harbor, MI (LRE) 21-15, 21-59, 
21-78 
Harry S. Truman Dam and Reservoir, Osage 
River, MO (NWK) 27-8, 27-15, 27-20, 
27-30 
Hartwell Dam and Lake, GA and SC (SAS) 8-9, 
8-12, 8-19, 8-22 
Heyburn Lake and Polecat Creek, OK (SWT) 
38-7, 38-18, 38-25 
Hidden Dam-Hensley Lake, Fresno River, CA 
(SPK) 35-11, 35-40 
Hidden Lake/Great Marsh, NE (NWO) 26-12, 
26-23, 26-29, 26-47 
Hills Creek Lake, OR (NWP) 28-22, 28-34, 
28-45 
Hillsdale Lake, Big Bull Creek, KS (NWK) 27-4, 
27-13, 27-16, 27-30 
Hodges Village Dam, MA (NAE) 1-27, 1-40 
Holes Creek, Ohio (LRL) 24-3, 24-16, 24-24 
Holland Harbor, MI (LRE) 21-16, 21-59, 21- 
78, 21-92 
Homer Harbor, AK (POA) 32-3, 32-10, 32-13 
Homer Spit Erosion, AK (POA) 32-6, 32-12, 
32-16 
Homme Lake and Dam, ND (MVP) 16-6, 
16-16, 16-19 
Honga River and Tar Bay, MD (NAB) 4-4, 4-27, 
4-35 
Hop Brook Lake, CT (NAE) 1-22, 1-38 
Hopkinton-Everett Lakes, NH (NAE) 1-24, 
1-39 
Hords Creek Lake, TX (SWF) 39-6, 39-16, 39- 
19, 39-25 
Hornell, NY (NAB) 4-18, 4-31 
Housatonic River, CT (NAE) 1-21 
Houston, MN (MVP) 16-6, 16-16, 16-20 
Houston-Galveston Navigation Channels, TX 
(SWG) 40-9, 40-26, 40-39, 40-62 
Houston Ship Channel, TX (SWGO) 40-10, 40- 
26, 40-39, 40-52, 40-56, 40-62 
Howard A. Hanson Dam, WA (NWS) 29-8, 29- 
18, 29-25 
Hudson River at Athens, NY (NAN) 2-6, 2-25, 
2-29, 2-33 
Hudson River, NY (NAN) 2-5, 2-25, 2-28, 2-33, 
2-35, 2-36 
Hugo Lake, OK (SWT) 38-7, 38-18, 38-25 
Hulah Lake, OK (SWT) 38-7, 38-18, 38-25 
Humboldt Harbor and Bay, CA (SPN) 34-2, 34- 
15, 34-24 
Hunting Bayou, TX (SWG) 40-17 
Huron Harbor, OH (LRB) 20-7, 20-16, 20-30, 
20-40 
Hurricane Barrier Operations 
New England Division (NAE) 1-29 
Hyannis Harbor, MA (NAE) 1-8, 1-33, 1-46 
I 
Ice Harbor Lock and Dam - Lake Sacajawea, 
WA (NWW) 30-6, 30-13, 30-18, 30-24, 
30-29 
Illinois and Mississippi Canal, (MVR) IL 15-2, 
15-9 
Illinois Beach State Park, IL (LRC) 22-10, 22 
19, 22-24 
Illinois Waterway, IL (MVS) 14-2 1 
Illinois Waterway, IL and IN (MVR) 15-2, 15-9, 
15-11, 15-18, 15-23 
I-10

Indian River County, FL (SAJ) 9-24, 9-48, 9- 
73 
Indian River Inlet and Bay, DE (NAP) 3-5, 
3-21, 3-27 
Indiana Dunes National Lakeshore, Bank 
Protection, Beverly Shores, IN (LRC) 
22-11, 22-19, 22-24 
Indiana Harbor, IN (LRC) 22-6, 22-18, 22-22, 
22-27 
Indiana Shoreline Erosion, IN (LRC) 22-11, 
22-19, 22-25 
Inland Route, MI (LRE) 21-16, 21-59, 21-78 
Inland Waterway from Delaware River to 
Chesapeake Bay, DE, MD, (NAP) 3-6, 
3-21, 3-27 
Inland Waterway Rehoboth to Delaware Bay, 
DE (NAP) 3-7, 3-21, 3-28 
Inner Harbor Navigation Canal Lock, LA (MVN) 
11-2, 11-13 
Inspection of Completed Beach Erosion 
Control Projects (NAE) 1-15 
Inspection of Completed Flood Control 
Projects 
Alaska District (POA) 32-6 
Albuquerque District (SPA) 36-10 
Baltimore District (NAB) 4-22 
Detroit District (LRE) 21-45 
Fort Worth District, (SWF) 39-14, 39-29 
Galveston District (SWG) 40-21 
Honolulu District (POH) 31-2 
Huntington District (LRH) 25-13, 25-25 
Jacksonville District (SAJ) 9-36 
Kansas City District (NWK) 27-8, 27-15 
Little Rock District (SWL) 37-9 
Los Angeles District (SPL) 33-11 
Louisville District (LRL) 24-14, 24-36 
Mobile District (SAM) 10-21 
Nashville District (LRN) 23-7 
New England Division (NAE) 1-28 
New Orleans District (MVN) 11-9 
New York District (NAN) 2-23 
Omaha District (NWO) 26-10, 26-22 
Philadelphia District (NAP) 3-15 
Pittsburgh District (LRP) 18-13 
Portland District (NWP) 28-18 
Rock Island District (MVR) 15-7, 15-16, 
15-20 
Sacramento District (SPK) 35-30 
San Francisco District (SPN) 34-10, 34- 
26 
Savannah District (SAS) 8-7, 8-12 
Seattle District (NWS) 29-8 
St. Louis District (MVS) 14-6 
St. Paul District (MVP) 16-13 
Tulsa District (SWT) 38-12, 38-29 
Vicksburg District (MVK) 12-8 
Walla Walla District (NWW) 30-2 
Wilmington District (SAW) 6-15 
Inspection of Completed Works (SAC) 7-7, 
(MVM) 13-2 
Inspection of Non-Federal Levees (NAP) 3-15 
Intracoastal Waterway, Caloosahatchee River 
to Anclote River, FL (SAJ) 9-8, 9-42, 9- 
57 
Intracoastal Waterway, Jacksonville to Miami, 
FL (SAJ) 9-8, 9-42, 9-58 
Irondequoit Bay, NY (LRB) 20-7, 20-16, 20-30 
Isabella Lake, Kern River, CA (SPK) 35-12, 
35-41 
J 
J. Edward Roush Lake, IN (LRL) 24-10, 24-19 
J. Percy Priest Dam and Reservoir, Ohio River 
Basin, TN (LRN) 23-8, 23-10 
J. Strom Thurmond Dam and Reservoir, GA 
and SC (Formerly Clarks Hill Lake, GA 
and SC) (SAS) 8-8, 8-13, 8-19, 8-22 
Jackson Hole, WY (NWW) 30-2, 30-13 
Jackson Port, Vicinity of Jackson, AL (SAM) 
10-9, 10-28, 10-35 
Jacksonville Harbor (Mill Cove), FL (SAJ) 9-10, 
9-43, 9-59 
Jacksonville Harbor, FL (SAJ) 9-9, 9-42, 9-58 
Jamaica Bay, NY (NAN) 2-6, 2-25, 2-29, 2-33, 
2-36 
James River, VA (NAO) 5-7 
James W. Trimble Lock and Dam (No. 13) 
(SWL) 37-3, 37-26 
Jemez Canyon Dam, NM (SPA) 36-6, 36-14 
Jennings Randolph Lake, MD and WV (NAB) 
4-11, 4-29, 4-38 
Jim Chapman Lake, TX (SWF) 39-7, 39-19, 
39-25 
Jim Woodruff Lock and Dam, FL & GA (SAM) 
10-23, 10-31, 10-42 
Joe Hardin Lock and Dam (No. 3), AR (SWL) 
37-4, 37-25 
Joe Pool Lake, TX (SWF) 39-7, 39-20, 39-25 
1-11

John Day Lock and Dam - Lake Umatilla, OR 
and WA (NWP) 28-22, 28-34, 28-45, 28- 
58 
John H. Kerr Dam and Reservoir, VA and NC 
(SAW) 6-16, 6-24 
John Martin Reservoir, CO (SPA) 36-3, 36-14 
John Redmond Dam and Reservoir, KS (SWT) 
38-7, 38-18, 38-25 
John W. Flannagan Dam and Reservoir, Ohio 
River Basin, VA (LRH) 25-6, 25-17, 
25-23 
John's Pass, FL (SAJ) 9-11, 9-43, 9-59, 9-86 
Johnstown, PA (LRP) 18-4, 18-15, 18-20 
Jones Creek, VA (NAO) 5-7 
Joseph G. Minish Passaic River Waterfront 
and Historic Area, NJ (NAN) 2-19, 2-27, 
2-34 
K 
Kake Harbor, AK (POA) 32-3, 32-10, 32-13, 
32-17 
Kanawha River, WV (LRH) 25-2, 25-15, 25-22 
Kanopolis Lake, Smoky Hill River, KS (NWK) 
27-4, 27-13, 27-16 
Kaskaskia River, IL (MVS) 14-2, 14-11, 14-16 
Kaw Lake, OK (SWT) 38-8, 38-18, 38-25 
Kaweah and Tule Rivers, including Terminus 
Dam and Success Lake, CA (SPK) 
35-14, 35-41, 35-48 
Kennebunk River, NH (NAE) 1-9, 1-33, 1-46, 
1-61 
Kenosha Harbor, WI (LRE) 21-17, 21-60, 
21-78, 21-93 
Kentucky Lock (LRN) 23-3, 23-10 
Kentucky River, KY (LRL) 24-2, 24-16, 24-35 
Kewaunee Harbor, WI (LRE) 21-18, 21-60, 
21-79 
Keweenaw Waterway, MI (LRE) 21-18, 21-60, 
21-79 
Keystone Lake, OK (SWT) 38-13, 38-22, 38-26 
Kikiaola Small Boat Harbor, Kaui, 
Hawaii(POH) 31-2, 31-5, 31-6 
Kill Van Kull Newark Bay, N.J. & NY (NAN) 
2-7, 2-25, 2-29, 2-33 
Kinzua Dam and Allegheny Reservoir, Ohio 
River Basin, PA and NY, (LRP) 18-8, 
18-16, 18-21 
Kissimmee River Restoration (SAJ) 9-37, 9-79 
Knapps Narrow, MD (NAB) 4-4, 4-27, 4-35 
Knightville Dam, MA (NAE) 1-19, 1-36 
L 
LA-LB Harbor (LA Harbor), CA (SPL) 33-2, 33- 
13, 33-17, 33-27 
Lac La Belle Harbor, MI (LRE) 21-19, 21-61, 
21-79 
Lackawanna River Basin, PA (NAB) 4-12, 
4-29, 4-38 
Lackawawnna River, Olyphant, PA (NAB) 4-13, 
4-29, 4-38 
Lackawanna River, Scranton, PA (NAB) 4-14, 
4-30, 4-39 
LaFarge Lake and Channel Improvement, WI 
(MVP) 16-7, 16-16, 16-20 
LaPointe Harbor, WI (LRE) 21-19, 21-60, 21- 
79 
Lake Ashtabula and Baldhill Dam, Sheyenne 
River, ND (MVP) 16-7, 16-16, 16-20 
Lake Elsinore, CA (SPL) 33-6, 33-14, 33-22 
Lake Erie - Cooley Canal - Lucas, OH (LRB) 
20-11, 20-19 
Lake George, Hobart, IN (LRC) 22-12, 22-19, 
22-25 
Lake Kemp, TX (SWT) 38-8, 38-19, 38-25 
Lake Michigan Diversion (LRC) 22-7, 22-18, 
22-23 
Lake Montauk Harbor, NY (NAN) 2-8, 2-25, 2- 
29, 2-36 
Lake Pontchartrain and Vicinity, LA 
(Hurricane protection) (MVN) 11-6, 
11-13, 11-17 
Lake Pontchartrain Stormwater Discharge 
Project, LA (MVN) 11-7, 11-14, 11-17 
Lake St. Clair, MI, Channels in (LRE) 21-19, 
21-61, 21-80 
Lake Texoma (Denison Dam) OK and TX (SWT) 
38-13, 38-22, 38-26 
Lake Washington Ship Channel, WA (NWS) 
29-4, 29-17, 29-20, 29-24, 29-27 
Lake Wichita, Holliday Creek, TX (SWT) 38-8, 
38-19, 38-25 
Larose to Golden Meadow, LA (Hurricane 
protection) (MVN) 11-8, 11-14, 11-18 
Las Cruces, NM (SPA) 36-4, 36-14, 36-16 
Laurel River Lake, Ohio River Basin, KY (LR) 
23-8 
Lavon Lake, TX (SWF) 39-8, 39-20, 39-25 
1-12

Lavon Lake Modification and East Fork 
Channel Improvement, TX (SWF) 39-8, 
39-20, 39-25 
Lee County, FL (SAJ) 9-25, 9-48, 9-74 
Leland Harbor, MI (LRE) 21-20, 21-61, 21-80 
LeSueur River CSAH 28, Blue Earth County, 
MN (MVP) 16-8, 16-17, 16-20 
Levisa and Tug Forks of the Big SACdy and 
Cumberland Rivers, KY, WV and VA 
(LRH) 25-7, 25-17, 25-23 
Lewisville Dam, TX (SWF) 39-9, 39-20, 39-25 
Lexington Harbor, MI (LRE) 21-20, 21-61, 
21-80 
Libby Dam - Lake Koocanusa, MT (NWS) 
29-11, 29-20, 29-26 
Lisle, NY (NAB) 4-18, 4-31 
Little Blue River Lakes, MO (NWK) 27-4, 
27-13, 27-18 
Little Calumet River Basin, Cady Marsh Ditch, 
IN (LRC) 22-13, 22-20, 22-25 
Little Calumet River, IN (LRC) 22-13, 22-19, 
22-25 
Little Dell Lake, UT, CA (SPK) 35-15, 35-41 
Little Falls Dam Passage #2, MD (NAB) 4-23, 
4-33, 4-40 
Little Goose Lock and Dam - Lake Bryan, WA 
(NWW) 30-7, 30-13, 30-18, 30-25, 30-29 
Little Harbor, NH (NAE) 1-9, 1-33, 1-46 
Little Lake Harbor, MI (LRE) 21-21, 21-62, 
21-80 
Little River Basin, AR (SWL) 37-7, 37-29 
Little River Inlet, NC and SC (SAC) 7-5, 7-12, 
7-18 
Little Sugar Creek Aquatic Ecosystem 
Restoration, N.C. (CAP Section 206) 
(SAW) 6-19, 6-24 
Little Sugar Creek Habitat Restoration, N.C. 
(CAP Section 1135) (SAW) 6-18, 6-24 
Little White Oak Bayou, TX (SWG) 40-18 
Little Wicomico River, VA (NAB) 4-5, 4-27, 4- 
35 
ittleville Lake, MA (NAE) 1-19, 1-36 
Lock and Dam No. 5, AR (SWL) 37-4, 37-25 
Lock Haven, PA (NAB) 4-12, 4-29, 4-38 
Lock No. 2 and Wilber D. Mills Dam (No. 2), 
AR (SWL) 37-4, 37-25 
Lockwoods Folly River, NC (SAW) 6-4, 6-21 
Logan Creek, Pender, NE (NWO) 26-6, 26-20, 
26-27 
Long Branch Lake, Little Chariton River, MO 
(NWK) 27-5, 27-13, 27-18 
Long Road, Chehalis River, WA (NWS) 29-8, 
29-18, 29-25, 29-35 
Longboat Pass, FL (SAJ) 9-11, 9-43, 9-59, 9- 
86 
Lookout Point-Dexter Lakes, OR (NWP) 28-23, 
28-35, 28-45 
Lorain Harbor, OH (LRB) 20-7, 20-17, 20-30, 
20-40 
Los Angeles County Drainage Area, CA (SPL) 
33-7, 33-14, 33-22 
Los Angeles River Sepulveda to Arroyo Seca 
Recreation Development, CA (SPL) 33-7, 
33-14, 33-23 
Lost Creek Lake, Rogue River, OR (NWP) 
28-24, 28-35, 28-45 
Loves Park, IL (MVR) 15-5, 15-9, 15-13 
Lower Columbia River Basin Bank Protection, 
OR and WA (NWP) 28-15, 28-32, 28-43 
Lower Decatur, NE (NWO) 26-12, 26-23, 26- 
29, 26-47 
Lower Girard Dam, OH (LRP) 18-9, 18-16 
Lower Granite Lock and Dam, WA (NWW) 
30-7, 30-13, 30-18, 30-26, 30-29 
Lower Monumental Lock and Dam - Lake 
Herbert G. West, WA (NWW) 30-8, 
30-13, 30-19, 30-27, 30-29 
Lower Rio Grande Basin, TX (SWG) 40-19, 
40-27, 40-46 
Lower Savannah River Basin GA & SC (SAS) 
8-3, 8-11, 8-16 
Lower Snake River Fish and Wildlife 
Compensation Plan, WA, OR and ID 
(NWW) 30-9, 30-14, 30-18 
Loyalhanna Lake, Ohio River Basin, PA (LRP) 
18-9, 18-16, 18-22 
Lucky Peak Lake, ID (NWW) 30-3, 30-13 
Ludington Harbor, MI (LRE) 21-21, 21-62, 
21-80 
Lynn Harbor, MA (NAE) 1-10, 1-34, 1-46, 1-61 
Lynnhaven Inlet VA (NAO) 5-8 
Maalaea Harbor, Maui, HI (POH) 31-2, 31-5, 
31-6 
Mahoning Creek Lake, Ohio River Basin, PA 
(LRP) 18-9, 18-16, 18-22, 18-32 
1-13

Maintenance and Repair Fleet and Marine 
Terminals, AR (SWL) 37-5 
Mamaronek Harbor, NY (NAN) 2-8, 2-26, 2-29, 
2-33, 2-36 
Manasquan River, NJ (NAP) 3-7, 3-22, 3-29 
Manatee County, FL (SAJ) 9-28, 9-48, 9-74 
Manatee Harbor, FL (SAJ) 9-11, 9-43, 9-59 
Manistee Harbor, MI (LRE) 21-22, 21-62, 
21-80 
Manistique Harbor, MI (LRE) 21-22, 21-63, 
21-81 
Manitowoc Harbor, WI (LRE) 21-23, 21-63, 
21-81, 21-93 
Mansfield Hollow Lake, CT (NAE) 1-27, 1-40 
Manteo (Shallowbag) Bay, NC (SAW) 6-5, 6-21 
Marina Del Rey, CA (SPL) 33-2, 33-13, 33-19, 
33-32 
Marion Reservoir, KS (SWT) 38-8, 38-19, 
38-25 
Marquette Harbor, MI (LRE) 21-24, 21-63, 21- 
81 
Marshall, MN (MVP) 16-8, 16-17, 16-22 
Martin County, FL (SAJ) 9-26, 9-49, 9-75 
Martins Fork Lake, KY (LRN) 23-6, 23-10 
Martis Creek Lake, Martis Creek, NV and CA 
(SPK) 35-16, 35-41 
Massillon, OH, (LRH) 25-7, 25-17, 25-23 
Matagorda Ship Channel, TX (SWG) 40-11, 
40-26, 40-40, 40-56, 40-63 
Mayaguez Harbor, PR (SAJ) 9-12, 9-44, 9-60 
McClellan-Kerr Arnkansas River Navigation 
System, OK (SWT) 38-2, 38-15, 38-24 
McCook and Thorton Reservoirs, IL (LRC) 
22-14, 22-20, 22-25 
McGrath Creek, Wichita Falls, TX (SWT) 38-8, 
38-19, 38-25 
McNary Lock and Dam - Lake Wallula, OR and 
WA (NWW) 30-9, 30-14, 30-18, 
30-27 
Melbourne Harbor, FL (SAJ) 9-12, 9-44, 9-60 
Melvern Lake, Marais des Cygnes (Osage) 
River, KS (NWK) 27-5, 27-13, 
27-18, 27-26 
Menominee Harbor and River, MI and WI 
(LRE) 21-24, 21-63, 21-81 
Meramec River Basin Valley Park, MO (MVS) 
14-5, 14-9, 14-13 
Merced County Stream Group, CA (SPK) 
35-18, 35-42, 35-58 
Merced County Streams, CA (SPK) 35-17, 
35-42 
Merrimack River Basin, NH and MA (NAE) 
1-23 
Metlakatla Harbor, AK (POA) 32-4, 32-10, 
32-14 , 32-19 
Miami Harbor, FL (SAJ) 9-12, 9-44, 9-60 
Michael J. Kirwan Dam and Reservoir, Ohio 
River Basin, OH (LRP), 18-9, 
18-16, 18-22, 18-24 
Michigan City Harbor, IN (LRC) 22-8, 22-18, 
22-23, 22-27 
Middle Rio Grande Flood Protection, Bernalillo 
to Belen, NM (SPA) 36-7, 37-14, 
36-17 
Middlesboro, Cumberland River Basin, KY 
(LRN) 23-6, 23-10 
Milford Lake, Republican River, KS (NWK) 
27-5, 27-13, 27-18, 27-30 
Milk River, Matta, MT (NWO) 26-6, 26-20, 26- 
27 
Mill Creek, Bennington Lake, WA (NWW) 30-3, 
30-13, 30-17 
Mill Creek, OH (LRL) 24-4, 24-16, 24-35 
Mill Creek, Fort Smith, AR (SWL) 37-7, 37-17 
Miller Corner Phragmites Control, SC (SAC) 7- 
10, 7-14, 7-20 
Millers Ferry Lock and Dam, AL (SAM) 10-23, 
10-32, 10-47 
Millwood Lake, AR (SWL) 37-7, 37-17, 37-29 
Milwaukee Harbor, WI (LRE) 21-25, 21-64, 21- 
82, 21-93 
Mingo Creek, OK (SWT) 38-9, 38-19, 38-25, 
38-29 
Miscellaneous Work Under Special 
Authorization 
San Francisco District (SPN) 34-11 
Walla Walla District (NWW) 30-10 
Mississinewa Lake, IN (LRL) 24-10, 24-19 
Mississippi River Between Missouri and 
Minneapolis, MN (MVS) 14-2 
Mississippi River Between the Missouri River 
and Minneapolis, MN (MVR) 153 
Mississippi River Between the Missouri River 
and Minneapolis, MN (MVP) 16-2 
Mississippi River between Ohio and Missouri 
Rivers, MO and IL (MVS) 14-2, 
14-9, 14-11 2 
Mississippi River-Gulf Outlet, LA (MVN) 11"' 
11-13, 11-15 
1-14

Mississippi River Main Stem Model 
Development (NWK) 27-10, 27- 
15 
Mississippi River Ship Channel, Gulf to Baton 
Rouge, LA (MVN) 11-3, 11-13, 
11-16 
Missouri National Recreational River, NE and 
SD (NWO) 26-6, 26-20, 26-27 
Missouri River Basin Colloboration Effort 
(NWK) 27-10, 27-15 
Missouri River Between Ft. Peck Dam, MT and 
Gavins Point Dam, SD & NE 
(NWO) 26-16, 26-25, 26-31 
Missouri River Fish and Wildlife Mitigation, IA, 
NE, KS and MO (NWK) 27-2, 
27-12, 27-16, (NWO) 26-13, 26- 
24, 26-30, 26-47 
Missouri River, Kenslers Bend, NE to Sioux 
City, IA (NWO) 26-7, 26-21, 
26-27 
Missouri River Levee System, IA, NE, KS and 
MO (Kansas City District) (NWK) 
27-6, 27-14, 27-18, 27-30 
Missouri River Master Water Control Manual 
Review and Update (NWO) 26-17, 
26-25, 26-31 
Missouri River, Sioux City, IA to Rulo, NE 
(NWO) 26-3, 26-19, 26-26, 26-38 
(NWK) 27-2, 27-12, 27-16 
Mitigation of Shore Damages 
Detroit District (LRE) 21-40 
Mobile Harbor, AL (SAM) 10-13, 10-29, 10-37 
Mojave River Dam, Mojave River Basin, CA 
(SPL) 33-7, 33-15, 33-23 
Molly Ann's Brook, NJ (NAP) 3-15, 3-23, 3-32 
Monongahela River, PA and WV (LRP) 18-2, 
18-15, 18-19, 18-30, 18-31, 18- 
32 
Monroe Harbor, MI (LRE) 21-26, 21-64, 21-82 
Monroe Lake, IN (LRL) 24-11, 24-19 
Moorefield, WV (NAB) 4-12, 4-29, Moravian 4-38 Creek, Wilkesboro, NC (SAW) 6-12, 
6-23 
Morehead City Harbor, NC (SAW) 6-6, 6-21 
Morgan Point Bendway Closure Structure 
(SWL) 37-14 
Morro Bay Harbor, CA (SPL) 33-3, 33-13, 
33-19 
Mosquito Creek Lake, Ohio River Basin, OH 
(LRP) 18-10, 18-16, 18-22, 18-24 
Mount Morris Lake, NY Genesee River (LRB) 
20-13, 20-19, 20-31 
Mt. St. Helens Sediment Control, WA (NWP) 
28-16, 28-32, 28-43 
Mud Mountain Dam, WA (NWS) 29-9, 29-19, 
29-25 
Multiple Purpose Projects Including Power 
(SAC) 7-9 
Murderkill River, DE (NAP) 3-7, 3-21, 3-28 
Murray Lock and Dam (No. 7), AR (SWL) 37-4, 
37-25 
Murrells Inlet, SC (SAC) 7-5, 7-12, 7-18 
Muscatine Island, IA (MVR) 15-7, 15-10, 15- 
14 
Muskegon Harbor, MI (LRE) 21-26, 21-64, 
21-82 
Muskingum River Lakes, OH (LRH) 25-8, 
25-18, 25-24, 25-26 
Myrtle Beach, SC (SAC) 7-7, 7-13, 7-20, 7-27 
N 
Nandua Creek (NAO) 5-8 
Nanticoke River, DE & MD (NAB) 4-5, 4-27, 4- 
35 
Napa River, CA (SPK) 35-18 
Narrows & Lake Champlain, NY (NAN) 2-9, 2- 
25, 2-29, 2-33 
Nassau County, FL (SAJ) 9-26, 9-49, 9-75 
Nathan's Lake (NOW) 26-13, 26-24, 26-30, 
26-47 
National Emergency Preparedness 
Buffalo District (LRB) 20-13 
Chicago District (LRC) 22-9 
Mobile District (SAM) 10-25 
Omaha District (NWO) 26-18 
Philadelphia District (NAP) 3-16 
St. Paul 16-13 
Seattle District (NWS) 29-15 
Naugatuck River, Torrington, CT (NAE) 1-22, 
1-38, 1-49 
Navarro Mills Lake, TX (SWF) 39-9, 39-20, 39- 
25 
Navigation Projects on which Reconnaissance 
and Condition Surveys only were 
Conducted during Period (SAJ) 
9-22 
Navigation Work Under Special Authorization 
Baltimore District (NAB) 4-9 
Charleston District (SAC) 7-6 
1-15

Detroit District (LRE) 21-38 
Galveston District (SWG) 40-15 
Honolulu District (POH) 31-2 
Jacksonville District (SAJ) 9-22 
Louisville District (LRL) 24-3 
Little Rock District (SWL) 37-5 
Mobile District (SAM) 10-17, 10-45 
Nashville District (LRN) 23-4 
New Orleans District (MVN) 11-4 
New York District (NAN) 2-14 
Omaha District (NWO) 26-3 
Philadelphia District (NAP) 3-19 
Portland District (NWP) 28-12 
San Francisco District (SPN) 34-7 
Savannah District (SAS) 8-5 
St. Louis District (MVS) 14-3 
Vicksburg District (MVK) 12-3 
Neabsco Creek, MD (NAB) 4-13, 4-29, 4-38 
Neal Sound, MD (NAB) 4-5, 4-27, 4-35 
Neches River and Tributaries Saltwater 
Barrier at Beaumont, TX (SWG) 
4-12, 40-26, 40-41, 40-52, 40- 
57, 40-63 
Neuse River Basin, NC (SAW) 6-13, 6-35 
New Bedford & Fairhaven Harbor, MA (NAE) 
1-10, 1-34, 1-47, 1-61 
New Bedford, Fairhaven, and Acushnet, MA 
(NAE) 1-24, 1-39 
New Buffalo Harbor, MI (LRE) 21-27, 21-65, 
21-82 
New Jersey Intracoastal Waterway (NAP) 3-8, 
3-21, 3-28 
New Madrid County Harbor, MO (MVM) 13-1, 
13-4 
New Melones Lake, CA (SPK) 35-31 
New Orleans to Venice, LA (Hurricane 
protection) (MVN) 11-7, 11-14, 
11-18 
New Pass, Sarasota, FL (SAJ) 9-13, 9-44, 9-62 
New York and New Jersey Channels (NAN) 2- 
11, 2-26, 2-31 
New York City Watershed, NY (NAN) 2-20, 2- 
27, 2-34 
New York Harbor and Adjacent Channels (Port 
Jersey) (NAN) 2-9, 2-26, 2-29 
New York Harbor-Collection and Removal of 
Drift (NAN) 2-10, 2-26, 2-30 
New York Harbor-Entrance Channels and 
Anchorage Areas (NAN) 2-10, 
2-26, 2-30 
New York State Canal System (LRB) 20-12, 
20-19, 20-31 
Newark, OH (LRH) 25-7, 25-14, 25-18, 25-24, 
25-30 
Newport Bay Harbor, CA (SPL) 33-3, 33-13, 
33-19, 33-27, 33-32 
Newport News Creek, VA (NAO) 5-8 
Nimrod Lake, AR (SWL) 37-8, 37-17, 37-28 
Nimrod Fisheries Restoration (SWL) 37-14 
Ninilchik Harbor, AK (POA) 32-4, 32-10, 32-14 
Nishnabotna River, Hamburg, IA (NWO) 26-7, 
26-21, 26-27 
Nogales Wash, AZ (SPL) 33-8, 33-15, 33-23 
Nolin Lake, KY (LRL) 24-11, 24-19 
Norco Bluffs, CA (SPL) 33-8, 33-15, 33-23 
Norfolk Harbor and Channels, VA (NAO) 5-8 
Norfolk Lake, AR (SWL) 37-11, 37-19, 37-29 
Norrel Lock and Dam (No. 1) and Entrance 
Channel, AR (SWL) 37-4, 37-25 
North Branch, Chicago River, IL (LRC) 22-14, 
22-20, 22-25 
North Branch of Kokosing River Lake, OH 
(LRH) 25-8, 25-14, 25-18, 25-24 
North Fork of Pound River Lake, VA (LRH) 
25-9, 25-18, 25-24 
North Hartland Lake, VT (NAE) 1-19, 1-37 
North Nashua River, Lancaster, PA (NAE) 1- 
24, 1-39, 1-49 
North Springfield Lake, VT (NAE) 1-29, 1-37 
Northeast River, MD (NAB) 4-6, 4-27, 4-36 
Northfield Brook Lake, CT (NAE) 1-22, 1-38 
Nutwood Drainage and Levee District, IL 
(MVS) 14-5, 14-14, 14-18, 14-23 
O 
O.C. Fisher Dam and Lake, TX (SWF) 39-9, 
39-20, 39-26 
Oahe Dam-Lake Oahe, Missouri River Basin, 
SD and ND (NWO) 26-16, 26-25, 
26-30, 26-36 
Oak Orchard, NY (LRB) 20-8, 20-19, 20-32 
Oakland Harbor, CA (SPN) 34-3, 34-15, 34-22 
Ocean City Harbor and Inlet and Sinepuxent 
Bay, MD (1954 River & Harbor 
Act) (NAB) 4-6, 4-27, 4-36 
Oceanside Harbor, CA (SPL) 33-3, 33-13, 
33-19, 33-32 
Oceanside Harbor Sand By-Pass, CA (SPL) 33" 
4, 33-13, 33-19 
1-16

Oconto Harbor, WI (LRE) 21-27, 21-65, 21-83 
O'Hare Reservoir, IL (LRC) 22-15, 22-20, 22- 
25 
Ohio River Basin 
Huntington District (LRH) 25-9, 25-18 
Louisville District (LRL) 24-11, 24-19, 
24-22 
Nashville District (LRN) 23-6, 23-13, 23- 
18 
Pittsburgh District (LRP) 18-10, 18-16, 
18-22, 18-24, 18-32 
Ohio River Flood Protection (LRL) 24-4, 24-16 
Okatibbee Lake, MS (SAM) 10-19, 10-31, 10- 
40 
Okeechobee Waterway, FL (SAJ) 9-13, 9-44, 
9-62, 9-88 
Oklawaha River, FL (SAJ) 9-14, 9-44, 9-62 
Oliver Lock and Dam (Replacement), AL (SAM) 
10-9, 10-28, 10-35 
Olympia Harbor, WA (NWS) 29-5, 29-17, 
29-24 
Onandaga Storm Water Discharge (LRB) 
20-13, 20-20 
Ontonagon Harbor, MI (LRE) 21-28, 21-65, 
21-83, 21-93 
Oologah Lake, OK (SWT) 38-9, 38-19, 38-25, 
38-28 
Open Channel Work, Licking River, KY (LRL) 
24-2, 24-16 
Open Channel Work, Ohio River (LRH) 25-3, 
(ORD) 19-4, 19-5, 19-6 (LRP) 18- 
3, (LRL) 24-3 
Optima Lake, OK (SWT) 38-9, 38-20, 38-25 
Oswego Harbor, NY (LRB) 20-8, 20-17, 20-31, 
20-41 
Other Aquatic Habitat (Sec. 204) (SAM) 10-25 
Other Authorized Beach Erosion Projects 
Chicago District (LRC) 22-11, 22- 
28 
Jacksonville District (SAJ) 9-30 
Mobile District (SAM) 10-17, 10- 
43 
New York District (NAN) 2-19 
Other Authorized Bridge Alterations (LRC) 
22-9, 22-28 
Other Authorized Flood Control Projects 
Albuquerque District (SPA) 36- 
11, 36-18 
Charleston District (SAC) 7-8, 7- 
22 
Chicago District (LRC) 22-16, 22- 
28 
Detroit District (LRE) 21-45 
Fort Worth District (SWF) 39-14, 
39-29 
Jacksonville District (SAJ) 9-36 
Little Rock District (SWL) 37-9, 
37-23 
Louisville District (LRL) 24-14, 
24-27 
Mobile District (SAM) 10-17, 
10-21, 10-44 
New York Division (NAN) 2-23 
Pittsburgh District (LRP) 18-13 
Rock Island District (MVR) 15-7, 
15-21 
Savannah District (SAS) 8-7, 8- 
21 
Seattle District (NWS) 29-10 
Tulsa District (SWT) 38-12 
Other Authorized Navigation Projects 
Charleston District (SAC) 7-6 
Detroit District (LRE) 21-38 
Huntington District (LRH) 25-3, 
25-26 
Jacksonville District (SAJ) 9-22 
Little Rock District (SWL) 37-5, 
37-22 
Louisville District (LRL) 24-3, 24- 
26 
Mobile District (SAM) 10-17, 10- 
43 
New York District (NAN) 2-14 
Pittsburgh District (LRP) 18-4 
Rock Island District (MVR) 15-4, 
15-17 
Savannah District (SAS) 8-5, 8- 
30 
Seattle District (NWS) 29-17 
Tulsa District (SWT) 38-2 
Other Authorized Shore Protection Projects 
Charleston District (SAC) 7-7, 7- 
21 
Other Programs and Activities (MVS) 14-6 
(SAS) 8-10 
Other Work Under Special Authority 
Albuquerque District (SPA) 36-12 
St. Paul District (MVP) 16-13 
Sacramento District (SPK) 35-34 
Otter Brook Lake, NH (NAE) 1-20, 1-37 
1-17

Ouachita and Black Rivers below Camden, AR 
(MVK) 12-2, 12-9, 12-11 
Ouachita River and Tributaries, AR and LA 
(MVK) 12-5, 12-12 
Ouachita River Levees, LA (MVK) 12-4, 12-10, 
12-18 
Owasco Outlet, Auburn, NY (LRB) 20-9, 20- 
17, 20-33 
Oxford, NY (NAB) 4-18, 4-31 
Oyster Channel, VA (NAO) 5-10 
Ozark-Jeta Taylor Lock and Dam (No. 12), AR 
(SWL) 37-12, 37-19, 37-26 
P 
Paint Creek Lake, Ohio River Basin, OH (LRH) 
25-10, 25-19, 25-24 
Painted Rock Dam (Gila River), AZ (SPL) 33-8, 
33-15, 33-23 
Paintsville Lake, KY (LRH) 25-10, 25-19, 25- 
24 
Pajaro River, CA (SPK) 35-19, 35-42 
Palm Beach County, FL (SAJ) 9-27, 9-49, 9-75 
Palm Beach Harbor, FL (SAJ) 9-15, 9-45, 9-63 
Palm Beach Island, FL (SAJ) 9-28, 9-49, 4-75 
Palm Valley Bridge, FL (SAJ) 9-15, 9-45, 9-63 
Panama City Harbor, FL (SAM) 10-13, 10-29, 
10-38 
Papillion Creek and Tributaries Lakes, NE 
(NWO) 26-7, 26-21, 26-27 
Parker Creek, VA (NAO) 5-10 
Parker Lake, OK (SWT) 38-9, 38-20, 38-25 
Pascagoula Harbor, MS (SAM) 10-14, 10-29, 
10-38 
Passaic River Basin, N.J. & NY (NAN) 2-20, 2- 
27, 2-34 
Pat Mayse Lake, TX (SWT) 38-10, 38-20, 
38-25 
Patchogue River, CT (NAE) 1-7, 1-25 
Patoka Lake, IN (LRL) 24-11, 24-20 
Pearl River Basin, MS and LA (MVK) 12-5, 12- 
10, 12-13 
Pearl River, Slidell, St. Tammany Parish, LA 
(MVK) 12-6, 12-10, 12-13 
Pearson-Skubitz Big Hill Lake, KS (SWT) 38- 
10, 38-20, 38-25 
Pebble Creek, Scribner, NE (NWO) 26-7, 
26-21, 26-27 
Pensacola Harbor, FL (SAM) 10-15, 10-29, 10- 
39 
Pentwater Harbor, MI (LRE) 21-28, 21-65, 
21-83, 21-93 
Perdido Pass Channel, AL (SAM) 10-15, 10-29, 
10-39 
Permit Evaluation (SAJ) 9-37 
Perry Creek, IA (NWO) 26-8, 26-21, 26-27, 26- 
29 
Perry Lake, Delaware River, KS (NWK) 27-6, 
27-14, 27-18, 27-30 
Petaluma River, Petaluma, CA (SPN) 34-8, 34- 
15, 34-24 
Petersburg, WV (NAB) 4-13, 4-30, 4-39 
Petoskey Harbor, MI (LRE) 21-29, 21-65, 21- 
* 83 
Philpott Lake, VA (SAW) 6-16, 6-24 
Pick-Sloan Missouri Basin Program (Kansas 
City District) (NWK) 27-6, 27-18 
Pick-Sloan Missouri River Basin Program 
(Omaha District) (NWO), 26-8, 
26-28, 26-39 
Pierre, SD (NWO) 26-17, 26-25, 26-31 
Pine and Mathews Canyons Dams, Colorado 
River Basin, NV (SPL) 33-8, 
33-15, 33-24 
Pine Bluff Wetland Restoration, AR (SWL) 37- 
15 
Pine Creek Lake, TX (SWT) 38-10, 38-19, 38- 
42 
Pine Flat Lake and Kings River, CA (SPK) 
35-19, 35-42 
Pinellas County, FL (SAJ) 9-28, 9-49, 9-76 
Pipestem Lake, ND (NWO) 26-8, 26-22, 26-28 
Planning, Engineering and Design (NAE) 1-30 
Plymouth Harbor, MA (NAE) 1-10, 1-34, 1-47 
Point Beach, Milford, CT (NAE) 1-15, 1-35, 1- 
48 
Point Lookout Harbor, MI (LRE) 21-29, 21-66, 
21-83 
Pomme de Terre Lake, Pomme de Terre River, 
MO (NWK) 27-6, 27-14, 27-19, 
27-30 
Pomona Lake, One Hundred Ten Mile Creek, 
KS (NWK) 27-7, 27-14, 27-19, 
27-30 
Ponce de Leon Inlet, FL (SAJ) 9-16, 9-45,9-64 
Ponce Harbor, PR (SAJ) 9-16, 9-45, 9-64, 9-86 
Pond Creek, KY (LRL) 24-4, 24-16, 24-24 
Pool 8 Pilot Drawd Own, WI (MVP) 16-9, 16- 
17, 16-20 
Poplar Island, MD (NAB) 4-24, 4-33, 4-40 
1-18

Port Everglades Harbor, FL (SAJ) 9-17, 9-45, 
9-64 
Port Fourchon, LA (MVN) 11-3, 11-13, 11-16 
Port Hueneme, CA (SPL) 33-4, 33-13, 33-19, 
30-32 
Port of Long Beach, CA (SPL) 33-3, 33-13, 33- 
19 
Port Orford, OR (NWP) 28-8, 28-31, 28-40 
Port Royal Harbor, SC (SAC) 7-5, 7-12, 7-19 
Port Sanilac Harbor, MI (LRE) 21-29, 21-66, 
21-83 
Port Washington Harbor, WI (LRE) 21-30, 
21-66, 21-83 
Port Wing Harbor, WI (LRE) 21-30, 21-67, 21- 
84 
Portage Lake Harbor, MI (LRE) 21-31, 21-67, 
21-84 
Portage, WI (MVP) 16-10, 16-17, 16-20 
Porter Levee, WA (NWS) 29-12, 29-20, 29-27 
Portland Harbor, ME (NAE) 1-11, 1-34 
Portsmouth Harbor and Piscataqua River, NH 
& ME (NAE) 1-11, 1-34 
Portugues and Bucana Rivers, PR (SAJ) 9-34, 
9-51, 9-78 
Potomac and Anacostia Rivers, DC, Collection 
and Removal of Drift (NAB) 4-7, 
4-28, 4-36 
Potomac River - Aquatic Plant Control, MD, 
VA, DC (NAB) 4-7, 4-27, 4-36 
Potomac River at Mt. Vernon, VA (NAB) 4-7, 4- 
28, 4-36 
Potomac River below Washington, DC (NAB) 4- 
7, 4-28, 4-36 
Preconstruction Engineering and Design - See 
Advance Engineering and Design 
Preservation of Natural Flood Storage, Passaic 
River, NJ (NAN) 2-21, 2-27, 2-34 
Presque Isle Peninsula, Erie, PA (LRB) 20-12, 
20-19, 20-33 
Prevention of Obstructions and Injurious 
Deposits, Baltimore Harbor, MD 
(NAB) 4-7, 4-28, 4-36 
Proctor Lake, TX (SWF) 39-10, 39-21, 39-26 
Project Condition Surveys 
Portland District (NWP) 28-12 
Seattle District (NWS) 29-5 
Project Modifications for Improvement of 
Environment (SAS) 8-7 (SWG) 
40-22 (LRE) 21-41, (SAM) 10-25, 
(LRP) 18-14 
Prompton Lake, PA (NAP) 3-16, 3-24, 3-32 
Protection of Navigation (MVN) 11-10 
Providence River and Harbor, RI (NAE) 1-12, 
1-34, 1-47, 1-62 
Puget Creek, WA (NWS) 29-13, 29-20, 29-27 
Puget Sound and its Tributary Waters, WA 
(NWS) 29-5, 29-17, 29-24 
Punxsatawney, Ohio River Basin, PA (LRP) 
18-5, 18-15, 18-20 
Put-In-Bay Harbor, OH (LRB) 20-9, 20-17, 20- 
33, 20-44
Q 
Quillayute River, WA (NWS) 29-5, 29-17, 
29-24 
Quonset Point, Davisville, RI (NAE) 1-25, 1-39, 
1-49 
R 
R.D. Bailey Lake, WV (LRH) 25-10, 25-19, 
25-24 
Rampano at Oakland, NJ (NAN) 2-21, 2-27, 2- 
34 
Raritan Bay and Sandy Hook, NJ (NAN) 2-17, 
2-26, 2-32 
Raritan River, NY (NAN) 2-12, 2-26, 2-31 
Raritan River Basin, Greenbook Sub-Basin, 
NJ (NAN) 2-22, 2-27, 2-34 
Raritan River to Arthur Kill Cutoff Channel, 
NJ (NAN) 2-13, 2-26, 2-31, 2-37 
Rathbun Lake, Chariton River, IA (NWK) 27-7, 
27-14, 27-20 
Ray Roberts Lake, TX (SWF) 39-10, 39-21, 39- 
26 
Raymondville Drain, TX (SWG) 40-20 
Raystown Lake, Raystown Branch, Juniata 
River, PA (NAB) 4-14, 4-30, 4-39 
Reconnaissance and Condition Surveys 
Baltimore District (NAB) 4-9 
Buffalo District (LRB) 20-11 
Charleston District (SAC) 7-6 
Chicago District (LRC) 22-9 
Detroit District (LRE) 21-38 
Galveston District (SWG) 40-15 
Honolulu District (POH) 31-2 
Mobile District (SAM) 10-17 
New York District (NAN) 2-14 
Philadelphia District (NAP) 3-16 
1-19

San Francisco District (SPN) 34-7 
Savannah District (SAS) 8-5 
Red River Basin Chloride Control, TX & OK 
(SWT) 38-4, 38-15, 38-24 
Red River below Denison Dam, levees and 
bank stabiliation (Vicksburg 
District) (MVK) 12-7, 12-14, 21- 
19 
Red River below Denison Dam (Vicksburg 
District) (MVK) 12-7, 12-10, 
12-14, 12-19, 12-20 
Red River Emergency Bank Protection (MVK) 
12-2, 12-9, 12-11 
Red River of the North, Fargo Public Facilities, 
ND (MVP) 16-10, 16-17, 16-20, 
16-30 
Red River-Waterway-Mississippi River to 
Shreveport, LA (MVK) 12-3, 12-9, 
12-11, 12-16, 12-20 
Red Rock Dam and Lake Red Rock, IA (MVR) 
15-5, 15-10, 15-13 
Redbank and Fancher Creeks, CA (SPK) 35- 
21, 35-42 
Redondo Beach Harbor (King Harbor), CA 
(SPL) 33-4, 33-13, 33-20, 33-27 
Regulatory Functions Program 
Buffalo, NY (LRB) 20-13 
Mobile District (SAM) 10-25 
St. Paul District (MVP) 16-13 
Regulatory Programs (NWK) 27-11, (NAB) 4-25 
Removal of Aquatic Growth from Navigable 
Waters in the State of Florida, 
(SAJ) 9-17, 9-46, 9-65, 9-89 
Research and Development 
Pittsburgh District (LRP) 18-14 
Sacramento District (SPK) 35-33 
Reservoirs at Headwaters of Mississippi River, 
MN (MVP) 16-2, 16-15, 16-19, 
16-28 
Restoration Work Under Special Authorization 
(SAJ) 9-39 
Richard B. Russell Dam and Lake, GA and SC 
(Formerly Trotters Shoals Lake, 
GA and SC) (SAS) 8-8, 8-12, 
8-19, 8-22 
Richmond Harbor (Deepening), CA (SPN) 34-4, 
34-16, 34-23 
Rillitoo River, AZ (SPL) 33-8, 33-15, 33-24 
Rio De La Plata, PR (SAJ) 9-34, 9-51, 9-78 
Rio Grande De Arecibo, PR (SAJ) 9-35, 9-51, 
9-78 
Rio Grande Floodway, NM (SPA) 36-7, 36-15, 
36-17, 36-18 
Rio Puerto Nuevo, PR (SAJ) 9-35, 9-51, 9-79 
Rio Salado, Phoenix Reach, AZ (SPL) 33-12 
Rio Salado, Tempe Reach, AZ (SPL) 33-12 
Rivers and Harbors Contributed Funds (SAS) 
8-10, (SAM) 10-26 
Roanoke River Basin, VA and NC (SAW) 6-15, 
6-35 
Roanoke River Upper Basin, VA Headwaters 
Area (SAW) 6-14, 6-23 
Robert Douglas Willis Hydropower, TX (SWF) 
39-14 
Robert F. Henry Lock and Dam, AL (SAM) 
10-23, 10-32, 10-47 
Robert S. Kerr Lock and Dam and Reservoir, 
OK (SWT) 38-13, 38-22, 38-26 
Rochester Harbor, NY (LRB) 20-9, 20-17, 
20-33, 20-44 
Rochester Harbor, NY (Wave Surge) (LRB) 20- 
12, 20-19 
Rochester, MN (MVP) 16-11, 16-17, 16-20 
Rockaway Beach at Lake Taneycomo Aquatic 
Habitat Restoration, MO (SWL) 
37-14 
Rocky River, OH (LRB) 20-9, 20-18, 20-34 
Rogue River Harbor at Gold Beach, OR (NWP) 
28-8, 28-31, 28-40 
Rollinson Channel, NC (SAW) 6-6, 6-22, 6-34 
Roseville, OH (LRH) 25-11, 25-19, 25-24, 25- 
30 
Rouge River, MI (LRE) 21-31, 21-67, 21-84, 
21-93 
Rough River Lake and Channel Improvement, 
KY (LRL) 24-12, 24-20 
Roughans Point, Revere, MA (NAE) 1-25, 1-39, 
1-49 
Rudee Inlet, VA (NAO) 5-11 
Russian River Basin including Dry Creek 
(Warm Springs Lake) and Lake 
Mendocino (Coyote Valley Dam), 
CA (SPK) 35-22, 35-43, 35-50, 
(SPN) 34-9, 34-17, 34-24, 34-27 
I-20

S 
Sabine-Neches Waterway, TX (SWG) 40-12, 
40-26, 40-41, 40-52, 40-57, 40- 
63 
Sabine-Neches Waterway, Texas Point 
National Wildlife Refuge, TX 
(SWG) 40-22, 40-28 
Sacramento River and Tributaries from 
Collinsville to Shasta Dam, CA 
(SPK) 35-23, 35-43, 35-50, 35-60 
Sacramento River, CA 35-2, 35-38, 35-49 
Sacramento River Deep Water Ship Channel, 
CA (SPK) 35-3, 35-38 
Sag Harbor, NY (NAN) 2-13, 2-26, 2-31, 2-37, 
2-41 
Saginaw River, MI (LRE) 21-32, 21-67, 21-71, 
21-84, 21-87, 21-93 
Salamonie Lake, IN (LRL) 24-12, 24-20 
Salem Harbor, MA (NAE) 1-12, 1-34, 1-47, 1- 
62, 1-72 
Salem River, NJ (NAP) 3-9, 3-22, 3-28 
Salt Creek and Tributaries, NE (NWO) 26-9, 
26-22, 26-29 
Salyersville, KY (LRL) 24-5, 24-17, 24-24 
Sam Rayburn Dam and Reservoir, TX (Dam 
Safety) (SWF) 39-13, 39-21 
Sammamish River Weir Restoration, WA 
(NWS) 29-13, 29-20, 29-27 
San Acacia to Bosque del Apache Unit, NM 
(SPA) 36-8, 36-15 
San Antonio Channel Improvement, TX (SWF) 
39-11, 39-21, 39-26 
San Diego Harbor, CA (SPL) 33-4, 33-14, 
33-20, 30-32 
San Diego River & Mission Bay, CA (SPL) 
33-5, 33-14, 33-21, 33-32 
San Francisco Bay and Delta Model, CA (SPN) 
34-6, 34-17 
San Francisco Bay Long Term Management 
Strategy (LTMS), CA (SPN) 34-6, 
34-17 
San Francisco Bay to Stockton, CA (John F. 
Baldwin and Stockton Ship 
Channels) (SPN) 34-4, 34-17 
San Francisco Bay to Stockton, CA (John F. 
Baldwin and Stockton Ship 
Channels), CA (SPK) 35-4, 35-38 
San Gabriel River, TX (SWF) 39-11, 39-22, 39- 
26 
San Joaquin River, CA (SPK) 35-4, 35-38, 35- 
58 
San Juan Harbor, PR (SAJ) 9-19, 9-46, 9-66 
San Lorenzo Creek, CA (SPK) 35-25, 38-43 
San Luis Rey River, CA (SPL) 33-9, 33-15, 
33-25 
San Pedro Creek, Pacifica, CA (SPN) 34-10, 
34-18, 34-24 
Sandusky Harbor, OH (LRB) 20-10, 20-18, 
20-34 
Sandy Hook to Barnegat Inlet, N.J. (NAN) 
2-18, 2-26, 2-34 
Santa Ana River Basin and Orange County, 
CA (SPL) 33-9, 33-15, 33-25, 33- 
31 
Santa Ana River Mainstem, CA (SPL) 33-8, 
33-15, 33-24 
Santa Barbara Harbor, CA (SPL) 33-5, 33-14, 
33-21, 33-32 
Santa Monica Breakwater, CA (SPL) 33-5, 33- 
14, 33-21 
Santa Paula Creek, CA (SPL) 33-9, 33-15, 
33-25 
Santa Rosa Dam and Lake, NM (SPA) 36-8, 
36-15 
Sarasota County, FL (SAJ) 9-29, 9-50, 9-75 
Sardis Lake, OK (SWT) 38-10, 38-20, 38-25 
Saugatuck Harbor and Kalamazoo River, MI 
(LRE) 21-34, 21-68, 21-85 
Saugus River, MA (NAE) 1-13, 1-35, 1-48 
Savannah Harbor, GA (SAS) 8-3, 8-11, 8-16 
Savannah River Below Augusta, GA (SAS) 8-5, 
8-11, 8-18 
Saw Mill Run, PA (LRP) 18-5, 18-15, 18-21 
Saxon Harbor, WI (LRE) 21-34, 21-68, 21-85 
Saylorville Lake, IA (MVR) 15-6, 15-10, 15-13 
Scappoose Drainage District, OR (NWP) 28-17, 
28-32, 28-43 
Scheduling Flood Control Reservoir 
Operations 
Albuquerque District (SPA) 36-10 
Baltimore District (NAB) 4-22 
Fort Worth District (SWF) 39-14 
Kansas City District (NWK) 27-8, 27-14 
Los Angeles District (SPL) 33-11 
Mobile District (SAM) 10-25 
Omaha District (NWO) 26-10, 26-23 
Portland District (NWP) 28-18 
Sacramento District (SPK) 35-31 
San Francisco District (SPN) 34-11 
1-21

Seattle District (NWS) 29-9 
Tulsa District (SWT) 38-12 
Walla Walla District (NWW) 30-4 
Wilmington District (SAW) 6-16 
Schuylkill River, PA (NAP) 3-10, 3-22, 3-29, 3- 
33 
Schuylkill River Park, Philadelphia, PA (NAP) 
3-16, 3-24, 3-32 
Sea Turtle Habitat Restoration, Oar Island, NC 
(CAP Section 1135) (SAW) 6-19, 
6-24 
Seattle Harbor, WA (NWS) 29-6, 29-18, 29-24 
Sebewaing River, MI (LRE) 21-35, 21-45, 21- 
68, 21-71, 21-85, 21-87 
Seekonk River, RI (NAE) 1-13, 1-35, 1-48 
Sepulveda Dam, CA (Recreation Development) 
(SPL) 33-9, 33-15, 33-23 
Sesuit Harbor, MA (NAE) 1-3, 1-35, 1-48, 1-72 
Shallow Creek, Baltimore, MD (NAB) 4-8, 4- 
28, 4-36 
Sheboygan Harbor, WI (LRE) 21-35, 21-68, 
21-85 
Shenango River Lake, Ohio River Basin, PA 
and OH (LRP) 18-10, 18-17, 18- 
23, 18-25 
Sheyenne River, ND (MVP) 16-11, 16-17, 16- 
20 
Shipyard River, SC (SAC) 7-6, 7-12, 7-19 
Shore Drive, Singleton Swash, Myrtle Beach, 
SC (SAC) 7-8, 7-13, 7-20 
Shore Protection Projection Under Special 
Authority 
Baltimore District (NAB) 4-10 
Charleston District (SAC) 7-7 
Portland District (NWP) 28-12 
Seattle District (NWS) 29-7 
Silver Lake Harbor, NC (SAW) 6-7, 6-22, 6-29, 
6-34 
Simmon Field Control Structure (MVM) 13-2, 
13-4 
Sims Bayou, TX (SWG) 40-20, 40-27, 40-46 
Sitka Harbor, AK (POA) 32-4, 32-10, 32-14, 
32-17 
Siuslaw River, OR (NWP) 28-8, 28-31, 28-40 
Skiatook Lake, OK (SWT) 38-10, 38-20, 38-25 
Skipanon Channel, OR (NWP) 28-9, 28-31, 
28-41 
Slack Water Harbor, Russellville, AR (SWL) 
37-16 
Smithville Lake, Little Platte River, MO (NWK) 
27-7, 27-14, 27-20 
Snake River Downstream from Johnson Bar 
Landing, OR, WA and ID (NWW) 
30-10, 30-14, 30-19 
Somerville Lake, TX (SWF) 39-12, 39-22, 39- 
27 
Sonoma Baylands Wetlands Demonstration 
Project (SPN) 34-5, 34-18, 34-23 
Souris River Basin, ND (MVP) 16-12, 16-18, 
16-21 
South Central Pennsylvania Environmental 
Improvement, PA (NAP) 3-17, 3- 
24, 3-32 (NAB) 4-24, 4-33, 4-40 
South Central Pennsylvania Environmental 
Restoration (LRP) 18-5, 18-15, 
18-21, (NAB) 4-15, 4-30, 4-39 
South Haven Harbor, MI (LRE) 21-36, 21-69, 
21-86 
South Main Channel, TX (SWG) 40-20 
South Platte River Basin, CO (NWO) 26-9, 26- 
29 
Southeast Louisiana Urban Drainage Project 
(MVN) 11-8, 11-14, 11-18 
Southeastern Pennsylvania, PA (NAP) 3-17, 3- 
24, 3-32 
Southern and Eastern, KY (LRL) 24-5, 24-17 
Southern New York Flood Control Projects 
(NAB) 4-15, 4-39 
Southern West Virginia (LRH) 25-11, 25-19, 
25-24 
Southwestern Jefferson County, KY (LRL) 
24-5, 24-17 
Spadra Creek, Clarksville, AR (SWL) 37-14 
St. Augustine Harbor, FL (SAJ) 9-18, 9-46, 9- 
65 
St. Clair River, MI (LRE) 21-33, 21-67, 21-84, 
21-93, 21-95 
St. Croix River, Stillwater, MN (MVP) 16-12, 
16-18, 16-21 
St. Genevieve, MO (MVS) 14-5, 14-10, 14-14 
St. George, AK (POA) 32-5, 32-11, 32-15 
St. John River Basin, ME (NAE) 1-26, 1-39, 1- 
50 
St. Johns County, FL (SAJ) 9-29, 9-49, 9-76 
St. Johns River, Jacksonville to Lake Harney, 
FL (SAJ) 9-18, 9-46, 9-65 
St. Joseph Harbor, MI (LRE) 21-33, 21-67, 
21-85 
1-22

St. Louis Harbor, MO and IL (MVS) 14-3, 
14-12, 14-23 
St. Lucie Inlet, FL (SAJ) 9-19, 9-46, 9-66 
St. Marys River, MI (LRE) 21-49, 21-71, 
21-87, 21-94 
St. Paul Island Harbor, AK (POA) 32-5, 32-11, 
32-15 
Stamford, CT (NAE) 1-26, 1-39 
Stillaguamish River, WA (NWS) 29-9, 29-19, 
29-25, 29-29 
Stillhouse Hollow Dam, TX (SWF) 39-12, 39- 
22, 39-27 
Stillwater Lake, Lackawanna River, PA (NAB) 
4-19, 4-32, 4-39 
Stockton Lake, Sac River, MO (NWK) 27-8, 
27-15, 27-21, 27-30 
Stonewall Jackson Lake, Ohio River Basin, 
WV (LRP) 18-11, 18-17, 18-23, 
18-25 
Streambank Erosion Under Special 
Authorization (SAC) 7-8 
Studies (SAJ) 9-37 
Sturgeon Bay and Lake Michigan Ship Canal, 
WI (LRE) 21-36, 21-69, 21-86 
Sturgeon Point, NY (LRB) 20-10, 20-18, 20-34 
Summersville Lake, Ohio River Basin, WV 
(LRH) 25-11, 25-19, 25-25 
Supervisor of New York Harbor (NAN) 2-13, 
2-26, 2-35 
Supervisor of Norfolk Harbor (Prevention of 
Obstructive & Injurious 
Deposits) (NAO) 5-11 
Surfside, Sunset and Newport Beach, CA (SPL) 
33-5, 33-14, 33-21 
Surry Mountain Lake, NH (NAE) 1-20, 1-37 
Surveillance of Northern Waters and 
International Water Studies 
(LRE) 21-46 
Surveys 
Alaska District (POA) 32-6 
Albuquerque District (SPA) 36-12 
Baltimore District (NAB) 4-25 
Chicago District (LRC) 22-16 
Detroit District (LRE) 21-51 
Fort Worth District (SWF) 39-16 
Galveston District (SWG) 40-22 
Honolulu District (POH) 31-3 
Huntington District (LRH) 25-14 
Jacksonville District (SAJ) 9-36 
Little Rock District (SWL) 37-13 
Los Angeles District (SPL) 33-11 
Louisville District (LRL) 24-15, 24-41 
Mobile District (SAM) 10-26 
Nashville District (LRN) 23-9 
New England Division (NAE) 1-30 
New York District (NAN) 2-24 
Philadelphia District (NAP) 3-19 
Pittsburgh District (LRP) 18-14 
Portland District (NWP) 28-27 
Rock Island District (MVR) 15-8 
Sacramento District (SPK) 35-32 
San Francisco District (SPN) 34-11 
Savannah District (SAS) 8-9 
Seattle District (NWS) 29-14 
St. Paul District (MVP) 16-14 
Tulsa District (SWT) 38-14 
Walla Walla District (NWW) 30-11 
Wilmington District (SAW) 6-20 
Susquehanna River Flood Control Projects, NY 
and PA (NAB) 4-19, 4-40 
Sutton Lake, Ohio River Basin, WV (LRH) 
25-11, 25-20, 25-25 
Sweetwater River, CA (SPL) 33-10, 33-15, 
33-25 
Swinomish Channel, WA (NWS) 29-6, 29-18, 
29-25 
T 
Table Rock Lake, MO (SWL) 37-12, 37-19, 37- 
29 
Tacoma, Puyallup River, WA (NWS) 29-10, 29- 
19, 29-26 
Tampa Harbor, FL (SAJ) 9-20, 9-47, 9-68 
Tangier Island, VA (NAO) 5-11 
Taylorsville Lake, KY (LRL) 24-3, 24-20 
Tenkiller Ferry Lake, OK (SWT) 38-14, 38-23, 
38-26 
Tennessee River, TN, AL & KY (LRN) 23-3, 23- 
10, 23-12, 23-18 
Tennessee-Tombigbee Waterway AL & MS 
(SAM) 10-15, 10-30, 10-39, 10- 
50, (LRN) 23-4, 23-10, 23-13 
Tennessee-Tombigbee Wildlife Mitigation, AL 
and MS (SAM) 10-16, 10-30, 
10-40 
Texas City Channel, TX (SWG) 40-12, 40-26, 
40-43, 40-53, 40-57 
Texas Flat Road, Kiln, MS (SAM) 10-19, 10-30, 
10-40 
I-23

Thames River Basin, CT, RI and MA (NAE) 
1-26, 1-53 
The Dalles Lock and Dam - Lacke Celilo, WA 
and OR (NWP) 28-24, 28-35, 
28-46, 28-59 
Thimble Shoals Channel, VA (NAO) 5-12 
Thomaston Dam, CT (NAE) 1-23, 1-38 
Thorton Creek, WA (NWS) 29-13, 29-20, 29-28 
Threemile Creek, Mobile, LA (SAM) 10-19, 
10-31 
Thurman to Hamburg, IA (NWO) 26-9, 26-22, 
26-29 
Tillamook Bay and Bar, OR (NWP) 28-9, 
28-32, 28-41 
Tioga-Hammond Lakes, PA (NAB) 4-20, 4-32 
Tionesta Lake, Ohio River Basin, PA (LRP) 
18-12, 18-17, 18-23, 18-25 
Toad Suck Ferry Lock and Dam (No. 8), AR 
(SWL) 37-5, 37-25 
Tolchester Channel, S-Turn, MD (NAB) 4-8, 4- 
28, 4-37 
Toledo Harbor, OH (LRB) 20-10, 20-18, 20-34 
Tom Jenkins Dam, Ohio River Basin, OH 
(LRH) 25-12, 25-19, 25-20, 25- 
25 
Tombigbee River (East Fork), MS & AL (SAM) 
10-19, 10-31 
Tombigbee River & Tributaries, MS & AL 
(SAM) 10-20, 10-31, 10-41 
Toronto Lake, KS (SWT) 38-11, 38-21, 38-25, 
38-28 
Touissaint River, OH (LRB) 20-11, 20-18, 20- 
44 
Town Bluff Dam-B.A. Steinhagen Lake, TX 39- 
16, 39-22 
Town Brook, Quincy and Braintree, MA (NAE) 
1-28, 1-40, 1-50 
Town Creek, SC (SAC) 7-6, 7-13, 7-19 
Townshend Lake, VT (NAE) 1-20, 1-37 
Trinidad Lake, CO (SPA) 36-9, 36-15 
Trinity River and Tributaries, TX (SWG) 40-13, 
40-26, 40-44, 40-53, 40-58 
Trinity River Project, TX (SWF) 39-3, 39-18 
Tropicana and Flamingo Washes, NV (SPL) 
33-10, 33-15, 33-26 
Tucson Diversion Channel (Recreation 
Development) (SPL) 33-10, 
33-15, 33-26 
Tug and Levisa Forks of the Big Sandy River 
and Cumberland River, WV, VA 
and KY (LRN) 23-6, 23-10 
Tully Lake, MA (NAE) 1-20, 1-37 
Tulsa and West Tulsa Levees, OK (SWT) 38- 
11, 38-21, 38-25 
Turkey Creek Basin, KS & MO (NWK) 27-7, 
27-14, 27-20 
Turkey Creek, Sumter County, SC (SAC) 7-8, 
7-13, 7-20 
Turning Basin #3, Seattl, WA (NWS) 29-13, 
29-21, 29-28 
Tuttle Creek Lake, Big Blue River, KS (NWK) 
27-7, 27-14, 27-20, 27-30 
Twitch Cove and Big Thorofare, MD (NAB) 4-8, 
4-28, 4-37 
Two Rivers Dam, NM (SPA) 36-10, 36-15 
Two Rivers Harbor, WI (LRE) 21-37, 21-69, 
21-86, 21-94 
Tybee Island, GA (SAS) 8-5, 8-11, 8-18 
U 
Umpqua River, OR (NWP) 28-10, 28-32, 28-41 
Unalaska Harbor, AK (POA) 32-5, 32-11, 32- 
15, 32-19 
Union City Dam, Ohio River Basin, PA (LRP) 
18-12, 18-17, 18-23, 18-25 
Union River, ME (NAE) 1-14, 1-35, 1-48 
Union Village Dam, VT (NAE) 1-20, 1-37 
Upper Gordon Creek, Hattiesburg, MS (SAM) 
10-20, 10-31, 10-41 
Upper Jordan, UT (SPK) 35-26, 35-43 
Upper Mississippi River Environmental 
Management Program (MVS) 
14-7 
Upper Mississippi River - Illinois Navigation 
Study (MVR) 15-3, 15-9, 15-13 
Upper Mississippi River System 
Environmental Management 
Program (UMRS-EMP), IL, IA, 
MN, MO, WI (MVR) 15-4, 15-9 
Upper Mississippi River System 
Environmental Management 
Program (UMRS-EMP)(MVP) 16-2 
I-24

V 
Van Bibber Creek, CO (MWO) 26-9, 26-22, 26- 
29 
Ventura Harbor, CA (SPL) 33-6, 33-14, 33-21, 
33-30, 33-32 
Vermilion Harbor, OH (LRB) 20-11, 20-18, 20- 
35 
Village Creek, Birmingham, AL (SAM) 10-20, 
10-31, 10-41 
Virginia Beach, VA (Hurricane Protection) 
(NAO) 5-14 
Virginia Beach, VA (Reimbursement) (NAO) 
5-14 
W 
W. Kerr Scott Dam and Reservoir, NC (SAW) 
6-15, 6-23 
W.R. Grace, Curtis Bay, MD (NAB) 4-26 
WV and PA Flood Control (NAB) 4-15, 4-30, 4- 
39 
Wabash River, New Harmony, IN (LRL) 24-6, 
24-17, 24-23 
Wabash River Basin (LRL) 24-13, 24-36 
Waco Lake, TX (SWF) 39-13, 39-22, 39-27 
Waco Lake, TX (Safety Dam) (SWF) 39-13, 39- 
23, 39-27 
Wallisville Lake, TX (SWG) 40-14 
Walnut Creek, CA (SPK) 35-27, 35-44 
Walter F. George Lock and Dam, AL & GA 
(SAM) 10-24, 10-32, 10-48 
Washington Aqueduct (NAB) 4-25 
Washington Harbor, DC (NAB) 4-9, 4-28, 4-37 
Waterway Connecting Pamlico Sound and 
Beaufort Harbor, NC (SAW) 6-7, 
6-22, 6-29 
Waterway on the Coast of VA (NAO) 5-12 
Waukegan Harbor, IL (LRC) 22-8, 22-18, 
22-24, 22-27 
Waurika Lake, OK (SWT) 38-11, 38-21, 38-26 
Webbers Falls Lock and Dam, OK (SWT) 
38-14, 38-23, 38-26, 38-29 
Wehrspann Lake Aquatic (NWO) 26-13, 26-24, 
26-30, 26-47 
Wells Harbor, ME (NAE) 1-14, 1-35, 1-48 
West Agurs, LA, Levee (MVK) 12-7 
West Bank of the Mississippi River, Vicinity of 
New Orleans, LA (MVN) 11-9, 11- 
14, 11-18 
West Branch of Susquehanna River, PA (NAB) 
4-20, 4-40 
West Columbus, OH (LRH) 25-12, 25-20, 
25-25, 25-30 
West Des Moines, IA (MVR) 5-6, 5-10, 5-13 
West Fork of Mill Creek Lake, OH (LRL) 24-13, 
24-20 
West Hill Dam, MA (NAE) 1-16, 1-36 
West Point Lake, Chattahoochee River Basin, 
AL & GA (SAM) 10-24, 10-32, 
10-42 
West Sacramento, CA (SPK) 35-28, 35-44, 35- 
48 
West Thompson Lake, CT (NAE) 1-27, 1-40 
West Virginia and Pennsylvania Flood Control 
(LRP) 18-6 
Westville Lake, MA (NAE) 1-27, 1-40 
Wetland and Other Aquatic Habitat Creation 
Under Special Authorization (SAJ) 9-39, 
(NAP) 3-19 
White Lake Harbor, MI (LRE) 21-37, 21-70, 
21-86 
White River Basin (Little Rock District, AR & 
MO) (SWL) 37-8, 37-17, 37-21, 
37-29 
White River, Batesville, AR (SWL) 37-8, 37-18, 
37-24 
White River, IN (LRL) 24-6, 24-17, 24-26 
White River, Indianapolis Central Waterfront, 
IN (LRL) 24-6, 24-17, 24-26 
White River, Jacksonport, AR (SWL) 37-9, 37- 
18, 37-22, 37-24 
White River to Newport, AR (MVM) 13-3, 13-4 
Whitefish Point Harbor, MI (LRE) 21-38, 21- 
70, 21-86 
Whitlow Ranch Dam, Queen Creek, AZ (SPL) 
33-10, 33-16, 33-26 
Whitney Lake, TX (SWF) 39-16, 39-23 
Whitney Point Lake, NY (NAB) 4-19, 4-31 
Whitney Point Village, NY (NAB) 4-19, 4-32 
Wicomico River, MD (NAB) 4-9, 4-28, 4-37 
Wildcat and San Pablo Creeks, CA, (SPK) 
35-29, 35-44 
Willamette River at Willamette Falls, OR (NWP) 
28-10, 28-32, 28-41 
Willamette River Basin Bank Protection, OR 
(NWP) 28-17, 28-32, 28-43 
Willamette River Temperature Control, OR 
(NWP) 28-26, 28-35, 28-46 
I-25

Willapa River and Harbor and Naselle River, 
WA (NWS) 29-7, 29-18, 29-25 Z 
Willapa River, Raymond, WA (NWS) 29-10 
William H. Harsha Lake, OH (LRL) 24-14, No entries 
24-20 
Williamsport Hagerman's Flume (NAB) 4-14, 
4-30, 4-39 
Willow Creek Lake, Heppner, OR (NWP) 28-17, 
28-34, 28-43 
Wilmington Harbor, DE (NAP) 3-10, 3-22, 3-29 
Wilmington Harbor, NC (SAW) 6-9, 6-22 
Wilson Harbor, NY (LRB) 20-11, 20-19, 20-35 
Wilson Lake, Saline River, KS (NWK) 27-8, 27- 
14, 27-20, 27-30 
Winfield, KS (SWT) 38-11, 38-21, 38-26 
Winter Harbor, VA (NAO) 5-15 
Wister Lake, OK (SWT) 38-11, 38-21, 38-26, 
38-28 
Wolf Creek Dam - Lake Cumberland, Ohio 
River Basin, KY (LRN) 23-8, 
23-10 
Wood River, Grand Island, NE (NOW) 26-9, 
26-22, 26-29 
Woodcock Creek Lake, Ohio River Basin, PA 
(LRP) 18-12, 18-17, 18-23, 18-25 
Woodmont Beach, Milford, CT (NAE) 1-15, 1- 
35, 1-49 
Work Under Continuing Authority Program 
(NAO) 5-13 
Work Under Special Authorization (SWF) 39- 
14, 39-31, (MVM) 13-2 
Wright Patman Dam and Lake, TX (SWF) 39- 
13, 39-23, 39-28 
Wrightsville Beach, NC (SAW) 6-14, 6-23 
Wyoming Valley, PA (Levee Raising) (NAB) 4- 
21, 4-32, 4-40 
Y 
Yadkin River Basin, NC and SC (SAW) 6-14 
Yaquina Bay and Harbor, OR (NWP) 28-11, 
28-32, 28-42 
Yaquina River, OR (NWP) 28-12, 28-32, 28-42 
Yatesville Lake, KY (LRH) 25-12, 25-20, 25-25 
York, Indian Rock Dam, PA (NAB) 4-22, 4-33, 
4-40 
Youghiogheny River Lake, Ohio River Basin, 
PA and MD (LRP) 18-13, 18-17, 
18-23, 18-25, 18-28 
York River, VA (NAO) 5-13 
I-26

